July 15, 2016
William J. Manuell
Wetlands & Land Management, Inc.
100 Conifer Hill Drive - #516
Danvers, MA 01923
Re: Certificate of Compliance DEP #64-603— 120 Swampscott Rd. headwall
Dear Mr. Manuell:
Enclosed, please find the Certificate of Compliance for the above referenced property.
This Document must be recorded at the South Essex County Registry of Deeds. Please
fill out and return the Recording Information on page 3 of the Certificate of Compliance,
which will indicate to the Salem Conservation Commission that the document has been
recorded.
If you have any further questions please feel free to contact me at 978-619-5685.
Sincerely,
T wine-/
Conservation Agent
Enclosures
CC: DEP Northeast Regional Office
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64-603
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
forms on the
computer, use Angelo & Carmine Mongiello
only the tab key Name
to move your 120 Swampscott Road
cursor-do not
use the return Mailing Address
key. Salem MA 01970
City/Town State Zip Code
d 2. This Certificate of Compliance is issued for work.regulated by a final Order of
Conditions issued to:
Angelo & Carmine Mongiello
Name
10/16/2015 64-603
Dated DEP File Number
3. The project site is located at:
120 Swampscott Road Salem
Street Address - City/Town
6 14
Assessors Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Angelo & Carmine Mongiello
Property Owner(if different)
Essex South 34495 356
County Book Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent,
on:
7/11/2016
Date
wpafrmBb.doc•rev.5M/14 WPA Form ea,Certificate of Compliance•Page 1 of 3
l
j•�
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance
1\ 64-603
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Certification
Check all that apply:
7K Complete Certification: It is hereby certified that the work regulated by the
above-referenced Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work
regulated by the above-referenced Order of Conditions have been satisfactorily
completed. The project areas or work subject to this partial certification that have
been completed and are released from this Order are:
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the
above-referenced Order of Conditions never commenced. The Order of
Conditions has lapsed and is therefore no longer valid. No future work subject to
regulation under the Wetlands Protection Act may commence without filing a new
Notice of Intent and receiving a new Order of Conditions.
❑ Ongoing Conditions: The following conditions of the Order shall continue:
(Include any conditions contained in the Final Order, such as maintenance or
monitoring, that should continue for a longer period).
Condition Numbers:
C. Authorization
Issued
lby
Sq 10✓—I (.T /6
Conservation Commission Jxafte of I suance
This Certificate must be signed by a majority of the Conservation Commission and a
copy sent to the applicant and appropriate DEP Regional Offic See '_--1
htth rmass. ov/eea/a encies/massde /at .
Signatl s:
wFafrmftdoc•rev.5/29114 WPA Form 83,Certificate of Compliance•Page 2 of 3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64-603
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in
the Registry of Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To: - - - - -----------------------
Conservation Commission
Please be advised that the Certificate of Compliance for the project at:
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County
for:
Property Owner
and has been noted in the chain of title of the affected property on:
Date Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applicant
wpafrm8b.doc•rev.5/29/14 WPA Form 8B,Certificate of Compliance•Page 3 of 3
i
Wetlands & Land Management, Inc. 100 Confer Hill Drive-#516
Danvers,MA 01923
978-777-0004 Telephone
978-539-0005 FAX
June 9,2016 .—
Tom Devine R E C E$N r
Conservation Agent JUN 1 a 2016
Department of Planning and Community Development
120 Washington Street - DEPT. OF PLANNING
Salem, MA 01970 COMMUNITY DEVELOPMEiv
RE: Request for Certificate of Compliance- Repair of a masonry culvert headwall at
120 Swampscott Road in Salem.
DEP File#64-603
Dear Mr. Devine and Conservation Commission Members:
The Commission approved an order of conditions to repair a headwall at the completed
property project at 120 Swampscott Road in Salem. All construction work is completed at
this time. The applicant is now seeking a certificate of compliance in order to close out
this project.
The approved work involved repairing the headwall constructed over a seasonal stream
on the northerly side of this. The headwall around the downstream end of this culvert was
deteriorated where stones had fallen out of the structured wall and some larger pieces of
granite or fieldstone had shifted out of a plumb orientation. The fence surrounding this
stream and culvert had been damaged from winter plowing as well. The headwall is now
repaired and a new fence is installed.
I find the work is completed in substantial compliance with the approved plans and order
of conditions.
On behalf of the applicant,we respectfully request a certificate of compliance for DEP
64-603.
Sincerely,
Wetlands &Land Management, Inc.
LA)(J)— c�
William J. Manuell
Wetland Scientist
WTIref
�tyMS!"
t r�_
� t t
t r
`td
J �)) � `'3f lett. f Y • �JV
49 r
.j B i�& xt :� +£ ��� ]f 'Ir ,) Y'a ! ' f-.X i� � � �4 Vic•
f17 N �
• � � fid.: 3. y
MA
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection -Wetlands
WPA Form 8A — Request for Certificate of Compliance Provided by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. Project Information
Important:
When filling out 1. This request is being made by:
forms on the Wetlands and Land Management Inc.
computer, use Name
only the tab
key to move 100 Conifer Hill Drive Suite#516
your cursor- Mailing Address
do not use the Danvers MA 01923
return key. City/Town State Zip Code
77-0004
VQ Phone Number
�' Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
�dHa Angelo&Carmine Mongiello
Applicant
10-16-15 64-603
Dated DEP File Number
Upon completion
of the work 3. The project site is located at:
authorized in 120 Swampscott Road Salem
an Order of Street Address Cityrrown
Conditions,the 6 14
property owner
must request a Assessors Map/Plat Number Parcel/Lot Number
Certificate of
Compliance 4. The final Order of Conditions was recorded at the Registry of Deeds for:
from the issuing SAME
authority stating Property Owner(if different)
that the work or
portionthe County work hass Essex South 34495 356
been nook Page
satisfactorily
completed. Certificate(if registered land)
5. This request is for certification that(check one):
® the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
❑ the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
WPA Form 8A Page I of 2
Rev.02/00
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form BA — Request for Certificate of Compliance Provided by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an DOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see Appendix A).
WPA Form 8A Page 2 0 2
Rev.02/00
�° IIININIIIIININIIIIIIIIIIIIIIIIIIIII�INI
RISE NO 8;34495 Pg;356
11/0312015 02:07 CONDN per 1112
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands 64-603
WPA Form 5 — Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
Citylrown
A. General Information
Please note: Salem
this form has 1. From:
been modified Conservation Commission
with added 2.This issuance is for
space to a.[]Order of Conditions b.❑ Amended Order of Conditions
accommodate (check one):
the Registry
of Deeds 3.To: Applicant:
Requirements
Angelo& Carmine Mongiello
a.First Name b.Last Name
Important:
When filling
out forms on c.Organization
the 55 Eastman Ave.
computer, d.Mailing Address
use only the
tab key to Swampscott MA 01907
move your e.Citylrown f.State g.Zip Code
cursor-do
not use the 4. Property Owner(if different from applicant):
return key.
IAV a. First Name b.Last Name
c.Organization
coon
d.Mailing Address
e.City/rown I.State g.Zip Code
5. Project Location:
120 Swampscott Road Salem
a.Street Address b.Citylrown
6 14
c.Assessors Map/Plat Number d.Parcel/Lot Number
Latitude and Longitude, if known: d m s it m s
d. Latitude e.Longitude
wpaform5.duc• rev.6/162015 Page 1 of 12
j CITY OF SALEM
CONSERVATION COMMISSION
October 16 2015
Scott Patrowicz
14 Brown Street
Salem,MA 01970
Re: Order of Conditions—DEP #64-603-120 Swampscott Road
Dear Mr. Patrowicz:
Enclosed, please find the Order of Conditions for the above referenced project. Following
the 10-business-day appeal period, this document and the attached Special Conditions must
be recorded at the Essex County Registry of Deeds (Shetland Park 45 Congress Street, Suite
4100 Salem, Massachusetts). Once recorded, please return a copy of Page 12 of the Order,
which will indicate to the Commission that the document has been recorded.
As indicated in the Order:
1. this Order must be recorded,
2. a sign shall be displayed showing DEP File#64-603 within public view, and
3. contact me at least 48 hours prior to any activity to schedule a pre-construction
meeting to review the Order with your hired contractor.
If you have any further questions,please feel free to contact me at 978-619-5685.
