64-603 - 120 SWAMPSCOTT ROAD - CONSERVATION COMMISSION �k-6o3 \ -- \ - , i ' ON 0, CITY OF SALEM s , 9 CONSERVATION COMMISSION July 15, 2016 William J. Manuell Wetlands & Land Management, Inc. 100 Conifer Hill Drive - #516 Danvers, MA 01923 Re: Certificate of Compliance DEP #64-603— 120 Swampscott Rd. headwall Dear Mr. Manuell: Enclosed, please find the Certificate of Compliance for the above referenced property. This Document must be recorded at the South Essex County Registry of Deeds. Please fill out and return the Recording Information on page 3 of the Certificate of Compliance, which will indicate to the Salem Conservation Commission that the document has been recorded. If you have any further questions please feel free to contact me at 978-619-5685. Sincerely, T wine-/ Conservation Agent Enclosures CC: DEP Northeast Regional Office Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 64-603 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information Important: When filling out 1. This Certificate of Compliance is issued to: forms on the computer, use Angelo & Carmine Mongiello only the tab key Name to move your 120 Swampscott Road cursor-do not use the return Mailing Address key. Salem MA 01970 City/Town State Zip Code d 2. This Certificate of Compliance is issued for work.regulated by a final Order of Conditions issued to: Angelo & Carmine Mongiello Name 10/16/2015 64-603 Dated DEP File Number 3. The project site is located at: 120 Swampscott Road Salem Street Address - City/Town 6 14 Assessors Map/Plat Number Parcel/Lot Number the final Order of Condition was recorded at the Registry of Deeds for: Angelo & Carmine Mongiello Property Owner(if different) Essex South 34495 356 County Book Page Certificate 4. A site inspection was made in the presence of the applicant, or the applicant's agent, on: 7/11/2016 Date wpafrmBb.doc•rev.5M/14 WPA Form ea,Certificate of Compliance•Page 1 of 3 l j•� Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 1\ 64-603 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Certification Check all that apply: 7K Complete Certification: It is hereby certified that the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the above-referenced Order of Conditions have been satisfactorily completed. The project areas or work subject to this partial certification that have been completed and are released from this Order are: ❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no longer valid. No future work subject to regulation under the Wetlands Protection Act may commence without filing a new Notice of Intent and receiving a new Order of Conditions. ❑ Ongoing Conditions: The following conditions of the Order shall continue: (Include any conditions contained in the Final Order, such as maintenance or monitoring, that should continue for a longer period). Condition Numbers: C. Authorization Issued lby Sq 10✓—I (.T /6 Conservation Commission Jxafte of I suance This Certificate must be signed by a majority of the Conservation Commission and a copy sent to the applicant and appropriate DEP Regional Offic See '_--1 htth rmass. ov/eea/a encies/massde /at . Signatl s: wFafrmftdoc•rev.5/29114 WPA Form 83,Certificate of Compliance•Page 2 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 64-603 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP D. Recording Confirmation The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court for the district in which the land is located. Detach on dotted line and submit to the Conservation Commission. To: - - - - ----------------------- Conservation Commission Please be advised that the Certificate of Compliance for the project at: Project Location DEP File Number Has been recorded at the Registry of Deeds of: County for: Property Owner and has been noted in the chain of title of the affected property on: Date Book Page If recorded land, the instrument number which identifies this transaction is: If registered land, the document number which identifies this transaction is: Document Number Signature of Applicant wpafrm8b.doc•rev.5/29/14 WPA Form 8B,Certificate of Compliance•Page 3 of 3 i Wetlands & Land Management, Inc. 100 Confer Hill Drive-#516 Danvers,MA 01923 978-777-0004 Telephone 978-539-0005 FAX June 9,2016 .— Tom Devine R E C E$N r Conservation Agent JUN 1 a 2016 Department of Planning and Community Development 120 Washington Street - DEPT. OF PLANNING Salem, MA 01970 COMMUNITY DEVELOPMEiv RE: Request for Certificate of Compliance- Repair of a masonry culvert headwall at 120 Swampscott Road in Salem. DEP File#64-603 Dear Mr. Devine and Conservation Commission Members: The Commission approved an order of conditions to repair a headwall at the completed property project at 120 Swampscott Road in Salem. All construction work is completed at this time. The applicant is now seeking a certificate of compliance in order to close out this project. The approved work involved repairing the headwall constructed over a seasonal stream on the northerly side of this. The headwall around the downstream end of this culvert was deteriorated where stones had fallen out of the structured wall and some larger pieces of granite or fieldstone had shifted out of a plumb orientation. The fence surrounding this stream and culvert had been damaged from winter plowing as well. The headwall is now repaired and a new fence is installed. I find the work is completed in substantial compliance with the approved plans and order of conditions. On behalf of the applicant,we respectfully request a certificate of compliance for DEP 64-603. Sincerely, Wetlands &Land Management, Inc. LA)(J)— c� William J. Manuell Wetland Scientist WTIref �tyMS!" t r�_ � t t t r `td J �)) � `'3f lett. f Y • �JV 49 r .j B i�& xt :� +£ ��� ]f 'Ir ,) Y'a ! ' f-.X i� � � �4 Vic• f17 N � • � � fid.: 3. y MA Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands WPA Form 8A — Request for Certificate of Compliance Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. Project Information Important: When filling out 1. This request is being made by: forms on the Wetlands and Land Management Inc. computer, use Name only the tab key to move 100 Conifer Hill Drive Suite#516 your cursor- Mailing Address do not use the Danvers MA 01923 return key. City/Town State Zip Code 77-0004 VQ Phone Number �' Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: �dHa Angelo&Carmine Mongiello Applicant 10-16-15 64-603 Dated DEP File Number Upon completion of the work 3. The project site is located at: authorized in 120 Swampscott Road Salem an Order of Street Address Cityrrown Conditions,the 6 14 property owner must request a Assessors Map/Plat Number Parcel/Lot Number Certificate of Compliance 4. The final Order of Conditions was recorded at the Registry of Deeds for: from the issuing SAME authority stating Property Owner(if different) that the work or portionthe County work hass Essex South 34495 356 been nook Page satisfactorily completed. Certificate(if registered land) 5. This request is for certification that(check one): ® the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above-referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. WPA Form 8A Page I of 2 Rev.02/00 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form BA — Request for Certificate of Compliance Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an DOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see Appendix A). WPA Form 8A Page 2 0 2 Rev.02/00 �° IIININIIIIININIIIIIIIIIIIIIIIIIIIII�INI RISE NO 8;34495 Pg;356 11/0312015 02:07 CONDN per 1112 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands 64-603 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem Citylrown A. General Information Please note: Salem this form has 1. From: been modified Conservation Commission with added 2.This issuance is for space to a.[]Order of Conditions b.