Loading...
64-223 - 22 BAYVIEW CIRCLE - CONSERVATION COMMISSION 1 r i�y tt F 3M-CMR. 10.99 ` (,`! DEP FUcNo. 64-223 (7•o be provided by DEP) Form 5 6ty/I'oen 4Ai>;rt Applicant Cheryl G;_denn commonwealth of Massachusetts 03:'02l94 d,�'t=lj1 iri .lC 583 order of Conditions d Massachuetts wetlands Protectio Kct1224 , ` 59 PG gt 94 O.L. c. 131r 540 From Salem Conservation (n •an _ issuing Authority To (Hama o Applicant) ( ams of property owner) Address 1 Richard Road Address This order is issued and delivered as follows: ❑ by hand delivery to applicant or representative on (date) ® by certified mail, return receipt requested on N/A (date) This project is located at 22 Bayview Circle The property is recorded at the Registry of t Book 5053 Fage__209 Certificate (if registered) The Notice of Intent for this project was filed on (date) The public hearing was closed on February In local (date) Findings The Commission has reviewed the above-referenced Notice of Intent and plans and has held a public hearing on the project. Based on the information available to the Commission at this tine, the Commission has determined that the area on which the proposed work is to be done is significant to the following interests in accordance with the Presumption` of Significance cat forth in the regulations for each Area Subject to Protection Under the Act (check as appropriate): ❑ Public water supply p��1( Flood Controi . Land containing shellfish �uJ Private water supply pW Storm oevvent�BcfPpoituti non protection of Wildlife Habitat Fisheries Ground water supply �.I Po �7t� Total Filing Fee Submitted $ Sn_nil State Share $1IL (V2 fee to excess of f25) _ City/Town Share 81 '17 9n Total Refund Due f City/Town Portion f State Portiont (1/2 total) (1/2 total). Effective 11/10/89 5-1 CC�� i � r Therefore, the (n hereby finds that theWallo%ri-dg -,'r5iQDs 19,5 are necessary, in accordance with the Performance standards not forth .in the regulations, to protect those interests checked above. The orders that all work shall be performed in accordance with said c ns and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. k - ,,General(Conditioas ditions stated with 1. Failure to ply statutes andootherwregulat ryith all nmeasures, shall be dled be deemedcause to revoke or modify this order. 2. The order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances,'by-laws or regulations. G. The work authorized hereunder shall be completed within three yearsfrom the date of this order unless either of the following apply: (a) the work is a maintenance dredging project as provided for in the Act; or (b) the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance and both that date and the special circumstances warranting the extended time period are set forth in this order. 5. This order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the order. 6. Any fill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts of any of the foregoing. 7. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department have been completed. S. No work shall be undertaken until the Final order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to. be done. in the case of registered land, the Final order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording informatin shall be submitted to the _on the form at the end of this order prior to commencement of t e work. 9. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection, File Number "i 22z 10. where the Department of Environmental Protection is requested to make a determination and to issue a superseding order, the Conservation commission shall be a party to all agency proceedings and hearings before the Department. 5-2 r d-� G 1 `ti + ull. Upon completion of the work described herein, the aC. li �a �•Lld oa r forthwith request in writing that a Certificate of Compliance be issued stating that the work has been satisfactorily completed. 12. The work shall conform to the following plans and special conditions: Plans: Title Dated signed and stamped by: on File with: Christopher Mello Site .Development Plan of 'osrri Land located in Salem, �� MA. Special conditions (Use additional paper if necessary) SEE ATTACHED CONDITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (Leave. Space. Hlank). . . . . . . . . . . . . . . . . . . . . . .. . . . . .. 5-3A BK '12459f P 1197 Plana: Title Dated signed and Stamped by: on File with: special conditions (use additional paper if necessary) (Leave space Blank) ... . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 5-3B .� l� '9 ei esgevt lssu`e'd' ey, € Salem censerwt�ion jCLuhass'ion 1 ��� Sig. ature( ) This order must be signed by a majority of the conservation commission. on this loth day of February 19 94 before me personally appeared - d , to me known to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed the same as his/her free act and deed. _ ;. July 15, 1999 Ng- Ary Public My commission expires The applicant, the owner, any person agrrieved by this order, any owner of lend abutting the lend upon which the proposed work (a to be done, or any ten residents of the city or town in which such land is lasted, are hereby notified of their right to request the Department of Environmental protection to issue a Superseding order, providing the request is made by certified mail or hand delivery to the Department, with the appropriate filing fee and Fee Transmittal Formas provided in 310 CMR 10.03(7), within ten days from the date of issuance of this determination. A copy of the request shell at the same time be sent by certified mail or hand delivery to the Conservation commission and the applicant. Detach en dotted line and submit to the Conservation Commission prior to commencement of work. .............................................................................. To Sajem Conservation Commission Issuing Authority I please be advised that the order of Conditions for the project st22 Bavview Cir--LP-- end Fila Number 64—? '1 has been recorded at the Registry of F ax has been noted in the chain of title of the affected property in accordance with General Condition 8 an 19 if recorded land, the instrument number which identifies this transaction is If registered land, the document number which identifies this transaction is Applicant Signature 5-dA A_ B r �y , . . 