64-555 - 10 WHITE STREET - CONSERVATION COMMISSION �}l�`lTa.._(fR�..�r uni.i Mo.l�^a
�� -
��
1
CITY OF SALEM
CONSERVATION COMMISSION
May 27, 2016
Noah Flaherty
BHCM, Inc.
10 White Street
Salem, MA 01970
Re: Extension Permit for Order of Conditions—DEP#64-555—Brewer Hawthorne Cove
Marina Pier Demolition
Dear Mr. Flaherty:
Enclosed, please find the Extension Permit for the above-referenced Order of Conditions. The
attached Extension Permit must be recorded at the South Essex County Registry of Deeds. Once
recorded, please return a copy of Page 2 of the Extension Permit, which will indicate to the
Commission that the document has been recorded.
If you have any further questions, please feel free to contact me at 978-619-5685.
Sincerely,
To evine
Conservation Agent
Enclosure
CC: DEP Northeast Regional Office
LlMassachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands If
WPA Form 7 — Extension Permit for Orders of Conditions 64-555
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. General Information
Important:
When filling out 1. Applicant:
forms on the Noah Flaherty BHCM Inc
computer, use Name
only the tab
key to move 10 White Street
your cursor- Mailing Address
do not use the Salem MA 01970
return key. City/Town State Zip Code
.A1 M 2. Property Owner(if different):
Name
rertm
Mailing Address
City/Town State Zip Code
B. Authorization
The Order of Conditions (or Extension Permit) issued to the applicant or property owner listed above on:
9/30/2013 Issued by: Salem
Date Conservation Commission
for work at: 10 White Street 41 283
Street Address Assessors Map/Plat Number Parcel/Lot Number
recorded at the Registry of Deeds for: J
South Essex
County
/ , Book Page
C rtificate(Sff registered land)
is hereby extended until: r
Do a Date the Order was last extended(if applicable)
This date can be no more than 3 years from the expiration date of the Order of Conditions or the latest
extension. Only unexpired Orders of Conditions or Extension may be extended.
This Extension Permit must be signed by a majority of the Conservation Commission and a copy sent to
the applicant and the appropriate DEP Regional Office
(http/lwww mass gov/eea/agencies/massder)/about/contacts/find-the-massdep-regional-office-for-your-city-or-
town.html .
Signatures: D e dU
`, 1
WaforroTdoc•rev.5/29/2014 Page 1 of 2
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 7 — Extension Permit for Orders of Conditions 64-555
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
C. Recording Confirmation
The applicant shall record this document in accordance with General Condition 8 of the Order of
Conditions (see below), complete the form attached to this Extension Permit, have it stamped by the
Registry of Deeds, and return it to the Conservation Commission.
Note: General Condition 8 of the Order of Conditions requires the applicant, prior to commencement of
work, to record the final Order(or in this case, the Extension Permit for the Order of Conditions) in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of
the affected property. In the case of recorded land, it shall be noted in the Registry's Granter Index under
the name of the owner of the land upon which the proposed work is to be done. In the case of registered
land, it shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the
proposed work is done.
Detach this page and submit it to the Conservation Commission prior to the expiration of the Order of
Conditions subject to this Extension Permit.
To:
Conservation Commission
Please be advised that the Extension Permit to the Order of Conditions for the project at:
Project Location DEP File Number
has been recorded at the Registry of Deeds of:
County
for:
Property Owner
and has been noted in the chain of title of the affected property in accordance with General Condition 8 of
the original Order of Conditions on:
Date Book Page
If recorded land the instrument number which identifies this transaction is:
Instrument Number
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applicant
wpalormTdoc•rev.5292014 Page 2 or 2
6
-sue � IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
CITY OF SALEM SO. /2016 #361 XTN P911 P 68
g.
07/15/2016 12:38 E%TN Pg 1/3
IM
CONSERVATION COMMISSION
0
May 27 •2016 573508 (84379) Btoh:385268
Southern Essex District Registry
7/15/2016 12:34 PN EATN Pg: 1/4
Noah Flaherty — --
BHCM, Inc.
10 White Street
Salem, MA 01970
Re: Extension Permit for Order of Conditions—DEP #64-555—Brewer Hawthorne Cove
Marina Pier Demolition
Dear Mr. Flaherty:
Enclosed, please find the Extension Permit for the above-referenced Order of Conditions. The
attached Extension Permit must be recorded at the South Essex County Registry of Deeds. Once
recorded, please return a copy of Page 2 of the Extension Permit, which will indicate to the
Commission that the document has been recorded.
If you have any further questions,please feel free to contact me at 978-619-5685.
Sincerely,
To evine "
Conservation Agent
Enclosure
ED
CC: DEP Northeast Regional Office C ' v
JUL 18 2016
,7_ r, PLANNING 8
�,- u,jITY DEVELOPMENT
q
LlMassachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 7 Extension Permit for Orders of Conditions 64-55e
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. General Information
Important:
When filling out 1. Applicant:
forms on the Noah Flaherty BHCM Inc
computer, use Name
only the tab
key to move 10 White Street
your cursor- Mailing Address
do not use the Salem MA 01970
return key. City/Town State Zip Code
2. Property Owner(if different):
c-v+n ---
Name
Mailing Address
CityfTown StateYip ode
de
B. Authorization
The Order of Conditions (or Extension Permit) issued to the applicant or property owner listed above on:
9/30/2013 Issued by: Salem .
Date Conservation Commission
for work at: 10 White Street 41 283
Street Address Assessors Map/Plat Number Parcel/Lot Number
recorded at the Registry of Deeds for:
South Essex
County Co Book Page
Certificate(i�g ted land)
is hereby extended until. , .-
Dafe Date the Order vias last extended�ri applicable)
This date can be no more than 3 years from the expiration date of the Order of Conditions or the latest
extension. Only unexpired Orders of Conditions or Extension may be extended.
This Extension Permit must be signed by a majority of the Conservation Commission and a copy sent to
the applicant and the appropriate DEP Regional Office
(http//www mass gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-for-your-city-or-
town.html .
Signatures:
) � 1
wpaformTdoc•rev.5/29/2014 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File"umber:
WPA Form 7 — Extension Permit for Orders of Conditions 64-555
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
C. Recording Confirmation
The applicant shall record this document in accordance with General Condition 8 of the Order of
Conditions (see below), complete the form attached to this Extension Permit, have it stamped by the
Registry of Deeds, and return it to the Conservation Commission.
Note: General Condition 8 of the Order of Conditions requires the applicant, prior to commencement of
work, to record the final Order(or in this case, the Extension Permit for the Order of Conditions) in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of
the affected property. In the case of recorded land, it shall be noted in the Registry's Granter Index under
the name of the owner of the land upon which the proposed work is to be done. In the case of registered
land, it shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the
proposed work is done.
Detach this page and submit it to the Conservation Commission prior to the expiration of the Order of
Conditions subject to this Extension Permit.
To:
Conservation Commission
Please be advised that the Extension Permit to the Order of Conditions for the project at:
Project Location DEP File Number
has been recorded at the Registry of Deeds of:
County
for:
Property Owner
and has been noted in the chain of title of the affected property in accordance with General Condition 8 of
the original Order of Conditions on:
Date Book Page
If recorded land the instrument number which identifies this transaction is:
Instrument Number
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applicant
wpaformTdoc•rev.52912014 Page 2 of 2
Lw
COMMONWEALTH OF MASSACHUETTS
LAND COURT
ESSEX REGISTRY OF DEEDS, SO. DIST.
ATRUE COPY OF DOCUMEN
`
� CUMV0NVVEALTM0F MASSACHUSETTS
ESSEXR[G}STRYOF DEEDS, SO, T. SAL[K�. MAS
S
ESSEXSS
ATRUE COPY 8FRECORD-
BOOK
ATTEST
""- PAGE
`� ` EG|STER
NOI Status Sheet
Address:la a"w") DEP #:
Application Type: /j/ Date Submitted:
Contact Name: -Ie4k L t-k O l l�r Phone:
Proposed activity: i
E�Application Complete d,�i c s�
Correct Fee Received-
-VAbutters List Requested /'®'Received
ZLegal Ad Sent [Legal Ad Confirmed VOnline
II Added to Agenda Agenda to Applicant
1� Agent Comments to Commission
L --DEP Comments
Hearing Opened: f,/d Y/I Continued: -- Site Visit:
['4Abutters Notice Confirmed
Permit Sent to Applicant and DEP
❑)%`onfirmation of Delivery
Y-Expiration date added to calendar
ed to database
i1 Applicant Recorded OoC with Registry
Preconstruction Meeting:
❑ Certificate of Compliance Sent to Applicant and DEP
❑ Confirmation of Delivery
❑ Applicant Recorded CoC with Registry
Notes`
HACON COMM\Administrative\project status sheet\NOI status sheet 2012-12-27.doc
`y Bourne Consulting Engineering, P.C.
3 Bent Street
Ronald R.Bourne,P.E. President Franklin, MA 02038
May 16,2016
Salem Conservation Commission
City Hall Annex
120 Washington St
Salem;MA 01970
ATTN: Tom Devine, Conservation Agent
RE: Brewer Hawthorne Cove Marina DEP#64-555 (BCE 32890)
Subj.: 10 White St.Pier Demolition=request for extension
Dear Commissioners:
Brewer Hawthorne Cove Marina (BHCM) has an existing Order of Conditions (#64-555) to
remove the deteriorating pier at their facility. The OOC is due to expire on 9/30/2016, therefore
BHCM is requesting a three year extension to this permit to perform the work.
BHCM has anticipated to perform this Work in conjunctionwith the dredging of the marina.
Obtainment of all required dredging permits has been a tedious process,however the final permit
from USACE should be issued within the immediate future.
Both projects are anticipated to be performed within the next dredge window.
We hope'the above is satisfactory for your needs. If you have any questions or need additional
information,please do not hesitate to contact us.
Very truly yours,
BOURNE CONSULTING ENGINEERING
Blake A.Peters
Senior Waterfront Engineer
Enclosure'
Cc:Noah Flaherty,BHCM
Tel. (508) 533-6666• Fax(508) 533-0600 • e-mail:bce@bournece.com
6`m
4^
.:�dONwr,(1
i
t �t CITY OF SALEM
G , CONSERVATION COMMISSION
€ September 30,2013
Seth Lattrell
g
Bourne Consulting Engineering
r
3 Bent.Street
Franklin,MA 02038
fig
Re: Order of Conditions—DEP#64-555-10 White Street Pier Demolition
s_
Dear Mr. Lattrell:
Enclosed, please find the Order of Conditions for the above-referenced project.