Sincerely,
o Devine
Conservation Agent
Enclosures
CC: DEP Northeast Regional Office
Bill Manuell
Angelo and Carmine Mongiello
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-603
WPA Form 5 — Order of Conditions MassDEPFile#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
City/Town
A. General Information
Please note: Salem
this form has 1. From: Conservation Commission
been modified
with added 2, This issuance is for
space to a.[-]Order of Conditions b. ❑ Amended Order of Conditions
accommodate (check one):
the Registry
of Deeds 3. To: Applicant:
Requirements
Angelo & Carmine Mongiello
a. First Name b. Last Name
Important:
When filling
out forms on c.Organization
the 55 Eastman Ave.
computer, d.Mailing Address
use only the
tab key to Swampscott MA 01907
move your e. City/Town f.State g.Zip Code
cursor-do
not use the 4, Property Owner(if different from applicant):
return key.
ree a. First Name to. Last Name
c.Organization
mun
d.Mailing Address
e.City/Town f.State g.Zip Code
5. Project Location:
120 Swampscott Road Salem
a.Street Address b.City/Town
6 14
c.Assessors Map/Plat Number d.Parcel/Lot Number
Latitude and Longitude, if known: d m s m s
d. Latitude e.Longitt ude
wpatorm5.doc• rev.611612015 Page 1 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-603
WPA Form 5 — Order of Conditions MassDEP File#
1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
City(rown
A. General Information (cont.)
6. Property recorded at the Registry of Deeds for(attach additional information if more than
one parcel):
South Essex
a. County b.Certificate Number(if registered land)
11130 124
c.Book d. Page
�. Dates: 9/22/2015 10/8/2015 10/16/2015
a. Date Notice of Intent Filed b. Date Public Hearing Closed c.Date of Issuance
8. Final Approved Plans and Other Documents (attach additional plan or document references
as needed):
See attached
a. Plan Title
b.Prepared By c.Signed and Stamped by
d.Final Revision Date e. Scale
f.Additional Plan or Document Title g. Date
B. Findings
t. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information
provided in this application and presented at the public hearing, this Commission finds that
the areas in which work is proposed is significant to the following interests of the Wetlands
Protection Act(the Act). Check all that apply:
a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of
Pollution
d. ® Private Water Supply e. ® Fisheries f. ® Protection of
Wildlife Habitat
g.. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance
standards set forth in the wetlands regulations. This Commission orders that all work shall
be performed in accordance with the Notice of Intent referenced above, the following
General Conditions, and any other special conditions attached to this Order. To the extent
that the following conditions modify or differ from the plans, specifications, or other
proposals submitted with the Notice of Intent, these conditions shall control.
w aform5.doc• rev.6/16/2615 Page 2 o112
Massachusetts Department of Environmental Protection Provided by MassDEP:
\ Bureau of Resource Protection - Wetlands 64-603
/ WPA Form 5 - Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
Cityrrown
B. Findings (cont.)
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth
in the wetland regulations. Therefore, work on this project may not go forward unless and
until a new Notice of Intent is submitted which provides measures which are adequate to
protect the interests of the Act, and a final Order of Conditions is issued. A description of
the performance standards which the proposed work cannot meet is attached to this
Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work,
or the effect of the work on the interests identified in the Wetlands Protection Act.
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides sufficient information and includes measures which are
adequate to protect the Act's interests, and a final Order of Conditions is issued. A
description of the specific information which is lacking and why it is necessary is
attached to this Order as per 310 CMR 10.05(6)(c). _
3. ® Buffer Zone Impacts: Shortest distance between limit of project
disturbance and the wetland resource area specified in 310 CMR 10.02(1)(a) a.linear feet
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. El Bank a. linear feet b. linear feet c. linear feet d.linear feet
s. ❑ Bordering
Vegetated Wetland a.square feet b.square feet c.square feet d.square feet
6. ❑ Land Under
Waterbodies and a.square feet b.square feet c.square feet d.square feet
Waterways
e.Gy dredged f.Gy dredged
7. ❑ Bordering Land
Subject to Flooding a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet
a. ❑ Isolated Land
Subject to Flooding a.square feet b.square feet
Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet
g. ❑ Riverfront Area
a.total sq.feet b.total sq.feet
Sq ft within 100 ft
c.square feet d.square feet e.square feet f.square feet
Sq ft between 100-
200 ft g.square feet h.square feet i.square feet j.square feet
wpaform5 doc• rev.6/162015 Page 3 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-603
WPA Form 5 — Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
City/Town
B. Findings (cont.)
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
1o. ❑ Designated Port Indicate size under Land Under the Ocean, below
Areas
11. ❑ Land Under the
Ocean a.square feet b.square feet
c.Gy dredged d.Gy dredged
12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes
below
cuyd
13. ❑ Coastal Beaches
a.square feet b.square feet c.nourishment
cu d.nourishment
14. ❑ Coastal Dunes cu yd cu yd
a.square feet b.square feet c.nourishment d.nourishment
15. ❑ Coastal Banks a.linear feet b. linear feet
16. ❑ Rocky Intertidal
Shores a.square feet b.square feet
17. E] Salt Marshes asquare feet b.square feet c.square feet d.square feet
18. ❑ Land Under Salt
Ponds a.square feet b.square feet
c.Gy dredged d.Gy dredged
19. ❑ Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
20. ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under
the Ocean, and/or inland Land Under Waterbodies and
Waterways, above
a.c/y dredged b.cty dredged
21. ❑ Land Subject to
Coastal Storm a.square feet b.square feet
Flowage
22. ❑ Riverfront Area
a.total sq.feet b.total sq.feet
Sq ft within 100 ft
c.square feet d.square feet e.square feet f.square feet
Sq ft between 100-
200 ft g.square feet h.square feet i.square feet j.square feet
wpaform5.doc• rev.6116/2015 Page 4 cf 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
\ Bureau of Resource Protection - Wetlands 64-603
WPA Form 5 — Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
City/Town
B. Findings (cont.)
#23. If the 23. ❑ Restoration/Enhancement*:
project is for
the purpose of
restoring or
enhancing a W a.square feet of BV b.square feet of salt marsh
wetland 2a ❑ Stream Crossing(s):
s
resource area 9( )
in addition to
the square
footage that a. number of new stream crossings b.number of replacement stream crossings
has been C. General Conditions Under Massachusetts Wetlands Protection Act
entered in
Section B.5.c
(BVW)or The following conditions are only applicable to Approved projects.
B.17.c(Salt
Marsh)above, 1. Failure to comply with all conditions stated herein, and with all related statutes and other
please enter regulatory measures, shall be deemed cause to revoke or modify this Order.
the additional 9 rY fY
amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying
with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this
Order unless either of the following apply:
a. The work is a maintenance dredging project as provided for in the Act; or
b. The time for completion has been extended to a specified date more than three years,
but less than five years, from the date of issuance. If this Order is intended to be valid
for more than three years, the extension date and the special circumstances warranting
the extended time period are set forth as a special condition in this Order.
c. If the work is for a Test Project, this Order of Conditions shall be valid for no more than
one year.
5. This Order may be extended by the issuing authority for one or more periods of up to three
years each upon application to the issuing authority at least 30 days prior to the expiration
date of the Order. An Order of Conditions for a Test Project may be extended for one
additional year only upon written application by the applicant, subject to the provisions of 310
CMR 10.05(11)(f).
6. If this Order constitutes an Amended Order of Conditions, this Amended Order of
Conditions does not extend the issuance date of the original Final Order of Conditions and
the Order will expire on 10/16/2018 unless extended in writing by the Department.
7. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash,
refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath,
paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the
foregoing.
wpaform5doc• ray.6116/2015 Peg.5 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-603
WPA Form 5 — Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
City(rown
C. General Conditions Under Massachusetts Wetlands Protection Act
8. This Order is not final until all administrative appeal periods from this Order have elapsed,
or if such an appeal has been taken, until all proceedings before the Department have been
completed.
9. No work shall be undertaken until the Order has become final and then has been recorded
in the Registry of Deeds or the Land Court for the district in which the land is located, within
the chain of title of the affected property. In the case of recorded land, the Final Order shall
also be noted in the Registry's Grantor Index under the name of the owner of the land upon
which the proposed work is to be done. In the case of the registered land, the Final Order
shall also be noted on the Land Court Certificate of Title of the owner of the land upon
which the proposed work is done. The recording information shall be submitted to the
Conservation Commission on the form at the end of this Order, which form must be
stamped by the Registry of Deeds, prior to the commencement of work.
10. A sign shall be displayed at the site not less then two square feet or more than three
square feet in size bearing the words,
"Massachusetts Department of Environmental Protection" [or, "MassDEP"]
"File Number 64-603 "
11. Where the Department of Environmental Protection is requested to issue a Superseding
Order, the Conservation Commission shall be a party to all agency proceedings and
hearings before MassDEP.
12. Upon completion of the work described herein, the applicant shall submit a Request for
Certificate of Compliance (WPA Form 8A)to the Conservation Commission.
13. The work shall conform to the plans and special conditions referenced in this order.
14. Any change to the plans identified in Condition #13 above shall require the applicant to
inquire of the Conservation Commission in writing whether the change is significant enough
to require the filing of a new Notice of Intent.
15. The Agent or members of the Conservation Commission and the Department of
Environmental Protection shall have the right to enter and inspect the area subject to this
Order at reasonable hours to evaluate compliance with the conditions stated in this Order,
and may require the submittal of any data deemed necessary by the Conservation
Commission or Department for that evaluation.
