64-446 - 96 SWAMPSCOTT ROAD - CONSERVATION COMMISSION R4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number.
WPA Form 8B — Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided
by DEP
J A. Project Information
C Imponeft
When filling out 1. This Certificate of Compliance is issued to:
forum
putera
rnputer,
couse
Groom Construction
only the tab key Name
to move your
96 Swampscott Road
curuse M returndo Moiling Address
� use the(atom
key. Salem MA 01970
./������ Cityrrown State Zip Code
1 2. This Certificate of Compliance is issued for work regulated by a final Order of
Conditions issued to:
J Groom Construction
• rt°^ Name
May 29,2007 #64-446
Dated DEP He Number
3. The project site is located at
v 96 Swampscott Road Salem
Street Address cityrrown
Map 7 lot 007
Assessors Map/Plot Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Property Owner(if ddterem)
Essex County
County Book Page
c205000
Certificate
4. A site inspection was made in the presence of the applicant,or the applicant's agent,
on:
May 14 2010
Data �I�I ��tf 9fII1t rI II II
50919I5II
e�III�IIIllll� Itl
2(C206 )Souhrn Essex Di,frit( 89372
6/ eaist
ry11/2010
12:09 Ph COMPL Pe: 1/4
wpefmdE.dx•rer.122309 WPAFm 68,Catlrira wcmpYence•Pee1 d3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number.
WPA Form 8B — Certificate of Compliance #64-446
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Certification
Check all that apply:
® Complete Certification: It is hereby certified that the work regulated by the
above-referenced Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work
regulated by the above-referenced Order of Conditions have been satisfactorily
completed.The project areas or work subject to this partial certifmtion that have
been completed and are released from this Order are:
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the
above-referenced Order of Conditions never commenced.The Order of
Conditions has lapsed and is therefore no longer valid. No future work subject to
regulation under the Wetlands Protection Act may commence without filing a new
Notice of Intent and receiving a new Order of Conditions.
❑ Ongoing Conditions:The following conditions of the Order shall continue:
(Include any conditions contained in the Final Order,such as maintenance or
monitoring,that should continue for a longer period).
Condition Numbers:
C. Authorization
Issued by:
Salem May 27, 2010
Conservation Commisslon Ode of Issuance
This Cer'i e mu t be signed by a majority of the Conservation Commission and a
copy s t to the ap licent and appropriate DEP Regional Office(See
htt :! mass. vldeolabout/regionNndvour.html.
Signature
e
wpehnft dw•rev.12r2aW WPA Fwm 69.Celt to d Co*W=•Pepe 2 m3
• �• y�aC2os-coS
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number.
WPA Form 8B — Certificate of Compliance #64-446
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in
the Registry of Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To:----------------------------------------------------------------------------------------------.-.-..
Salem
conservation CommiaMon
Please be advised that the Certificate of Compliance for the project at
96 Swampscott Road 1164-446
Project Location DEP He Number
Has been recorded at the Registry of Deeds of
Essex
county
for.
Property Owner
and has been noted in the chain of title of the affected property on:
Data Book Page
if recorded land,the instrument number which identifies this transaction is:
If registered land,the document number which identifies this transaction is:
Document Number
Signature of Applicant
wyeft"m6w.m.MAW WPAFn W.Cv"W a&Cwpllenre•Pap3ar3
Document: 509958
COnPL
ESSEX SOUTHERN DISTRICT REGISTRY OF DEEDS
RECEIVED FOR REGISTRATION
On: 6/11/2010 12:09 Pn '
Noted on Cert: 0205 005
J
- I
V �
May 19, 2010
372 Alcrrlmac St,eer
Mr. David Pabich ,vee,huryparr
Chair Mas.,hns,tr,
Salem Conservation Commission 01950
City Hall Annex (978)46;-1428
120 Washington Street
Salem, MA 01970 R.
('7781 465-2/10
Re: Request for Certificate of Compliance mM-.Wncaseoclare,.net
Groom Construction, 96 Swampscott Road DEP File#64-446
Dear Mr. Pabich,
Enclosed please find one original and seven (7)copies of a Request for Certificate of
Compliance for the installation of the wind turbine at 96 Swampscott Road. The work
has been completed in substantial compliance with the Order of Conditions issued by
the Conservation Commission on May 29, 2007 as noted in the attached letter from
Patrowicz Land Development Engineering. Please note that the client decided not to
install the bollards shown on the attached approved site plan. I have attached a copy of
the Order of Conditions for your use.
Could you please place this item on your May 27, 2010 meeting agenda? Should you
have any questions or comments regarding this submittal, or if you require any additional
information, please contact our office at(781)439-2461.
Sincerely,
VINE ASSOCIATES, INC.
RECEI V r-
MAY 2 0 2010
Susan St. Pierre DEPT.OF PLANNING&
Project Manager COMMUNITY DEVELOPMENT
CC: J. Guerster
PATROWICZ
LAND DEVELOPMENT ENGINEERING
May 19, 2010
Salem Conservation Commission
City Hall Annex
120 Washington Street
Salem, MA 01970
RE: Request for Certificate of Compliance: Groom Construction, 96 Swampscott Road
DEP File number 64-446
PLDE#07-12
Dear Commission Members:
I have inspected the site with Frank Taormina and Susan St. Pierre on 5/15/10 and found the
constructed improvements (wind turbine installed on a concrete pad and landscaping) to be in
substantial compliance with the Order of Conditions issued on 5/29/07.
On behalf of the owner, I respectfully request submit the following for your review: WPA Form 8A
(Request for Certificate of Compliance) and this cover letter(Statement of compliance). On behalf
of the owner, I respectfully request that the Certificate of Compliance be issued at the 5/27/10
Conservation Commission meeting.
Thank you.
Sincerely,
PATRO Z LAND DEVELOPMENT ENGINEERING
Scott Patrowicz, P.E.
14 Brown Street, Salem, Massachusetts 01970
Cell: 978-836-6400 Fax: 978-745-4110 Email: scott.patrowicz@verizon.net
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection -Wetlands
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 �� by DEP
A. Project Information
Important:
When filling out 1. This request is being made by:
fors on the Groom Construction
computer,use Name
only the tab sco
96 Swampscott Road
key to move p
your cursor- Mailing Address
do not use the Salem MA 01970
return key. City/rown State Zip Code
781.592.3135
VQ
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
° Groom Construction
Applicant
May 29,2007 64-446
Dated DEP File Number
Upon completion
of the work 3. The project site is located at:
authorized in 96 Swampscott Road Salem
an Order of Street Address City/rown
Conditions,the 7 007 0
property owner
must request a Assessors Map/Plat Number Parcel/Lot Number
Certificate of 4. The final Order of Conditions was recorded at the Registry of Deeds for:
Compliance g ry
from the issuing 96 Swampscott Road LLC
authority stating Property Owner(if different)
that the work or Essex
portion of the
work has been County Book Page
satisfactorily C205000
completed. Certificate(if registered land)
5. This request is for certification that(check one):
® the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed(use additional paper if necessary).
❑ the above-referenced Order of Conditions has lapsed and is therefore no longer valid,and the
work regulated by it was never started.
wpararmaa.d.—rev.711a Page 1 art
Massachusetts Department of Environmental Protection DEP File Number.
Bureau of Resource Protection -Wetlands
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information (cont.)