Following the 10-business-day appeal period (as of September 30, 2013). this document
and the attached Special Conditions must be recorded at the Essex County Registry of
Deeds (Shetland Park 45 Congress Street, Suite 4100 Salem; Massachusetts). Once
recorded, please return a copy of Page 12 of the Order. which will indicate to the
Commission that the document has been recorded.
As indicated in the Order,prior to any work commencing:
1. this Order must be recorded,
2. contact me at least 48 hours prior to any activity to schedule a pie-construction
meeting to review the Order with your hired contractor.
'
If you have any further questions.please feel free to contact me at 978-619-568:5.
a Sincerely, �^p,
Tom Devine
Conservation Agent/Staff Planner
Enclosures
CC: DEP Northeast Reaional Office
k
i
w'
w�coNoir��0
ym� e..3 fir,
� ;, CITY OF SALEM
CONSERVATION
COMMISSION
September 30, 2013
Seth Lattrell
Bourne Consulting Engineering
3 Bent Street
Franklin, MA 02038
Re: Order of Conditions—DEP #64-555-10 White Street Pier Demolition
Dear Mr. Lattrell:
Enclosed, please find the Order of Conditions for the above-referenced project.
Following the 10-business-day appeal period (as of September 30, 2013), this document
and the attached Special Conditions must be recorded at the Essex County Registry of
Deeds (Shetland Park 45 Congress Street, Suite 4100 Salem, Massachusetts). Once
recorded, please return a copy of Page 12 of the Order, which will indicate to the
Commission that the document has been recorded.
As indicated in the Order, prior to any work commencing:
1. this Order must be recorded,
2. contact me at least 48 hours prior to any activity to schedule a pre-construction
meeting to review the Order with your hired contractor.
If you have any further questions, please feel free to contact me at 978-619-5685.
Sincerely,
Tom Devine
Conservation Agent/ Staff Planner
Enclosures
CC: DEP Northeast Regional Office
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 54-555
WPA Form 5 — Order of Conditions MassDEPFile#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPTransaction#
Salem
City[Town
A. General Information
Please note: Salem
this form has 1. From:
been modified Conservation Commission
with added 2, This issuance is for
space to a. ®Order of Conditions b. ❑ Amended Order of Conditions
accommodate (Check one):
the Registry
of Deeds 3. To: Applicant:
Requirements
Noah Flaherty
Important: a. First Name b. Last Name
When fining Brewer Hawthorne Cove Marina
out forms on c.Organization
the 10 White Street
computer,
use only the d. Mailing Address
tab key to Salem MA 01970
move your e. Citylrown f. State g. Zip Code
cursor-do
not use the 4. Property Owner(if different from applicant):
return key.
IIYIrm a. First Name b. Last Name
c. Organization
rewn
d. Mailing Address
e. City/Town f. State g. Zip Code
5. Project Location:
10 White Street Salem
a. Street Address b. City/Town
41 283
c.Assessors Map/Plat Number d. Parcel/Lot Number
Latitude and Longitude, if known: d m s d m s
J. Latitude e. Longitude
apaform5.doc• rev.05119/2010
Page 1 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-555
WPA Form 5 — Order of Conditions MassDEP File#
1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
City[Town
A. General Information (cont.)
6. Property recorded at the Registry of Deeds for(attach additional information if more than
one parcel):
South Essex 63244
a.County b. Certificate Number(if registered land)
11868 86
c. Book d. Page
9/12/2013 9/26/2013 9/30/2013
7. Dates: a. Date Notice of Intent Filed b. Date Public Hearing Closed c. Date of Issuance
a. Final Approved Plans and Other Documents (attach additional plan or document references
as needed):
Pier Demolition Plan & Section
a. Plan Title
Bourne Consulting Engineering Ronald R. Bourne
b. Prepared By c.Signed and Stamped by
9/11/2013 1"=30'
d. Final Revision Date e.Scale
f.Additional Plan or Document Title g. Date
B. Findings
t. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information
provided in this application and presented at the public hearing, this Commission finds that
the areas in which work is proposed is significant to the following interests of the Wetlands
Protection Act(the Act). Check all that apply:
a. ❑ Public Water Supply b. ® Land Containing Shellfish c. ❑ Prevention of
Pollution
d. ❑ Private Water Supply e. ® Fisheries f. ® Protection of
Wildlife Habitat
g. ❑ Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance
standards set forth in the wetlands regulations. This Commission orders that all work shall
be performed in accordance with the Notice of Intent referenced above, the following
General Conditions, and any other special conditions attached to this Order. To the extent
that the following conditions modify or differ from the plans, specifications, or other
proposals submitted with the Notice of Intent, these conditions shall control.
wpa(orm5.do< rev.OSI192010 Page 2 0(12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-555
WPA Form 5 — Order of Conditions MassDEP File#
1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
City/Town
B. Findings (cont.)
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth
in the wetland regulations. Therefore, work on this project may not go forward unless and
until a new Notice of Intent is submitted which provides measures which are adequate to
protect the interests of the Act, and a final Order of Conditions is issued. A description of
the performance standards which the proposed work cannot meet is attached to this
Order.
C. ❑ the information submitted by the applicant is not sufficient to describe the site, the work,
or the effect of the work on the interests identified in the Wetlands Protection Act.
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides sufficient information and includes measures which are
adequate to protect the Act's interests, and a final Order of Conditions is issued. A
description of the specific information which is lacking and why it is necessary is
attached to this Order as per 310 CMR 10.05(6)(c).
3. ❑ Buffer Zone Impacts: Shortest distance between limit of project
disturbance and the wetland resource area specified in 310 CMR 10.02(1)(a) a. linear feet
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. ❑ Bank a. linearfeet b. linear feet c. linearfeet d. linearfeet
6. ❑ Bordering
Vegetated Wetland a. square feet b.square feet c.square feet d.square feet
6. ❑ Land Under
.Waterbodies and a.square feet b. square feet c.square feet d. square feet
Waterways
e.c/y dredged f.Gy dredged
7. ❑ Bordering Land
Subject to Flooding a.square feet b.square feet c. square feet d. square feet
Cubic Feet Flood Storage e.cubic feet f. cubic feet g.cubic feet h.cubic feet
s. ❑ Isolated Land
Subject to Flooding a. square feet b. square feet
Cubic Feet Flood Storage c.cubic feet d. cubic feet e. cubic feet f.cubic feet
g. ❑ Riverfront Area
a.total sq.feet b.total sq. feet
Sq ft within 100 ft
c.square feet d.square feet e. square feet f.square feet
Sq ft between 100-
200 ft g.square feet h.square feet i.square feet j.square feet
wpaform5.doc rev.05!192010
Page 3 a!12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-555
- WPA Form 5 — Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
City/Town
B. Findings (cont.)
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
to. ❑ Designated Port Indicate size under Land Under the Ocean, below
Areas
n. ® Land Under the 90 90
Ocean a.square feet b.square feet
c.c/y dredged d.c/y dredged
z. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes
below
10 10 cu yd cu yd
13. ® Coastal Beaches
a.square feet b.square feet c. nourishment d. nourishment
cu yd cu yd
14. El Coastal Dunes
a.square feet b.square feet c.nourishment d. nourishment
15. ® Coastal Banks 12 12
a. linear feet b.linear feet
15. ❑ Rocky Intertidal
Shores a.square feet b.square feet
.square feet b.square feet c.square feet d.square feet
17. E] Salt Marshes a
19. ❑ Land Under Salt
Ponds a.square feet b.square feet
c.c/y dredged d.c/y dredged
19. ® Land Containing 100 100
Shellfish a. square feet b.square feet c. square feet d.square feet
20. ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under
the Ocean, and/or inland Land Under Waterbodies and
Waterways, above
a.c/y dredged b.c/y dredged
21. ❑ Land Subject to
Coastal Storm a.square feet b. square feet
Flowage
wpaform5.doc• rev.05I19I 010 Page 4 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP
Bureau of Resource Protection - Wetlands 64-555
WPA Form 5 — Order of Conditions MassDEP File#
1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
City/Town
B. Findings (cont.)
p o2ect is for 2. If the 22. ❑ Restoration/Enhancement
the purpose of
restoring or s. uare feet of BVW
enhancing a aq b.square feet of salt marsh
wetland
resource area 23. ❑ Stream Crossing(s):
in addition to
the square
footage that a. number of new stream crossings b. number of replacement stream crossings
has been
entered in C. General Conditions Under Massachusetts Wetlands Protection Act
Section B.5.c
or
Bet�)(Salt The following conditions are only applicable to Approved projects.
Marsh)above, I. Failure to comply with all conditions stated herein, and with all related statutes and other
please enter
the additional re ulator measures, shall be deemed cause to revoke or modify this Order.
g Y
amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying
with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this
Order unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years,
but less than five years, from the date of issuance. If this Order is intended to be valid
for more than three years, the extension date and the special circumstances warranting
the extended time period are set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three
years each upon application to the issuing authority at least 30 days prior to the expiration
date of the Order.
6. If this Order constitutes an Amended Order of Conditions, this Amended Order of
Conditions does not extend the issuance date of the original Final Order of Conditions and
the Order will expire on 9/30/2016 unless extended in writing by the Department.
7. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash,
refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath,
paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the
foregoing.
8. This Order is not final until all administrative appeal periods from this Order have elapsed,
or if such an appeal has been taken, until all proceedings before the Department have been
completed.
.vpaform5.dcc- rev.05/198010
Page 5 0l 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-555
4, WPA Form 5 — Order of Conditions MassDEP File#
1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
City/Town
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
9. No work shall be undertaken until the Order has become final and then has been recorded
in the Registry of Deeds or the Land Court for the district in which the land is located, within
the chain of title of the affected property. In the case of recorded land, the Final Order shall
also be noted in the Registry's Grantor Index under the name of the owner of the land upon
which the proposed work is to be done. In the case of the registered land, the Final Order
shall also be noted on the Land Court Certificate of Title of the owner of the land upon
which the proposed work is done. The recording information shall be submitted to the
Conservation Commission on the form at the end of this Order, which form must be
stamped by the Registry of Deeds, prior to the commencement of work.