16. This Order of Conditions shall apply to any successor in interest or successor in control of
the property subject to this Order and to any contractor or other person performing work
conditioned by this Order.
wpaform5.doc• rev.6/16/2015 Page 6 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-603
WPA Form 5 — Order of Conditions MassDEP File#
1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
Cityfrown
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated
Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be
marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall
be maintained until a Certificate of Compliance has been issued by the Conservation
Commission.
18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have
been fully stabilized with vegetation or other means. At no time shall sediments be
deposited in a wetland or water body. During construction, the applicant or his/her designee
shall inspect the erosion controls on a daily basis and shall remove accumulated sediments
as needed. The applicant shall immediately control any erosion problems that occur at the
site and shall also immediately notify the Conservation Commission, which reserves the
right to require additional erosion and/or damage prevention controls it may deem
necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
19. The work associated with this Order(the 'Project")
(1) ❑ is subject to the Massachusetts Stormwater Standards
(2) ® is NOT subject to the Massachusetts Stormwater Standards
If the work is subject to the Stormwater Standards, then the project is subject to the
following conditions:
a) All work, including site preparation, land disturbance, construction and redevelopment,
shall be implemented in accordance with the construction period pollution prevention and
erosion and sedimentation control plan and, if applicable, the Stormwater Pollution
Prevention Plan required by the National Pollution Discharge Elimination System
Construction General Permit as required by Stormwater Condition 8. Construction period
erosion, sedimentation and pollution control measures and best management practices
(BMPs)shall remain in place until the site is fully stabilized.
b) No stormwater runoff may be discharged to the post-construction stormwater BMPs
unless and until a Registered Professional Engineer provides a Certification that:
i. all construction period BMPs have been removed or will be removed by a date certain
specified in the Certification. For any construction period BMPs intended to be converted
to post construction operation for stormwater attenuation, recharge, and/or treatment, the
conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that
the BMP has been properly cleaned or prepared for post construction operation, including
removal of all construction period sediment trapped in inlet and outlet control structures;
ii. as-built final construction BMP plans are included, signed and stamped by a Registered
Professional Engineer, certifying the site is fully stabilized;
iii. any illicit discharges to the stormwater management system have been removed, as per
the requirements of Stormwater Standard 10;
wpaform5doc• rev.611 M015 Page 7 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands 64-603
WPA Form 5 — Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
City/rown
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
iv. all post-construction stormwater BMPs are installed in accordance with the plans
(including all planting plans) approved by the issuing authority, and have been inspected to
ensure that they are not damaged and that they are in proper working condition;
v. any vegetation associated with post-construction BMPs is suitably established to
withstand erosion.
c) The landowner is responsible for BMP maintenance until the issuing authority is notified
that another party has legally assumed responsibility for BMP maintenance. Prior to
requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible
party (defined in General Condition 18(e)) shall execute and submit to the issuing authority
an Operation and Maintenance Compliance Statement("O&M Statement) for the
Stormwater BMPs identifying the party responsible for implementing the stormwater BMP
Operation and Maintenance Plan ("O&M Plan") and certifying the following:
i.) the O&M Plan is complete and will be implemented upon receipt of the Certificate of
Compliance, and
ii.)the future responsible parties shall be notified in writing of their ongoing legal
responsibility to operate and maintain the stormwater management BMPs and
implement the Stormwater Pollution Prevention Plan.
d) Post-construction pollution prevention and source control shall be implemented in
accordance with the long-term pollution prevention plan section of the approved
Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by
the National Pollution Discharge Elimination System Multi-Sector General Permit.
e) Unless and until another party accepts responsibility, the landowner, or owner of any
drainage easement, assumes responsibility for maintaining each BMP. To overcome this
presumption, the landowner of the property must submit to the issuing authority a legally
binding agreement of record, acceptable to the issuing authority, evidencing that another
entity has accepted responsibility for maintaining the BMP, and that the proposed
responsible party shall be treated as a permittee for purposes of implementing the
requirements of Conditions 18(f) through 18(k)with respect to that BMP. Any failure of the
proposed responsible party to implement the requirements of Conditions 18(f) through
18(k) with respect to that BMP shall be a violation of the Order of Conditions or Certificate
of Compliance. In the case of stormwater BMPs that are serving more than one lot, the
legally binding agreement shall also identify the lots that will be serviced by the stormwater
BMPs. A plan and easement deed that grants the responsible party access to perform the
required operation and maintenance must be submitted along with the legally binding
agreement.
f) The responsible party shall operate and maintain all stormwater BMPs in accordance
with the design plans, the O&M Plan, and the requirements of the Massachusetts
Stormwater Handbook.
wpaform5.doc• rev.6/16/2015 Page 8 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands 64-603
WPA Form 5 - Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
Cityrrown
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
g) The responsible party shall:
1. Maintain an operation and maintenance log for the last three (3) consecutive
calendar years of inspections, repairs, maintenance and/or replacement of the
stormwater management system or any part thereof, and disposal (for disposal the
log shall indicate the type of material and the disposal location);
2. Make the maintenance log available to MassDEP and the Conservation
Commission ("Commission") upon request; and
3. Allow members and agents of the MassDEP and the Commission to enter and
inspect the site to evaluate and ensure that the responsible party is in compliance
with the requirements for each BMP established in the O&M Plan approved by the
issuing authority.
h) All sediment or other contaminants removed from stormwater BMPs shall be disposed
of in accordance with all applicable federal, state, and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04
are prohibited.
j) The stormwater management system approved in the Order of Conditions shall not be
changed without the prior written approval of the issuing authority.
k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site
Design Credit(as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1,
Low Impact Development Site Design Credits) shall not be altered without the prior written
approval of the issuing authority.
I) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld.
Any fencing constructed around stormwater BMPs shall include access gates and shall be
at least six inches above grade to allow for wildlife passage.
Special Conditions (if you need more space for additional conditions, please attach a text
document):
NA
20. For Test Projects subject to 310 CMR 10.05(l 1), the applicant shall also implement the
monitoring plan and the restoration plan submitted with the Notice of Intent. If the
conservation commission or Department determines that the Test Project threatens the
public health, safety or the environment, the applicant shall implement the removal plan
submitted with the Notice of Intent or modify the project as directed by the conservation
commission or the Department.
i
wpaform5 doc• rev.6/16/2015
Page 9 0/12
I�
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-603
WPA Form 5 - Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP-Transaction#
Salem
Citylrown
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No
2. The Salem hereby finds (check one that applies):
Conservation Commission
a. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a
municipal ordinance or bylaw, specifically:
1. Municipal Ordinance or Bylaw 2.Citation
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides measures which are adequate to meet these
standards, and a final Order of Conditions is issued.
b. ® that the following additional conditions are necessary to comply with a municipal
ordinance or bylaw:
Wetlands Protection and Conservation Ordinance c. 50
1. Municipal Ordinance or Bylaw 2.Citation
3. The Commission orders that all work shall be performed in accordance with the following
conditions and with the Notice of Intent referenced above. To the extent that the following
conditions modify or differ from the plans, specifications, or other proposals submitted with
the Notice of Intent, the conditions shall control.
The special conditions relating to municipal ordinance or bylaw are as follows (if you need
more space for additional conditions, attach a text document):
Attached conditions are issued under the Wetlands Protection Act and are sufficient for
compliance with the local ordinance
wpaform5 doc• rev.61162015 Page 10 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
[L7,
Bureau of Resource Protection - Wetlands �� �O MEDEP File WPA Form 5 — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDE Transaction#
City/Town
E. Signatures
Important:when This Order is valid for three years, unless otherwise specified as a special to I K�5
filling out forms condition pursuant to General Conditions#4,from the date of issuance. 1. ate of Issuance
on the computer,
use only the tab Please indicate the number of members who will sign this form.
key to move your This Order must be signed by a majority of the Conservation Commission. 2.Number of Signers
cursor-do not
use the return The Order must be mailed by certified mail (return receipt requeste ) or ha d delivered to
key the applicant.A copy must be mailed, hand delivered or filed electr,)nicalat th ame time
with the ap opriate MassDEP Regional Office. /
IL
Signat e
❑ by hand delivery on by certified mail, return receipt
ues
7t Zo
Date Daat
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting
the land subject to this Order, or any ten residents of the city or town in which such land is
located, are hereby notified of their right to request the appropriate MassDEP Regional
Office to issue a Superseding Order of Conditions. The request must be made by certified
mail or hand delivery to the Department, with the appropriate filing fee and a completed
Request for Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)
within ten business days from the date of issuance of this Order.A copy of the request shall
at the same time be sent by certified mail or hand delivery to the Conservation Commission
and to the applicant, if he/she is not the appellant.
Any appellants seeking to appeal the Department's Superseding Order associated with this
appeal will be required to demonstrate prior participation in the review of this project. Previous
participation in the permit proceeding means the submission of written information to the
Conservation Commission prior to the close of the public hearing, requesting a
Superseding Order, or providing written information to the Department prior to issuance of
a Superseding Order.
