Loading...
64-139 - WINTER ISLAND ROAD - CONSERVATION COMMISSION ����,� �� �� 5 , ��, r� �� a� b�L t� �� i 310 Ch1R: DEPARTMENT OF ENVIRONMENTAI, QUALITY ENGINEERING 10.99: continued - Form 5 Forma -`'.:..:._ ✓ _... owEva.no. 64-13� EU Ve.e.EMDEDFj commonwealth of Massachusetts ,�,,,� City of Salam Order of Conditions Massachusetts Wetlands Protection Act G.L a 131, §40 Salem Conservation Commission C TD ;t.. na ca9 m (Name of Applicant) (Marne of property owner) One Salem Green Address Ad— Thr Order is issued and delivered as follows: fl �byheriddeiiverytoappikamorrepresentativeon Tuaa_2 19RF (date) E3 by certified mad,return receipt requested on (date) The project Is located at Winter Island �F5 The property is recorded at the Registry c! ESSEX Book Pape Geraficate(If registered) The Notice of Intent for this protect was filed on June 11 1 Q RF, (date) The public hearing was dosed on Tuna 19 '9R6 (date) Findings The Salem Conservation COMM. has reviewed the above-referenced Notice of Intent and plane and has held a'public hearing on the project Based on the information available to the at this time,the Commission has determined that the area on which the proposed work is t0 be Cone is significant to the following interests in accordance with the PresumDtioris of Significance set forth in the regulations for each Area Subject to Protection Under the Act(Check as approPnete): ❑ Public water supply }} Sloan damage prevention ❑ Private water supply ❑ Prevention of pollution ' ❑ Ground water suoply ❑ Land containing shellfish , ❑ Flood control ❑ Fisheries 6/30/83 Vol. 12 - 222.17 310 CMR: DEPARTMENT Of ENVIRONMENTAL QUALITY ENGINEERING 10.99: continued Form 5: continued There fore.theCOl15�n Cnmmi cci nn hereby finds that the following conditions are necessary,in accordance with the performance Standards set forth in the regulations.to protect those Inter- ests checked above.The orders that so work shall be performed b accordance with said conditions and with the Notice of Intent referenced above.To Me extent that the lot. . loving conditions modify or differ from the plans,specifications or other proposais submitted with the Notice W Intent,the conditions shag control. Ganeml Conditions I. Fedora to Comply with all conditions staled herein,and with ail related statutes and other regulatory meas- . wars,shag be deemed rause to revoke or modity this Order._ 2. This Order does not grant any property rights or any e4clush a prvaeges;it does hot authorize arry injury to private property or Invasion of private rights.' — - 3. Thls Order does not relieve the permittee or any other person of the necessity of Comptyinq with a0 other applicable federal.stale or tocol stall t",ordinances,by-laws or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Ord"unless either of the following apPV. (a) the work Is a maintenance dredging project as provided for in the Act or (b) the time for completion has been extended to a specified date more than three years,but less than five years:from the dale of fssuence and both that date and the special circumstances warranting the extended time period are set forth in this Order. S. This Order may be extended by the issuing authority for one or more periods of up to three years each upon appidetion to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shag be dean fol.containing no bash,refuse,rubbish or do- t tires,ashes, - oris,including but not Limited to lumber,bricks,Plater,w"ve,lath,paper,wdboard,Pipe, rekigarators,motor vehicles or pans of any of the foregoing. T. No work shag be undertaken until all administrative appeal periods from this Order have elapsed or,11 such an appeal has been Pled,unto ell proceedings before the Department have been completed. 