10. A sign shall be displayed at the site not less then two square feet or more than three
square feet in size bearing the words,
"Massachusetts Department of Environmental Protection" [or, "MassDEP"]
"File Number 64-455 "
11. Where the Department of Environmental Protection is requested to issue a Superseding
Order, the Conservation Commission shall be a party to all agency proceedings and
hearings before MassDEP.
12. Upon completion of the work described herein, the applicant shall submit a Request for
Certificate of Compliance (WPA Form 8A) to the Conservation Commission.
13. The work shall conform to the plans and special conditions referenced in this order.
14. Any change to the plans identified in Condition #13 above shall require the applicant to
inquire of the Conservation Commission in writing whether the change is significant enough
to require the filing of a new Notice of Intent.
15. The Agent or members of the Conservation Commission and the Department of
Environmental Protection shall have the right to enter and inspect the area subject to this
Order at reasonable hours to evaluate compliance with the conditions stated in this Order,
and may require the submittal of any data deemed necessary by the Conservation
Commission or Department for that evaluation.
16. This Order of Conditions shall apply to any successor in interest or successor in control of
the property subject to this Order and to any contractor or other person performing work
conditioned by this Order.
17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated
Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be
marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall
be maintained until a Certificate of Compliance has been issued by the Conservation
Commission.
wpaform5 doc- rev.05/192010 Page 6 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
_ Bureau of Resource Protection - Wetlands 64-555
MassDEP File#
WPA Form 5 — Order of Conditions
1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
City/Town
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have
been fully stabilized with vegetation or other means. At no time shall sediments be
deposited in a wetland or water body. During construction, the applicant or his/her designee
shall inspect the erosion controls on a daily basis and shall remove accumulated sediments
as needed. The applicant shall immediately control any erosion problems that occur at the
site and shall also immediately notify the Conservation Commission, which reserves the
right to require additional erosion and/or damage prevention controls it may deem
necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS
19. The work associated with this Order(the "Project") is (i) Elis not (2) ® subject to the
Massachusetts Stormwater Standards. If the work is subject to the Stormwater
Standards, then the project is subject to the following conditions:
a) All work, including site preparation, land disturbance, construction and redevelopment,
shall be implemented in accordance with the construction period pollution prevention and
erosion and sedimentation control plan and, if applicable, the Stormwater Pollution
Prevention Plan required by the National Pollution Discharge Elimination System
Construction General Permit as required by Stormwater Condition 8. Construction period
erosion, sedimentation and pollution control measures and best management practices
(BMPs) shall remain in place until the site is fully stabilized.
b) No stormwater runoff may be discharged to the post-construction stormwater BMPs
unless and until a Registered Professional Engineer provides a Certification that:
i. all construction period BMPs have been removed or will be removed by a date certain
specified in the Certification. For any construction period BMPs intended to be converted
to post construction operation for stormwater attenuation, recharge, and/or treatment, the
conversion is allowed by the MassDEP Stormwater Handbook BMPspecifications and that
the BMP has been properly cleaned or prepared for post construction operation, including
removal of all construction period sediment trapped in inlet and outlet control structures;
ii. as-built final construction BMP plans are included, signed and stamped by a Registered
Professional Engineer, certifying the site is fully stabilized;
iii. any illicit discharges to the stormwater management system have been removed, as per
the requirements of Stormwater Standard 10;
iv. all post-construction stormwater BMPs are installed in accordance with the plans
(including all planting plans) approved by the issuing authority, and have been inspected to
ensure that they are not damaged and that they are in proper working condition;
v. any vegetation associated with post-construction BMPs is suitably established to
withstand erosion.
wpaform5.doc rev.05M 912010
Page 7 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-555
WPA Form 5 - Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
City/town
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
c) The landowner is responsible for BMP maintenance until the issuing authority is notified
that another party has legally assumed responsibility for BMP maintenance. Prior to
requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible
party (defined in General Condition 18(e)) shall execute and submit to the issuing authority
an Operation and Maintenance Compliance Statement ("O&M Statement) for the
Stormwater BMPs identifying the party responsible for implementing the stormwater BMP
Operation and Maintenance Plan ("O&M Plan") and certifying the following: i.) the O&M
Plan is complete and will be implemented upon receipt of the Certificate of Compliance,
and ii.) the future responsible parties shall be notified in writing of their ongoing legal
responsibility to operate and maintain the stormwater management BMPs and implement
the Stormwater Pollution Prevention Plan.
d) Post-construction pollution prevention and source control shall be implemented in
accordance with the long-term pollution prevention plan section of the approved
Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by
the National Pollution Discharge Elimination System Multi-Sector General Permit.
e) Unless and until another party accepts responsibility, the landowner, or owner of any
drainage easement, assumes responsibility for maintaining each BMP. To overcome this
presumption, the landowner of the property must submit to the issuing authority a legally
binding agreement of record, acceptable to the issuing authority, evidencing that another
entity has accepted responsibility for maintaining the BMP, and that the proposed
responsible party shall be treated as a permittee for purposes of implementing the
requirements of Conditions 18(f) through 18(k)with respect to that BMP. Any failure of the
proposed responsible party to implement the requirements of Conditions 18(f) through
18(k)with respect to that BMP shall be a violation of the Order of Conditions or Certificate
of Compliance. In the case of stormwater BMPs that are serving more than one lot, the
legally binding agreement shall also identify the lots that will be serviced by the stormwater
BMPs. A plan and easement deed that grants the responsible party access to perform the
required operation and maintenance must be submitted along with the legally binding
agreement.
f) The responsible party shall operate and maintain all stormwater BMPs in accordance
with the design plans, the O&M Plan, and the requirements of the Massachusetts
Stormwater Handbook.
.vpaform5.doc• rev.0 5/1 912 01 0 Page 8&12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-555
WPA Form 5 — Order of Conditions MassDEP File#
1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
City/Town
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
g) The responsible party shall:
1. Maintain an operation and maintenance log for the last three (3) consecutive
calendar years of inspections, repairs, maintenance and/or replacement of the
stormwater management system or any part thereof, and disposal (for disposal the
log shall indicate the type of material and the disposal location);
2. Make the maintenance log available to MassDEP and the Conservation
Commission ("Commission") upon request; and
3. Allow members and agents of the MassDEP and the Commission to enter and
inspect the site to evaluate and ensure that the responsible party is in compliance
with the requirements for each BMP established in the O&M Plan approved by the
issuing authority.
h) All sediment or other contaminants removed from stormwater BMPs shall be disposed
of in accordance with all applicable federal, state, and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04
are prohibited.
j) The stormwater management system approved in the Order of Conditions shall not be
changed without the prior written approval of the issuing authority.
k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site
Design Credit (as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1,
Low Impact Development Site Design Credits) shall not be altered without the prior written
approval of the issuing authority.
1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld.
Any fencing constructed around stormwater BMPs shall include access gates and shall be
at least six inches above grade to allow for wildlife passage.
Special Conditions (if you need more space for additional conditions, please attach a text
document):
wparorm5doc rev.0511912010 Page 9 d 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-555
WPA Form 5 — Order of Conditions MassDEP File#
1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
Cityrrown
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No
2. The Salem hereby finds (check one that applies):
Conservation Commission
a. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a
municipal ordinance or bylaw, specifically:
1. Municipal Ordinance or Bylaw 2.Citation
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides measures which are adequate to meet these
standards, and a final Order of Conditions is issued.
b. ® that the following additional conditions are necessary to comply with a municipal
ordinance or bylaw:
Wetlands Protection & Conservation Ordinance c.50
1. Municipal Ordinance or Bylaw 2. Citation
3. The Commission orders that all work shall be performed in accordance with the following
conditions and with the Notice of Intent referenced above. To the extent that the following
conditions modify or differ from the plans, specifications, or other proposals submitted with
the Notice of Intent, the conditions shall control.
The special conditions relating to municipal ordinance or bylaw are as follows (if you need
more space for additional conditions, attach a text document):
Attached conditions are issued under the Wetlands Protection Act and are sufficient for
compliance with the local ordinance
w rafonn5.doc- rev.05119M 10 Page 10 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-SfS'
+
WPA Form 5 — Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
City/Town
E. Signatures
This Order is valid for three years, unless otherwise specified as a special ov /
condition pursuant to General Conditions#4,from the date of issuance. 1. ate of ssuance
Please indicate the number of members who will sign this form. .5—
This Order must be signed by a majority of the Conservation Commission. 2. Number of Signers
The Order must be mailed by certified mail (return receipt requested) r h e iVeTd to the applicant. A
copy also must be mailed or hand delivered at the same time to the ppr rate Dep ent of
Environmental Protection Regional Office, if not filing electronically n e prop ner, if different
from applicant.
S' n ue :
❑ by hand del ery on ® by certified mail, return receipt
requestedd on /
Date Date
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the
land subject to this Order, or any ten residents of the city or town in which such land is located,
are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a
Superseding Order of Conditions. The request must be made by certified mail or hand delivery
to the Department, with the appropriate filing fee and a completed Request of Departmental
Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from
the date of issuance of this Order. A copy of the request shall at the same time be sent by
certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is
not the appellant.
Any appellants seeking to appeal the Department's Superseding Order associated with this appeal
will be required to demonstrate prior participation in the review of this project. Previous participation
in the permit proceeding means the submission of written information to the Conservation
Commission prior to the close of the public hearing, requesting a Superseding Order, or
providing written information to the Department prior to issuance of a Superseding Order.
The request shall state clearly and concisely the objections to the Order which is being
appealed and how the Order does oes not contribute to the protection of the interests identified in
the Massachusetts Wetlands Protection Act (M.G.L. c. 131, §40), and is inconsistent with the
wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal
ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the
Department has no appellate jurisdiction.
wpaform5.doc- rev.0 511 92 01 0 Page 11 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-555
WPA Form 5 - Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
City/Town
G. Recording Information
Prior to commencement of work, this Order of Conditions must be recorded in the Registry of
Deeds or the Land Court for the district in which the land is located, within the chain of title of
the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land subject to the Order. In the
case of registered land, this Order shall also be noted on the Land Court Certificate of Title of
the owner of the land subject to the Order of Conditions. The recording information on this page
shall be submitted to the Conservation Commission listed below.
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation
Commission.
