Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
64-404 - 1 SMITH AVENUE - CONSERVATION COMMISSION
o _ _ _ I-#6q—tock I Siwv"ve _I RNM Massachusetts Department of Environmental Protection LJ Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 7 — Extension Permit for Orders of Conditions 64404 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP C. Recording Confirmation The applicant shall record this document in accordance with General Condition 8 of the Order of Conditions (see below), complete the form attached to this Extension Permit, have it stamped by the Registry of Deeds, and return it to the Conservation Commission. Note: General Condition 8 of the Order of Conditions requires the applicant, prior to commencement of work, to record the final Order(or in this case, the Extension Permit for the Order of Conditions) in the Registry of Deeds or the Land Court for the district in which the land is located within the chain of title of the affected property. In the case of recorded land, it shall be noted in the Registry's Granter Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, it shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. Detach page 3 of Form 7 and submit it to the Conservation Commission prior to the expiration of the Order of Conditions subject to this Extension Permit. To: Salem Conservation a on Commission Please be advised that the Extension Permit to the Order of Conditions for the project at: 1 Smith Avenue 64-404 Project Location DEP File Number has been ecorded at the Registry of Deeds of: County for:V 1 G 4" (;Wy 6"( ( Prop Owner and has been noted in the chain of title of the affected property in accordance with General Condition 8 of the original Order of Conditions on: od t f 55 - Date Book Page If recorded land the instrument number which identifies this transaction is: Instrument Number If registered land, the document number which identifies this transaction is: Document Number Signature of Applicant EGEHiV OCT 0 8 2008 DEPT.OF PLANNING& wpafcrm7.dac•rev.7/14/04 COMP,' :;?l'u 'v:ter_LOP}R�(`rrR Page 3 of 3 J "�cosu& A,� = N A CITY OF SALEM CONSERVATION �mNe COMMISSION October 3, 2008 Patrick and Carol Farrell 1 Smith Avenue Salem, MA 01970 Re: Extension Permit for Order of Conditions--DEP #64-404 Construction of a garage and associated utilities- 1 Smith Avenue, Salem, Massachusetts Dear Mr. and Mrs. Farrell: Enclosed, please find the Extension Permit for Orders of Conditions for the above referenced project. The attached Extension Permit must be recorded at the Essex County Registry of Deeds, Shetland Park 45 Congress Street, Suite 4100 Salem, Massachusetts. Once recorded, please return a copy of Page 3 of the Extension Permit, which will indicate to the Commission that the document has been recorded. This extension permit is good until September 22, 2012 and allowsou to complete the Y project at 1 Smith Avenue including construction of a garage and associated utilities as described in the original Notice of Intent filed on August 26, 2005. If you have any further questions, please feel free to contact me 978-619-5685. Sinc ly, Carey DuqYes Conservation Agent/Staff Planner Enclosures CC: DEP Northeast Regional Office Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands WPA Form 7 — Extension Permit for Orders of Conditions 64-404 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. General Information Important: When filling out 1. Applicant: forms on the Patrick and Carol Farrell computer, use Name only the tab key to move 1 Smith Avenue your cursor- Mailing Address do not use the Salem MA 01970 return key. Cityrrown State Zip Code m 2. Property Owner(if different): Name mun Mailing Address Cityrrown state Zip Code B. Finding Information The Order of Conditions (or Extension Permit) issued to the applicant or property owner listed above on: September 22, 2005 Date for work at: 1 Smith Avenue Map 36 Lots 227 and Street Address Assessor's Map/Plat Number 226 Parcel/Lot Number recorded at the Registry of Deeds for: Essex South 25003 14 County Book Page Certificate(if registered land) is hereby extend Se tember 2,�nfl 012 \\ Date i This date can be mo than 3 years from the expiration date of the Order of Conditions or the latest extension. Only unexpired Orders of Conditions or Extension may be extended. Date the Order was last extended (if applicable): Dale Issued by: Salem Conservation Commission wpaform7.doc•rev.7114104 Page 1 of 3 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 7 — Extension Permit for Orders of Conditions 64-404 i Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Finding Information (cont.) This Order of Conditions Extension must be signed by a majority of the Conservation Commission and a copy sent to the applicant and the appropriate DEP Regions Office. Signatu Notary Acknowledgement Commonwealth of Massachusetts County of Essex On this 25 of September 2008 Day Month Year Before me, the undersigned Notary Public, personally appeared K. Cornacchio, K. Glidden, M. Blier, D. Pabich, A. Hamilton, Name of Signer proved to me through satisfactory evidence of identification, which was/were personally known Description of evidence of identification to be the person whose name is signed on the preceding or attached document, and acknowledged to me that he/she signed it voluntarily for its stated purpose. As member of Salem Conservation Commission City/Town CAREY R.OUOUES More ooW���M w OF Evill urrrn my commwm orr e�lrm arp,at to so+a Sig tura of otary Public Carey R. u ues Printed Name of Notary Public 13 Place notary seal and/or any stamp above August 16, My Commissionn Expires(Date) v aformZdoc•rev.7/14/04 Page 2 of 3 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands WPA Form 7 — Extension Permit for Orders of Conditions 64-404 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP C. Recording Confirmation The applicant shall record this document in accordance with General Condition 8 of the Order of Conditions (see below), complete the form attached to this Extension Permit, have it stamped by the Registry of Deeds, and return it to the Conservation Commission. Note: General Condition 8 of the Order of Conditions requires the applicant, prior to commencement of work, to record the final Order(or in this case, the Extension Permit for the Order of Conditions)in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, it shall be noted in the Registry's Granter Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, it shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. Detach page 3 of Form 7 and submit it to the Conservation Commission prior to the expiration of the Order of Conditions subject to this Extension Permit. To: Salem Conservation Commission Please be advised that the Extension Permit to the Order of Conditions for the project at: 1 Smith Avenue 64-404 Project Location DEP File Number has been recorded at the Registry of Deeds of: County for: Property Owner and has been noted in the chain of title of the affected property in accordance with General Condition 8 of the original Order of Conditions on: Date - _ Book Page If recorded land the instrument number which identifies this transaction is: Instrument Number If registered land, the document number which identifies this transaction is: Document Number Signature of Applicant