6. Did the Order of Conditions for this project,or the portion of the project subject to this request,contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions(OOC). If the project received an DOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office(see htto://www.mass.cov/dep/about/region/fiindvour.html.
wpalannMd.-rev]/1390 Pa 2d2
CITY OF SALEM
.w.2 CONSERVATION COMMISSION
June 2, 2010
Scott Patrowicz
Patrowicz Land Development Engineering
15 Brown Street
Salem, Massachusetts 01970
Re: Certificate of Compliance
96 Swampscott Road—Groom Construction Wind Turbine—Salem, Massachusetts
Dear Mr. Patrowicz:
Enclosed, please find the Certificate of Compliance for the above referenced project. This
Document must be recorded at the Essex County Registry of Deeds (Shetland Park, 45
Congress Street, Suite 4100, Salem, MA). Please fill out and return the Recording Information
on Page 4 of the Certificate of Compliance, which will indicate to the Salem Conservation
Commission that the document has been recorded.
If you have any further questions, please feel free to contact me at 978-619-5685.
Sincerely,
Fra k Taormi a
Planner/Harbor Coordinator
Interim Conservation Agent
Cc: DEP Northeast Regional Office
t
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number.
WPA Form 8B —. Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, 0 #64-446
Provided by DEP
A. Project Information
_ Important:
When filling out 1. This Certificate of Compliance is issued to:
forms on the
computer, use Groom Construction
only the tab key Name
to move your 96 Swampscott Road
curuse the
return
not Mailing Address
use the urn
key. Salem MA 01970
Cityrrown State Zip Code
VS_0__�_J2. This Certificate of Compliance is issued for work regulated by a final Order of
Conditions issued t
Groom Construction
Name
May 29, 2007 #64-446
Dated DEP File Number
3. The project site is located at:
96 Swampscott Road Salem
Street Address Cityrrown
Map 7 Lot 007
Assessors Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Property Owner(if different)
Essex County
County Book Page
c205000
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent,
on:
May 14, 2010
Date
"ekreft. •rar.1=3.09 WPA Foran 813,CenifimM 0 Compliable•Page 7 of 3
14
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 86 — Certificate of Compliance lance
i<r -aas
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 provided by DEP
B. Certification
Check all that apply:
® Complete Certification: It is hereby certified that the work regulated by the
above-referenced Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work
regulated by the above-referenced Order of Conditions have been satisfactorily
completed. The project areas or work subject to this partial certification that have
been completed and are released from this Order are:
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the
above-referenced Order of Conditions never commenced. The Order of
Conditions has lapsed and is therefore no longer valid. No future work subject to
regulation under the Wetlands Protection Act may commence without filing a new
Notice of Intent and receiving a new Order of Conditions.
❑ Ongoing Conditions: The following conditions of the Order shall continue:
(Include any conditions contained in the Final Order, such as maintenance or
monitoring, that should continue for a longer period).
Condition Numbers:
C. Authorization
Issued by:
Salem May 27 2010
Conservation Commission Date of Issuance
This Certi emu t be signed by a majority of the Conservation Commission and a
copy s t to the ap lica it and appropriate DEP Regional Office(See
htt :/! mass. v/dep/about/region/findvour.htm).
Signature
wpef raft oo•rev.120=9 WPA Form 86.Cenifiaafe of C.Plie •Page 2 of 3
q' <
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance f164-446
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in
the Registry of Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To:--------------------------------------------------------------------- --------------------------
Salem
Conservation Commission '
Please be advised that the Certificate of Compliance for the project at:
96 Swampscott Road 1164-446
Project Location DEP File Number
Has been recorded at the Registry of Deeds of
Essex
County
for:
Property Owner
and has been noted in the chain of title of the affected property on:
Date Book Page _
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applicant _
wpeb rft,doc•rer.12MM9 APA Form 8B,Ce ifl a &Compllarr •Page 3 of 3
.,�_.. 't. xP^—. +•� -<*r. c»:: ��"�"'-'3C" sJ l8 cam""'°' v v t "'"a",d Px f rr- �t [Id lm' �1
a
...
Massachusetts Departmentot Env r'6rimen€a] PrQtectton
DEP File Number;,'
Bureau of Resouroe ProtectionY Wetlands
F '
$6MA
VW $ oy ! ",fy O ' CtpI IqV, } ...
MassachusetIVetlands Protection Act`fivi G,L, c,x13i, po
G. Reecarrling Information
Thig Order of t ohditions must ec reorded in the Registry of Needs orthe lend Court 16Fr me district in,,,,
which the landis located,*ithin the chain of title of thy, affected property. (n the case of recoiled land,the
Final Order shall also be i7oted In the Registry's Grantor index under the name of'the owner o`the land ;
s4jeot to the Order. In the case of registered an d;,this Order shall also be notedon the Land Court '
Certificate of Title of the owne,of the lard subject to the Order of Oo'tditions,l he iiocorcling inforriation
t on Page 7 of this form shall be subrnitted to the Gonservatfcn Commission)iated bedw,
x Sa'em_
^. _` Cgnserva'fon Calnrn ion,. s
Detach an do ed zine, have stamped 5y tho Registry of Deetls and subt t to Cahservation Gomm) Gn.
,
d
--------------
0.p '
a Salem +. diad
f . ..Conseivatian.Comroiss10i1 +s;rs d « r - r4, an
Please be advised that th4a-Order cf Gorr.itions for the Project of
96 Stivampscott Road 64' a6
F'rafec+Luratfon - DEP File Nuflbar
r} � ' t--1
r
C/v't 4 Aj i r. din
€ Has been recorded at the Registry, f L7
r
Eisex
w
Count,/.,„ d.w -- v usi
�., �[e �:1
for: #P t
L'EitH1 4
P
1
P oprre 01 b
r
and has been noted in the chain c titre ofthe'a#tooled property n t
Rage
740 i
In accordance with the Order of Conditions issued nn
Date
. j.w S _ F 4:: S
If recorded and; the instr f cent number identifying this trans,qo�tion is.
&
E lrstrument Numbrf
.. .. :,.. .=4
.0 .Q<
If registered land, the aoc6rnert� number ideo#riyIng this transaction is ,: "
�w �
Doclunan,�J,1m'^gr " $
r _ oit
t
Signature of App(cant _
� ,d
st
F' n�afnrrr,5 ac:-iev.3lh;5 x .e,": i t Pag 9.13i
4, 471
eu
I
y} .. ..
T
t,i§i�htGr;�Sw .:fit"LIpt+W,e°.d 'aL�:-:x-.---.�.+�,,.
v6�COAi
t.
CITY OF SALEM
CONSERVATION COMMISSION
May 29, 2007
Susan St. Pierre
Vine Associates
372 Merrimac Street
Newburyport, MA 01950
Re: Order of Conditions—DEP #64-446
96 Swampscott Road, Salem,Massachusetts
Dear Ms. St. Pierre:
Enclosed, please find the Order of Conditions for the above referenced project.
Following the 10-day appeal period (as of June 8, 2007), this document and the attached
Special Conditions must be recorded at the Essex County Registry of Deeds (36 Federal
Street, Salem, MA). Once recorded, please return a copy of Page 9 of the Order, which
will indicate to the Commission that the document has been recorded.
As indicated in the Order,prior to any work commencing:
1. this Order must be recorded,
2. a sign shall be displayed showing DEP File#64-446 within public view, and
3. contact me at least 48 hours prior to any activity to schedule a pre-construction
meeting to review the Order with your hired contractor.
If you have any further questions,please feel free to contact me 978-619-5685.