To:
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
Project Location MassDEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
for: Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wpaform5.doc• rev.0511912010 Page 12 of 12
, _may_ Attachment to Order of Cond ons # 64-555
Page 1 of 5
SALEM CONSERVATION COMMISSION
DEP FILE #64-555
10 White Street Pier Removal
City of Salem, Massachusetts
ADDITIONAL FINDINGS
Based on the Estimated Habitats of Rare Wildlife and Certified Vernal Pools Map (online, 9/25/2013) from Natural
Heritage & Endangered Species Program (NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has
been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contains any
vernal pools.
This order permits the demolition of the pier at 10 White Street per Notice of Intent submitted to the Conservation
Commission on September 12,2013.
GENERAL CONDITIONS
I. This Order of Conditions must be recorded in its entirety (including all 5 pages of Special Conditions)
at the Essex County Registry of Deeds or the Land Court for the district in which the land is located,
after the expiration of the 10-day appeal period and within 30 days of the issuance. A copy of the
recording information must be submitted to the Salem Conservation Commission before any
work approved in this Order commences.
2. Approval of this application does not constitute compliance with any law or regulation other than
M.G.L Chapter 131, Section 40, Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands
Protection Ordinance, Salem Code Chapter 50.
J. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No
alteration of wetland resource areas or associated buffer zones, other than that approved in this Order,
shall occur on this property without prior approval from the Commission.
4. Prior to any work commencing on site, a DEP Sign showing DEP File #64-555 must be installed at the
entrance to the site and seen from the public way, but not placed on a living tree.
5. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the
date of the issuance of this Order.
6. With respect to this Order, the Commission designates the Conservation Agent as its agent with powers
to act on its behalf in administering and enforcing this Order.
7. The Commission or its Agent,officers, or employees shall have the right to enter and inspect the property at
any time for compliance with the conditions of this Order, the Wetlands Protection Act MGL Chapter 131,
Section 40, the Wetlands Regulations 310 CMR 10.00, and shall have the right to require any data or
documentation that it deems necessary for that evaluation.
8. The term "Applicant" as used in this Order of Conditions shall refer to the owner, any successor in
interest or successor in control of the property referenced in the Notice of intent, supporting documents
Attachment to Order of Conditions # 64-555
Page 2 of 5
and this Order of Conditions. The Commission shall be notified in writing within 30 days of all
transfers of title of any portion of the property that takes place prior to issuance of the Certificate of
Compliance.
9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and
approvals associated with this project. These permits may include but are not necessarily limited to the
following:
(1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816), U.S. Army
Corps of Engineers.
(2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority
of sec. 27(5) of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00.
(3) Sewer Extension Permit from the DEP Division of Water Pollution Control under G. L. Ch. 21A ss7
and 314 CMR 7.00. Any Board of Health permit for septic system design for any portion of the
septic system within 100 feet of wetlands shall be submitted to the Commission prior to
construction initiation.
(4) Design Requirements for Construction in Floodplains under the State Building Code (780 CMR
744.).
10. If there are conflicting conditions within this Order,the stricter condition(s) shall rule.
11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and
surface waters during construction or after completion of the project.
12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods
and boundary during construction if necessary.
13. The Commission reserves the right to impose additional conditions on portions of this project or this site
to mitigate any actual or potential impacts resulting from the work herein permitted.
14. The work shall conform to the following attached plans and special conditions:
Final Approved Plans
Pier Demolition Plan & Section
('L'itle)
9/1 1/2013
(Dater!)
Ronald R. Bourne
(Signed and Stamper)by)
City of Salem Conservation Commission
(On file Wilt)
15. Any proposed changes in the approved plan(s) or any deviation in construction from the approved
plan(s)shall require the applicant to file a Notice of Project Chance with the Commission. The Notice
shall be accompanied by a written inquiry prior to their implementation in the field, as to whether the
change(s) is substantial enough to require filing a new Notice of Intent or a request to correct or amend
this Order of Conditions. A copy of such request shall at the same time be sent to the Department of
Environmental Protection.
Attachment to Order of Conditions # 64-555
rZ Page 3 of 5
16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has
been issued, the applicant or current landowner shall submit to the Commission a statement signed by the
buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of
the Order of Conditions.
PRIOR TO CONSTRUCTION
17. Prior to the commencement of any activity on this site other than activities listed above, there
must be a Pre-Construction Meeting on site between the project supervisor, the contractor responsible
for the work, and the Conservation Agent and/or a member of the Conservation Commission to ensure
that the requirements of the Order of Conditions are understood. The staked erosion control line shall be
adjusted, if necessary, during the pre-construction meeting. Please contact the Conservation Agent at
(978) 619-5685 at least forty-eight(48) hours prior to construction to arrange for the Pre-
Construction Meeting.
18. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and
erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The
Commission and/or its Agent shall inspect and approve such installation at the pre-construction
meeting.
19. No clearing of vegetation, including trees,or disturbance of soil shall occur prior to the pre-construction
meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre-
construction meeting if absolutely necessary in order to place erosion control stakes where required.
20. There shall be adequate erosion and sediment controls stored under cover on the site to be used for
emergency erosion control purposes.
EROSION CONTROL
21. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction,
and shall be maintained during construction in any wetland resource area and/or buffer zones. The
erosion control measures shown on the approval plan(s)and provisions in the Order will be the minimum
standards for this project; the Commission or its Agent may require additional measures.
22. All debris, fill and excavated material shall be stockpiled a location far enough away From the wetland
resource areas to prevent sediment from entering wetland resource areas.
23. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or
replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed.
24. The area of construction shall remain in a stable condition at the close of each construction day.
25. Any de-watering of trenches or other excavation required during construction shall be conducted so as
to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered
through hay bale sediment traps, silt filter bags or other means approved by the Commission or its
Administrator.
26. If soils are to be disturbed for longer that two(2) months, a temporary cover of rye or other grass should
be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,
exposed surface shall be stabilized by other appropriate erosion control measures, firmly anchored, to
prevent soils from being washed by rain or flooding.
<.,,.
'Z Attachment to Order of Conditions # 64-555
rF Page 4 of 5
DURING CONSTRUCTION
27. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all
times when work is in progress.
28. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on
the approved plan(s).
29. All waste products, grubbed stumps,slash;construction materials, etc. shall be deposited at least 100 feet
from wetland resource areas and 200 feet from river.
30. Cement trucks shall not be washed out in any wetland resource or buffer zone area, nor into any drainage
system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be
immediately removed.
-3 1. There shall be no pumping of water from wetland resource areas.
32. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other
components shall be fixed immediately.
33. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance
of enforcement actions by the Conservation Commission including, but not limited to,civil administrative
penalties under M.G.L Chapter 21A, section 16.
AFTER CONSTRUCTION
34. Upon completion of construction and final soil stabilization, the applicant shall submit the following to
the Conservation Commission to request a Certificate of Compliance(COC):
(1) A Completed Request for a Certificate of Compliance form (WPA Form 8A or other form if
required by the Conservation Commission at the time of request).
(2) A letter from a Registered Professional Engineer certifying compliance of the property with this
Order of Conditions.
35. When issued, the Certificate of Compliance must be recorded at the Essex County Registry of Deeds
and a copy of the recording submitted to the Salem Conservation Commission.
36. If the completed work differs from that in the original plans and conditions, the report must specify how
the work differs; at which time the applicant shall first request a modification to the Order. Only upon
review and approval by the Commission, may the applicant request in writing a Certificate of
Compliance as described above.
37. Erosion control devices shall remain in place and properly functioning until all exposed soils have been
stabilized with final vegetative cover and the Conservation Commission and/or its Agent has authorized
their removal
ADDITIONAL CONDITIONS
38. Per Division of Marine Fisheries comments (9/24/2013 letter from Tay Evans), a bottom weighted silt
curtain shall be maintained around the area of work during pile removal and any in-water, silt-producing
work.
Attachment to Order of Conditions # 64-555
Y+ r Page 5 of 5
xs
39. Any concrete falling into water shall be removed by hand.
40. In order to prevent the barge from making contact with the seafloor, it shall be moored offshore.
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number
Salem
City/Town
'mP°"a"`
When filing out A. General Information
forms on the
comur,use
only Phe tab key 1. Project Location (Note: electronic filers will click on button to locate project site):
to move your 10 White Street Salem 01970
cursor-do not
use the return a.Street Address b.City/Town c.Zip Code
key. 42.521354 -70.882564
Latitude and Longitude: d. Latitude e. Longitude
td 41 283
f.Assessors Map/Plat Number g. Parcel/Lot Number
2. Applicant:
Noah Flaherty
a. First Name b. Last Name
Note: Brewer Hawthorne Cove Marina
Before c.Organization
completing this
form consult 10 White Street
your local d.Street Address
Conservation Salem MA 01970
Commission e.City/Town f.State Zi Code
regarding any g' P
municipal bylaw (978)740-9890 (978)740-9994 nflaherty@byy.com
or ordinance. h. Phone Number i. Fax Number j.Email Address
3. Property owner(required if different from applicant): ❑ Check if more than one owner
a. First Name b. Last Name
c.Organization
d.Street Address
e.City/Town f.State g.Zip Code
h.Phone Number I. Fax Number j.Email address
4. Representative (if any):
Seth Lattrell
a. First Name b.Last Name
Bourne Consulting Engineering
c.Company
3 Bent Street
d.Street Address
Franklin MA 02038
e. City/Town f.State g.Zip Code
(508)533-6666 (508)533-0600 slattrell@bournece.com
h. Phone Number i. Fax Number j.Email address
5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form):
500 237.50 262.50
a.Total Fee Paid b. State Fee Paid C.City/Town Fee Paid
wpaform3.doc•rev. 1/3/2013
Page 1 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands MaSsDEP File Number
WPA Form 3 - Notice of Intent
Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
A. General Information (continued)
6. General Project Description:
Removal of existing dilapidated pier
7a. Project Type Checklist:
1. ❑ Single Family Home 2. ❑ Residential Subdivision
3. ❑ Limited Project Driveway Crossing 4. ❑ Commercial/Industrial
5. ® Dock/Pier 6. ❑ Utilities
7. ❑ Coastal Engineering Structure 8. ❑ Agriculture (e.g., cranberries, forestry)
9. ❑ Transportation 10. ❑ Other
7b. Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR
10.24 (coastal)or 310 CMR 10.53 (inland)?