naforW.doc•rev.7/14/04 Page 3 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands 1 DEP Regional Addresses Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Mall transmittal forms and DEP payments,payable to: Commonwealth of Massachusetts Department of Environmental Protection Box 4062 Boston, MA 02211 DEP Western Region Ada. Colrain Hampden Monroe Pittsfield Tyringham 436 Dwight Street Agawam Conway Hancock Montague Plainfield Wales 9 Alford Cummington Hatfield Monterey Richmond Ware Suite 402 Arroerst Dalton Hawley Montgomery Rowe Warwick Springfield,MA 01103 Ashfield Deerfield Heath Monson Russell Washington Phone:413-784-1100 Becket Easthampton Hinsdale Mount Washington Sandisfield Wendell Belchertown East Longmeadow Holland New Ashford Savoy Westfield Fax:413-784-1149 Bemarostm Egremont Holyoke New Marlborough Sheffield Westhampton Blandford Erving Huntington New Salem Shelburne West Springfield Brimfield Florida Lanesborough North Adams Shutesbury West Stockbridge Bualand Gill Lee Northampton Southampton Whately Chademtont Goshen Lenox Northfield South Hadley Wilbraham Cheshire Granby Leverelt Orange Southwick Williamsburg Chester - Granville Leyden Ods Springfield Williatretown Chesterfield Great Baminglon Longmeadow Palmer Stockbridge Windsor Chicopee Greenfield Ludlow Pelham Sunderland Worthington Clarksburg Hadley Middlefield Peru Tolland DEP Central Region Acton Charlton Hopkinton Millbury Rutland Uxbridge 627 Main Street Ashbumham Clinton Hubbardslon Millvlte Shirley Warren Ashby Douglas Hudson New Braintree Shrewsbury Webster Worcester,MA 01605 Athol Dudley Holliston Northborough Southborough Westborough Phone:508-792-7650 Auburn Dunstable Lancaster Northbridge Southbridge West BoNston Fax:508-792-7621 Ayer East Brookfield Leicester North Brookfield Spencer West Brookfield Bathe Fitchburg Leominster Ockham Sterling Westford TDD:508-767-2788 Bellingham Gardner Littleton Oxford Stow Westminster Bertin Grafton Lunenburg Paxton Sturbridge Wnchendon Blackstone Groton Marlborough Pepperell Sutton Worcester Bolton Harvard Maynard Petersham Templeton Soxborough Hardwick Medway Phillipston Townsend Boylston Holden Mendw Princeton Tyngsborough Brookfield Hopedale Milford Royalston Upton DEP Southeast Region Abington Dartmouth Freetown Mattapoisett Provincetown Tisbury 20 Riverside Drive Acushnet Dennis Gay Head Middleborough Raynham Tram Attleboro Dighton Gosnold Nantucket Rehoboth Wareham Lakeville,MA 02347 Avon Duxbury Halifax New Bedford Rochester Wellfieet Phone:508-946-2700 Bamstsble Eastham Hanover North Atgeborough Rockland West Bridgewater Fax:508-947-6557 Beckley East Bridgewater Hanson Norton Sandwich Westport Bourne Easton Harwich Norwell Scituate West Tsbury TDD:508-946-2795 Brewster Edgartown Kingston Oak Bluffs Seekonk Whitman Bridgewater Fairhaven Lakehlle Orleans Sharon Wrentham Brockton Fall River Mansfield Pembroke Somerset Yarmouth Carver Falmouth Marion Plainville Stoughton Chatham Foxborough Marshfield Plymouth Swansea Chilmark Franklin Mashpee Plympton Taunton DEP Northeast Region Amesbury Chelmsford Hingham Merrimac Quincy Wakefield 1 Winter Street Andover Chelsea Holbrook Methuen Randolph Walpole Acingtpn Cohasset Hull Middleton Reading Waltham Boston, MA 02108 Ashland Concord Ipswich Millis Revere Watertown Phone:617-654-6500 Bedford Danvers Lawrence Milton Rockport Wa land Fax: 617-556.1049 Belmont Dedham Lexington Nahanl Rowley Wellesley Beverly Dover Lincoln Natick Salem Wenham TDD:617-654-6868 Bisfence Dracut Lowell Needham Salisbury West Newbury Boston Essex Lynn Newbury Saugus Weston Boxford Everett Lynnfield NewLuryport Sherbam We hood Braintree Framingham Malden Newlon Somerville Weymouth Brookline Georgetown Manchester-By-The-Sea Norfolk Stoneham Wllmingurn Burlington Gloucester Marblehead North Andover Sudbury Winchester Cambdtlge Groveland Medfield North Reading Swampscott Winthrop Canton Hamilton Medford Norwood Tewksbury Woburn Carlisle Haverhill Melrose Peabody Topsfield wpaform7o.•DEP Addresses•rev.10008 Page 1 of 1 RECEIVED August27;2008 SEP 0 4 2008 Carey Duques DEPT. OF PLANNNG& COAMlJF.",T CEVELOPIRENT Conservation Agent Dear Ms.Duques, We are applying for an extension of an existing Order of Conditions DEP#64-404. Weare requesting,an extension of thr years.Thank you_ Since e] , j Patrick an Carol acre..11 2 Smith Avenue Salem,MA'01:970 978-745-8373 caxwr,�� �v � CITY OF SALEM CONSERVATION COMMISSION July 28, 2008 Patrick& Carol Farrell 1 Smith Avenue Salem, MA 01970 Re: DEP#64-404—Request for an Extension for an Existing Order of Conditions- 1 Smith Avenue, Salem, Massachusetts Dear Patrick and Carol Farrell: As you are aware the Order of Conditions for the above referenced projects will expire on September 22, 2008. Based on our phone conversation, it sounds like the project has not been completed. Therefore in order to keep the existing Order of Conditions you must submit a written request for an extension of the existing Order of Conditions to the Commission at least 30-days prior to the expiration of the order, as required in the Wetland Protection Act. You can request an extension for one, two, or three years. Please submit the request for an extension to me at the following address: Carey Duques City of Salem, Planning Department. 120 Washington Street Salem, MA 01970 If the project has not been completed and your Order of Conditions expires, you will be required to file a new Notice of Intent to complete these previously approved projects. Please contact me at(978) 619-5685 if you have any questions. Sincerely, 1 Carey Duq> es Conservation Agent/Planner ��muir,,7 c�t �r lig 3 CITY OF SALEM CONSERVATION COMMISSION l4CVP.po July 16, 2008 Patrick & Carol Farrell 1 Smith Avenue Salem, MA 01970 Re: DEP #64-403 and #64-404—Reconstruction of a single family house and addition of deck and associated work within a Riverfront Area— 1 and 2 Smith Avenue, Salem, Massachusetts Dear Patrick and Carol Farrell: Please be advised that the Order of Conditions for the above referenced projects will expire on September 22, 2008. If these projects are complete, you should submit a Request a Certificate of Compliance for each project (see enclosed forms) from the Salem Conservation Commission. If these projects have not been completed, than you must submit the a written request for an extension of the existing Order of Conditions to the Commission at least 30-days prior to the expiration of the order, as required in the Wetland Protection Act. If the projects have not been completed and your Order of Conditions expires, you will be required to filen new Notice of Intent to complete these previously approved projects. Please contact me at (978) 619-5685 if you have any questions. Sincerely, Carey Dulues Conservation Agent/Planner Enclosures Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Forna-4— Order of Conditions #64-404 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land,the Final Order shall also be noted in the Registry s Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on Page 7 of this form shall be submitted to the Conservation Commission listed below. Salem Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. To: Salem Conservation Commission Please be advised that the Order of Conditions for the Project at: t Smith Avenue #64-404 Project Location DEP File Number