Sinc e ,
Carey Duq s
Conservation Agent/ Planner
Enclosures
CC: DEP Northeast Regional Office
L11Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-446
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. General Information
Important: Salem
When filling From: 1.Conservation Commission
out forms on
the computer, 2.This issuance is for (check one): a. ® Order of Conditions b. ❑ Amended Order of Conditions
use only the
tab key to 3.To: Applicant:
move your
cursor-do not Groom Realty
use the return a.First Name b.Last Name c.Company
key. 96 Swampscott Road
d.Mailing Address
VQ Salem MA 01970
e.City/Town I.State g.Zip Code
4. Property Owner (if different from applicant):
a. First Name b. Last Name c.Company
d.Mailing Address
e.City/Town
I.State g.Zip Code
5. Project Location:
96 Swampscott Road Salem
a.Street Address b.City/Town
c.Assessors Map/Plat Number d. Parcel/Lot Number
Latitude and Longitude, if known (note:
electronic filers will click for GIS locator): e.Latitude I. Longitude
s. Property recorded at the Registry of Deeds for (attach additional information if more than one parcel):
a.County b.Certificate(if registered land)
c. Book d. Page
April 13, 2007 May 17, 2007 May 29, 2007
7. Dates: a.Date Notice of Intent Filed b. Date Public Hearing Closed c.Date of Issuance
e. Final Approved Plans and Other Documents (attach additional plan or document references as
needed):
Site Plan Proposed Location for a Demonstration Wind Turbine to accompany a Notice of Intent
Application
Patrowicz Land DevelopmentPatrowicz Land Development Engineering Scott Ian Patrowicz
b. Prepared By c.Signed and Stamped by
April 11, 2007 1"=40'
d. Final Revision Date e.Scale
Photographs of Wind Turbine April 12 2007
I.Additional Plan or Document Title g.Date
wpaformitloc• rev.311105
Page 1 019
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-446
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings
t. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information provided
in this application and presented at the public hearing, this Commission finds that the areas in which
work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that
apply:
a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution
d. ® Private Water Supply e. ® Fisheries f. ® Protection of Wildlife
Habitat
g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance standards set
forth in the wetlands regulations. This Commission orders that all work shall be performed in
accordance with the Notice of Intent referenced above, the following General Conditions, and any
other special conditions attached to this Order. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these
conditions shall control.
Denied because:
b. ❑ the proposed work cannot be conditioned to meet theerformanc t
p e standards set forth in the
wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice
of Intent is submitted which provides measures which are adequate to protect these interests, and a
final Order of Conditions is issued. A description of the performance standards which the
proposed work cannot meet is attached to this Order.
C. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the
effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this
project may not go forward unless and until a revised Notice of Intent is submitted which provides
sufficient information and includes measures which are adequate to protect the Act's interests, and a
final Order of Conditions is issued. A description of the specific information which is lacking and
why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c).
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
3. ❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and
wetland boundary (if available) a.linear feet
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. ❑ Bank a.linearfeet b.linearfeet c.linearfeet d.linear feet
s. ❑ Bordering Vegetated
Wetland a.square feet b.square feet c.square feet d.square feet
6. EJLand Under Waterbodies a.square feet b.square fest c.square feet d.square feet
and Waterways
e.cuyd dredged f.cu.yd dredged
wpaiorm5.tloc• rev.9/1/05
Page 2 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-446
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings (cont.)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
7. El Bordering Land
Subject to Flooding a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet
s. ❑ Isolated Land Subject
to Flooding a.square feet b.square feet
Cubic Fee[Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet
e. N Riverfront area 64 64
a.total sq.feet b.total sq.feet
Sq It within 100 It 6464
c.square feet d.square feet e.square feet f.square feet
Sq It between 100-200 ft 00
g.square feet hsquare feet i.square feet j.square feet
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
10. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
11. ❑ Land Under the Ocean a.square feet b.square feet
c.cu.yd dredged d.cu.yd dredged
12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below
13. ❑ Coastal Beaches a.square feet b.square feet c.c/y nourishmtd.c/y nourishmt.
14. ❑ Coastal Dunes a.square feet b.square feet c.c/y nourishmt. d.c/y nourishmt
16. ❑ Coastal Banks a. linear feet b.linear feet
16. ❑ Rocky Intertidal Shores a:square feet b.square teat
17. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet
is. ❑ Land Under Salt Ponds a.square teat b.square feet
c.cu.yd dredged d.cu.yd dredged
19. ❑ Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
20. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
a.cuyd dredged b.cu.yd dredged
21. ❑ Land Subject to Coastal
Storm Flowage a.square feet b.square feet
wpaform5.dx- rev.311/05
Page 3 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-446
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
(only applicable to approved projects)
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory
measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any
injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order
unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years, but less
than five years, from the date of issuance. If this Order is intended to be valid for more than three
years, the extension date and the special circumstances warranting the extended time period are
set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse,
rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard,
pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing.
7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such
an appeal has been taken, until all proceedings before the Department have been completed.
8. No work shall be undertaken until the Order has become final and then has been recorded in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title
of the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to
be done. In the case of the registered land, the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done. The recording
information shall be submitted to this Conservation Commission on the form at the end of this Order,
which form must be stamped by the Registry of Deeds, prior to the commencement of work.
9. A sign shall be displayed at the site not less then two square feet or more than three square feet in
size bearing the words,
"Massachusetts Department of Environmental Protection" [or, "MA DEP"]
"File Number 64-446 "
wpalorm5aoc• rev.3/1/05
Page 4 0l 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 — Order of Conditions 64-446
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the
Conservation Commission shall be a party to all agency proceedings and hearings before DEP.
11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of
Compliance (WPA Form 8A) to the Conservation Commission.
12. The work shall conform to the plans and special conditions referenced in this order.
13. Any change to the plans identified in Condition #12 above shall require the applicant to inquire of the
Conservation Commission in writing whether the change is significant enough to require the filing of a
new Notice of Intent.
14. The Agent or members of the Conservation Commission and the Department of Environmental
Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours
to evaluate compliance with the conditions stated in this Order, and may require the submittal of any
data deemed necessary by the Conservation Commission or Department for that evaluation.
15. This Order of Conditions shall apply to any successor in interest or successor in control of the
property subject to this Order and to any contractor or other person performing work conditioned by
this Order.
16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland,
the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden
stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate
of Compliance has been issued by the Conservation Commission.
17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully-
stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or
water body. During construction, the applicant or his/her designee shall inspect the erosion controls
on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately
control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission, which reserves the right to require additional erosion and/or damage prevention controls
it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
18. All work associated with this Order is required to comply with the Massachusetts Stormwater Policy
Standards.
Special Conditions:
If you need more
space for
additional
conditions,
select box to
attach a text
document
wpalorm5.tloc• rev.3/1/05
Page 5 019
L11Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-446
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
D. Findings Under Municipal Wetlands Bylaw or Ordinance
t. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No
z. The - hereby finds (check one that applies):
Conservation Commission
3. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal
ordinance or bylaw specifically:
a. Municipal Ordinance or Bylaw b.Citation
Therefore, work on this project may not go forward unless and until a revised Notice of Intent is
submitted which provides measures which are adequate to meet these standards, and a final Order of
Conditions is issued.
4. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or
bylaw:
a. Municipal Ordinance or Bylaw b. Citation
The Commission orders that all work shall be performed in accordance with the following conditions
and with the Notice of Intent referenced above.To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the'
conditions shall control.
If you need more 9 P c. The special conditions relating to municipal ordinance or law are as follows:
space for p Y
additional The special conditions attached to this Order of Conditions relate to both the Cit of Salem's local
select box to
conditions, ordinance and the Massachusetts Wetlands Protection Act. y
attach a text
document
w aforrr doc• rev.3/1/05 Page 6 of 9
L1Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
1 WPA Form 5 — Order of Conditions 64-446 ;
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
E. Issuance
This Order is valid for three years, unless otherwise specified as a special 9 c2wl
condition pursuant to General Conditions #4, from the date of issuance. t.Date of issuance
Please indicate the number of members who will sign this form: 5;X n(,i>
This Order must be signed by a majority of the Conservation Commission. 2. Number of signers
The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electronically, and the property owner, if different
from applicant.
Signatures
!