1 rl• r Pr3 1909 riti �iesued by the Department of Environmental Protection L 1.4 mil Signature On this day of 1'9 ' before me personally appeared to me known to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed the same as his/her free act and deed. Notary Public My commission expires The-appl{cant,.the owner, any person aggrieved by the superseding order, any owner of land abutting the land upon which the proposed workisbe dorm; orany ton. persons.pursuant to G.L. e.30A JIOA, are hereby notified of their right to request`en adjudiestory hearing pursuant to G.L. c.30A, 110 Providing the,,' ' request is made by certified mail or hand delivery to the Department, with the appropriate filing,fee-a C+ Fee Transmittal Form as provided in 310 CMR 10.03(7), within ten days from the date of issuance 61 this ; superseding Order, and is addressed to: Docket Clerk, Office of General Counsel, Department of &1vJ`roi �• >riental Protection, one Winter Street, Boston, MA 02108. A copy of the request shall at the same time,be dent by certified moil or hand delivery to the Conservation Commission, the applicant, and any other, pay._. ,r �- A Notice of Claim for an Adjudicatory Hearing shall comply with the Department's Rules for Ad)JU`iSz'pryProceedings, 310 310 CMR 1.01(6), and shall contain the following information: (a) .the DEP Wetlands File Number, name of the applicant and address of the project; (b) the complete name, address and telephone number of the.perty filing the request, and, if reprasentad by counsel, the now and address of the attorney; (c) the names and addresses of all other parties, if known; (d) a clear and concise statement of (1) the facts which are grounds for the proceedings, (2) the objections to this Superseding order, Including specifically the;manner in which it is alleged to be inconsistent with the Department's Wetlands Regulations (310 CMR 10 .00) and does not contribute to the protection of the interests identified in the Act, and (3) the relief sought through the adjudicatory hearing, including specifically the changes desired in the Superseding Order; (e) a statement thata copy of the request has been sent to the applicant, the conservation commission and each other party or representative of such party., Failure to submit all necessary information may result in a dismissal by the Department of the Notice of Claim for an Adjudicatory Hearing. Detach an dotted tiro and submit to .the prior to comancement of work. ................................................................................................ Issuing Authority. To Please be advised that the Order of Conditions for the project-at File Number has been recorded at the Registry of and has been noted in the chain of title of the effected property in accordance with General Condition 8 on 19 If recorded land, the instrument nunber which identifies this transaction is If registered land, the document umber which identifies this"transaction is Applicant Sigroture . 5-48 mal;.RK�• 12450 a 50 P ' 200� �•= 5 �� si�� DEP File # 64-223 SPECIAL CONDITIONS 22 BAYVIEW CIRCLE 1. All work shall conform to the above-referenced Notice of Intent (NOI) , site plan and supporting documents and those final specifications which shall be filed with the Commission prior to construction. Any change to the approved plans shall require the applicant to inquire of the Commission in writing whether the change is substantial enough to require the filing of a new NOI. 2 . Members and agents of the Commission shall have the right to enter and inspect the premises at all reasonable times to evaluate compliance with the conditions in this Order. The Commissionmay require the applicant. to submit additional data or information necessary for the Commission to conduct that evaluation. 3 . Upon completion of the project, the applicant shall submit, with the request for a Certification of Compliance, an affidavit, prepared by a professional engineer or land surveyor registered in the Commonwealth of Massachusetts, stating that the site has been developed, in accordance with the requirements of this Order of Conditions, the referenced site plan and supporting documents. 4. This Order shall apply to every successor in control or successor in interest of the property described in the Notice of Intent and accompanying plans or part thereof. In the event this land or any part thereof changes ownership before or during construction, the current owner shall notify the new owner, by registered mail, of this Order prior to the transfer of ownership and shall forward proof of this notification to the Commission. 5. Notice shall be given this Commission no more than 2 weeks nor less than 2 days prior to the commencement of construction activities. Said notice shall include, in writing, the name(s) , address(es) , and business and home telephone numbers of the project supervisor(s) responsible for insuring that operations are conducted in compliance with this Order. 6. A copy of the plan, and the Order of Conditions with any Special Conditions will be retained on site throughout the project. 7 . A haybale barrier will be constructed such that the arc sweeps in the east from the end of the driveway curbing on lot 29 north along the lot line to the proposed 18 foot elevation. The haybale configuration will then turn west following the 18 foot contour line and end at the paved portion of Louis Street as reflected on the revised plan dated February 10, 1994 . CIR IX_4%"JV IPG 2101 8. Additional erosion and sedimentation control measures deemed necessary by the Commission shall be instituted by the applicant. Any siltation caused onto any resource area shall be promptly reported to the Commission and shall be restored to the satisfaction of the Commission. 9 . No excavated material shall be placed on the northern side of the foundation footprint between the foundation and the haybale barrier reflected on the revised plan dated February 10, 1994. Any stockpile material shall be placed outside the Buffer Zone. 10. Prior to commencement of any pre-construction activity, the applicant will contact the Salem Clerk of the Works who will view the constructed haybale barrier to ensure that its placement and construction are consistent with good erosion and sedimentation control practice. No preconstruction activity will commence until any alterations recommended by the Clerk of the Works have been completed and the Clerk of the Works has confirmed, by an on site view, that the structure is acceptable. 11. A copy of the revised plan dated February 10, 1994 , the Order of Conditions, and Special Conditions will be retained on site throughout the life of the project. 12 . Equipment servicing and overnight equipment storage must be conducted outside the buffer zone. Equipment must be maintained to prevent leakage or discharge of pollutants. 