The request shall state clearly and concisely the objections to the Order which is being
appealed and how the Order does not contribute to the protection of the interests identified
in the Massachusetts Wetlands Protection Act (M.G.L. c. 131, §40), and is inconsistent
with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a
municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or
regulations, the Department has no appellate jurisdiction.
wpa5sigs.doc• rev.021252010 Page�(rof 1(�,
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-603
WPA Form 5 — Order of Conditions NlassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
City/Town
G. Recording Information
Prior to commencement of work, this Order of Conditions must be recorded in the Registry of
Deeds or the Land Court for the district in which the land is located, within the chain of title of
the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land subject to the Order. In the
case of registered land, this Order shall also be noted on the Land Court Certificate of Title of
the owner of the land subject to the Order of Conditions. The recording information on this page
shall be submitted to the Conservation Commission listed below.
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation
Commission.
To:
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
Project Location MassDEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
for: Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wpaform5.tloc• rev.6/16/2015 Page 12 of 12
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
Request for Departmental Action Fee
Transmittal Form Provided by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. Request Information
1. Location of Project
a. Street Address b.City/Town,Zip
c.Check number d.Fee amount
Important:
When filling 2 Person or party making request(if appropriate, name the citizen group's representative):
out forms on
the computer, Name
use only the
tab key to Mailing Address
move your
cursor-do City/Town State Zip Code
not use the
return key. Phone Number Fax Number(if applicable)
3. Applicant(as shown on Determination of Applicability(Form 2), Order of Resource Area Delineation
(Form 4B), Order of Conditions (Form 5), Restoration Order of Conditions (Form 5A), or Notice of
Non-Significance (Form 6)):
Name
Mailing Address
City/rown State Zip Code
Phone Number Fax Number(if applicable)
4. DEP File Number:
B. Instructions
1. When the Departmental action request is for(check one):
❑ Superseding Order of Conditions—Fee: $120.00(single family house projects)or$245(all other
projects)
❑ Superseding Determination of Applicability— Fee: $120
❑ Superseding Order of Resource Area Delineation—Fee: $120
wpaform5.tloc- rev.4122/2015 Page 7 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
Request for Departmental Action Fee
Transmittal Form Provided by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Instructions (cont.)
Send this form and check or money order, payable to the Commonwealth of Massachusetts, to:
Department of Environmental Protection
Box 4062
Boston, MA 02211
2. On a separate sheet attached to this form, state clearly and concisely the objections to the
Determination or Order which is being appealed. To the extent that the Determination or Order is
based on a municipal bylaw, and not on the Massachusetts Wetlands Protection Act or regulations,
the Department has no appellate jurisdiction.
3. Send a copy of this form and a copy of the check or money order with the Request for a
Superseding Determination or Order by certified mail or hand delivery to the appropriate DEP
Regional Office (see htto://www.mass.gov/eea/agencies/massdep/about/contacts/).
4. A copy of the request shall at the same time be sent by certified mail or hand delivery to the
Conservation Commission and to the applicant, if he/she is not the appellant.
wpaform5 doe• rev.4/2 212 01 5 Page 2 of 2
ti g a, Attachment to Order of Conditions # 64-603
I � Page 1 of 5
SALEM CONSERVATION COMMISSION
ATTACHMENT TO ORDER OF CONDITIONS
DEP FILE #64-603
120 SWAMPSCOTT ROAD
City of Salem, Massachusetts
ADDITIONAL FINDINGS
Based on the Estimated Habitats of Rare Wildlife and Certified Vernal Pools Map(online, 10/1/2015)from Natural
Heritage & Endangered Species Program (NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has
been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contain any
vernal pools.
This Order permits the repair of an existing culvert headwall at the above-referenced location per 9/20/2015 Notice
of Intent,approved plan(s),and the following conditions.
This Order does not grant the applicants any right to complete work on property for which they lack ownership or
lack other appropriate legal permission to enter to complete work.
GENERAL CONDITIONS
1. This Order of Conditions must be recorded in its entirety(including all 5 pages of Special Conditions)
at the Essex County Registry of Deeds or the Land Court for the district in which the land is located,
after the expiration of the 10-day appeal period and within 30 days of the issuance. A copy of the
recording information must be submitted to the Salem Conservation Commission before any
work approved in this Order commences.
2. Approval of this application does not constitute compliance with any law or regulation other than
M.G.L Chapter 131, Section 40, Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands
Protection Ordinance, Salem Code Chapter 50. .
3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No
alteration of wetland resource areas or associated buffer zones, other than that approved in this Order,
shall occur on this property without prior approval from the Commission.
4. Prior to any work commencing on site, a DEP Sign showing DEP File#64-603 must be installed at the
entrance to the site and seen from.the public way,but not placed on a living tree.
5. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the
date of the issuance of this Order.
6. With respect to this Order,the Commission designates the Conservation Agent as its agent with powers
to act on its behalf in administering and enforcing this Order.
7. The Commission or its Agent,officers,or employees shall have the right to enter and inspect the property at
any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131,
Attachment to Order of Conditions # 64603
Page 2 of 5
Section 40,the Wetlands Regulations 310 CMR 10.00,and shall have the right to require any data or
documentation that it deems necessary for that evaluation.
8. The term "Applicant"as used in this Order of Conditions shall refer to the owner, any successor in
interest or successor in control of the property referenced in the Notice of intent, supporting documents
and this Order of Conditions. The Commission shall be notified in writing within 30 days of all
transfers of title of any portion of the property that takes place prior to issuance of the Certificate of
Compliance.
9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and
approvals associated with this project. These permits may include but are not necessarily limited to the
following:
(1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816),U.S. Army
Corps of Engineers.
(2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority
of sec.27(5)of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00.
(3) Design Requirements for Construction in Floodplains under the State Building Code(780 CMR
744.).
10. If there are conflicting conditions within this Order,the stricter condition(s)shall rule.
11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and
surface waters during construction or after completion of the project.
12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods
and boundary during construction if necessary.
13. The Commission reserves the right to impose additional conditions on portions of this project or this site
to mitigate any actual or potential impacts resulting from the work herein permitted.
14. The work shall conform to the following attached plans and special conditions:
Final Approved Plans
Site Plan to Accompany a Conservation Commission Notice of Intent Application to Repair an
Existing Headwall (45+/-LF) for Property Located at: #120 Swampscott Road, Salem, MA
(Title)
9/18/2015
(Dated)
Scott Ian Patrowicz
(Signed and Stamped by)
City of Salem Conservation Commission
(On file with)
15. Any proposed changes in the approved plan(s) or any deviation in construction from the approved
plan(s) shall require the applicant to file a Notice of Project Change with the Commission. The Notice
shall be accompanied by a written inquiry prior to their implementation in the field, as to whether the
change(s) is substantial enough to require filing a new Notice of Intent or a request to correct or amend
this Order of Conditions. A copy of such request shall at the same time be sent to the Department of
Environmental Protection.
Attachment to Order of Conditions # 64-603
Page 3 of 5
16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has
been issued,the applicant or current landowner shall submit to the Commission a statement signed by the
buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of
the Order of Conditions.
17. [Reserved].
PRIOR TO CONSTRUCTION
18. Prior to the commencement of any activity on this site other than activities listed above, there
must be a Pre-Construction Meeting on site between the project supervisor,the contractor responsible
for the work, and the Conservation Agent and/or a member of the Conservation Commission to ensure
that the requirements of the Order of Conditions are understood. The staked erosion control line shall be
adjusted, if necessary,during the pre-construction meeting. Please contact the Conservation Agent at
(978)619-5685 at least forty-eight(48) hours prior to construction to arrange for the Pre-
Construction Meeting.
19. Prior to the pre-construction meeting and commencement of any activity on this site, sedimentation and
erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The
Commission and/or its Agent shall inspect and approve such installation at the pre-construction
meeting.
20. No clearing of vegetation, including trees,or disturbance of soil shall occur prior to the pre-construction
meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre-
construction meeting if absolutely necessary in order to place erosion control stakes where required.
21. There shall be adequate additional erosion and sediment controls stored onsite for emergency purposes.
EROSION CONTROL
22. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction,
and shall be maintained during construction in any wetland resource area and/or buffer zones. The
erosion control measures shown on the approval plan(s)and provisions in the Order will be the minimum
standards for this project; the Commission or its Agent may require additional measures.
23. All debris,fill and excavated material shall be stockpiled a location far enough away from the wetland
resource areas to prevent sediment from entering wetland resource areas.
24. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or
replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed.
25. The area of construction shall remain in a stable condition at the close of each construction day.
26. Any de-watering of trenches or other excavation required during construction shall be conducted so as
to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered
through straw bale sediment traps, silt filter bags or other means approved by the Commission or its
Administrator.
27. Within thirty(30)days of completion of construction on any given portion of the project,all disturbed
areas in the completed portion of the site shall be permanently stabilized with rapidly growing
vegetative cover, using sufficient top soil to assure long-term stabilization of disturbed areas.
