Loading...
64-274 - VICTORIA STATION, 86 WHARF ST - CONSERVATION COMMISSION Vic'TvAjA SOCT)OH 310 CMR 10. 99 DEP File No. 64-274 (To be provided by DEP) Form 5 City/Town Salem Applicant Victo, Station Commonwealth ' of Massachusetts Order of Conditions Massachuetts Wetlands Protection Act G.L. c. 131, 540 From Salem Conservation Commission Issuing Authority To A.S. Management 70 S((Nmamer f Applicant) (Name of property owner) AddressStamford, CT 06901 Address_ Same This Order is issued and delivered as follows: ❑ by hand delivery to applicant or representative on (date) ❑ by certified mail, return receipt requested on (date). This project is located at ? . ,. harf Street The property is recorded at the Registry of Essex .1: Book 0000 Page 000 Certificate (if registered) - The Notice of Intent for this project was filed on Marcn 9, 1998 (date) The public hearing was closed on March 26, 1998 (date) Findings The Commission has reviewed the above-referenced Notice of Intent and plans and has held a public hearing orbiyhe project. Based on the information available to the Commission at this time, the Commis sl has determined that the area on which the proposed work is to be done is significant to the following interests in accordance with the Presumptions of Significance set forth in the regulations for each Area Subject to Protection under the Act (check as appropriate): Public water supply Flood Control Land containing shellfish Private water supply Storm damage prevention Fisheries Ground water supply Prevention of pollution Protection of Wildlife Habitat Total Filing Fee Submitted 98.00 State Share 36.50 (1/2 fee in excess of $25) City/Town Share 61. Sn Total Refund Due E City/Town Portion E State Portion$ (1/2 total) (1/2 total) Effective 11/10/89 5-1 Therefore, the Commission hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the regulations, tc protect those interests checked above. The Commission .orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. General Conditions 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2 . The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3 . This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this order unless either of the following apply: (a) the work is a maintenance dredging project as provided for in the ACC; or (b) the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance and both that date and the special circumstances warranting the extended time period are set forth in this Order. S. This order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any Sill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts of any of the foregoing. 7. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Final order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the'Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording informatin shall be submitted to the Commission on the form at the end of this Order prior to commencement of the work. - 9. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection, File Number 64-274 11 10. Where the Department of Environmental Protection is requested to make a determination and to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 5-2 v .. Issued By Salem Conservation Commission Signat (s) _ D i This Ord a::)e signed by a majority of the Conservation Commission. on this 26th day. of March 19 98 before me personally appeared the above mentionpr] to me known to be the person described in and who executed the foregoing instrument and acknowledged that h /sh exec t e same as his/her free act and deed. SlEPHEN,DIBBLE Notary Public My Commission Expires Nov.12;2004 tar Public My commission expires The applicant, the owner, any person agrrieved by this Order, any owner of land abutting the land upon which the proposed work is to be done, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the Department of Environmental Protection to issue a Superseding Order, providing the request is made by certified mail or hand delivery to the Department, with the appropriate filing fee and Fee Transmittal Form as provided in 310 CMR 10.03(7), within ten days from the date of issuance of this determination. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and the applicant. Detach on dotted Line and submit to the prior to commencement of work. ............................................................................................................ To Issuing Authority Please be advised that the Order of Conditions for the project at File Number has been recorded at the Registry of and has been noted in the chain of title of the affected property in accordance with General Condition 8 on ,19 If recorded land, the instrument number which identifies this transaction is If registered land, the document number which identifies this transaction is Signature Applicant 5-4A 11. Upon completion of the work described herein, the applicant $hall forthwith request in writing that a Certificate of Compliance be issued stating than the work has been satisfactorily completed. 12 . The work shall conform to the following plans and special conditions : Plans: Title Dated Signed and Stamped by: On File with: Seasonal Awning Structure 2/27/98 Jetferson Grove Arch. S.C.C. 1. Exterior E1Pv, Fact 2. Propbsed Deck Replacement 3. Exterior Elev. North Special Conditions (Use additional paper if necessary) See Attached (Leave Space Blank) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3A SALEM CONSERVATION COMMISSION SPECIAL CONDITIONS -DEP FILE #64-274 1. All work shall conform to the above-referenced Notice of Intent, site plan and supporting documents and those final specifications which shall be filed with the Commission prior to construction. Any change made or intended to be made to the approved plans shall require the applicant to inquire of the Commission in writing whether the change is substantial enough to require the filing of a new Notice of Intent. 2. Members and agents of the Commission shall have the right to enter and inspect the premises at all reasonable times to evaluate compliance with the conditions in this Order. The Commission may require the applicant to submit additional data or information necessary for the Commission to conduct that evaluation. 3. Upon completion of the project, the applicant shall submit, with the request for a Certification of Compliance, an affidavit,prepared by a professional engineer or land surveyor registered in the Commonwealth of Massachusetts, stating that the site has been developed in accordance with the requirements of this Order of Conditions,the referenced site plan and supporting documents. 4. This Order shall apply to every successor in control or successor in interest of the property described in the Notice of Intent and accompanying plans or part thereof. In the event this land or any part thereof changes ownership before or during construction, the current owner shall notify the new owner, by registered mail, of this Order prior to the transfer of ownership and shall forward proof of this notification to the Commission. 5. During construction, no debris, fill, or excavated material shall be stockpiled within 100 feet of designated wetlands. Any other stockpile location will be protected sufficient to prevent sediment from surface runoff entering wetlands. 6. Equipment servicing and overnight equipment storage must be conducted outside the buffer zone. Equipment must be maintained to prevent leakage or discharge of pollutants. Cleaning of equipment including concrete truck shute shall be done off site. Contractor shall have adequate spill kit and be accessible for aggressive containment. No running machinery shall be left unattended. 7. *No spill or discharge of petroleum products or other pollutants will occur within 100 feet of any wetland resource area. 8. Notice shall be given this Commission no more than 2 weeks nor less than 2 days prior to the commencement of construction activities. Said notice shall include, in writing, the names(s), address(es), and business and home telephone numbers of the project supervisor(s) responsible for insuring that operations are conducted in compliance with this Order. 9. The Order of Conditions including these Special Conditions shall be posted on site. *ongoing conditions that do not expire upon completion of the project or issuance of a Certificate of Compliance. sd\concom\ooc\pickwharfvictstat 310 CMR 10.99 DPI File No. . . (ro be isnsw !by DPT) Form 3 ciryjr� SALEM Appuom Victoria Station commonwealth Department of of Massachusetts Defense volt d States Notice of Intent of Aa:erlCa Under the Massachusetts Wetlands Protection act, G.L. c. 131, 540 and Application for a Department of the y, P,67i �w�� gr� ISI s5 Part It General Information 1n Q 1. Location: street Address Wharf Street, Salem, MassadriGgt4 ' E, -'J .5&9 Lot NumberASO, Parcel 000 (assessor's map) S�fa;m «tl) =.iv ®(3p2. 