13 . * No spill or discharge of petroleum products or other pollutants will occur within 100 feet of any wetland resource area. 14 . * Use or storage of rock salt (sodium chloride) or other toxic de-icing chemicals is prohibited within 100 feet of the resource area. Any arrangement for snow removal shall stipulate the ban. 15. * Minimal pruning and no removal of any buffer zone or wetland vegetation will occur downgradient of the staked haybale line. 16. All disturbed soils shall be immediately and similarly re- vegetated upon completion of construction activities or shall be mulched until the next growing season. 17 . * Fertilizers used for landscaping and lawn care shall contain a low nitrogen content and be used in moderation. Pesticides and herbicides shall not be used within 100 feet of the resource area. 8K 12459 PG 202 18 . Prior to commencing any on site activity intended to support construction of a pier, wharf, outbuilding, or any other structure not included on the December 21, 1993 plan, the applicant will file a Notice of Intent with the Salem Conservation Commission. *ongoing conditions that do not expire upon issuance of a Certificate of Compliance. jmWh\spmm.294 Olv. Sal��� Greer Sa/,11 , Professional Land Surveyors Et Civil Engineers ESSEX SURVEY SERVICE 1958 - 1986 OSBORN PALMER 1911 - 1970 BRADFORD & WEED 1885 - 1972 January 5, 1994 Ms. Debbie Hurlburt - Conservation Commission City Hall One Salem Green Salem, MA 01970 RE: Notice of Intent for Lot 28+, 22 Bayview Circle, Salem HAND DELIVERED Dear Ms. Hurlburt: Please find enclosed the completed package for the filing of a Notice of Intent for Lot 28+, 22 Bayview Circle, Salem, MA. This package includes the completed Notice of Intent with the appropriate number of copies of the checks and plans. Any questions or comments, should be directed to the undersigned. Sincerely, gpristopher R. Mello P.L.S. President Enclosure 104 LOWELL STREET PEABODY, MASS. 01960 (508)531-8121 FAX:(508)531--5920 - e � Lheldon CITY OF SALEM CONSERVATION COMMISSION hold a public hearing f'or a Notice of Intent the Massachusetts Wetlands Protection Act, .L.Chapter 131,Section 40,at the request ryl Gideon.The proposal involves the con- on of a single family dwelling,appurtenant s and landscaping within a Buffer Zone d at 22 Bayview Circle. This hearing will on Thursday,January 27,1994 at7:00 P.M., alem Green,second floor conference room. BETSY HORNE, Chair ary 18, 1994 SN11030 &gIDTM I&A LI pTnw G]� oQ�n�o�a Bodo Professional Land Surveyors 8 Civil Engineers ESSEX SURVEY SERVICE. 1958 - 1986 OSBORN PALMER 1911 - 1970 BRADFORD 8 WEED 1885 - 1972 January 31, 1994 Attorney Stephen Lovely 14 Story Street Salem, MA 01970 RE: F 8923 Bayview Circle Salem, MA Dear Steve: I have reviewed the above referenced site with respect to the Salem Wetlands and Flood Hazard Districts and we have ascertained that the subject parcel is not shown on the "Wetland Areas of Salem, Massachusetts" prepared by Dr. Jerome Long. The land subject to construction is above mean high tide and the land subject to construction is above the A-3 base elevation as shown on the FEMA Maps for the City of Salem. Based on this information it is the opinion of this office that the proposed construction is not subject to Section 7.16 of the Salem Zoning Ordinance. Sincerely, Christopher R. Mello P.L.S. President 104 LOWELL STREET PEABODY, MASS.01960 (508)531-8121 FAX:(508)531-5920 { Commonwealth of Massachusetts _ Executive Office of Environmental Affairs - Department of _ R ! ' ID- '. Environmental Protection Metro Boston/tvortheastRagional Office - JAW-2 -1-1994 William F Weld Daniel S.Greenbaum - - Comminioner .. DEP File # 64-22 RE: NOTIFICATION OF WETLANDS_ PROTECTION ACT FILE NUMBER SALEM DATE: 1/19/94 (city/town) The Department of Environmental Protection has received a Notice of Intent filed in accordance with the Wetlands Protection Act (M.G.L. c . 131, X40) : Applicant : CHERYL GIDEON Owner: SAME Address : 1 RICHARD ROAD ' Address : SALEM MA 01970 Project Location: 22 BAYVIEW CIRCLE LOT 28 IF CHECKED, THE FOLLOWING ITEM(S) APPLY TO THIS NOTICE OF INTENT: A. (X) This project has been assigned the following file #: 64-222 Although a file # is being issued, please note the following: ISSUANCE OF A FILE NUMBER INDICATES ONLY COMPLETENESS OF SUBMITTAL, NOT APPROVAL OF APPLICATION B." No File # will be assigned to this project until the following missing information is sent to this office, to meet the minimum submittal requirements in accordance with the Wetlands Protection Regulations at 310 CMR 10 . 00 : lK ( ) copy (s) of a completed Notice of Intent (Form 3 or Form 4 of Sect . 10 . 99, whichever is applicable) and a copy of the Fee Transmittal Form, with a copy of the check for the State ' s share of the Notice of Intent filing fee. 2 . ( ) _ copy(s) of plans, calculations, and other documentation necessary to completely describe the proposed work and mitigating measures to protect resource areas . 3 . ( ) _ copy(s) of an 8%11 X 11" section of the USGS map of the area. 4 . ( ) _ copy(s) of plans showing compliance with Title 5 of the State Environmental Code, 310 CMR 15 . 00 . 5 . ( ) Proof that a copy of your Notice of Intent has been mailed or hand delivered to the Natural Heritage and Endangered Species Program. COMMENTS : (see page 2 for additional information) 10 Commerce Way a Woburn,Massachusetts 01801 0 FAX(617)935-6393 a Telephone(617)935-2160 2. O Other Regulatory Jurisdiction 1. ( ) Application-has -been -forwarded to waterways Regulatory Program to- determine if a Chapter 91 License is required. 2 . ( ) Applicant is advised to forward a copy of the Notice of Intent to the Corps of Engineers for review (call 1-800-362-4367 for information) . D. 401 Water 'Quality Certification The project described in your Notice of Intent requires a 401 Water )uality Certification from the Department of Environmental Protection and may require submittal of a 401 application form. See below for further details : 1 . ( ) Based upon the information submitted in and with your Notice of Intent a separate 401 Water Quality Certification application form is not required. The Department of Environmental Protection has reviewed the plans submitted by the applicant and finds that there is reasonable assurance that the project or activity will be conducted in a manner that will not violate the Massachusetts Surface Water- Quality Standards, provided that : a) the applicant receives and complies with a Final Order of Conditions from the local conservation commission or the Department; b) the Order of Conditions does not cause the loss -of more than 5000O sq. ft . of bordering vegetated wetlands and land under water and/or the dredging of more than 100 cubic yards of land under water; c) any loss of vegetated wetlands has been mitigated with a minimum replication of 1 : 1; and d) the project is not exempt from the M.G.L. c. 131, 940 - the Wetlands Protection Act; is not part of a subdivision; does not cause the loss of any wetlands designated as Outstanding Resource Waters; and does not cause the loss of any salt marsh. Therefore, provided that the above conditions are satisfied, the Final Order of Conditions will serve as the Water Quality Certification for this project . This does not relieve the applicant of the duty to comply with any other statutes or regulations . 