Attachment to Order of Conditions # 64-603
r'Lrf Page 4 of 5
28. If soils are to be disturbed for longer than two(2)months, a temporary cover of rye or other grass
should be established to prevent erosion and sedimentation. If the season is not appropriate for plant
growth, exposed surface shall be stabilized by other appropriate erosion control measures,firmly
anchored,to prevent soils from being washed by rain or flooding.
DURING CONSTRUCTION
29. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all
times when work is in progress.
30. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on
the approved plan(s).
31. All waste products,grubbed stumps, slash;construction materials, etc. shall be deposited at least 100 feet
from wetland resource areas and 200 feet from river.
32. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage
system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be
immediately removed.
33. All exposed sub-soils shall be covered by a minimum of three(3)inches of quality screened loam topsoil
prior to seeding and final stabilization.
34. Immediately following drainage structure installation all inlets shall be protected by silt fence,strawbale
barriers and/or silt bags to filter silt from stormwater before it enters the drainage system.
35. There shall be no pumping of water from wetland resource areas.
36. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other
components shall be fixed immediately.
37. During construction,all drainage structures shall be inspected regularly and cleaned as necessary.
38. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance
of enforcement actions by the Conservation Commission including,but not limited to,civil administrative
penalties under M.G.L Chapter 21A, section 16.
AFTER CONSTRUCTION
39. Upon completion of construction and final soil stabilization, the applicant shall submit the following to
the Conservation Commission to request a Certificate of Compliance (COC):
(1) A Completed Request for a Certificate of Compliance form (WPA Form 8A or other form if
required by the Conservation Commission at the time of request).
(2) A letter from a Registered Professional Engineer certifying compliance of the property with this
Order of Conditions.
(3) An"As-Built"plan signed and stamped by a Registered Professional Engineer or Land Surveyor
showing post-construction conditions within all areas under the jurisdiction of the Massachusetts
Wetlands Protection Act. This plan shall include at a minimum:
(a) All wetland resource area boundaries with associated buffer zones and regulatory setback
areas taken from the plan(s)approved in this Order of Conditions;
q" Attachment to Order of Conditions # 64603
t Page 5 of 5
(b) Locations and elevations of all stormwater management conveyances, structures and best
management designs, including foundation drains,constructed under this Order within any
wetland resource area or buffer zone;
(c) Distances from any structures constructed under this Order to wetland resource areas-
"structures"include,but are not limited to,all buildings, septic system components,wells,
utility lines,fences,retaining walls,and roads/driveways;
(d) A line delineatingthe limit of work-"work"includes an filling,excavating and/or
Y g> g
disturbance of soils or vegetation approved g under this Order;
40. When issued,the Certificate of Compliance must be recorded at the Essex
County Registry of Deeds
and a copy of the recording submitted to the Salem Conservation Commission.
41. If the completed work differs from that in the original plans and conditions, the report must specify how
the work differs; at which time the applicant shall first request a modification to the Order. Only upon
review and approval by the Commission,may the applicant request in writing a Certificate of
Compliance as described above.
42. Erosion control devices shall remain in place and properly functioning until all exposed soils have been
stabilized with final vegetative cover and the Conservation Commission and/or its Agent has authorized
their removal.
ADDITIONAL CONDITIONS
43. To reduce the chance of introducing invasive species to the project site, straw bales, rather than hay
bales, shall be used.
44. Crushed stone utilized in the approved work shall be no smaller than 1.5"diameter.
45. To the maximum extent practicable,filter fabric shall be installed behind the repaired wall.
PERPETUAL CONDITIONS
46. [Reserved)
v�CONA.,g�i
CITY OF SALEM
� g CONSERVATION COMMISSION
• k�
SITCE VISIT FOR
PROJECT LOCATION: ATE OF SITE VISIT•
PROJECT PROPONENT: DEP FILE NUMBER:
PROPOSED WORK:
INATTEfVUANCE � ._, :::
Commission Members/Agent: Abutters:
• Applicant/Property Owner/Representative: 9 �7 4S� 1
;SITE VISIT;PURPOSE x =2f ., ..
SITE VISIT�DOCUMENTATEl ION`, ,�:;, ,,,,, tel, v �v; u eg
Photos ❑ Site Map 0 Other:
¢n,aun't ..L.4P>P3'�-
4'12'1
yOBSERYATIONS 9
»y»»
�,..,r�aNas�;raL. .,,. -, ..! Mv�,. ..`u ate.:... ,ate.n».,,�., -.va�a 'r_
Take into account relevant aspects or features such as: natural or piped drainage or obvious pollution;
topography; existing vegetation; possible alternative sites; signs of wildlife, possible vernal pools, rare species
habitat; landmarks; recent or historical disturbances; proximity to other water bodies or drainage areas;
adjacent land uses.
C�
_ .. . _RECOMMENDATIONS , !2 P gr
! set
'd
INOI Status Sheet
Address: la° S� ^"C'��' "�/ DEP #: G y . GGA
Application Type: Date Submitted: q/, Yl C-
Contact Name: a � �� ( I Phone: v-A� 97-7 "-°K
Proposed activity: l " Ar-15-(r
Application Complete do
,Correct Fee Received
,Abutters List Requested Received
lLegal Ad Sent - Laal Ad Confirmed Online
Added to Agenda Agenda to Applicant
,,Agent Comments to Commission
DEP Comments
Hearing Opened: ell�<p Continued Site Visit:Abutters Notice Confirmed
Permit Sent to Applicant and DEP
Confirmation of Delivery
Expiration date added to calendar
Added to database
/Applicant Recorded OoC with Registry
Preconstruction Meeting:
certificate of Compliance Sent to Applicant and DEP
Confirmation of Delivery
Applicant Recorded CoC with Registry
Notes:
H1CON COMMWdministrativ6project status sheet\NOI status sheet 2012-12-27.doc
vt�
AND IA�..
CITY OF SALEM
CONSERVATION COMMISSION
SITE VISIT11/n� ORM
PROJECT LOCATION: S ' V` DATE OF SITE VISITI d v
PROJECT PROPONENT: DEP FILE NUMBER:
r
PROPOSED WORK: C-t-l Gj— V�c�✓
IN ATTENDANCE:.
Commission Members/Agent: Abutters:
Applicant/Property Owner/Representative: C-e-"L" .(� I�CoU/�Coti
• SITE VISIT.PURPOSE:_ _rte— Cyv, t
SITE VISIT DOCUMENTATION:
❑Photos ❑ Site Map ❑Other:
OBSERVATIONS:
Take into account relevant aspects or features such as: natural or piped drainage or obvious pollution;
topography; existing vegetation; possible alternative sites; signs of wildlife, possible vernal pools, rare species
habitat; landmarks; recent or historical disturbances; proximity to other water bodies or drainage areas;
adjace t land uses.
(7
RECOMMENDATIONS:
•
Notice of Intent Application
Wetlands Protection Act and Salem Wetlands By-law
120 Swampscott Road
Salem, MA
September 2015
o
N
Ui N IL
N Wetlands & Land Management, Inc.
1100 Conifer Hill Drive-Suite 516
cc Danvers, MA 01923
Wetlands & Land Management, Inc. IOU Cunife"Hill Dike -#i Ifi
Dancers. NIA 01923
5178-777-100+Tdephu ie
September 20, 2015 978-539-0005 FAX
Tom Devine
Salem Conservation Commission
120 Washington Street
Salem, MA 01970
RE: Notice of Intent to repair a culvert headwall.
120 Swampscott Road, Salem
Dear Mr. Devine and Conservation Commission Members:
On behalf of the applicant, Wetlands&Land Management Inc. is submitting this Notice
of Intent to repair an existing culvert headwall that has fallen into disrepair
A seasonal stream on the northerly side of this property enters and exits a culvert under a
driveway entrance at the northwest corner of the lot. There is a masonry headwall around
the down stream end of this culvert. This headwall has deteriorated where certain stones
have fallen out of the wall and some larger pieces of granite or fieldstone have shifted out
of a plumb orientation. A fence has been damaged by winter plowing as well. The
Commission may remember this site as you had previously issued an order of conditions
to do a much more extensive repair of this same headwall. Unfortunately, that order of
conditions has expired.
The property is for sale and the owners do not want to undertake an extensive repair of
the headwall at this time. Instead, they propose a`low-tech approach" where they would
simply recover and re-mortar the fallen stones back into the headwall. Other stones
would be re-positioned back to plumb and vertical. The owners envision performing this
work by hand or perhaps using a back hoe to help nudge some of the larger stones back
into place.
Would you please schedule this matter for your earliest available meeting?