2. Projeot: Type Replace oescriptionThe applicant proposes to replace the existing-*nage, tipgIade the existirig woud deck (appA t9 ft by 39 ft) _, _ with concrete and replace exisijpg seasonal awning 3. Registry: county_ Fssex Current Book 0000 c Page 000 Certificate (if Registered Land)' n.a. 4. Applicant A S Management Co Tel.t203) 967-4003 Address 760 Summer Street, Stamford, CT 06901 same as above 5. Property owner Tel. Address same as above 6. Representative Wm. H. Kelley Tel (781) 639-4454 Address_ Turker'a Wharf, Marhlehead MA 01945 7. a. Have the conservation commission and the Department's Regional office each been sent, by certified mail or-hand deliver, 2 copies of completed Notice of intent, with supporting plans and documents? Yes ❑ No ❑ b. Has the fee been submitted? Yes ❑ No ❑ C. Total Filing Fee submitted ��. o d. City/Town share of Filing Fee 1/ . 0 state share of Filing Fee 3(o (sent to tlty/Torn) (R of fee in excess of f25, sent to DEP) e. Is a brief statement attached indicating how the applicant calculated the fee? ❑ Yes ❑ No 1-1 Effective 11/20/92 'S. Have all obtainable pormit.:, variances and apprrmala required by local by-law been obtained? Yea ❑ No obtained Applied for: Not Applied For: Rnilding permit m 9. Is any portion of the site subject to a Wetlands Epstricttgn order pursuant to C.L. c. 131, S40A or G.L. C. 130, $1057 Yes U No U 10. List all plans and supporting documents submitted with this Notice of intent. Identifying Number/Letter Title, Date Exhibit A Locus Plan 1985 9xhibit B Plan accompanying petition of A.S. Management showing existing conditions. Titled: "EXISTING CONDITIONS, PLAN OF LAND for PICKERING WHARF, DERBY & CONGRESS ST.. SALEM, MASSACHUSETTS". dated March 5. 1998 by Patrowicz Land Development Engineering, 65 Eastern Ave, Essex, MA 01929. Exhibit C Three plans "VICTORIA STATION", P1.113 -Seasonal Awning Proposed Deck replacement, P1.1C - Seasonal Awning Structure Exterior Elevation-East, Seasonal Awning Structure Exterior Elevation- North. February 27. 1998 —Exhibit-D -- FeeSthadute------- ---- 11. check those resource areas within which work is proposed: (a) P( Buffer Zone ' (b) Inland: ❑ Bank* Land subject to Flooding ❑ Bordering vegetated Wetland* ❑ Bordering ❑ rLand.Under water Body i waterway ❑ isolated (c) Coastali ❑ Land under the ocean* ❑ Designated Port Area• ❑ Coastal Beach* ❑ coastal Dune ❑ Barrier Beach* ❑ coastal Bank ❑ Rocky Intertidal shore* ❑ salt Marsh• ❑ Land Under salt Pond* ❑ Land Containing shellfish* ❑ Fish Run- *Likely to involve U.S. Army corps of Engineers concurrent jurisdiction. see General Instructions for Completing Notice of Intent. 3-I 12. is the uroje:t within eeLi.mated habitat which is indicated on the most recent intimated Habitat Map of state-Listed Aare Wetlands wildlife (i! any) published by the Natural Heritage and Endangered species Program? YES [ J NO [Xj Date printed on the Estimated Habitat Map NO MAP AVAILABLE [ i (if any) If yes, have you sent a copy of the Notice of Intent to the Natural Heritage and Endangered Species Program via the U.S. Postal Service by certified or priority mail (or otherwise sent it in a manner that guarantees delivery within two days) no later than the date of the filing of this Notice of Intent with the conservation commission and the DEP regional office? YES [ J NO If yes please attach evidence of timely mailing or other delivery to the Natural Heritage and Endangered species Program. Part IL Site Description Indicate which of the following information has been provided (on a plan, in narrative description or -calculations) to clearly, completely and accurately r" describe existing site conditions . Identifying Number/Letter (of plan, narrative or calculations). Natural Features Soils Vegetation _ Topography open water bodies(including ponds and lakes) Flowing water bodies(including streams and rivers) Public and private surface water and ground water supplies on or within 100 feet of site Maximum annual ground water elevations with dates and location of test Boundaries of resource areas checked under Part 1, item 11 above Other �1 Man-made Features: Ci Structures (such as buildings, piers, towers and headwalls) Drainage and flood control facilities at the site and immediately off the site, including culverts and open channels (with inverts), dams and dikes subsurface sewage disposal systems Underground utilities 3-3 �7 Roadways and }arking areas Prvp;rty bouncrrie4- sag"•into and ri,,hts-of-W,ty Other Part XIII Work Description Indicate which of the following information has been provided (on a plan, in narrative description or calculations) to clearly, completely