� -'aA'Izzr (-AAALaC
Notary Acknowledgement
Commonwealth of Massachusetts County of Essex
On this 17 of May 2007
Day Month Year
Before me, the undersigned Notary Public, K. Cornacchio, D. Pabich, M. Slier, K. Glidden,
personally appeared D. Summer, A. Hamilton, J. Furnari
proved to me through satisfactory evidence of identification, which was/were
personally known
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged to
me that he/she signed it voluntarily for its stated purpose.
As member of Salem Conservation Commission
Cityrrown
CAREY R.DUOUES )
?` eorra�r�vwwafueene �
at:? M/0WAIWwEvIrm
20113 Signature of tary Public
Carey R. D ques
Printed Name of Notary Public
Place notary seal and/or any stamp above August 2013
My Commisssion Expires(Date)
This Order is issued to the applicant as follows:
❑ by hand delivery on by certified mail, return receipt requested,on
Date Date
wpaforrr5.doc• rev.3/1/05 Page 7 of
L1Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
1 WPA Form 5 - Order of Conditions 64-446
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject
to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of
their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions.
The request must be made by certified mail or hand delivery to the Department, with the appropriate filing
fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR
10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at
the same time be sent by certified mail or hand delivery to the Conservation Commission and to the
applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding
Order associated with this appeal will be required to demonstrate prior participation in the review of this project.
Previous participation in the permit proceeding means the submission of written information to the
Conservation Commission prior to the close of the public hearing, requesting a Superseding Order or
Determination, or providing written information to the Department prior to issuance of a Superseding Order
or Determination.
The request shall state clearly and concisely the objections to the Order which is being appealed and how
the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands
Protection Act, (M.G.L. c. 131, §40) and is inconsistent with the wetlands regulations (310 CMR 10.00).
To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts
Wetlands Protection Act or regulations, the Department has no appellate jurisdiction.
Section G, Recording Information is available on the following page.
w aform5Atl • rev.311105 Page 8 of 9
L1Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
1 WPA Form 5 - Order of Conditions 64-446
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located, within the chain of title of the affected property. In the case of recorded land, the
Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land
subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court
Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information
on Page 7 of this form shall be submitted to the Conservation Commission listed below.
Salem
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
_------------------------------------- --------------------------------------------------------------------------------
To:
Salem
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
96 Swampscott Road 64-446
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
Essex
County Book Page
for:
Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wpalorm5.tloc• rev.3/1/05 Page 9 of
Attachment to Order of Conditions # 64-446
Page lof 5
SALEM CONSERVATION COMMISSION
DEP FILE #64-446
96 Swampscott Road
City of Salem, Massachusetts
ADDITIONAL FINDINGS
Based on the Estimated Habitats or Rare Wildlife and Certified Vernal Pools Map (June 1, 2003) from Natural
Heritage &Endangered Species Program(NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has
been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contains any
vernal pools.
This Order is issued under the Massachusetts Wetlands Protection Act,M.G.L. Chapter 131, Section 40 and the City
of Salem Wetlands Protection Ordinance,Salem Code Chapter 34,Section 34-1 —34-13.
This Order permits the installation of a six (6)foot by three (3)foot deep concrete foundation upon which a 34 foot
high tower wind turbine will be located. A total of 64 square feet of Riverfront Area located within the inner
riparian zone (0-100 feet from the River) will be impacted for the above referenced project. Excavation activities
will be staged from the roadway and a row of haybales and silt fence will be placed around the excavation area to
protect the down-gradient BVW and pond, as noted on the approved site plan. Excavated materials shall be
immediately removed from the resource area and all buffer zones.
GENERAL CONDITIONS
1. This Order of Conditions must be recorded in its entirety (all 5 pages) at the Essex County Registry of
Deeds or the Land Court for the district in which the land is located, after the expiration of the 10-day
appeal period and within 30 days of the issuance. A copy of the recording information must be
submitted to the Salem Conservation Commission before any work approved in this Order
commences.
2. Approval of this application does not constitute compliance with any law or regulation other than
M.G.L Chapter 131, Section 40, Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands
Protection Ordinance, Salem Code Chapter 34,Section 34-1 —34-13.
3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No
alteration of wetland resource areas or associated buffer zones, other than that approved in this Order,
shall occur on this property without prior approval from the Commission.
4. Prior to any work commencing, a sign shall be displayed showing DEP File #64-446, and not placed on
a living tree.
5. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the
date of the issuance of this Order.
6. With respect to this Order, the Commission designates the Conservation Agent as its agent with powers
to act on its behalf in administering and,enforcing this Order.
Attachment to Order of Conditions # 64-446
Page 2of 5
7. The Commission or its Agent,officers,or employees shall have the right to enter and inspect the property at
any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131,
Section 40,the Wetlands Regulations 310 CMR 10.00, and shall have the right to require any data or
documentation that it deems necessary for that evaluation.
8. The term"Applicant" as used in this Order of Conditions shall refer to the owner, any successor in
interest or successor in control of the property referenced in the Notice of intent, supporting documents
and this Order of Conditions. The Commission shall be notified in writing within 30 days of all
transfers of title of any portion of the property that takes place prior to issuance of the Certificate of
Compliance.
9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and
approvals associated with this project. These permits may include but are not necessarily limited to the
following:
(1) Section 404 of the Federal Water Pollution Control Act (P.L. 92-500, 86 stat. 816), U.S. Army
Corps of Engineers.
(2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority
of sec. 27(5) of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00.
(3) Sewer Extension Permit from the DEP Division of Water Pollution Control under G. L. Ch. 21A ss7
and 314 CMR 7.00. Any Board of Health permit for septic system design for any portion of the
septic system within 100 feet of wetlands shall be submitted to the Commission prior to
construction initiation.
(4) Design Requirements for Construction in Floodplains under the State Building Code(780 CMR
744.).
10. If there are conflicting conditions within this Order, the stricter condition(s) shall rule.
11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and
surface waters during construction or after completion of the project.
12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods
and boundary during construction if necessary.
13. The Commission reserves the right to impose additional conditions on portions of this project or this site
to mitigate any actual or potential impacts resulting from the work herein permitted.
14. The work shall conform to the following attached plans and special conditions:
Final Approved Plans
Site Plan Proposed Location for a Demonstration Wind Turbine to accompany a Notice of
Intent Application
(Title)
April 11, 2007
(Dated)
Scott Ian Patrowicz
(Signed and Stamped 6y)
City of Salem Conservation Commission
(On file with)
Attachment to Order of Conditions # 64-446
Page 3of 5
15. Any proposed changes in the approved plan(s) or any deviation in construction from the approved
plan(s)shall require the applicant to file a Notice of Project Change with the Commission. The Notice
shall be accompanied by a written inquiry prior to their implementation in the field, as to whether the
change(s) is substantial enough to require filing a new Notice of Intent or a request to correct or amend
this Order of Conditions. A copy of such request shall at the same time be sent to the Department of
Environmental Protection.
16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has
been issued,the applicant or current landowner shall submit to the Commission a statement signed by the
buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of
the Order of Conditions.
PRIOR TO CONSTRUCTION
17. Prior to the commencement of any activity on this site other than activities listed above,there
shall be a Pre-Construction Meeting between the project supervisor,the contractor responsible for the
work, and a member of the Conservation Commission or its Administrator to ensure that the
requirements of the Order of Conditions are understood. The staked erosion control line shall be
adjusted, if necessary, during the pre-construction meeting. Please contact the Conservation Commission
Agent at (978)745-9595 ext 311 at least forty-eight(48) hours prior to any activity to arrange for the
pre-construction meeting.
18. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and
erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The
Commission and/or its Administrator shall inspect and approve such installation at the pre-construction
meeting.
19. No clearing of vegetation, including trees, or disturbance of soil shall occur prior to the pre-construction
meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre-
construction meeting if absolutely necessary in order to place erosion control stakes where required.