1. ❑ Yes ® No If yes, describe which limited project applies to this project:
2. Limited Project
8. Property recorded at the Registry of Deeds for:
Essex 63244
a.County b.Certificate#(if registered land)
11868 86
c.Book d. Page Number
B. Buffer Zone & Resource Area Impacts (temporary & permanent)
1. ❑ Buffer Zone Only— Check if the project is located only in the Buffer Zone of a Bordering
Vegetated Wetland, Inland Bank, or Coastal Resource Area.
2. ❑ Inland Resource Areas (see 310 CMR 10.54-10.58; if not applicable, go to Section B.3,
Coastal Resource Areas).
Check all that apply below. Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including standards
requiring consideration of alternative project design or location.
Resource Area Size of Proposed Alteration Proposed Replacement(if any
For all projects
affecting other
Resource Areas, a. ❑ Bank 1.linear feet 2.linear feet
please attach a b. ❑ Bordering Vegetated
narrative
explaining how Wetland 1.square feet 2.square feet
the resource
area was c. ❑ Land Under square feet 2.square feet
delineated. Waterbodies and 1.
Waterways
3.cubic yards dredged
wpaform3.doc•rev. 1/3/2013 Page 2 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands
MassDEP File Number
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number
Salem
City(fown
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (corl
Resource Area Size of Proposed Alteration Proposed Replacement of any)
d. ❑ Bordering Land
Subject to Flooding 1.square feet 2.square feet
3.cubic feet of flood storage lost 4.cubic feet replaced
e. E] Isolated Land
Subject to Flooding 1.square feet
2.cubic feet of flood storage lost 3.cubic feet replaced
f. ❑ Riverfront Area
1.Name of Waterway(if available)
2.Width of Riverfront Area (check one):
❑ 25 ft. - Designated Densely Developed Areas only
❑ 100 ft. - New agricultural projects only
❑ 200 ft. -All other projects
3. Total area of Riverfront Area on the site of the proposed project: square feet
4. Proposed alteration of the Riverfront Area:
a.total square feet b.square feet within 100 ft. c.square feet between 100 ft.and 200 ft.
5. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes❑ No
6.Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes❑ No
3. ® Coastal Resource Areas: (See 310 CMR 10.25-10.35)
Check all that apply below. Attach narrative and supporting documentation describing how the project
will meet all performance standards for each of the resource areas altered, including standards
requiring consideration of alternative project design or location.
Online Users:
Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any
document
transaction
number a. ElDesignated Port Areas Indicate size under Land Under the Ocean, below
(provided on your 90 (extraction of piles)
receipt page) b. ® Land Under the Ocean
with all 1.square feet
supplementary
information you
submit to the 2.cubic yards dredged
Department. c. ❑ Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below
d. ® Coastal Beaches 10 (extraction of piles)
1.square feet 2.cubic yards beach nourishment
e. ❑ Coastal Dunes 1.square feet
q 2.cubic yards dune nourishment
wpaform3.doc•rev. 1/3/2013 Page 3 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number
Salem
cityrrown
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont'd)
Size of Proposed Alteration Proposed Replacement(if any)
f. ® Coastal Banks 12
1.linear feet
g. ❑ Rocky Intertidal
Shores 1.square feet
h.❑ Salt Marshes 1.square feet 2.sq ft restoration,rehab.,creation
i. ❑ Land Under Salt
Ponds 1.square feet
2.cubic yards dredged
Land Containing 100
Shellfish 1.square feet
k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
1.cubic yards dredged
I. ❑ Land Subject to
Coastal Storm Flowage 1.square feet
4. ❑ Restoration/Enhancement
If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the
square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional
amount here.
a.square feet of 3VW b.square feet of Salt Marsh
5. ❑ Project Involves Stream Crossings
a. number of new stream crossings b. number of replacement stream crossings
C. Other Applicable Standards and Requirements
Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review
1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on
the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural
Heritage and Endangered Species Program (NHESP)?To view habitat maps, see the Massachusetts
Natural Heritage Atlas or go to
http://www.mass.gov/dfwele/dfw/nhesl)/regulatory review/priority habitat/online viewer htm.
a. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
100 Hartwell Street, Suite 230
b. Date of map West Boylston, MA 01583
wpaform3.doc•rev. 1/3/2013 Page 4 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands
MassDEP File Number
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number
Salem
City/Town
C. Other Applicable Standards and Requirements (cont'd)
If yes, the project is also subject to Massachusetts Endangered Species Act(MESA)review(321
CMR 10.18). To qualify for a streamlined, 30-day, MESANVetlands Protection Act review, please
complete Section C.1.C, and include requested materials with this Notice of Intent(NOI); OR complete
Section CAA, if applicable. If MESA supplemental information is not included with the NOI, by
completing Section 1 of this form, the NHESP will require a separate MESA filing which may take up
to 90 days to review(unless noted exceptions in Section 2 apply, see below).
1. c. Submit Supplemental Information for Endangered Species Review'
1. ❑ Percentage/acreage of property to be altered:
(a)within wetland Resource Area percentage/acreage
(b)outside Resource Area
percentage/acreage
2. ❑ Assessor's Map or right-of-way plan of site
3. ❑ Project plans for entire project site, including wetland resource areas and areas outside of
wetlands jurisdiction, showing existing and proposed conditions, existing and proposed
tree/vegetation clearing line, and clearly demarcated limits of work**"
(a)❑ Project description (including description of impacts outside of wetland resource area &
buffer zone)
(b) ❑ Photographs representative of the site
(c)❑ MESA filing fee(fee information available at:
http://www.mass.gov/dfwele/dfw/nhesp/regulatory review/mesa/mesa fee schedule htm).
Make check payable to"Commonwealth of Massachusetts - NHESP" and mail to
NHESP at above address
Projects altering 10 or more acres of land, also submit:
(d)❑ Vegetation cover type map of site
(e)❑ Project plans showing Priority& Estimated Habitat boundaries
d. OR Check One of the Following
1.❑ Project is exempt from MESA review.
Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14,
http://www.mass.gov/dfwele/dfw/nhesp/regulatory review/mesa/mesa exemptions htm;
the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to
310 CMR 10.37 and 10.59.)
2. ❑ Separate MESA review ongoing.
a.NHESP Tracking# b. Date submitted to NHESP
Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review(see
http://www.mass.gov/dfwele/dfw/nheso/nheso.htm, regulatory review tab). Priority Habitat includes habitat for state-listed plants and
strictly upland species not protected by the Wetlands Protection Act.
" MESA projects may not be segmented (321 CMR 10.16).The applicant must disclose full development plans even if such plans are
not required as part of the Notice of Intent process.
wpaform3.doc•rev. 1/3/2013
Page 5 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number
Salem
City/iown
C. Other Applicable Standards and Requirements (cont'd)
3.❑ Separate MESA review completed.
Include copy of NHESP"no Take"determination or valid Conservation & Management
Permit with approved plan.
2. For coastal projects only, is any portion of the proposed project located below the mean high water
line or in a fish run?
a. ❑ Not applicable— project is in inland resource area only
b.® Yes ❑ No If yes, include proof of mailing or hand delivery of NOI to either:
South Shore-Cohasset to Rhode North Shore- Hull to New Hampshire:
Island,and the Cape&Islands:
Division of Marine Fisheries- Division of Marine Fisheries-
Southeast Marine Fisheries Station North Shore Office
Attn: Environmental Reviewer Attn: Environmental Reviewer
1213 Purchase Street—3rd Floor 30 Emerson Avenue
New Bedford, MA 02740-6694 Gloucester, MA 01930
Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region,
please contact MassDEP's Boston Office. For coastal towns in the Southeast Region, please contact
MassDEP's Southeast Regional Office.
3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
Online users: a. ❑ Yes ® No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP
Include your Website for ACEC locations). Note: electronic filers click on Website.
document
transaction b.ACEC
number
(provided on your 4. Is any portion of the proposed project within an area designated as an Outstanding Resource Water
receipt page) (ORW)as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00?
with all
supplementary a. ❑ Yes ® No
information you
submit to the 5. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Department. Restriction Act(M.G.L. c. 131, §40A)or the Coastal Wetlands Restriction Act (M.G.L. c. 130, § 105)?
a. ❑ Yes ® No
6. Is this project subject to provisions of the MassDEP Stormwater Management Standards?
a. ❑ Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management
Standards per 310 CMR 10.05(6)(k)-(q)and check if:
1. ❑ Applying for Low Impact Development(LID)site design credits (as described in
Stormwater Management Handbook Vol. 2, Chapter 3)
2.❑ A portion of the site constitutes redevelopment
3.❑ Proprietary BMPs are included in the Stormwater Management System.
b.® No. Check why the project is exempt:
1.❑ Single-family house
wpaform3.doc•rev. 1/3/2013 Page 6 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 - Notice of Intent
Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
cityrrown
C. Other Applicable Standards and Requirements (cont'd)
2.❑ Emergency road repair
3. ❑ Small Residential Subdivision (less than or equal to 4 single-family houses or less than or
equal to 4 units in multi-family housing project)with no discharge to Critical Areas.
D. Additional Information
Applicants must include the following with this Notice of Intent(NOI). See instructions for details.
Online Users: Attach the document transaction number(provided on your receipt page)for any of the
following information you submit to the Department.
1. ® USGS or other map of the area (along with a narrative description, if necessary)containing
sufficient information for the Conservation Commission and the Department to locate the site.
(Electronic filers may omit this item.)
2. ❑ Plans identifying the location of proposed activities(including activities proposed to serve as a
Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to
the boundaries of each affected resource area.
3. ❑ Identify the method for BVW and other resource area boundary delineations (MassDEP BVW
Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.),
and attach documentation of the methodology.
4. ® List the titles and dates for all plans and other materials submitted with this NOI.
