Salem Redevelopment Authority Decision
December 9, 2015
217 Essex Street: Discussion and vote on proposed revisions to Verizon rooftop
wireless antennae installation
SRA Decision
At its meeting on December 9, 2015, the SRA voted unanimously (3-0) to
approve the proposed the installation of wireless antennas on the roof of
217 Essex Street, as recommended by the Design Review Board, and as
shown in photo simulations and plans submitted to the SRA dated
November 10, 2015. Approval is conditional upon the following:
• The faux chimney shall be set back 4 inches from the parapet;
• the balustrade shall be designed and constructed in such a way as to
match the existing balustrade on the back of the building; and
• that the language in the SRA decision from July 9, 2014 regarding
installation of gas run-ups shall remain in force:
• "...the proposed vertical gas run-up to be installed on the wall of
the south facing elevation shall be painted to resemble the
building's shade, and will be installed at or as close to the seam
If
of the two buildings as possible."
Recommendation
At its meeting on November 17, 2015 the DRB unanimously voted to recommend
approval of the proposed rooftop wireless antennae installation subject to the
following:
• The faux chimney shall be set back 4-6 inches from the parapet,
• the balustrade shall be designed and constructed in such a way as to match
the existing balustrade on the back of the building, and
• that the language in the decision from July 9, 2014 regarding installation of
gas run-ups shall remain in force:
• "...the proposed vertical gas run-up to be installed on the wall of the south
facing elevation shall be painted to resemble the building's shade, and will
be installed at or as close to the seam of the two buildings as possible."
Proposal
Last year, the DRB recommended approval of a wireless antenna installation atop
the roof at 217 Essex Street. The installation would expose three to four antennas
, I
Salem
® Redevelopment
Authority
and they would be supported by steel braces, conditional upon the antennas being
painted warm grey to match the steel braces, and that the braces were lowered as
much as possible so as to be as inconspicuous as possible. The recommendation
was subsequently approved by the SRA.
The applicant is returning to the boards to revise its proposal. The applicant seeks to
shelter the antennas in a 12 ft. high faux fiberglass chimney made to look like the
same brick used on the building, to be installed at the southwest corner of the roof.
Each side would be 5'10" in width.
A white balustrade would be constructed at the roofline to screen mechanicals and
other roof elements. It would meet the chimney's edge.
Enclosed is a cover letter, plans, and photo simulations of the proposed project.
Staff Comments
The applicant was compelled to revise its project because the City's Historical
Commission recommended the use of a faux chimney when this project was
originally proposed. The DRB rejected the faux chimney that was proposed for the
original project. The Massachusetts Historical Commission (MHC) is compelling the
applicant to have a project that is approved by all local Boards.
The project that is before you now is a result of conversations between a select group
of DRB and Historical Commission members who agreed that the use of an
appropriately sited and constructed faux chimney, with a balustrade, could be
acceptable.
The Historical Commission on Wednesday, November 4th approved of the project as
it is now being presented to the SRA.
THOMAS W.HILDRETH
C LANE Direct Dial 603.lme. om
Email:thomas.hildreth@mclaoe.com
900 Elm Street,P.O.Boz 326
M I DD LETON Manchester,NH 03105-0326
T 603.625.6464
F 603.625.5650
November 30, 2015
Robert Mitnik, Chair
Salem Redevelopment Authority("SRA")
Salem City Hall
93 Washington Street
Salem, MA 01970
Re: Verizon Wireless ("VzW") Rooftop Installation at 217 Essex Street
Dear Chairman Mitnik & Honorable Members of the SRA:
The purpose of this letter is to deliver to you the most recent copies of VzW's plans and photo
simulations to share with your SRA colleagues in relation to the proposed communications
facility at 217 Essex Street. This letter is being provided in advance of your December 9th
meeting for final review of this project.
In support of VzW's proposal, enclosed please find:
• Six (6) 11" x 17"copies of our updated plans (revised as of November 10, 2015)
• Six (6) copies of our updated photo simulations (revised as of November 11, 2015)
Since the spring of 2014, VzW has been in communication with the SRA, as well as the Salem
Historical Commission ("SHC"), the Design Review Board ("DRB"), and the Massachusetts
Historical Commission ("MHC"), regarding the proposed rooftop antenna installation at 217
Essex Street. The parties have grappled over several different proposals, including the
installation VzW's antennas within a faux chimney, as well as a"naked" installation with the
antennas painted to match the existing elements of the rooftop.
As of August 2015, MHC has suggested a compromise plan whereby VzW would construct a
smaller faux chimney than called for in the original plans that were reviewed by the SRA in July
2014. Since then, VzW has been working with its engineering team to modify its site design to
incorporate a less conspicuous chimney enclosure, resituated and repositioned to complement the
historical features of the rooftop aesthetic. The enclosed plans and photo simulations reflect the
most recent iteration of these evolving modifications as suggested by the SHC at its November
4th meeting, which have been approved by the DRB as of its November 17th meeting, and which
now come before the SRA for final review and approval.
McLane Middleton,Professional Association
Manchester,Concord,Portsmouth,NH I Woburn,MA
MCLane.coni
Salem Redevelopment Authority
November 30, 2015
Page 2
As previously noted, VzW's project is in complete harmony with the purposes and objectives of
the Salem Downtown Renewal Plan (the"Plan") in that increased wireless communications
promotes the"health, safety general welfare and amenity of the City and its people." Enhanced
wireless communications can also be deemed to satisfy the Plan's goal of providing"new and
expanded residential and non-residential opportunities, services, facilities and amenities." With
increased reliance on wireless technologies by both businesses and individuals, this project
directly serves and benefits this objective by providing state-of-the-art enhanced wireless
communications to the City of Salem. This installation supports economic development and
enhances Salem's wireless connectivity thereby benefitting residents, business owners, tourists
and public safety personnel.
The physical attributes of the installation are also harmonious with the stated Plan goal to
"preserve...historic architecture and resources." VzW has worked diligently with the above
mentioned authorities, seeking their respective input at all stages of review to minimize the
visual impact of the project and to avoid "blighting factors," the culmination of which work
comes before you for review at the December 9th meeting.
Should you have any questions of concerns, feel free to contact me.
Tnerly yours,
Thomas W. Hildreth
TWH:bsl
ec. R. Enright, VzW
S. Arena, EBI
C. Webberly, SCG
96219\9931759
Salem 5 - 217 Essex St., Salem, MA
View from South verimW
Proposed Design 400 FRIBERG PARKWAY
WESTBOROUGH, MA 01581
L
lamb:-
IN
Salem 5 - 217 Essex St., Salem, MA
BSView from South verimW
Existing Condition 400 FRIBERG PARKWAY
WESTBOROUGH, MA 01581
z
0
0
cr
F-
cn
z
0
0
cc
u-
VerI2 On wireless
SALEM 5 MA
217 ESSEX STREET
SALEM, MA 01970
CONSULTANT TEAM PROJECT SUMMARY SHEET INDEX
SHT.
SITE NAME: SALEM 5 MA NO. DESCRIPTION
PROJECT ENGINEER SITE ADDRESS: 217 ESSEX STREET T-I TITLE SHEET
SALEM. WA 0197D - --- --
C-1 RADIUS PLAN
HUDSON DESIGN CROUP LUC APPLICANT: VERIZON WIRELESS A-1 BASEMENT PLAN ------
1600 OSGOOD STREET 400 FRIEBERG PARKWAY A-2 ROOF PLAN
BUILDING 20 NORTH. SUITE 3090 WESTBOROUGH. MA 01581
N. ANDOVER, MA 01845 A-3 ELEVATION
TEL 1-?78 557-5553 ZONING DISIRICT: 85 (CENTRAL DEVELOPMENT)
FAX: I- 978�-336-5586 A-4 EQUIPMENT ROOM PLAN
ZONING JURISDICTION: CITY OF SALEM, MA A-5 EQUIPMENT ROOM RCP & SECTION 1-
MEP ENGINEER A-6 EQUIPMENT ROOM DETAILS
LATITUDE N 42' 31' 16,7"
A-7 DETAILS t� T 2
CS, ENGINEERING, LLC SN-1 STRUCTURAL NOTES
999 BROADWAY LONGTUDE., W 70* 53' 41,1" 15
SUITE 206 S-I ALPHA ANTENNA DETAILS .1
SAUGUS. MA 01906 PARCEL ID: 25-0251 S-2 STRUCTURAL PLANS 9 g
TEL: 1-(781)-233-4808 -
FAX: 1-(781)-233-4848 S-3 ANTENNA STRUCTURAL SECTION
S-4 ANTENNA STRUCTURAL DETAILS
PROPERTY OWNER: PARK TOWERS V. E.L.C.
KTA ATT: PETER BOHLIN S-5 ANTENNA STRUCTURAL DETAILS
100 WASHINGTON ST STE 11 S-5 GENERATOR STRUCTURAL SECTIONS
SALEM. MA 01970 S-7 GENERATOR STRUCTURAL DETAILS
�RECTIQN5 TO SITE, 12 8 2 -
FROM WESTBOROUGH DEPART FRIBERG PKWY FP-1 FM200 PLANS
WESTBOROUGH BUSINESS P-1 PLUMBING GAS PLANS
PARK TOWARD RESEARCH OR
TURN LEFT ONTO RESEARCH OR P-2 PLUMBING DETAILS
TAKE RAMP RIGHT FOR RT-9 E / TURNPIKE RD M-1 MECHANICAL PLAN, NOTES & DETAILS
TAKE RAMP RIGHT FOR 1-90 EAST TOWARD BOSTON E-1 ELECTRICAL DETAILS
AT EXIT 14. TAKE RAMP RIGHT FOR 1-95 NORTH TOWARD
WALTHAM / PORTSMOUTH NH E-2 UTILITY & GROUNDING PLAN
KEEP LEFT ONTO RT-128 N E-3 GROUNDING DETAILS 4-
AT EXIT 25A. TAKE RAMP RIGHT FOR RT-114 EAST -4 TRAY GROUNDING & DETAILS IV"
TOWARD WEST PEABODY
BEAR RIGHT ONTO Rt-114 / ANDOVER ST RF-I RIF COLOR CODE
BEAR RIGHT ONTO CENTRAL ST RF-2 RIF ANTENNA DESIGN
TURN LEFT ONTO MAIN ST PEABODY SO RF-3 RIF ANTENNA DESIGN
TURN LEFT ONTO RT_107 BRIDGE ST
BEAR RIGHT. AND THEN BEAR RIGHT ONTO WASHINGTON ST
ARRIVE AT 217 ESSEX ST. SALEM. MA 0197 217 ESSEX STREET
DIG SAFE SALEM, MA 01970
3 WORKING DAYS
BEFORE YOU DIG Tmi
CALL TOLL FREE 888—DIG—SAFE
UNDERGROUND SERVICE ALERT
>
z
WASBINGTON ST
in�
L
P
0 Pl OX0,il
�z
LAL
DERBY SQ
m T
CENTRAI ST
p
'124t
Is
<
z
Om
zm
0
mm
80
0
z-
0
z m 0
z
z
0- m 0 0
C
0 z m
Z,
z
c
mown
m
m m .0':' m
. 1 0 0 00
c 0 2 , c I m
I in MD '0 A
m M K
>
>
0 z �-02 0 0
moo-mo
> 0 0 w
Z z>m m
-Z z x
0 Z m 0
z z z z z si I 1 0 �, o v m5 Om 8 0 0
PH z
>
c z m �3 Z-01 Oz no R X-zc Op 5�
s' z -2> 'I
z 0 q 0 0 0 z
s, m
m Ml 8 T
> 0 m
m mom
0 0
0
z m m z z Z.
m �rri.z �,O
0 Z I mp
m �j X,, i�� Ilz
x 0
0
c Kc 10
Z
m c 0 c m v).
>
z I z
0 0
0>0
z %0
ss
n
m
FOR CONSTRUCTIO
RADIUS PLAN PREPMED BY. "L��R�u �fiq
mn KKMPMN BY �js,, D
SM FO
2li MC)FO CMSTRM m Op
Hudson
G,Oup,,
Design
NS a PH WOMMwireless
"10//28/15 RMSED OYSERCLASS ClMs,
a (),H
78 x R�O nm�s cHniNly
H
T R E z In
X ---------------------- 0
--------------
F-
----------------------------------
F-
z
0
cc
0
LL
OAz PROPOSED POWER &
TELCO UTILITY CONDUIT
FROM EXISTING TO
0 PROPOSED EOUIPMENII�
ROOM
z
mg
RCP
PROPOSED VERTICAL
CABLE RUN
PROPOSED VERTICAL r
CONDENSER UTILITY
LIU
------------- --------
-———————————————— ————————— (ZI
m
'XISTING I' THI-K A'TFP
p
B,EARING WALLS (Ty R In e
4�
G
- - ------------ - - — -------- --------- —EXISTING ROOF OVERHANG (TYP.)
'---�EXISTING ACCESS DOOR --'Sn
(GROUND LEVEL) l';17 SEX�STREET
EXISTING GAS METER SALEM, MA 01970
PROPOSED GAS METER (GROUND LEVEL)
A(� PROPOSED VERTICAL GAS RISER ON
OUTSIDE WALL OF EXISTING BUILDING
(PANTED TO MATCH BRICK)
SITE COORDINATFq: Aml
N BASEMENT PLAN@ CRAEHIC SCAL
2'-8*5-4' 10*-8, �6-0, EATITUDE: N 42' 31' 16.7"
SCALE 3/lb �1 -0 LONGITUDE: W 70' 53' 41.1"
M �om ZIM M-Z�x
0 .0 0 .0 ovin _0
TO a , I M�,
"'Do 0 -,1
2 4 cc 0 z OM
pq M--
X�o
MC,M TO-
0
'j'A P90
0�0*w !�
8 8z -
�z >M-
0,
H I G G I N S 0 N IS 0 U A R E
>0
>
x
z
52-
cx on MM MM 28MM 8 Mo 8S.- Z>
Zzo 0
-2, K-om -M
A
'o 0 — 3
Z� M. jA OP- go 0� �0 0-Z, 7 Z�, 7,�
A EM
t 10 cz 0, 0 'a N z Mo �0 0M 'H
406k�� 2>
< < —0
I cm I
sc M on 00- 2 Z>
c M
0 M Z,.-
0 z
0 g M AF > c 00 M
z
0
MOMCV -U,M UUM >M
0
z C, LA
o a
8 O�0-1 o Z
F A
.0
n 0
0
�C
---------- ------ -- -----
JERA T�IN BIE IRAI
PARAPET Lu DATEAPET
OC z
-OM
ozz OZ AM MM
om 'D 0�
0 'o
> Lj
o 0 "0
no \<
,0<
I ASM
x
CTE z 0 1, 1 L
WX *::L"
C .1
,ZM Z
1 2
,I. U`- mm A
DI" 0 - �I EX[STING CURB (TYP.)
c 0M ,,,U` M,==�—
M40 4,3
A
'40
ZS
z
'M
M, 0
00
MZ
zi 00
----- --------!-----------
m DOM m
MFTM M
OM
01 A ov UI
M
0 E
z y
S u A R
0 g E
I MON,
0 c c:E
I z 1 0,
x >
0 -
z "u
10
2 bo
0 n
TO >
0
Z
z
M<
Z, 01012601>z
MCI, Z
`D� 0,A
C 6.
C" qN,
.MUT,
,M"x
>
FOR CONSTRUCTION
ROOF PLAN PREPARED BY: PREPARED FOR
DESCRIPTION _R.K OPO
0/12/14 ISSUED FOR RV,n� VS Jx DPH
.N� V DAFT
0 Hudson
"A DesignGfoupuc
>X A 1 09 2/15 ISSUED FOR CONSTRUCTION VS ix DPH
�2 ,0/28/v, REVISED FISERCUIGS CHIUNEY NS A DP. VWIM wireless
3 /1./,5 REVISED FIBERCUSS CHIMNEY NS JX DPH
0-
D
TOP OF HIGHEST APPURTENANCE 11 U)
TOP !�F EX!SPI�LO ANTENNAS) PROPOSED ANTENNA INFORIVIATION� 0
ELEV. 0_O , fZL)
(AMSQ P:
SECTOR STATUS AZIMUTH CABLELENGTH
ft OF PROPOSED ANTENNAS
BETA & GAMMA SECTOR) �-PROPOSED 6'-6".6'-6'. 12' -HIGH I PROPOSED 65' 300'
_4t_tV7_-__bT-_S—± (AG-LT-- FIBERGLASS ENCLOSURE TO MATCH EXISTING EXISTING ANTENNAS cr
280*
FACADE ON PROPOSED STEEL FRAME (BY OTHERS) 2 PROPOSED 2W
107'-3-± (AMS1.) PROPOSED ANTENNA PER 'RF'
PROPOSED ANTENNA, RRH, & JUNCTION BOX OWGS MOUNTED TO PENTHOUSE 3 PROPOSED 3w 280' U)
O� EXaST P / z
G PFNT-OU�� ER 'RF' DWGS IN PROPOSED ENCLOSURE
LE 2 _Nh FACADE & PAJNTEO TO MATCH NQM' CABLE LENGTH EXACT LENGTH PLUS 25
ib 0�� ,I-,- (TYP. BETA & GAMMA SECTORS) EXISTING (TYP. OF ALPHA SECTOR) 0
104'-O-t (AMSL) I\_ EXISTING ANTENNAS BY OTHERS
TOP OF PROPOSED (TYP.)
FIBERGLASS STEALTH CHIMNEY C-L._QF PROtCLSED ALPHA ANTENKLA4 x
offK �_8-0-_0-T_FAGL)_ ELEV. - 81'-O-t (AGL)
102'-O"± (AMSLI 103-0-± (AMI 0
EXISTING PENTHOUSE (TYP.. I
(j OF PROPOSED ANTENNAS I PROPOSED GPS ANTENNA LL
(BETA & GAMMA SECTOR) a
99'-O-± (AMSL) 'XISTING VERTICAL CABIF
IRAY (BY OTHERS)
DF EXISTING BUILDING
0"E"ILAN PROPOSED VERTICAL CABLE
-0 ± IAGL,)
V 7
0 ± (AMSQ RAY PAINTED TO MATCH
,,u7F.121, _ I OPOSED RRHs & JUNCTION BOX
,�) TO -OF EX)IS7NG BUILDING PR
AG PER 'RF' DWGS MOUNTED TO FACADE
90--O'± (AMSL)
EXISTING CABLE PROPOSED CABLE RUN IN CABLE TRAY
CHASE 0
PROPOSED BALUSTRADE to� W
PROPOSED CABLE RUN THROUGH c
EXISTING CABLE CHASE
PROPOSED (2) CONDENSERS MOUNTED ON
PROPOSED SLEEPERS (TYP.) 60
PROPOSED 35kW NATURAL GAS GENERATOR
MOUNTED ON PROPOSED STEEL FRAME
EXISTING CURB (TYP OF 2)
EXISTING HVAC UNIT (TYP
EXISTING BALUSTRADE (TYP I
T2p 2 0-
ll_'V,o� �M5 -040F�k)
57'-O"l (AMSQ
,-PROPOSED VERTICAL GAS RISER
o ON EXISTING BUILDING PANTED r G
I TO MATCH EXISTING FACADE C:) . .
0 1, um
;H U ;H ;H ;H �H :H ULl
r
IX,
PROPOSED EOUIPMENT ROOM
LLLi J J I J I //,-LOCATED IN BASEMENT
(AREA - 222 t SO. FT.)
1 P99
A
EXISTING ACCESS DOOR
TO EQUIPMENT ROOM REGISTEIICO Env_
GFREIT)U ND La - - - - - - - --xz GROUND LEVEI --sxLcv,�,
L �VE ELEV 0'-O-± (ACL) ET
(ACT) 217 ESSEX STREET]
970
22 -U (AM,]) SALEM. MA 01970
G
EXISTING GAS METER
PROPOSED GAS METER
GRAPHIC SC� PER 'P' DWGS Am3
SOUTH ELEVATION 2-a"5-1' A-8, X _"�FXSTING GAI HINT ALQ,%(,
OLTS01 WAIT T)l EXISTING
5ull Ir .�
A 69Aj,
CIO A, 341ilgl Mm 21H A AK�2A -RA�-
2
n�T�2 i. ? a
H -8A E� H A, P9 i ly U;31g 21 B.Mqj -jXp 22�
z Z!, 6 Z
A �W, A t quig 21�0 A Up m-t;� rT,
in� �P,P$X�2�
X22 cit, -
42,� A2�,R;; vu; A �o m-- - c.g. j �-S
;ji; p 0p, AA 2 vl�.0 X
091A - a § film g�T� tA29 , >
61 Nlrd MH axpj �!.x Affx Z.-A2 2.,-N eP 23;
P5 A -A �z 1 2 -A Aug 2 J�flqffl
RA
a -a S� A 2 2- PYR2 �5j-
G-m; AA.p
I A A.-319 A a >05R
�Af Malo sigU is8a `14- Hai! so
v is 9 4 D.1 51 9m OA-. -,WP_A z
18- C)
0 z
qffl aq �dx� 98t 4.W 7pA X2," Z�.
9� Agm AA9�4R ANA, �,S�jp --g �9�-g gmR;2
tzsP, -j. 6�5 78-g
HIA % iE
�96,,S- ;2-� E�C, M
gi;12 Ric, 4-j .- . . "t
�� P: Rm pi� 2�8. 2-2 A
jz A
8'.9 P no R2,D� n
-Z
c
9a,X z. 0,
m Uo SAN 2,2
�-& 12.
0 m Milli
z 05 S i i,
-2AA 2.� z ii, zz�
z
MZAA bz 19
'AAR vI A�zm,- 8
j, I
11 V . _ , rc
zo Z,z 0 T § I G
's. V
.z 8 2
VM3
z Z
z mo
A
V p
9 C-32
cv�zl
OX
oc,d��z �,F
m lkl
Z
0
C--
A
A
v---------
--------------------------------- ------ ---------- ----
------------------------- --- ---------------------------- -- ----:
0 m
m
0 ,5
-- ---------
r - ------------- -
> Z
Z --I
r--------
-------------------------
--- --------------------------
ox
z s, 0
Z, Ism
'M Im I I
0
0
m MMAX
0
8.
Wo .0
m f, 0
z
Z, mo, <
I'm
Q9
-0 m
I
I
ITI
z c:
6--9-
m
Z
C1 ———————— --———
0 r-
-— - ———————
>
mgn, *.Im �mam
x 2 m 2
1z �Z�o 0
.1s "Um
Z M 0 M�o
Hin
1 41�0" 22'-g" T-4" FOR CONSTRUCTION
PREPARED 'OR
EQUIPMENT ROOM PLAN PREPASU BY.