20. There shall be 10 hay bales and wooden stakes under cover on the site to be used only for emergency
erosion control.
EROSION CONTROL
21. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction,
and shall be maintained during construction in the wetland areas and buffer zones. The erosion control
specifications provided in the Notice of Intent and the erosion control provision in the Order will be the
minimum standards for this project; the Commission may require additional measures.
22. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland
resource areas to prevent sediment from entering wetland resource areas.
23. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or
replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed.
24. The area of construction shall remain in a stable condition at the close of each construction day.
25. Any de-watering of trenches or other excavation required during construction shall be conducted so as
to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered
Attachment to Order of Conditions # 64-446
Page 4of 5
through hay bale sediment traps, silt filter bags or other means approved by the Commission or its
Administrator.
26. Within thirty(30)days of completion of construction on any given portion of the project, all disturbed
areas in the completed portion of the site shall be permanently stabilized with rapidly growing
vegetative cover, using sufficient top soil to assure long-term stabilization of disturbed areas.
27. If soils are to be disturbed for longer that two(2) months, a temporary cover of rye or other grass should
be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,
exposed surface shall be stabilized by other appropriate erosion control measures, firmly anchored, to
prevent soils from being washed by rain or flooding.
DURING CONSTRUCTION
28. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all
times when work is in progress.
29. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on
the approved plan(s).
30. All waste products,grubbed stumps,slash;construction materials,etc. shall be deposited at least 100 feet
from wetland resource areas and 200 feet from river.
31. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage
system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be
immediately removed.
32. All exposed sub-soils shall be covered by a minimum of three(3)inches of quality screened loam topsoil
prior to seeding and final stabilization.
33. Immediately following drainage structure installation all inlets shall be protected by silt fence,haybale
barriers and/or silt bags to filter silt from stormwater before it enters the drainage system.
34. There shall be no pumping of water from wetland resource areas.
35. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other
components shall be fixed immediately.
36. During construction, all drainage structures shall be inspected regularly and cleaned as necessary.
37. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance
of enforcement actions b the Conservation Commission including, but not limited to civil administrative
Y g, strap e
penalties under M.G.L Chapter 21A, section 16.
AFTER CONSTRUCTION
38. Upon completion of construction and final soil stabilization, the applicant shall submit the following to
the Conservation Commission to request a Certificate of Compliance(COC):
(1) A Completed Request for a Certificate of Compliance form(WPA Form 8A or other form if
required b the Conservation Comm ssion at the time of request).
9 Y
(2) A letter from a Registered Professional Engineer certifying compliance of the property with this
Order of Conditions.
i
Attachment to Order of Conditions # 64-446
Page 5of 5
(3) An "As-Built" plan signed and stamped by a Registered Professional Engineer or Land Surveyor
showing post-construction conditions within all areas under the jurisdiction of the Massachusetts
Wetlands Protection Act. This plan shall include at a minimum:
(a) All wetland resource area boundaries with associated buffer zones and regulatory setback
areas taken from the plan(s)approved in this Order of Conditions;
(b) Locations and elevations of all stormwater management conveyances,structures and best
management designs,including foundation drains,constructed under this Order within any
wetland resource area or buffer zone;
(c) Distances from any structures constructed under this Order to wetland resource areas-
"structures"include,but are not limited to,all buildings,septic system components,wells,
utility lines,fences,retaining walls, and roads/driveways;
(d) A line delineating the limit of work-"work"includes any filling,excavating and/or
disturbance of soils or vegetation approved under this Order;
39. When issued, the Certificate of Compliance must be recorded at the Essex County Registry of Deeds
and a copy of the recording submitted to the Salem Conservation Commission.
40. If the completed work differs from that in the original plans and conditions, the report must specify how
the work differs; at which time the applicant shall first request a modification to the Order. Only upon
review and approval by the Commission, may the applicant request in writing a Certificate of
Compliance as described above.
41. Erosion control devices shall remain in place and properly functioning until all exposed soils have been
stabilized with final vegetative cover and the Conservation Commission and/or its Administrator has
authorized their removal.
ADDITIONAL CONDITIONS
42. Applicant shall stage equipment on pavement and work from the roadway.
43. Applicant shall remove all soils immediately from the resource area and all buffer zones.
Wate�front
.r..•.,
...•..•.�
ASSOCIATES,
371 Morn...ac Slrea
Ner"bw,mori
April 12, 2007 M°ss°chuseirs
01950
Mr. Kevin Cornacchio (978)465-1428
Chair
Fax
Salem Conservation Commission
City Hall Annex (978)465-2640
120 Washington Street
Salem, MA 02201
Re: Notice of Intent Filing
Proposed Wind Turbine
96 Swampscott Road
t•` Dear Mr. Cornacchio,
Enclosed please find one original and six(6) copies of a Notice of Intent to install a
demonstration residential-scale wind turbine at the above referenced property. The
applicant is Groom Realty, LLC which recently purchased space at the 96 Swampscott
Road property. Groom Realty, LLC includes two divisions, Groom Construction
Corporation and Groom Energy Solutions, LLC. The latter is the company's energy
division that has been installing these devices in various Massachusetts locations.
The wind turbine is proposed to be located along the top of the side slope along the
entrance road that was recently planted and improved as part of the 96 Swampscott
Road Order of Conditions(see DEP File No.64-410).
The proposed work involves the installation of a 6 foot by 6 foot by 3 foot deep concrete
foundation upon which the 34 foot high tower will be installed. The location has been
selected to provide optimum wind flow conditions for the turbine.
The work is proposed at the landward edge of the 200 foot riparian zone in the Riverfront
Area along the existing street and is also located in the Buffer Zone of the Bordering
Vegetated Wetlands (BVW). The total area affected is 36 square feet. Foundation
S•ai
Mr. Cornacchio
Salem Conservation Commission
April 12, 2007
Page 2 of 2
excavation activities will be staged from the roadway to the extent practical and a row of
hay bales will be placed around the excavation area to protect the down-gradient BVW
and pond. The duration of the work is expected to be between three to four weeks to
allow sufficient curing time for the concrete foundation prior to the installation of the
tower. Attachment 3 includes some photographs of the wind turbine installed on a
circular foundation. As described, the proposed installation at the site will occur on a
larger, square foundation to spread the load more effectively.
As required, one (1) copy of the Notice of Intent has been submitted to the Northeast
Regional Office of the Department of Environmental Protection. We have enclosed a
check in the amount of$95.50 to cover the local filing fee for this Category 1 activity.
Should you have any questions or comments regarding this submittal, or if you require
any additional information, please contact our office at (978)465-1428.
Sincerely,
VINE ASSOCIATES, INC.
• Susan St. Pierre
Principal
CC: DEP Northeast Region (1 copy)
•
NOTICE OF INTENT
DEMONSTRATION RESIDENTIAL SCALE WIND TURBINE
96 SWAMPSCOTT ROAD
SALEM, MA
Submitted to:
SALEM CONSERVATION COMMISSION
CITY HALL
120 WASHINGTON STREET
SALEM,MA 01970
• Prepared for:
GROOM REALTY,LLC
96 SwAMPscoTT ROAD
SALEM, MA 01970
Prepared by:
VINE ASSOCIATES,INC.