Pier Demolition Plan and Sectoin
a. Plan Title
Bourne Consulting Engineering, P.0 Ronald R. Bourne
b. Prepared By c.Signed and Stamped by
September 2013 1"=30'
d.Final Revision Date e.Scale
Pier Demoition Section September 11, 2013
f.Additional Plan or Document Title g.Date
s. ❑ If there is more than one property owner, please attach a list of these property owners not
listed on this form.
s.❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7. ® Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
8. 0 Attach NOI Wetland Fee Transmittal Form
g. ❑ Attach Stormwater Report, if needed.
wpaform3.doc•rev. 1/3/2013 Page 7 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 — Notice of Intent
Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem _
City/Town
E. Fees ------------ ---------
1. ❑ Fee Exempt: No filing fee shall be assessed for projects of any city, town,county,or district of
the Commonwealth, federally recognized Indian tribe housing authority, municipal housing
authority, or the Massachusetts Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Welland Fee
Transmittal Form)to confirm fee payment:
2-Municipal Check Number 3 e/
.Check dal
7886 _ _ _y-//�__i3______
4,fState Check Number _ 5.Check date
_I>oenn2 First Na
8.Payer name
nano on check:First Name) J ✓ � 7.Payor name on cheek:Last Name
F. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans,
documents,and supporting data are true and complete to the best of my knowledge. I understand that
the Conservation Commission will place notification of this Notice in a local newspaper at the expense of
the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the
requirements of M.G.L. c. 131, §40. Notice must be made by Certificate of Mailing or in writing by hand
delivery or certified mail(return receipt requested) to all abutters within 100 feel of the property line of the
project locatf n.
_ _ _ Gin. ✓_�_— _ f,�ac,/3
I.Signature of Ai linen 2.Uat
3.Signet gr»dfPmppr�0*- real) _----- A Dv IF
, J--
5.SignaW " ReprP nlalive(if any) - ---- - fi.Uate _—
l/
For Conservation Commission:
Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents, two
copies of the NOI Welland Fee Transmittal Form, and the city/town fee payment, to the Conservation
Commission by certified mail or hand delivery.
For MassDEP:
One copy of the completed Notice of Intent(Form 3), including supporting plans and documents, one
copy of the NOI Welland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP
Regional Office(see Instructions)by certified mail or hand delivery.
Other:
If the applicant has checked the "yes"box in any part of Section C, Item 3, above, refer to that section
and the Instructions for additional submittal requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a
timely manner may result in dismissal of the Notice of Intent.
wpaform3.doc•rev. 1/312013 Page 8 of 8
Bourne Consulting Engineering
Project Narrative
Pier Removal
Brewers Hawthorne Cove Marina
September 2013
Summary
Hawthorne Cove Marina is seeking the required regulatory approvals to remove a dilapidated concrete
decked timber pier from their existing boating facility at 10 White Street in Salem, MA. The pier
proposed for removal was licensed and installed in 1935/36 under DPW Licenses 1792 and 1729. It is
located along the westerly side of the Marina, and will require removal of approximately 125 chemically
treated piles from Salem Harbor.
The project is anticipated to require the following permits:
- USACE Category I Notification
- Chapter 91 Notification
- Order of Conditions with the Salem Conservation Commission
In favor of full disclosure,the long-term goal for the marina is to increase capacity and expand southward
into this area,however no expansion is proposed at this time.
� II,jII1 �
3 4 I
Figure I- Project Locus
Existing Conditions
The pier is approximately 400 feet long and 12 feet wide and supported by 125 piles and associated cross
bracing, with an approximately 2" layer of concrete decking. The pier is currently inaccessible as the
timber members are severely deteriorated. Restoration of the pier to a safe and accessible condition
would require complete replacement of the structure.
The site is mapped habitat for Quahog, Soft-shell Clam, and European Oyster. It is outside the Salem
Harbor DPA, and outside of any NHESP habitat.
Proposed Work
The proposed work involves removal of all pier components. The contractor will be required to attempt
complete removal of all piles, however if the pile breaks at or below the mudline, the remaining pile will
be left to avoid additional disturbances to sediment and increases in turbidity. Piles along the inshore
bulkhead will also be cut off to prevent extracted piles from creating voids and undermining the soil
below the bulkhead. Concrete decking will be split into manageable sections and loaded into the barge.
BREWERS HAWTHORNE COVE MARINA
MARINA FLOAT REPLACEMENT
PROJECT NARRATIVE SEPTEMBER 2013
All timber and concrete will be disposed of at an approved upland facility, and all proposed work will be
contained within a debris boom to reduce disturbances outside of the project area. The work will be
performed from the waterside by barge. Work within inshore areas will be performed at or near high
water to avoid intertidal impacts.
Impact Summary
Impacts are anticipated to be minimal and temporary as they are limited to benthic disturbance from pile
removal, which will be minimized to the greatest extent feasible. The project will impact 12 feet of
coastal bank and 100 feet of land under ocean through the removal of the structure. The impacts to coastal
bank will not impact bank stabilization or flood capacity. Impacts to land under ocean will result in
improved habitat for shellfish and local marine life. Removing the creosote treated piles from the
waterway will also eliminated continued leaching of chemicals into the environment and improve flow
through the area.
BOURNE CONSULTING ENGINEERING PAGE 2 OF 4 BCE#32890
BREWERS HAWTHORNE COVE MARINA
MARINA FLOAT REPLACEMENT
PROJECT NARRATIVE SEPTEMBER 2013
Appendix A- Abutter Information
BOURNE CONSULTING ENGINEERING PAGE 3 OF 4 BCE#32890
NOTIFICATION TO ABUTTERS UNDER THE
MASSACHUSETTS WETLANDS PROTECTION ACT
In accordance with the second paragraph of Massachusetts General Laws Chapter 131, Section 40, you are hereby
notified of the following:
A. The name of the applicant is
Noah Flaherty Brewer Hawthorne Cove Marina
a. First Name b. Last Name C.Company
10 White Street
d. Mailing Address
Salem MA 01970
e.City(fom f.State g.Zip Code
nflaherty(&bvy.com
(978) 740-9890 (978)740-9994 j.Email address
h. Phone Number i. Fax Number
B. The applicant has filed a Notice of Intent with the Conservation Commission for the Brewer
Hawthorne Cove Marina seeking permission to repair and upgrade existing dock.
C. The location of the lot where the activity is proposed is at 10 White Street in Salem Harbor.
D. Copies of the Notice of Intent may be examined at: The Conservation Commission at 120
Washington Street, Monday through Friday, between the hours of 8:30 and 4:30. For more
information, call the Conservation Commission Agent at: (978) 619-5685.
E. Information regarding the date, time and place of the public hearing may be obtained by calling the
Conservation Commission at: (978) 619-5685.
NOTE: Notice of the public hearing, including its date, time and place, will be published at least
five (5) days in advance in the Salem News.
NOTE: Notice of the public hearing, including its date, time and place, will be posted in the City or
Town Hall not less than forty-eight(48) hours in advance.
NOTE: You also may contact your local Conservation Commission or the nearest Department of
Environmental protection Regional Office for more information about this application or the
Wetlands Protection Act.
CITY OF SALEM
ASSESSOR'S CERTIFICATION OF ABUTTERS AND
f PROPERTY OWNERS
i
BOARD/COMMISSION: Conservation Commission
PROJECT SITE: 10 White St
DATE: 9/5/2013
DESCRIPTION OF REQUIREMENT: All abutters and any property owner
within 100 feet of the property line of the land where the activity is proposed
including if land is separated by a public or private p
P p ate street or a body of water
not ante y er and
unreasonably distant from the project site.
This is to certify that the time of the last assessment for taxation made by the City of
Salem, the names and addresses of those listed on the attached sheets are"abutters and
property owners"(as defined by Wetlands Protection Act 310 CMR 10.05(4)(a)) to the
parcel(s) of land listed above as the project site.
Assessor's Signature: ��y /lE fj y -- .--
Uate:
Number of initialed pages attached:
Once Certified, Return to:
Tom Devine,Department of Planning and Community Development
Salem Web GIS- Map Page
IA http st.appgeo.com/saleninia/Mip.lst
��'" ,; #fPlcofffc to tht C'et5' of tilt gut 1�IItttsrits� '* ��
New Property Search
Property ID
Address
I ,,✓%� T/ p'�f)VG`(/��y ♦ �'° Owner
'Y a
Property 10 41 0278 0
Address 10 BLANEY
o` ra
s,
Owner
CITY OF S.
Property ID 41_0279_0
i Address 2 BLANEY
Owner VETERANS
Pro e
P rtyiD 41_0334_8
Address 4BLANEY
Owner FURLONG
Property ID41_0334_8,
Address 4 BLANEY
Owner GASTRO N
Property ID 41_0334_8
-6 '51`!"n Search
E w +J^�!,ed 'u n -v t
�� es ', w�r" ;� r � 4< i„ Distance . 100 ft F
AAA -44P I`I" Maili
! n9 Labels
0 1• fy�
R r _ T �ft�
Scale 1" = 332 It
Salem City Hall 93 Washington Street, Salem, MA 01970
Phone: 978-745-9595
City Hall Hours of Operation: Monday, Tuesday S:Wednesday SAM-4PM Thursday SAM-7PM
Site designed by AppGem.
wiu��-vod paoga al aalanaa weu�enmy� i
g , ..worNane•nnrm n.. _. 'a a sua ' D965 A83A-V1lje eb
' _. p ul;e aan4304 e,.e.zallday_ _ P 5 q- a!zas!!!±
4, ,:4478 i� -� � — --- -�ialatl.esalne}saRanbl:
fl'T OF SALEM THE 41 0237 0
41 0299 0
z r SSiIIISGT'lN STREET t V F W OF THE U171 ED STATES Air'
ALE - '
55DERBY ST "OUSE O_r
SEVEN GABLES
:: bt,IvfA. 07370 1 I5 DE P Y STREET
SALEMI-LA 61970
SALEM,K4 01970
41 086 0 41_0298_0
!
VETERANS ERAIJS OF FOREIGN WARS
s v.,JE'r:Rt STREET JORDAN rOLOREST -LilclI INC
i 97 DEFBY STREET
C
SALEM.MA 0197;jc 104.'-'IiTE ST
!
SALEM,Ilk 0197n
1
SALEM.IVU, 019970
i
11 13344 �j'O1
FURLONG MICHAEL F 41.0291_0 -
'O+-iISUEIJROTH Rh i'IvIC 41_G2R3_0
4 BLAh1EY ST II? �1'ID BHCAfi PIC
SALEM,MA 01970 26 THORNDIKE STREET 10 WFPTb ST
BEYERL Y,MA 01915 SALEM,MA 019%0
41-0334802 802 41_0292 0
CA"iB'._MARLA LAWRENCE iOR7R 402t] 0 l C. i( 1ctl� tali
42 39 TUkNEP,ST -
r D
SALEM.MA 019-0 3 WHITE ST
SALEM,MA 01970
334 8G: 41 0'293 0
81 33 E DA ST L C 41 0285 80'
of aR_IDi`-E STREET LAVE2,TER GAF'ETF �� -f`tichr �!- M7CAULEY DENISEM
'iALEI✓i.A.J. 0i197n 41 TUF.RiER ST L-0 e.