and accurately describe work proposed within each of the resource areas checked in Part I, item 11 above. Identifying Number/Latter (of plan, narrative or calculations) Planview and Cross Section of: C structures(such as buildings, piers, towers and headwalls) Drainage and flood control facilities, including culverts and open channeleiwith inverts) , dams and dikes subsurface sewage disposal systems i underground utilities Filling, dredging and excavating, indicating volume and composition of material Compensatory storage areas, where required in accordance with Part III, Section 10.57(4) of the regulations. Wildlife habitat restoration or replicaticn areas Other Point Source Discharge Description of characteristics of discharge from point source (both closed and open channel) , when point of discharge falls within resource area checked under Part I, item 11 above, as supported by standard engineering calculations, data and plans, including but not limited to the following: 1. Delineation of the drainage area contributing to the point of discharge; 2. Pre-and post-development peak run-off from the drainage area, at the point of discharge, for at least the 10-year and 100-year frequency storm; 3. Pre- and post-development rate of infiltration contributing to the resource area checked under Part 1, ftem 11 above; 4. Estimated water quality characteristics of pre- and post-development run-off at the point of discharge. 3-4 Part lyt Mitigating Measures i Clea iv. •..olete!y Mrd 4rc,jre7nly descrr'n, with reference to supporting piers and calculations where necwssary: - (a) All measures and designs proposed to meet the perfornrnco standards set forth under each resource area specified in Part 11 or Part III of the regutations; or (b) why the presumptions set forth under each resource area specified In Part It or Part III of the regulations do not apply. r ❑ Coastal Resource Area Typei Identifying number or ❑ Inland letter of support documents ❑ Coastal Resource Area Type: Identifying number or ❑ Inland letter of support + documents 3-5 t ❑ coastal Resource Area Type: Aentifyiny number or ❑ Inland letter of support documents 2. Clearly, completely and accurately describe, with reference to supporting plans and calculative where necessary- (a) all measures and designs to regulate work within the Buffer Zone so as to ensure that said work does not alter an area specified In Part 1, section 10.02(1)(a) of these regulations; or (b) If work In the Buffer Zone will alter such an are@, all measures and designs proposed to seat -he perfonen:e standards est.P,:ishea fcr 0- ad!acenr resource area, specified in Port ii u^ Part III of these regulaticnc. ' Coastal Resource Area Type Bordered identifying number or '❑ Inland By 100-Feet Discretionary Zone: letter of support documents' BUFFER ZONE All precautions to prevent environmental impact will be used. Hay bales, dumpsters land silt barriers will be utilized where appropriate. Exhibit B 3-6 Part vs Additional information for a Department of the Army Permit 1. COE Application No. (to be provided by COE) z. Salem Harbor, South River (Name of waterway) 3. Names and addresses of property owners adjoining your property: See attached list of abutters 4. Document other project alternatives (i.e., other locations and/or construction methods] particularly those that would eliminate the discharge of dredged or fill material into waters or wetlands) . 5. Sh" x 11" drawings in planview and cross-section, showing the resource area and the proposed 'activity within the resource area. Drawings must be to scale and should be clear enough for photocopying. Certification is required from the Division of water Pollution control before the Federal permit can be issued. certification may be obtained by contacting the Division of water Pollution Control, 1 winter Street, Boston, Massachusetts 02108. " where the activity will take place within the area under the Massachusetts approved Coastal Zone Management Program, the applicant certifies that his proposed activity complies with and will be conducted in a manner that is ,Onaistent with the approved program. Information provided will be used in evaluating the application for a permit and i9 .made a matter of public record through issuance of a public notice. Disclosure of this information is voluntary; however, if necessary information is not provided, the application cannot be processed nor can a permit be issued. I hereby certify under the pains and penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents and supporting data are true and complete, to the best of my knowledge. Signet a of Applica t Data 7/// fes {�/� /,-�ko�/ac ' Signature of Applican s Representative Date FORM -'Exception to ENC Form 4345 approved by HOUSACE, 6 May 1982" IED 100 (TEST) 1 MAT 82 -This document contains a joint Department of the Army and State of Massachusetts application for a permit to obtain permission to perform activities in United States waters. The Office of Management and Budget(O46) hes approved those questions required by the US Army Corps of Engineers. OMB Nurber 0702.0036 and expiration date of 30 September 1983 applies". This statement will be set In 6 point type. 3-7 �� .•.�+�, � rel - � � � � � � Cemetery( 5�� � mL d 1 { z n4 ? » r ��• I l k4� sr / 00 1,n \ rnwood - / * +t _% •� t a In er 8n(j � w<N�r C l' t � f t ao-a$ �,�� ✓ ; s n ' V %4y� zw �t orrFljpkerimg sr _� � rt �,=b >t y}vre lY ai > Fr {* 5 r � • �. C! J it Ha/hide"Boat Rarr)P t . - .k' 'r ''A�t NSalem r I • ll°� *Rock �� sr �= A Pyr g * i a Co�rtSo y • /Sal m Terminal SP�i rf s EICT to hPo SU 3J a 1 c Folger oI l/ �wlr h 1 "'e°-t • a r l _ I r .ark. rr Point 1 l S . yr l�/ SI V a /r ' / as - 68 Point S A/L,.EM t /tl HLBS OH sPalme� ��. ryF •�O A � • 'O � I Q �Q f ry} r Park 1 .P%okerog \ _ dPoin _ t _ o IP.01386 .342 SSS 343 944 SWAMPSC07Ie.5KM 845 52' 30" 1 1 1 z 3 < SCALE 1:25 000 5 9 CENTIMETER ON THE MAP REPRESENTS 250 METERS ON THE GROUND t 2 CONTOUR INTERVAL 3 METERS U.S.G.S. MAP - SALEM. Massachusetts - 1985 - 1:25000 - scale topographic map 9f COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION METROPOLITAN BOSTON-NORTHEAST REGIONAL OFFICE ARGEO PAUL CELLUCCI t;�^� „i..-LL p' �I 17 c t - TRUDY CORE Governor !]`�h � W' Secrenry Aire r 131w".3 DAVID B. STRUHS ©2Commissioner Salem €larddn; ng Dept, DEP File # 64-274 RE : NOTIFICATION OF WETLANDS PROTECTION ACT FILE NUMBER SALEM DATE : 3/30/98 (city/town) The Department of Environmental Protection has received a Notice of Intent filed in accordance with the Wetlands Protection Act (M.G.L. c . 131, §40) : Applicant : A.S. MANAGEMENT CO. Owner: SAME Address : 760 SUMMER STREET Address: STAMFORD, CT. 06901 Project Location: WHARF STREET, SALEM,MA IF CHECKED, THE FOLLOWING ITEM(S) APPLY TO THIS NOTICE OF INTENT: A." This project has been assigned the following file Although a file # is being issued, please note the following: ISSUANCE OF A FILE NUMBER INDICATES ONLY COMPLETENESS OF SUBMITTAL, NOT APPROVAL OF- APPLICATION. B . No File # will be assigned to this project until the following missing information is sent to this office, to meet the minimum submittal requirements in accordance with the Wetlands Protection Regulations at 310 CMR 10 . 00 : 1 . ( ) copy (s) of a completed Notice of Intent (Form 3 or Form 4 of Sect . 10 . 99, whichever is applicable) and a copy of the Fee Transmittal Form, with a copy of the check for the State' s share of the Notice of Intent filing fee. 2 . ( ) _ copy(s) of plans, calculations, and other documentation necessary to completely describe the proposed work and mitigating measures to protect resource areas . 3 . ( ) _ copy (s) of an 8%11 X 11" section of the USGS map of the area . 4 . ( ) _ copy(s) of plans showing compliance with Title 5 of the State Environmental Code, 310 CMR 15 . 00 . S . ( ) Proof that a copy of your Notice of Intent has been mailed or hand delivered to the Natural .Heritage and Endangered Species Program. COMMENTS : 10 Commerce Way 0 Woburn,Massachusetts 01801 0 FAX (617) 932-7615 0 Telephone (617) 932-7600 • TDD/(617)932-7679 C. Other Regulatory Jurisdiction j. 1 . ( ) Application has been forwarded to Waterways Regulatory Program to determine if a Chapter 91 License is required. 2 . ( ) Applicant is advised to forward a copy of the Notice of Intent to the Corps of Engineers for review (call 1-800-362-4367 for information) . D. 401 Water Quality Certification The project described in your Notice of Intent requires a 401 Water Quality Certification from the Department of Environmental Protection and may require submittal of a 401 application form. See below for further details: 1 . ( ) Based upon the information submitted in and with your Notice of Intent a separate 401 Water Quality Certification application form is not required. The Department of Environmental Protection has reviewed the plans submitted by the applicant and finds that there is reasonable assurance that the project or activity will be conducted in a manner that will