❑ Amended Order of Conditions accommodate (check one): the Registry of Deeds 3.To: Applicant: Requirements Angelo& Carmine Mongiello a.First Name b.Last Name Important: When filling out forms on c.Organization the 55 Eastman Ave. computer, d.Mailing Address use only the tab key to Swampscott MA 01907 move your e.Citylrown f.State g.Zip Code cursor-do not use the 4. Property Owner(if different from applicant): return key. IAV a. First Name b.Last Name c.Organization coon d.Mailing Address e.City/rown I.State g.Zip Code 5. Project Location: 120 Swampscott Road Salem a.Street Address b.Citylrown 6 14 c.Assessors Map/Plat Number d.Parcel/Lot Number Latitude and Longitude, if known: d m s it m s d. Latitude e.Longitude wpaform5.duc• rev.6/162015 Page 1 of 12 j CITY OF SALEM CONSERVATION COMMISSION October 16 2015 Scott Patrowicz 14 Brown Street Salem,MA 01970 Re: Order of Conditions—DEP #64-603-120 Swampscott Road Dear Mr. Patrowicz: Enclosed, please find the Order of Conditions for the above referenced project. Following the 10-business-day appeal period, this document and the attached Special Conditions must be recorded at the Essex County Registry of Deeds (Shetland Park 45 Congress Street, Suite 4100 Salem, Massachusetts). Once recorded, please return a copy of Page 12 of the Order, which will indicate to the Commission that the document has been recorded. As indicated in the Order: 1. this Order must be recorded, 2. a sign shall be displayed showing DEP File#64-603 within public view, and 3. contact me at least 48 hours prior to any activity to schedule a pre-construction meeting to review the Order with your hired contractor. If you have any further questions,please feel free to contact me at 978-619-5685. Sincerely, o Devine Conservation Agent Enclosures CC: DEP Northeast Regional Office Bill Manuell Angelo and Carmine Mongiello Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-603 WPA Form 5 — Order of Conditions MassDEPFile# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town A. General Information Please note: Salem this form has 1. From: Conservation Commission been modified with added 2, This issuance is for space to a.[-]Order of Conditions b. ❑ Amended Order of Conditions accommodate (check one): the Registry of Deeds 3. To: Applicant: Requirements Angelo & Carmine Mongiello a. First Name b. Last Name Important: When filling out forms on c.Organization the 55 Eastman Ave. computer, d.Mailing Address use only the tab key to Swampscott MA 01907 move your e. City/Town f.State g.Zip Code cursor-do not use the 4, Property Owner(if different from applicant): return key. ree a. First Name to. Last Name c.Organization mun d.Mailing Address e.City/Town f.State g.Zip Code 5. Project Location: 120 Swampscott Road Salem a.Street Address b.City/Town 6 14 c.Assessors Map/Plat Number d.Parcel/Lot Number Latitude and Longitude, if known: d m s m s d. Latitude e.Longitt ude wpatorm5.doc• rev.611612015 Page 1 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-603 WPA Form 5 — Order of Conditions MassDEP File# 1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City(rown A. General Information (cont.) 6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel): South Essex a. County b.Certificate Number(if registered land) 11130 124 c.Book d. Page �. Dates: 9/22/2015 10/8/2015 10/16/2015 a. Date Notice of Intent Filed b. Date Public Hearing Closed c.Date of Issuance 8. Final Approved Plans and Other Documents (attach additional plan or document references as needed): See attached a. Plan Title b.Prepared By c.Signed and Stamped by d.Final Revision Date e. Scale f.Additional Plan or Document Title g. Date B. Findings t. Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act(the Act). Check all that apply: a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution d. ® Private Water Supply e. ® Fisheries f. ® Protection of Wildlife Habitat g.. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control 2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes) Approved subject to: a. ® the following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. w aform5.doc• rev.6/16/2615 Page 2 o112 Massachusetts Department of Environmental Protection Provided by MassDEP: \ Bureau of Resource Protection - Wetlands 64-603 / WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem Cityrrown B. Findings (cont.) Denied because: b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect the interests of the Act, and a final Order of Conditions is issued. A description of the performance standards which the proposed work cannot meet is attached to this Order. c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). _ 3. ® Buffer Zone Impacts: Shortest distance between limit of project disturbance and the wetland resource area specified in 310 CMR 10.02(1)(a) a.linear feet Inland Resource Area Impacts: Check all that apply below. (For Approvals Only) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 4. El Bank a. linear feet b. linear feet c. linear feet d.linear feet s. ❑ Bordering Vegetated Wetland a.square feet b.square feet c.square feet d.square feet 6. ❑ Land Under Waterbodies and a.square feet b.square feet c.square feet d.square feet Waterways e.Gy dredged f.Gy dredged 7. ❑ Bordering Land Subject to Flooding a.square feet b.square feet c.square feet d.square feet Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet a. ❑ Isolated Land Subject to Flooding a.square feet b.square feet Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet g. ❑ Riverfront Area a.total sq.feet b.total sq.feet Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet Sq ft between 100- 200 ft g.square feet h.square feet i.square feet j.square feet wpaform5 doc• rev.6/162015 Page 3 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-603 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town B. Findings (cont.) Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only) Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 1o. ❑ Designated Port Indicate size under Land Under the Ocean, below Areas 11. ❑ Land Under the Ocean a.square feet b.square feet c.Gy dredged d.Gy dredged 12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below cuyd 13. ❑ Coastal Beaches a.square feet b.square feet c.nourishment cu d.nourishment 14. ❑ Coastal Dunes cu yd cu yd a.square feet b.square feet c.nourishment d.nourishment 15. ❑ Coastal Banks a.linear feet b. linear feet 16. ❑ Rocky Intertidal Shores a.square feet b.square feet 17. E] Salt Marshes asquare feet b.square feet c.square feet d.square feet 18. ❑ Land Under Salt Ponds a.square feet b.square feet c.Gy dredged d.Gy dredged 19. ❑ Land Containing Shellfish a.square feet b.square feet c.square feet d.square feet 20. ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above a.c/y dredged b.cty dredged 21. ❑ Land Subject to Coastal Storm a.square feet b.square feet Flowage 22. ❑ Riverfront Area a.total sq.feet b.total sq.feet Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet Sq ft between 100- 200 ft g.square feet h.square feet i.square feet j.square feet wpaform5.doc• rev.6116/2015 Page 4 cf 12 Massachusetts Department of Environmental Protection Provided by MassDEP: \ Bureau of Resource Protection - Wetlands 64-603 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town B. Findings (cont.) #23. If the 23. ❑ Restoration/Enhancement*: project is for the purpose of restoring or enhancing a W a.square feet of BV b.square feet of salt marsh wetland 2a ❑ Stream Crossing(s): s resource area 9( ) in addition to the square footage that a. number of new stream crossings b.number of replacement stream crossings has been C. General Conditions Under Massachusetts Wetlands Protection Act entered in Section B.5.c (BVW)or The following conditions are only applicable to Approved projects. B.17.c(Salt Marsh)above, 1. Failure to comply with all conditions stated herein, and with all related statutes and other please enter regulatory measures, shall be deemed cause to revoke or modify this Order. the additional 9 rY fY amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. The work is a maintenance dredging project as provided for in the Act; or b. The time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. c. If the work is for a Test Project, this Order of Conditions shall be valid for no more than one year. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. An Order of Conditions for a Test Project may be extended for one additional year only upon written application by the applicant, subject to the provisions of 310 CMR 10.05(11)(f). 6. If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not extend the issuance date of the original Final Order of Conditions and the Order will expire on 10/16/2018 unless extended in writing by the Department. 7. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. wpaform5doc• ray.6116/2015 Peg.5 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-603 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City(rown C. General Conditions Under Massachusetts Wetlands Protection Act 8. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 9. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to the Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 10. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or, "MassDEP"] "File Number 64-603 " 11. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before MassDEP. 12. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A)to the Conservation Commission. 13. The work shall conform to the plans and special conditions referenced in this order. 14. Any change to the plans identified in Condition #13 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. wpaform5.doc• rev.6/16/2015 Page 6 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-603 WPA Form 5 — Order of Conditions MassDEP File# 1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem Cityfrown C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) 17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. 