FIN DOE I DESCRO'DOR I W I C..jmPPo
ISSIJED FOR Jx Oft Huc
Ison
I M/22/15 ISSUED FM WNSTR�710N NS JX )PH Design Groupo WORM wireless
2 7o/iam MED nan,,ASS
JX DPH
3 11/10/15 RMSED BERGLASS C..NEY NS . DPR
UILDII� 40kl�IWE.911 �L (118�551
'A A.DO'[' �0181� AX. ,.j 3'.
A"'noz
0
v -::n'm
000 , 0
,co
M, 0 2 v Z.. A
MO
OZ 0 ZQ
C, 0 co
z ax
A A-el im
a
'c 2RZ
0 a
01 x
ro m m 0-
rn C)
-n c
r, & F7 —
m
1109
' MZ --T-TTT-TTT 1 11 I� 11 11 11 11111
0 -4
Om 1 5�
m 0
F o
2*-5" V-11 41-0. i
7'-21/2'
6'-51/2-
V) m 0 0 0
v m
m 0 lio 0
A
0 c
0
Z M z
0
z
0
m
0
0
9
obbo
.000( )
-000( m
0000
7
v
FOR CONSTRUCTION
EQUIPMENT ROOM RCP &SECTION PREPMED W PREP�RED F014
ui *v DuE DESCRIPT� u I CH.1�0
Hudson±*b
1 1 WWII MWED FO.CO.SIRUCT. s 0� Design Group,
2 10/28/15 R�o Flun,,ss :�Whl, o V� V911Mwireless
0.'m E�u PKK,,5s
H
m
< C�on
nmmmnm
�q no�,
X. --Z 0
I oa ,Zrito
-Z
> �o
A DZOZ
vi,
CA-zo 0
m
TD c
Z,c 0:6
osoo 0,
z
X.
m m
--I Z
L> --i
Z
z
> 0
0
om
'm
I
z
* m
M M
-4 Z
L>
M
0
0
mz��08 2Z
OZ 1 �3*-
R) 10 ,
,,CZ<
0,
c
z 'M
00,
zz�
Z10ox R'
0ocz
x
4z >
Im"
,z
WO Wo
z -,oz
CZ
0 0
z c
Lp
FOR CONSTRUCTION
EQUIPMENT ROOM DETAILS PREP�REO PREPARED FOR
WE DEKRIPT*N By CHK 1�D
W 12/14 LSSUED FOR ks��
I.R F§ST�VCCTl..�" �P2 Hudson b
09/22/15 tSWED FOR COWR�Cll� Design G'.10".
2 10/28/15 RE�ED OMRG�S CHPMN" D� WWI= wireless
3 11/10/1$ R�SED nKK,sS C�iuN�
IE
z
PACKING MATERIAL, MIN 1-1/2 iF. ONE 2-0 (OR SMALLER) SCHEDULE FLOOR MIN ww_om MIN NVUX MIN PU_ MIN F T 0
ANNULAR FORMING I RATING WALL HIR Q)
THICKNESS OF MIN 6 pcf MINERAL WOOL 40 P',IC PIPE TO BE CENTERED OR FLOOR OF STEEL ANNUUNIT MY Omm OF T RATING HR (IT
BATT INSULATION FIRMLY PACKED INTO 10iiiLL 04.�*SJLL PIPE OR SPACE SPACE �KNS IATL I MUGH PENETRANT in.
WTHIN FIRESTOP SYSTEM. A NOW T. CONDUIT (I.) THONS (HOURS) (HOURS) 2 1 I-_
OPENING AS A PERMANENT FORM ANNULAR SPACE OF 5/16- IS (in.) (In.) (in.) (m) CI ::�4 I
0
u I
M
'v
PACKING MATERIAL TO BE RECESSED REQUIRED WITHIN THE FIRESTOP FLOOR 3-3/4 t-1/2 3/8 2-1/8 1 2-3/4 _2 0 1-1/4
FROM TOP SURFACE OF FLOOR OR FROM SYSTEM PIPE SHALL BE RIGIDLY WOOD
BOTH SURFACES OF WALL AS REQUIRED SUPPORTED ON BOTH SIDES OF FLOOR 3-3/4 6 3/8 3/4 1 2-3/4 2 0 THE HOURLY F RATING OF THE FIRESTOP OR
LC
TO ACCOMMODATE THE REQl.'14WAL_L/FLOOR ASSEMBLY SYSTEM IS EQUAL TO THE HOURLY FIRE METAL
THICKNESS OF FILL MATERIAL.RED FLOOR 3-Z/4 6 318 1 2 1-3/1 2 0 RATING OF THE WALL ASSEMBLY IN WHICH STUDS
IT IS INSTALLED. U)
4-1/2 1-1/2 3/8 2-1/8 1 3-1/2 3 3/4 z
THROUGH PENET NI ONE 2"o
0 ROOR 4-1/2 6 3/8 3/. 1 3-'/2 3 0 1 0
Z GROUT ALL VOIDS NONMETALLIC PIPE. CONDUIT OR RACEWAY
AROUND SLEEVES FLOOR 4-1/2 6 3/8 1 2 2-1/2 3 0 TO BE CENTERED WITHIN THE FRESTOP 0
I I I I 1 5 rEM A NOM ANNULAR SPACE OF
SEALANT WN1 5-1/2 1-1/2 3/8 2/.1/8 3-:�2 3 3/4 5/16 in, IS REQUIRED WITHIN THE
HIT
FILL VOID OR CAVITY MATERIA HIT EINFORCED LIGHT FIRESTOP SYSTEM, PIPE, CONDUIT OR 0 w 0
MIN 2 in. THICKNESS OF FILL MATERIAL WT. CONCRETE OR PAUL 5-./2 6 3/8 3 0 RACEWAY TO BE RIGIDLY SUPPORTED ON
APPLIED WITHIN ANNULUS, FLUSH WITH TH UIL CLASSIFIED BOTH SIDES OF THE FLOOR OR WALL LL
TOP SURFACE OF FLOOR OR WITH BOTH
SURFACES OF WALL. CmU_ PAUL 6-1/2 1-1/2 3/5 2-1/8 2 2-1/2 3 1 ASSEMBLY.
CONDUIT ____ I
PILL. 5-1/2 6 3/8 1 2 3 0 RILL VOID OR CAVITY MATERLAI_ - SEALANT
SPECIFIED TFCHNOICGIFS INCi UL SYSTEM NUMBER: C-AJ-2057
SPECSEAL SERIES SSS SEALANT NOTE MIN 5/8 iF. THICKNESS OF FILL MATERIAL
F RATING - 2 42� APPLIED WITHIN ANNULUS, FLUSH WITH
OR SPECSEAL LCI SEALANT. CORE HOLE 1 1/2" LARGER CONCRETE FLOOR OR WALL ASSEMBLY. BOTH SURFACES OF WALL. ADDITIONAL LAYERS
THAN THE DIAMETER OF THE MINIMUM 3-3/4 in, THICKNESS
CONDUIT CORE DRILLS TO FLOOR/ MINIMUM 6-1/2 in. WALL FILL MATERIAL TO BE INSTALLED SUCH OF
PVC CONDW PENEMTKENNI HE SEALED WITH THAT A MIN 1/4 in THICK CROWN IS 5/8- db
DETAIL IN CONCRETE OR MASONRY ElUASTOMERIC SEAI.ANT FORMED AROUND THE PENETRATING ITEM GYPSUM
TYPE AS OR TYPE SS AND LAPPING I F. BEYOND THE BOARD Am
PIPE AND CONDUFF PENETRATICIN MINIMUM THICKNESS OF SEALANT AS STEEL SLEEVE PERIPHERY OF THE OPENING.
PACKING MATERIAL MIN. I in THICKNESS OF SPECIFIED IN THE TABLE ABOVE. 0%�
MIN. 3.5 pcf FIBERGLASS INSULATION SHALL DETAL IN NON-RATEE)PARTFION (OPTIONAL) UL SYSTEM NUMBER: W-L-2093
APPLIED WITHIN THE OPENING, FLUSH SPECIFIED TECHNOLOGIES INC-' F RATING - I & 2 HR.
BE WRAPPED AROUND THE WITH THE TOP SURFACE OF THE FLOOR SPECSEAL SERIES SSS SEALANT, 0
THROUGH-PENETRANT AND SECURED OR BOTH SURFACES OF THE WALL. SPECSEAL LCI SEALANT. U)�
TOGETHER BY MEANS OF NO. 24 AWG STEEL
TIE WIRE PACKING MATERIAL SHALL BE ONE 4"0 OR SMALLER METALLIC PIPE FORMING MATERIAL
CENTERED AT MID-DEPTH OF OPENING AND PVC CONOW PENETRATION
RECESSED FROM BOTH SURFACES OF WALL OR CONDUIT TO BE CENTERED WITHIN MINERAL WOOL BATT INSULATION WTALIM aypswWALLBOAM
FIRESTOP SYSTEM. PIPE SHALL BE (MINIMUM 4.0 pl) FIRMLY PACKED INTO
m
L
V
I
RE
FS
IT
RC
E
P
'C'
0
M
S_
R
E
T-
T
U-
A
DL
S
.':'WAY
PTOP
EEO"'S E 7OF
V'S ,HE OR
T
TIED ON
ALL
MATERIAL
WITH
"FIN I I
12 RGER
`ER 0, MEF
)HILLS To
LANT
AS STEE
I USH (OPT
FLOOR
LL I To
D N
ASSEMBLY REQUIRED TO ACCOMMODATE ME RIGIDLY SUPPORTED ON BOTH SIDES ORM*:
C
THE OPENING AS A PERMANENT FORM; SEE
REQUIRED THICKNESS OF FILL AUATERLI OF WALL/FLOOR ASSEMBLY AND HAVE TABLE FOR MINIMUM REQUIRED THICKNESS
AN ANNULAR SPACE OF 3/4- NOTE,
FILL. VOID OR CAVITY MATERIAL - CAULK OR PUTTY METALLIC PIPE
IN 2 HR FIRE RATED ASSEMBLIES MIN 3/4 IN'. ___ in CABLES IN VERTICAL RUNS. CABLES INSTALLED IN VERTICAL RUNS AND
THICKNESS FILL MATERIAL APPLIED WITHIN ME STEEL PIPE: 6"o (OR SMALLER) SCHEDULE 10 PENETRATING MORE THAN ONE FLOOR. OR CABLES INSTALLED IN VERTICAL
ANNULUS. FLUSH BOTH SURFACES OF WALL. (OR HEAVIER) STEEL PIPE. RUNS IN A SHAFT. SHALL BE TYPE CMFL FLOOR PENETRATIONS REQUIRING
ADDITIONAL FILL MATERIAL TO BE INSTALLED SUCH THAT LAYERS OF 5/8- THICK CONDUIT: 4-0 (OR SMALLER) ELECTRICAL TYPE CMR SHALL CONTAIN ONLY CABLES SUITABLE FOR RISER OR PLENUM
GYPSUM WALL BOARD METALLIC TUBING (EMT) USE. LISTED RISER COMMUNICATIONS RACEWAYS AND LISTED FILE
A MIN 1/4 in. CROWN IS FORMED AROUND TH*E NUM
PENETRATING ITEM. IN 1 HR FIRE RATED ASSEMBLIES. OR METAL STUDS ALL CORES THROUGH ELECTRI OR 6"0 RIGID STEEL CONDUIT. COMMUNICATIONS RACEWAYS SHALL BE PERMITTED TO BE INSTALLED IN
WOOL VERTICAL RISER RUNS IN A SHAFT FROM FLOOR TO FLOOR. ONLY TYPE GAIN
MIN 5/8 iR. THICKNESS OF FILL MATERIAL APPLIED UL SYSTEM NUMBER: C-AJ-1020 CABLES SHALL BE PERMITTED TO BE INSTALLED IN THESE RISERS. ONLY
WITHIN ANNULUS ON BOTH SURFACES OF WALL. UL SYSTEM 'U'RER I CMP CABLES SHALL BE PERMITTED TO BE INSTALLED IN PLENUMS.
ADDITIONAL FILL MATERIAL TO BE INSTALLED SUCH THAT UL SYSTEM NUMBER: W-L-1029 USE FULL CONDUIT RUNS F RATING - 3 HR. (FOR PIPES GREATER THAN 4')
F RATING - I & 2 HR. THROUGH PENETRATIONS F RATING - 2 HR. (FOR PIPES LESS THAN 4-) METAL RACEWAYS OR FIREPROOF SHAFTS. LISTED COMMUNICATIONS CABLES
A MIN 3/8 iF. CROWN IS FORMED AROUND THE
, T_
PENETRATING ITEM AND LAPPING 1 IF. BEYOND THE SHALL BE ENCASED IN A METAL RACEWAY OR LOCATED IN A FIREPROOF SHAFT
PERIPHERY OF THE OPENING. PIPE AND CONDUFT PENETRATION HAVING FIRESTOPS AT EACH FLOOR. 12 v T 9
SPECIFIED TECHNOLOGIES INC' WE AND CONDUIT FIENElIFIATION DETAIL IN CCNCFETE OR MASONRY
SPECSEAL SERIES SSS SEALANT, IN GYP"WALLBOAM
SPECSEAL LCI SEALANT OR
SPECSEAL PUTTY.
PENETRATION DETAILS
SCALE: IN T S ICX
UNISTRUT PIOOO
ATTACH WITH APPROPRIATE ANCHORS:
1. MASONRY - 3/8" HY20 HILTI
zr
I ANCHORS '_ 5-
GALVANIZED STEEL 1 X" GALV. P I DOD 0- 2. WOOD - 3/8" LAG BOLTS
CONDUIT/ PVC AND UNISTRUT (PAINTED 0. 3. DRYWALL - PROVIDE WOOD
ANDREWS HAINGE (IF COLOR OF BLOCKING USE WOOD LAG BOLTS
PAINTEDT �SURROUNDINGS)
EXTERIOR,
COLOR OF
SURROUNDINGS)
EXISTING METAL ANCHORED W/ SHEET METAL APPROVED EQUAL
SITE PROl SP1542
CEILING/ WALL STUD SCREWS (2 PER UNISTRUT) 0- ROOFTOP CABLE KIT OR
EXISTING GONG (2) A-0 I h" UG. HILTI 0-
CEILINC/WALL HIT HY20 ANCHORS OF? (I I-1/2W It 8"H)
EQUAL E.OnEgi`
SITE PROI RPIF RUBBER
MAT OR APPROVED EQUAL
217 ESSEX STREET
GALVANIZED STEEL—A�o \�_l %, CALV, Pl000 CABLE MOUNTED TO UNISTRUT FILL SLEEPER W/ SALEM. " 01970
CONDUIT AND UNISTRUT (PAINTED CONCRETE EVERY
ANDREWS HANGER COLOR OF 8'-0" MAX
(PAINTED COLOR OF SURROUNDINGS) WALL/CEILING/FLOOR
SURROUNDINGS)
CONDUIT RUN DETAIL CABLE-RUN DETAIL r3__� CABLE TRAY DETAIL r4__�
Al� N I Am7
U)
0
C)
STRUCTURAL NOTES:
1, DESION REQUIREMENTS ME PER STATE BUILDING CODE AND
SPECIAL INSPECTIONS(REFERENCE IBC CHAPTER 17): MASSACHUSETTS AMENDMENTS TO THE IBC
APPLICABLE SUPPLEMENTS. INTERNATIONAL BUILDING CODE (18C 2009).
GENERAL: WHERE APPLICATION IS MADE FOR CONSTRUCTION, THE OWNER OR THE REGISTERED
ASCE 7-05, EMITIA-222-C STRUCTURAL STANDARDS FOR STEEL (REFERENCE 780 CMR):
ANTENNA, TOWERS AND ANTENNA SUPPORTING STRUCTURES CONSTRUCTION/INSTAU_ATION DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE ACTING AS THE OWNER S AGENT SHALL EMPLOY 107.6 CONSTRUCTION CONTROL.
INSPECTIONS AND TESTING ONE OR MORE APPROVED AGENCIES TO PERFORM INSPECTIONS DURING CONSTRUCTION ON THE 107.6.1 GENERAL. THIS SECTION SHALL APPLY TO THE
2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS IN THE REQUIRED (COMPLETED BY REPORT ITEM TYPES OF WORK LISTED IN THE INSPECTION CHECKLIST ABOVE. CONSTRUCTION CONTROLS. PROFESSIONAL SERVICES AND s T r
FIELD PRIOR TO FABRICATION AND ERECTION OF ANY MATERIAL ANY CONTRACTOR SERNICES REQUIRED FOR BUILDINGS AND 0
UNUSUAL CONDITIONS SMALL BE REPORTED TO THE ATTENTION OF THE ENGINEER OF RECORD) THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE AND ENGINEERS Or RECORD STRUCTURES NEEDING REGISTERED DESIGN PROFESSIONAL L)
CONSTRUCTION MANAGER AND ENGINEER OF RECORD. REQUIRED ENGINEER 0 RECORD APPROVED INVOLVED IN ME DESIGN OF THE PROJECT ME PERMITTED TO ACT AS THE APPROVED AGENCY AND SEWICES THE FOLLOWING STRUCTURES ME EXEMPT FROM THE
STEEL SHOP DRI THEIR PERSONNEL ME PERM17CO TO ACT AS THE SPECIAL INSPECTOR FOR THE WORK DESIGNED REQUIREMENTS OF THIS SECTION ANY BUILDING CONTAINING LESS CC
3 DESIGN AND CONSTRUCTION OF STRUCTURAL STEEL SMALL CONFORM ENGINEER OF RECORD APPROVED BY THEM, PROVIDED THOSE PERSONNEL MEET ME OU�IFICATION REQUIREMENTS. THAN 35,000 CUBIC FEEL OF ENCLOSED SPACE. MEASURED TO o 0
TO ME AMERICAN INSTITUTE OF STEEL CONSTRUCTION -SPECIFICATION REQUIRED FRP SHOP DRAWINGS' THE EXTERIOR SURFACES OF WALLS AND ROOFS AND TO THE TOP
FOR ME DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL STATEMENT OF SPECIAL INSPECTIONS THE APTILKANT SMALL SUBMIT A STATEMENT OF SPECIAL OF A GROUND SUPPORTED FLOOR. OR IN THE CASE OF A CRAWL
FOR BUILDINGS-, REQUIRED MATERIAL SPECIFICATIONS REPORT' INSPECTIONS PREPARED BY ME REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE IN SPACE, TO THE BOTTOM SURFACE OF THE CRAWL SPACE. IN THE
ACCORDANCE WITH SECTION 107.1 AS A CONDITION FOR ISSUANCE. THIS STATEMENT SHALL BE IN CASE OF BASEMENT FLOORS OR LEVELS, THE CALCULATION OF
4. STRUCTURAL STEEL SMALL CONFORM TO ASIM A992 (Fy-50 kSi), N/A FABRICATOR NOE INSPECTION ACCORDANCE WITH SECTION 1705. ENCLOSED SPACE SMALL INCLUDE SUCH SPACES FOR ADDITIONS
MISCELLANEOUS STEEL SMALL CONFORM TO ASTM AJI6 UNLESS TO EXISTING BUILDINGS, THE VOLUME OF ENCLOSED SPACE SMALL
OTHERWISE INDICATED. REQUIRED PACKING SUPSA REPORT REQUIREMENT SPECIAL INSPECTORS SHALL KEEP RECORDS OF INSPECTIONS. THE SPECIAL INCLUDE THE ENTIRE EXISTING BUILDING AND ALL PROPOSED
INSPECTOR SMALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL, AND TO THE ADDITIONS
5, STEEL PIPE SHALL CONFORM TO ASTM A500 'COLD-FORMED WELDED ADDITIONAL TESTING AND INSPECTIONS: REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARCE. REPORTS SMALL INDICATE THAT WORK 1. MY ONE OR TWO EMILY DWELLING OR MY ACCESSORY
INbHLWLU WAS OR WAS NOT COMPLETED IN CONFORMANCE TO APPROVED CONSTRUCTION BUILDING THERETO
& SEAMLESS CARBON STEEL STRUCTURAL TUBING". GRACE B. OR ASIM CONSERUCTION/WST�LABON THE CONTRACTOR 2 My BUILDING USED EXCLUSIVELY FOR AGRICULTURAL
DURING CONSTRUCTION
A53 PIPE STEEL BLACK AND HOT-DIPPED ZiNC-COATED WELDED AND DOCUMENTS DISCREPANCIES SMALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF PURPOSES SEE APPENDIX C FOR OCCUPANCY AND OTHER
SEMILESS TYPE E OR S. GRACE e. PIPE SIZES INDICATED ME FOR CORREG
NOWNAI., ACTUAl- OUTSIDE DIAMETER IS LARGER INSPECTIONS AND TESTING TION. IF THEY ME NOT CORRECTED. THE DISCREPANCIES SHN.L BE BROUGHT TO ME LIMITATIONS
REQUIRED (COMPLETED Elf REPORT ITEM ATTENTION OF ME BUILDING OFFICIAL AND TO THE REGISTERED DESIGN PROFESSIONAL IN 3 RETUNING WALLS LESS THAN TEN FEET IN HEIGHT AT ALL
6. STRUCTURAL CONNECTION BOLTS SMALL BE HIGH STRENGTH BOLTS ENGINEER OF RECORD) RESPONSIBLE CHARGE, A FINAL REPORT DOCUMENTING REQUIRED SPECIAL INSPECTIONS SMALL BE POINTS &ONG IKE WALL AS MEASURED MOM ME BASE OF
(BEARING TYPE) AND CONFORM TO ASTM A325 TYPE-X IHIGH SUBMITTED. THE FOOTING TO THE TOP OF THE WALL
STRENGTH BOLTS FOR STRUCTURAL JOINTS, INCLUDING SUITABLE NUTS REQUIRED STEEL INSPECTIONS 6.