372 Merrimac Street
Newburyport, MA 01950
In Association with
Patrowicz Land Development Engineering
• April 12,2007
INDEX
Attachments
1. WPA Form 3- NOI Application Form
2. Abutters Notification
3. Photographs and List of Plans
•
•
ATTACHMENT 1
WPA Form 3 - NOI Application Form
Massachusetts Department of Environmental Protection Provided byDEP:"—
-
Bureau of Resource Protection -Wetlands DEP File Number
WPA Form 3 - Notice of Intent �^ DocumentTransacfionNumber
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 - -- c- - - -,
Salem
City/rown
Important:
When filling out A. General Information
forms on the
computer,use
only the tab key 1. Project Location (Note: electronic filers will click on button for GIS locator):
to move your 96 Swampscott Road Salem MA
cursor-do not a.Street Address use the return b.City/rown c.Zip Code
key. Latitude and Longitude: 42.64842 71/02'25
d.Latitude e.Longitude
VQ
Map 07 Parcel 0070_0
f.Assessors Map/Plat Number g.Parcel ILot Number
2. Applicant:
Groom Realty,
LLC b.Last Name c.Company
Note: 96 Swampscott Road
Before d.Mailing Address
completing this Salem
form consult MA 01970
your local e.City/Town f.State g.Zip Code
Conservation 781-592-3135 781-593-1480 dave@groomco.com
Commission h.Phone Number i.Fax Number J.
Email address
regarding any
municipal bylaw 3. Property owner(if different from applicant): ❑ Check if more than one owner
or ordinance.
• 96 Swampscott Road LLC
c.
a.First Name b.Last Name c.Company
5 Corn Point Road
d.Mailing Address
Marblehead MA 01945
e.City/Town f.State g.Zip Code '.
(781)631-5015
h.Phone Number i.Fax Number 1.Email address
4. Representative(if any):
a.Fmn
Susan St. Pierre
b.Contact Person First Name c.Contact Person Last Name
372 Merrimac Street
d.Mailing Address
Newburyport MA 01950
e.City/Town f.State g.Zip Code
(978)465-1428 (978)465-2640 sst.pierre@vineassociates.net
h.Phone Number i.Fax Number 1.Email address
5. Total WPA Fee Paid (from NO[Wetland Fee Transmittal Form):
$165.00 $70.00 $95.00
a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid
6. General Project Description:
Installation of a demonstration residential-scale wind turbine.
wpaformIdoc•rev.10/16/06
Page 1 of 9
Massachusetts Department of Environmental Protection Provided by DEP:-
Bureau of Resource Protection - Wetlands DEP File Number_
WPA Form 3 - Notice of Intent 0I Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
city/rown
A. General Information (continued)
7. Project Type Checklist:
a. ❑ Single Family Home b. ❑ Residential Subdivision
C. ❑ Limited Project Driveway Crossing d. ❑ Commercial/Industrial
e. ❑ Dock/Pier f. ❑ Utilities
g. ❑ Coastal Engineering Structure h. ❑ Agriculture—cranberries, forestry
i. ❑ Transportation j. ® Other
8. Property recorded at the Registry of Deeds for:
Essex
a.County b.Page Number
25972 69284(PL 1180242)
c.Book d.Certificate#(if registered land)
• 9. Has work been performed on the property under an Order of Resource Area Delineation involving
Simplified Review within 3 years of the date of this application?
a. ❑Yes b. ® No
If yes, no Notice of Intent or Request for Determination of Applicability may be filed for work within the
50-foot-wide area in the Buffer Zone along the resource area during the three-year term of an Order
of Resource Area Delineation, or any Extended Order, or until the applicant receives a Certificate of
Compliance, whichever is later.
10. Buffer Zone Only- Is the project located only in the Buffer Zone of a bordering vegetated wetland,
inland bank, or coastal resource area?
a. ❑Yes-answer 11 below,then skip to Section C.
b. ® No-skip to Section B.
11. Buffer Zone Setback—For projects that involve work only in the buffer zone, select the applicable
adjacent resource area (check one):
a. ❑ BVW b. ❑ inland bank c. ❑coastal resource area
The distance between the closest project disturbance and the associated resource area is:
d.linear feet
wpaformIdoc•rev. 10/16/06
Page 2 of 9
Massachusetts Department of Environmental Protection Provided by DEP'-' -
l Bureau of Resource Protection - Wetlands DEP File Number
r WPA Form 3 - Notice of Intent
Document Transaction_ Number,
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem rt.
atyrrown
B. Resource Area Effects
1. Inland Resource Areas
Check all that apply below.Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
Online Users:
Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any)
document
transaction
number a. ❑ Bank 1.linear feet 2.linear feet
(provided on b. ❑ Bordering Vegetated
your receipt
page)with all Wetland 1.square feet 2.square feel
supplementary
information you c. ❑ Land Under 1.square feet 2.square feet
submit to the Waterbodies and
Department. Waterways
3.cubic yards dredged
d. ❑ Bordering Land
Subject to Flooding 1.square feet 2.square feet
3.cubic feet of flood storage lost 4.cubic feet of flood storage replaced
• e. ❑ Isolated Land Subject
to Flooding 1.square feet
2.cubic feet of flood storage lost 3.cubic feet of flood storage replaced
unnamed
f. ® Riverfront area 1.Name of Waterway(if available)
❑For projects 1.Width of Riverfront Area(check one):
impacted by the
riverfront area ❑ 25 ft. -Designated Densely Developed Areas only
and a buffer
zone of another
resource area, ❑ 100 ft. -New agricultural projects only
add 50%to the
total fee. ® 200 ft. -All other projects
2.Total area of Riverfront Area on the site of the proposed project: 376,194
Square Feet
3. Proposed alteration of the Riverfront Area:
64 64 0
a.TotalSquare Feet b.Square Feet within 100 ft. c.Square Feet between 100 ft.and 200 ft.
4. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes® No
5.Was the lot where the activity is proposed created prior to August 1, 1996? ® Yes❑ No
110
wpaform3.doc•rev.10/16/06 Page 3 of 9
Massachusetts Department of Environmental Protection Provided by DER
Bureau of Resource Protection -Wetlands DEP File Number
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 `— -Document Transaction Number-- ---m�- -•-
Salem
City/rown
B. Resource Area Effects
2. Coastal Resource Areas:
Check all that apply below. Attach narrative and supporting documentation describing how the project
will meet all performance standards for each of the resource areas altered, including standards
requiring consideration of alternative project design or location.
Online Users:
Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any)
document
transaction
number a. E] Designated Port Areas Indicate size under Land Under the Ocean, below
(provided on
your receipt b. ❑ Land Under the Ocean
page)with all 1.Square feet
supplementary
information you 2.Cubic yards dredged
submit to the
Department. c. ❑ Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes
below
d. ❑ Coastal Beaches 1.Square feel 2.Cubic yards beach nourishment
e. ❑ Coastal Dunes 1.Square feet
q 2.Cubic yards dune nourishment
f. ❑ Coastal Banks 1.Linear feet
g. ❑ Rocky Intertidal Shores 1.Square feet
h. ❑ Salt Marshes 1.Square feet 2.Sq it restoration,rehab.,or creation j
i. ❑ Land Under Salt Ponds 1.Square feet
2.Cubic yards dredged
j. ❑ Land Containing
Shellfish 1.Square feet 2.Square feet restoration,rehab.
k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
1.Cubic yards dredged
I. ❑ Land Subject to Coastal
Storm Flowage 1.Square feet
3. Limited Project:
Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR
10.24 or 310 CMR 10.53?
e a. ❑ Yes ® No If yes, describe which limited project applies to this project:
b.Limited Project
wpaform3.doc•rev.10/16/06
Page 4 of 9
Massachusetts Department of Environmental Protection Provided by-DEP:
Bureau of Resource Protection - Wetlands
DEP File Number
i WPA Form 3 - Notice of Intent
s.