Sincerely,
Wetlands&Land Management, Inc.
waw-� 1<n </
William J. Manuell
Wetland Scientist
For the Applicant
`�`�'�'�—�`�'�:r,�����ays 3 `k Q�5'\�7F' a ter t°��������^��i�"��� '�C�•'
SIMON
Err
a. RI s cp �'
F'-v'S� Y 9✓3 v ,f�y�"� � �y dl��
fAAb , tii >'- s;.s .� o� s i gqyy��tr i �3st ✓p'_ r��,�v ow
111
' 111
/ r 80 40 0 80 160 240 / =i35Aate s r A�A /
Bogle in Feet
160
70r I��l 11 I v / II( Isz 73+a/ til Oar �J�I�I it �i
"o. I
10
^ t
_ r
fig
\\�IIII I I f illi( _
b
Notice of Intent Application (WPA Foran 3)
ElMassachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands
WPA Form 3 — Notice of Intent MassDEP File Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number
Salem Wetlands By-lawimportSalem
City/Town
When henfian`'lling out A. General Information
W
forms on the
computer,use
only the tab key 1. Project Location (Note: electronic filers will click on button to locate project site):
to move your 120 Swampscott Road Salem
cursor-do not 01970
use the return a.Street Address b.City/Town c.Zip Code
key. Latitude and Longitude: 42.4918 __ -70.9206 _
d. Latitude e. Longitude
m 6 14
f.Assessors Map/Plat Number g.Parcel/Lot Number
2. Applicant:
Angelo &Carmine Mongiello _
a.First Name b. Last Name -
Note:
Before c.Organization — ---------
completing this
form consult 55 Eastman Avenue
form
yourlocal d.Street Address --- --
Conservation Swampscott
Commission MA 01907
e.City/Town f.State
regarding any g.Zip Code
municipal bylaw 781-389-3802
or ordinance. h.Phone Number i.Fax Number j.Email Address -
3. Property owner(required if different from applicant): ❑ Check if more than one owner
SAME
a.First Name b. Last Name -
c.Organization
d.Street Address
e.City/Town f.State
g.Zip Code
h. Phone Number i.Fax Number 1.Email address ----
4. Representative (if any):
William Manuell
a.First Name -
------
b.LastName —
Wetlands& Land Management, Inc.
c.Company
100 Conifer Hill Drive#516
d.street Address -------------------
Danvers MA 01923
e.City/Town L State ----------- g.Zip Code-_--
978-777-0004 978-539-0005 bill@wetlandslm.com_
h.Phone Number i.Fax Number 1. Email address _ -
5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form):
$110.00 $42.50 _ $67.50
a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands
WPA Form 3 — Notice of Intent MassDEP Pile Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number
Salem Wetlands By-law Salem
City/Town
A. General Information (continued)
6. General Project Description:
Repair an existino culvert headwall
7a. Project Type Checklist: (Limited Project Types see Section A. 7b.)
1. ❑ Single Family Home 2. ❑ Residential Subdivision
3. ❑ Commercial/Industrial 4. ❑ Dock/Pier
5. ❑ Utilities 6. ❑ Coastal engineering Structure
7. ❑ Agriculture (e.g., cranberries, forestry) 8. ❑ Transportation
9. 0 Other
7b. Is any portion of the proposed activity eligible to be treated as a limited project(including Ecological
Restoration Limited Project) subject to 310 CMR 10.24 (coastal) or 310 CMR 10.53 (inland)?
t. ❑ Yes 0 No If yes, describe which limited project applies to this project. (See 310 CMR
10.24 and 10.53 for a complete list and description of limited project types)
2. Limtted -----
If the proposed activity is eligible to be treated as an Ecological Restoration Limited Project (310
CMR10.24(8), 310 CMR 10.53(4)), complete and attach Appendix A: Ecological Restoration Limited
Project Checklist and Signed Certification.
8. Property recorded at the Registry of Deeds for:
Essex South
a.County b.Certificate#(if registered land)
11130 124
c.Book d.Page Number
B. Buffer Zone & Resource Area Impacts (temporary & permanent)
1. ® Buffer Zone Only—Check if the project is located only in the Buffer Zone of a Bordering
Vegetated Wetland, Inland Bank, or Coastal Resource Area.
2. ❑ Inland Resource Areas (see 310 CMR 10.54-10.58; if not applicable, go to Section B.3,
Coastal Resource Areas).
Check all that apply below. Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
ElMassachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands
WPA Form 3 - Notice of Intent MassDEP File Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number
salem
Salem Wetlands By-law
City-
/Town-B. Buffer Zone & Resource Area impacts (temporary & permanent coned
) ( 1
Resource Area Size of Proposed Alteration Proposed Replacement(if any
a. ❑ Bank _
For all projects 1.linear feet 2.linear feet
affecting other b. ❑ Bordering Vegetated
Resource Areas, Wetland 1.square feet 2.square feet
please attach a
narrative c. ❑ Land Under
explaining how Waterbodies and 1.square feet 2.square feet
the resource
area was Waterways
delineated. 3.cubic yards dredged
Resource Area Size of Proposed Alteration Proposed Replacement(if any)
d. ❑ Bordering Land
Subject to Flooding 1.square feet 2 square feet
3.cubic feet of flood storage lost cubic feet replaced
e. El Isolated Land 4.
Subject to Flooding tsquare feet
2.cubic feet of flood storage lost 3.cubic feet replaced
f. ❑ Riverfront Area 1.Name of Waterway(if available) -specify coastal or inland
2. Width of Riverfront Area (check one):
❑ 25 ft.- Designated Densely Developed Areas only
❑ 100 ft. - New agricultural projects only
❑ 200 ft. -All other projects
3. Total area of Riverfront Area on the site of the proposed project:
square feet
4. Proposed alteration of the Riverfront Area:
a.total square feet b.square feet within 100 ft. c.square feet between 100 ft.and 200 ft.
5. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes❑ No
s. Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes❑ No
3. ❑ Coastal Resource Areas: (See 310 CMR 10.25-10.35)
Note: for coastal riverfront areas, please complete Section B.2.f. above.
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands MassDEP File Number —
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number
em
Salem Wetlands By-law salCity/Town y
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont'd)
Check all that apply below. Attach narrative and supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
Online Users: "
Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any)
document
transaction
number a. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
(provided on
your receipt page)with all b. El Land Under the Ocean 1.square feet
supplementary
information you 2.cubic yards dredged
submit to the
Department. a ❑ Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below
d. ❑ Coastal Beaches 1,square feet 2.cubic yards beach nourishment
e. ❑ Coastal Dunes 1.square feet
q 2.cubic yards dune nourishment
Size of Proposed Alteration Proposed Replacement(if any)
f. ❑ Coastal Banks I.linear feet
g. ❑ Rocky Intertidal
Shores 1.square feet
h. ❑ Salt Marshes 1.square feet 2,sq it restoration,rehab.,creation
i. E] Land Under Salt
Ponds I.square feet __
2.cubic yards dredged
I. ❑ Land Containing
Shellfish 1.square feet
k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
1.cubic yards dredged
I. ❑ Land Subject to _
Coastal Storm Flowage 1.square feet
4. ❑ Restoration/Enhancement
If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the
square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional
amount here.
a.square feet of BM b.square feet of Salt Marsh
5. ❑ Project Involves Stream Crossings
a.number of new stream crossings b.number of replacement stream crossings
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands _—
� MassDEP File Number
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number
Salem Wetlands By-law Salem
Y Citylrown
C. Other Applicable Standards and Requirements
❑ This is a proposal for an Ecological Restoration Limited Project. Skip Section C and
complete Appendix A: Ecological Restoration Notice of Intent— Required Actions (310 CMR
10.11).
Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review
1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on
the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the
Natural Heritage and Endangered Species Program (NHESP)? To view habitat maps, see the
Massachusetts Natural Heritageor 9 Atlas o to
htto://rnaps.massgis state ma us/PRI EST HAB/vievver.htm.
a. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
2008 1 Rabbit Hill Road
b.Date of map Westborough, MA 01581
If yes,the project is also subject to Massachusetts Endangered
1 g Species Act (MESA) review (321
CMR 10.18). To qualify for a streamlined, 30-day, MESA/Wetlands Protection Act review, please
complete Section C.1.c, and include requested materials with this Notice of Intent (NOI); OR
complete Section C.11, if applicable. If MESA supplemental information is not included with the NOI,
by completing Section 1 of this form, the NHESP will require a separate MESA filing which may take
up to 90 days to review(unless noted exceptions in Section 2 apply, see below).
c. Submit Supplemental Information for Endangered Species Review"
1. ❑ Percentage/acreage of property to be altered:
(a)within wetland Resource Area --------_
percentage/acreage
(b)outside Resource Area
percentagetacreage
2. ❑ Assessor's Map or right-of-way plan of site
2. ❑ Project plans for entire project site, including wetland resource areas and areas outside of
wetlands jurisdiction, showing existing and proposed conditions, existing and proposed
tree/vegetation clearing line, and clearly demarcated limits of work"
(a)❑ Project description (including description of impacts outside of wetland resource area &
bufferzone)
(b) ❑ Photographs representative of the site
Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review(see
http://www mass.gov/eea/agencies/dfq/dfw/natLira1-heritage/ce.qLilatorV-i eviewi). Priority Habitat includes habitat for state-listed plants
and strictly upland species not protected by the Wetlands Protection Act.
'" MESA projects may not be segmented(321 CMR 10.16). The applicant must disclose full development plans even if such Plans are
not required as part of the Notice of Intent process.