NOTIMMSTANDING THESE EXEMPTIONS. PROFESSIONAL ENGINEERING 0
AND PLAIN HARDENED W�ERS". ALL BOLTS SMALL BE 3/4- DIA UCN. SERVICES SHALL BE REQUIRED FOR AC TMITIES WHICH ME
N/A HIGH STRENGTH BOLT INSPECTIONS REQUIRED INSPECTIONS AND SITE REVIEW DOCUMENT AS A CONDITION OF THE DEEMED TO CONSTITUTE ME PRACTICE OF ENGINEERING
7. ALL STEEL MATERIALS SHALL BE CA_VMlZED AFTER FABRICATION IN BUILDING PERMIT THE FOLLOWING INSPECTIONS AND SITE RMEWS IDENnFIED BY AS DEFINED IN WC L. C 112. § 81 D. EXCEPT AS PROVIDED IN
ACCORDANCE WITH ASTM A123 -ZINC (MOT-DIP GALVANIZED) COATINGS N/A HIGH WND ZONE INSPECTIONS THE BUILDING OFFICIALARE REQUIRED FORWORK PER THE M.G.L. C. 54A ARE MY LEGALLY REQUIRED PROFESSION OR AS
0
ON IRON AND STEEL PRODUCTS'. UNLESS OTHERWISE NOTED PROVIDED IN MGL C 112. § SIR WHERE WORK IS PERFORMED
N/A FOUNDATION INSPECTIONS STH EDITION OF THE BY LICENSED TRADES PEOPLE PURSUANT TO M.G.L. C� 112. f N
B. ALL WETS. ANCHORS AND MISCELLANEOUS HARDWARE SMALL BE MASSACHUSETTS STATE BUILDING CODE,780 CMR,SECTION 110 AND CHAPTER 17 SIR. PLANS AND SPECIFICATIONS PREPARED TO DOCUMENT THAT
GALVANIZED IN ACCORDANCE NTH ASTIM A153 'ZINC-CCATING N/A CONCRETE COUP. STRENGTH, SLUMP WORK SMALL NOT BE REQUIRED TO BEAR THE SEAL OR
(HOT-DIP) ON IRON AND STEEL HARDWARII UNLESS OTHERWISE TESTS AND PLACEMENT SIGNATURE OF A REGISTERED DESIGN PROFESSIONAL,
NOTED, UIRED SBBEREVIIBN AND DOCUMENTATION FOR PORTIONS OR PHASES CONSTRUCTION"T
POST INSTALLED ANCHOR ROD RED
N/A VERiFTCXTION 1. /HA 107.6.1.1 SPEC%LIZED STRUCTURES. TELECOMMUNICATION TOWERS,
9. FIELD WELDS. DRILL HOLES, SAW CUTS AND ALL OAIWUGED GALVANIZED N/A BASE PLATE GROUT VERIFICATION WIND TURBINE TOWERS. AND SIMILAR STRUCTURES ME
SURFACES SMALL BE REPAIRED WITH AN ORGANIC ZINC REPAIR PAINT SITE REVIIEVII AND DOCUMENTATION X SITE REVIEW AND DOCUMENTATION X ENGINEERED STRUCTURES AND SMALL BE SUBJECT TO THE
COMPLYING WITH REQUIREMENTS OF ASTM A780. GALVANIZING REPAIR REQUIREMENTS OF SECTION T07.6.
PAINT SMALL HAVE 65 PERCENT ZINC BY WEIGHT, ZIRP BY DUNCAN N/A CERTIFIED WELD INSPECTION soNCONDIMON/MALYSIS/REP0RT ENERGY EFFICIENCY PEOUIRNENTS
GALVANIZING. GALVA BRIGHT PREMIUM BY CROWN OR EQUAL. - 107.8.2.2 CONSTRUCTION, THE REGISTERED DESIGN
THICKNESS OF APPLIED GALVANIZING REPAIR PAINT SHALL HE NOT NOT N/A EARTHWORK: LIFE AND DENSITY FOOTING AND FOUNDATION PROFESSIONALS WHO ME RESPONSIBLE FOR ME DESIGN. PLANS.
LESS THAN 4 COATS (&LOW TIME TO DRY BETWEEN COATS) WITH A (INCLUDING REINFORCEMENT AND FIRE �. INSTALUkTION' CALCULATIONS. AND SPECIFICATIONS, THEIR DESIGNEE OR THE
RESULTING COATING THICKNESS REQUIRED BY ASTM A123 OR A153 AS NIA ON SITE COLD GALVANIZING FOUNDATION ALINNIMENT) REGISTERED DESIGN PROFESSIONALS WHO HAVE BEEN RETAINED
APPLICABLE VERIFICATION CONCRETE FLOOR AND UNDER FLOOR PRE SVINNESSION INSTkUKTION' FOR CONSTRUCTION PHASE SERVICES. SMALL PERFORM ME
M CONTRACTOR SMALL COMPLY WITH AWS CODE FOR PROCEDURES. N/A GUY WIRE TENSION REPORT FOLLOWING TASKS
LOWEST FLOOR FLOOD ELEVATION FIELD, KPI I REVIEW, FOR CONFORMANCE DO THIS CODE ANO THE DESIGN
APPEARANCE AND OU&ITY OF WELDS. AND FOR METHODS USED IN ADDITIONAL. TESTING AND INSPECTIONS: STRUCTURAL FFMAIE - W&L/FLOOR/ROOF X CARBON MONOXIDE CETECTRON SYSTICA0 CONCEPT. SHOP DRAWINGS. SAMPLES AND OTHER
CORRECTING WELDING. ALL WELDERS AND WELDING PROCESSES SMALL SUBMITTALS Erf THE CONTRACTOR IN ACCORDANCE WITH THE
BE QUALIFIED IN ACCORDANCE NTH AWS 'STANDARD OUNUPICATION UI MD PUASTER/GYPSIJU SEISMIC REINFORCEMENT REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS.
PROCEDURES" ALL WELDING SMALL BE DONE USING E70XX E.O.R. TO INSPECT EXISTING MASONRY FIRE RESISTANT W&l_/PI FRAMING SMOKE CONTROL SYSTEMS 2 PERFORM THE DUTIES FOR REGISTERED DESIGN
ELECTRODES AND WELDING SHALL CONFORM TO ASC AND 01.1. WHERE PROFESSIONALS IN CHAPTER 17. Lut
FILLET WELD SIZES ME NOT SHOWN, PROVIDE ME MINIMUM SIZE PER PARAPET & WALL PRIOR TO STEEL FIRE RESISTANT WAUL/PARTFOCNS TIMSH SMOKE MD HEAT VENTS 3. BE PRESENT AT INTERVALS APPROPRIATE TO ME STAGE OF I
TABLE J2.4 IN THE ASC 'MANU� OF STEEL CONSTRUCTION". 9M STUB-UP INSTALLATION ATTACHMENTS CONSTRUCTION TO BECOME GENERALLY FAMILIAR WITH THE C3 it,
EDITION. ABOVE CUUNG INSPECTION ACCESSIBILITY(521 CUR) PROGRESS AND QUALITY OF THE WORK AND TO DETERMINE
IF THE WORK 15 BEING PERFORMED IN A MANNER _.1 2 z
11.INCORRECTLY FABRICATED. DAMAGED OR OTHERWISE MISFITTING OR FIRE SLOCKING/STOPPPIG SYSTEM OTHER CONSISTENT WITH ME CONSTRUCTION DOCUMENTS AND THIS
NON-CONFMMING MATERIALS OR CONDITIONS SMALL. BE REPORTED TO AFTER CONSTRUCTION EMERGENCY UGHTII SIGNAGE CODE
ME CONSTRUCTION MANAGER PRIOR TO REMEDIAL OR CORRECTIVE
ACTION. ANY SUCH ACTION SMALL REQUIRE CONSTRUCTION MANAGER CONSTRUCTION/INSTMAJATiON MEANS OF EGRESS SPECIAL INSPECTIONS ISECTION 1704): ME PERMIT APPLICATION SMALL NOT BE DEEMED COMPLETED
UNTIL ALL OF ME CONSTRUCTION DOCUMENTS REQUIRED BY THIS C.)
INSPECTIONS AND TESTING -CHANNEL REINFORCEMENT = . .
APPROVAL REQUIRED (COMPLETED BY REPORT ITEM -STEEL STUI INSTALLATION SUPPORTING CODE HAVE BEEN SUBMITTED. DOCUMENTATION INDICATING THAT
12.UNISTRUT SMALL BE FORMED STEEL CHANNEL STRUT FRAMING AS ENGINEER OF RECORD) ROOFING. CORNC/SYSEEM PLATFORM (ROOF) WORK COMPLIES WITH ME PLANS AND SPECIFICATIONS SMALL BE
PROVIDED AT ME COMPLETION OF EACH PHASE WHEN REQUIRED crI 4
MANUFACTURED BY UNISTRUT CORP., WAYNE. MI OR EDO&. STRUT MODIFICATION INSPECTOR REDLINE OR BY THE BUILDING OFFICIAL. X,
MEMBERS SHALL BE 1 5/8"xl S/Wxl2CA� UNLESS OTHERWISE NOTED, REQUIRED RECORD DRAWINGS�
AND SMALL BE HOT-DIP GALVANIZED AFTER FABRICATION. N/A POST INSTALLED ANCHOR ROO - VENTING SYSTEMS (KITCHEN. CHEMIM, FUME) 107.6.3 CONSTRUCTION CONTRACTOR SERVICES, THE ACTUAL v !2 9
Il EPDXY ANCHOR ASSEMBLY SMALL CONSIST OF STAINLESS STEEL PULL-OUT TESTING STEMS CONSTRUCTION OF THE WORK SMALL BE THE RESPONSIBILITY OF w ;Ir Z;
MECRAHICAL THE GENERAL CONTRACTOR AS IDENTIFIED ON THE APPROVED
ANCHOR ROD WITH NUTS & WASHERS, AN INTERNALLY THREADED REQUIRED PHOTOGRAPHS BUILDING PERMIT AND SMALL INVOLVE THE FOLLOWING.
INSERT, A SCREEN TUBE AND A EPDXY ADHESIVE THE ANCHORING
SYSTEM SMALL BE ME HILTI-HIT W-20 AND OR HY-150 SYSTEMS ADDITIONAL TESTING 1. IT IS THE RESPONSIBILITY OF THE PERMIT APPLICANT TO NOTIFY THE BUILDING OFFICIAL OF I EXECUTION OF 41 WORK IN ACCORDANCE NTH THE
APPROVED CONSTRUCTION DOCUMENTSI
(AS SPECIFIED IN DWI OR ENGINEERS APPROVED EGO& AND INSPECTIONS REQUIRED 2 EXECUTION AND CONTROL OF ALL METHODS OF
INSPECTIONS (9) INSPECTION OF 780 CMR FIRE PROTECTION SYSTEMS MY BE WITNESSED BY CONSTRUCTION IN A WE AND SATISFACTORY MANNER IN
14 EXPANSION BOLTS SHALL CONFORM TO FEDERAL SPECIFICATION ME FIRE,
FF-S-325. GROUP 11. TYPE 4, CLASS 1. HILB KWIK BOLT III OR OFECIAL. AND NST&LAT`ON PERMITS ME REQUIRED FROM ME FIRE DEPARTMENT PER 527 ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE. AND
APPROVED EDO&. INSTALl-kTION SMALL BE IN ACCORDANCE WITH THE NOTES: CMR FEDERAL STATUTES AND REGULATIONS.
1. REQUIRED FOR MY NEW SHOP FABRICATE CLUDE NFPA 72 TEST AND ACCEPTANCE DOCUMENTATION 3. UPON COMPLETION OF THE CONSTRUCTION, CERTIFICATION IN
MANUFACTURERS RECOMMENDATIONS. BOLTS OR STEEL. D FRP OR STEEL 2, IN WRITING TO THE REGISTERED DESIGN PROFESSIONAL IN
2� PROVIDED BY MANUFACTURER. REQUIRED IF HIGH STRENGTH 3 INCLUDE APPLICABLE NFPA 13, 13R. 13D. 14. 15. 17. 20, 241. ETC. - TEST AND RESPONSIBLE CHANCE THAT. TO THE BEST OF ME
15 LUMBER SMALL COMPLY WITH THE REQUIREMENTS OF THE AMERICAN ACCEPTANCE CONTRACTORS KNOWLEDGE AND BELIEF, CONSTRUCTION HAS
INSTITUTE OF TIMBER CONSTRUCTION AND ME NATIONAL FOREST 2E PROVJDED By GENERAL CONTRACTOR: PROOF Of MATERIALS DOCUMENTATION SEEN DONE IN SUBSTANTIAL ACCORD WITH SECTION 107U6
PRODUCTS ASSOCIATION'S NATIONAL DESIGN SPECIFICATION FOR WOOD 4. HIGH WIND ZONE INSPECTION CATS 120MPH OR CAT CO 4. INCLUDE NFPA 720 RECORD OF COMPLETION AND INSPECTION AND TEST FORM Aft�l
CONSTRUCTION ALL LUMBER SMALL BE PRESSURE TREATED AND SMALL I IOMPH INSPECT FRAMING OF WALLS. ANCHORING. 5 INCLUDE FIELD REPORTS AND RELATED DOCUMENTATION AND WITH ALL PERTINENT DEVIATIONS SPECIFICALLY NOTED 4
BE STRUCTURAL GRACE NO 2 OR BETTER FASTENING SCHEDULE. 6 WORK SMALL NOT PROCEED. OR BE CONCEALED, UNTIL THE REWIRED INSPECTION HAS BEEN THE BUILDING OFFICIAL MAY REQUIRE A COPY OF THIS k
S. AS REQUIRED. FOR ANY FIELD CHANGES TO ME ITEMS IN APPROVED BY CERTIFICATION
M WHERE ROOF PENETRATIONS ME REQUIRED. ME CONTRACTOR SMALL THIS TABLE ME BUILDING OFFICIAL. AND NOTHING WITHIN CONSTRUCTION CONTROL SMALL RAW ME
CONTACT AND COORDINATE RELATED WORK NTH THE BUILDING OWNER EFFECT OF WAIVING OR LIMITING THE BUILDING OFFICIALS AUTHORITY TO ENFORCE THIS CODE NTH 107.5.4 ON SITE PROJECT REPRESENTATION. WHEN APPLICATIONS YZ�LSIERED E-MNEOV
AND THE EXISTING ROOF INSTALLER WORK SMALL BE PERFORMED IN NOTES. RESPECT TO EXAMINATION OF THE CONTRACT DOCUMENTS. INCLUDING PLANS. FOR UNUSUAL DESIGNS OR MAGNITUDE OF CONSTRUCTION ME � I
FILED, OR WHERE REFERENCE STANDARDS REQUIRE SPECIAL A
SUCH A MANNER AS TO NOT VDIO THE EXISTING ROOF WARRANITE 1. ALL CONNECTIONS TO BE SHOP WELDED & FIELD BOLTED COMPUTATIONS AND SPECIFICATIONS. AND FIELD INSPECTIONS. ARCHITECTURAL OR ENGINEERING INSPECTIONS. THE BUILDING E EET
ROOF SMALL BE WATERTIGHT. USING 3/4-0 A325-X BOLTS UNLESS OTHERWISE NOTIFIED 7. ROUGH AND/OR FINISH INSPECTIONS OF ELECTRICAL. PLUMBING. OR SHEET METAL SMALL BE OFFICIAL MAY REQUIRE FLELTIME PROJECT REPRESENTATION BY A FM�SX5 S�T R
2, SHOP DRAWING ENGINEER REVIEW & APPROVAL REQUIRED INSPECTED REGISTERED ARCHITECT OR PROFESSIONAL ENGINEER IN ADDITION SALEM, MA 01970
17 ALL FIBERGLASS MEMBERS USED ARE AS MANUFACTURED BY BEFORE ORDERING MATERIAL PRIOR TO ROUGH AND FINISH INSPECTIONS BY ME BUILDING OFFICIAL TO THAT PROVIDED IN SECTION 107 6, THE PROJECT
STRONCWEUL COMPANY OF BRISTOL, VA 24203 ALL DESIGN CRITERIA 3. SHOP DRAWING ENGINEER REVIEW & APPROVAL REQUIRED REPRESENTATIVE SMALL KEEP DAILY RECORDS AND SUBMIT
FOR THESE MEMBERS 15 BASED ON INFORMATION PROVIDED IN THE PRIOR TO STEEL FABRICATION. REPORTS AS MAY BE REQUIRED BY THE BUILDING OFFICIAL. UPON
DESIGN NANO& ALL REOUIREMENTS PUBLISHED IN SAID MANI MUST k VERIFICATION OF EXISTING ROOF CONSTRUCTION IS REWIRED COMPLETION OF THE WORK. THE REGISTERED DESIGN
BE STRICTLY ADHERED TO PRIOR TO THE WST�LATION OF THE ROOF PLATFORM. PROFESSIONAL SMALL, FILE A FINAL REPORT INDICATING NAT THE
ENGINEER OF RECORD IS TO APPROVE EXISTING CONDITIONS WORK HAS BEEN PERFORMED IN ACCORDANCE WITH ME
ISE NO MATERIALS TO BE ORDERED AND NO WORK TO BE COMPLETED IN ORDER TO MOVE FORWARD, APPROVED PLANS AND THIS CODE THIS ON SITE PROJECT
UNTIL SHOP DRAWINGS HAVE BEEN REVIEWED AND APPROVED IN 5. CENTERUNE OF PROPOSED STEEL PLATFORM SUPPORT REPRESENTATION RECLIREMENT SHALL BE DETERMINED PRIOR TO
WRITING, COLUMNS TO BE CENTRALLY LOCATED OVER THE THE ISSUANCE OF THE BUILDING PERMIT AND SMALL BE A
EXISTING BUILDING COLUMNS REQUISITE FOR THE PERMIT ISSUANCE REFUSAL BY ME
19, SUBCONTRACTOR SMALL FIREPROOF ALL STEEL TO PRE-EXISTING 6. EXISTING BRICK MASONRY COLUMNS/BEARING TO BE APPLICANT TO PROVIDE SUCH SERVICE SHAJ_L RESULT IN ME SNml
CONDITIONS. REPARED/REPLACEO AT ALL PROPOSED PLATFORM SUPPORT DENIAL OF THE PERMIT ALL FEES AND COSTS RELATED TO THE
POINT. ENGINEER OF RECORD TO APPROI PERFORMANCE OF ONSITE PROJECT REPRESENTATION SHALL BE
I BORNE BY ME OWNER.
1>
±2-0'
M
>
z
cn Im
m z
z
o
>
-0
-0 0 0 a
z
z
8)
mom p:,m c v -a i8,,
m "as m I �3 " 2 ,
0 0 .0 W
0�3
U,
0 Q �.l
a z 0 W 0 10,
zo, 0 0
z
00
C 105
z Z,
C
m O�
16'-o" I V,-O'T
M
m
z I -I�L\
z
>
En 0
m
0� 0 '9
m v 13
D�o 'o I
0 0
0 0 0
a t Z N Wo
MO
z
Z
.0
0
0
z WW
c
FOR CONSTRUCTIO
ALPHA ANTENNA DETAILS PREP�ED W.
DATE DES�01�4 EV ,C�R,�v-0
0 W/I?jll ISSUED FOR RM usl JX10 Hudson
M UA�G X.M.SOFT,
I =VFR W0JW
N IA
x 1 09/22/15 ISSUED FOR CONSIRI,CTIO. RS A 0 D.,jg.GrOUp,
2 10/28/15 RMED I`IKK�S CHIMNEY 0 wireless
3 11/10/T5 A�D FIBERG., OF,
"MG000STRM
(n m
m
0 Rls 10
0
z
-0, 0
A A A z g GO
0,0 8 1
Z Z z
z 0 0 x
in
z
p
@) ±1'-2' lekSONRY�_j
WALL BELOW
1 7
cn
0
-4 M
m z
.0m 9
-ml >
m 0
ct.
zo
z z
0
WIOx22
z 00
±2'-B'- *V-5 1/2"
FOR CONSTRUCTION
PREPMED OR".
STRUCTURAL PLANS
MTE KWRtP7*N V CHK �V
to W/12/,! 6MO MR (NNR
Hudson a
I GSMO MR W a DF7 Design Grmp,,,±*
0 1 10/28/15 9�0 FqxK,Ass R5 ix (NN, wireless
—3 11/10/15 RMED FIKKURSS Cmm�
Re J. YN
40 !WIMP
OLIWNR�2R NORK SU,�X90 M. '970 -5553 V,
.0011R 0181� FM 33&S586
v—I C4-t t4"i ±4'—1 Cj-±
0
0
1 0
0 z
0
0.
-- --- ----- - -----------
u) w
m m ----- 7-0�Jo-
>
FD Ro
Z G)
0 0 0
> - - I
o 00
>
>
z
m
z
z
I
0 0
0.
gn S, M.
o 0
1 0
z
om
oz,
Po
p m
YZ
wo a gox
T'T 'o A
Ao 0 Z, 10
81 0 N -% � Z, 0
30 zz
A
21
m Qm
OR
0
,1 0 0
!0
0
4'±
0
FOR CONSTRUCTIO
ANTENNA STRUCTURAL SECTION MPMtEl) W,
m
*V cmLn CHX 1�0
cn N/,2/14 SMO FOR fll� Hudson
6
2D.
§., 0/22/15 ISSVEG FOR CONSTALJVKX� J. Destgn Grcmp�,
2 '10/28/15 �o FTBEK�s a ON VMMwireless
m
3(Ri) TEL 19781557-55�
1 Wltl .0 w 1.,11,81 11&5�
5'-1 O"t
V-15"t V-Y*
R,..
ti 0,
xm2c
z
2 z
'D cu — 0 0 Ol 0 0 0
m
z >
aRO - ---- ---
M G) 1. 4. --------------
>
>
m 0
0 ,
00
7
OR
Un
0 1 0
z
z m-
F�a t.
z
no 5.
XR m
0
x H<
3'* 9"t 9"t 3,*
Offi
. 0
0 > 0
z z
z z
m m
- 0
0 0
--- -------------- -------------- ----- -
a.Ac�
Z' _9 to
no Is ON
0 -00
z
zi
TO 0 �z
cu!
C, 0 lz
I Em-"Z� Az Z,
Z�
2
0,
no O,x Z,
v I ko Zn c
�,z
0 m vo�
>, z
I
z
0 Lox
0 '0
z m
Z
Z
FOR CONSTRUCTIO
NTENNA STRUCTURAL DETAILS PREPARED V PREPARED FOR
WE I DESMPT*M v CHK APWO
cn M/12/1. MSVEO FOR M JX DR. Huldson
x 09/22/15 ISSUED FOR CO smv� Me ix DPH Design Group�,
`-R,Q/2a/15 R�MOS O,.� Re WMIMwireless
3 11/10/15 ft�nKROAsSOR.� I Re I
0 IEL �115155155�
D
00
� o
00
Z -1 1 !� o C)
z z
z
m 0 M
1: 0 C) 0
n 9 - 0
C)
z > z
0 m
mM - ------- ---------------- ---- -----ElA-- -----
--------------- ---------
8-3! -i,-Z, t prj� 11 m '0 0
wx . 2� . m
coz. 0 ao� 0 A E 8S
-!7' Z "MR, A'� G Inz
c �X,8� xc, m
>MO OD, 0 1, 0
.nl c Z� 0
A AF 00 X 01)
z 0
Z, 0.
Ao.