Has been recorded at the Registry of Deeds of: c� rSSF r To. Tt 'Z-S a County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: /0 12-7/US Date If recorded land,,(tthe instrument number identifying this transaction is: Instrument Numbi If registered land, the document number identifying this transaction is: �Iw Document Number Signature of Applicant vgalam5.doc• rev.3/1/05 Page 9o19 Massachusetts Department of Envi nmental Protection Bureau of Resource Protection - Wetlands DEP File Number. WPA Form 5 — Order of Conditions #64-404 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: Salem When filling From: 9 t.Conservation Commission out forms on the computer, 2. This issuance is for (check one): a. ® Order of Conditions b. ❑ Amended Order of Conditions use only the tab key to 3. To: Applicant: move your cursor-do not Patrick& Carol Farrell use the return a. First Name b.Last Name c.Company key. 1 Smith Avenue d.Mailing Address Salem MA 01970 e.City/Town I.State g.Zip Code 4. Property Owner(if different from applicant): a. First Name b.Last Name c.Company d.Mailing Address e.City/Town f.State g.Zip Code 5. Project Location: 1 Smith Avenue Salem a.Street Address b.City/Town MAP 36 LOTS 227&228 c.Assessors Map/Plat Number d. Parcel/Lot Number Latitude and Longitude, if known (note: electronic filers will click for GIS locator): e.Latitude I.Longitude 6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel): Essex a.County b.Certificate(if registered land) 11358 417 c.Book d. Page 8/26/05 9/22/05 9/22/05 7. Dates: a.Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance 8. Final Approved Plans and Other Documents (attach additional plan or document references as needed): Site Plan to accompany NOI 1 Smith Avenue a. Plan Title Griffin Engineering Group, LLC Robert H. Griffin b. Prepared By c.Signed and Stamped by August 26, 2005 1"= 10, d. Final Revision Date e.Scale f.Additional Plan or Document Title g.Date wpaform5.dm• rev.3/1/05 Page i of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number. ' WPA Form 5 - Order of Conditions #64-404 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings t. Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: a. ® Public Water Supply b. ® Land Containing Shellfish c. ® Prevention of Pollution d. ® Private Water Supply e. ® Fisheries f. ® Protection of Wildlife Habitat g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control 2. This Commission hereby finds the project,as proposed, is: (check one of the following boxes) Approved subject to: a. ® the following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations.Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect these interests, and a final Order of Conditions is issued. A description of the performance standards which the proposed work cannot meet is attached to this Order. c. ❑ the information submitted by the applicant is not sufficient to describe the site,the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific Information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). Inland Resource Area Impacts: Check all that apply below. (For Approvals Only) 3. ❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and wetland boundary(if available) a.linear feet Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 4. ❑ Bank a.linear feet E linear feet c.linear feet d.linear feet 5. ❑ Bordering Vegetated Wetland a.square feet b.square feet c.square feet d.square feet 6. El Land Under Waterbodies a.square feet b.square feet c.square feet d.square feet and Waterways e.cu.yd dredged f.cu.yd dredged wpafcr .dw rev.3/1/05 Page 2 of LlMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions #64-404 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 7. ❑ Bordering Land Subject to Flooding a.square feet b.square feet c.square feet d.square feet Cubic Feet Flood Storage e.cubic feet cubic feet g.cubic feet h.cubic feet f. s. ❑ Isolated Land Subject to Flooding a.square feet b.square feet Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet I.cubic feet 3,600 3,600 s. ® Rivertront area a.total sq.feet b.total sq.feet Sq ft within 100 ft c.square feet d.square feet e.square feet I.square feet Sq ft between 100-200 It 3,600 3,600 3,600 3,600 g.square feet h.square feet i.square feet j.square feet Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only) 1o. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below 11. ❑ Land Under the Ocean a.square feet b.square feet c.cu.yd dredged d.cu.yd dredged 12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 13. ❑ Coastal Beaches a.square feet b.square feet c.c/y nourishmt. d.c/y nourishmt. 14. EI Coastal Dunes a.square feet b.square feet c.c/y nourishmt. d.c/y nourishmt 15. ❑ Coastal Banks a.linear feet b.linear feet 16. ❑ Rocky Intertidal Shores a.square feet b.square feet 17. E] Salt Marshes a.square feet b.square feet c.square feet d.square feet 18. ❑ Land Under Salt Ponds a.square feet b.square feet c.cu.yd dredged d.cu.yd dredged 19. ❑ Land Containing Shellfish a.square feet b.square feet c.square feet d.square feet 20. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above a.cu.yd dredged b.cu.yd dredged 21. ❑ Land Subject to Coastal Storm Flowage asquare feet b.square feet w afarm5.dw• rev.3/1/05 Page 3 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions #64-404 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. General Conditions Under Massachusetts Wetlands Protection Act (only applicable to approved projects) 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years,from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land,the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to this Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or, "MA DEP"] "File Number #64-404 " wpalaM6,doc• rev,3/1/05 Page 4019 LlMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 — Order of Conditions #64-404 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. General Conditions Under Massachusetts Wetlands Protection Act 10. Where the Department of Environmental Protection is requested to issue a Superseding Order,the Conservation Commission shall be a party to all agency proceedings and hearings before DEP. 11. Upon completion of the work described herein,the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A) to the Conservation Commission. 12. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 15. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place,the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction,the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed.The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. 18. All work associated with this Order is required to comply with the Massachusetts Stormwater Policy Standards. Special Conditions: If you need more See Attached space for additional conditions, select box to attach a text document w aforrn5.dw• rev.3/1105 Page 5 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions #64-404 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Findings Under Municipal Wetlands Bylaw or Ordinance t. Is a municipal wetlands bylaw or ordinance applicable? ❑ Yes ❑ No 2. The hereby finds (check one that applies): Conservation Commission 3. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: a.Municipal Ordinance or Bylaw b.Citation Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. 4. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or bylaw: a. Municipal Ordinance or Bylaw b.Citation The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above.To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent,the conditions shall control. If you need more space for c. The special conditions relating to municipal ordinance or bylaw are as follows: additional conditions, select box to attach a text document ❑ wpWorm5 Coc• rev.3/1/05 Page 6 o19 ILIMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions #64-404 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 E. Issuance This Order is valid for three years, unless otherwise specified as a special 9/22/05 condition pursuant to General Conditions#4, from the date of issuance. 1.Date of Issuance Please indicate the number of members who will sign this form: 6 This Order must be signed by a majority of the Conservation Commission. 2.Number of signers The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office, if not filing electronically, and the property owner, if different from applicant. Signatures: Notary Acknowledgement Commonwealth of Massachusetts County of Essex On this 22nd of September 2005 Day Month Year Before me, the undersigned Notary Public, Kevin Cornacchio, Joe Furnari, David Pabich, personally appeared Keith Glidden, Michael Blier, & Kevin Carr proved to me through satisfactory evidence of identification, which was/were Personally Known Description of evidence of identification to be the person whose name is signed on the preceding or attached document, and acknowledged to me that he/she signed it voluntarily for its stated purpose. As member of SALEM Conservation Commission City/Town FRANKTAORMINA n,p Notary Public Commormeab of Massachusetts I \f 1 My Commission Expires April 27,2012 Sigre ef Notary �c 77 '!'1Wlk— �cYJyrni�l2 Printed Name of Notary Public ' Place notary seal and/or any stamp above My Codon Expir s(Date) This Order is issued to the applicant as follows: ❑ by hand delivery on I�Q by cert'Ified mail, return receipt requested,on Date /Datt'e wpatormS.Am• rev.31105 Page 7 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions #64-404 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order.A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order or Determination, or providing written information to the Department prior to issuance of a Superseding Order or Determination. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act, (M.G.L. c. 131, §40) and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. Section G, Recording Information is available on the following page. wpafom)5.dw• rev.3/1/05 Page 8 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions #64-404 Massachusetts Wetlands Protection Act M.G.L. c. 131 , §40 G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on Page 7 of this form shall be submitted to the Conservation Commission listed below. Salem Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. To: Salem Conservation Commission Please be advised that the Order of Conditions for the Project at: 1 Smith Avenue #64-404 Project Location DEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant Wafomi&dw• rev.3/1105 Page 9 of 9 Attachment to Order of Conditions # 64-404 Page Ilof 5' SALEM CONSERVATION COMMISSION DEP FILE #64-404 1 Smith Avenue City of Salem, Massachusetts ADDITIONAL FINDINGS Based on the Estimated Habitats or Rare Wildlife and Certified Vernal Pools Map (June 1, 2003) from Natural Heritage &Endangered Species Program(NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contains any vernal pools. This Order is issued under the Massachusetts Wetlands Protection Act,M.G.L.Chapter 131,Section 40 and the City of Salem Wetlands Protection Ordinance, Salem Code Chapter 34,Section 34-1 —34-13. This Order permits the construction of a 26' x 38' garage with associated driveway and utilities within a buffer zone to a Coastal Bank and 3,600 sq ft of Riverfront Area(outer riparian zone)at 1 Smith Street. SPECIAL CONDITIONS 1. This Order of Conditions must be recorded in its entirety (all 5 pages) at the Essex Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property; and recording information must be submitted to the Salem Conservation Commission in writing,before any work approved in this Order commences. 2. Approval of this application does not constitute compliance with any law or regulation other than M.G.L Chapter 131, Section 40,Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands Protection Ordinance, Salem Code Chapter 34, Section 34-1—34-13. 3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No alteration of wetland resource areas or associated buffer zones, other than that approved in this Order, shall occur on this property without prior approval from the Commission. 4. Prior to any work commencing, a sign shall be displayed showing DEP File#64-404, and not placed on a living tree. 5. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the date of the issuance of this Order. 6. With respect to this Order, the Commission designates the Conservation Agent as its agent with powers to act on its behalf in administering and enforcing this Order. 7. The Commission or its Agent,officers,or employees shall have the right to enter and inspect the property at any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131, Section 40, the Wetlands Regulations 310 CMR 10.00,and shall have the right to require any data or documentation that it deems necessary for that evaluation. 8. The term"Applicant" as used in this Order of Conditions shall refer to the owner,any successor in interest or successor in control of the property referenced in the Notice of intent, supporting documents Attachment to Order of Conditions # 64-404 Page 20£ and this Order of Conditions. The Commission shall be notified in writing within 30 days of all transfers of title of any portion of the property that takes place prior to issuance of the Certificate of Compliance. 9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and approvals associated with this project. These permits may include but are not necessarily limited to the following: (1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816),U.S. Army Corps of Engineers. (2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of sec. 27(5) of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00. (3) Sewer Extension Permit from the DEP Division of Water Pollution Control under G.L. Ch. 21A ss7 and 314 CMR 7.00. Any Board of Health permit for septic system design for any portion of the septic system within 100 feet of wetlands shall be submitted to the Commission prior to construction initiation. (4) Design Requirements for Construction in Floodplains under the State Building Code(780 CMR 744.). 10. If there are conflicting conditions within this Order,the stricter condition(s) shall rule. 11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters during construction or after completion of the project. 12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods and boundary during construction if necessary. 13. The Commission reserves the right to impose additional conditions on portions of this project or this site to mitigate any actual or potential impacts resulting from the work herein permitted. 