not violate the Massachusetts Surface Water Quality Standards, provided that : a) the applicant receives and complies with a Final Order of Conditions from the local conservation commission or the „ Department; b) the Order of Conditions does not cause the loss of more than 5 , 000 sq. ft . of bordering vegetated wetlands and land under water and/or the dredging of more than 100 cubic yards of land under water; c) any loss of vegetated wetlands has been mitigated with a minimum replication of 1 : 1; and d) the project is not exempt from the M.G.L. c. 131, §40 - the Wetlands Protection Act; is not part of a subdivision; does not cause the loss of any wetlands designated as Outstanding Resource Waters; and does not cause the loss of any salt marsh. Therefore, provided that the above conditions are satisfied, the Final Order of Conditions will serve as the Water Quality Certification for this project . This does not relieve the applicant of the duty to comply with any other statutes or regulations . 2 . ( ) Before the activity described in the Notice of Intent can commence, you must obtain a Water Quality Certification from this Regional Office . Please complete the enclosed 401 Water Quality Certification application form and file it with this Regional Office for review. 3 . . ( ) Your project involves dredging of greater than 100 cubic yards of material or requires a permit from the Federal Energy Regulatory Commission for work in "waters of the Commonwealth. " Therefore, your proposed project is subject to 314 CMR 9 . 00 and requires a Water Quality Certification. Please complete the enclosed 401 Water Quality Certification application form and file it with the Department of Environmental Protection, Waterways Program, One Winter Street, Boston, MA 02108. Contact the Division of Waterways Program at 617-292-5655 if you have any questions . For more information please contact :DERRICK STANDISH at (617) 932-7600 . CC : Conservation Commission ( ) U. S . Army Corps of Engineers ( ) Owner ( ) Coastal Zone Management ( ) DEP - Water Pollution Control ( ) Representative : WILLIAM A. KELLEY ( ) DEP - Waterways TUCKERS WHARF ( ) Other: MARBLEHEAD, MA 01945 3 \oN Cp�� W z Conservazim Commission 1� Salem. Massachusetts 01970 yVASS�� y City of Salem Conservation Commission Will hold a public hearing for a Notice of Intent under the Wetlands Protection Act, Massachusetts General Laws, Chapter 131, Section 40, at the request of A.S. Management Co, 760 Summer Street, Stamford, CT. The purpose of the hearing is to discuss the effects of proposed work to upgrade existing wood deck with concrete and replace existing signage and seasonal awning located at Victoria Station,Pickering Wharf,Wharf Street. This hearing will be held on Thursday,March 26, 1998 at 7:00 p.m. in the second floor conference room at One Salem Green. Mark George Chairman March 18, 1998 Please send bill to: A.S. Management Co 760 Summer Street Stamford, CT 06901 - - - - - F- - - -� s ' . . . . .. . . - . . . . - . . . . .. . . .. .. . . . . . . . . . . . . ' • .:�... ... . ... . . . . . . . . .. . . . . - . . . . .. . . . .. . . .. . . . . . • Y•••..•.•:•:.••. . . ... . .. .. . . . . .. _ f Remove Emtlne Wood Der-king This Area to Top of Ex6ting R Modr Exrot! Ram Members (Remove Top 2 I/Z of Each Member) LJ y .. . . .... . . . . . .. . L . . ted Structural New Pres tuber r,: Each er . . . .. � .... E (5!s Treated : ...: .: n9 Member : �a New 3/4' Pressure Treated P�=d Sheathng New c ,000 PSI Concrete Slab w/ 5�o to r. 4Entrapment, �. 3' Thick 4 ; ' Re!nforce Slab w/ V x V W2.9 x 29 M . :.. S!dewalk bnt Pattern as Shown 1481 OC Each ) . .. . . ...... .. .. L _ . J .,- - . . . . . . - f - 3 -. ... ... .. _ . i J a 8 — General Note_ 2 See Architectural Drawings for Dimensions. 153- Structural Engineer Shall Review Existln Structure _ - - _ - - - - - at Completion of Demolition Phase of t e Project, : � T+6WMlt6AMRf6 AX fl�llee Patlo Plan (, roposod) � � VICTORIA STAT♦.^iIN rerun lmr�m,uourr�_clume °i�^mK . Dae h Ww rn S�'t: .�. neat uus 51_I �- - - : - - --v° D sties r amu: w.N - - " U1, s.em 5Er u1 SAS Mid Ai RC mmB,(N-- Pdo.%7 Rai!Goka L, vji Ni 1 tRWIEI: d sa�.rcrrnuon ewo. �R,_.� „ ��.1 p®pgr, BF w�wv+,«. w Dare� Or705EL1/ _ R'R lE IG : SIC i1 t.w veaaot •..r�m<ne �111: M -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - , TSS x4 x3/8'Y Lsp F- TS S' x4' x3/8' I 54. S3. LJ �+ co 53. I - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - MRiFAt81iT61O61pCpy q p opori Plan (Pro osed) =� wcToa sTatbh lllnln Caro u p i Biu ar.