,mz-� 0 Z - Z x
Z,
80
0 mz
0
m
8z x
0
0
3' 3.
0 ca
0 0
Z
0 1 1
------------
oz 0
> z
m
t7 -----0---- --- ---
-0
i OZ
MZ
C . o
Z,68 6,
,16.0 la
z I C% t
oz, -n
x
so 0
0 0 z
Z
zz M C
0 a)
---- --------
m
0 0
0
t z
>
00
z
z >
M Z
- 0 --1
m z
o z
z z x
> >
m m Z,
T
m
m
z
�O
4-� &
0
F
oz,
FOR CONSTRUCTION
ANTENNA STRUCTURAL DETAILS IRE—EO 81 llF'�IED ll)�
FIEV OATE I OE�MPIRON I v I C.J�;
0 _n_ - -M Hud:son±*p
0 FOR RMR
095 122//il! INO FOR COR�TPON 05 Ix 0�
Design GFOUPLL
10/28/15 RiWO AMRG�5 C.047r 'OS A 4f
2 WrIMwireless
11/10/15 RMED nWRGkMS CWM� J. R.
(mn KO05GWOVw
WLDiNGX40�SUFEXRD IEL 1118)Ml-�3
v
--------------
V, (n 0
� mm � mm
loz 1 10
M 0 z 1,
M DO
m A,
5 m --------------
Z > Z >
) 0 0 0
c�M
--------------------
I -
--------------
ILI >
-C
I'
0. At
--------------
Ul
I
0
,N
,`0 z
----------------------
z
ci
V; A
U,
I A.±2'-
FOR CONSTRUCTION
GENERATOR STRUCTURAL SECTIONS PREPARED PREPARED FOR
74
qWEDESCRIATION OY CHK ARAD
I C
NS 1. DR. Hu
08/12/14 ISSUED FOR RME�
09/22/15 ISSUED FOR CONSTRUCTION NS Jx DAN De
cn PT dson
A sign Grcup
C/2./l, E SE MlMwireless
2 10/28/15 RZ�ASED FiBEASSUISS C.I..E, NS ix OPH
�,/,O/j 5 E�E I N
U, �1/10/15 -PASED FKRE�S C�-.AEI As ix DAN
M , 40
C,
SXZI,, 175)
N ANDOlbs .WIN, - ,I ll—�-
V)
0 W
P:
0
M
F—
C12x2O 7 z
3/4-0 A325-X �ClWOJ 0
BOLTS (TYP.) 5/8-* HILTI HIT-HY 70 0
WIO.22 HYBRID ANCHOR (MIN cc
o
6- EMBEDMENT)(TYP.)
u-
L4X44'
PLATE
0 31600 4
8�4.5 8
PLATE 3/4-0 A325- t6.6.1/2"
BOLTS (TYP.)
WIO.22 3 16 Ab
-LFJ
3/,6 C)
------ 3/16
cx
5/8"0 HILTI HIT-HY 70 0 ,
HYBRID ANCHOR (MIN 6- 2
EMBEOMENT)(tYR)
v
GENERATOR GENERATOR
CONNECTION DETAIL CONNECTION DETAIL
GRAPHIC SCAL GRAPHIC SON E
0 0-2-0-4- V-8* 11-1. 0 a'-2' D-4' 0-8, 1-0-
WIOx22 r. t2 t2 v
---�L3x3xl/4 x 8' LONG
13/4-0 A325-X L r
BOLTS (TYP.)
CJ,
6*xlo"x3/8'
1—
PLATE
C)
1 1/2- il 1/2- 1 1/2- 1/2
il? 7
6".10'.3/8" S-xlO-x3/8-
PLATE PLATE
WIOx22 EX STING BEAM PROPOSED FLASHING
BEI-9 (V.I.F.) PER MANUFACTUREWS
SPECIFICATIONS
cl 0 4'91/4- HSS 0 4".4".1/4" ASS
---- ----------
0 0— 3/4-0 A325-X 4 0 PROPOSED 3/4-0 TIM,
BUTS (TYP.) BLIND BOLTS. SMEREX 5'.10-.3/
7371�6 HOS-75GO-3.40 OR PLATE
371-67-e APPROVED EQUAL
NOTE PROPOSED 3/4-0
SEE 4/S-5 FOR BLIND BOLTS. SHEREX 1,
OTHER CONNECTION HOS-7500-3.40 OR
DETAIL APPROVED EQUAL
GENERATOR TOP PLATE GENERATOR B0170M PLATE BEAM 217 ESSEX STREET
CONNECTION DETAIL CONNECTION DETAIL Klow (viF) SALEM. MA 01970
SCALE 3t' I'-0 SCALE 3" - I'-C'
GRAPHIC SCAL GRAPHIC SCALF
0 0*-2'0'-4' 0'-8- EX[STING COLUMN
GENERATOR BELOW (V IF)
CONNECTION DETAI
SCALE 1 -0 GRAPHIC SCAL Sm7
0 W-V 0-4' 0-8, V-0.
z
FM NO CLEAN AGENT FIRE SUPPRESSION SYSTEM 0 V)
1. FURNISH AND INSTALL A 70TAL FLOOD'CLEAN AGENT FIRE SUPPRESSIONSYSTEMWRH AUTOMATIC DETECAON AND CONTROL
2. THE DESIGN.EOUIPME]NI,INSTALLATION.TESTING AND MAINTENANCE OF THE CLEAN AGENT SUPPRESSION SYSTEM SHALL BE IN
ACCORDANCE WITH THE APPLICABLE REQUIREMENTS SET FORTH IN THE LATEST EDITION OF THE FOLLOWING CODES AND SIMPLEX MONITOR TO SHUNT TRIP IN
STANDARDS: MODULE FOR ALARM SPEAKER AT
2.a. NFPA NO,2001-CLEAN AGENT FIRE EXTINGUISHING SYSTEMS AND TROUBLE ELECTRICAL SERVICE
2T� NFPA NO 70-NATIONAL ELECTRICAL CODE cr
2.c. NFPA NO.72-STANDARD FOR PROTECTIVE SIGNALING PROPOSED TELCO
2.d. FACTORY MUTUAL APPROVAL GUIDE FM-2GO TA lK�-\ FM200SYSTEM
2.e. UL LISANGS CONTROL PANEL
2.f. REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION(AHUO.THE STANDARDS LISTED,AS WELL AS ALL OTHER APPLICABLE VALVE z
CODES,STANDARDS,AND GOOD ENGINEERING PRACT ICES SHALL BE USED AS WINIMUM'DESIGN STANDARDS.
3. THE SUPPRESSION SYSTEM INSTALLATION SHALL BE MADE IN ACCORDANCE WITH THE DRAWINGS,SPECIFICATIONS AND APPLICABLE
STANDARDS.SHOULD A CONFLICT OCCUR BETWEEN THE DRAWINGS AND SPECIFICATIONS,THE SPECIFICATIONS SHALL PREVAll-
4. NSTAULAAON SHALL CONSIST OF THE FOLLOWING:
4.a. A COMPLETE OPERATIONAL FM NO SYSTEMS
4.b. NEW SMOKE DETECTORS IONIZATION BUILDING FIRE 0
4.� POWER FM NO SYSTEMS CONTROL PANEL FROM SMOKE DETECTION CIRCUIT. --------- SMOKE DETECTOR L TO VERUPON AUDIBLEISTROBE IN LL
4.d. INTERLOCK WIRING AND CONDUIT FOR SHUTDOWN OF HVAC&ELECTRICAL POWER SUPPLIES. MONITOR MINTS SERIES WITH EXISTING
4.0. CONNECTION TO VERVON WIRELESS MONITOR POINTS. CIRCUIT
5. THE MANUFACTURER OF THE SUPPRESSION SYSTEM HARDWARE AND DETECTION COMPONENTS SHALL BE ISO 9000 REGISTERED.
6. ALL DEVICES.COMPONENTS AND EQUIPMENT SHALL BE THE PRODUCTS OF THE SAINIE MANUFACTURER
T ALL DEVICES,COMPONENTS AND EQUIPMENT SHAU BE NEW,STANDARD PRODUCTS OF THE MANJFACTURER'S LATEST DESIGN AND PHOTOELECTRIC
SUITABLE TO PERFORM THE FUNCTIONS INTENDED. SMOKE DETECTOR
8. AAAL DEVICES AND EQUIPMENT SHALL BE Ul LISTED MUM FM APPROVED.
9. THE INSTALLING CONTRACTOR SHALL BE�NED By THE SUPPLIER TO DESIGN,INSTALL,TEST AND MAINTAIN FIRE SUPPRESSION
SYSIPEMS.THE INSTALLING CONTRACTOR SHALL HE AN EXPERIENCED FIRM REGULARLY ENGAGED IN THE INSTALLATION OF All, X
AUTOIWFHC CLEAN AGENT,OR SIMILAR,FIRE SUPPRESSION SYSTEMS IN STRICT ACCORDANCE WITH ALL APRUCAI CODES AND ------- - --A
STANDARDS THE INSTALLING CONTRA�CTOR MUST HAVE A MINIMUM OF FIVE(5)YEARS EXPERIENCE IN THE DESIGN.INISTALI-ATION DISPERSION FMNO SYSTEM MANUAL
AND TESTING OF CLEAN AGENT,OR SIMILAR.FIRE SUPPRESSION SYSTEMS. NOME DISCHARGEAND
10. THE INSTALLING COWRACTOR SHAA-L SUBMIT DRAWINGS.CALCULATIONS AND SYSTEM COMPONENT DATA SHEETS FOR APPROVAL -------- ABORT SWITCH
TO THE LOCAL FIRE PREVENTION AGIENCY,OVVNU`S INSURANCE UNDERWRITER.AND ALL OTHER AUTFORMES HAVING JURISDICTION
HUME STARTING INSTALLATION.SUBMIT APPRONOED PLANS TO THE ARCHITECTIENGINEER FOR RECORD. --- - ------------------------ 0
11. THE SYSTEM SHALL PROVIDE A FM-NO MINIMUM DESIGN CONCENTRATION OF 7.2%BY VOLUME.SYSTEM DESIGN SHALL NOT EXCEED
10.5%FOR NORMALLY OCCUPIED SPACES WITH RETENTION TIME OF 10 MINUTES,
12. THE SYSTEM SHALL BE COMPLETE IN ALL WAYS.IT SHALL INCLUDE ALL MECHANICAL AND ELECTRICAL INSTALLATION.ALI-DETECTION
AND CONTROL EQUIPMENT,AGENT STORAGE CONTAINERS,FWM AGENT DISCHARGE NOG2LES.PIPE AND FITTINGS.MANUAL
RELEASE AND A80RT STATIONS,AUDIBLE AND VISUAL ALARM DEVICES AUXILIARY DEVICES AND CONTROLS,SHUTDOWNS.ALARM
INTERFACE,CAUTION)ADVISORY SIGNS,FUNCTIONAL CHECKOUT AND TESTING.TRAINING AND ALL OTHER OPERATIONS NECESSARY
FOR A FUNCTIONAL,ILL LISTED ANDIOR FM APPROVED FM-200 CLEAN AGENT SUPPRESSION SYSTEM. z
13. PROVIDE TWO(2)INSPECTIONS DURING THE FIRST YEAR OF SERVICE.INSPECTIONS SHALL BE MADE AT&MONTH INTERVALS
COMMENCING WHEN THE SYSTEM IS FIRST PLACED INTO NORMAL SERVICE.
14. THE SYSTEM SHALL 99 ACIIUATED BY A COMBINATION OF IONLZATION AND PHOTOELECTRIC DETECTORS INSTALI-EEI MR MAXIMUM
AREA COVERAGE OF 260 SO.FT.(23.2 W)PER DETECTOR.DETECTORS SHALL BE CROS&ZONED DETEC-nOm REQUIRING TWO
DETECTORS TO BE IN ALARM BEFORE RELEASE.
15. AUTOMATIC OPERATION OF PROTECTED AREA SHALL BE AS FOLLOWS:
ACTUATION OF(1)DETECTOR,MTH THE SYSTEM SHAUL,
a. ILLUMINATE THE'ALARM'I-AMP ON THE CONTROL PANEL FACE. FM-200 DESIGN FM200 PLAN
b. ENERG2E A VISUAL INDICATOR.
C. TRANSMIT A SIGNAL TO VERIZON WIRELESS MONITOR POINT,
d. TRANSMIT A SIGNAL TO THE BUILDING FIRE ALARM SYSTEM. VOLUME:APPROX.2.200 CUBIC FEET
MINIMUM AGENT FOR TUM CONCENTRATION:75 LB.
ACTUATION OF A 2NO DETECTOR,ON A SECOND ZONE,SHALL. CYLINDER SIZE:I" NOTES
e. ILLUMINATE THE'PRE-DISCHARGE'LAMP ON THE CONTROL PANEL FACE.
I. ENERGIZE A PRE-DISCHARGE I-ANIP ON THE CONTROL PANEL. VALVE ASSEMBLY I. ALLEQUIPMEWNOTSHONNFORCLARITY
9- START TIME-DEILAY SEQUEINCE(NOTTO EXCEED SO SECONDS). LOW PRESSURE SENSOR
h. SYSTEM ABORT SEQUENCE IS ENABLED AT THIS TIME- UOUID lUEA4EL INDICATOR 2. PROPOSED ROOM SHALL BE2 HOUR FIRE RATED.NOSPRINKIERS IN DATA ROOM.
AFTER COMPLETION OF THE TIME-DELAY SEOUUICE,THE FM 200 CLEAN AGENTSHALl.DISCHARGE AND THE FOLLOWING SHALL OCCUR: BURST DISC
1. ILLUMINATE ASYSTEM FIRED'FAMP ON THE CONTRON-PANEL FACE CLASS C FIRE cf)
SHUTDOWN OF ALL POWER TO HIGH VOLTAGE EQUIPMENT. I-M DEGREE NOME
IL SHUTDOWN CIC POWER TO SHUNT TRIP BREAKER.
1. CLOSE VENT DAMPERS. 101-
TRANSMIT A SIGNAL TO VUVON WIRR FSS MONITOR POINT.
P. ENERGIM A VISUAL INDICATOR OUTSIDE THE ENCLOSURE. SIMPUEX NONffOR MODIAS (TROUBLE)
16. THE SYSTEM SHALL BE CAPABLE OF BEING ACTUATED BY MANUAL DISCHARGE DEVICE LOCATED AT EXIT DOOR.OPERAIMN OF A SIMPIEX MONITOR MODULE(�M)
MANUAL DEVICE$HALL DUPUCATE THE SEQUENCE DESCRIPTION ABOVE EXCEPT THAT THE TIME DELAY AND ARENT FUNCTIONS iai-
TIE INTO BUILDING 0
SHALL BEBYPASSED.THE MAINUAI-DISCHARGE STATION SHALL BE OF THE EUECTRICALACTUATIONTYPE AND SHALL BE SUPERNOSED FIRE ALARM TELCO AURA BOX
AT THE MAIN CONTROL PANEL. ELECTRICAL R
17. CONTAINER SHALL HE SUPER-PRESSUREEED WITH DRY NITROGEN TO AN OPERATING PRESSURE OF 360 Psi @ 70 OF(24.8 BAR AT W SERVICE PONIER & NN INDOOR W� MIS
SHUNT TRIP IN BUILDING W� CONIROU,ER CONNECT NG
OC),CONTAINERS SHALL BE OF HIGH-STRENGTH LEON ALLOY STEEL CONSTRUCTION AND CONFORM TO NFPA NOI. 40 VOLT RECTIOERS E CHNIC ROOM OONT�T�ROSS INPUT
18. CONTAINER SHALL BE ACTUATED BY A RE-SMABUE ELECTRIC ACTUATOR NTH MECHANICAL OVERRIDE LOCATED AT AGENT EMERGENCY SHUTOOM4
CONTAINER.
L IN.7R PNM� UMO�G.ED
E C
19. CONTAINER SHALL HAVE A PRESSURE GAUGE AND LOW PRESSURE SWITCH TO PROVIDE VISUAL AND ELECTRICAL SUPERVISION OF TEL/C
_GJAL
PAR E
THE CONTAINER PRESSURE.THE LOW-PRESSURE SWITCH SHALL BE WIRED TO THE CONTROL PANEL TO PROVIDE AN AUDIBLE AND "'ANUAL FM 200 CONOROL PMEL
VISUAL'TROUBLE'ALARMS IN THE EVENT THE CONTAINER PRESSURE DROPS BELOW 247 PSI(1 7BAR).THE PRESSURE GAUGE SHALL r.I.- DISCHARGE
E
BE COLOR CODED TO PROVIDE AN EASY.VISUAL INDICATION OF CONTAINER PRESSURE. -ONI LUX DAWERS
20. CONTAINER SHALL HAVE A PRESSURE RELIEF PROVISION THAT AUTOMATICALLY OPERATES BEFORE THE INTERNAL PRESSURE T.�U'�DE AGE, T-4
EXCEEDS 750 PSI(51.1 BAR). LOW PRESSURE MUCH
21. ENGINEERED DISCHARGE N=UES SHALL BE PROVIDED WITHIN THE MANUFACTURERS GUIDELINES TO DISTRIBUTE THE FMF= FM 200 SGUENDID V&�
AGENT THROUGHOUT THE ENCLOSURE. ABORT STAROK
22. DISTRIBUTION PIPING AND FITTINGS,SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S REQUIREMENTS,NFPA MI
AND APPROVED PIPING STANDARDS AND GUIDELINES.ALL DISTRIBUTION PIPING SHALL BE INSTALLED BY QUALIFIED INDIVIDUALS
USING ACCEPTED PRACTICES AND QUALITY PROCEDURES.ALL PIPING SHALL BE ADEQUATELY SUPPORTED AND ANCHORED AT ALL
DIRECTIONAL CHANGES AND NOME LOCATION.
23. THE CONTROL PANEL SHALL BE A PCR RELEASING PANEL SUPPLIED BY F�200,SYSTEM.THE CONTROL SYSTEM AND ITS FIRE ALARM NOTES
COMPONENTS SHALL BE ILL LISTED AND FM APPROVED FOR USE AS A LOCAL FIRE ALARM SYSTEM WITH RELEASING DEVICE SERVICE
THE CONTROL SYSTEM SHALL PERFORM ALL FUNCTIONS NECESSARY TO OPERATE THE SYSTEM DETECTION,ACTUATION AND 1. INSTALL AS REQUIRED BY FIRE DEPARTMENT AND NATIONAL FIRE CODE.
AUXILIARY FUNCTIONS, R
24. THE CONTROL SYSTEM SHALL INCLUDE BATTERY STANDBY POWER TO SUPPORT 24 HOURS IN STANDBY AND 5 MINUTES IN ALARM. 2. ALL FIRE ALARM EQUIPMENT,CONDUIT WIRING SIZES,QUANTITIES.TYPES AND LOCATIONS SHALL BE vERIFTEO AND APPROVED BY
25. THE DETECTORS SHALL BE SPACED AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS SPECIFICATIONS AND THE LOCAL FIRE DEPARTMENT PRIOR TO INSTALLATION,
GUIDEUNES OF NFPA M SALEM 5 MA
26. ALL SYSTEM WIRING SFAU-BE FURNISHED AND INSTALLED BY THIS CONTRACTOR. 1 THE MANUAL DISCHARGE PULL STATION SHALL BE DIFFERENT IN APPEARANCE FROM BUILDING FIRE ALARM SYSTEM.LABEL 217 ESSEX STREET
27, ALL WIRING SHALL BE INSTALLED IN ELECTRICAL METALLIC TUBING(EMT),OR CONDUIT.AND MUST BE INSTALLED AND KEPT 'FWM MANUAL DISCHARGE'. SALEM. MIA 01970
SEPARATE FROM ALL OTHER BUILDING WIRING.
28, AFTER THE SYSTEM INSTALLATION HAS BEEN COMPLETED.THE ENTIRE SYSTEM SHALL BE CHECKED OUT.INSPECTED AND 4. THE FM-M HORNISTROBE UNITS SHALL BE DIFFERENT COLOR AND DISTINCT SOUND FROM THE BUILDING FIRE-
FUNCHONALLY TESTED BY QUALIFIED,TRAINED PlER$ONNEl,IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDED S. ALARM SIGNAL DEVICES.EXTERIOR HORWSTROBE SHALL BE LABELED�FIWNO DISCHARGE'.
PROCEDURES AND NFPA STANDARDS.
29. PRIOR TO FINAL ACCEPTANCE.THE INSTALLING CONTRACTOR SHAU-PROVIDE OPERATIONAL TRAINING TO VERIZON WIRELESS 6. POST FM-NO SYSTEM SEQUENCE OF OPERATIONS AND OPERATIONAL INSTRUCTIONS ADJACENT TO FloFND CONTROL PANEL.
PERSONNEL.EACH TROOJING SESSION SHALL INCLUDE CONTROL PANEL OPERATION.MANUAL AND ABORT FUNCTIONS.TROUBLE
PROCEDURES,SUPERV[SMY PROCEDURES.AUXILIARY FUNCTIONS AND EMERGENCY PROCEDURES.
30. ALL TESTING SHALL BE IN ACCORDANCE WITH NFPA MI.APPENDIX B.
31, THE FM NO SYSTEM COMPONENTS FURNISHED AND INSTALLED UNDER THIS CONTRACT SHALL BE WMRANTED AGAINST DEFECTS IN FPnl
DESIGN.MATERIALS AND WORKMANSHIP FOR THE FULL WARRANTY PERIOD WHICH IS STANDARD WITH THE MANUFACTURER,BUT IN FM 200 WIRING DIAGRAM (g)
NO CASE LESS THAN ONE(1)YEAR FROM THE DATE OF SYSTEM ACCEPTANCE, SCALE. NTS -I
z
PLUMBING NOTES 0
1. THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL PLUMBING EQUIPMENT SHOWN ON THE DRAWINGS AND HEREIN
SPECIFIED.EQUIPMENT ITEMS NOT SHOWN OR CALLED FOR SUCH AS F"INGS,VALVES,HANGERS.ETC.SMALL ALSO BE
INSTALLED TO MAKE A COMPLETE AND WORKABLE PLUMBING SYSTEM.
2. THE WORK SMALL INCLUDE.BUT NOT NECESSARILY LIMITED TO THE FOLLOWING:
3. A-NAME TAW. cn
z
4- THE FOLLOWING WORK IS TO BE DONE BY OTHER TRADES
4.1. EXCAVATION&SACKFIU- 0
4.2. CONCRETE WORK
4.3. PAINTING
44. ACCESS PANELS E T cr
4.5. CUTTING AND PATCHING
4.6. ELECTRICAL MIRING F X
S s 0
S. OBTAIN AND PAY FOR All REQUIRED TEST,PERMITS INSPECTIONS AND BACK CHARGES. 67" LL
6. ALL WORK SHOWN ON THE PLANS IS INTENDED TO BE APPROXIMATELY CORRECT TO SCALE,BUT FIGURED 01MENSIONS
DETAILED DRAWINGS ARE TO BE FOLLOWED IN EVERY CASE.THE DRAWINGS SMALL BE TAKEN IN A SENSE AS DIAGRAM1=10C.