14. The work shall conform to the following attached plans and special conditions: Final Approved Plans Site Plan to accompany NOI I Smith Street Title August 26 2005 Dated Robert H. Griffin Signed and Stamped by City of Salem Conservation Commission On file with 15. Any proposed changes in the approved plan(s)or any deviation in construction from the approved plan(s) shall require the applicant to file a Notice of Project Change with the Commission. The Notice shall be accompanied by a written inquiry prior to their implementation in the field, as to whether the change(s) is substantial enough to require filing a new Notice of Intent or a request to correct or amend this Order of Conditions. A copy of such request shall at the same time be sent to the Department of Environmental Protection. Attachment to Order of Conditions # 64-404 Page Sof 5 16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has been issued,the applicant or current landowner shall submit to the Commission a statement signed by the buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of the Order of Conditions. 17. Condition Number as indicated shall continue in force beyond the Certificate of Compliance,in perpetuity,and shall be referenced to in all future deeds to this property. PRIOR TO CONSTRUCTION 18. Prior to the commencement of any activity on this site other than activities listed above,there shall be a PRE-CONSTRUCTION MEETING between the project supervisor, the contractor responsible for the work,and a member of the Conservation Commission or its Administrator to ensure that the requirements of the Order of Conditions are understood. The staked erosion control line shall be adjusted, if necessary,during the pre-construction meeting. Please contact the Conservation Commission Agent at(978)745-9595 ext 311 at least forty-eight(48)hours prior to any activity to arrange for the pre-construction meeting. 19. Prior to the pre-construction meeting and commencement of any activity on this site, sedimentation and erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The Commission and/or its Administrator shall inspect and approve such installation at the pre-construction meeting. 20. No clearing of vegetation,including trees,or disturbance of soil shall occur prior to the pre-construction meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre- construction meeting if absolutely necessary in order to place erosion control stakes where required. 21. There shall be twenty(20) hay bales and wooden stakes under cover on the site to be used only for emergency erosion control. EROSION CONTROL 22. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction, and shall be maintained during construction in the wetland areas and buffer zones. The erosion control specifications provided in the Notice of Intent and the erosion control provision in the Order will be the minimum standards for this project; the Commission may require additional measures. 23. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland resource areas to prevent sediment form entering wetland resource areas. 24. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 25. The area of construction shall remain in a stable condition at the close of each construction day. 26. Any de-watering of trenches or other excavation required during construction shall be conducted so as to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered through hay bale sediment traps, silt filter bags or other means approved by the Commission or its Administrator. 27. Within thirty (30)days of completion of construction on any given portion of the project, all disturbed areas in the completed portion of the site shall be permanently stabilized with rapidly growing vegetative cover,using sufficient top soil to assure long-term stabilization of disturbed areas. Attachment to Order of Conditions # 64-404 Page 4of 5 28. If soils are to be disturbed for longer that two(2) months, a temporary cover of rye or other grass should be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth, exposed surface shall be stabilized by other appropriate erosion control measures,firmly anchored,to prevent soils from being washed by rain or flooding. DURING CONSTRUCTION 29. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all times when work is in progress. 30. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on the approved plan(s). 31. All waste products,grubbed stumps, slash;construction materials,etc. shall be deposited at least 100 feet from wetland resource areas and 200 feet from river. 32. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage system Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be immediately removed. 33. All exposed sub-soils shall be covered by a minimum of three(3)inches of quality screened loam topsoil prior to seeding and final stabilization. 34. Immediately following drainage structure installation all inlets shall be protected by silt fence,haybale barriers and/or silt bags to filter silt from stormwater before it enters the drainage system. 35. There shall be no pumping of water from wetland resource areas. 36. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other components shall be fixed immediately. structures shall be inspected regularly 37. During construction,all drainage p g Y and cleaned as necessary. 38. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance of enforcement actions by the Conservation Commission including,but not limited to,civil administrative penalties under M.G.L Chapter 21 A, section 16. AFTER CONSTRUCTION 39. Upon completion of construction and final soil stabilization,the applicant shall submit the following to the Conservation Commission to request a Certificate of Compliance(COC): (1) A Completed Request for a Certificate of Compliance form(WPA Form 8A or other form if required by the Conservation Commission at the time of request). (2) A letter from a Registered Professional Engineer certifying compliance of the property with this Order of Conditions. (3) An "As-Built"plan signed and stamped by a Registered Professional Engineer or Land Surveyor showing post-construction conditions within all areas under the jurisdiction of the Massachusetts Wetlands Protection Act. This plan shall include at a minimum: Attachment to Order of Conditions# 64-404 Page5Sof 5 (a) All wetland resource area boundaries with associated buffer zones and regulatory setback areas taken from the plan(s)approved in this Order of Conditions; (b) Locations and elevations of all stormwater management conveyances, structures and best management designs, including foundation drains,constructed under this Order within any wetland resource area or buffer zone; (c) Distances from any structures constructed under this Order to wetland resource areas- "structures"include,but are not limited to,all buildings,septic system components, wells, utility lines,fences,retaining walls,and roads/driveways; (d) A line delineating the limit of work-"work"includes any filling,excavating and/or disturbance of soils or vegetation approved under this Order; 40. When issued, the Certificate of Compliance must be recorded at the Essex County Registry of Deeds and a copy of the recording submitted to the Salem Conservation Commission. 