�crur.®mt»a�cmnme `3mrra�'//��oow;AwXc p i0.Tar-u1N� r II I 11 nwzraessrt�+eti.saxeua �•"�`s" yEMRSOM `✓.IR;rA Yiu: et.K 5t_1 �cole: 1/4 =1-0 � CROUP ne cewcs�c;toff.-.e, ARCHITEM.INC. al 4vw � fi l 41l®ASN(ASg�L "''Yt''YY'"'''�� CN W.NW, 64T J6Irp�WN AWL♦. 1 p®ate� M t RR 20 R1� :.4 Tt rw y-ONS M1t fYll V>�9c 1F:IO - 1 2 TS8' x4' x3/8' T60' x4' x1/4' I , I t£ 8' x 5/8' x 5 1/2' fE 6' x5/8' x 9' U) 5x16 Column w/ TS 4' x orae 3/8' TS 4' x 4' x 3/5' Column (Typical Bracket Support (1/4 End 12) at ,owning Supports) — I I I III 54.1 VY Compressable Hler at EetN Bu ft T gxA New 3' Thick 4,000 Pa Concrete Slab w/ 5% to 1% Ar Entrapment New 3' Thck 4,000 PSI Concrete Slab w/ b% to 1% Ar Entrapment, and b' x b' U)2.9 x 2.9 UIUJM, Type Reinforce Slab w/ 6' x 6' U)2.9 x 2.9 UU)M New 3/4' Presse Treated Pk uood Sheat ( I I New 3/4' Pressure Treated Plywood Sheathng I I New Press�ae Treated Framing Members as Drected by 5tructwal 2 I New Pressure Treated Franrg Members as Drected by Structural Engineer,(Seter Each Existing Franng Member) S4.1 I Ergnser (Sister Each Existing Framing Member) 'X SB'x 12' wr;2 518! gZolts 9 fir 8' x 5/8' x 5 1/2' w/ 2 - 5/8' x 0 Expansion Bolts (6' GaJ, d Solid Blockrn For u umn 5u outs Set on V4' Bearing fE on P C%rout ( I ' 1 (Revrew 'Gonfrgura on vtructural :Engnepee) - .=x Colmn Base to Set on Existing Concrete Grade 5m 1117 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ /_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ __ 1 5e - - - - - - - - - - - 2 v�ctlot� B-B S3. Scale: ll/2"=1'-0° S3. Scale: ll/2"=1'-0" TB WMK.fi AW¢I4kl PojdlhR IGBA11®ST6fOb10.Cli> oxrvurwrem_�mAu VICTORIA $TATbN nM IT® ���ooBilt.mO1pE nsaw�rc,macnwpneei.amTues>Ysre�.smeiPsa.-r. o,�,«sin�s 4 IX7F®svr: W " � u� 2t A FIERJP IiYn fiKI.S na BwKscrmsxcc AjtcHnEm,ma U,5e�(PfO�X„'�) 1 sm.n w.ssaeT. .1 O;+II:R: eE ear�cFrwor.suv. 0@960 RF WRQ• N OiHie Rk l$NJ., syp ra rYV wap tia rrU'lF[M j81O: 41Q u' r Existing 4 x 10 Rafters at 1. All concrete work shall conform to the latest AG standards. Concrete shall 4'-3't OG have-d.rwvrtw n-compressive strength of 4,000 psi at 28 days, except as noted below. Roofin d Fascia, See Architectural Reinforcing steel 5rAl conform to A5TM A615 Grade 60, we wre mesh shall Drawings confer to A5TM A185. Patio slab shall have a mag float finish (Confirm w/ the Architect). TS Sx4x3/8 Beam 2• Concrete exposed to the weather shad have a minimum compressive strength of 4,000 psi at 28 days, and shag be entraned with 5-1 percent ar, L 3x3 1/2x1/4 Gip Angle - 2 at 3. All new Framing d plywood sheathrrg shall be pressure treated Each Existing Rafter fE 4x3/8x6 Shelf at Each Existing 4. Notify the structural a at the corpletion of the demolition phase of Rafter g the project. The stru�lural engneer shall make an onsite r�pection of the �fr z Wiz$ existing framng/deck prior to tFie new construction phase of the project, ..:. 5. Cooperate with all other trades and refer to all other dawings for the Cut Existing Rafter as Shown, installation of sleeves, averts, chases, etc. G' Typical I �ectlon C=C - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 �JGCtl011 C-� 54. Scale: T=1'-0° S4. Scale: 3"=1'-0" Remove ve )=xis Wood Dec This Area to T of s a Fra ........... �9 Top Exi n9 "°n9 .............................................. ............................................................................................ ...................................................................... ..... — — — — Modf Exw Fr Members (Remove T 1 V2 of Each Member) 9g New 3/4' Pressure Treated Plywood Sheathing New 3' 4,000 PSI Concrete Slab w/ 59. to 1% Ar Entramment, Ranforce Slab w/ 6' x b' W.9 x 1.9 WuJM New Pressure Treated Framag Members a5 Drected by Structural Engineer (faster Each Existing Framing Member) , liGtR.WG 6A W8l CFR p.j�{yy.. _ _ _ NOTORIA STATION �_ ow�rt wosrarniosiaiuc srtwr�mtru�«_mmue ��� r 5r.uzro-K.cpw.�rA:.rku - S."Y:�®m,. �i y,g{r- pec: rw¢a+ero ccr.'uKnrac��+�:e.sF�x-AVE yEtFERSON SCQie: 14-0" nsswu bwrmffw;a O'S+u-ma� �,itpUP y9_��dlh 4ffflt2: r.. fRI�IGRA59ti /�RCHfiECT$,ING I ea Deab r Note5 54.1 R/IfIBf. Q w .+c..sweoH.urn. OHAID6f.IdR �+�`^^Q. x, oases C n EXISTING BUILDING,BEYOND MAT 19'•6 3/8" � EXTENT OF EXISTING ALK 14'-S" PROPOSED AWNING REPLACEMENT I� b X 6 POST- TYPICAL EXISTING PLANTERS TO REMAIN a TOP OF PLANTER SHOUN DASHED CONCRETE DECK i EAST ELEVATION FI.IG SCALE:VS":I'-m" 155UED FOR REGULATORY REVIEW 2-21-9a 1uIF VW M15<P.T RLV Rta/j`r:T'NLYp: /, t T Pbt 6J: GM cR:LiRC1�4�EK�i2RCRITO 4L -r�EFZRROSON VICTORIA STATION': RAS WT WI MI ED to LE1F ;A.DiIWb*imam a u'UtM'oro PICKERIrvG LLHdRF Dale ll c : 1R69d tlR NRKL9LF rW'i"'Z= 54Et1.M rta TM s ECPiuna a;.