METHODS OF RUNNING PIPES AGE SHOWN BUT R IS NOT INTENDED TO SHOW OFFSETS AND FITTINGS,OR EVERY STRUCTURAL
DIFFICULTY THAT MAY BE ENCOUNTERED.
7. MATERIAL,INSTALLATIONS AND WORKMANSHIP SMALL BE IN FULL ACCORD WITH THE MOST MODERN PLUMBING CONSTRUCTION
REQUIREMENTS,ALL MATERIALS SHALL BE NEW,UNLESS NOTED OTHERWISE.THIS CONTRACTOR SHALL COMPLY WITH ALL
LOCAL,STATE,BOCA AND NATIONAL CODES.
S. THIS CONTRACTOR SHALL INSPECT THE SITE AND SMALL INVESTIGATE ALL CONDITIONS UNDER WHICH HIS WORK WILL BE w
PERFORMED.HE SMALL COORDINATE MIS WORK SO THAT IT DOES NOT INTERFERE WITH THE WORK OF 01-HER TRADES AND THE
GENERAL CONTRACTORS BUILDING SCHEDULE. w 0
9� THE CONTRACTOR SHALL GUARANTEE HIS WORK FOR A PERIOD OF ONE YEAR FROM THE DAM OF FINAL ACCEPTANCE.IF ANY w V) '5*
DEFECTS IN MATERIALS OR WORKMANSHIP OCCUR MHIN THIS PERIOD.THEY SHALL BE CORRECTED AT NO ADDITIONAL COST <
TO THE OWNER.
go R-1
10. GAS PIPING SMALL BE SCHEDULE 40 BLACK STEEL PIPE WITH THREADED MALLEABLE]RON FITTINGS.ALL GAS PIPING SMALL BE
PAINTEDYELLOW.
Ii. GAS COCK SHALL BE WATTS REGULATOR SERIES GBV APPROVED GAS BALL VALVE.
12. EACH ABOVE GROUND PORTION OF THE GAS PIPING SYSTEM UPSTREAM FROM EACH EQUIPMENT SHUTOFF VALVE SHALL BE
ELECTRICALLY CONTINUOUS AND BONDED TO MY GROUNDING ELECTRODES.
13. FURNISH AND INSTALL ALL REOUIRED HANGERS,STRUCTURAL SUPPORTS,RIGGING,SLEEVES,l HOIST AND OTHER
REQUIREMENTS FOR THE INSTALLATION OF ALL PLUMBING EQUIPMENT. z
14. FURNISH AND INSTALL NAME TAG ON GAS PIPING.NAME TAG SMALL BE METAL STAMPED WITH WIRE ATTACHMENT STATING 0
EQUIPMENT SERVED.
15. COORDINATE GAS SERVICE WORK WITH GAS CO.
I& THE EMERGENCY GAS SHUTOFF VALVE SHALL BE NORMALLY CLOSED GAS VALVE 120 VOLT.ASCO MODEL 80,K).2'. z
El
PROPOSED
GENERATOR ON
ROOF(361 CFH)
GAS PIPING TORUN 1Y,*G(361 CFH)TO
ALONG SIDE OF PROPOSED GENERATOR co
BUILDING TO ROOF NEW lY4'G(361 CFH)TO PROPOSED GAS BOOSTER LOCATED ON
PlP,
�S BOOSTER S CEL PLA FORM ON ROOF TO PROVIDE
EXISTING GAS TO & ERAP=1�ON ROOF RECELLREDTPIRESSURE OF 7-1 I-WC FOR g3-
GENERATOR(SEE P-2)
BOILER IN BASEMENT
BUILDING TO ROOF
CTE GAS SERVICE PROPOSED NEW GAS METER EX STING GAS TO Boil
LOJ�ATED IN BASEMEh
WNEW%'G(361 CFH) SET BY GAS CO.(361 Cl ---------
1)','G DAI Cl RISER ING RUN ALOMG
ALONG FACADE OF NEW 1Y.'GAS PIP
ROOF TO PROPOSED LEIS
EXISTING MUM
EXISTING INCOMING LOW GENERATOR SPECIFICATIONS EXISTING INCOMING EXISTING GAS METER
PRESSURE NATURAL GAS
SERVICE MAKE MTU Enel,,y Onsite LOW PRESSURE
MODEL 3O-CC6NLTI NATURAL GAS SERVICE NEW GAS METER SET
KW: 30 BY GAS CO.TNT Cl
HZ 60 (SEE RISER DIAGRAM)
GAS RISER DIAGRAM GAS PRESSURE 7'-11'WC.
SCALE NTS GAS LOAD 351 CFH I
UMBING OVERALL PLAN K�RU)ENOWE"
SCALE 1/8-�l -0- SALEM 5 1
217 ESSEX STREET
REFER TO 'A' DVl SALEM. MA 01970
FOR LATEST LAYOUT
Fp m 1
z
PACKAGED SIMPLEX GAS BOOSTER SYSTEM SPECIFICATION 0
V)
Q)
CENTRIFUGAL GAS BOOSTER SYSTEM
t THE CONTRACTOR SHALL FURNISH AND INSTALL A COMPLETE U.L.LISTED,FACTORY BUILT.ENCLOSED PACKAGED,SIMPI-EK GAS BOOSTER SYSTEM WITH UPS BACKUP MICH
SHALL BE CAPABLE OF DELIVERING A VARIABLE VOLUME OF NATURAL GAS TO A MAXIMUM OF 785 CFH MILE PROVIDING AN ELEVATED DIFFERENTIAL GAS PRESSURE OF UPTO I I
W.C.
2� THE SYSTEM SHALL CONTAIN ALL THE NECESSARY COMPONENTS INCLUDING A HERMETICALLY SEALED EAS BOOSTER PUMP,F.M APPROVED CHECK VALVES,ISOLATING VALVES
PRESSURE SWITCHES,PRESSURE RELIEF VALVEIREGULATOR.AND CONTROLS REQUIRED TO PROVIDE A COMPLETELY AUTOMATIC OPERATING SYSTEM IN FULL ACCORDANCE
WITH THE LATEST LOCAL UTILITY COMPANY REQUIREMENTS.THE GAS BOOSTER SHALL BE UTL.LISTED AND BE OF THE HERMETICALLY SEALED,SINGLE STAGE,CENTRIFUGAL TYPE
WHICH SHALL INCLUDE A MAGNETIC COUPLED,WN RPM TEFC MOTOR.OPERATING ON 116 VOLT I PHASE POWER. z
3. THE BOOSTER SYSTEM SHALL BE LOCATED ON THE ROOF AS NOTED ON THE PLANS.THE UPS SYSTEM SHALL BE LOCATED IN NEMA 3R ENCLOSURE UNDER POWER DISTRIBUTION 0
PANEL MOUNTED TO UNISTRUT.
4. THE PACKAGE SIMPLEK GAS BOOSTER SYSTEM SHALL BE EQUIVALENT TO ECLIPSE COMPAC MODEL M0101LUPS WITH 91(=4279 UPS AND OUTDOOR ENCL�URE. 0
cc
PIPING MANIFOLDS AND BYPASS LOOP 0
1. THE COMPLETE PACKAGED GAS BOOSTER SYSTEM SHALL BE PRE-PIPED,ASSEMBLED,PAINTED AND WIRED ON A STEEL RNSEANO SHALL INCLUDE FACTORY BUILT PIPING
MANIFOLDS FOR THE INLET DISCHARGE AND BYPASS LOOP OF THE BOOSTER.THE MANIFOLDS SHALL BE PROPERLY PRESSURE TESTED AND SHALL INCLUDE ALL
APPROPRIATELY SIZED SYSTEM COMPONENTS.
SIMPLEX GAS BOOSTER CONTROL SYSTEM
I. THE GAS BOOSTER SYSTEM SHALL INCLUDE A MICROPROCESSOR BASED CONTROL SYSTEM WHICH SHALL BE DESIGNED TO AUTOMATICALLY OPERATE THE GAS BOOSTER ON A CAU.
TO RUN THE AT&T EMERGENCY GENERATOIT
2. THE CONTRACTOR SHALL WIRE A PHYSICAL O�LCONTACT CLOSURE INTERLOCK WITH GENERATOR AND EMERGENCY GAS SHUTOFF MUCH TO PROVIDE STARTGTOP SIGNALS FOR
THE GAS BOOSTER.
AILARM BELL WITH SILENCING SWITCH AND GAS PRESSURE SWITCHES,UPSlBATTERY BACK-IJP POWER MODULE NECESSARY TO RUN THE GAS BOOSTER FOR A MAXIMUM OF 7
3. THE CONTROL SYSTEM SHALL INCLUDE AN ENCLOSURE WITH REQUIRED MOTOR CONTRACTOR.FUSIBLE DISCONNECT SWITCH,OWOFF SELECTOR MITCH,INDICATING UGF[TS'
MINUTES ON AN INTERRUPTION OF MAIN POWER IN ORDER TO ALLOW THE GENERATOR TO BEGIN OPERATION. c
0
DESIGN.COORDINATION,FIELD SUPPORT AND QUALITY ASSURANCE
1. TO ENSURE DESIGN INTEGRITY THE CAS BOOSTER SYSTEM SHALL BE COMPLETELY TESTED AT THE FACTORY PRIOR SHIPMEWTO THE JOB SITE WITH AWRITTEN CERTIFICATION
OF'PERFORMANCE.
2. THE BOOSTER MANUFACTURER SHALL PROVIDE ALL REQUIRED FIELD SERVICE ASSISTANCE FOR INSTALLATION SUPERVISION,EQUIPMENT STARTUP,AND ONE(1)YEAR
WARRANTY SERVICE.
PRESSURE
�UGE
ISGI-ATFNG TESTTAP EMERGENCY SHUTOFF VALVE
TESTTAP E ERGENCY SHUT�FF VALVE
C" UY CLOSED ASVALVE
VE SC DEL"'Ho",VAC
GAS 'ERIINCY
"l CF
BALL VALVE ECLIPSE CHECK NORMALLY CLOSED GAS VALVE.
VALVIE ASCO MODEL IM40.T.IM VAC U)
GAS I
IN
in
-cu' C5
LOW DISCHARGE GAS
PRESSURE PRESSURE MITCH AUTO
a GikUGE RESET.MODEL No,DARJ-
DUNES GML MLF6 S FLEXIBLE
ISOLAl'ING C UU'
BALL VALVE COUPLING GAS FIRED EMERGENCY C3-
GENERATOR 361 CFH
UNGN GAS UNION
COCK -I F J .1
I LL
OUT
I ISOLATING LOCK UP F DRIP
"-T'
LV
41:—!L V!ALV:E REGULATOR LEG
SEND SIGNAL TO OPERATE
BOOSTER FOR GENERATOR
RUNNING
GAS BOOSTER PIPING DIAGRAM
SALEM 5 MA
217 ESSEX STREET
SALEM. MA 01970
Pm2
0
0, W-2<T Ewc
Xmmm .. Om '�O z. -P-2 -Q
'10 1 m'0 5 -zzO
6--� A i�Q ' E �1.iR ;lp .0 P az
,I c D 0 m �10 ED
'W"A� --" 0 5 1 ",mz
OU, 0
0, V�imET 0 U` R
0 IM rn>0<x -Ea O> z"um'00
MF,,.
,Mcz
�z X
M�X�p 'YDO- Mo.
m Am o DO 1 0
0
0
0
> T.000
Aa 0-
0 0
z
Z
0
m
'�65; DO s A z
0 '� A
0, O� cz, 0- Z''m cn
m DO g mm O's. LL=L I I—El
,,>, >0'
> 42,
9 F,
z
2 RE
z '
�--5 -.'0 W��Ozzm cc - 2
Oc> �m.K Z'
A, mo
C--- --- Z 0
z?, Df-, I u,
g'
'>DD
<'Om' -,-; -,T.'�>-0
'm'�c w I�' SO 1
.0a- 0 �� z;I ,DO M�
,Ozm, F,Z>S 0-Am,a 0-
siomnq -X 0 Am 0 M
S' 9.
MO .2c
on Cc C cc 1;
m;-Z" Omm 0
ED A OX I
'm a'> D, 11 Fr zm a 2 1-0
m<> I
z
>
ac
O'ZTD, 1 10 F,, xZ0
0
'cz, 0
nz O�,-
c'n C�- 0 2 " R,
<
"z 0 m
DDZ 0 KO TO 'D
x Z"z z Z
C> Am
IN 339�
It"'OO
Z DDO.�
0
0 ml D'
Ol 7 co
0 DO
z
zz i=F,'D
zo. Om 2 �m
0 'ZO O'Zo
O.T COOT
OZmO
Ull
mo
mc, Tm'O
I't 0 Z92t
0.- 0>n.-0�4
-zc, >
A-2 DO
3D A-Ov z
Om 0
A z z
KA
Z' m m
0 0
Ll
00 .0
F-
>
.1 -D- 0
�0 h (-) >
m 0
g om 0
zo�
-z'
EDZ-1
01
-D
I, cc
�z ------- ------ -------
'z A F7
�M, 0 mo, F,
>
0
>
ED
'2
" -1" 77
+ 0 m
2 '00
"2zz
0,50
0 z
Ol
0
0
m
0
U,
g s- 2 g a goo> ;8 �Tgs 2§x -c
.z �0 !-i Z� c, �O �"rpz -0 '1 �'Z-� .��K nvi� UrI� jlz� I
> ED: V.a,0 6 ,E-, mg P- 2 . , , " m, z 1:0
T 'R 'A�rn orz Uc A -> �P- C 2h'--an ad .0 0. -''m�>�q-'Z'- A 2.5 C23
-9 >z 6 rl -Z og Ll F U,W� , F. --1 7'- q-�Z —1 Ur m.
z A ��T >z<n, �z F, -2 2. it <
7 >c m 00000 00608 ?'m TA '-522r� 2--� 22 f 98- 2A 2o2og
'> �c,-Px oc-0. 0' w;0' Al.� 'm -.2,- 8. 8.-0' Yg. m gi=-5
H 2, 68. .8
�Z'c. M'56 9!Q Z.� z;a K:
Oz 2 4 -z 06 '0 0, K 0 > - '. m-�-
F ED Qrjr . rri
U, OAC 'p"m zz mz q'5 '�mvf z-Z 9.,
2IM 0 8 00 PH., --Mr. -I-,OD -I
z 0 1,
ED 0 X" 6 mm
A ,,89N &k -- z 0
-D, U, InKRI m z A 0 �8
'U, > 0,�O I 'R i I'. -IMF Or
Z" 0 mo ASz 0" 2' ME Tf 2 PZ2>m z X, -'-3T >
ED ci. Z-U,Iu. O's 42�Tz 05" mo,
gz 6 Oc 'P. 062. 0 0 Z- 2z
'r=0 A
mm 0 0 > z Zzu,F, T O"m.m'
-c
O> DO A Ur D, �D,
0, 1 0 Z� M cc >�Zo
594; A' -Az AlAzzi
> -z! :E�
A 0> t S 0 0 T� ��0.m
0 M Rz
> DO Z--:�g' FO DO,
8 �*c 8 'C-'"
.2 0 lz .8 'z m >-�m� 2
z 00 z -Z�c- at-
TO 0 f T 0'F,'.i M m-
0 0
Z ml mr� m '.2 x 'A'm ;tog
-0 Ll m �O 0 ..-0 H?
ED 7� A
c Z!i�
.> �z "Z z K
c/)
z sts,
c
" Dw A �T
tm .8 m A P 9
I, z c > 0
I D, 0020
K'S, F �n Ur
0 7 Oz z F Fs . *-�U`
c 0 m OU- .6 00- C ;0 =-D" A
'c
I Ur z
0 F, Or
0 0 0 .15i -F 1 -2, .
o
m
z c
A
A IF Oz 0 -�OMD` Am
00
FOR CONSTRUCTION
f f i A MECHANICAL PLAN,NOTES& DETAILS PREPARED W PREPARED FOR
J�LDATE DESCRIPTION
_a__S.HK �1`0
Or3/12/14 ISSUED FOR Revinv rs ,r OP,, Ht
idson ID
1 09/22/11 ISSUED FOR CONS7RUC7" NS Iri )P,, Design Group
X"
1 —2 10/28/15 RIN!SED FSERCUISS C=7 ,s .�7 VWXMwireless
3 11/10/15 ,S
`rllSCROUG,`.0ISSI
U)
GENERATOR SPECIFICATIONS PANEL NAME: INTERGRATED LOAD CENTER ASSEMBLY ABBREVIATIONS GENERAL NOTES 0
ONE GENERATOR A,K OF THE SAME ACCESSORIES III,BIN �2012-CAX. 2� MOUN,MAD SURFACE ELECTRICAL
.1 AS THE GEFIE�XCM.GENERATOR MANNUFACTkAIIER.C(PIERAC POWER SAISTIENN AW COPPER AXOTRAN,(MIDLAND SAA 1 ALL ClIoDOCTOI STIALL BE COPPER F- (ILI
-ACOUSUCAL ENCLOSURE
WIN CRIPICAL EXHAUST SII�CE. AWC AAMEFND.WME(DRUGS
FLEXURE TUID A UST CONNECION, STAINLESS IIEEL MY BONN p '� mxXWXwR BRANCH! "A__LW P BFUM CRT SOW OWNS C�M WIRE 2 ALL WRING DEMM AND EOI SHALL BE SPECIFICATION GRADE AND UL LISTED
-BLOW HEATER WITH THERMOSTAT AM 0NI L� CRT MIAMI"I ARM N. 3 THE INSTALLATION OF ALL MATERIALS SMALL COMPLY WTH TME NAEONAL ELECTRIC CODE, cc
WDEMA,,j, I a SYS BASE TRANSMISSION TOM
-IAL PI AMID RAHN CA'KIT 1 20 1 1 UGUNTS jJ12, 111n.3141 2#12. 1112G,3/4-C 2014 EDITOR OR LATEST
GENERATOR SMALL BE A 30 PKW1 60 HI/STANDBUY -BATTERY 3 20 1 WICEPTAI 21Q. IJIN,3/4C 2112. 1#12G.3/4% 7T E CLOCK 4 COOK COIN SCIEFFED GROUND BAR EXTERNAL 4 ALL MATERIALS SMALL BE NEW V)
201 ENCLOSED UNJT -8.17.1 TALK AID CAKES -
I,
JktXtl�CHARGER.EQTMALIZE/TUOAT-�C 5 1. INER B BIRDS SQUAWK
DRAI. IT - W 2 AMI 5 WON -c 2 -C 2 W - 5, OTTLETS AID JUNCDON BOXES SMALL BE ZINC-COATED ON CAEI PLAYED SHEET STEEL
L AIZI('�)US �3. .SO -IMOA SAFE�UARB BREAKER 7 _j SAY ELECIll METALLIC TUSXK SO ES NOT LESS TFIAN FUXUR INCHES SQUARE AID SUITABLE FOR THE �E OF SERVICE
BIL 216. low.3/. 216. TOM, 314 ANI 5 FORM I z
OUTLET ALL OUTLET AND ANCTION BOADES SHALL BE SECURELY SURFACE WOUN7D 0
I (RADIATOR MODEL), WET LO 1 450 LBS -COMMON FAILURE RELAY Krf 9 30 2 CU_T 2#10. IftSQ.3/4", 2#10. 1110C. 3/4-C M-2 2 30 to CEN GENERATM 6 THE ENTIRE S�YEM SHALL BE SOUDLY(SOTONDED USING COMPRESSON-TIFE CONDUIT
-MERATION ISOLATOR KIT 5 11 12 C�(XAUL.POSMIDI SOCITEM FITTINGS GRI CONDULTS AND PROWERLY QUADDED WOUND CONDUC70RS TRIMP-TYPE AND
Is " C', GROWTH SET SCREW-TYPE CONDUH FITTINGS ARE NOT ALLOWED ALL RECEPTACLES AND EQUIPMENT
Q#6 1. 3 DIRE ITS SHALL BE GROUNDED USING A FIFUL--SZE EQUIPMENT GROUNDING CONDUCTOR
jo 2 FOECTWIER 01 2#10. 11 3/41C 306. INS). 3/4-C - SUNNGE ARRESTOR 2 60 UMTH
C,, INTERIOR GROUND UK(MATO) RUN THE CURRENT CONDUCTORS 0
FUEL OAS AND PLUMBING CODE AFFLIES M THE GENERATOR AND ITS DSMPGRENrS
11 LOAND ANTER. WPIM GROUND SAN I ALL WALL IEWTIXTIONI FOR TELCO,POWER. AND GAILMIN.I.Al REQUIRE IQJD STEEL
W 2 NEC�. so, ijiW.A/4AQ 2110. ?JIGG.3/41C - RECTIFIER 13 2 1 7 SLEEIIES
#2 2# S AWAS
9 MASTER DMORATED GMRO)BAR
2' - 22 "C'S PER1%WAEE CCMM�TAW SYMMI a ALL SWHC�ES SMALL BE 48 INCHES At F L,
,, BIT 2 RECTONER 1- 2#10. ?JIM.3/4-C 2110. 111(XI 3/4-C KCFTYER 15 2 Qo 7. , POWER PROTECTIONK! (LABORED 9 ALL RECEPTACLES SHALL BE IS INCHES A F F _j
7s 2o , a. eArt. WAmsiu, 2#12. low. 11c A P� PRIMARY�CABINET 10 ALL I-S7ATS SHALL BE 60 INCHES A F F
T, 20 1 a. SLOW EAVEFY 21110. low. "c 2012. 1#12G, 3/4-C INGS MID GALVANIZED STECU
29 20 WARE 2#12 1#12G 31eC AXNI CASE TRAY
Ty BOTTOM OF CARE MAY NHA�HE 7-S'AFF
3. 20 FIX-201) 2012, 1#12G. 3/.'C TYP
33 2#12, 1112C. 3/4CG LIPPER ANTLY.co,'PER WI BAN, $7 CABLE WAY AN�CNES SHALL BE MOUNTED TO STRUCIURAL CEPUNG
M SIMODE POWER CASSIO
13 AFTER FINAL LEMELING OF CAKE MAY,CUT THREADED ROSS 1/2-BELOW NUT AID
37 IS VARE WARE 20 38 1 ALARM AND SIGNAL CIL
I PHOTOELECTRIC SIPW 2 0
SWITYKE DEFECTOR 0 140 14 ALL ALARM VINCE SHALL-BE RUN FROM EACH OF THE COMPONENTS TERMINAL STIFF LEASTE V)
41 2 ION1?AjqNQNGR vAuNE 20 ADDITIONAL ALARM MARE COFLED WIN SUFFICIENT LENGTH TO REACH FRE FLOOR
.EA Not,
15 At' ... MWES SHALL BE TAGGED AND LABELED WIN THE APPTA)ARNFAFE ALARM ITfP�
ALL COY4TAC��S IREL BE NORMALLY CL�ED.WY. AND ISOLATED Fll�GROUND.U CIA
16 ALL ALARM WRING SHAUD.BE T/2-C 2 122 UNLESS OTHERWISE NOTED
17 ELECTROAL C�DPACTW TO CARRY POWER FEED OF LESSEES LED DIDUL EfX.NMONT
18 ALL ENCLOSURES TO BE NEMA
19. INTERCRATELD LOAD CENTER ASSEMBLY AND THE GENERATOR SLflFk'E0 BY LESSEE.
EP
f
AP
NEMA I ENCLOSURE WITH
HINGED COVER & LATCH,
LABEL"AEARM TERMINAL NOTES AR`ZON
CABINET
1. TERMINATIONS: TERMINATIONS TO THE ALARM SMIP U)
WILL HAVE CRIMP ON BLOCK SPADE. TELCO
2. L8BELING' ALL ALARMS WILL BE LABELED WITH WHITE PARSE
C0,064EINCIAR.POWER FUULUK LAMINATTED TAPE USELS AT THE ALARM BLOCK. F_G G MEF`Z0,,�0
3. ALL ALARMS WILL BE BROUGHT TO THE TELCO RING
L)
(XI INTILISION 4 BOARD AND CONNECTED TO THE TERMINAI_ STRIP. GA
4. TERMINAL STRIP WILL BE LOCATED INSIDE A
TEDIi SITECE 21�W. M
HOFFMAN BOX MOUNTED TO THE TELCO BOARD.