19. The work associated with this Order(the 'Project") (1) ❑ is subject to the Massachusetts Stormwater Standards (2) ® is NOT subject to the Massachusetts Stormwater Standards If the work is subject to the Stormwater Standards, then the project is subject to the following conditions: a) All work, including site preparation, land disturbance, construction and redevelopment, shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Construction General Permit as required by Stormwater Condition 8. Construction period erosion, sedimentation and pollution control measures and best management practices (BMPs)shall remain in place until the site is fully stabilized. b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/or treatment, the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures; ii. as-built final construction BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized; iii. any illicit discharges to the stormwater management system have been removed, as per the requirements of Stormwater Standard 10; wpaform5doc• rev.611 M015 Page 7 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands 64-603 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/rown C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) iv. all post-construction stormwater BMPs are installed in accordance with the plans (including all planting plans) approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetation associated with post-construction BMPs is suitably established to withstand erosion. c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible party (defined in General Condition 18(e)) shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement("O&M Statement) for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan ("O&M Plan") and certifying the following: i.) the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance, and ii.)the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. d) Post-construction pollution prevention and source control shall be implemented in accordance with the long-term pollution prevention plan section of the approved Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Multi-Sector General Permit. e) Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement, assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of the property must submit to the issuing authority a legally binding agreement of record, acceptable to the issuing authority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 18(f) through 18(k)with respect to that BMP. Any failure of the proposed responsible party to implement the requirements of Conditions 18(f) through 18(k) with respect to that BMP shall be a violation of the Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans, the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. wpaform5.doc• rev.6/16/2015 Page 8 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands 64-603 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem Cityrrown C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) g) The responsible party shall: 1. Maintain an operation and maintenance log for the last three (3) consecutive calendar years of inspections, repairs, maintenance and/or replacement of the stormwater management system or any part thereof, and disposal (for disposal the log shall indicate the type of material and the disposal location); 2. Make the maintenance log available to MassDEP and the Conservation Commission ("Commission") upon request; and 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. j) The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit(as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits) shall not be altered without the prior written approval of the issuing authority. I) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions (if you need more space for additional conditions, please attach a text document): NA 20. For Test Projects subject to 310 CMR 10.05(l 1), the applicant shall also implement the monitoring plan and the restoration plan submitted with the Notice of Intent. If the conservation commission or Department determines that the Test Project threatens the public health, safety or the environment, the applicant shall implement the removal plan submitted with the Notice of Intent or modify the project as directed by the conservation commission or the Department. i wpaform5 doc• rev.6/16/2015 Page 9 0/12 I� Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-603 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP-Transaction# Salem Citylrown D. Findings Under Municipal Wetlands Bylaw or Ordinance 1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No 2. The Salem hereby finds (check one that applies): Conservation Commission a. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw, specifically: 1. Municipal Ordinance or Bylaw 2.Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. b. ® that the following additional conditions are necessary to comply with a municipal ordinance or bylaw: Wetlands Protection and Conservation Ordinance c. 50 1. Municipal Ordinance or Bylaw 2.Citation 3. The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows (if you need more space for additional conditions, attach a text document): Attached conditions are issued under the Wetlands Protection Act and are sufficient for compliance with the local ordinance wpaform5 doc• rev.61162015 Page 10 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: [L7, Bureau of Resource Protection - Wetlands �� �O MEDEP File WPA Form 5 — Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDE Transaction# City/Town E. Signatures Important:when This Order is valid for three years, unless otherwise specified as a special to I K�5 filling out forms condition pursuant to General Conditions#4,from the date of issuance. 1. ate of Issuance on the computer, use only the tab Please indicate the number of members who will sign this form. key to move your This Order must be signed by a majority of the Conservation Commission. 2.Number of Signers cursor-do not use the return The Order must be mailed by certified mail (return receipt requeste ) or ha d delivered to key the applicant.A copy must be mailed, hand delivered or filed electr,)nicalat th ame time with the ap opriate MassDEP Regional Office. / IL Signat e ❑ by hand delivery on by certified mail, return receipt ues 7t Zo Date Daat F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order.A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act (M.G.L. c. 131, §40), and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. wpa5sigs.doc• rev.021252010 Page�(rof 1(�, Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-603 WPA Form 5 — Order of Conditions NlassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town G. Recording Information Prior to commencement of work, this Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on this page shall be submitted to the Conservation Commission listed below. Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. To: Conservation Commission Please be advised that the Order of Conditions for the Project at: Project Location MassDEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant wpaform5.tloc• rev.6/16/2015 Page 12 of 12 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: Request for Departmental Action Fee Transmittal Form Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. Request Information 1. Location of Project a. Street Address b.City/Town,Zip c.Check number d.Fee amount Important: When filling 2 Person or party making request(if appropriate, name the citizen group's representative): out forms on the computer, Name use only the tab key to Mailing Address move your cursor-do City/Town State Zip Code not use the return key. Phone Number Fax Number(if applicable) 3. Applicant(as shown on Determination of Applicability(Form 2), Order of Resource Area Delineation (Form 4B), Order of Conditions (Form 5), Restoration Order of Conditions (Form 5A), or Notice of Non-Significance (Form 6)): Name Mailing Address City/rown State Zip Code Phone Number Fax Number(if applicable) 4. DEP File Number: B. Instructions 1. When the Departmental action request is for(check one): ❑ Superseding Order of Conditions—Fee: $120.00(single family house projects)or$245(all other projects) ❑ Superseding Determination of Applicability— Fee: $120 ❑ Superseding Order of Resource Area Delineation—Fee: $120 wpaform5.tloc- rev.4122/2015 Page 7 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: Request for Departmental Action Fee Transmittal Form Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Instructions (cont.) Send this form and check or money order, payable to the Commonwealth of Massachusetts, to: Department of Environmental Protection Box 4062 Boston, MA 02211 2. On a separate sheet attached to this form, state clearly and concisely the objections to the Determination or Order which is being appealed. To the extent that the Determination or Order is based on a municipal bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. 