=.R I.0 4D.5 toe cx VF Ftpcora.15 PW IFAXK M F Sm rix rm w. '. 4a BN 100 FC4EDDeORD a ARCHITECTS,INC. SEASONAL AWNING STRICTUR_ 647 xA SfWLI. 1,1 J IC.K- -ON BLVD. EXTERIOR ELCVATON`EAST WAR RI 02BBB iel.fd911139-P.�14 Pox ld91/131-d139 �,�gD eldl EXISTING DOORS SHALL BE REMOVED EXISTING LOUNGE PROPOSED FOLDING DOOR SYSTEM WITH NEW HEADER BEAM ABOVE w 7` IIIIIIIIIIIIIIII a ii 77 W uuuu */_ ° n11I1I11I ' uuu E III I EXISTING PATIO NORTH PROPOSED WORK: I �, Q I I. UPGRADE EXISTING WOOD I DECKING TO CONCRETE. 00000000 I I 2. NEW SEASONAL AWNING STRUCTURE '� �� vlcroRla so anoN 000 � o 0 EXISTING P CANTERS PUSL�Y AREA OF Q ENLARGED PLAN m w 29•-8.. 2' QY PLAN �BLICPASSAGEWAY PUB SCALE:I°=4m' NOTE: I I.THE PROP05ED DECK AND ALINING WILL OCCUPY THE SAME i FOOT PRINT AS THE EXISTING STRUCTURE. I 2.THE CONCRETE DECK 15 BEING PROPOSED TO REPLACE THE EXISTING WOOD DECKING WHICH POSES A HAZARD To ®® III ®®v ® q CLIENTELE. I55ULD FOR REGG LATOIR REVIEW 2-2�= Ja i EXISTING PATI® M5 OFn.imr.I5d P0.¢I Oi 6V fSECFrF RojN Wrc: PenB): GNSCALE:I/4 I' m l �,Eo ,a ,RE,I�lo 15 VICTORIA STATION 6ocR='Ab PKY�RItG WU56 Dale bs'ci: 2n&m NNF 'XEMr M,Euwcu sr:csicdnav rsRz,o N wk: eS NOtED 7E & ECIIs<xxErete P Fkl Tlb:C. SEASONAL ApNG STRUCTURE64"EPERSON BLVD. PROPOSED DECK REPLACEMENT ' WARWIC%, RI 02889 7e1,14 U1:B fy7q fav;q'l3I)137 4130 JO,IM 9147 is NEW BACK-LIT SIGN,EXISTING SIGN 5HALL BE REMOVED AND FASCIA PATCHED AND PAINTED EXTENT OF EXIST AWNING �� i MANUFACTURER SUPPLY VELCRO EAR AWAY LOUVRE WIND VENTS - TYP.OF 2 pg,8 PROPOSED AWNING REPLACEMENT & X 6 POST- TYPICAL EXISTING PLANTERS TO REMAIN it II liil li I I II II II II II I II II II II II I _ _ _ II II IIII II I TOP OF PLANTER 514CLN DASHED CONCRETE DECK NEW FOLDING DOOR SYSTEM NORTH ELEVATION PLID SCALE:I/8"=I'-m" 155UED FOR REGULATOR' REVIEW 2-27 =9E • ' IMIS DFNYiG I54 PdFl LF 6V ROMINVe: PM�: GM wca oRauuas 1'P'ioau VICTORIA STATION nwa ay: Ru Bn fmT�nrtED To xmPRx (1MnV.NS"Sn74eY R u[MX'cVp PILK:ROG WGl3 Dale bvtl: 28690 6vYYRed6'EP6Vfd'IUR'R PSEFCFERROSON cPirsnaB.IE'ERIO A `Tis a.vErunc P W 5wi TOM s EITN, 4° /ARCHITECT INC. 5E450NAL A KING 5TRUCTU�RE a uanu. p p 1 11 I.I WA WCK. RI JEFFERSON BLVD. EXTERIOR[L E l/AT DN-NO'J'TM ' WARWICK. RI 02BB8 I� Tel l<OU 113.":,624 Fax NOI11324130 JM Y. 9�e7 RIM=9.}6 \P CB � META _ WOODEN P \ / v BRICK 5 RIM-9.03 - OaA55 1 CA TE DEQ '. � BRICK STEP - ` / A� WC! GRANITE- GANGWAY 4 PLOCIC VALL o , _ T • O BOATOAD ' P TM" WHARF RRIM-9. � GAWT � � `I MONllMEN'HYD � <` .DMH \ a.,, ` 'A _ F - LF RM-10.05 v''' BRICK POSTS Isla wintedT 7 amu, \{.'F ay GRANITE BLOCK( 'ry Cv LP. 14 RETAINING WALL WOODRAILING ( P-� Poser C. SM N /1 GRASS ti LP NG dz ESSE f t A N/ 1 SEWER e.41GN JUNCTION BMCN STEPS h MN � Y � PLANTER U VENTTILITY 1NCrT .. -U ]lON � `R�'\ o!A!: - .BOX PLANTER \'Fl",�` RIk-1o,97 trn V P.0 .. a1 `nr 'T•4� '� h r IUM�10.79 ()\)\ - PLANTER a SITE / P �/ W j Pp•+„I`'+ 11 r.y TiTiru°rty_ ,a h K; . '- 3 PLANTER d� _ PLANTER 3 m AC UNITS Q._ � Y� p ty,� y jvu r. e - PLAN Derb SCREENED } ^3. C} -, m ^� m PUNTER ' IP �r S Wharf BY LOW v� - I L+. e.�.� PLANTER N ST. /Salem PICKET FENCE : ' K y'Fc - .. K P. �9 PLANTER LEAN Mw / � t at ,� H k W / arbor NtLOCUS R. .; s c BRICK _ / SCALE t"— 2000" s ,may .� { _, 4�Q5 a Y f'n� .. :: �RS ,gj k v r } "e, AC UNITS SCREENED VNIGFI PICKET N T rECE ( L ` A 71pi „GRAND TURK" s GAS METERS SCREENED BY HIGH PICKET FENCE NG / j Gra AC UNITS SCREENED aPpgY By Wq4 PICKET FENCE LP Ln (\ ce RIM-9.b r j DECK WITH CANOPY FOR SEATING L➢ SEATING .. N,. DECK LINED PITH WOODEN PLANTERS L CB RW-9-69 ® � � ANS LP 'slcN \\ n u < WG ROOFED ENTRANCE / LDECK WTHP /LOADING a - V ZONE OUTDOOR CC Ci CONCRETE- - SEATING LP " \\ PAD 1* DECK LINED PARTITION INITH WOODEN PL - ANTES[5 "GRAND TURK" LP " WOOD PRXET TOP ESTAURANT EXISTING CONDITIONS FENCE WITH r LP �T GAS MESHED PLAN OF LAND P roF �®J7 GRAPHIC SCALE ��— S y n1 D TD 20 40 • �':.: . 5RP MARNA`DOCKS Pickens Wharfg � \ "GNAW LINK ' EAST CRUISE CO. Derby Street & • >_ ( IN FEET ) MACHINE SHED j I inch = 20 ft. 41Congress Street Salem, Massachusetts RAISED aw�e'.24' Date: March 5, 1998 L "'G" PLDE#98-01 Scale: 1" = 20' Sheet 1 of 1 Prepared for Pickering Wharf Realty Trust 84 Wharf Street: Salem, MA 01970 u PATROWICZ LAND DEVELOPMENT ENGINEERING 65 Eastern Avenue, Essex, MA 01929 (978) 768-1141 w Ln uT