IS
5. USE A MINIMUM IaAWG WIRE TO BRING ALARMS TO ig
GENINATOR IMUL101C jU, MLCO) ILL! S
0
GENERATOR UANI FUEL THE ALARM BOARD. I"RNG1 CONWIT TO
CF::� III WYMEND
1 (3)#3/0 (1) cSC CAEN.Et
VDIERADDIR RUNNING IN 2 1/21C I..MER'ZON
6. ALARM CONTACTS ARE NORMALLY CLOSED. OPENING EQUIPMENT SHELTER,
TE.Pt:::� OF CONTACTS INDICATES AN ALARM CONDITION. __-__.1 I.."__ a
RIC"
NEW ZOO AMP.MAIN 1*.
LOW TE.�-E 2-AME CWUIT BRENNER (M N MIT
0 EXISTING MAIN GROUND
.0 IMR C014EXPANTORN CAN
ORRI
2,12, 1,120, IT
"M
2112. IJTZG, 1%
2112. 1112G. I'D
S.()KE/1WE* ALMR,OESUCI ALAMR.GENEWITED BO BAR N
JL5_. TERIONALS M WETS. to PANEL I. EMERGENCY
SASEMENt
1-2 CORNIONEAL POWER FAILURE 11UNCIPIR SWITCH
LZOL
N,MC-2 FAILURE SOON RIMS" EITHER fXXA (3)13/0. (I)DG. 2 1/2C �_�tNICUNO TO EXISTING f I
RMAC-1 FAILURE
K5-6 TECH M WE SUIELTER
7-5 GENERATION 1XI MCBM�TXP AHEAD OF MAIN GRICAMNO BAN
"AMTW ECr/EXXSMNRG MEFER 'C FM CONNECTION TO FINE NEAR EMEDREENCI 4-
L J 9-10 GIBOE�TOR AJYW FUEL CORONATION DURSTARGISMINCE IS WOMA 3 ExiSTaG nK ALAN.OCEXCES.CMISDONATE PANEL AN BAI
11-12 GENERATOR RI GENERATOR 20SX. PHASE. 4 WINE) AM AIANM NIFOAT� XWWG REQUIREMENTS IN FIELD
CIRCUIT L
W.TERA CUNATE CONTROL
REC.1IEIO1H ENCINEEN
15-16 Um TER", CLARAFT CONTRI
FN-STALL ALARM TERMINAL INSIDE 1BX1 17-18 sWlXoD
NOTE EMNF (B)014
6 PROMM SAWAGE (3)#3/0.(1)12G. 2 I/ZX
HOFFMAN BOX TELCO BACKBOARD WITH 19-20 WAI 27 S ACCONI)ANCE INIFIR CODE TO EXQUEXIENT LENEL 217 ESSEX STREET
Mu�m THIS Is A SERAINCE
(2)1'KNOCK OUTS 2t-22 ANNAI TAXI ,mc �CT f OF CONTEXT NEI THRI SALEM. 6A 01970
EMSTSIC STASSMELL CHASE
'AWEAR 10 METING
RMF
I CONISSNUFF JUI MITIFFUNG INOW
'QUIREMEN"
WITH UTILITY COMPANY
ALARM DETAIL POWER & TELEPHONE
SCALE NT� UNSET LOCWTED --- Emi
ON 14COF RISER DIAGRAM 2
SCALE NI' `I0
0
�.o 0
ED 0 0 0 0
A
z
a
0
m
0c
m --i I I z
oF
c
C) t�L
Z � —1--, pl- PI-3
4�............... --------- ------- --- ----------------------------
2 > QL
Z Z
C) 0
S
-----TI
-C
-JR--- -- - --------- ---
------------- -I' ---%-- F=== I I I I -I
qp 1 0 oil
>0
0 CT�OT zo
T
Z- 0 �z To Z V 0M
PC)
0 'o 'o
,,,o
0
10 x 0
M.T- MM� 0 z ,I
0
m 0
x Fn 0 0,
c no x
z
zm
-Z�
h > 0
Ac 0 2, m rn
F,0 -C z
?"r, , m
m, n I z
0 z 0 0 0 lz
0 z
0 Z
.rn mo X, Z� 1, x
1> I z
0 K a
z
C
"o XX �O O� >- O� 0>
C- 0 0
M 2 1 0- n2 0.-02. im-Z-Z, z 1 0 M- as -z- M.- Z, a- m- -0z -r-,--Z 0. se x S.-N CE I.- W>"A
M- s n;z Z-�---�x -M-�o P A.Z x-T. Ez j- -'o Z-'
az z-M A RZ z 0, M--
10 oo
z cq
>n A.
M. �rz'..0,mv o>x 0,on. so c. -0,-0 T4 7. 0. z co n� cu X., Sz �0 oz 2z -�h2 >
..M. '00--im- omn '. > � -. �c- C- >,2 Z-zo- A-ci Q
.� , nc,z .0- -Z mz --o IN RM z
Z mz mm "o
0 ?-�
5 CC?z -3 0 C 09 UP. Ro z Z-' -Z,
00 >0-o z q M-n m
zm
01-20 z z "o , m
,00 n Z,S.7 'o 0 2 R 1 4 o 0
8 --.0 M-. m<x W W
0�n M. ac AM -g,8a - i W 0
Sz -mS. zz s-X,.n% -".,-z 'd.0. -M a z zo- mm o-m o Z-
o z 0-p , i 8 -� ;
A-7- L z
0 A, -'z �z 0� x,'r- �m '. go cc ol'> ;z 2a c -0
A �zm
z mo x 4c A 0 Z z m
0mc O*cc, 0 ,
0..0 -0 o- Am 00 z -0�z '0-�� -M ri 0. nm p�
n Z8�1. z 0 Z� "0->T g:4 0- o o o-M -zZ 8.
0�
ZE c n- i A S" km -xx 0-- z OT >
z- 0 zz�� 0
z �z-..M. ;mo no ">-z r-, z
.,n 8z cm� sT-.T oc.a.00 n
m z m a
0 C w Z 2� mm o- > Z
Ax -- -Z A, M- o �0 3m*n., m 0 m 0 0� 92 n000, Z ' 0 om-m OZI �m 0
M-1 0 . .,n az,
22, 010,1 'o
lo� z 0, , 0 om zo, T �o 0-
C
-0 rz mo om ma
0,z c 'o
moonv 0
6 cc -C -rn 0 00,
0� 0 a 3 MM, a z If 0 " n*m 'm
. IC 'o - >
MM, 2 2 > T 0 0 m
A 0 no m "
m n 00; 0 z
�O� , 0 .1z, om 5 M Faz
2z go 0 m 0,0 00 'mQ*
�o oz" 0 > T 2 0 n,= on
ci� xz z 'm o Z
n o R -0 , '. 0 .0
z � 2 Az 10 0 -4 0 T 0
,iwo So c -A-�-- m m r A 0 0
olo > z x no 0 ma
I t, �vo i- -
z
> Im m
0-
0
0
w 0 0
FOR CONSTRUCTION
UTILITY&GROUNDING PLAN PREPMED PREP�REO FOR
REV I WE I CESCRIPTCM En CHK[OR 0
0 /,2 6SUED FOR iONJ Is 0
I lu N NS is OPH Hudson±*p
x wn/51 17SCSOI�D.'07-2 '�L�C.�o Design Group,
Jx OPH VICIMwireless
3 .�O neun�s c... x v.
WNORQUG��0�I
0
FROMANTENNA
R
FIX
Tx c/)
TX/RX z
6 AWC MOM ANTENNA CABLE 3/4-
JUMPER REOUfRED ONLY /-LARGE UNIVERSAL
9ROUND KIT WHEN 1-1/4-0 AND WEATHERPROOFING 2
LARGER (TYPICAL) KIT (TYPICAL) 4 'k
V < R
GROUND BAR STANDARD CAKEWARE 7/16" 0
ON WALL OR GROUND KIT (TYP.) 2' u-
ON ANTENNA (SEE NOTE 1)
(SEE NOTE #2)
TX/RX
T
Rx-�
W
S
GK
C
IT
T�
R
SE
'TO CABLE TRAY (TYP.) 3 00� 0
ANTENNA CABLE
CA13LE GROUND KIT
LEGEND
FROM ANTENNA
FRAME SUPPORT IGBE GROUND BAR NEWTON I- CALVNIZED STEEL GROUND BAR, 1/4"X 4'X 20".
R EQUAL SIMILAR TO OR OTHER LENGTH AS REQUIRED. HOLE CENTERS
2UNTED 4-EAR BEL
iAlGTENNA (SEE QTE012) TO MATCH NEMA DOUBLE LUG CONFIGURATION
2- INSULATORS. NEWTON INSTRUMENT o
TWO HOLE LUG, TO BE #2 I.MGBCW 2 AWG BCW. BONDED CAT. NO, 3061-4 OR EQUAL
USED WITH j 4VO OR 112 AWC BCW fO GROUND WIRE ALONG loo
C 3- 5/8- LOCKWASHERS OR EQUAL
TO BLDG 0 G OUND ING CABLE TRAY TO CIGBE/MIGB
AS SHOWN. 4- WALL MOUNTING BRACKET. NEWTON INSTRUMENT CO.
NOTES NOTES, CAT NO, A-8056 OR EQUAL
1. CONTRACTOR TO UTILIZE KOPR-SHIELD 1. DO NOT INSTALL CABLE GROUND KIT AT A BEND 5- 5/8-11 X 1- H.HCS.BOLTS Ut'Ll
(THOMAS & BETTS) ON ALL LUG CONNECTIONS. AND ALWAYS DIRECT GROUND WIRE DOWN TO CIGBE.
2, ALL GROUND BARS SHALL BE GALVANIZED WITH 2. ALL GROUND BARS SHALL BE GALVANIZED WITH NOTES
ANTI-THEFT HARDWARE. ANTI-THEFT HARDWARE. 1. ALL BOLTS, NUTS. WASHERS AND LOCK WASHERS
SHALL BE 18-8 STAINLESS STEEL.
GROUNDING - STANDARD GROUNDING - STANDARD
2 ALL GROUND BARS SHALL BE GALVANIZED WITH
DETAIL INSTALLATION OF DETAILCONNECTION OF ANTl-THrFT HARDWARE.
GROUNDWIRE TO GROUND WIRES TO GROUNDING m STANDARD
GROUNDBAR GROUNDING BAR (CIGBE) DETAIL GROUND BAR
Al F 11 T SCALE N T S,
�#6 INSULATED GREEN
STRANDED CONDUCTOR
C5
C3
REMOVE ALL PAINT AND
APPLY AND ANTI-OXIOANT v
�2-2 HOLE COMPRESSION �j
Z LUGS
DOOR
�GISTEUD E�K�
�--�BRAIDED ROPE LAY I
-SIMEO-54'.
217 ESSEX STREET
GROUNDING - DOOR SALEM, MA 01970
'-CALr
Em3
0 Ln
ILI
F- Q)
U)
z
#6 INSULATED
GREEN STRANDED CABLE TRAY PARTS BOM
2 H CONDUCTOR
2 HOLE CO PRESSION (MAINTAIN 8"
COMPRESSION LUGS SEND RADIUS) OESCRIPTION 0
06 INSULATED LUGS LL
CENTRAL STEEL 10012ZY 12" WIDE CABLE RACK
GREEN STRANDED
CONDUCTOR
16 INSULATED GREEN 0
,,�16 INSULATED CENTRAL STEEL 10018ZY 18' WIDE CABLE RACK
GREEN STRANDED
LUGS
6 IN�
S:1
TRANDED CONDUCTOR HALO GROUND CENTRAL STEEL H812 HANGING BRACKET
MM T
(MAINTAIN 8
5/8- SPRING NUT U BEND CENTRAL STEEL SC-12 STRAIGHT CLAMP
R
ADIUS)
CENTRAL STEEL CC12 CORNER CLAMP
\—COMPRESSION
C-CRIMP CENTRAL STEEL HN148 5/8-11 HEX NUT
CENTRAL STEEL LWIS8 SPRING LOCKWASHER
r
CENTRAL STEEL FW168 FLAT WASHER
42 HOLE 0 0
CEN'�r STEELI CC 7 CENTRAL STEEL MN146 %--Il HEX NUT U)
COMPRESSION .00
D LU SPRING LOCKWASHER
12-/ LUGS CENTRAL STEEL LW156 %
CABLE RACK
CENTRAL STEEL TR51 12" THREADED ROD
PSNSS %- SPRING NUT. 5/8-11
CABLE RACK GROUNDING - CABLE RACK GROUNDING - CABLE RACK GROUNDING - CENTRAL STEEL ET112 12' WIDE ENO TUBE
SPLICE CORNER 6ST12-OU-Zy UNISTRUT
END
SCALE N T S SCALE N.T 5 SCALE. NT S,
u It
co
=! iii
CENTRAL STEEL—\ CENTRAL STEEL CENTRAL STEEL
CC12 CORNER C6171 CONNECTOR CC72 CORNER -a
CLAMP BOLT CLAMP GALV, SCREW CD
6xl 1/4'
UST12 OU ZY (4 MIN.) INTO CEILING JOIST
LOCATIONS 4
UNISTRUT 1)16, D.C.
n
Ir
CENTRAL STEEL IT -i
LW156 SPRING
0 LOCKWASHER
CENTRAL STEEL
12"/
CASL
m -RR i
CENTRAL STEEL — CC a - F �,ZZ!
18" WOE CENTRAL STEEL 0 LW155 SPRING — CENTRAL STEEL c 8
ET 112 12' MOE LOCKWASHER — 12"/18* WIDE
END TUBE — CABLE RACK
CENTRAL STEEL
LLL
171 C HECTOR
LT
I
MN146 HEX NUT
CENTRAL STEEL CENTRAL STEEL
T M51 12'
HN146 HEX NUT THREADED ROD L-
CENTRAL STEEL
H812 HANGING
BRACKET
CENTRAL STEEL Im
LWI56 SPRING 217 ESSEX STREET
LOCKWASHER SALEM, MA 01970
CEN I— 5....
HN146 HEX NUT
CABLE RACK DETAIL - END CABLE RACK DETAIL- CORNER CABLE RACK DETAIL - HANGER
SCALE N.TS
SCALE N T 5 E=4
0
0
0 0 w
o 0 w
w w
I los 0- s Q M GO m
G) v
0
>
999 9 n
g g R § §
9 9 9 9
m m m
> - - g. . .
. . . . . . . . . . . .
m M I
0
0
r-
0 0
>
03
00
CD 0
< 6 o @ > 3 .0
0 0 DO 0 >
@ �g 2L
-M
s @
0
a 0 cc m n a a
M
P4
91
wa 30 3
0
022 ccc000l- cc0000 _� cc0000l<
0
0 0 c c o0oom- c c 0000w� C-C-0 0 0 0.1 0
0 > m
0
0 co
M r-
m
00 00 00
0-c-
0-c-, R_ _
- - -------------
00 cc cc
FOR CONSTRUCTION
RF COLOE CODE PREPARED EN PREPARED FOR
_0 /12/14 ISSUEDPTO� ElE. HL
—722/7—ISSUED FOR CONSTRUMN �s 1. op. idson
I DesignGroupu,'#
VSrfMwireless
�Msco .KRG�s�..El 1. op�
W5TRQ'ROUGH.MA 01 W
MLDNG�40M.SWE�0 TD. �1101557�5� W81�33W UL
�o
_N.�Eg,� W5 rAX 718133,
>
0 Z
<
-n Z
z Z
A
m >
z
z
> C0
0 -< C)
m
cn F-7
B :�o
z
Z
C-) 0
z
FTJ cJ
FT] FTI
FOR CONSTRUCTION
PREPPRED Oy EPARED FOR
V DOE DESCRIPTION BY CHIP NEED
1) UP IZ I- ISSUED TOP PEIE. OPH Huc
F ANTENNA DESIGN
IC IT Ison
> 2/11 "ITIT C'UP IX OPH
11 ./�2/11 ISSUED POP CO Design Glcupu, AW
2 MI TE'SED EBENC
"5 ISSUC.I.FF, FS WOMMwireless
w PC 3 11/10/15 POISED FIBERCLASS CHIMNEY NS IP DEN
'NIG I NQIIN SUITE M TEL (110,W 5�,,
WE)M&5.�
>
0 Z
FT1
n FF-1
z Z
m >
z
z
>
m
FT
z -T] C-)
/;�T�
C� 0
z
F-F]
FOR CONSTRUCTION
PREPI B`f� PREPARED FOR
RF ANTENNA DESIGN
DR.
I IX
By CHK
DI "�RFFON Hu
U 08/12/14 ISSUED FOR REVIEW Ns ix OR
EF
1 D9/22/15 ISSUED FOR COFISIFRUCION NS 1. OR dson p
x Design GrouI
�U,SS
2 10/20/15 REVSEO FISE -C...� NS 0 SEE MlMwireless
3 REVISED FIBERGI-ASA CEEWSEI S 1� 0 1 100 IE!ELll I'Al�.�
16M OSGOOD SIREF .15lEOQouG..I
IUININO" cyI E3CW) �E, 1978)557-%S�
N ANDOVER NIFOR." 1118)3315!D6 soBj 3�33v T71
i
fii:.--C,SVED
THOMAS W.HILDRETH
U.-T 0 12015 Mobile:603.566.4154
V Office:603.528.1177
Email.Tom.Hildrcih@McL�e.com
MQLANE DE.Vr.oF PLANKW& Admitted in NH,MA and ME
C0MMjjt,--rY DEVELOPMENT 900 Elm Street,P.O.Box 326
MIDDLETON Manchester,NH 03105-0326
T 603.525.6464
F 603.525.5650
October 1,2015
Kimberly Driscoll,Mayor Robert Mitnik,Chair
Salem City Hall Salem Redevelopment Authority(IL SRAII)
93 Washington Street Salem City Hall
Salem,MA 0 1970 93 Washington Street
Salem,MA 01970
Jessica Herbert,Chair
Salem Historical Commission("SHC")
Salem City Hall
93 Washington Street
Salem,MAO 1970
Re: Verizon Wireless Rooftop Installation at 217 Essex Street
Honorable Mayor Driscoll,Chairwoman Herbert,and Chairman Mitnik:
The purpose of this letter is to request your assistance on behalf of our client, Verizon Wireless, in resolving a
difference of opinion between the SRA and SHC. The difference concerns the details of a new Verizon Wireless
communications facility proposed for the rooftop of the building at 217 Essex Street,and has contributed to a
lengthy delay in Verizon's efforts to improve the coverage and capacity of its wireless network in downtown Salem.
Following is a brief summary of the history that brings us to this point:
PAST
The Original Faux Chimney Plan
In the spring of 2014,both the SRA and the SHC were presented with the same plan,dated May 16,2014, utilizing a
faux chimney to contain four antennas,comprising two of the three sectors designed for this site. SHC thought that
the faux chimney was out of proportion with the existing elements on the roof and it relayed that opinion to
Verizon's regulatory consultants, EBL in a letter dated September 8,2014. SRA didn't like the faux chimney and,
based on the recommendation of its Design Review Board,approved a plan with naked antennas.That approved
plan was dated June 30,2014. SRA's approval is reflected in a letter dated July 11,2014,and it is on the basis of that
approval and plan that a building permit was issued.
The State Historic Preservation Process
In 2014, EBI was handling the interactions with SRH and McLane Middleton was handling the process with SRA.
While both interactions were happening at around the same time,there was no intersection between them and the
conflict between the SRA and SHC did not become apparent until later in 2014,as Verizon was trying to complete
the federal regulatory process involving review of the proposed plans by the Massachusetts Historical Commission
("MHC").
When the conflict became known, EBI and McLane Middleton together met with SHC. When presented with a
choice between the plan utilizing the faux chimney and the plan with the naked antennas,SHC chose the faux
McLane Middleton,Professional Asseciation
Manchester,Concord,Portsmouth, NE I Woburn,MA
McLa:ic,corn
Salem Histmical Commission
120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970
(978)619-5685 FAX(978)740-0404
December 2, 2015
MS. Susan Arena
Architectural Historian
EBI Consulting
21B Street
Burlington, MA 01803
RE: Addendum to FCC Form 621
19021/ SALEM 5 MA-New Build
217 Essex Street, Salem, MA 01960
EBI Project #61144726
Dear Ms. Arena:
The Salem Historical Commission(SHC) appreciates the opportunity to comment on the
proposed telecommunications facility installation at 217 Essex Street for Verizon Wireless. The
property at 217 Essex Street is historically known as the Hoyt Block and is located within the
Downtown Salem National Historic District. It is a Classical Revival, commercial building with
many ornamental details including the roof balustrade,wooden cornice with modillions and
dentils, and the stone-accented, round-arched window openings.