2 . ( ) Before the activity described in the Notice of Intent can commence, you must obtain a Water Quality Certification from this Regional Office. Please complete the enclosed 401 Water Quality Certification application form and file it with this Regional Office for review. 3 . ( ) Your project involves dredging of greater than 100 cubic yards of material or requires a permit from the Federal Energy Regulatory Commission for work in "waters of the Commonwealth. " Therefore, your proposed project is subject to 314 CMR 9 . 00 and requires a Water Quality Certification. Please complete the enclosed 401 Water Quality Certification application form and file it with the Department of Environmental Protection, Division of Water Pollution Control, One Winter Street, Boston, MA 02108 . Contact the Division of Water Pollution Control at 617-292-5655 if you have any questions . ?or more information please contact :MIKE TURGEON it (617) 935-2160 . :c : Conservation Commission ( ) U.S . Army Corps of Engineers Owner ( ) Coastal Zone Management DEP - Water Pollution Control (X) Representative :EASTERN LAND SURVEY DEP - Waterways 104 LOWELL STREET Other: PEABODY, MA 01960 2 ' Y Professional Land Surveyors & Civil Engineers ESSEX SURVEY SERVICE, 1958 - 1986 OSBORN PALMER 1911 - 1970 BRADFORD & WEED 1885 - 1972 February 11, 1994 Ms. Betsy Horne, Chairpersonp� �t `a Salem Conservation Commission City of Salem IFEB 1 144 One Salem Green Salem, MA 01970 E�49p RE: F 8923 Bayview Circle Salem, MA Dear Madam Chairperson: Please find enclosed a revised plan of the above referenced Notice of Intent filing. This plan has been altered to reflect the requested location of the proposed haybales. Thank you for your cooperation in this matter. Sincerely, Christopher R. Mello P.L.S. President Enclosure cc: Stephen Lovely Brian Gideon Dept. of Environmental Protection 104 LOWELL STREET PEABODY, MASS. 01960 (508)531-8121 FAX:(508)531-5920 ..\ON CO,,, Conservatim Commission ✓�i� y Salem. Massachu�ctts 01970 41ASSA�a yy CITY OF SALEM CONSERVATION COMMISSION Will hold a public hearing for a Notice of Intent under the Massachusetts Wetlands Protection Act , Mass G.L. Chapter 131, Section 40, at the request of Cheryl Gideon. The proposal involves the construction of a single family dwelling, appurtenant utilities and landscaping within a Buffer Zone located at 22 Bayview Circle. This hearing will be held on Thursday, January 27 , 1994 at 7 : 00 p.m. , One Salem Green, second floor conference room. Betsy Horn /X``fj Chair January 18, 1994 EX\DH\NOILEGAL.BAY Ti:i:i notice posted on "Official Stij.1pt!n n^�rej" City, H#il Ave., Salem, Mass. n-: ��-%� at ' ;x p . 39 Sec. - 23A S 239 of 310 CMR 10.99 DEP File No, Form 3 CFO 6e pmovi"69 DEP) . aty/rown Salem Appresol .Cheryl Gideon Commonvealth Department of of Massachusetts Defense united states Notice of Intent of America " Under the Massachusetts Wetlands Protection Act, G.L. c. 131, '$40 s and Application for a Department of the Army Permit Part I: General Information - 1. Location: Street Address 22 Bayview Circle Lot Number 28+ 2. Project: Type Residential . Description Construct a single family dwelling, - appurtenant utilities and landscape with the buffer to a resoucre area. 3. Registry: County Essex Current Hook 5053 6 Page 209 Certificate (if Registered Land) 4. 'Applicant Cheryl Gideon Tel. 744-2416 Address_ 1 Richard Road Salem, MA 01970 5. Property owner SAME Tel. Address 6. Representative Eastern land Survey Assoviataa� Tnr Tel. 5'11-8191 Address 104 Lowell Street Peabddy MA 01960 7. a. Have the conservation Commission and the Department's Regional Office each been sent, by certified mail or hand deliver, 2 copies of completed Notice of Intent, with supporting plans and documents? Yes ® No ❑ b. Has the fee been submitted? Yes ® No ❑ c. Total Filing Fee Submitted$ 250.00 d. City/Town Share of Filing Fee 13 .50 state Share of Filing Fee 112.50 (sent to City/Town) (% of fee in excess of S25, sent to DEP) .e. Is a brief statement attached indicating how the applicant calculated the fee? ® Yes ❑ No - - 3-1 Effective 11/20/92 8. Have all obtainable permits, variances and approvals required by local by-law x, been obtained? Yes ❑ No obtained Applied For: Not Applied For: Building Permit 9. Is any portion of the site subject to a Wetlands $gstrict)'gn Order pursuant to G.L. c. 131, S40A or G.L. C. 130, 8105? Yes LJ No LnJ 10. List all plans and supporting documents submitted with this Notice of Intent. Identifying Number/Letter Title, Date A Site Development Plan prepared by Eastern Land Survey Assoc. , Inc. , dated December 21, 1993 11. Check those resource areas within which work is proposed: (a) ® Buffer zone (b) Inland: ❑ Bank* Land subject to Flooding ❑ Bordering Vegetated Wetland* ❑ Bordering ❑ Land Under Water Body a Waterway* ❑ Isolated (c) Coastal: ❑ Land Under the ocean* ❑ Designated Port Area* ❑ coastal Beach* ❑ coastal Dune ❑ Barrier Beach* ❑ coastal Bank ❑ Rocky Intertidal shore* ❑ salt Marsh* ❑ Land Under salt Pond* ❑ Land Containing shellfish* ❑ Fish Run* *Likely to involve U.B. A=my Corps of Engineers concurrent jurisdiction. See General Instructions for Completing Notice of Intent. 3-2 12. la the project within es'cimated habitat which is indicated on the most recent Estimated Habitat Map of State-Listed Rare Wetlands Wildlife ('if any) published by the Natural Heritage and Endangered species Program? YES [ ] NO [ Xj Date printed on the Estimated Habitat Map NO MAP AVAILABLE [ ] (if any) 1993 If yes, have you sent a copy of the Notice of Intent to the Natural Heritage and Endangered Species Program via the U.S. Postal service by certified or priority mail (or otherwise sent it in a manner that guarantees delivery within two days) no later than the date of the filing of this Notice of Intent with the conservation commission and the DEP regional office? YES I ] NO I ]if yes please attach evidence of timely mailing or other delivery to the Natural Heritage and Endangered Species Program. Part Ii: Site Description indicate which of the following information has been provided (on a plan, in narrative description or .calculations) to clearly, completely and accurately describe existing site conditions. S Identifying