8. No work shell be undertaken until the Final Ord"has been recorded in the Regletryof Deeos air the land Court for the district In which the land is located,within the chain of title of the affected pmpeny.In the case of recorded land,the Final Order shall also be noted in the Registry's Grantor index under the name of the owner of Me land upon which the proposed work is to be done.In the case of registered land,Me upon which Final Order shall also be noted on the Land Court Coni icate of Title of the owner of the Ian dCommiS cion . the proposed work Is to be done.The recording Information shall be submitted to the ` an the form al The and of this Order prior to commencement of the work 2. A sign shall be displayed at ths,site not tees than two square feet Or more than three equve lest In size bearing the words,-Massachusetts Department of Environmental Oualty Engineering, Ro Number 64-135 10.Where the Department of Environmental Oualiy,Engineenng n requested to make a determination and to issue a Superseding Order.the Conservation Commission shall be a party to all agency proceedings and hearings before the Department - 11.Upon completion of the work described herein,the applicant shall forthwith request in writing that a Certificate of Compliance be issued stating that the work has been satisfactorily completed. 12.The work shall conform to the following plans and special conditions: S-2 . 6/30/83 Vol. 12 - 222.18 _ + 310 CMR: DEPARTMENT OF ENVIRONMENTAL QUALITY ENGINEERING 10.99: continued Form 5: continued T10o Dated Signed and Stamped by: On File w0h Winter Is. Prelim. Site Plan Wallace Flovd Associates/ Rizzo Associates Apr. 25, 1986 Con. Comm Cost Analvsis Anri. 10, 1986 Con. Comm. Spacial Ca+ditions(Use additional paper it necessary) , 1. Work shall conform to above-referenced plans and cost analysis. . .................._.—_.�_..._.._._........._._.. . . __....__ nen.SWc.ew+t � I 5-3A 6/30/83 Vol. 12 - 222.19 i I I 310 CMR: DEPARTMENT OF ENVIRONMENTAL QUALITY ENGINEERING it I 10.99: continued Form 5• continued Issued By Conservation Commission J. �u e it This order must be signed by a majority of the Conservation Commission._ on na. 12 day al gun _ 19 FF -before me e naInE to me known to be the personally appear ' person described In end who executed the foregoing Instnlment and ack+wwiedged that he/she executed the same his/her tree d and de 9-9-88 Notary Pub6o My commission exp'irell t!�..00y�nl gia X�nar,anY Xenen.gprlaed try dwa Mer.mo+.raWwadRWgwwe wa+.IJrJlM prO♦bl.d wxOb M Gana o a^Y IM r..NanO M XM oy Xr torwr n vnCl arxr bM u lor+hd an Meby noXXad d PK rqM b ravu.at N.pagYCn.M W 6+.:wnenm O ty Enpina.rv+g lo:aaua a Sugan.a.tg Ores.orwm'+w Xv raw.l Y rmd.h •rar.a mm1 ar X d dag..ry to . es oegvim.m.wv+n l.n data 1r V»dala of�al eW Ordar.A mq ad Irr.mra.l✓uX 4r.am.Xmo w.a tGy aaranad t a,mNrk d.YrarY to P.ra .atbn co�aek M aooXord Salem Cons. Commission�l�Na�mug.m.ma.aa gnaeneXe.e.duX.ma.gbmumm. laau�g AUXunry Te i .1.aa.M aMud Xu1 MN Orda!el Corona+m IY M pajM and Fg.XManD.r hat Gaon raexXb al ma R.gialry al ,,to DaaX MI.d a1 Ma CXYn OI XXa d IM a11Me4 pOCMA'h aCCddMCa w+IX danOlY CTdXglf a W1 0_ II rec O"tots,XIo n.XYTMI'b"wM 4"0140 mn M....W.1 11 ragmv.d IaXd.T.doc rl 1w bv,-nch boat..Tia 11—cGCn • AGpcam etgftwv 5.4A 6/30/83 Vol. 12 - 222.20 5 Form 4 DEQE File No. ' (To be Provided by DEQE) city/rows Salem Commonwealth r of Massachusetts Applicant City of Salem Abbreviated Notice of Intent Massachusetts Wetlands Protection Act, G.L. c. 131, §40 To be used only for projects of minimum impact, as described in the General Instructions for Completing the Notice of Intent. Lot Number 1. Location: Street Address Winter Island Road 2. Project:Type Winter Island Renovation Description Various Site improvements and constru rinn of A 600 square foot bathroom/shower facill 3. Registry: County Current Book i£Page Certificate(If Registered Land) Tel. 744-4580 4. Applicant: City of Salem Address: One Salem Green Salem MA Tel. 5. Property Owner: Same Address: 6. Representative: City of Salem Planning Department Tel. Address 7. Have the Conservation Commission and DEQE Regional Office each been sent, by certified mail or hand delivery, 2 copies of completed Notice of