41. If the completed work differs from that in the original plans and conditions, the report must specify how the work differs; at which time the applicant shall first request a modification to the Order. Only upon review and approval b the Commission, may the applicant request in writing a Certificate of PP Y Y Compliance as described above. 42. Erosion control devices shall remain in place and properly functioning until all exposed soils have been stabilized with final vegetative cover and the Conservation Commission and/or its Administrator has authorized their removal. :i co �v CITY OF SALEM CONSERVATION COMMISSION SITE VISIT FARM PROJECT LOCATION: /L/� Ski A i9ve�U-c DATE OF SITE VISIT Z2j Zoos PROJECT PROPONENT: /d A'Y����-//,t Cam I F&r?-ell DEP FILE NUMBER: � - a PROPOSED WORK: C12��t'_T 41 0 J` Gara9x /✓rL[// � lnc1'/ daOG 3 u�/fieS �'I�1 ATT�1!ID_A_ E• Commission Me b s/Agent: Abutters: plicant/Property Owner/Representative: $ITE VISIT�PURPO_SEW =' a s'elkull? ti. ❑Request for Determination ❑Abbreviated Notice of Resource Area Delineation ANoticeofIntent ElCertificate of Compliance ❑Enforcement/Violation ❑Emergency ❑ Informal AREAS_OF:7URISDICTION � ' �� � ��� �� � �. r�„'.•.�*y ,''�°�., .' ?� INLAND RESOURCE AREAS q COASTAL RESOURCE AREAS I Bank ii ❑ Land Subject to Coastal ❑Land Under the Ocean Storm Flowage ❑Bordering Vegetated Wetland ElDesignated Port Area —1 Coastal Beach ❑Land Subject to Flooding ❑ Coastal Dune ❑Barrier Beach ❑Land Under Water Bodies or Waterway Name: n i; Coastal Bank ElRockyIntertidal Shore I V t/� I� El Marsh Land Under Salt Pond Ziverfront Area /W,rtA 9 13, ❑Veinal Pools ❑ Land Containing ❑Anadromous/Cats- Shellfish dromous Fish Run ii ❑ Bordering Vegetated Wetland in Coastal Area i� i 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 •TEL: 978.745.9595 FAx: 978.740.0404 • WWW.SALEM.COM exsm�s'mazat"t�; fi" "q"; ?tw,,fee.... # u - `* BUFFER.ZONEI(wittiin 100-feet) .>=as.:�.=- ❑Water Body ❑ Bordering Vegetated Wetland Bank ❑ Coastal Beach ❑ Coastal Dune tI�N-,i{ERES7S iJ(iProtection of Water Supply Protection of Groundwater Supply , ,(Flood Control XStorm Damage Prevention Prevention of Pollution 7I�I�Protection of Fisheries Protection of Wildlife Habitat Protection of Land Containing Shellfish Is this an exempt project:If so,why? Are resource area boundaries delineated correctly? If not,explain. SITE'YISIf':D000MEN7ATIUN:a d"l �r. ❑Photos ❑ Site Map ❑ Other: - � "'la6fi�NF8�.*!W�� jk MrCA±�4L"+' •W �` y�r .a M :#' OBSERVATIONS: `:> �'3� " Take into account relevant aspects or features such as: natural or piped drainage or obvious pollution; topography; existing vegetation; possible alternative sites; signs of wildlife, possible vernal pools, rare species habitat; landmarks; recent or historical disturbances; proximity to other water bodies or drainage areas; adjacent land uses. __:m ..-""""' __-,..._.....A*�wm���+syTrmt+.,�v„;.,..'k".e"�-"'-^o. '#'.v"s'R=• r+c�^*y�rv'pht '�+;4; , . RECOMMENDATION..S * 1 1 y�8.�1C r .y�iti 1-F• �✓` � Yr�; i t .r T A {J♦t _O f No {�j yJj�L a t . t ' �,t ! � r E Yh �r wx t� EaYL:rd 'I ti 1 I , Nonce of Intent underthe ' a Massachusetts Wetlands Protection Act and the ' City of Salem Wetlands Ordinance Construction of a Garage ' Accessory Structure at 1 Smith �„'- - Salem, Massachusetts August 26, 2005 Applicant: Patrick & Carol Farrell oai.aim Submitted to: R City of Salem Conservation Commission and Massachusetts Department of ' Environmental Protection Prepared by: Griffin Engineering gk Beverly, MA 1 .x 1 1 1 Grin P.O.Box 7061, 100 Cummings Center, Suite 224G, Beverly, MA 01915 August 26, 2005 1 Engineering Phone:978-927-5111 • Fax:978-927-5103 - Group, LLC Salem Conservation Commission 1 City Hall Annex 120 Washington Street Salem, MA 01970 1 By Hand Delivery 1 Subject: Notice of Intent for the Construction of a Garage Accessory Structure at 1 Smith OEM (Map 36 Lot 228) 1 Dear Commission Members: s: On behalf of the property owners, Patrick and Carol Farrell, we are pleased to provide 1 seven (7) copies of a Notice of Intent (NOI)for the subject property. The proposed project involves the construction of a garage with associated driveway and utilities. The garage is an accessory structure to the single-family residence located at 1 Smith 1 Street. The wetland resource areas located on or near the subject property that are protected 1 under the Wetland Protection Act include the Riverfront Area and the buffer zone to a Coastal Bank. As shown on the enclosed plans, minimal alteration of the buffer zone and Riverfront area are proposed. 1 We look forward to discussing the project with the Commission. Please do not hesitate to contact the undersigned with any questions or comments. 1 Very truly yours, .Griffin Engineer ng Group C f7 Robert H. Griffin, P.E. 1 enclosures: NOI (7 copies) cc: Massachusetts DEP Northeast Region (2 copies) 1 Patrick & Carol Farrell (1 copy) 1 1 1 P:\Projects\Salem\Farrell-SmithAve\NOI-27R March St\TranLtr.wpd 1 Civil & Environmental Engineering • Permitting • Design • Construction Management 1 ' TABLE OF CONTENTS Notice of Intent Application (WPA Form 3) Notice of Intent Wetland Fee Transmittal Form and Fee Calculation Sheet Attachment A Project Description 1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1 2.0 WETLAND RESOURCE AREAS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1 2.1 Riverfront Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1 2.2 Coastal Bank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-3 ' 2.3 Additional Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-3 3.0 PROPOSED PROJECT/WETLAND RESOURCE AREA WORK . . . . . . . . . . . . A-3 ' 3.1 Riverfront Area . . . . . . . . A-3 3.2 Coastal Bank . . . . . . . . . . . . . . • . . . . . . . . . . . . . . . . . . . . . . . . A-4 ' 4.0 MITIGATION MEASURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-4 5.0 CONCLUSION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5 Figure 1 - Site Locus Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-2 Attachment B Plan to Accompany NO] Attachment C Riverfront Form Attachment D Erosion Control Specifications Attachment E Affidavit of Service, Notice to Abutters & Certified List of Abutters 1 1 1 III NOTICE OF INTENT APPLICATION (WPA FORM 3) 1 1 1 1 1 1 1 1 1 ' Massachusetts Department of Environmental Protection ProwdedbyDEPr, Bureau of Resource Protection -Wetlands '_t ; r 3 DEP Ffle Number 3';�,m,,,. WPA Form 3 - Notice of Intent Docuon Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 menC! nsacti ._ .. . Salem CityrrownA. General Information ' 1. Project Location (Note: electronic filers will click on button for GIS locator): 1 Smtih tom. Salem 01970 ' a.Street Address b.City/rown c.Zip Code N42d 31'59" W70d 53'26" Latitude and Longitude: d.Latitude e.Longitude ' Map 36 Lot 227&228 f.Assessors Map/Plat Number g.Parcel/Lot Number Important: i When filling out 2. Applicant: forms on the Patrick&Carol Farrell computer, use a.First Name b.Last Name o Company only the tab 1 Smith 9lpllii4-A e key to move your cursor- d.Mailing Address do not use the Salem MA 01970 return key. e.Cityrrown f.State g.Zip Code ' 978.745.8373 W h.Phone Number i. Fax Number j.Email address 3. Property owner(if different from applicant): ❑ Check if more than one owner a.First Name b.Last Name c.Company ' d.Mailing Address Note: Before e.Cityrrown f.State g.Zip Code completing this ' form consult h.Phone Number i.Fax Number