Number/Letter - - (of plan, narrative or calculations) Natural Features - soils A Vegetation A Topography A Open water bodies(including ponds and lakes) A Flowing water bodies(including .streams and rivers) Public and private surface water and ground water supplies : on or within 100 feet of site Maximum annual ground water elevations with dates and location of test 11 A Boundaries of resource areas checked under Part ' l,litem 11 above other Man-made Features: A Structures (such as buildings, piers, towers and headwalls) A Drainage and flood control facilities at the site and, immediately off the site, including culverts and open channels (with inverts), dams and dikes subsurface sewage disposal systems A underground utilities 3-3 A Roadways and parking areas A Prop,,rty houndari.e4. sas,:,aents and rights-of-way other Part III: Work Description Indicate which of the following information has been provided (on a plan, in narrative description or calculations) to clearly, completely and accurately describe work proposed within each of the resource areae checked in Part 1, item 11 above. Identifying Number/Letter - (of plan, narrative or calculations) Planview and Cross Section of: A Structures(such as buildings, piers, towers and headwalls) Drainage and flood control facilities, including culverts and open channels(with inverts), dams and dikes A Subsurface sewage disposal systems & underground utilities Filling, dredging and excavating, indicating volume and composition of material Compensatory storage areas, where required in accordance with Part III, Section 10.57(4) of the regulations. wildlife habitat restoration or repiicaticn areas other Point Source Discharge Description of characteristics of discharge from point source (both closed and open channel) , when point of discharge falls within resource area checked under Part I, item 11 above, as supported by standard engineering calculations, data and plans, including but not limited to the following: 1. Delineation of the drainage area contributing to the point of discharge; 2. Pre-and post-development peak run-off from the drainage area, at the point of discharge, for.at least the 10-year and 100-year frequency storm; 3. Pre- and post-development rate of infiltration contributing to the resource area checked under Part 1, Item 11 above; 4. Estimated water quality characteristics of pre- and post-development run-off at the point of. discharge. 3-4 Part IV: Mitigating Measures i. Clea; lv: r;.pletety r.nd accuratelydescr{Se, with reference to supporting plans and calculations where necessary: - (a) All measures and designs proposed to met the performance standards set forth under each resource area specified in Part II or Part III of the regulations; or (b) ,Why the presumptions set forth under each resource,area specified in Part 11 or Part III of the regulations do notapply. - - - ❑ coastal Resource Area Type: identifying number:or . ❑ inland letter of support documents N/A ❑ coastal Resource Area Type: Identifying number or ❑ inland letter of support.:: documents NA 3_5 ❑ coastal Resource Area Type: '9enti.fying number or ❑ inland letter of support documents N/A 2. -Clearly, completely and accurately describe, with reference to supporting plans and calculations where necessary: (a) all measures and designs to regulate work within the Buffer Zone so as to ensure that saidwork does not alter an area specified in Part 1, Section 10.02(i)(a) of these regulations; or (b) if work in the Buffer Zone will alter suchanarea, all measures and designs proposed to meet the performance standards est.ibtished for the adjacenr resource area, specified in Part if or Part III of these regulations. ❑ coastal Resource Area Type Bordered identifying number or M inland By 100-Feet Discretionary Zone: letter of support documents Bordering Vegetated Wetlands Resource Area will be protected from siltation by a staked haybale silt barrier as shown on the accompanying plans. A 3-6 Part Vs Additional Information for a Department of the ` iArmy Permit 1: COE Application No. (to. be provided by COE) 2 (Name of waterway) 3. ' Names and addresses of property owners adjoining your property: i 4. Document other project alternatives (i.e., other locations and/or construction met$ods, particularly those that would eliminate the discharge of dredged or fill material into waters or wetlands) .., 5. 8§" x 11" drawings in planview and cross-section, showing the resource area and the proposed -activity within the resource area. Drawings mustibe to scale and should.be clear enough for photocopying. Certification is required from the Division of water Pollution control before: the Federal permit can be .issued. Certification may be obtained by contacting the Division of water Pollution Control, 1 Winter Street, Boston,s Massachusetts 02108. Where the activity will take place within the area under the Massachusetts approved Coastal Zone Management Program, the applicant certifies that his proposed activity complies with and will be conducted in a manner that is ;onRistent with the approved program. Information provided will be used in evaluating the application for a permit and is made a matter of public record through issuance of a public notice. Disclosure of this information is voluntary; however, if necessary ;information is not provided, the application cannot be processed nor can a permit be issued. I hereby certify under the pains and penalties of perjury that the foregoing. . Notice of Intent and accompanying plana, documents and supporting data are : true and co pie e . . the best of my knowledge. . Signat pplican Da e Sign urs of App ican 's Representative Date FORM "Exception to ENG Form 4345 approved by HOUSACE, 6 May 1982" NED 100 (TEST) 1 MAY 82, "This document contains a joint Department of the Army and State.of Massachusetts application for a permit to obtain permission to perform. activities in United States waters. The Office of Management and Budget(OMB) has approved those questions required by the US Army Corpsof Engineers. OMB Number 0702-0036 and expiration date of 30 September 1983 applies". This statement will be set in 6 point type. 3-7 FILING FEE CALCULATION WORKSHEET plants, roadways/driveways NOT subject to 310 CMR 10.53(3e) SHALL NOT BE SUBJECT TO ADDITIONAL FEES CATEGORY 1 $55 PER ACTIVITY $ No if said activities are reviewed under a SINGLE NOI A. Existing House/residential lot (addition, deck, C. Construction of EACH ROADWAY/DRIVEWAY within the garage,pool, shed,or DRIVEWAY) — Buffer zone or Coastal Floodzone NOT reviewable under 310 CHR 10.53 (`3e) and NOT associated with a SFH B. Site Preparation (removal of vegetation, exca- vation grading