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands
WPA Form 3 - Notice of Intent MassDEP File Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document—Transaction Number
Salem Wetlands By-law Salem
City/Town
C. Other Applicable Standards and Requirements (contrd)
(c)❑ MESA filing fee (fee information available at
htt0//www mass qov/dfwele/dfw/nheso/regulatory review/mesa/mesa fee ,chedule.htm).
Make check payable to "Commonwealth of Massachusetts- NHESP"and mail to NHESP at
above address
Projects altering 10 or more acres of land, also submit
tdl ❑ Vegetation cover type map of site
(e)❑ . Project plans showing Priority & Estimated Habitat boundaries
(0 OR Check One of the Following
I. ❑ Project is exempt from MESA review. j
Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14,
http://www.mass.gov/dfwele/dfw/nhesp/re ulatory review/mesa/mesa exernotions htm,
the NO] must still be sent to NHESP if the project is within estimated habitat pursuant to
310 CMR 10.37 and 10.59.)
2. ❑ Separate MESA review ongoing. —._
a.NHESP Tracking# b. Date submitted to NHESP
3. ❑ Separate MESA review completed.
Include copy of NHESP "no Take"determination or valid Conservation &Management
Permit with approved plan.
3. For coastal projects only, is any portion of the proposed project located below the mean high water
line or in a fish run?
a. ❑ Not applicable—project is in inland resource area only b. ❑ Yes ® No
If yes, include proof of mailing, hand delivery, or electronic delivery of NO[to either:
South Shore-Cohasset to Rhode Island border, and North Shore-Hull to New Hampshire border:
the Cape&Islands:
Division of Marine Fisheries- Division of Marine Fisheries-
Southeast Marine Fisheries Station North Shore Office
Attn: Environmental Reviewer Attn: Environmental Reviewer
1213 Purchase Street—3rd Floor 30 Emerson Avenue
New Bedford, MA 02740-6694 Gloucester, MA 01930
Email: DMF.EnvReview-Southostate.ma.LIS Email: DMF.EnvKe_vvievv NurtiTr�%siate.ma.us
Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region,
please contact MassDEP's Boston Office. For coastal towns in the Southeast Region, please contact
MassDEP's Southeast Regional Office.
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands
/
WPA Form 3 - Notice of Intent MassDEP File Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number
salem
Salem Wetlands By-law
Y
Cit (Town
C. Other Applicable Standards and Requirements (conYd)
4. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
Online users: a. ❑ Yes M No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP
Include your Website for ACEC locations). Note: electronic filers click on Website.
document
transaction b.ACEC ------- --
number
(provided on 5. Is any portion of the proposed project within an area designated as an Outstanding Resource Water
your receipt (ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00?
page)with all Y
supplementary a. ❑ Yes ® No
information you
submit to the 6. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Department. Restriction Act(M.G.L. c. 131, §40A) orthe Coastal Wetlands Restriction Act (M.G.L. c. 130, §
a. ❑ Yes ® No
7. Is this project subject to provisions of the MassDEP Stormwater Management Standards?
a. ❑ Yes.Attach a copy of the Stormwater Report as required by the Stormwater Management
Standards per 310 CMR 10.05(6)(k)-(q) and check if:
1.❑ Applying for Low Impact Development(LID) site design credits (as described in
Stormwater Management Handbook Vol. 2, Chapter 3)
2.❑ A portion of the site constitutes redevelopment
3. ❑ Proprietary BMPs are included in the Stormwater Management System.
b. ® No. Check why the project is exempt:- The project is a repair of an existing headwall.
t.❑ Single-family house
2.❑ Emergency road repair
3.❑ Small Residential Subdivision (less than or equal to 4 single-family houses or less than
or equal to 4 units in multi-family housing project)with no discharge to Critical Areas.
D. Additional Information
❑ This is a proposal for an Ecological Restoration Limited Project. Skip Section D and complete
Appendix A: Ecological Restoration Notice of Intent—Minimum Required Documents (310 CMR
10.12).
Applicants must include the following with this Notice of Intent (NO[). See instructions for details.
Online Users: Attach the document transaction number(provided on your receipt page) for any of
the following information you submit to the Department.
1. 0 USGS or other map of the area (along with a narrative description, if necessary) containing
sufficient information for the Conservation Commission and the Department to locate the
site. (Electronic filers may omit this item.)
2. ® Plans identifying the location of proposed activities (including activities proposed to serve as
a Bordering Vegetated Wetland [BVWj replication area or other mitigating measure) relative
to the boundaries of each affected resource area.
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands
WPA Form 3 — Notice of Intent MassDEP File Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem Document Transaction Number
Salem Wetlands By-law Salem —D. Additional Information (cont'd)
3. ❑ Identify the method for BVW and other resource area boundary delineations (MassDEP BVW
Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.),
and attach documentation of the methodology.
4. 0 List the titles and dates for all plans and other materials submitted with this NOI.
Site Plan Showing Proposed Work
a.Plan Title ---
Patrowicz Land Development Engineering Scott Patrowicz _
b.Prepared By c.Signed and Stamped by
9-18-15 5 scale
d.Final Revision Date e-Scale
f.Additional Plan or Document Title - -g. Date
s. ❑ If there is more than one property owner, please attach a list of these property owners not
listed on this form.
s. ❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
8. 0 Attach NOI Wetland Fee Transmittal Form
9. ❑ Attach Stormwater Report, if needed.
E. Fees -
1. ❑ Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district
of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing
authority, or the Massachusetts Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland
Fee Transmittal Form)to confirm fee payment:
999 9-21-15
2.Municipal Check Number 3.Check date - --
998 9-21-15
- -------------------
4.State Check Number 5.Check date —
Carmine _ Mongiello
6.Payor name on check:First Name 7. Payor name on check Last Name
ElMassachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands
WPA Form 3 — Notice of Intent MassDEP File Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number
Salem Wetlands By-law salem
City/Town
F. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying
plans, documents, and supporting data are true and complete to the best of my knowledge. I understand
that the Conservation Commission will place notification of this Notice in a local newspaper at the
expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to
the requirements of M.G.L. c. 131, §40. Notice must be made by Certificate of Mailing or in writing by
hand delivery or certified mail (return receipt requested)to all abutters within 100 feet of the property
line of the project location.
9-20-15
1.Signature o Applicant 2.Date
3.Signature of Property owner(if different) 4. Date
I fry -A 9-20-15
5.Signature o Representative(if any) 6.Date
For Conservation Commission:
Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents,
two copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the
Conservation Commission by certified mail or hand delivery.
For MassDEP:
One copy of the completed Notice of Intent(Form 3), including supporting plans and documents, one
copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the
MassDEP Regional Office (see Instructions) by certified mail or hand delivery.
Other:
If the applicant has checked the"yes" box in any part of Section C, Item 3, above, refer to that
section and the Instructions for additional submittal requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a
timely manner may result in dismissal of the Notice of Intent.
Notice of Intent .Fee 'Transmittal Form
(WPA Appendix B)
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands
NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Important: A. Applicant Information
When filling out
forms on the 1. Location of Project:
computer,use
only the tab key 120 Swampscott Road Salem
to move your a.Street Address - _------
cursor-do not b.City/Town
use the return 998 $42.50
key.�--� c.Check number d. Fee amount —
v/fl.� II 2. Applicant Mailing Address:
Angelo and Carmine Mt N to
Las -- -.---
a.First Name b. Last Name
fro
c.Orgamzation ---------------
55 Eastman Avenue
d.Mailing Address - -------
Swampscott
-----Swampscott MA 01907 _
e.City/Town I.State g.Zip Code
781-389-3802
h. Phone Number I. Fax Number j. Email Address -
3. Property Owner (if different):
SAME
a.First Name b. Last Name
c.Organization _-------
d.Mailing Address -
e.City/Town - f.State
g.Zip Code
h.Phone Number i.Fax Number j.Email Address -
To calculate B. Fees _
filing fees,refer
to the category
fee list and Fee should be calculated using the following process&worksheet. Please see Instructions before
examples in the filling out worksheet.
instructions for
Florm out 3(Notre of WPA Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and buffer zone.
Intent).
Step 2/Number of Activities: Identify the number of each type of activity.
Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions.
Step 4/Subtotal Activity Fee: Multiply the number of activities(identified in Step 2)times the fee per category
(identified in Step 3)to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in
addition to another Resource Area or the Buffer Zone, the fee per activity should be multiplied by 1.5 and then
added to the subtotal amount.
Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4.
Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract$12.50.To
calculate the city/town share of the fee, divide the total fee in half and add$12.50.
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands
NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Fees (continued) ---
Step Irrype of Activity Step 2/Number Step Step 4/Subtotal Activity
of Activities 3/Individual Fee
Activity Fee
repair existing headwall one $110.00 $110.00
Step 6/Total Project Fee:
Step 6/Fee Payments:
Total Project Fee: $110.00
a.Total Fee from Step 5
State share of filing Fee: $42.50
b. 1/2 Total Fee less$12.50
City/Town share of filling Fee: $67.50
c. 1/2 Total Fee plus$12.5o
C. Submittal Requirements
a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to
the Commonwealth of Massachusetts.
