Loading...
221 ESSEX STREET- THE GATHERING, DIGITAL IMAGING EGRESS DOOR 22I �sscx St -(�n2 C-� aFkzr'� r1g Salem Redevelopment Authority SALEM REDEVELOPMENT AUTHORITY DECISION July 11, 2007 The Gathering and Digital Imaging (221 Essex Street) — Rear egress door SRA DECISION: At their meeting on July 11, 2007, the SRA voted to approve the DRB Recommendation for the proposed egress door located at the rear of 221 Essex Street. RECOMMENDATION: At their meeting on June 27, 2007, the DRB recommended approval of the proposed egress door with the condition that the selected brick be reviewed on- site with a DRB member prior to installation. PROPOSAL: The proposal includes the installation of an egress door at the rear of 221 Essex Street. This door will serve as a second means of egress for The Gathering (221 Essex Street) and Digital Imaging (217 Essex Street) as required by MA State Building code. The proposed exit is adjacent to Derby Square. The proposed door is a black painted metal panel door with brick infill at each side of the door opening. Salem ® Redevelopment Authority DESIGN REVIEW BOARD RECOMMENDATION June 27, 2007 The Gathering and Digital Imaging (221 Essex Street) — Rear egress door RECOMMENDATION: At their meeting on June 27, 2007, the DRB recommended approval of the proposed egress door with the condition that the selected brick be reviewed on- site with a DRB member prior to installation. PROPOSAL: The proposal includes the installation of an egress door at the rear of 221 Essex Street. This door will serve as a second means of egress for The Gathering (221 Essex Street) and Digital Imaging (217 Essex Street) as required by MA State Building code. The proposed exit is adjacent to Derby Square. The proposed door is a black painted metal panel door with brick infill at each side of the door opening. i • r— Concrete cap I Metal Door Brick infill Photo w/ Proposed Egress Door Egress Compliance (Proposed Rear Exit) 217/221 Essex Street, Salem, MA Date: May 31, 2007 SRA comments-revised: 6/21/07 John A. Seger Architects, Inc. 9A Derby Square, Salem, MA DRB comments-revised: 7/2/07 rs Salem ® Redevelopment Authority DESIGN REVIEW BOARD PROPOSAL June 27, 2007 The Gathering and Digital Imaging (221 Essex Street) — Rear egress door PROPOSAL: The proposal includes the installation of an egress door at the rear of 221 Essex Street. This door will serve as a second means of egress for The Gathering (221 Essex Street) and Digital Imaging (217 Essex Street) as required by MA State Building code. The proposed exit is adjacent to Derby Square. The proposed door is a black painted metal panel door with brick infill at each side of the door opening. JOTIN A . SEGER ARCI-IITECT , INC . DFSIG is / PLAN KING / NIA NAGEM E_NT May 31, 2007 Salem Design Review Board Salem City Hall Annex 120 Washington Street Salem, MA 01970 Re: 221 Essex Street-Egress Door Dear Board Members; I am providing the attached submittal on behalf of my client Park Towers Management, the owner of the existing buildings located on 217 and 221 Essex Street, for your review, We are proposing to Install a new exterior door to accommodate a second "means of egress" located on the first floor at the back alley of 221 Essex Street. 1 was initially hire by Tom Carpi of Park Towers Management Co. to provide an analysis of the "means of egress" for the existing buildings at the request of Joseph Barbeau, the Building Inspector for the City of Salem. Our findings determined a second exit for the first floor is needed in order to meet current egress requirements per the MA State Building Code. The attached submittal includes a proposed design providing the second means of egress with an internal half stair, stair landing, and exterior exit door, A portion of an existing brick wall and granite header will need to be removed in order to install a new door. The door will be a metal panel door used for egress only and will be painted black to match the adjacent door and metal work. Brick infill to either side of the jamb will match the adjacent brick. Please feel free to contact me at 978-745-4404 with any questions. Sincerely; John A. Seger I I I INi ,ii aft, . I I II :..I i �I. ,�, 'i-I 1_ "'N.'a' 4 4 1 1 P.7J Ff k,1 1V A1I At h y� 4 I } Existing Photo: Backof Building Egress Compliance (Proposed 4 `I ! I 1 y I Existing Photo: Back of Building Egress Compliance (Proposed Rear Exit) 217/221 Essex Street, Salem, MA John A. Seger Architects, Inc. 9A Derby Square, Salem, MA Date: May 31, 2007 ketal panel M ¢ � w Photo w/ Proposed Egress Door Egress Compliance (Proposed Rear Exit) 217/221 Essex Street, Salem, MA Date: May 31, 2007 John A. Seger Architects, Inc. 9A Derby Square, Salem, MA Revised 6/21/07 BLDG,#221 STREET o aaa E55E X N { -_ BLDG.