where home construction isn't — D. HAZARDOUS WASTE CLEANUP (except as noted in proposed under this N01) category 4) C. Control of nuisance vegetation by removal, herb- TOTAL CATEGORY 3 ACTIVITIES icides, etc. within a Resource-Area PER LOT pursuant to 310 CMR 10.53(4) CATEGORY 4 $725 PER ACTIVITY D. Resource Area Improvement pursuant to 310 CMR A. EACH WETLAND FILLING/CROSSING LIMITED PROJECT _ 10.53 (4) other than 1C above ACCESS ROADWAY/DRIVEWAY under 310 CMR 10.53 (3e) E. SEPTIC SYSTEMS or any part thereof/repairs, associated with COMMERCIAL, INDUSTRIAL, INSTITU- �replacement, UPGRADING — 7IONAL DEVELOPMENT OR RESIDENTIAL SUBDIVISION CONSTRUCTION. (*see category 2g for SFH driveways*) F. Monitoring Wella/well _— B. Flood Control Structures (construction, REPAIR, TOTAL CATEGORY 1 ACTIVITIES and/or modification) — C..LANDFILLS-public A private CATEGORY 2 $250 PER ACTIVITY D. SAND 6 GRAVEL OPERATIONS . A. EACH NEW single family house (SFH) INCLUDING 250 1 E. NEW railroad linea or EXTENSIONS of EXISTING site preparation, retention/detention basins, lines — utilities, SEPTIC SYSTEM, roadway/driveway other than those pursuant to 310 CMR 30.53(3e) F. Control of NUISANCE VEGETATION under 310CMR if reviewed under a SINGLE NOI 10.53(4) other then on a SFH lot B. Parking lot/ ANY size _ G. BRIDGES (construction, reconstruction, expansion,_ — C. Beach Nourishment maintenance) ASSOCIATED with a SFH lot D. Coastal Activities pursuant to 310 CMR 10.24 H. Raising or lowering WATER LEVELS _ (7a-c) including 7a-Electric Generation Facilities, I. ALTERATION Of RESOURCE AREA h diversion of water _ 7b-Public Utilities, 7c-Coastal Limited Projects associated with HAZARDOUS WASTE CLEANUP, non- buildings — including REPAIR/MAINTENANCE of EXISTING piers, buildings culverts, etc. mosquito control projects, or for ANY OTHER PURPOSE NOT EXPRESSLY IDENTIFIED ELSEWHERE IN THIS FEE SCHEDULE E. LIMITED PROJECT ACTIVITIES pursuant to 310 CMR 10.53 (a-d) AND 310 CMR 10.53 (f-1) per footprint — J. DREDGING ACTIVITIES not associated with a NEW — dock, pier or other structure described in category 5 F. NEN agricultural/aquaculturel projects — TOTAL CATEGORY 4 ACTIVITIES G. EACH WETLAND DRIVEWAY CROSSING associated with _ a SFH pursuant to 310 CMR 10.53(3e) CATEGORY S $2 PER LINEAR FOOT; TOTAL FEET NOT 70 BE LESS H. ANY point source discharge THAN $50 NOR MORE THAN $1000 I. ANY OTHER ACTIVITY not described in categories A. Construction, reconstruction, REPAIR, or replace-_ _ 1,3,4 d 5 — ment of DOCKS, PIERS, REVETMENTS, DIKES, or other engineering structures on COASTAL or INLAND RESOURCE TOTAL CATEGORY 2 ACTIVITIES 250 1 AREAS including the placement of RIP-RAP or other materiel on coastal or inland resource areae CATEGORY 3 $525 PER ACTIVITY TOTAL CATEGORY 5 ACTIVITIES A. SITE PREPARATION for ANY development other than TO-TAL FILING FEE CALCULATED 5.250.00 for,-a SFJi INCLUDING removal of vegetation, excavation h grading when actual construction is PERSON-CALCULATING FEE SCHEDULE (Print--Name) NOT-proposed under this NOI Christopher R. Mello Eastern Land Survey Assoc. Inc, S. CONSTRUCTION OF EACH BUILDING-within-commercial, -_ — ADDRESS104 Lowell Street Peabody, MA 01960 industrial, institutional; or apartment/condo/ TELEPHONE N MO R X08 31-8121 townhouse type of development, ANY PART of which - - �. _. is in a BUFFER ZONE or RESOURCE AREA. Associated SIGNATE DATE Jan. 5, 1994 activities: site preparation retention/detention basin construction,septic systems, parking lots, . . utilities, point source discharges, sewerage treatment NOTICE OF INTENT FEE TRANSMITTAL FOR4 DEPAIM41 T OF.ENVIRC+fII+FEML PFUTDCITON DIVISION OF WETLANDS AND VMFId+)P.yS NOTICE OF INFANT (NOI) APPLICANT: PROPERTY OMER: Name Cheryl Gideon Name SA Street 1 Richard Road Street City/Town Salem City/Town State M_ Zip Code _01970 State Zip Code Phone Number 744-2416 Project Location: Street/Lot Nmnber Lot 28+ 22 Bayview Circle City/Town Salem DEP FILE NLMER (if available) NOI FILING FEE DISPUTM FEE Total NOI Filing Fee: $ 250.00 Total Disputed Fee: $ (as determined in Notice of State Share of Filing Fee: $ 112.50 Insufficient Fee letter from (1/2 of fee in excess of $25.00) conservation commission) City/Town Share of State Share of Fee: $ Filing Fee: $ 137.50 (1/2 of total disputed fee) City/Town Share of Fee: $ (1/2 of total disputed fee) INSTRUCTIONS 1. Send this Fee Transmittal form with a check or money order, payable to the Cammanwealth of Massachusetts, to the DEP Lock Box at: Department of Environmental Protection Box 4062 Boston, MA 02211 2. Attach a coov of this form to the Notice of Intent submitted to the local Conservation Commission. 3. Attach a con of this form and acopy of the DEP check to each of the Notice of Intent forms submitted to the DEP regional office. 11/10/89 INrtRCHnNGm, 5 else � �i' _ i s -� r �"�u`.. i• v� ��fletei�'v J ! wm i ��� Flo x- '\ \ oso to ouse Golf Ci Sceh h ��rA �- l P 1 ✓r/�v �°ei � ) v ' J J 11 a � - �� 1 � � /�_ �I��ao ��° � '� L� /� � �r • I �a9g��� ��1� I I,r °\�♦ , •1` rA"\Il�� ls�ereja � 'l�y\ �\`. � �ly r ,�J �5 1 nkI / 1 e� 11� �� r��� i� ✓ 1 r I ta �� _1 Sf r ,/ _Bfo / i��r r/ 1�(wM'01 \ �� �(\ \ ��--7Ca.y'Sah Lam\\\z�,j�l� 1 res❑ �w ,[I J Ijoiy� Hill', t,Tier �/'}ail ✓ J k �i - ) o \�>. - A sr/_ Fo H : �--�qg I —Sc� a � ��i o ANTERCHA X ] > _, r �F J / . v 11 v L" � J \ ✓ l� lr r tees t - T� -_ ole7•y -r �Vr :- dQ Paek ✓ soJ _ vs Wl�,� AA ��°e ) ( d` `ri�il v � o ✓ elsee Ce I Zi Gol u sa ��� 'Pt �� 50 ar eis BM35 Q` A pp)) • _ "-/ ,1� ij ' _i�\rPeter3� PoinP-, � lil �� rkwood �� � i���l��� ash$vn �. . Lobster -Tuck R j ."p? Golt Cou se - Rocks pt �� —I ; - 0 m -, BEVERLY v ,r �IsJ r \ I �1 "`y-h HARBOR \ \�t \�1 tic nl\1t� Ja UxtH8OJIrnII iB��M�r 5 r�,/I/'ds�cu`�\"1 Pebe.eyw�_Igt IrY r itL�Ir�Crz��/{g`at€v �i>r n1■f \G1eetel.a oo� ���✓ ✓ % r��8 'r I) "0t4 �®aK��2� r63 ✓ i4M-il � SE1�r 4 1N Pb t/Lr•ae" g. jI� ��� _`� n�` �� �. 7°s bpi � 1 L. ��� ����✓,\ I/Ai+� � ✓. _ +� �Or,�� � V/�� /„l? e rr--- 0 i l j� - PI I jI ILILJA� ra ptif r I�17!Fire ' it Il zi A�e� / v li Flat �� �� �✓ r ta S �' lis i�� Acker5Jh✓ `��.-t�snn r / Mon menta r � � '1 �����L � r p r✓ iL/�T �y°�� �✓ iaV�J �•—� �kc. / �/.. �� �ti4T �Y✓ j 1�� rl rt T�J �- �, z a A� ; G Frat �l I�_1 �/ ���\� ��� ;/ o� ✓ 5tz v A �.uan lr/� /I �A r X07 '•IAi�'�V✓iy. A� )�� r l- A� SD hnJ r������ 7 ��, ✓ �aCeme G N� VST t-1 II � '�ir�� N �Llb ar '�v r /�A 5b % I D� vA� ✓� �) ��Mliv �� s 9< A.- ✓ �� OId South - �1 \ 1 ale4r y �r/ ® �( Pak T ��1' �` �� �« y�i. r r.- ,•1e I/, ✓ o: r or� -;� vm�i n�.� v:� wrpr ��� � / � :'i,., — ��v✓� / yT ter@r ( \� f° �A QT v s ni AFnd� A� �� Hain' Sadm�,FStvntt� a \ � asenme oN l� �j A � .f I r ao� ich �� I �V�r, �Re f�\1 �1 A � ` \GTS/ �' � v��II/ r /;:, � �\f � Jf, I J ♦ t mill- �y r^'­pqa� If� / �.