Intent, with supporting plans and documents? Yes EX No ❑ 8. Have all obtainable permits, variances and approvals required by local by-law been obtained or applied for?Yes 0 ' No ❑ Not Applied For: Obtained: Applied For: Building Permit 9. Is any portion of the site subject to a Wetlands Restriction Order pursuant to G.L. c. 131, §40A or G.L c. 130,§1057 Yes Gi No iq 10. List all plans and supporting documents submitted with this Notice of Intent. Identifying Number/Letter Title/Date W1 1 Winter Island Preliminary Site Plan April 25,1986 f13 Cost Analysis Aril 10 1986 41 A, 1 1. For work proposed within the Buffer Zone(as defined in Part I, Sections 10.02(2) and 10.04 of the reg- ulations) describe,with reference to supporting plans and calculations where necessary: (a) The size, shape,type and!ocation of the proposed work. Stone dust path along eastern perimeter, 4" depth. Bath House (600SF) S P g " Foreign debris will be judiciously removed from on 8 concrete pad. Fore g J . moat. (b) Mitigating measures and designs to insure that the proposed work will not alter the resource area which said Buffer Zone borders;or if it will alter said resource area, the mitigating measures and designs proposed to meet the performance standard established for that resource area in Part 11 or Part III of these regulations. Ecavation for paths will be done by hand. Drainage from bath ,house excavation will be directed away from resource areas. , 12. For work proposed within Land Subject to Flooding(as defined in Part ill, Section 10.57(2)of the reg- ulations)describe, with reference to supporting plans and calculations where necessary: (a) The size, shape, type and location of the proposed work. (b) Mitigating measures and designs proposed to meet the performance standards set forth in Part III, Section 10.57(4) of the regulations. I hereby certify under the pains and penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents and supporting data are true and complete,to the best of my knowledge. Signature of Applicant Date �— Date Signature of Applicant's Representative �e`iakf�eeizGa�(�tu,,+i��vnmenla��cca�.�, �J� 2tne19v� �feGa`u�ilarc .%Ja1Ccu� _ ��okl� e 69 S. RUSSELL SYLVeA 5 ��pyytrycarutrea�C��z ��/menpgl E(ls''..r;�l.i!:v�� UtPT. Curnmi.csiunrr 935-2160 <txGt/' DATE: July 21, 1G$6 �' Salam ASSIGNED FILE NO: 64_11q The Division of Wetlands is in receipt of an application filed under M.G.L. Chapter 131, Section 40, the application is in the name of: APPLICANT: City of Salem OVNER OF LAND: same One Salem Green Salem, MA 01970 PROJECT LOCATION: Winter Island Road LOT: PROJECT REVIEW ( ) The application is incomplete. No file number will be assigned until material checked below is submitted to this Office: ( ) Notice of Intent ( ) Plans ( ) Project requires the filing of a Form 3 (Notice of Intent) rather than Form 4 (Abbreviated Notice of Intent) ( ) Locus FIATE14AIAYS REVIEW ( ) Project may require a Chapter 91 License-Project has been referred to 4'aterways. ( X ) Preliminary review indicates that the project does not require a Chapter 91 License. However, should further review indicate that the project may require a Chapter 91 License, the Department reserves the right to refer the project to Waterways at that time. ISSUANCE OF A FILE NUMBER INDICATES ONLY COMPLETENESS OF FILING SUBMITTED, NOT APPROVAL OF THE APPLICATION. Very truly you , Sabin M. Lord, Jr. , Deputy Regional Environmental Engineer cc: Conservation Commission,Salem, MA 01907 CITY OF SALEM CONSERVATION COMMISSION Will give a public hearing under the Wetlands Protection Act, Mass. G. L. Chap. 131, Section 40, at the request of the City of Salem Planning Department. The purpose of the hearing is to explore the effects of site work, utility improvements, and the construction of a 2000 square foot bath and restroom on Winter Island. This hearing will be held on Thursday, June 12, 1986, at 7:30 p.m. , One Salem Green, second floor , conference room. Philip D. Moran Chairman June 4