j.Email address yourlocal Conservation 4. Representative (if any): ' Commission Griffin Engineering Group, LLC regarding any a.Firm municipal bylaw Robert H. Griffin, P.E. or ordinance. b.Contact Person First Name c.Contact Person Last Name P.O. Box 7061 100 Cummings Center Suite 224 G d.Mailing Address Beverly MA 01915 ' e.Cityrrown f.State g.Zip Code 978.927.5111 978.927.5103 GriffinEng@aol.com h.Phone Number i.Fax Number j.Email address ' ❑ Select if 5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form): you want to see Wetland Fee $ 165 $ 70.00 $ 95.00 Transmittal a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid ' Form. 6. General Project Description: Construction of a garage with associated driveway and utilities. (See Attachment A) 1 ' wpaform .doc•rev.N1105 Page 1 of 7 Massachusetts Department of Environmental Protection Provided by DEPS v Bureau of Resource Protection -Wetlands ` ` DEP File Number 1 WPA Form 3 - Notice of Intent x µ Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Documer$ rahszdforiNumber ' Salem City/Town A. General Information (continued) ' 7. Project Type Checklist: ' a. ❑ Single Family Home b. ❑ Residential Subdivision ' c. ❑ Limited Project Driveway Crossing d. ❑ Commercial/Industrial ' e. ❑ Dock/Pier f. ❑ Utilities g. ❑ Coastal Engineering Structure ' h. ❑ Agriculture—cranberries, forestry i. ❑ Transportation ' i. N Other Garage at Single-Family House 8. Property recorded at the Registry of Deeds for: ' Essex(South) 417 a.County c.Page Number 11358 b.Book d.Certificate#(if registered land) 9. Buffer Zone Only ' Is the project located only in the Buffer Zone of a bordering vegetated wetland, inland bank, or coastal resource area? a. ❑ Yes If yes, please answer Questions 10 and 11 below,then skip to Section C. ' b. N No If no, check the resource areas to be affected by this project in Section B. 10. Has work been performed on the property under an Order of Resource Area Delineation involving ' Simplified Review within 3 years of the date of this application? a. N No b. ❑ Yes ' If yes, no Notice of Intent or Request for Determination of Applicability may be filed for work within the 50-foot-wide area in the Buffer Zone along the resource area during the three-year term of an Order of Resource Area Delineation, or any Extended Order, or until the applicant receives a Certificate of Compliance, whichever is later. ' 11. Buffer Zone Setback ' If the project involves only work in the buffer zone, the distance between closest project disturbance and the a. ❑ BVW b.❑ inland bank c.❑ coastal resource area associated with the buffer zone is: d.linear feet ' wpafore3doe-rev.3/1105 Page 2 of Massachusetts Department of Environmental Protection Prowdedby DEP k Bureau of Resource Protection - Wetlands I DEPFileNumber 2 t =WPA Form 3 - Notice of Intent I Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salemhf7ransacNonNumber:Salem City(rown B. Resource Area Effects 1. Inland Resource Areas Check all that apply below. Attach narrative and any supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online Users: Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any) document transaction a. ❑ Bank 1.linear feet 2.linear feet number b. ❑ Bordering Vegetated (provided on Wetland 1.square feet 2.square feet your receipt page)with all c. ❑ Land Under 1.square feet 2.square feet supplementary Waterbodies and information you Waterways 3.cubic yards dredged submit to the d. ❑ Bordering Land Department. Subject to Flooding 1.square feet 2.square feet 3.cubic feet of flood storage lost 4.cubic feet of flood storage replaced e. ❑ Isolated Land Subject to Flooding 1.square feet 2.cubic feet of flood storage lost 3.cubic feet of food storage replaced North River f. ® Riverfront area 1.Name of Waterway(if available) 1.Width of Riverfront Area (check one): ❑ 25 ft. -Designated Densely Developed Areas only ❑ 100 ft. - New agricultural projects only ® 200 ft. -All other projects 2. Total area of Riverfront Area on the site of the proposed project: 21'375± Square Feet 3. Proposed alteration of the Riverfront Area: 3,600± 0 3,600± a.Total Square Feet b.Square Feet within 100 ft. c.Square Feet between 100 it and 200 ft. ' 4. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes® No 5.Was the lot where the activity is proposed created prior to August 1, 1996? ® Yes❑ No i i wpaformldoc•rev.311105 Page 3 of 7 Massachusetts Department of Environmental Protection Provided byDER Bureau of Resource Protection - Wetlands 1, ' DEP File Number WPA Form 3 - Notice of Intent Document:Tmnsac6on:Numbe_r Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem City/Town i B. Resource Area Effects 2. Coastal Resource Areas: Check all that apply below. Attach narrative and supporting documentation describing how the ' project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online Users: ' Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any) document transaction a. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below number (provided on b ❑ Land Under the Ocean 1.square feel your receipt page)with all 2.Cubic yards dredged ' supplementary Indicate size under Coastal Beaches and/or Coastal Dunes information you c. ❑ Barrier Beach below submit to the ' Department. d. ❑ Coastal Beaches 1.Square feel 2.Cubic yards beach nourishment e. ❑ Coastal Dunes 1.Square feet Y 2.Cubic yards dune nourishment ' f. ❑ Coastal Banks 1.Linear feet g. ❑ Rocky Intertidal Shores 1.Square feet ' h.❑ Salt Marshes 1,Square feet 2.Sq it restoration,rehab.,or creation ' i. ❑ Land Under Salt Ponds 1.Square feet 2.Cubic yards dredged j. ❑ Land Containing Shellfish 1.Square feet 2.Square feet restoration,rehab. k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the ' Ocean, and/or inland Land Under Waterbodies and Waterways, above 1.Cubic yards dredged I. ❑ Land Subject to Coastal Storm Flowage 1.Square feet 3. Limited Project: ' Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 or 310 CMR 10.53? a. ❑ Yes ® No If yes, describe which limited project applies to this project: ' b.Limited Project ' wpaform doc•rev.3/1/05 Page 4 of 7 Massachusetts Department of Environmental Protection Provided by DER Bureau of Resource Protection - Wetlands 91 '' DEP File Number .. WPA Form 3 - Notice of Intent �a Document 7ransactioon Number. Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem ' Cityrrow C. Bordering Vegetated Wetland Delineation Methodology ' Check all methods used to delineate the Bordering Vegetated Wetland (BVW) boundary: NOT APPLICABLE Online Users: t. ❑ Final Order of Resource Area Delineation issued by Conservation Commission or DEP Include your (attached) document transaction 2. ❑ DEP BVW Field Data Form (attached) number ' (provided on 3. ❑ Final Determination of Applicability issued by Conservation Commission or DEP (attached) your receipt page)with all 4. ❑ Other Methods for Determining the BVW Boundary(attach documentation): ' supplementary information you a. ❑ 50%or more wetland indicator plants submit to the Department. b. ❑ Saturated/inundated conditions exist c. ❑ Groundwater indicators d. ❑ Direct observation For all projects affecting other e. ❑ Hydric soil indicators ' Resource Areas, please f. ❑ Credible evidence of conditions prior to disturbance attach a narrative 5. Other resource areas delineated: the lassos ow D. Other Applicable Standards and Requirements area was ' delineated. 