-• � /� Gallows 1��'; 1 s J���\I� �� .% i�1�. � l I Den �� �.� � �,_ A I��1 A ✓ � r �lH III� .(� ✓ 7 ' 1 ' Ptr�.goidi . � (� _� u� Ste� A\ Mill...l 1 it I 1 Al or kl ( y ��Ur 32 Lt !�i •. t Pinl dr P�� 4/ iI/� P `1•l -� 1 li T% �� T k✓ r) A r� f �P ' (t. Lon Pt Jul r �Na 01”, sg �l� e/ `` ��- \ mak,/s n� �a4�1 3vnsta Plargqunn �(, (�� P(]'11i1eT yg� i Jl �l �Z71� o°%r r ♦ J� t 111 �._ Au} a �r NlcocKs A CO2P �• I ✓ r a� / V r ♦� Salem r III�� o� �JA. S hst ♦ q I!los tam t lW §r Ily� sr W Palmer I 11i^ 1y1 GEPN 44 \ W V1, II'..\f-_ \o �i �Il�— 1� 1 i 1l 1l!/ e5er ui H I- O� •,W (r sr L�' 2 jV �� �., .Es j^ a k Y`Pickerig ill r Pt ri SPECIAL CONDITIONS 2-94 1. All work shall conform to the above-referenced Notice of Intent (NOI) , site plan and supporting documents and those final specifications which shall be filed with the Commission prior to construction. Any change to the approved plans shall require the applicant to inquire of the Commission in writing whether the change is substantial enough to require the filing of a new NOI. 2. Members and agents of the Commission shall have the right to enter and inspect the premises at all reasonable times to evaluate compliance with the conditions in this Order. The Commission may require the applicant to submit additional data or information necessary for the Commission to conduct that evaluation. 3 . Upon completion of . the project, the applicant shall submit, with the request for a Certification of Compliance, an affidavit, prepared by a professional engineer or land surveyor registered in the Commonwealth of Massachusetts, stating that the site has been developed in accordance with the requirements of this Order of Conditions, the referenced site plan and supporting documents. 4 . This Order shall apply to every successor in control or successor in interest of the property described in the Notice of Intent and accompanying plans or part thereof. In the event this land or any . part thereof changes ownership before or during construction, the current owner shall notify the new owner, by registered mail , of this order prior to the transfer of ownership and shall forward proof of this notification to the Commission. 5. Notice shall be given this Commission no more than 2 weeks nor less than 2 days prior to the commencement of construction activities. Said notice shall include, in writing, the name(s) , address(es) , and business and home telephone numbers of the project supervisor(s) responsible for insuring that operations are conducted in compliance with this Order. 6. A copy of the plan, and the order of Conditions with any Special Conditions will be retained on site throughout the project. 7. Prior to commencing construction activity, a haybale barrier shall be placed downgradient of construction location. Haybales shall be anchored with stakes and entrenched 4 to 6 inches in depth. Trench material shall be deposited on the upgradient side of the haybale barrier. Haybales shall be inspected daily; those showing signs of deterioration shall be replaced immediately. The haybale barrier shall remain in proper functioning condition until all disturbed areas have been stabilized. 8 . Additional erosion and sedimentation control measures deemed necessary by the Commission shall be instituted by the applicant. Any siltation caused onto any resource area shall be promptly reported to the Commission and shall be restored to the satisfaction of the Commission. 9. During construction, no debris, fill , or excavated material shall be stockpiled within 100 feet of the resource area. Any other stockpile location will be protected sufficient to prevent sediment from surface runoff entering wetlands. 10. A paved berm shall be installed around the parking lot perimeter to contain and direct the flow of water to catch basins. 11. All catch basins and pipes shall be fitted with oil and gas traps. A regular cleaning and structural maintenance schedule for catch basins, manholes, and pipes shall be developed and submitted for Conservation Commission approval. 12. * Every December 15, a letter confirming the implementation of the cleaning and maintenance schedule shall be filed with the Commission. 13 . Any proposed headwalls with pipes shall be fitted with a protective barrier, approved by the Commission, sufficient to assure the free flow of water. 14. Equipment servicing and overnight equipment storage must be conducted outside the buffer zone. Equipment must be maintained to prevent leakage or discharge of pollutants. 15. * No spill or discharge of petroleum products or other pollutants will occur within 100 feet of any wetland resource area. 16. * Use or storage of rock salt (sodium chloride) or other toxic de-icing chemicals is prohibited within 100 feet of the resource area. Any arrangement for snow removal shall stipulate the ban. 17. * Minimal pruning and no removal of any buffer zone or wetland vegetation will occur downgradient of the staked haybale line. 18. All disturbed soils shall be immediately and similarly re- vegetated upon completion of construction activities or shall be mulched until the next growing season. 19. * Fertilizers used for landscaping and lawn care shall contain a low nitrogen content and be used in moderation. Pesticides and herbicides shall not be used within 100 feet of the resource area. 20. A plan for landscaping and maintenance of vegetation for the buffer zone shall be submitted for Commission approval prior to commencement of work. 21. No project activities will be conducted between December 1 and March 15. Projects shutting down for the winter will , by December 1 , complete slope stabilization sufficient to prevent erosion or siltation until project activities resume in March. *ongoing conditions that do not expire upon issuance of a Certificate of Compliance. J f pQ. ve�s IZ ✓e'' � �/l 1 � L E G E N D ZONING DISTRICT R1 • SMH PROPOSED SEWER MANHOLE o SMH EXISTING SEWER MANHOLE h LOT AREA 10,000 SF. * o DMH EXISTING DRAIN MANHOLE DMH PROPOSED DRAIN MANHOLE f i' LOT WIDTH 100 FT. ■ CB PROPOSED CATCH BASIN o CB EXISTING CATCH BASIN FRONT YARD 15 FT. ,� HYD PROPOSED HYDRANT Locus � ,� SIDE YARD 10 FT. � HYD EXISTING HYDRANT z •• WG PROPOSED WATER GATE WG EXISTING WATER GATE L \ REAR YARD 30 FT. j 1 pp PROPOSED CONTOUR — — 100 — EXISTING CONTOUR O — 100x0 PROPOSED SPOT GRADE -0100.00 EXISTING SPOT GRADE 3 Z (rU11LITY POLE RETAINING WALL STONE WALL° ��L 7e7- e BITUMINOUS CURB � I x x FENCE LOCUS MAP — l HAYBALE DETAIL LINE OF FLATS r t, yE rtKyL,KE 1) THIS PLAN /S THE RESUL T OF AN ON THE GROUND FIELD , FROM ASSESSORS MAP u SURVEY AND PUBLIC AND PRI VA TE PLANS f!E°°.N0 DETAIL ♦4011 PIR1T STAAE TO111AAD W AEY.JLI LAID fA LE .