3. Send a copy of this form and a copy of the check or money order with the Request for a Superseding Determination or Order by certified mail or hand delivery to the appropriate DEP Regional Office (see htto://www.mass.gov/eea/agencies/massdep/about/contacts/). 4. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. wpaform5 doe• rev.4/2 212 01 5 Page 2 of 2 ti g a, Attachment to Order of Conditions # 64-603 I � Page 1 of 5 SALEM CONSERVATION COMMISSION ATTACHMENT TO ORDER OF CONDITIONS DEP FILE #64-603 120 SWAMPSCOTT ROAD City of Salem, Massachusetts ADDITIONAL FINDINGS Based on the Estimated Habitats of Rare Wildlife and Certified Vernal Pools Map(online, 10/1/2015)from Natural Heritage & Endangered Species Program (NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contain any vernal pools. This Order permits the repair of an existing culvert headwall at the above-referenced location per 9/20/2015 Notice of Intent,approved plan(s),and the following conditions. This Order does not grant the applicants any right to complete work on property for which they lack ownership or lack other appropriate legal permission to enter to complete work. GENERAL CONDITIONS 1. This Order of Conditions must be recorded in its entirety(including all 5 pages of Special Conditions) at the Essex County Registry of Deeds or the Land Court for the district in which the land is located, after the expiration of the 10-day appeal period and within 30 days of the issuance. A copy of the recording information must be submitted to the Salem Conservation Commission before any work approved in this Order commences. 2. Approval of this application does not constitute compliance with any law or regulation other than M.G.L Chapter 131, Section 40, Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands Protection Ordinance, Salem Code Chapter 50. . 3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No alteration of wetland resource areas or associated buffer zones, other than that approved in this Order, shall occur on this property without prior approval from the Commission. 4. Prior to any work commencing on site, a DEP Sign showing DEP File#64-603 must be installed at the entrance to the site and seen from.the public way,but not placed on a living tree. 5. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the date of the issuance of this Order. 6. With respect to this Order,the Commission designates the Conservation Agent as its agent with powers to act on its behalf in administering and enforcing this Order. 7. The Commission or its Agent,officers,or employees shall have the right to enter and inspect the property at any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131, Attachment to Order of Conditions # 64603 Page 2 of 5 Section 40,the Wetlands Regulations 310 CMR 10.00,and shall have the right to require any data or documentation that it deems necessary for that evaluation. 8. The term "Applicant"as used in this Order of Conditions shall refer to the owner, any successor in interest or successor in control of the property referenced in the Notice of intent, supporting documents and this Order of Conditions. The Commission shall be notified in writing within 30 days of all transfers of title of any portion of the property that takes place prior to issuance of the Certificate of Compliance. 9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and approvals associated with this project. These permits may include but are not necessarily limited to the following: (1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816),U.S. Army Corps of Engineers. (2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of sec.27(5)of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00. (3) Design Requirements for Construction in Floodplains under the State Building Code(780 CMR 744.). 10. If there are conflicting conditions within this Order,the stricter condition(s)shall rule. 11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters during construction or after completion of the project. 12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods and boundary during construction if necessary. 13. The Commission reserves the right to impose additional conditions on portions of this project or this site to mitigate any actual or potential impacts resulting from the work herein permitted. 14. The work shall conform to the following attached plans and special conditions: Final Approved Plans Site Plan to Accompany a Conservation Commission Notice of Intent Application to Repair an Existing Headwall (45+/-LF) for Property Located at: #120 Swampscott Road, Salem, MA (Title) 9/18/2015 (Dated) Scott Ian Patrowicz (Signed and Stamped by) City of Salem Conservation Commission (On file with) 15. Any proposed changes in the approved plan(s) or any deviation in construction from the approved plan(s) shall require the applicant to file a Notice of Project Change with the Commission. The Notice shall be accompanied by a written inquiry prior to their implementation in the field, as to whether the change(s) is substantial enough to require filing a new Notice of Intent or a request to correct or amend this Order of Conditions. A copy of such request shall at the same time be sent to the Department of Environmental Protection. Attachment to Order of Conditions # 64-603 Page 3 of 5 16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has been issued,the applicant or current landowner shall submit to the Commission a statement signed by the buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of the Order of Conditions. 17. [Reserved]. PRIOR TO CONSTRUCTION 18. Prior to the commencement of any activity on this site other than activities listed above, there must be a Pre-Construction Meeting on site between the project supervisor,the contractor responsible for the work, and the Conservation Agent and/or a member of the Conservation Commission to ensure that the requirements of the Order of Conditions are understood. The staked erosion control line shall be adjusted, if necessary,during the pre-construction meeting. Please contact the Conservation Agent at (978)619-5685 at least forty-eight(48) hours prior to construction to arrange for the Pre- Construction Meeting. 19. Prior to the pre-construction meeting and commencement of any activity on this site, sedimentation and erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The Commission and/or its Agent shall inspect and approve such installation at the pre-construction meeting. 20. No clearing of vegetation, including trees,or disturbance of soil shall occur prior to the pre-construction meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre- construction meeting if absolutely necessary in order to place erosion control stakes where required. 21. There shall be adequate additional erosion and sediment controls stored onsite for emergency purposes. EROSION CONTROL 22. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction, and shall be maintained during construction in any wetland resource area and/or buffer zones. The erosion control measures shown on the approval plan(s)and provisions in the Order will be the minimum standards for this project; the Commission or its Agent may require additional measures. 23. All debris,fill and excavated material shall be stockpiled a location far enough away from the wetland resource areas to prevent sediment from entering wetland resource areas. 24. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 25. The area of construction shall remain in a stable condition at the close of each construction day. 26. Any de-watering of trenches or other excavation required during construction shall be conducted so as to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered through straw bale sediment traps, silt filter bags or other means approved by the Commission or its Administrator. 27. Within thirty(30)days of completion of construction on any given portion of the project,all disturbed areas in the completed portion of the site shall be permanently stabilized with rapidly growing vegetative cover, using sufficient top soil to assure long-term stabilization of disturbed areas. Attachment to Order of Conditions # 64-603 r'Lrf Page 4 of 5 28. If soils are to be disturbed for longer than two(2)months, a temporary cover of rye or other grass should be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth, exposed surface shall be stabilized by other appropriate erosion control measures,firmly anchored,to prevent soils from being washed by rain or flooding. DURING CONSTRUCTION 29. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all times when work is in progress. 30. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on the approved plan(s). 31. All waste products,grubbed stumps, slash;construction materials, etc. shall be deposited at least 100 feet from wetland resource areas and 200 feet from river. 32. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be immediately removed. 33. All exposed sub-soils shall be covered by a minimum of three(3)inches of quality screened loam topsoil prior to seeding and final stabilization. 34. Immediately following drainage structure installation all inlets shall be protected by silt fence,strawbale barriers and/or silt bags to filter silt from stormwater before it enters the drainage system. 35. There shall be no pumping of water from wetland resource areas. 36. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other components shall be fixed immediately. 37. During construction,all drainage structures shall be inspected regularly and cleaned as necessary. 38. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance of enforcement actions by the Conservation Commission including,but not limited to,civil administrative penalties under M.G.L Chapter 21A, section 16. AFTER CONSTRUCTION 39. Upon completion of construction and final soil stabilization, the applicant shall submit the following to the Conservation Commission to request a Certificate of Compliance (COC): (1) A Completed Request for a Certificate of Compliance form (WPA Form 8A or other form if required by the Conservation Commission at the time of request). (2) A letter from a Registered Professional Engineer certifying compliance of the property with this Order of Conditions. (3) An"As-Built"plan signed and stamped by a Registered Professional Engineer or Land Surveyor showing post-construction conditions within all areas under the jurisdiction of the Massachusetts Wetlands Protection Act. This plan shall include at a minimum: (a) All wetland resource area boundaries with associated buffer zones and regulatory setback areas taken from the plan(s)approved in this Order of Conditions; q" Attachment to Order of Conditions # 64603 t Page 5 of 5 (b) Locations and elevations of all stormwater management conveyances, structures and best management designs, including foundation drains,constructed under this Order within any wetland resource area or buffer zone; (c) Distances from any structures constructed under this Order to wetland resource areas- "structures"include,but are not limited to,all buildings, septic system components,wells, utility lines,fences,retaining walls,and roads/driveways; (d) A line delineatingthe limit of work-"work"includes an filling,excavating and/or Y g> g disturbance of soils or vegetation approved g under this Order; 40. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds and a copy of the recording submitted to the Salem Conservation Commission. 41. If the completed work differs from that in the original plans and conditions, the report must specify how the work differs; at which time the applicant shall first request a modification to the Order. Only upon review and approval by the Commission,may the applicant request in writing a Certificate of Compliance as described above. 42. Erosion control devices shall remain in place and properly functioning until all exposed soils have been stabilized with final vegetative cover and the Conservation Commission and/or its Agent has authorized their removal. ADDITIONAL CONDITIONS 43. To reduce the chance of introducing invasive species to the project site, straw bales, rather than hay bales, shall be used. 44. Crushed stone utilized in the approved work shall be no smaller than 1.5"diameter. 45. To the maximum extent practicable,filter fabric shall be installed behind the repaired wall. PERPETUAL CONDITIONS 46. [Reserved) v�CONA.,g�i CITY OF SALEM � g CONSERVATION COMMISSION • k� SITCE VISIT FOR PROJECT LOCATION: ATE OF SITE VISIT• PROJECT PROPONENT: DEP FILE NUMBER: PROPOSED WORK: INATTEfVUANCE � ._, ::: Commission Members/Agent: Abutters: • Applicant/Property Owner/Representative: 9 �7 4S� 1 ;SITE VISIT;PURPOSE x =2f ., .. SITE VISIT�DOCUMENTATEl ION`, ,�:;, ,,,,, tel, v �v; u eg Photos ❑ Site Map 0 Other: ¢n,aun't ..L.4P>P3'�- 4'12'1 yOBSERYATIONS 9 »y»» �,..,r�aNas�;raL. .,,. -, ..! Mv�,. ..`u ate.:... ,ate.n».,,�., -.va�a 'r_ Take into account relevant aspects or features such as: natural or piped drainage or obvious pollution; topography; existing vegetation; possible alternative sites; signs of wildlife, possible vernal pools, rare species habitat; landmarks; recent or historical disturbances; proximity to other water bodies or drainage areas; adjacent land uses. C� _ .. . _RECOMMENDATIONS , !2 P gr ! set 'd INOI Status Sheet Address: la° S� ^"C'��' "�/ DEP #: G y . GGA Application Type: Date Submitted: q/, Yl C- Contact Name: a � �� ( I Phone: v-A� 97-7 "-°K Proposed activity: l " Ar-15-(r Application Complete do ,Correct Fee Received ,Abutters List Requested Received lLegal Ad Sent - Laal Ad Confirmed Online Added to Agenda Agenda to Applicant ,,Agent Comments to Commission DEP Comments Hearing Opened: ell�<p Continued Site Visit:Abutters Notice Confirmed Permit Sent to Applicant and DEP Confirmation of Delivery Expiration date added to calendar Added to database /Applicant Recorded OoC with Registry Preconstruction Meeting: certificate of Compliance Sent to Applicant and DEP Confirmation of Delivery Applicant Recorded CoC with Registry Notes: H1CON COMMWdministrativ6project status sheet\NOI status sheet 2012-12-27.doc vt� AND IA�.. CITY OF SALEM CONSERVATION COMMISSION SITE VISIT11/n� ORM PROJECT LOCATION: S ' V` DATE OF SITE VISITI d v PROJECT PROPONENT: DEP FILE NUMBER: r PROPOSED WORK: C-t-l Gj— V�c�✓ IN ATTENDANCE:. Commission Members/Agent: Abutters: Applicant/Property Owner/Representative: C-e-"L" .(� I�CoU/�Coti • SITE VISIT.PURPOSE:_ _rte— Cyv, t SITE VISIT DOCUMENTATION: ❑Photos ❑ Site Map ❑Other: OBSERVATIONS: Take into account relevant aspects or features such as: natural or piped drainage or obvious pollution; topography; existing vegetation; possible alternative sites; signs of wildlife, possible vernal pools, rare species habitat; landmarks; recent or historical disturbances; proximity to other water bodies or drainage areas; adjace t land uses. (7 RECOMMENDATIONS: • Notice of Intent Application Wetlands Protection Act and Salem Wetlands By-law 120 Swampscott Road Salem, MA September 2015 o N Ui N IL N Wetlands & Land Management, Inc. 1100 Conifer Hill Drive-Suite 516 cc Danvers, MA 01923 Wetlands & Land Management, Inc. IOU Cunife"Hill Dike -#i Ifi Dancers. NIA 01923 5178-777-100+Tdephu ie September 20, 2015 978-539-0005 FAX Tom Devine Salem Conservation Commission 120 Washington Street Salem, MA 01970 RE: Notice of Intent to repair a culvert headwall. 120 Swampscott Road, Salem Dear Mr. Devine and Conservation Commission Members: On behalf of the applicant, Wetlands&Land Management Inc. is submitting this Notice of Intent to repair an existing culvert headwall that has fallen into disrepair A seasonal stream on the northerly side of this property enters and exits a culvert under a driveway entrance at the northwest corner of the lot. There is a masonry headwall around the down stream end of this culvert. This headwall has deteriorated where certain stones have fallen out of the wall and some larger pieces of granite or fieldstone have shifted out of a plumb orientation. A fence has been damaged by winter plowing as well. The Commission may remember this site as you had previously issued an order of conditions to do a much more extensive repair of this same headwall. Unfortunately, that order of conditions has expired. The property is for sale and the owners do not want to undertake an extensive repair of the headwall at this time. Instead, they propose a`low-tech approach" where they would simply recover and re-mortar the fallen stones back into the headwall. Other stones would be re-positioned back to plumb and vertical. The owners envision performing this work by hand or perhaps using a back hoe to help nudge some of the larger stones back into place. Would you please schedule this matter for your earliest available meeting? Sincerely, Wetlands&Land Management, Inc. waw-� 1<n </ William J. Manuell Wetland Scientist For the Applicant `�`�'�'�—�`�'�:r,�����ays 3 `k Q�5'\�7F' a ter t°��������^��i�"��� '�C�•' SIMON Err a. RI s cp �' F'-v'S� Y 9✓3 v ,f�y�"� � �y dl�� fAAb , tii >'- s;.s .