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 LDocument Transaction NumberSalem _
city/rown
C. Bordering Vegetated Wetland Delineation Methodology
Check all methods used to delineate the Bordering Vegetated Wetland (BVW) boundary:
Online users: 1. ❑ Final Order of Resource Area Delineation issued by Conservation Commission or DEP
Include your (attached)
document
transaction 2. ❑ DEP BVW Field Data Form (attached)
number
(provided on
your receipt 3. ❑ Final Determination of Applicability issued by Conservation Commission or DEP (attached)
page)with all
supplementary 4. ❑ Other Methods for Determining the BVW Boundary information you 9 (attach documentation):
submit to the
Department. a. ❑ 50%or more wetland indicator plants
b. ❑ Saturated/inundated conditions exist
For all projects c. ❑ Groundwater indicators
affecting other d. ❑ Direct observation
Resource Areas,
please attach a e. ❑ Hydric soil indicators
narrative f. ❑ Credible evidence of conditions prior to disturbance
explaining how
the resource 5. Other resource areas delineated:
area was
delineated. D. Other Applicable Standards and Requirements
Streamlined Massachusetts Endangered Species Act(Wetlands Protection Act Review
1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on
the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural
Heritage and Endangered Species Program(NHESP)?To view habitat maps, see the Massachusetts
Natural Heritage Atlas or go to http://www.mass.gov/dfvvele/dfw/nheso/nhregmap.htm.
a. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
2006 Route 135, North Drive
b.Date of map Westborough, MA 01581
If yes, the project is subject to Massachusetts Endangered Species Act(MESA) review(321 CMR
10.18). To qualify for a streamlined, 30-day, MESA/Wetlands Protection Act review, please complete
Section 1, and include requested materials with this Notice of Intent(NOI); OR complete Section 2, if
applicable. If MESA supplemental information is not included with the NOI, by completing Section 1 of
this form, the NHESP will require a separate MESA filing which may take up to 90 days to review
(unless noted exceptions in Section 2 apply, see below).
A. Submit Supplemental Information for Endangered Species Review
❑ Percentage/acreage of property to be altered:
(1)within wetland Resource Area percentage/acreage
(2)outside Resource Area percentage/acreage
❑ Assessor's Map or right-of-way plan of site
wpaform3.doc•rev.10/16/06 Page 5 of 9
Massachusetts Department of Environmental Protection Provided by DEPT`
Bureau of Resource Protection -Wetlands I DEP File Number
WPA Form 3 - Notice of Intent
_n
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document TransadioNumber.
Salem
City/Tom
D. Other Applicable Standards and Requirements (cont.)
❑ Project plans for entire project site, including wetland Resource Areas and areas outside of
wetlands jurisdiction, showing existing and proposed conditions, existing and proposed
tree/vegetation clearing line, and clearly demarcated limits of work**
❑ Project description(including description of impacts outside of wetland Resource Area&
Buffer Zone)
❑ Photographs representative of the site
❑ MESA filing fee(fee information available at:
hftp://www.mass.gov/dfWele/dfw/nhesp/nhenymesa.htm)
Make check payable to"Natural Heritage&Endangered Species Fund"and mail to NHESP
at above address
Projects altering 10 or more acres of land, also submit.,
❑ Vegetation cover type map of site
❑ Project plans showing Priority&Estimated Habitat boundaries
B. OR Check One of the Following
• ❑ Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption
applies. (See 321 CMR 10.14, http//www mass qov/dfwele/dfw/nheso/nhenvexemptions htm)
❑ Separate MESA review ongoing.
NHESP Trao i g Number Date submitted to NHESP
❑ Separate MESA review completed.
Include copy of NHESP"no Take"determination or valid Conservation & Management Permit
with approved plan.
Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP
review(see www.nhesp.org regulatory review tab). Priority Habitat includes habitat for state-
listed plants and strictly upland species not protected by the Wetlands Protection Act.
'* MESA projects may not be segmented(321 CMR 10.16).The applicant must disclose full development plans
even if such plans are not required as part of the Notice of Intent process.
2. For coastal projects only, is any portion of the proposed project located below the mean high water
line or in a fish run?
a.❑ Yes ❑ No If yes, include proof of mailing or hand delivery of NOI to either:
South Shore-Cohasset to Rhode North Shore-Hull to New Hampshire:
Island, and the Cape&Islands:
Division of Marine Fisheries-
Division of Marine Fisheries- North Shore Office
Southeast Marine Fisheries Station Attn: Environmental Reviewer
Attn: Environmental Reviewer 30 Emerson Avenue
838 South Rodney French Blvd. Gloucester, MA 01930
New Bedford, MA 02744
b. ® Not applicable—project is in inland resource area only
wpaform3.doc•rev.10116/06 Page 6 of 9
Massachusetts Department of Environmental Protection Provided by DEP:
Bureau of Resource Protection -Wetlands• DEP File Number
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number,
Salem
cityrrown
D. Other Applicable Standards and Requirements (cont.)
3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
a. ❑ Yes ® No If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP
Website for ACEC locations). Note: electronic filers click on Website.
b.ACEC
Online users: 4. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Include your Restriction Act(M.G.L. c. 131, §40A)or the Coastal Wetlands Restriction Act(M.G.L. c. 130, § 105)?
document
transaction
number a. ElYes ® No
(provided on 5. Is any activity within any Resource Area or Buffer Zone exempt from performance standards of the
your receipt
page)with all wetlands regulations, 310 CMR 10.00.
supplementary
information you a. ❑ Yes ® No If yes, describe which exemption applies to this project:
submit to the
Department.
b.Exemption
6. Is this project subject to the DEP Stormwater Policy? a. ❑ Yes ® No
If yes, stormwater management measures are required.Applicants should complete the Stormwater
Management Form and submit it with this form.
b. If no, explain why the project is exempt:
No new stormwater impacts-Project limited to pier recontruction. No increase of impervious area
proposed.
E. Additional Information
o anon
Applicants must include the following with this Notice of Intent(NOI). See instructions for details.
Online Users:Attach the document transaction number(provided on your receipt page)for any of the
following information you submit to the Department.
1. ® USGS or other map of the area (along with a narrative description, if necessary)containing
sufficient information for the Conservation Commission and the Department to locate the site.
(Electronic filers may omit this item.)
z. ® Plans identifying the location of proposed activities(including activities proposed to serve as a
Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to
the boundaries of each affected resource area.
3. ❑ Other material identifying and explaining the determination of resource area boundaries
shown on plans(e.g., a DEP BVW Field Data Form).
4. ® List the titles and dates for all plans and other materials submitted with this NOI.
5. ❑ If there is more than one property owner, please attach a list of these property owners not
listed on this form.
6. ❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
wpaform3.doc•rev.10/16/06 Page 7 of 9
Massachusetts Department of Environmental Protection Provided by DEP:
Bureau of Resource Protection - Wetlands
DEP File Number
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number
Gloucester
Cityrrown
E. Additional Information (cont.)
8. ® Attach NOI Wetland Fee Transmittal Form
9. ❑ Attach Stormwater Management Form, if needed.
F. Fees
The fees for work proposed under each Notice of Intent must be calculated and submitted to the
Conservation Commission and the Department(see Instructions and NOI Wetland Fee Transmittal
Form).
No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth,
federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts
Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee
Transmittal Form)to confirm fee payment:
1038$ �/12-/67
1.Municipal Check Number 2.Check date
_ /03RQyhz/o7
3.State Check Number 4.Check date
• 5.Payor name on check:First Name 6.Payor name on check:Last Name
G. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans,
documents, and supporting data are true and complete to the best of my knowledge. I understand that
the Conservation Commission will place notification of this Notice in a local newspaper at the expense of
the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the
requirements of M.G.L. c. 131, §40. Notice must be made in writing by hand delivery or certified mail
(return ceipt reques )to all abutters within 100 feet of the property line of the pro'ect location.