SALEM,MA 01970 6 WHITE ST Ul
SALEM,MA 01970
-
41 0294 _ -
4 BLANELL SFLARIN:IAS LI 41 0285 1
?BLA 1dEY STREET V4 HALEY LIRIDAC
43 TURNER S�
SAi,EAA;MA 01970 SALEM.MA 01 970 6W ST U2
SALEM,IvLA 01970
1J 4 30� 4102950
4- A!T
MICHELE 5 TWANICKI ASTI^HC, Nl'JR 41 0285_803
ani I M. oig7o iJ` - BUR:�EJOHN 15.
47 TURNER v7
SALEM.RfuA 01970 SALEM,MA 01970 6 WB7TE ST Li?
SALEM,MA 01970
41_0 '7 7
4 Oea6 0
Hi T ..AIT TRUST - 4. 083 804
F , V 31:6 NORTHRUP 4IJDkAf 1TARARIIO CAR O:,
49''C NEn REET
ALE 4 �S J v 0 SALENT,MA 01970 - • a WHITE STREET
.
SALEM.Mk 01970
111EL I+LPERTJ _ 41_029-i2(i 41 0283 E:�
gr. -i h:'BEET 'x tEkS JEFFREY e. :'MATTH..e'_�Rr
53 TIIE,RTEE ST iJ I
SALEid..!A Oi874 6WHfl E.ST Lid
Se,LEPA.AAP. Ol 07.;
SALEM,MA 019-10
r F
n Y,Z YNSF7.CHIi F ' =a4 0
_:ALEL4,AR;. n;, nLrT },?TJP.2IER;in_EET U2 :I 21c
+,'0 S
S=.Lc'M.3pA 013 10 W=E"i0 SAI F14.Ni41)1 o
aa0965 L==--' uk46pj d()_dod asodra jade ' �
1"='—' of aw;Guole puaA da°4 00915 a:eidwal.oba,A r asn
BREWERS HAWTHORNE COVE MARINA
MARINA FLOAT REPLACEMENT
PROJECT NARRATIVE SEPTEMBER 2013
Appendix B-Project Plans
BOURNE CONSULTING ENGINEERING PAGE 4 OF 4 BCE#32890
Commonwealth ofMassachusetts
Division of Marine Fisheries
30 Emerson Ave.
I
9
l
Gloucester MA 01930
Paul J.Diodati (978)282-0308 w
Director fax (617727-3337 Deval Patrick
Governor
Timothy P.Murray
Lt. Governor
Richard K. Sullivan,Jr.
September 24,2013 Secretary
Mary B.Griffin
Salem ConCommissioner
servation Commission
Attn: Tom Devine
tdevine@salem.com
Dear Commissioners:
The Division of Marine Fisheries(MarineFisheries) has reviewed the Notice of Intent, submitted by
Brewer Hawthorn Cove Marina, for the removal of an existing dilapidated pier. The project includes
complete removal of approximately 125 chemically treated piles. We offer the following comments for
your consideration, with respect to the project's potential impacts to marine fisheries resources.
The project site is on Salem Harbor and is mapped habitat for a variety of shellfish including soft shell
clams (Mya arenaria), blue mussels (Mytilus edulis), and quahog(Mercenaria mercenaria).The harbor is
also considered habitat for the spawning, settlement and juvenile development of winter flounder
(Pseudopleuronectes americanus).
To minimize turbidity impacts to adjacent habitats,we recommend that a bottom weighted silt curtain be
maintained around the area of work, during pile removal and any in-water, silt-producing work.
Thank you for considering our comments. If you have any questions about this review please contact me at
our Gloucester office at tay.evansgstate ma us or 978-282-0308 x. 168.
Sincerely yours,
J
N. Tay Evans
Environmental Reviewer
ZNOTE
_ Z ALL PI
SALEM ER STRUCTURE TO BE REMOVED ENTIRELY
HARBOR EXCEPT FOR ALONG SEAWALL WHERE PILES ARE TO
3 _
BE CUi AT MUDLWE.
12
2 DECKING W/ .
R
REMOVE i1MBE
" LONG. OVERLAY
REMOVE 9X6
LIMBER RAILING
`- �• ' ,I �' 1 REMOVE 6X12 TIMBER
I � � III 1 SPLIT PILE CAP
yI'I �I \ B; REMOVE 2X12 TIMBER
ceoss SPACING
EXISTING BULKHEAD _ 1 1 ` REMOVE
'L • I, �JILI,� � 4X12 LATERAL
^) 1 REMOVE 120 TIMBER PILE
[ • 1 - ' +, i GROSS BRACING
J I IL
.. ... ... .. . ._MLW El-.0.0
4 1. w
I III _
TO MUDLINE vgRlEs
TO i D PIER DEMOLITION SECTION
It ! L S l 15 5
' l ti g ExlsilNc
t 1 -.1 p l S \ II'� TIMBER FLDATS
1
1,. �` Iti U,III
-—ti __ ��, �' Itit o I til I �• I 1 ��
Y L �.�� lN1 4_• `
u €
t
FLOATING DEBRIS BOOM ---
l t - -�
eo
BD -Fiji. 1 „' L l� t • rl I 'q f n
OB DB .�DBBO BO
- ..OB-. - -- a'.i-
°BM DB DB DB DB DB' * X J I� ,Ir; %t Ir I it
uDS
B
Da
z I EXISTING BOAT
'MLW I � i .. •_ .._- _._v_i_.� L T.1.,; 1 \....._.i. - �
EXISTING PIER TO BE REMOVED
g
PIER DEMOLITION PLAN---------
DF
LAN ------ f�
1 - ,
SCALE: t"=JO'-0'
�.�N OF MASS40
RONALD R. c PIER DEMOLITION
BOURNt I�
No 32€61b PLAN & SECTION
- 9 R MARINA
c DREDGING INVESTIGATION
_
E
o
BREWER HAWTHORNE COVE MARINA
SALEM, MA
q `3 SEPTEMBER 2013
DATUMMean LoW
LIC-later I
100 YR FLOOD +16.2
HTL +Ito Bourne Consulting Engineering
sf3ss+
I +B.4ae
NOTES: NGVD +4.< / F /•
anV
MLW DO m/sml AP-.
qu Roel
DRAWN: JSF
1. HYDROGRAPHIC DATA SHOWN ONLY HEREON WAS COLLECTED ON NOVEMBER 2 2012 OF BOURNE T CONSULTING FOR PERMITS ONLY CHECKED: 3zseo-ot-ot
ENGINEERING AND CAN ONLY REFLECT CONDITIONS AS THEY EXISTED DURING THE TIME OF THE SURVEY. 0 30 60 gPPROVED'. DRAWING NO.
NOT FOR CONSTRUCTION m'�= APPROVED
SCALE: t"=30'-C" REVISIONS SH ECT I CF I
ALLLEPIER STRUCTURE TO BE REMOVED ENTIRELY
SALEM EXCEPT FOR ALONG SEAWALL WHERE PILES ARE TO
HARBOR BE CUT AT MUDLINE.
3
g
1 � 12
,2.00 I REMOVE TIMBER DECKING W/
2" CONC. OVERLAY
1
–3.00
–4
REMOVE 4X4.00(7ARSf TIMBER RAILING
(IgBS) 1 REMOVE 4X12 TIMBER
1 SPLIT PILE CAP
MHW EL. +8.9
T
OSSSEBRAC NGIMBER
SHED
REMOVE
EXISTING BULKHEAD 4X12 LATERAL REMOVE 12"0 TIMBER PILE
CROSS BRACING
. . . . . . . . . . . . . . . . . . . . . . . . MLW
O
'i�l�l I�IIHI�I Ir-
"
I MUDLINE VARIES
I
o e
PIER DEMOLITION SECTION
0
EXISTING SCALE: 3/16"=1'-0"
TIMBER FLOATS
I
\ I
F
MOOD'o
VCK
WOOD
9LDC.3?I
STEPS
2 STORY
BOD FRAME:
NG
I
R,A.#PP I \ I I I
FLOATING DEBRIS BOOM 00
' I MEAN HLCH B
t^-WA7ER LWE
ALCl11�/YgNI C 1
84
—5.00
2
m x 80 \4.00
1 DBDB _ 80 84 --_
h DB DB
DIBQ
DB -__ DB DB DB DB o
,zz r 7DQ DB
0
A/LW / MEAN LOW B
/
WA 7 LNC
/ EXISTING FLOAT
(9i) EXISTING PIER TO BE REMOVED p
A PIER DEMOLITION PLAN -_
o SCALE: 1"=30'-O"
cv
0
0
cv
00 N
cv
PIER DEMOLITION
a N00%QFAf4
LL 9C .
Li
PLAN & SECTION.
' � MARINA DREDGING INVESTIGATION
BREWER HAWTHORNE COVE MARINA
SALEM , MA
Ui
w SEPTEMBER 2013
Low
er
co 1000UYR FLOOD +16 2 MLW "
HTL +, ,.oFBourne Consult�n En Meering
MHW +8.908, 533-0800 B�L 3 Bent Stiwt
5
NGVD +4.4 z ___— F� lnMA OZO38
00 MLW 0.0 TML W 533-8888 FAX
NOTES:
i 1. HYDROGRAPHIC DATA SHOWN HEREON WAS COLLECTED ON NOVEMBER. 2, 2012 BY BOURNE CONSULTING FOR PERMITS ONLY CHDECKED: JSF DRAWING NO. 32890-01 -01
x ENGINEERING AND CAN ONLY REFLECT CONDITIONS AS THEY EXISTED DURING THE TIME OF THE SURVEY. 0 30 60
NOT FOR CONSTRUCTION SCALE: 1 "=30'-0" APPROVED:DATE: 09/11 /13
REVISIONS SHEET 1 OF 1
11,
S2 h. .?'05"E `` I ! I 4.3 -4,8
41. 70 -5.5
i I 3.