� o� s i gqyy��tr i �3st ✓p'_ r��,�v ow 111 ' 111 / r 80 40 0 80 160 240 / =i35Aate s r A�A / Bogle in Feet 160 70r I��l 11 I v / II( Isz 73+a/ til Oar �J�I�I it �i "o. I 10 ^ t _ r fig \\�IIII I I f illi( _ b Notice of Intent Application (WPA Foran 3) ElMassachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands WPA Form 3 — Notice of Intent MassDEP File Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number Salem Wetlands By-lawimportSalem City/Town When henfian`'lling out A. General Information W forms on the computer,use only the tab key 1. Project Location (Note: electronic filers will click on button to locate project site): to move your 120 Swampscott Road Salem cursor-do not 01970 use the return a.Street Address b.City/Town c.Zip Code key. Latitude and Longitude: 42.4918 __ -70.9206 _ d. Latitude e. Longitude m 6 14 f.Assessors Map/Plat Number g.Parcel/Lot Number 2. Applicant: Angelo &Carmine Mongiello _ a.First Name b. Last Name - Note: Before c.Organization — --------- completing this form consult 55 Eastman Avenue form yourlocal d.Street Address --- -- Conservation Swampscott Commission MA 01907 e.City/Town f.State regarding any g.Zip Code municipal bylaw 781-389-3802 or ordinance. h.Phone Number i.Fax Number j.Email Address - 3. Property owner(required if different from applicant): ❑ Check if more than one owner SAME a.First Name b. Last Name - c.Organization d.Street Address e.City/Town f.State g.Zip Code h. Phone Number i.Fax Number 1.Email address ---- 4. Representative (if any): William Manuell a.First Name - ------ b.LastName — Wetlands& Land Management, Inc. c.Company 100 Conifer Hill Drive#516 d.street Address ------------------- Danvers MA 01923 e.City/Town L State ----------- g.Zip Code-_-- 978-777-0004 978-539-0005 bill@wetlandslm.com_ h.Phone Number i.Fax Number 1. Email address _ - 5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form): $110.00 $42.50 _ $67.50 a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands WPA Form 3 — Notice of Intent MassDEP Pile Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number Salem Wetlands By-law Salem City/Town A. General Information (continued) 6. General Project Description: Repair an existino culvert headwall 7a. Project Type Checklist: (Limited Project Types see Section A. 7b.) 1. ❑ Single Family Home 2. ❑ Residential Subdivision 3. ❑ Commercial/Industrial 4. ❑ Dock/Pier 5. ❑ Utilities 6. ❑ Coastal engineering Structure 7. ❑ Agriculture (e.g., cranberries, forestry) 8. ❑ Transportation 9. 0 Other 7b. Is any portion of the proposed activity eligible to be treated as a limited project(including Ecological Restoration Limited Project) subject to 310 CMR 10.24 (coastal) or 310 CMR 10.53 (inland)? t. ❑ Yes 0 No If yes, describe which limited project applies to this project. (See 310 CMR 10.24 and 10.53 for a complete list and description of limited project types) 2. Limtted ----- If the proposed activity is eligible to be treated as an Ecological Restoration Limited Project (310 CMR10.24(8), 310 CMR 10.53(4)), complete and attach Appendix A: Ecological Restoration Limited Project Checklist and Signed Certification. 8. Property recorded at the Registry of Deeds for: Essex South a.County b.Certificate#(if registered land) 11130 124 c.Book d.Page Number B. Buffer Zone & Resource Area Impacts (temporary & permanent) 1. ® Buffer Zone Only—Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland, Inland Bank, or Coastal Resource Area. 2. ❑ Inland Resource Areas (see 310 CMR 10.54-10.58; if not applicable, go to Section B.3, Coastal Resource Areas). Check all that apply below. Attach narrative and any supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. ElMassachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands WPA Form 3 - Notice of Intent MassDEP File Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number salem Salem Wetlands By-law City- /Town-B. Buffer Zone & Resource Area impacts (temporary & permanent coned ) ( 1 Resource Area Size of Proposed Alteration Proposed Replacement(if any a. ❑ Bank _ For all projects 1.linear feet 2.linear feet affecting other b. ❑ Bordering Vegetated Resource Areas, Wetland 1.square feet 2.square feet please attach a narrative c. ❑ Land Under explaining how Waterbodies and 1.square feet 2.square feet the resource area was Waterways delineated. 3.cubic yards dredged Resource Area Size of Proposed Alteration Proposed Replacement(if any) d. ❑ Bordering Land Subject to Flooding 1.square feet 2 square feet 3.cubic feet of flood storage lost cubic feet replaced e. El Isolated Land 4. Subject to Flooding tsquare feet 2.cubic feet of flood storage lost 3.cubic feet replaced f. ❑ Riverfront Area 1.Name of Waterway(if available) -specify coastal or inland 2. Width of Riverfront Area (check one): ❑ 25 ft.- Designated Densely Developed Areas only ❑ 100 ft. - New agricultural projects only ❑ 200 ft. -All other projects 3. Total area of Riverfront Area on the site of the proposed project: square feet 4. Proposed alteration of the Riverfront Area: a.total square feet b.square feet within 100 ft. c.square feet between 100 ft.and 200 ft. 5. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes❑ No s. Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes❑ No 3. ❑ Coastal Resource Areas: (See 310 CMR 10.25-10.35) Note: for coastal riverfront areas, please complete Section B.2.f. above. Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands MassDEP File Number — WPA Form 3 - Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number em Salem Wetlands By-law salCity/Town y B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont'd) Check all that apply below. Attach narrative and supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online Users: " Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any) document transaction number a. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below (provided on your receipt page)with all b. El Land Under the Ocean 1.square feet supplementary information you 2.cubic yards dredged submit to the Department. a ❑ Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below d. ❑ Coastal Beaches 1,square feet 2.cubic yards beach nourishment e. ❑ Coastal Dunes 1.square feet q 2.cubic yards dune nourishment Size of Proposed Alteration Proposed Replacement(if any) f. ❑ Coastal Banks I.linear feet g. ❑ Rocky Intertidal Shores 1.square feet h. ❑ Salt Marshes 1.square feet 2,sq it restoration,rehab.,creation i. E] Land Under Salt Ponds I.square feet __ 2.cubic yards dredged I. ❑ Land Containing Shellfish 1.square feet k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above 1.cubic yards dredged I. ❑ Land Subject to _ Coastal Storm Flowage 1.square feet 4. ❑ Restoration/Enhancement If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional amount here. a.square feet of BM b.square feet of Salt Marsh 5. ❑ Project Involves Stream Crossings a.number of new stream crossings b.number of replacement stream crossings Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands _— � MassDEP File Number WPA Form 3 - Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number Salem Wetlands By-law Salem Y Citylrown C. Other Applicable Standards and Requirements ❑ This is a proposal for an Ecological Restoration Limited Project. Skip Section C and complete Appendix A: Ecological Restoration Notice of Intent— Required Actions (310 CMR 10.11). Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review 1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and Endangered Species Program (NHESP)? To view habitat maps, see the Massachusetts Natural Heritageor 9 Atlas o to htto://rnaps.massgis state ma us/PRI EST HAB/vievver.htm. a. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife 2008 1 Rabbit Hill Road b.Date of map Westborough, MA 01581 If yes,the project is also subject to Massachusetts Endangered 1 g Species Act (MESA) review (321 CMR 10.18). To qualify for a streamlined, 30-day, MESA/Wetlands Protection Act review, please complete Section C.1.c, and include requested materials with this Notice of Intent (NOI); OR complete Section C.11, if applicable. If MESA supplemental information is not included with the NOI, by completing Section 1 of this form, the NHESP will require a separate MESA filing which may take up to 90 days to review(unless noted exceptions in Section 2 apply, see below). c. Submit Supplemental Information for Endangered Species Review" 1. ❑ Percentage/acreage of property to be altered: (a)within wetland Resource Area --------_ percentage/acreage (b)outside Resource Area percentagetacreage 2. ❑ Assessor's Map or right-of-way plan of site 2. ❑ Project plans for entire project site, including wetland resource areas and areas outside of wetlands jurisdiction, showing existing and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work" (a)❑ Project description (including description of impacts outside of wetland resource area & bufferzone) (b) ❑ Photographs representative of the site Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review(see http://www mass.gov/eea/agencies/dfq/dfw/natLira1-heritage/ce.qLilatorV-i eviewi). Priority Habitat includes habitat for state-listed plants and strictly upland species not protected by the Wetlands Protection Act. '" MESA projects may not be segmented(321 CMR 10.16). The applicant must disclose full development plans even if such Plans are not required as part of the Notice of Intent process. Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands WPA Form 3 - Notice of Intent MassDEP File Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document—Transaction Number Salem Wetlands By-law Salem City/Town C. Other Applicable Standards and Requirements (contrd) (c)❑ MESA filing fee (fee information available at htt0//www mass qov/dfwele/dfw/nheso/regulatory review/mesa/mesa fee ,chedule.htm). Make check payable to "Commonwealth of Massachusetts- NHESP"and mail to NHESP at above address Projects altering 10 or more acres of land, also submit tdl ❑ Vegetation cover type map of site (e)❑ . Project plans showing Priority & Estimated Habitat boundaries (0 OR Check One of the Following I. ❑ Project is exempt from MESA review. j Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14, http://www.mass.gov/dfwele/dfw/nhesp/re ulatory review/mesa/mesa exernotions htm, the NO] must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.) 2. ❑ Separate MESA review ongoing. —._ a.NHESP Tracking# b. Date submitted to NHESP 3. ❑ Separate MESA review completed. Include copy of NHESP "no Take"determination or valid Conservation &Management Permit with approved plan. 3. For coastal projects only, is any portion of the proposed project located below the mean high water line or in a fish run? a. ❑ Not applicable—project is in inland resource area only b. ❑ Yes ® No If yes, include proof of mailing, hand delivery, or electronic delivery of NO[to either: South Shore-Cohasset to Rhode Island border, and North Shore-Hull to New Hampshire border: the Cape&Islands: Division of Marine Fisheries- Division of Marine Fisheries- Southeast Marine Fisheries Station North Shore Office Attn: Environmental Reviewer Attn: Environmental Reviewer 1213 Purchase Street—3rd Floor 30 Emerson Avenue New Bedford, MA 02740-6694 Gloucester, MA 01930 Email: DMF.EnvReview-Southostate.ma.LIS Email: DMF.EnvKe_vvievv NurtiTr�%siate.ma.us Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office. For coastal towns in the Southeast Region, please contact MassDEP's Southeast Regional Office. Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands / WPA Form 3 - Notice of Intent MassDEP File Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number salem Salem Wetlands By-law Y Cit (Town C. Other Applicable Standards and Requirements (conYd) 4. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? Online users: a. ❑ Yes M No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP Include your Website for ACEC locations). Note: electronic filers click on Website. document transaction b.ACEC ------- -- number (provided on 5. Is any portion of the proposed project within an area designated as an Outstanding Resource Water your receipt (ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00? page)with all Y supplementary a. ❑ Yes ® No information you submit to the 6. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Department. Restriction Act(M.G.L. c. 131, §40A) orthe Coastal Wetlands Restriction Act (M.G.L. c. 130, § a. ❑ Yes ® No 7. Is this project subject to provisions of the MassDEP Stormwater Management Standards? a. ❑ Yes.Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR 10.05(6)(k)-(q) and check if: 1.❑ Applying for Low Impact Development(LID) site design credits (as described in Stormwater Management Handbook Vol. 2, Chapter 3) 2.❑ A portion of the site constitutes redevelopment 3. ❑ Proprietary BMPs are included in the Stormwater Management System. b. ® No. Check why the project is exempt:- The project is a repair of an existing headwall. t.❑ Single-family house 2.❑ Emergency road repair 3.❑ Small Residential Subdivision (less than or equal to 4 single-family houses or less than or equal to 4 units in multi-family housing project)with no discharge to Critical Areas. D. Additional Information ❑ This is a proposal for an Ecological Restoration Limited Project. Skip Section D and complete Appendix A: Ecological Restoration Notice of Intent—Minimum Required Documents (310 CMR 10.12). Applicants must include the following with this Notice of Intent (NO[). See instructions for details. Online Users: Attach the document transaction number(provided on your receipt page) for any of the following information you submit to the Department. 1. 0 USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) 2. ® Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland [BVWj replication area or other mitigating measure) relative to the boundaries of each affected resource area. Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands WPA Form 3 — Notice of Intent MassDEP File Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem Document Transaction Number Salem Wetlands By-law Salem —D. Additional Information (cont'd) 3. ❑ Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology. 4. 0 List the titles and dates for all plans and other materials submitted with this NOI. Site Plan Showing Proposed Work a.Plan Title --- Patrowicz Land Development Engineering Scott Patrowicz _ b.Prepared By c.Signed and Stamped by 9-18-15 5 scale d.Final Revision Date e-Scale f.Additional Plan or Document Title - -g. Date s. ❑ If there is more than one property owner, please attach a list of these property owners not listed on this form. s. ❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. 7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. 8. 0 Attach NOI Wetland Fee Transmittal Form 9. ❑ Attach Stormwater Report, if needed. E. Fees - 1. ❑ Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form)to confirm fee payment: 999 9-21-15 2.Municipal Check Number 3.Check date - -- 998 9-21-15 - ------------------- 4.State Check Number 5.Check date — Carmine _ Mongiello 6.Payor name on check:First Name 7. Payor name on check Last Name ElMassachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands WPA Form 3 — Notice of Intent MassDEP File Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number Salem Wetlands By-law salem City/Town F. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, §40. Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested)to all abutters within 100 feet of the property line of the project location. 9-20-15 1.Signature o Applicant 2.Date 3.Signature of Property owner(if different) 4. Date I fry -A 9-20-15 5.Signature o Representative(if any) 6.Date For Conservation Commission: Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery. For MassDEP: One copy of the completed Notice of Intent(Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery. Other: If the applicant has checked the"yes" box in any part of Section C, Item 3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. Notice of Intent .Fee 'Transmittal Form (WPA Appendix B) Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Important: A. Applicant Information When filling out forms on the 1. Location of Project: computer,use only the tab key 120 Swampscott Road Salem to move your a.Street Address - _------ cursor-do not b.City/Town use the return 998 $42.50 key.�--� c.Check number d. Fee amount — v/fl.� II 2. Applicant Mailing Address: Angelo and Carmine Mt N to Las -- -.--- a.First Name b. Last Name fro c.Orgamzation --------------- 55 Eastman Avenue d.Mailing Address - ------- Swampscott -----Swampscott MA 01907 _ e.City/Town I.State g.Zip Code 781-389-3802 h. Phone Number I. Fax Number j. Email Address - 3. Property Owner (if different): SAME a.First Name b. Last Name c.Organization _------- d.Mailing Address - e.City/Town - f.State g.Zip Code h.Phone Number i.Fax Number j.Email Address - To calculate B. Fees _ filing fees,refer to the category fee list and Fee should be calculated using the following process&worksheet. Please see Instructions before examples in the filling out worksheet. instructions for Florm out 3(Notre of WPA Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and buffer zone. Intent). Step 2/Number of Activities: Identify the number of each type of activity. Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions. Step 4/Subtotal Activity Fee: Multiply the number of activities(identified in Step 2)times the fee per category (identified in Step 3)to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be multiplied by 1.5 and then added to the subtotal amount. Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4. Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract$12.50.To calculate the city/town share of the fee, divide the total fee in half and add$12.50. Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Fees (continued) --- Step Irrype of Activity Step 2/Number Step Step 4/Subtotal Activity of Activities 3/Individual Fee Activity Fee repair existing headwall one $110.00 $110.00 Step 6/Total Project Fee: Step 6/Fee Payments: Total Project Fee: $110.00 a.Total Fee from Step 5 State share of filing Fee: $42.50 b. 1/2 Total Fee less$12.50 City/Town share of filling Fee: $67.50 c. 1/2 Total Fee plus$12.5o C. Submittal Requirements a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to the Commonwealth of Massachusetts. Department of Environmental Protection Box 4062 Boston, MA 02211 b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent, a copy of this form, and the city/town fee payment. To MassDEP Regional Office(see Instructions): Send a copy of the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these electronically.) CARMINE MONGIELLO s7-7055/2113 9 9:8 ANGELO MONGIELLO 086600226, 55 EASTMAN AVE. i SWAMPSQOTT, MA 01907-1209 DA 1'21�L yPAY TO THE/p _ r ORDEROF l_.rn+L�.,�{J—_'16 42 L)'T /'"� ------ —DOLLARS � Ls Salemn � ,,M 210 Essex Streeq Salem,MA 01970 c mo ___ aff p O/ x: 2113705581: 086600226411° 0998 FTHE MINE MONGIELLO 3 i075i2i'3 999 CARMINE MONGIELLO '%6606226* 55 EASTMAN AVE. SCOTT, MA. 019074209 -SCI �4 i--�.'Y�2. .____ I �G1 ✓ J V /t1 ! DOLLARS Save,M 210 Essex Street,Salem,hlA 01970 4/ MEMO r F� 0: 2113705581: 086600226411° 0999 Abutter Information i CITY OF SALEM CONSERVATION COMMISSION NOTICE OF PUBLIC HEARING NOTIFICATION TO ABUTTERS Under the Massachusetts Wetlands Protection Act &the City of Salem Wetlands Protection Ordinance A Public Hearing will be held at the City Hall Annex 120 Washington Street, Salem, MA 01970 at: 6:30 pm on October 8, 2015 To consider a Notice of Intent Of Angelo and Carmine Mongiello For the property located at 120 Swampscott Road—Mao 6 Lot 14 The Notice of Intent is filed to repair an existing headwall on the northerly watercourse on the property. This is a joint hearing under the requirements of G.L. Ch 131 Section 40, as amended, and the Salem Wetlands Protection Ordinance and Regulations. Plans are available at the Department of Planning and Community Development at the City Hall Annex 120 Washington Street Salem, MA from 8 am- 4 pm Monday — Wednesday, 8 am -7 pm on Thursday, and 8 am- 12 pm on Friday. For information call the Conservation Agent at 978-619-5685. Note: Notice of the public hearing, including its date, time and place, will be published at least a week prior to the meeting date in The Salem News. Note: Notice of the public hearing, including its date,time, place, will be posted on the Public Meetings Bulletin Board in Salem City Hall not less than 48-hours in advance. Note: You also may contact the Salem Conservation Commission or the nearest: Department of Environmental Protection Regional Office for more information about this application or the Wetlands Protection Act. To contact DEP call: Central Region: (508) 792-7650 Northeast Region: (978) 694-3200 Southeast Region: (508) 946-2714 Western Region: (413) 78=-1100 CITY OF SALEM ASSESSOR'S CERTIFICATION OF ABUTTERS AND PROPERTY OWNERS BOARD/COMMISSION• Conservation Commission PROJECT SITE: 06-4)()14, �'-0 n�m�r,cuitkould DATE: 9/I G/I; DESCRIPTION OF REQUIREMENT: All abutters and an) property property owr ne within 100 feet of the property line of the land where the activity is proposed including if land is separated by a public or private street or a body of water and not unreasonably distant from the project site. This is to certify that the time of the last assessment for taxation made by the City of Salem, the names and addresses ol'those listed on the attached sbeets are 'abutter's and property owners"(as defined by Wetlands Protection Act 310 CMR 10.05(4)(a)) to the parcel(s)of land listed above as the project site. Assessor's Signature: ' - r Date: ! u� - -'�,c ; J Number of initialed pages attached: Once Certified, Return to: Tom Devine, Department of Planning and Community Development J � 4 P t 9 rt,P jg On LINE � �—_ rS� 4�POfl 6nnietl 4n G3/162G15 �1 i?:5S 661 Il — Use Avery"mplate 51600 ' Feed Pe er y sena amng rale'' l ® P expose Pop•Up Edgel", U 6c"L� Y1'��5960'a' i d Parcel ID:06.0014-0 Parcel ID: 06-0012-0 MONGIELLO CARMINELYNN SAND 6 STONE Parcel ID:06-0013-0 MONGIELLO ANGELO CIO AGGREGATE INDUSTRIES MOUNTAIN REALTY TRUST 55 EASTMAN AV 1715 BROADWAY HUTCHIIJSUIJ SHIRLEY A TR SWAMPSCOTT,MA 01907P U BOX 403 SAUGUS,MA 01906 SALEM, MA 01970 Parcel ID:06-0016-0 Parcel ID:06-0018.0 LYNN SAND$STONE CO KOUNSALIEN SPIRO Parcel ID: 11-0002-0 C/O AGGREGATE INDUSTRIES156 DERBY VINANDAL, LLC STREET 1715 BROADWAY SALEMMA STREET 4 ALVIN ROAD , SAUGUS,MA 01906 SWAMPSCOI'f.MA 01907 Parcel ID:07-0061-0 - Parcel ID:06-0020.0 D&D REALTY TRUST 15 ROBINSON ROAD REALTY DILISIO D ANAIDIHUTCHINSON FREDERICK TR 100 SWAMPSCOTT TT ROAD P p BOX 403 - SALEM,MA 01970 SALEM, MA 01970 WC[Uettes fadles 6 peler l A j Utillsez le gabarit AVERY®5160® Sens de RePilez a la hachure afin de IvvvJuv.averycon-� �,! A chargement rAvBlerie rebord Pap-upvc 5-bU0•GCi•AVENY Attachment A Project Description Proposed Work for Culvert Headwall Repair 120 Swampscott Road, Salem The proposed project involves the repair of a masonry culvert headwall at 120 Swampscott Road in Salem. The Commission may remember this project as they had issued an order of conditions previously to perform much of the same work, although the former application was more extensive than what is proposed today. That order of conditions, even with the Permit Extension Act has expired. A seasonal stream onh t e northerly side of this property runs through a culvert wider a driveway entrance at the northwest corner of the lot. There is a masonry headwall around the down stream end of this culvert. This headwall has deteriorated where stones have fallen out of the wall and some larger pieces of granite or fieldstone have shifted out of a plumb orientation. A fence has been damaged by winter plowing as well. The property is for sale and the owners(applicant prefer a less intrusive solution to shore up the existing headwall. The culvert headwall is like any other low retaining wall structure. It requires maintenance from time to time. At this site, some of the stones have fallen out of the wall. Other stones have shifted or may have been knocked out of place from winter plowing. An existing chain link fence has been pushed over from winter plowing. The owners wish to repair this small section of their property. The repair work will involve re-stacking or re-setting the headwall stones to a vertical position again. The length of headwall is approximately 45 linear feet. The owners anticipate that they will use various hand tools primarily such as a pry bar or similar tool to work the stones back to a vertical position. A backhoe may be used to maneuver some of the larger stones. The wall stones will be re-set and mortared into place. Any stones that fell out of the wall and are in the seasonal watercourse will be salvaged and re-used, or at a minimum, be removed from the watercourse. The owners may opt to bring in some larger stones with a less rounded shape s that they can be pieced together with greater precision and stability. 2 The work will involve adding crushed drainage stone behind the wall and then restoring the ground surface with a crushed rock driving surface in any disturbed areas of Robinson Road. The site plans included with this application show the details of the headwall repair. The applicant will remove any deteriorated hay bales along the top of the old wall and add new hay bales along the top of the re-built headwall to help filter any runoff that runs down Robinson Road. Avoidance of Impacts to Resource Areas With reasonable site controls, none of the performance standards for bank will he impacted. The relevant performance standards include maintaining: 1. The physical stability of the Bank; 2. The water carrying capacity of the existing channel within the Bank; 3. Ground water and surface water quality; 4. The capacity of the Bank to provide breeding habitat, escape cover and food for Fisheries; 5. The capacity of the Bank to provide important wildlife habitat functions. We expect that no impacts will occur to the P adjacent intermittent stream banks. The existing and proposed headwall are beyond the limits of the adjacent banks. The only activity that could occur on the stream banks is possible foot traffic from the workers re- positioning the stones. The work will actually contribute to the stability of the adjacent banks in that the banks will not be impacted by an untimely catastrophic collapse of the headwall if the headwall were not repaired. The dimensions of the headwall will not change so there is no infringement of the work on the water carrying capacity of the existing channel. Fisheries are not an issue at this water course and the project does not impact any bank resource area so impacts to wildlife habitat functions are not incurred.