#217 w --'`� �ssex5T ` 221 217 I � II 0 1=0 • I � � EXTENT OF WORK NO 8IDn I O i O BU51NE55 U5E 1 Digital Imac]Ing, Inc. WF O O -- — 1 CHURCH i FnaPosEn ewcss noon ® ` (FUTURE 5PRINKER SYSTEM) ao roxN NALL I a� ass 0 ON • b� I O O 0 8HI I EXTENT OF HORK I I 4 c ❑ KEY PLAN � I ST.Flims L'CGR —• EXISTING EGRESS a. O PROPOSED WORK PROPOSED EGRESS I I PRa+oSEo ON EBRE55 5TAIR / \ I 0 \ REGE55FD INFILL METAL PANEL BLDG.#217 � �'EEREESomR BLDG. #221 + snlroT PROPOSED REM EGRESS REVISION DATE: ISSUE: JOHN A. SEGER ARCHITECTS FIRST FLOOR PLAN 1� 9A DERBY SQUARE, SALEM, MA 2171221 ESSEX STREET, SALEM, MA „ Salem ® Redevelopment Authority MEMORANDUM TO: Members of the Salem Redevelopment Authority FROM: Kirsten Kinzer, CDBG Planner SUBJECT: 217 and 221 Essex Street egress door DATE: June 7, 2007 CC: Lynn G. Duncan, Executive Director Attached please find information regarding the proposed egress door at the rear of 221 Essex Street. This door will serve as a second means of egress for The Gathering (221 Essex Street) and Digital Imaging (217 Essex Street) as required by MA State Building code. The applicant has proposed a new exit door at the tear of the building, adjacent to Derby Square. Please feel free to contact me at (978) 619-5685 or kkinzer@salem.com should you have any questions or concerns regarding this matter. I ( ) I I N \ I: t l f 12 1 R t III 'I' f t' '1' . IN ( May 31, 2007 Salem Redevelopment Authority Salem City Hall Annex 120 Washington Street Salem, MA 01970 Re: 221 Essex Street-Egress Door Dear Members; I am providing the attached submittal on behalf of my client Park Towers Management, the owner of the existing buildings located at 217 and 221 Essex Street for your review and approval, We are proposing to install a new exterior door to accommodate a second "means of egress" located on the first floor at the back alley of 221 Essex Street. I was initially hire by Tom Carpi of Park Towers Management Co. to provide an analysis of the "means of egress" for the existing buildings at the request of Joseph Barbeau, the Building Inspector for the City of Salem. Our findings determined a second exit for the first floor is needed in order to meet current egress requirements per the MA State Building Code. The attached submittal includes a proposed design providing the second means of egress with an internal half stair, stair landing, and exterior exit door. A portion of an existing brick wall and granite header will need to be removed in order to install a new door. The door will be a metal panel door used for egress only and will be painted black to match the adjacent door and metal work. Brick Infill to either side of the door jambs will match the adjacent brick. Please feel free to contact me at 978-745-4404 with any questions. Sindf John A, Seger, RA r - 1 Existing Photo: Back of Building Egress Compliance (Proposed Rear Exit) 217/221 Essex Street, Salem, MA John A Seger Architects, Inc. 9A Derby Square, Salem, MA Date: May 31 , 2007 I . M t � Existing Photo; Back of Building Egress Compliance (Proposed Rear Exit) 217/221 Essex Street, Salem, MA John A. Seger Architects, Inc 9A Derby Square, Salem, MA Date; May 31 , 2007 s F. Y „ r I' Metal Panel Door i Brick Infill k Photo w/ Proposed Egress Door Egress Compliance (Proposed Rear Exit) 217/221 Essex Street, Salem, MA John A. Seger Architects, Inc. 9A Derby Square, Salem, MA Date: May 31 , 2007 BLDG.#221 XTREET -- EESEBLDG.#217#217 ^ -J ESSEX 51 F_= 221 217 I n aH� O t N ❑ O Rte. • I - E%TENT OF WORK No a®� O / _ T BUSINE55 USE n O 1 Digital Imaging, Inc. UP L� ^ I 0 GHURGH 1 PROPOKO[aresS DOOR 1 (FUTURE 5PRINKER 5YSTEM) ♦♦ _ iI dD TOW XNL I 7--L HataonO IO EXTENT OF WORK I I ❑ KEY PLAN � I 5T.FlRE DAN'R —• EXISTING EGRESS ON -- 0 PROPOSED WORK a I PROPOSED EGRESS NO 0 o I I 1 I pRbP05ED I p ON K-+KESS STAIR / \ I —-I \ PROPOSED E DOOR BLDG.#217 \ BLDG.#221 1 5131107 PROPOSED REAR EGRESS REVISION DATE: ISSUE: JOHN A. SEGER ARCHITECTS FIRST FLOOR PLAN 9A DERBY SQUARE, SALEM, MA 217/221 ESSEX STREET, SALEM, MA