In accordance with the Section 106 permitting process, the Commission has reviewed the
submitted drawings and project information to determine whether the proposed
telecommunications installation project will have an adverse effect on the structure and/or its
surrounding historic properties. The Commission received and has reviewed revised drawings
dated November 11, 2015. The Salem Redevelopment Authority and the SHC both previously
commented on the project and proposed different opinions on how the antennae should be
concealed. The revised design proposes two antennae to be instafled within a single 6'-6"x 6'-6"
x 12' fiberglass chimney that will sit flush with the southwest comer of the roof. The third
antennae will remain flush mounted and painted to match the penthouse. The fiberglass chininey
shall be painted the color of natural red brick.
It was ftirther recommended by the SHC that the revised chimney have a setback of 6". It
is our understanding that the Design Review Board, at its meeting of November 17, 2015,
recommended a setback between 4"-6" and that this is slated for final review and approval by the
Salem Redevelopment Authority on December 9, 2015.
Page 2
EBI Consulting
We accept this revision and find that this compromise design will help mitigate any
adverse effects on the structure and/or its surrounding historic properties. We require no further
review, but respectfuHy request that a corrected drawing reflecting the 4"-6" setback be provided
for the Commission's files.
Thank you for your cooperation in this matter.
Respe ly submitted,
SALEM IUSTORI CO ISSI N
Jessica Herbert
Chair
cc: Ryan Maciej, Massachusetts Historical Commission
Andrew Shapiro, Salem Redevelopment Authority
City of Salem
October 1,2015
Page 2
chimneys and communicated that position to EBI in a letter dated June 8,2015. EBI reported the SHC position to
MHC as part of the MHC review process.
We also brought the conflict to the attention of SRA,which reiterated its position to the MHC in a letter dated June
19,2015.
Action Sujwested by
MHC grappled with the conflicting positions of SRA and SHC and suggested a path forward in a letter dated August
12,2015. N4HC expressed concerns about the visibility of some rooftop bracing in the same manner as SRA. At the
same time, MHC suggested utilizing potentially smaller faux enclosures along the lines suggested by SHC.
Since the time of that August letter,Verizon has been working on a way to design the site utilizing a faux chimney
or similar type stealth enclosure,but in a smaller dimension than originally proposed in an effort to thread this
needle. A plan that can win approval of both SRA.and SHC will also pass muster with MH-C.
PRESENT
And this brings us to the present and where we could use your help. Verizon's design team has completed work on
a re-design that we would like to present to both SHC and SRA in hopes that it will win approval from both boards.
We have been in touch with Andrew Shapiro,the Economic Development Planner who provides staff support to the
SRA and its Design Review Board. Andrew is in conversation with his colleague, Natalie Lovett,the Community
Development Planner,who provides staff support to the SHC.
The two staffers are conferring with the chairs of their respective boards and trying to arrange a couple of dates in
the next two weeks when a Verizon delegation could meet with both staffers and the chairs to review the proposed
reconciliation plan and to chart a course for moving the plan through the formal review and approval process.
Following the initial informal meeting, we expect that the proposed sequence will be Salem Historical Cormnission,
followed by Design Review Board, followed by Salem Redevelopment Authority.
We write to you now to request that you do what you can ft7om your respective positions to help this process move
along as quickly and smoothly as possible. Verizon is most anxious to enhance its wireless service in the heart of
your community,while at the same time respecting the rich history and heritage of Salem. We appreciate all
appropriate support and assistance you can offer to help us iron out these local differences so that we can move on
with implementation of the project.
Sin8 yours,
76,y— o"
Thm ias W. Hildreth
TWH:
ec: R. Enright,VzW
S.Arena,EBI
C. Webberly, SCG
9621T9693188.vl
Salem Histotical Commission
120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970
(978)619-5685 FAX (978)740-0404
June 8, 2015
Ms. Susan Arena
Architectural Historian
EBI Consulting
21B Street
Burlington, MA 0 1801
RE: Addendum to FCC Form 621
1902 1/ SALEM 5 MA-New Build
217 Essex Street, Salem, MA 01960
EBI Project#61144726
Dear Ms. Arena:
At its meeting on June 3, 2015, the Salem Historical Commission(Commission) reviewed
revised project drawings for a telecommunications installation at 217 Essex Street. This information
was submitted to the Commission as part of the Section 106 permitting process.
The revised drawings demonstrate revisions requested by the Salem Design Review Board
(DRB) as part of its review of the project, which is located within the City's Urban Renewal Area.
The revised plans show the installation mounted to a raised steel frame on the southwest comer of
the rooftop. The elements are painted warm gray. Two additional flush mount antennas are painted
to match the brick.
In its initial review, the Commission was concerned with the alteration of the roofline of this
historic building, which is also located within the Downtown Salem National Historic District. As a
result, the Commission requested that a less visible location for the telecommunications installation
be found. Concurrently, the DRI3 commented on the project and requested that the antennae
elements be exposed rather than concealed by a faux chimney structure.
After reviewing the revised drawings for the steel frame structure, the Commission found the
revisions to be less desirable than the original plans. While the antennae are not visible from Essex
Street or Derby Square, the bracing is visible from the southern view along Washington Street, a
main thoroughfare through the City. As designed, the steel framing is very obtrusive and distracts
the eye from the historic buildings and skyline of the downtown. Of the two options presented to the
Commission, the Commission unanimously voted in favor of the faux chimney to conceal the
proposed antennae. There being an existing chimney on the building, the faux chimney will not
Page 2
stand out as completely inappropriate to the structure and will suspend the diminishing effects of the
accumulation of antennae on the building.
Respectfully submitted,
OALEMHIST ON
Jessica Herbert
Chair
cc: Ryan Maciej, Massachusetts Historical Commission
Andrew Shapiro, Salem Redevelopment Authority
�- C
ftu�!- I L(4�kyeHt
Andrew Shapiro W� coullalwye6fitt,
Subject: City Council, Committe of the Whole - Special Act Licenses
Start: Tue 10/18/2016 6:30 PM oar��V
End: Tue 10/18/2016 7:30 PM Y:�W7 -og //
Recurrence: (none) 'y-V t"(),
Organizer: Andrew Shapiro
October 4, 2016
Memo To: Tom Daniel, i ;Planner
You or your representative (Andrew Shapiro) are respectfully requested to attend a meeting of
the Salem City Council Committee of the Whole to be held on Tuesday, October 18, 2016 at 6:30 P.M.
in the Council Chambers for the purpose of discussing a Home Rule Petition to the General Court to
convert certain seasonal liquor licenses to annual licenses and grant additional liquor licenses for the
sale of all alcoholic beverages to be drunk on the premise to the following:
1. Grant 1 additional license for the sale of all alcoholic beverages to �e drunk on the premises o ZXE,
LLC d/b/a Merchant Hotel to be located at 148 Washington Street — [�5 ccp�"J
1 2. Grant 1 additional license for the sale of wine and malt beverages to be drunk on the
premises to Brew on the Grid Salem, LLC located at 217 Essex Street
3. Grant 5 additional licenses for the sale of all alcoholic beverages to be drunk on the
premises to establishments located within the B5 Central Business District, the Entrance
Corridor Overlay Zoning Districts or Derby and Congress Streets
4. Convert 2 Currently issued seasonal licenses for the sale of all alcoholic beverages to
be drunk on the premises currently issued to Salem BC, d/b/a Bonchon located at 299
Essex Street and Salem Flatbread, LLC located at 311 Derby Street to annual licenses
for the sale of all alcoholic beverages to be drunk on the premises
rtru'y you rs'
HERYL A. LAPOINTE
ITY CLERK
2 17 Essex Street
Brew on the Grid
Salem
Redevelopment
HE Authority S- RA
Salem Redevelopment Authority Decision
October 12, 2016
217 Essex Street (Brew on the Grid): Discussion and vote on proposed installation of
signage + small project review: proposed new outdoor caf6 seating area, new door and
windows, and fagade improvements.
SRA Decision
At its meeting on October 12, 2016 the SRA voted unanimously (4-0) to approve
the proposed installation of signage, new outdoor caf6 seating area / deck, new
door and windows, and additional fagade improvements at 217 Essex Street
(Brew on the Grid) as detailed in plans dated 9/15/16 and as recommended by
the Design Review Board.
Recommendation
At its meeting on September 28, 2016 the Design Review Board voted unanimously (6-
0) to recommend approval of the proposed installation of signage, outdoor caf6/seating
area/patio, new door and windows, and other fagade improvements as presented in
plans dated 9/15/16. The approval is subject to the proposed blade sign on the Derby
Square elevation being moved back from Essex Street to the other side of the window
below it (so as to not black to the marble inset), and to limit the placement of logos on
no more than three of five umbrellas in the outdoor seating area.
Staff Comments for October 12, 2016 SRA Meeting
The applicant originally proposed having a sign reface the existing time/temperature
clock that is mounted on the fagade. The DRB expressed a preference to another
scheme shown, whereby the clock fixture is removed from the fagade, and a blade sign
is installed on the Essex Street fagade. The applicant agreed to this scheme and to the
conditions noted in the recommendation.
Proposal
The applicant proposes to make a series of changes to the exterior(primarily Derby
Square side) of the building. The restaurant owner is working with the City on acquiring
an easement to utilize the Derby Square side of the building; proposing to remove the
existing planting bed and replace it with a new outdoor seating area, which will rise
2'10" at its highest point from grade. The patio, which will be made of a concrete
foundation, with brick face and brick pavers, will provide ADA accessible at-grade
access where it will meet Essex Street. An existing bench will be moved and relocated
next to a portion of the planting bed that will remain (closest to Old Town Hall).
q Salem
-11111M,
Redevelopment
Authority
A new mahogany door with windows will be installed as a second means of egress for
the building, which will exit to the proposed patio. Sidelights will be installed on both
sides of the new door. The front entrance door will be refurbished.
The patio area will be bordered by a proposed 3'6" high square black picket fence.
Proposed furniture includes black steel chairs and 30N30" square top tables, as well as
black umbrellas with the restaurant's logo.
Three signs are proposed for the building:
1.) A sign to reface the existing time/temperature display, which calls for internal
illumination of the white text with existing electrical infrastructure
2.) 10' x 13" pin mounted letters lit by proposed goose neck lighting fixtures (x3)
above the front entrance; and
3.) A 2'6" x 2'6" black metal blade sign with white text mounted to brick on the Derby
Square elevation and lit with a black finished LED fixed arm fixture.
Staff Comments
Any approval of the patio area will be conditional upon the applicants successful
acquisition of an easement for the area.
The pin mounted sign and blade sign mounted on the Derby Street elevation are
compliant with the City's sign ordinance and design guidelines. The reface of the clock
does not appear to be in compliance with the City's sign ordinance, as it is positioned
above the sills of the second floor windows (no- allowed per ordinance). Additionally,
signs are not permitted to project more than five feet from the building; this structure (if
acting as a sign) may violate that standard set forth by the ordinance. Lastly, internally
illuminated signs are discouraged in the urban -enewal area. At this time we are
recommending denial of this sign.
BREW ON THE GRID
2 1 / ESSEX STREET, SALEM, W
BREW ON THE GRID SALEM, LLC
OCTOBER 5, 2016
SHEET LIST
COVER
I EXISTING CONDITIONS PHOTOS
2 EXISTING CONDITIONS PHOTOS
3 EXISTING SITE PLAN
4 EXISTING BASEMENT PLAN
5 EXISTING GROUND FLOOR PLAN
6 PROPOSED SITE PLAN
7 PROPOSED BASEMENT PLAN
Im", a PROPOSED GROUND FLOOR PLAN
9 DERBY SQUARE EXISTING AND PROPOSED ELEVATIONS
.-ARGED ELEVATIONS AT EGRESS DOOR
I I PROPOSED SIGNAGE
12 PROPOSED ELEVATIONS WITH SIGNAGE
13 PATIO DETAIL
14 PATIO FURNITURE AND RAILING DETAIL
PROJECT DESCRIPTION
INTERIOR FIT-OUT OF EXISTING VACANT BUSINESS SPACE (FORMER BANK) INTO AN ARTISANAL
COFFEE RESTAURANT WHICH WILL FEATURE COFFEE DRINKS, FRESH JUICES, CRAFT BEER, WINE,
HANDCRAFTED SCRATCH SANDWICHES AND PASTRIES.
PROPOSED EXTERIOR IMPROVEMENTS INCLUDE PATIO WHICH WILL ACCOMMODATE AN
EGRESS DOOR FOR SECOND MEANS OF EGRESS AND SIGNAGE.
EMBARC .
i I T E C F .1
-t7
1w
AA
It-
of
bo
4,
L 11
em
2
.NMMA
A-a.
al
..2.AA
lk
:A*A
lit
"lip
sot,
jib
5-7 DERBY SQUARE
IINCH :::��
BRICK CURB BRICK PAVERS DERBY SaJARE
PLANTING BED
OLD TOWN HALL
LIGHT POLE
OLD TOWN HALL
F
217 ESSEX STREET
225 ESSEX STREET 5 FHIGGINSO)N SQUARE
z
EXISTING SITE PLAN
EMBARC . BREW ON THE GRID
i ' F � D E 1 217 ESSEX STREET,SALEM,MA
,,p,4jcjjt:Fj,j3ARCStud� 1 9/16/2016&09:02� c 6065 217 ESSEX(BREM-5 SD Cl_��M SEPTEMBER IS,2016 DS
u
u
w u
M
u
VAULT
MECHANICAL
UP
wC u
UP
2 EXISTING BASEMENT FLOOR PLAN
EMBARC . BREW ON THE GRID
217 ESSEX STREET,SALEM,MA
��53 �l E.,SEX 3REWi-S(J Cl-- SEPTEMBER 15,2016 DS
DERBY SQUARE
PLANTING BED
VAULT
cl�
VAU LT
DN UP
UP DN
T17 1
7L
Z-
EXISTING GROUND FLOOR PLAN
EMBARC , BREW ON THE GRID 5
L 217 ESSEX STREET,SALEM,MA
�cp,�cpt:EV&ARC StuJo. �/l 6/2016 3 09 06 AM . ........ 217ES�EURRE\'A D CLeE l SEPTEMBER 15,201 DS
5-7 DERBY SQUARE
EXISTING BRICK PAVERS
LIMIT OF WORK BRICK PAVERS TO MATCH EXISTING
54 DERBY SQUARE
OLD TOWN HALL
BRICK PATIO DECKING ——————– OLD FTOWN HALL
RELOCATED
EXIST BENCH
EXISTING LIGHT POLE TO REMAIN
BRICK PAVERS TO MATCH EXISTING DN EXIST BRICK CURB
ALIGN WITH ADJACENT GRADE P LANTING BED TO REMAJN
NEW BRICK CURB
TO MATCH EXIST
PROPOSED EGRESS
217 ESSEX STREET
225 ESSEX STREET 5 FHIGGINSON SQUARE
z
1/16
2 PROPOSED SITE PLAN
EMBARC . BREW ON THE GRID 6
� P, C H I T F C T I J R E � D E S I G N 2 17 ESSEX STREET,SALEM,MA
CcWj�jt:ENABARCStucio, 1 9/16/2016 8 09 07 AM I C\U,,,,W—\D�,,�t\l 6065 217 E55EX(BREW) So I SEPTEMBER 15,2016 1 IDS
PREP KITCHEN I
LIMIT OF WORK
T u
u
W
7
DIVEN U 77
m
U
�ONG ;Q,.G
PREP
TAR,
TABLE
DSHO/A�HER WIT"
SOLL AND CLPAN VAULT
HAND MECHANICAL
SINK
SIN
UP
STAIR
I'D, I PNO Bl u
El I)R
OJT" UP CORRIDOR
EXIST WC
LIMIT OF WORK
GSF 1,060 G5F
1/8 1 -0
PROPOSED BASEMENT FLOOR PLAN
EMBARC . BREW ON THE GRID 7
217 ESSEX STREET,SALEM, MA
<-21-,SE, n�EV.� —1 SEPTEMBER 15,2016 DS
54' - 0"
DERBY SQUARE
0
BENCH
J�:
PATIO AREA ='685 S_r DN PLANTING BED
=7-
0, f 110 , "
<®r_ F-A
I- VAULT
CD � :�11COUNTER _
CONDIMENT SEATS
5 COUNTER SEATS m
0 0
6
�2 6
C6NDIMENT
rn F n
L/) 0
POS 00 c
VAULT
m 8
MERCH WALL
rn
6 6
0 Tim] _1_j 0
2
DIN UP
MEN WOMEN-`- PREP GSF: 3,727 GSF
UP DN rf F.O.H.: 3,149 GSF
B.O.H.: 578 GSF
LOFT ABOVE TO REMAIN
# OFINDOORSEATS: 85
# OF OUTDOOR SEATS: 34
# OFSEATS: 119
EXISTING
WC z
1/8 1-0
PROPOSED GROUND FLOOR PLAN
EMBARC .
0 BREW ON THE GRID 8
I N 217 ESSEX STREET,SALEM,MA
cijp,o 4it:DABARC Stucko, 1 9/16/2016 8 09 20 1 C\U�.,W,AD.�W 6065217 ESSEX(BREW) SOCL.�,� SEPTEMBER 15,2016 DS
I �L� SECOND FLOOR
El
Lp "I I
ESSEX STREET
OF!RS01FLOOR
DERBY SQUARE
EXISTING DERBY SQUARE FACADE
16FQ
O�D FLOOR
0-0
PROPOSED
ITH LH�I BLADE SIGN
7
EU
ESSEX STREET
07WI-OOR
DERBY SQUARE
RELOCATE BENCH
PROPOSED DERBY SQUARE FACADE
DERBY SQUARE ELEVATIONS
EMBARC . BREW ON THE GRID 9
2 17 ESSEX STREET,SALEM,%\
copy6ght:EMBARCSfUdi0r ESSEX(BREW) SDJ�,, OCTOBER 3, 2016 DS
I Ll E El E El
1-1 F-1
El
—j COR TO BE REFURBiSHED
El
NEW SIDELIGHTS, PAINTED
WHITE TO MATCH EXISTING
NEW MAHOGANY AND GLASS
DOOR AND FRAME TO MATCH
EXISTING FRONT DOORS WHICH
WILL BE REFURBISHED, NATURAL
FINISH
PATIO
FIRST FLOOR
01 -01,
PROPOSED EGRESS DOOR OPENING
EXISTING WINDOW
1/211 — 11-01' 1/2' — ]�-O`
2 ENLARGED ELEVATIONS
EMBARC � BREW ON THE GRID
0
A R C �1 1 T E C T IJ r) F s I G N 2 17 ESSEX STREET,SALEM,MA
CIDW q,,LF,,8ARCSt,,,J, I 9/1.i/701680924AM SEPTEMBER 15,2016 1 DS
STEEL NaJNTII`,GPLATE. 6'
PAI`4TED BLNCK
BLADE SIGN LIGHT.
PAINTED BLACK
2"X 2"STEEL TUBE WITH
WELEDED END CAP, ALL EDGES
GRIND SMOOTH. PAINTED BLACK
3/4"X 3/4"SQ STEEL FIXED
HANGERS, PAINTED BLACK
brew BROWN (PANTONE 4625 UNCOATED)
SIGN PANEL WITH WHITE LETTERS
BOTH SIDES
ON THE GRID
2' - 6"
BLADE SIC-N DETAILS
I O'DAVETER SHADE, PC"ER COAT BLACK FINSH,S\A4VEL
KNI HEAVY DUTY BACNt,,K3-PLATE- LED LIGHT
BLADE SIG" LIG�-F. LED. 24" GCCISE NECK SIC-3N LIG4-iT FIXTURE
FVED ARM BLACK FINISH
2 PROPOSED SlGNAGE DETAILS
EMBARC .
BREW ON THE GRID
L - j 2 17 ESSEX STREET,SALEM,MA
copyric,+it:ENSARC Sh-6o. 1 911612016 11 54 11 AM I C\LJsen\claa\0�uments\l 6065217 E5SEX(BREW) ED CL�.rvl SEPTEMBER 15,2016 1 Author
Ih/
All
SIGN 2: PIN MOUNT
LETTERS, 10�-O' LONGX
13" HIGH X 2" DEEP.
GOOSE NECK LIGHTING.
wit, NO EXPOSED CONDUIT.
PAINT BACKBOX SAME
COLOR AS FACADE
SIGN 1 & 3: METAL
BLADE SIGN
EXISTING FACADE REMOVE LEASING SIGN CLEAN MARBLE PROPOSED SIGNAGE
AND MENU BOX ENTABLATURE
PROPOSED SIGNAGE - ALTERNATE
EMBARC � BREW ON THE GRID 12A
2 17 ESSEX STREET,SALEM,NI
copyinght:EMBARC Studio. 10/312016 5 19 07 PM I ESSEX MREW)-513-d.t.�h�d_OPTIONS-cl��.,f OCTOBER 3, 2016
FACE OF EXISTING BUILDING
METAL GUARD RAIL
PRECAST CONCRETE CAP, LENGTH 6-0"
TYP, 3-0"MIN. COORDINATE VIA SHOP
BRICK PAVERS TO MATCH DRAWINGS. SET ON MORTAR BED.
EXISTING DERBY SQUARE BRICK. CONSTRUCTED WITH (2) X 1/2" DA. X B"
MASON SAND IN JOINTS S.S. DOWELS PER CAPSTONE CENTERED
IN CONCRETE FOUNDATION WALL. 3/8"
F- 3/4"SETTING BED WITH 2% WIDE JOINTS TYP
NEOPRENE MODIFIED TACK COAT CORE HOLE IN CONCRETE
FOUNDATION TO ACCEPT POST.
CAST IN PLACE CONCRETE SLAB FILL WITH NON-SHRINK GROUT 41F
SEALANT, BACKER CONTROL JOINT 12'-0" O.C. SLOPE 2%TO DRAIN
ROAD AND FIRSTFLOOR
PREFEROMED 0, O�.