+/I,
0-7
nat of A icantDate
1 //ZJa7
Sign ure of roperty Own if diffe t) Date � '7
Sin ur o Representative(IT any) Date
For Conservation Commission:
Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents;
two copies of pages 1 and 2 of the NOI Wetland Fee Transmittal Form; and the city/town fee payment
must be sent to the Conservation Commission by certified mail or hand delivery.
For DEP:
One copy of the completed Notice of Intent(Form 3), including supporting plans and documents;one copy
of pages 1 and 2 of the NOI Wetland Fee Transmittal Form; and a copy of the state fee payment must be
sent to the DEP Regional Office(see Instructions)by certified mail or hand delivery. (E-filers may submit
• these electronically.)
wpaform3.doc•rev.10/16/06 Page 8 of 9
Provided by--DEP:-
Massachusetts Department of Environmental Protection r
Bureau of Resource Protection - Wetlands DEP File Number
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document_Transaction NumberSalem
Citylrown
G. Signatures and Submittal Requirements (cont.)
Other:
If the applicant has checked the"yes" box in any part of Section D, Item 3, above, refer to that section
and the Instructions for additional submittal requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a
timely manner may result in dismissal of the Notice of Intent.
•
wpaform3.doc•rev.10/16/06 Page 9 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands
! NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Important: A. Applicant Information
When filling out
forms on the 1. Applicant:
computer, use
only the tab Groom Realty, LLC
key to move a.First Name b.Last Name c.Company
your cursor- 96 Swampscott Road
do not use the d.Mailing Address
return key. Salem MA 01970
e.Cityrrown f.State g.Zip Code
° 781-592-3135
h.Phone Number
�m 2. Property Owner(if different):
96 Swampscott Road, LLC
a.First Name b.Last Name c.Company
5 Corn Point Road
d.Mailing Address
Marblehead MA 01945
e.City/Town f.State g.Zip Code
(617)428-2800
h.Phone Number
3. Project Location:
• 96 Swampscott Road Salem
a.Street Address b.City/rown
To calculate B. Fees
filing fees, refer
to the category Notice of Intent(Form 3)or Abbreviated Notice of Intent(Form 4):
fee list and
examples in the The fee should be calculated using the following six-step
instructions for 9 g p process and worksheet. Please see
filling out WPA Instructions before filling out worksheet.
Form 3(Notice of
Intent). Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and
buffer zone.
Step 21N umber of Activities: Identify the number of each type of activity.
Step 31individual Activity Fee: Identify each activity fee from the six project categories listed in the
instructions.
Step 4/Subtotal Activity Fee: Multiply the number of activities(identified in Step 2)times the fee per
category(identified in Step 3)to reach a subtotal fee amount. Note: If any of these activities are in a
Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be
multiplied by 1.5 and then added to the subtotal amount.
Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4.
Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract
$12.50. To calculate the city/town share of the fee, divide the total fee in half and add$12.50.
Wpefonn3.Wc•NOI Weyand Fm TrensmiM Form•rev.3nN5 Pegs 1&2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands
• NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Fees (continued)
Step 1/Type of Activity Step 2/Number Step Step 4/Subtotal Activity
of Activities 3/Individual Fee
Activity Fee
1 1 110 x1.5 $165
Step 5/Total Project Fee: $165
• Step 6/Fee Payments:
Total Project Fee: $165.00
a.Total fee from Step 5
State share of filingfee: $70.00
b.12 total fee less$12.50
Cityrrown share of filling fee: $95.00
c.1/2 total fee plus$12.50
C. Submittal Requirements
a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee,
payable to the Commonwealth of Massachusetts.
Department of Environmental Protection
Box 4062
Boston, MA 02211
b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent;
a copy of this form; and the city/town fee payment.
c.) To DEP Regional Office(see Instructions): Send a copy of the Notice of Intent or Abbreviated
Notice of Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of
Intent may submit these electronically.)
WpaformlA •NOI We d Fee Tw w ttal Form•rev.31105 Page 2 of 2
ATTACHMENT 2
Abutters Notification Form
0
CITY OF SALEM
CONSERVATION COMMISSION
MEMORANDUM
TO: Assessor's Office
FROM: Carey Duques,Planner/Conservation Agent
DATE: April 11, 2007
RE: Certified Abutters List
The Salem Conservation Commission is requesting a certified abutters list for the property
located on 96 Swampscott Road (Map 7—Lot 0070).
. The following are the 100-foot abutters to the project site:
Map 7—Lots 0077, 0062, 0078, 0079, 0074, 0061, 0043_801-888
Map 6—Lot 0013
When list is completed please send to:
Susan St. Pierre
Vine Associates; Inc.
372 Merrimac Street
Newburyport, MA 01950
Thank you for your attention to this matter. If you have any questions, please contact me at
extension 8682.
I •
II, �
Abutters Notification
•
•
Notification to Abutters Under the
Massachusetts Wetlands Protection Act
In accordance with the second paragraph of Massachusetts General Laws Chapter 131, Section 40,
you are hereby notified of the following:
A. The name of the applicant is Groom Realty, LLC
The applicant has filed a Notice of Intent with the Conservation Commission for the municipality of
Salem
seeking permission to remove, till, dredge or alter an Area Subject to Protection under the Wetlands
Protection Act (General Laws Chapter 131, section 40).
B. The address of the lot where the activity is proposed 96 Swampscott Road, Salem MA
C. Copies of the notice of Intent may be examined at Salem City Hall Annex 120 Washington Street
between the hours of 9 AM and 5 PM on the following days of the weeks:
Monday through Thursday and 9.00 and 12.00 PM Friday
For more information, call: (978) 745-9595 ext 311
Check One: This is the applicant j representative.or other X(specify): Salem Planning Office
D. Copies of the Notice of Intent may be obtained from either(check one)the_ applicant, or the
applicant's representative X by calling this telephone number
(978)465-1428 between the hours of 8:30 AM and 4:30 PM on
the following days of the week: Monday through Friday
E. Information regarding the date, time, and place of the public hearing may be obtained from
Salem Conservation Commission
by calling this telephone number (978) 745-9595 between the hours of and on the following
days of the week:
Monday through Thursday and 9.00 and 1200 PM Friday
Check One: This is the applicant, representative, or other X(specify): Salem City Hall
NOTE: Notice of the public hearing, including its date, time, and place, will be published at least
five(5) days in advance in the Salem Evening News
Name of newspaper
NOTE: Notice of the public hearing, including its date, tine, and place,will be posted in the City or Town Hall not
less than forty-eight(48) hours in advance.
NOTE: You also may contact your local Conservation Commission or the nearest Department of Environmental
• Protection Regional Office for more information about this application or the Wetlands Protection Act. To contact
DEP, call: the Northeast Region: (978)661-7600.
ATTACHMENT 3
• Photographs and List of Plans
t _
d
T .
„a .�'r•' r7d .,,�, .,x � } � e � „mow
�f SS's .r ,� ? �w�' •.. � "S-i`��, x
N
ILI
Ard �F*y `R
..�' tJ ✓ \F ! i` C^-�,�}y5:� .C^" 'i.T/e"'Yvii: y,
I ui:
ML C
T i 1 t hAu
K nye
Ly
l
n
w
;:
ye k v
f
List of Plans
1. Locus Map
2. Site Plan Layout for a Wind Turbine to Accompany a Notice of Intent
Application for Groom Realty, LLC at#96 Swampscott Road, Salem,
Massachusetts dated April 13, 2007 and prepared by Patrowicz Land
Development Engineering.
P
•
• A . /9ii v �'�f �11 /�/rl i .� 1 I\\�i � C�` �:. r !�<.�'`/ �
LA
b 4
IN
0
,P•l � . .� � L a� rfL,r
n
-4 oil
,..
k � a
�
:�.� ~ -- I ` Ott ti • - ++ r
CA - J'�� fly 8, �.• �. ` r