= 2) UPLI TIES SHOWN ARE BASED UPON FIELD SURVEY AND LOT AREA RECORD PLANS PLANS AND ARE NOT NECESSARIL Y INDICA T7 VE OF L '`WI) -` OOIMO SALES►LAC E0 ON CONTWR UNDERGROUND CONDI TIONS. 167000± SF . ��'�'` f i'a E AE ,AAS.f .L TEEL PICTI.OR 2:=3TAA1I % ( INCLUDES FLATS ) ,I,e To><IN iAOUNJ DANE STAAL.': /1�U_S 6 3) THE CONTRACTOR SHALL BE RESPONSIBLE FOR I/ER/EYING AND '\ " WITH ULLi ANC/40RJN0 DETAIL DETERMINING THE LOCA RON, SIZE AND ELEVATION OF ALL \ fItZSTARI N SPECIFI ATIQLS EX/STING U T7LI TIES, SHOWN OR NOT SHOWN ON THESE PLANS, PRIOR TO ANY CONSTRUCTION. THE ENG/NEER SHALL BE NOTIFIED _ 'ho*�"''���"°"Cpff ULA���ca aux K� �„A�M TM ^y HIGH WATER br•SALE.&,ALL K.t7oEiLED.�N W SOIL A MINMA a (4) ,r,ws w.J m,,=sr IN WRITING OF ANY UTILITIES FOUND INTERFERING WITH THE \� `\ " _ �° FROM FIELD LOCATION FATS WAS_Y SM0.1Y woauD IN RAI ST EITTfA TO STAYLI OR RE-9ARS CRIYEI, PROPOSED CONSTRUCTION AND APPROPR/A TF REMEDIAL ACTION ��"' �o:"_- - - ����rAT` ANGLE T-'MMEa'TK 'rcIt. 'S��TK IWL IE y - - lo,1 I DRI,X ru.�w Ta TK w.c. BEFORE PROCEEDING WI TH THE WORK. - — _ — — --_ h 4, INSTi.CTIQ1 sal.:tE lRECE.EM MD VfyAIR KUVZDVrT Sti, 8c r:.rE narvTtT As Q IWET.E STO"ija Ck E11AI.4f . \ xY \1\ 5 )±tI sN. eE R&D,=NEN ner NYE �I)EIA USuwui SO AS KIT TO w:r. 4) THIS PLAN IS BASED ON THE REFERENCED PLANS, DEEDS �� >' " % s 16 ~`� \ ' -1 \\ AND THE RESUL TS OF A FIELD SURVEY AS OF THIS DA TF \�, \\" ��,�* �, =` X '` — FEDERAL FLOOD ZONE V PROPOSED HAYBALES � - > NO CERTIFICA T7ON /S INTENDED AS TO PROPERTY 77TLE \ \ f ,� 7 (EL . ►4.4 OR AS TO THE EXISTENCE OF UNWRITTEN OR UNRECORDED \ 04� \ N EA SEMEN TS. 20 00 O $ \ cr 0 � FEDERAL FLOOD ZONE FROM FIRM 250102 PANEL 01 , AUG. 5, 1985 �'!b� I---_ PLAN REFERENCE: PLAN BOOK 93 PLAN 18 g _ _ h � � z2 � o DECK � � I DEED REFERENCE: BOOK 9838 PAGE 592 ; 0 36'0' I H ASSESSORS PARCEL 11 ; 17 0. N LOT 29 CITY OF SALEM DATUM PROPOSED 0I1— DWELLING SEWER SERVICE AND WATER SERVICE TO BE CONNECTED TO \\\� ryo FF FLR 25.07 EXISTING MUNICIPAL UTILITIES IN BAYMEW CIRCLE. — GARAGE 23.4 �x I Ir4 CELLAR 16.74 D w r-LLJN� • N ri.20 O PROPOSED DRIVEWAY 0 'L i 170 8 s; I 16, 1 ; I 6 1 I SB dh FD. V 1 0 � 58 . 36 i O / s I .4. Z2 7�:- —_ " IBAYVIEW CIRCLE - W -- REMOTE CURB S L BENCHMARK — – w w �o Sewer Manhole I J PROPOSED 6" SANITARY SEWER SERVICE SITE DEVELOPMENT I � ,� �--- PROPOSED PLAN OF LAND 1 ' TYPE "K" COPPER WATER SERVICE LOCA TED IN 100 FT. BUFFER SALEM , MASS . PREPr.RE✓ BY EASTERN LAND SURVEY ASSOCIATES, INC. 'F�►.a CHRISTOPHER R. MELL 0, PLS CHRISRGPHER � 104 LOWELL ST. PEABODY, MA. 01960 o (508) 531 -8121 MELLO No..3131T O i3 SCALE: 1 "= 20' DECEMBER 21 , 1993 PREPARED FOR REV. FEB. 10, 1994 PHOTO REPRODUCTION OF THE ABOVE SEAL iS CHERYL G I D E O N INDICATIVE OF UNAUTHORIZED REPRODUCTION OF THIS PLAN AND IS TO BE CONSIDERED A COPYRIGHT INFRINGEMENT AND/OR FRAUD. --- — — --- - ENFORCEMENT AUTHORITY SHALL NOT ACCEP r PHOTO REPRODUCTION FOR ANY PURPOSE. - - 10 20 46 60 80 F 8923 I Da�ve�s River- � l f ZONING DISTRICT R1 L E G E N D _ LOT AREA 10,000 SF. • SMH PROPOSED SEWER MANHOLE o SMH EXISTING SEWER MANHOLE -� ^ y / LOT WIDTH 100 FT. • DMH PROPOSED DRAIN MANHOLE o DMH EXISTING DRAIN MANHOLE �°`'� / FRONT YARD 15 FT. ■ CB PROPOSED CATCH BASIN ❑ CB EXISTING CATCH BASIN HYD PROPOSED HYDRANT c?a HYD EXISTING HYDRANT Loc vs SIDE YARD 10 FT l 2 .. WG PROPOSED WATER GALE WC EXISTING WATER GATE REAR YARD 30 FT. I-- W 100 PROPOSED CONTOUR — 100 — EXISTING CONTOUR s O PROPOSED SPOT GRADE 100.00 EXISTING SPOT GRADE 100x0 -0- z U11LIlY POLE % S V \ X RETAINING WALL STONE WALL cE ,fr ` BITUMINOUS CURB x x FENCE LOCUS MAP HAYBALE DETAIL 1) THIS PLAN IS THE RESULT OF AN ON THE GROUND FIELD / LINE OF FLATS � SURVEY AND PUBLIC AND PRI VA TE PLANS. FROM ASSESSORS MAP BEDDING DETAIL �'�JWTO LILA4LD Iwo r E 'r . 2 U T1Ll TIES SHOWN ARE BASED UPON FIELD SURVEY AND LOT AREA RECORD PLANS AND ARE NOT NECESSARILY IND/CA Tl VE OF v 1106140{ALES PLACID.N CONI WA UNDERGROUND CONDI TONS. 1 6 , 000± SF . Ilk ' z' Z Itit ..A7.,TEE,.i[�TT,D1 i:: ST.K}7 c ( INCLUDES FLATS ) u ' WITHTot IY 6AOVNJ D61vC$7"E-; n- 'S» WITt[A[tt 3) THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING AND ANCM0FtING DETAIL DETERMINING THE LOCATION, SIZE AND ELEVATION OF ALL \ �diPltTl M aECTFI ATIM EXISTING U 7lLl TIES, SHOWN OR NOT SHOWN ON THESE PLANS, :. X 1UCEA AT TW TOE GF A t.M OR 04 tit [A10 IN. WITH PRIOR TO ANY CONSTRUCTION. THE ENG/NEER SHALL BE NOTIFIED _ __ HIGH WATER "M'•G..r•ARM 11:M [r SIL"..;AAvco . 0 `� - �° FROM FIELD ELD LOCATION . EK s wl'I E?eEm0E0-tM M MIL A M1N,lVt Ci (4) IIi1ES Ahs nxrD 9C IN WRITING OF ANY U TIL/TIES FOUND INTERFERING WITH THE PROPOSED CONSTRUCTION AND APPROPRIATE REMEDIAL AC710N �- ��' �o, - --- --- > —��— TW °"`"g°�" '"Q�TAn PLACE EA N E'er T.�s1A>u°""` TK ��'� ��� / $IiGL6L &04A. ID eAci`AT`A Iv [�r.t"•vu.Z`'I•rf tE..ES'S TDc�T)�EJi si -`s�9 �, 1( ��_ 7 --- '� - - - - - 'IOC "V' SL*t L ID of W.E. BEFOREPROCEEDING WI TH THE WORK. � �o' = _ u, �, t[c�mi DI rlAl�U Fug NO WAla ILrLAtErDrt Sl""U YdE ~[rvRT AS H[ 4, 5 Wr-W._eE Imvm 14[)1 ntti vE srmDIEM :Er D nu uLu•ss m Az No TOeoc. 4) THIS PLAN /S BASED ON THE REFERENCED PLANS, DEEDS ��� \` xY �' ' - - " I M10%na a�I AND THE RESULTS OF A FIELD SURVEY AS OF THIS DA TF: \ ,\A NO CER TIF/CATION /S INTENDED AS TO PROPERTY TITLE \� �� / PROPOSED HAYBALES - ,( FEDERAL FLOOD ZONE (EL . 14.4 OR AS TO THE EXISTENCE OF UNWRI TTFN OR UNRECORDED EASEMENTS CID o IT 0 1 �-: FEDERAL FLOOD ZONE FROM FIRM 250102 PANEL 01 , AUG. 5, 1985 1' — N u- PLAN REFERENCE: PLAN BOOK 93 PLAN 18 ;I �b;� o ti a t o DECK J — DEED REFERENCE: BOOK 9838 PAGE 592 x� < 0 36'0' ASSESSORS PARCEL 11 _ 16 -' ' 17'0r CITY OF SALEM DATUM - �; i N I LOT 29 PROPOSED DWELL I NG SEWER SERVICE AND WATER SERVICE TO BE CONNECTED TO EXISTING MUNICIPAL UTILITIES IN BAYMEW CIRCLE. pyo FF FLR 25.07 — GARAGE 23.4 I Ex 157,N 42 tj Too CELLAR 16.74 !;� DwEt-LJN6 i 15+ -- PROPOSED DRIVEWAY F s / SB dh FD WBA YV I EW C I RCLE REMOVE CURB BENCHMARK N .p ,7 Sewer Manhole I PROPOSED 6' SANITARY SEWER SITE DEVELOPMENT PLAN OF LAND PROPOSED IN TYPE •K' WATER ' OCA TED IN X100 FT. BUFFER 45 \2oa"a SALEM , MASS . PRE-PA RED B Y 17-ASTERN LAND SURVEY ASSOCIATES, INC. �LRCHRISTOPHER R. MELL 0, PLS 'ICHRISTOPHER ul R ; 04 LOWELL ST. PEABODY, MA. 01960 v MELLO [" gNo.31317 a (508) 531 -8121 �GISTtilk A- �, SCALE: 1 "= 20' DECEMBER 21 , 1993 PREPARED FOR PHOTO REPRODUCTION OF THE ABOVE SEAL IS CHERYL G I DEON INDICATIVE OF UNAUTHORIZED REPRODUCTION OF THIS PLAN AND IS TO BE CONSIDERED A COPYRIGHT INFRINGEMENT AND/OR FRAUD. ENFORCEMENT AUTHORITY SHALL JOT ACCEPT PHOTO REPRODUCTION FOR ANY PURPOSE. - 110 2 0 40 60 80 F 8 9 23