E X - j co I \ E -4,9 -s.a
-6.8
-5.2 N
50927�ry i oAP oo� I sp 50 -L_ 4.9 N N v ui M
gBOLT E y�p�,� °.o. -4 8 �4.� v <r ,n L uj n 75. u Ln
D O N
I _ I I
-ze 4.8 _4.6 -5.2_5.3-5.3
-5.3
-4.7 -4.5 -5.1 -5.1
OOD /_ / -5.3
I WATER PIPES 1 -4.6 -4.5
ON
- -
EL _
'I - -4.0 -4. -5.4
SEWER
ELEC. - 1 -- -4.6 -4.4 00 � 4 o 5.<-5v ,v 5.3 5.3
PANEL -4.4 v ui nLo m
1 �o -4.5
_ `n -4 4 v v
I I -4.9 0 1
1 ifs
(INTO GPJD.) � � I 1` -3.8 -4.2 -4.5 v v -4.3 v r v -4.9
v v v
° I^ A M TL rn v '- 0 -4.3 v v u' r v vj uj ui
oI STEPS I ci I `o - 3.6 -4.3 X4.3 v -4.6 -5.0
A Im LA rj 4.1 -5.0 -4.5 -4.6 IM I -4.6 -4.9
L
o N IN IIo 'M -4.2 -4.2 '4 _4.8 -4.6 -4.8 v u?-4.3v -4.5
� Iv IAS o N rn -3.9 -4.84.7 -443 v r r v v
rn m u I ri -4.5 f v n r, n * uj -s.a
e m i r o Iv rn ml -3.9 -417 -4.6 -4.6 -4.8 -4.4 1 4 4 v v Q'9 u� ui - I I ui ri
Lo o l o c^ n cJ ri 1 1 I 1 1
I� 1 -J•e -3.8 -4.2 -a,o -4.3 -4.7 -4.4
�I Z I v
I 4.7 -4.8 - 4.8
-5.7
0, o I 1 N -3.8 rl� -4.1 O rn -4.3 -4.8 � -4.4 C -5.6
v �* 1 -3.61 rn J -5.4
o r M 3.8 1 4. 1 N -4.4 -4.8 -4.8 -4.3 -4 5 \
\ 1 1 co- 4.01-4 4.1 0 v -5.4
I I r r^ WOOD -4.7 -4.9 -4.2 - 4
0 RAMP 1 M
LIMIT OF FEMA I 0 \
FLOOD M I -�•� M 6n -4.1
ZONE A-4 I o A \ N M
I
ao
(ECFV. 11 r. O < ` - -4.3 - .
`r 4. �4t8
N.G.V.D.) 1 - _
_ 1 V
in m ARF./ - _.
I � � r�_ i � " ;n .M � N-�4 Iv I 1 4.9
_6
c: r TO BASE OF WALL \ � 4 c° I -4.8 v -- - - -
�\ ( M.H.W.) v rn 4 rn - rn o? -a,e ---4,i
x ' 1 n II n PRESUMED 10'-12' o c v v v 3 v - 0 -
N75 I m p 7 rn N u ° f" v v - v o -5.3 v -4.5
c ➢ m BURIED STONE WALL ao 1 " I I u?1 Ln rn
-4.2 -4.7
MOl -�lo MOl c I v v v ' n v ' - 4.8
- - - - - - -_ << REGISTERED % / O� mol aMP oe N `* �•7 ' I N -5.2
_ _ LAND » / Q1 TOP OF WALLv I
� (� << UNREGISTERED LAND » I. M 2't N00p co
o ` �,{I v t-4.* u ri �I M ui v 5.0 I -4 2 4 1�
1 1 w �/7inl7l/ x 1 ^^u M I u v -4.2
/
1330�'R o BLDG. I It -T4 ,n I v d
�_� I INSTALL EROSION 0`N r 7 0 _ UECK i 4.6 v ' 'n -�s
6�_ CONTROL WATTLE ?/ 7/Tj/T7 l co - 01 v rte, 1 -4.3 -4.7
-� _
N79330U"W -- TI ALONG LIMIT OF WORK 3 W&O�T�PSK- m rn N 4 r ri -so
cyi 1 N 4.7� �I a -�
�� , N .c} V7 N ' N V
S1EPS V w v a <* 1 �4. v ri 1� r j 00 00 oq 1, r o 0 5 ri u; u u u ri v
I I I v �1.4v `r' v v v ui ui ui ui
7835 o _2--s T-asy , m -4.6 cy 4.3 n N I rn 0 1 I 1 1 I I 1 1 1 1 1 I I I I
N2/Stir/. WOOD FR ME v I� v 1 50 -5.0
O N7 O / Q�yOpC\ /v - BUILDING Q 1 4 - .1 � s I 5.1 -5.2
1 939 Q PILE AREA p. �. .�vm• v N
t 4�IQ r �24 �C GY 3 �V FIEOLDKDETERMINED PEGS �� COATI �` E IS BOOM -4.6 v N u-i-5.2 04 N CN r) n n K
v� 22 / p \ SP\� / OD RAMP s V ITH I CURTAIN g `j 4.2 �-_ uj N -5.3
_ J n �[j u_ M
Z 6, eD d T-T�- �n ,n u'i u'i u) ,n �n 1 - I I I v v 'n ,n
GARAGE a u� 5CP u, �, �,
u� �rS 'n ,n ,n co ro ao
\ •6, INSTALL WATTLE AROUND STOCK I
E DETAIL 1-4 a I I 1
h i � `� PILE AREA AS REQUIRED 4.2 ' I I 1 I
rW
WOOD OUTWARD✓ U D�wARD �� O Q P,. S \ ' - .2 vI N I -� _\ -5.1 1
�_
BUILDING //�G v
�` �, �� -3. r7
w l- 8710 E J Jv� S`� SEAWALL Ln
�M y/ l Ln
ui r Ln ri ri j
�3 ' WA 45't 1
N N
S r7
) ,V 19 76"16"W UM R N
OC)^ x QNI i P I - SEAWALL rj r �� �: 4 UQ
m r�
STAT/ ---- 1 j --ri t v a
01 ��M01 ON / RECONSTRUCTION-_-_
C - --�
RIGHT OF Mol -Moi
1 1 I I
I
WAY 3 - -- - - ---___ -�_-
- - -
- 9100' ° � _ -- -- 7_�-STINGTIMBER PIER -
o =z =�_ o o� a o 0 0 0 0 0 <o 0 0 0 L. 0.0 0 0 N r, N
o r - o 0 0 0 11 0 0 0 0 0 0 - y N
b0 v b a J7 qti" `� - -z 0. 1 1 -
- 5'l I I I 1
----- - z o a 3 8. o o ' I o
h ro
I _._ _ . 7 �
V "� 122 t 0.3 _ -
N
O � '
Lf) n
I O I'
2 \ - I'-qN LGW
- - - - _ BUIOOD G ` .0.0• '� ✓4 rE L ,1 i c i '� 0 0 0 0 �00
. • .R s .1 i 85) LJ. 1 1 0 0
----ss- -_- ss TURNER STR; ET --o __ 3 I ^ T ' N1PtE -0.3 Mew. 0.2
- - - � LL11g"85) -0.3 0.3
(PUBLIC-VARIABLE NgDTH) ss,_ -C -�� I' ( 0.0
5.82' s f, -0.1
_ lV2022 53"'W
W -0.3 -0.3
Lo 0 q o. ' -0.1
-0.7
y?y rl O O O p 0 O. : 0 O ON ON 0 0 O 20 p N N N -0.7
y� -0.8
I I ' -'0.21 I I I O1 1 p o
0
i I `f v
0 0 0 0 0 0 0 0 0 0 o O `c r
1 -0.2 1 0 o 0. v 0. v u1 � 0 q 0 o 0 0 � o � � � w
HTL -0.3 -b.6 I j C j
-- - -0.7
o -0.2
-0.7
C6
TIDE RANGE I I I III _
0.7
V, VARIES -0 2
w I I 4" TO 6"0 ROUND FLOAT I PILE TYPE & LOCATION -0.3 -0.8
DETERMINED BY CONTRACTOR -0.3
0
MLW WATER LEVEL (VARIES) -0.8
~ VINYL COATED NYLON -0'3 -0.8
i OR POLYESTER FLOAT
M M N N N N
Ir GROMMETS CONTAINER TIE STRAP o 0 0 -0i2 0 0 0 0l 0 1 0 0 0 0 0 0 o v -0.7
POLYPROPYLENE ° '^ -0.7
SILT CONTAINMENT BARRIER CURTAIN TIE EXISTING CONDITIONS
ii WOVEN POLYPROPYLENE
OR EQUAL
L Y4" CHAIN BALLAST AND EXTEND BARRIER LEGEND EROSION CONTROL
0 1"X1" STAKE TO MUDLINE
0 WEIGHTED AS NECESSARY _
I - LOW LOW- LLIIMITIER OF WORK BREWER
DEBRIS BOOM BREWER HAWTHORNE COVE MARINA
8"-10"0 'WATTLE SEWN FABRIC
= CUT TO FIT MUDLINE
Li
- EC EC EROSION CONTROL SALEM , MA
Li \\///\/\\/ \\
AUGUST 2014
m \��\� j/\\��\\�� ELEVATION MUDLINE (VARIES) SECTION � � d�
m \. �i..I, I
NOTE: PILE DEPTH TO BE 9gt1iWE �, DATUM: Mean Low Water MLWCD
INSTALL EROSION CONTROL AROUND STOCK PILE AND DETERMINED BY 100 YR FLOOD +16.2 ��� BOIIl7l@ COIISUItIlI FII' t'ell�
AT TOP OF SLOPE IMMEDIATELY AFTER EXCAVA110N. CONTRACTOR �,
�'�1 c � HTL +11.0 s amt Servet
"o ea��` MHW +8.9
EROSION CONTROL DETAIL M wD 040.4 ( ) - rez ( ) -
A SILT BARRIER CURTAIN DETAIL `"` "6 �, v � DRAWN-
SILT
DRAWING N0. 34016-01 -01
1 I I CHECKED:
O z
SCALE: 1/2" = 1'-0" ' 1 1 0 20 40
SCALE: 1/4"=1'-0" FOR PERMIT USE ONLY APPROVED:
Ll SCALE: 1 "=20'-0" DATE: O8, 14/14 SHEET I O F 3
REVISIONS