EXPANSION JOINT
MATERIAL FULL DEPTH N z
4� ra 'i�
Tr 6'IQ� lll� 1� r ri k
It
-A
V"y
&�-jj
#4 @ 24" O.C.X
3-0" LONG DRILL FACE BRICK
AND EPDXY WITH
CONCRETE FOUNDATION
8" EMBED
COMPACTED GRAVEL BASE
RE-SET EXISTING
CONCRETE BORDER
-71
7 -7�/ N
I'u,'I
COMPACTED ORDINARY FILL OR
UNDISTURBED SUBGPADE
01
..............
rk
_fA_ 6-k A - _'A�
2 PATIO DETAIL
EMBARC . BREW ON THE GRID 13
i L 2 17 ESSEX STREET,SALEM,MA
�,ry�nc�jt:EVBARCStuclo, I 9116/20168092SAM I C\U.... 606J217 ESSEX tBREW) SO CL,,It SEPTEMBER 15,2016 CIL
REV
PATIO UMBRELLA
=TLI BLACK FABRIC AND BLACK POLE,
7-A" F)IAMFTPR,
1/2"X 3" FLAT BAR TOP
RAJL AND POST WITH 3"
X 7"X 3/8" BASE PLATE
1/21'X 1/2" SQUARE PICKET
1/2"X 1-1/2" FLAT BAR
-TT-FF
3' - 6" O.C. MAX
PATIO RAILING ELEVATION BLACK STEEL STACKABLE CHAIRS 30" 30" BLACK STEEL TABLES
PATIO FURNITURE
EMBARC . BREW ON THE GRID 14
217 ESSEX STREET,SALEM,MA
ccpynght:ENI�A�Stucko, I W16/2016R09:25AM 1 (,065217 ESSEX(BREW) SDCL,�.,f SEPTEMBER IS,2016 1 CL
2 17 Essex Street
Wireless Installation
RECEIVED
AUG 112015
August 12,2015 nEFT OF PLANNiNG&
The Commonwealth of Massachusetts COMWiwry I)EVELOPMENT
Susan Arena William Francis Galvin. Secretary of the Commonwealth
Architectural Historian Massachusetts Historical Commission
EBI Consulting
21 B Street
Burlington, MA 01803
RE: Telecommunications Installation on Eastern Bank
217-221 Essex Street, Salem,MA;MHC#RC.23937
EBI Project Number: 61144726
Dear Ms. Arena:
The Massachusetts Historical Commission QvfHC)has reviewed the information you submitted,received July 13,
2015,and comments from the Salem Historical Commission, Salem Design Review Board,and the Salem
Redevelopment Authority concerning the revised proposed project referenced above. The subject property at 217-
221 Essex Street,historically known as the Hoyt Block,is located within the Downtown Salem Historic District and
is listed in the National and State Registers of Historic Places. After a review of the information submitted,MHC
staff have the following comments.
The revised proposed Verizon project consisting of the installation of four tall exposed antennas with vertical and
diagonal bracing at the southwest comer of the subject property rooftop,two antennas to the penthouse,and other
associated equipment is described in the informational packet that was submitted to this office,received July 13,
2015.
At this time,the MHC is concerned that the heigbt,location, and diagonal bracing of the antennas proposed for the
southwest comer of the subject property will be visually obtrusive from at least one major thoroughfare within
Salem and will alter the character of the building. The MHC requests that the project proponent explore the
feasibility of locating the antennas proposed for the southwest comer of the subject property rooftop to another
location on the rooftop or to enclose to antennas within a stealth chimney enclosure. Relocating a portion of these
four antennas and placing the remaining antennas within stealth flue pipes and/or a smaller stealth chimney may also
provide an effective alternative that would preserve more of the historic architectural characteristics of the rooftop.
Please submit a copy of the above requested information to Jessica Herbcr�Chairperson, Salem Historical
Commission,Salem Historical Commission, 120 Washington Street Salem,MA 01970. The MHC looks forward
to receiving and reviewing the comments of the Salem Historical Commission.
These comments are offered to assist in compliance with Section 106 of the National Historic Preservation Act of
1966,as amended(36 CFR 800),and M.G.L.Chapter 9, Section 26-27C, as amended by Chapter 254 of the Acts of
1988 (950 CMR 7 1.00). Please do not hesitate to contact me at this office if you have any questions.
Sincerely,
A7
Ryan T.Maciej
Preservation Planner
Massachusetts Historical Commission
xc: Salem Historical Commission
Jane Guy,City of Salem
220 Morri�,,e\ Boule\arcl. Boston, Massachusetts 0212�
�O 17") 727-X470 -- Fix: (617) 727-5 128
\�\\\\.see.state.ma.LIS/11111C
Salem
Redevelopment
Authority
July 11, 2014
Carol J. Holahan, Esq.
300 TradeCenter, Suite 700
Woburn, MA 0 1801
Dear Carol:
Enclosed please find the SRA decision regarding the installation of telecommunications
equipment at 217 Essex Street, for Verizon Wireless. If you have any questions, please
do not hesitate to contact me.
Sincerely,
A apiro
Economic Development Planner
Enclosure (1)
Salem
Redevelopment
Pool',
EE Authority A,
Salem Redevelopment Authority Decision
July 9, 2014
217 Essex Street (Verizon Wireless): Discussion and vote on proposed installation
of wireless telecommunications equipment
SRA Decision
At its meeting on July 9, 2014, the SRA voted 5-0 to approve a June 25, 2014
DRB recommendation to approve the installation of telecommunications
equipment at 217 Essex Street (Verizon Wireless Antennas) as presented in
plans dated 6/30/14 and in photo simulations presented at the SRA meeting.
DRB Recommendation
At its meeting on June 25, 2014, the DRB voted 4-0 to recommend approval of the
proposed installation of wireless telecommunications equipment at 217 Essex Street,
conditional upon the following:
• That the support structure connected to the antennas is lowered so as to
minimize visual impact;
• That the antennas are painted a "warm gray" color to match the support
structure; and
• That the proposed vertical gas run-up to be installed on the wall of the south
facing elevation be painted to resemble the building's shade, and that it be
installed at or as close to the seam of the two buildings as possible.
Staff Comment
The applicant has agreed to the above conditions. In the enclosed plans, the vertical
gas line is shown running up the seam of the two buildings. The applicant will
provide renderings of the antenna installations at the meeting.
Proposal for June 25 DRB Meeting
The applicant has revised its original proposal to eliminate the use of a fiberglass
chimney to hide the antennae. Instead the applicant proposes to install these
antennae on poles with no covering except to paint them black. The applicant has
provided plans and simulated images.
Staff Comment for June 25, 2014
Please note that the plans show proposed natural gas generators and condensors
mounted on the roof, as well as proposed gas meter and run-up (up the side of the
building), of which the applicant has not provided further information. I will request
that further information be brought to the meeting or sent beforehand.
Salem
Redevelopment
Authority
Proposal for May 28 DRB Meeting
The applicant proposes to install two (2) antennae on an existing rooftop penthouse
that will be camouflaged to match the color of the masonry on which they will sit.
Additionally, a proposed fiberglass chimney (6'x6'xl5' high) will be installed in the
southwest corner of the roof to house four (4) additional antennae that will be inside
it.
A cover letter, pictures, and plans that detailed this proposed project are enclosed.
Staff Comment from May 28, 2014
1 have requested more information from the applicant about how the fiberglass
chimney element will appear. I have also requested more information about the
"proposed vertical gas run up" noted on the outside of the building in the included
plans.
q Salem
Redevelopment
Authority
Salem Redevelopment Authority Proposal
July 9, 2014
217 Essex Street (Verizon Wireless): Discussion and vote on proposed installation
of wireless telecommunications equipment
DRB Recommendation
At its meeting on June 25, 2014, the DRB voted 4-0 to recommend approval of the
proposed installation of wireless telecommunications equipment at 217 Essex Street,
conditional upon the following:
• That the support structure connected to the antennas is lowered so as to
minimize visual impact;
• That the antennas are painted a "warm gray" color to match the support
structure; and
• That the proposed vertical gas run-up to be installed on the wall of the south
facing elevation be painted to resemble the building's shade, and that it be
installed at or as close to the seam of the two buildings as possible.
Staff Comment
The applicant has agreed to the above conditions. In the enclosed plans, the vertical
gas line is shown running up the seam of the two buildings. The applicant will
provide renderings of the antenna installations at the meeting.
Proposal for June 25 DRB Meeting
The applicant has revised its original proposal to eliminate the use of a fiberglass
chimney to hide the antennae. Instead the applicant proposes to install these
antennae on poles with no covering except to paint them black. The applicant has
provided plans and simulated images.
Staff Comment for June 25, 2014
Please note that the plans show proposed natural gas generators and condensors
mounted on the roof, as well as proposed gas meter and run-up (up the side of the
building), of which the applicant has not provided further information. I will request
that further information be brought to the meeting or sent beforehand.
Proposal for May 28 DRB Meeting
The applicant proposes to install two (2) antennae on an existing rooftop penthouse
that will be camouflaged to match the color of the masonry on which they will sit.
Additionally, a proposed fiberglass chimney (6'x6'xl 5' high) will be installed in the
southwest corner of the roof to house four (4) additional antennae that will be inside
it.
Salem
Redevelopment
Authority
A cover letter, pictures, and plans that detailed this proposed project are enclosed.
Staff Comment from May 28, 2014
1 have requested more information from the applicant about how the fiberglass
chimney element will appear. I have also requested more information about the
.'proposed vertical gas run up" noted on the outside of the building in the included
plans.
M
McLane, Graf,
Raulerson & Middleton
Professional Association
300 Ti-ad(-C(-ntr.Suite 7000 1 WA)urn.MA 01801 1,13
00)RD
T(+ 781.904.2700 Fam 781.904.2701 wwumirlanex.nn 1'(�N NIIOI III
CAROLJ HOLAHAN
Direct Dial:781-904-2684
Email car(11.1101allanO n1CIarCX0ff1
Admitted in NH and MA
June 27,2014
Via Federal Express
Mr. Andrew Shapiro
Economic Development Planner
City of Salem
Department of Planning and Community Development
120 Washington Street
Salern, MA 0 1970
Re: Application for Approval by the Redevelopment Authority by Bell Atlantic
Mobile of Massachusetts Corporation, LTD d/b/a Verizon Wireless ("VzW")
for Collocation of a Rooftop Wireless Service Facility at 217 Essex Street,
Salem, MA
Dear Mr. Shapiro:
Consistent with our recent conversation and correspondence, the purpose of this letter is
to deliver to you an original and 6 copies of VzW's application for review and approval by the
Redevelopment Authority for its proposed collocation of wireless telecommunications
equipment at 217 Essex Street. By this letter, VzW requests that the matter be placed on the
meeting agenda for the Board*s meeting on July 9th, 2014.
In support of this application, VzW has enclosed the following materials:
• Letter of Authorization from the property owner with respect to the property;
• Written statement of the proposal, including proposed time schedule for
cornpleting the improvements and a description of the materials to be used in the
project; and
• Scaled drawings, including building elevation denoting proposed installation.
Kindly note that VzW will provide photo simulations of the proposed installation under
separate cover.
Page ')
June 27, 2014
The proposed installation is in complete harmony with the purposes and objectives of the
Salem Downtown Renewal Plan (2011) ("Plan") in that increased wireless communications
promotes the "health, safety general welfare and amenity of the City and its people." (See Plan at
E-6). Enhanced wireless cornmunications can also be deemed to satisfy the Plan's goal of
providing"new and expanded residential and non-residential opportunities, services, facilities
and amcnities." (See Plan at E-7). With increased reliance on wireless technologies by both
businesses and individuals alike, this installation directly serves and benefits this objective by
providing state-of-the-art enhanced wireless communications to the area. This installation
supports economic development and enhances Salem's wireless connectivity thereby benefitting
residents, business owners, tourists and public safety.
The physical attributes of the installation are also harmonious with the stated Plan goal to
-preserve...historic architecture and resources." (See Plan at E-6). VzW has attempted to
minimize any visual impact from the installation to avoid "blighting factors." (See Plan at E-6).
While VzW had originally proposed to enclose four of the six antennas in a faux chimney, at the
request of the Design Review Board ("DRB"), four of the antennas will now be mounted on
posts and painted a "warm gray" and two antennas will be mounted to an existing brick rooftop
penthouse and paimcd to match the penthouse. Additionally, the DRB requested that VzW
change the location of the 3" gas run up to coincide with a"searn" between the two buildings,
and also requested that VzW paint the pipe to match the brick building faqade. VzW has agreed
to make the changes requested by the DRB and believes the installation strikes a balance
between enhanced comm uni cations and protecting the building's architectural integrity.
Furthermore, VzW is a tenant on the premises. When its leasehold term terminates, VzW
will remove its antennas and equipment. Again, completely consistent with the Plan's
objectives, this installation will have no long-term deleterious impact on the building's character,
nor will the installation require permanent change or derogation to the building. The installation
brings benefits to the community, will little to no visual impact, and makes no permanent
changes to the architecture.
Very truly yours,
C I__Z J, t�—�
Carol, J. H ahan
CJH
Enclosures
cc: B. Gill (w/o enc.)
Park Towers IV, LLC
c/o Old Boston Properties
100 Washington Street, Office#1
Salem,MA 0 1970
January 17,2014
Planning Board
Zoning Board
Code Enforcement Offirer
City of Salem
City Hall
93 Washington Street
Salem,Massachusetts 01970
Re: Authorization of Bell Atlantic Mobile of Massachusetts Corporation LTD
d/b/a Verizon Wireless
Ladies and Gentlemen:
The undersigned,as lessor of premises in the City of Salem,described as 217 Essex
Street,hereby authorizes Bell Atlantic Mobile of Massachusetts Corporation LTD d/b/a Verizon
Wireless,and its employees, agents,and consultants,to seek approval from the City of Salem
(including a building permit,zoning relief,site plan review,and special permit)in connection
with the construction and installation of a wireless telecommunication facility and support
structures on the Property.
Very truly yours,
PAJRKOW
K-' .ERS IV, LC
BY:
Ngfm�:
Titltf.- Ate,,A e-
7370710 LDOC
%219
McLane, Graf,
Raulerson & Middleton
Professional Association
3001'ra&G-nwr.Suite 7000 1 Woburn.MA01HOI
TO: 791.904.27,111) 1 Fax: 7,81.904.27,01 ww%�.jurlan,---mn 'Nint I'll
CAROLJ HOLAHAN
Dirw Dial.781-904-2684
Finail carol.holahanlii niclane.com
Admitted in Nil wid MA
July 7, 2014
Via Federal Express
Mr. Andrew Shapiro
Economic Development Planner
City of Salem
Department of Planning and Community Development
120 Washington Street
Salem, MA 01970
Re: Application for Approval by the Redevelopment Authority by Bell Atlantic
Mobile of Massachusetts Corporation, LTD d/b/a Verizon Wireless ("VzW")
for Collocation of a Rooftop Wireless Service Facility at 217 Essex Street,
Salem, MA
Dear Mr. Shapiro:
In anticipation of the July 9th, 2014 meeting, enclosed please find an original and 6 copies
of the photo simulations related to VzW's application for review and approval by the
Redevelopment Authority for its proposed collocation of wireless telecommunications
equipment at 217 Essex Street.
Please let rne know if you have any questions in this regard.
Very truly yours,
CC—� f Tt—�
Carol. J. Holahan
CJH
Enclosures
cc: B. Gill (w/o enc.)
A
Salem 5 - 217 Essex St. Salem, MA
View from South verIZpn
JACOBS 400 FRIBERG PARKWAY
Existing Condition WESTBOROUGH, MA 01581
-.gab.:-
Lk
Am
Salem 5 - 217 Essex St, Salem, MA
View from South ��Izon
JACOBS 400 FRIBERG PAnKWAY
Proposed Design WESTBOROUGH, MA 01581
Ar
wo 606116#40 4k
40
71
di"
Wes,
Al
0
z
E
0
0
ILL
VWIZOn wireless
N
CITY CC&ALM NIA
0
SALEM 5 MA PLANNINCI BOAM APPRCYVAL
217 ESSEX STREET
SALEM, MA 01970
CONSLLTANT TEAM PROJECT��RY 9-IEET INDEX MIKE-
SITE NAIIE SHT �IPTION A
No. A a u x 4 9
PROJECT ENGINEER SITE -------
T
C- RADIUS`,A
U.0 APPUCANT: 'ROD.
A-,
URN, ADD ROUND RURON,1
N AN A..DI.1 A-, �UVAITD.
L �?
ZONING DI�V' 0.
ZONING JURISDICTION: Ow�RALEm N�
LAMM.
LDNKMILIDE. 71
PARCEL III
victm PRDPERTY (MM. TW...ILC.
ATT A��EN 8CNHU.
100 AARNINCTOA,515,11,
DIMOID-S 10 ME DAUDO. .100
IND.WESIDOR I,E1. RmR,
�ST OUCH
DUR
TOMARD REIU�AQCHI DR
TURN
TANI L INRIPAU,No
T., OH'
ANUR.HT"N -DO I.-WN A
AT�O 14.WE R.1 ION T-D1..1.0
. ,"ONTIARCIAN A.
't, TT ONTO.-U.
AT'A'�TANE ION
I.,.R�
..OUND NT-".,.�R
INAR NIGHT ONTO NNA,ITT
TU:N LEFT ONTO W-107/BRIDGE ST DIG SAFE
NOW.AND�N"AR RONT ONTO..NWON D,
AN.AT 21,IDRI CIDI 3 WORKING DAYS
BEFORE YOU DIG
T,1
ua�EREc 888—DIG—SAFE
UNDERGROUND SEWHCE ALERT
14�
L
P
-5f
L�y j
:L
0
K's 141 r, MIN I
cm,
5
�2
0
'2T
FOR ZONING
RADIM PLAN
EEPE7--- ..� HtAds0n±*
.fit,
PLA�WARD APPROVAL z
LL
(IANR m mA.MAI
Ing
0
loc A
Ex�71I4 PUIF-
IIN A,
W L
ow
PRINAI(2
wk Box
[71 844qgn
As
A
?�m`AMR
II,AIII.
�cd INN`
�) 0 §
—A
NMIM,,
�EL IRAAR� IRMAR,
pRQpo,,EQ NTENNM �lll-I.II
AZ"m
RX,I'I
INN A.,NR
'b .6, 1 AN�IS FM TK�X�
PKMISED(4 A� MAR (DN RI .1�E .WNG
IN�NP.�T. WKXIW
v 2 MR mmm mm a 0) 0 UN.W.`RZ""�M
VOR -..w ,,,I WAM,MY)" wN 1�.ITIII 11.11 -11 1 IYI I ..N.� . I
(P�D NANIN RRj I PER �ml 70TAL CORI
PWMSW RANNA,my) 2 �mp A� Hs AI A,
.� �02)-irm
IE�(AAN- --�/ — E.MN NA"
M, Nv —
L ---
.��Il.IIMII.L.L) AZIAUTHS 211 U.."M
01".
A
(PA,"'N' RRA� TO �E MN. MnN
T,P�
WK!iED A04WN� lm,K)sm MIM 0. A.
MA�aW ... ..
KENUTH (ARI m n.W.) -IF -i-�-
5cA
X
F4=] FT-� F-P
IF—H F17 FT� EE
EE] P� P-1
EEI P
FT� R-1 FT� PP
gi clav
gn
FETH P
EIR FIE
Api
00
9; VIA 8jsj�
El
I
oil M
9 01, t
FO R ZONING
ELEYAMN
A&
Hudson
E VSrbMwirefess
G; W,
Elm
—N\
Estate Valuation
DaLe Of �eath� 04/28/2014 Estate Of: Edward Kaplan M
Valuation Date: 04/28/2014 Account: XX0771�
Processing Date; 06,'3C/2CI4 Report Type; Date of Death
Nun�Der of Securities: 3
Fil� ID: 07710 DOD Assets for
Share. Security Mean and/or Di, and Int Security
or Par -Iescript�or. High/Ask f,ow/Bid AdjustmenEs Accruals Value
U 1530 4605 30S�ON TR k WAIMEN FDS (101156305)
BOS—ON TR FD
Mitual Fund values reported �� �A.SDAC
24/28,/2314 39.95000 Mk�
2) 55��4822 BOSTON T.R. E W.�EN FDS (1011565D3)
BOSTON TR MCP FJ�
Mutual Uund valieS reported to XASDAQ
04/28/2014 14.77000 Mk�
14.77000C 8,'74.93
2� 41�.7598 BOSTON T� & WALDEN FS (:011566�2j
BOSTON TR SCP FD
X X by VASDAQ�
UL.13 F:r.0 iar, q-,oted
64/28112U� L4.91000 MXC
14.910000 6,228.80
F S75,545.63
rotal AcCrLll $0.00
545.6'.
P-ge
Tnis report was nroduc�d .,Ith E8--ate4al, a product of Estate Va�uar'�nS & Dricing SyS-,e.mS, -nC. if you have questions,
plea�,& =nta..: EV? Systems at (818) 3�3-6300 Or www,e�psys.com. (Revision 7.4'01
, r. , � ' '- , ..
�0011 ��
,io
IL
FAVI
Verizon Wireless' Proposal for the Installation of Wireless
Telecommunications Equipment on the Rooftop of 217 Essex Street
Overview of the Proposed Project:
VzW seeks to install wireless telecommunications equipment on the rooftop of 217
Essex Street in the City of Salem ("City"). The proposed project includes the installation of six
(6) antennas on the rooftop, all installed in accordance with directives from the Design Review
Board to minimize their visual impact. The proposed improvements will close a coverage gap
currently existing in VzW's network and allow it to meet its obligations under the
Telecommunications Act of 1996 and to provide service to the its customers in and around the
City.
Timeline:
The proposed installation will begin as soon as the required approvals are in place and the
building inspector has issued a building permit. Installations of this type typically are completed
within 45-90 days.
Overview of Proposed Rooftop Wireless Telecommunications Equipment Requiring
SRA/DRB Approval:
Of the six (6) antennas VzW proposes to install on the rooftop, 4 of these antennas, the
beta and gamma sectors, will be mounted on posts in the southwest corder of the rooftop and
painted a"warm gray." VzW also proposes to install an additional 2 antennas, the alpha sector,
on the wall of an existing penthouse. Those antennas will be painted in color and texture to
match the color of the penthouse to which they are attached. In addition, VzW intends to install
additional equipment on the rooftop to support the antennas, with little to no visual impact. The
rooftop at 217 Essex Street already hosts wireless telecommunications equipment; VzW's
equipment will be installed in a manner that will not interfere with the existing carrier on the
rooftop.
Specifications for the Proposed Equipment:
Antennas
The proposed installation includes a total of six (6) antennas. Four (4) of the antennas
will be mounted on posts and painted to minimize visual impact from the street. The two (2)
alpha sector antenna arrays will be affixed to the existing rooftop penthouse, will be painted in
a color and texture similar to match that of the structure to which they are attached. As a
result, there should be little to no visual impact.
3"Gas Pipelin e
VzW also proposes to install a 3" steel pipe that will ran up the fa�ade of the building.
The pipe will be installed on the seam between two building on Essex Street, and will be painted
to match the brick fagade of the two buildings to minimize visual impact.
Additional Equipment
Any additional equipment installed by VzW, including cables, cable trays, condenser units
and generators will either have no visual impact, or will blend in the with the equipment already
existing on the rooftop.
2