Department of Environmental Protection
Box 4062
Boston, MA 02211
b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent, a copy of
this form, and the city/town fee payment.
To MassDEP Regional Office(see Instructions): Send a copy of the Notice of Intent or Abbreviated Notice of
Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these
electronically.)
CARMINE MONGIELLO s7-7055/2113 9 9:8
ANGELO MONGIELLO 086600226,
55 EASTMAN AVE. i
SWAMPSQOTT, MA
01907-1209 DA 1'21�L
yPAY TO THE/p _
r ORDEROF l_.rn+L�.,�{J—_'16 42 L)'T
/'"� ------ —DOLLARS
� Ls
Salemn � ,,M
210 Essex Streeq Salem,MA 01970 c
mo
___ aff
p
O/
x: 2113705581: 086600226411° 0998
FTHE
MINE MONGIELLO 3 i075i2i'3 999
CARMINE
MONGIELLO '%6606226*
55 EASTMAN AVE.
SCOTT, MA. 019074209
-SCI �4 i--�.'Y�2. .____ I �G1 ✓ J V
/t1 !
DOLLARS
Save,M
210 Essex Street,Salem,hlA 01970 4/
MEMO r F�
0: 2113705581: 086600226411° 0999
Abutter Information
i
CITY OF SALEM CONSERVATION COMMISSION
NOTICE OF PUBLIC HEARING
NOTIFICATION TO ABUTTERS
Under the Massachusetts Wetlands Protection Act
&the City of Salem Wetlands Protection Ordinance
A Public Hearing will be held at the City Hall Annex 120 Washington Street, Salem, MA 01970
at:
6:30 pm on October 8, 2015
To consider a Notice of Intent
Of Angelo and Carmine Mongiello
For the property located at 120 Swampscott Road—Mao 6 Lot 14
The Notice of Intent is filed to repair an existing headwall on the northerly watercourse on
the property.
This is a joint hearing under the requirements of G.L. Ch 131 Section 40, as amended, and the
Salem Wetlands Protection Ordinance and Regulations. Plans are available at the Department of
Planning and Community Development at the City Hall Annex 120 Washington Street Salem,
MA from 8 am- 4 pm Monday — Wednesday, 8 am -7 pm on Thursday, and 8 am- 12 pm on
Friday. For information call the Conservation Agent at 978-619-5685.
Note: Notice of the public hearing, including its date, time and place, will be published at least a
week prior to the meeting date in The Salem News.
Note: Notice of the public hearing, including its date,time, place, will be posted on the Public
Meetings Bulletin Board in Salem City Hall not less than 48-hours in advance.
Note: You also may contact the Salem Conservation Commission or the nearest: Department of
Environmental Protection Regional Office for more information about this application or
the Wetlands Protection Act.
To contact DEP call:
Central Region: (508) 792-7650 Northeast Region: (978) 694-3200
Southeast Region: (508) 946-2714 Western Region: (413) 78=-1100
CITY OF SALEM
ASSESSOR'S CERTIFICATION OF ABUTTERS AND
PROPERTY OWNERS
BOARD/COMMISSION• Conservation Commission
PROJECT SITE: 06-4)()14, �'-0 n�m�r,cuitkould
DATE: 9/I G/I;
DESCRIPTION OF REQUIREMENT: All abutters and an) property property owr
ne
within 100 feet of the property line of the land where the activity is proposed
including if land is separated by a public or private street or a body of water and
not unreasonably distant from the project site.
This is to certify that the time of the last assessment for taxation made by the City of
Salem, the names and addresses ol'those listed on the attached sbeets are 'abutter's and
property owners"(as defined by Wetlands Protection Act 310 CMR 10.05(4)(a)) to the
parcel(s)of land listed above as the project site.
Assessor's Signature: ' -
r
Date: ! u� - -'�,c ; J
Number of initialed pages attached:
Once Certified, Return to:
Tom Devine, Department of Planning and Community Development
J �
4 P
t
9 rt,P
jg
On
LINE
� �—_ rS� 4�POfl 6nnietl 4n G3/162G15 �1 i?:5S 661
Il —
Use Avery"mplate 51600 ' Feed Pe er y sena amng rale'' l
® P expose Pop•Up Edgel", U 6c"L� Y1'��5960'a' i
d
Parcel ID:06.0014-0 Parcel ID: 06-0012-0
MONGIELLO CARMINELYNN SAND 6 STONE Parcel ID:06-0013-0
MONGIELLO ANGELO CIO AGGREGATE INDUSTRIES MOUNTAIN REALTY TRUST
55 EASTMAN AV 1715 BROADWAY HUTCHIIJSUIJ SHIRLEY A TR
SWAMPSCOTT,MA 01907P U BOX 403
SAUGUS,MA 01906
SALEM, MA 01970
Parcel ID:06-0016-0 Parcel ID:06-0018.0
LYNN SAND$STONE CO KOUNSALIEN SPIRO Parcel ID: 11-0002-0
C/O AGGREGATE INDUSTRIES156 DERBY VINANDAL, LLC
STREET
1715 BROADWAY SALEMMA STREET
4 ALVIN ROAD
,
SAUGUS,MA 01906 SWAMPSCOI'f.MA 01907
Parcel ID:07-0061-0 - Parcel ID:06-0020.0
D&D REALTY TRUST 15 ROBINSON ROAD REALTY
DILISIO D
ANAIDIHUTCHINSON FREDERICK TR
100 SWAMPSCOTT TT ROAD P p BOX 403
- SALEM,MA 01970 SALEM, MA 01970
WC[Uettes fadles 6 peler l A j
Utillsez le gabarit AVERY®5160® Sens de RePilez a la hachure afin de IvvvJuv.averycon-� �,!
A chargement rAvBlerie rebord Pap-upvc 5-bU0•GCi•AVENY
Attachment A
Project Description
Proposed Work for Culvert Headwall Repair
120 Swampscott Road, Salem
The proposed project involves the repair of a masonry culvert headwall at 120
Swampscott Road in Salem. The Commission may remember this project as they had
issued an order of conditions previously to perform much of the same work, although the
former application was more extensive than what is proposed today. That order of
conditions, even with the Permit Extension Act has expired.
A seasonal stream onh
t e northerly side of this property runs through a culvert wider a
driveway entrance at the northwest corner of the lot. There is a masonry headwall around
the down stream end of this culvert. This headwall has deteriorated where stones have
fallen out of the wall and some larger pieces of granite or fieldstone have shifted out of a
plumb orientation. A fence has been damaged by winter plowing as well.
The property is for sale and the owners(applicant prefer a less intrusive solution to shore
up the existing headwall.
The culvert headwall is like any other low retaining wall structure. It requires
maintenance from time to time. At this site, some of the stones have fallen out of the
wall. Other stones have shifted or may have been knocked out of place from winter
plowing. An existing chain link fence has been pushed over from winter plowing. The
owners wish to repair this small section of their property.
The repair work will involve re-stacking or re-setting the headwall stones to a vertical
position again. The length of headwall is approximately 45 linear feet. The owners
anticipate that they will use various hand tools primarily such as a pry bar or similar tool
to work the stones back to a vertical position. A backhoe may be used to maneuver some
of the larger stones.
The wall stones will be re-set and mortared into place. Any stones that fell out of the
wall and are in the seasonal watercourse will be salvaged and re-used, or at a minimum,
be removed from the watercourse. The owners may opt to bring in some larger stones
with a less rounded shape s that they can be pieced together with greater precision and
stability.
2
The work will involve adding crushed drainage stone behind the wall and then restoring
the ground surface with a crushed rock driving surface in any disturbed areas of Robinson
Road. The site plans included with this application show the details of the headwall
repair.
The applicant will remove any deteriorated hay bales along the top of the old wall and
add new hay bales along the top of the re-built headwall to help filter any runoff that runs
down Robinson Road.
Avoidance of Impacts to Resource Areas
With reasonable site controls, none of the performance standards for bank will he
impacted. The relevant performance standards include maintaining:
1. The physical stability of the Bank;
2. The water carrying capacity of the existing channel within the Bank;
3. Ground water and surface water quality;
4. The capacity of the Bank to provide breeding habitat, escape cover and food for
Fisheries;
5. The capacity of the Bank to provide important wildlife habitat functions.
We expect that no impacts will occur to the
P adjacent intermittent stream banks. The
existing and proposed headwall are beyond the limits of the adjacent banks. The only
activity that could occur on the stream banks is possible foot traffic from the workers re-
positioning the stones.
The work will actually contribute to the stability of the adjacent banks in that the banks
will not be impacted by an untimely catastrophic collapse of the headwall if the headwall
were not repaired. The dimensions of the headwall will not change so there is no
infringement of the work on the water carrying capacity of the existing channel.
Fisheries are not an issue at this water course and the project does not impact any bank
resource area so impacts to wildlife habitat functions are not incurred.