1. Is any portion of the proposed project located in estimated habitat as indicated on the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and Endangered Species Program? 1 a. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife ' July 2003 Route 135, North Drive b.Date of Map Westborough, MA 01581 2. For coastal projects only, is any portion of the proposed project located below the mean high water ' line or in a fish run? a.❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to: Massachusetts Division of Marine Fisheries ' 251 Causeway Street, Suite 400 Boston, MA 02114 b. ❑ Not applicable—project is in inland resource area only ' 3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP a. ❑ Yes ® No Website for ACEC locations). Note: electronic filers click on Website. ' b.ACEC ' w aforrr .doc•rev.3/1/05 Page 5 of 7 ' Massachusetts Department of Environmental Protection Promded by DEP Bureau of Resource Protection - Wetlands DEPFle Number $ WPA Form 3 — Notice of Intent % i $.'-Document Transaction_Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 `— - - ' Salem City/Town D. Other Applicable Standards and Requirements Online Users: 4. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Include your Restriction Act(M.G.L. c. 131, §40A)or the Coastal Wetlands Restriction Act(M.G.L. c. 130, § 105)? document ' transaction a. ❑ Yes ® No number (provided on your receipt 5. Is any activity within any Resource Area or Buffer Zone exempt from performance standards of the ' page)with all wetlands regulations, 310 CMR 10.00. supplementary information you a. ❑ Yes ® No If yes, describe which exemption applies to this project: submit to the Department. b.Exemption 6. Is this project subject to the DEP Stormwater Policy? a. ❑ Yes ® No ' If yes, stormwater management measures are required.Applicants should complete the Stormwater Management Form and submit it with this form. ' b. If no, explain why the project is exempt: Stormwater Management Standards do not apply to single-family house projects. E. Additional Information ' Applicants must include the following with this Notice of Intent(NOI). See instructions for details. Online Users: Attach the document transaction number(provided on your receipt page)for any of the following information you submit to the Department. 1. ® USGS or other map of the area (along with a narrative description, if necessary)containing sufficient information for the Conservation Commission and the Department to locate the site. ' (Electronic filers may omit this item.) See Attachment A 2. ® Plans identifying the location of proposed activities (including activities proposed to serve as ' a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area. See Attachment B 3. ❑ Other material identifying and explaining the determination of resource area boundaries ' shown on plans (e.g., a DEP BVW Field Data Form). Not Applicable 4. 0 List the titles and dates for all plans and other materials submitted with this NOI. See Table of Contents ' 5. ❑ If there is more than one property owner, please attach a list of these property owners not listed on this form. Not Applicable 6.❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. Not Applicable ' T ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. Not Applicable a. ® Attach NOI Wetland Fee Transmittal Form. See Next Section. s. ❑ Attach Stormwater Management Form, if needed. Not Applicable ' vvpatoro3,doc rev.31IM5 Page 6 o(] Massachusetts Department of Environmental Protection Provided bk DEP _ Bureau of Resource Protection -Wetlands WPA Form 3 - Notice of Intent = �_ aDocumentTransadio'nNumbe'r Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem City/Town F. Fees The fees for work proposed under each Notice of Intent must be calculated and submitted to the Conservation Commission and the Department(see Instructions and NOI Wetland Fee Transmittal Form). No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form)to confirm fee payment: 2274 8.25.05 1.Municipal Check Number 2.Check date 2273 8.25.05 3.State Check Number 4.Check date Griffin Engineering Group, LLC Griffin Engineering Group, LLC 5.Payor name on check: First Name 6.Payor name on check:Last Name G. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, §40. Notice must be made in writing by hand delivery or certified mail (return_rece�trequeste o all abutters within 100 feet of the property line of the project location r u�> Z(o Signature of Applicant Date Signature o rty Owner if rent Date Q� Signature of Representative(if any) Date ' For Conservation Commission: Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents;two copies of pages 1 and 2 of the NOI Wetland Fee Transmittal Form; and the city/town fee payment must be sent to the Conservation Commission by certified mail or hand delivery. For DEP: One copy of the completed Notice of Intent(Form 3), including supporting plans and documents;one copy of pages 1 and 2 of the NOI Wetland Fee Transmittal Form; and a copy of the state fee payment must be sent to the DEP Regional Office(see Instructions)by certified mail or hand delivery. (E-filers may submit these electronically.) Other: If the applicant has checked the"yes"box in any part of Section D, Item 3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. 1 wpaform .doc•rev.111105 Page 7 of 7 1 ' NOTICE OF INTENT WETLAND FEE TRANSMITTAL FORM & ' FEE CALCULATION SHEET 1 1 . 1 1 ' Massachusetts Department of Environmental Protection ' Bureau of Resource Protection -Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 ' Important: A. Applicant Information ' When filling out forms on the 1. Applicant: computer, use only the tab Patrick&Carol Farrell key to move a.First Name b.Last Name c.Company ' your cursor- 1 Smith Street do not use the d.Mailing Address return key. Salem MA 01970 ' e.City/Town f.State g.Zip Code 978.745.8373 In.Phone Number ' 2. Property Owner(if different): a. First Name b.Last Name c.Company d.Mailing Address ' e.City/Town f.State g.Zip Code h.Phone Number ' 3. Project Location: 1 Smith Street Salem a.Street Address b.Cityrrown To calculate B. Fees ' filing fees, refer to the category Notice of Intent(Form 3) or Abbreviated Notice of Intent(Form 4): fee list and examples in the The fee should be calculated using the following six-step process and worksheet. Please see t instructions for filling out WPA Instructions before filling out worksheet. Form 3 (Notice of Intent). Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and buffer zone. Step 2/Number of Activities: Identify the number of each type of activity. ' Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions. ' Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2)times the fee per category(identified in Step 3)to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be multiplied by 1.5 and then added to the subtotal amount. ' Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4. ' Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract $12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50. ' wwform3.tloc-storm ter Management Form-rev.3/1/05 Page 1 of ' Massachusetts Department of Environmental Protection ' Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Fees (continued) ' Step 1/Type of Activity Step 2/Number Step Step 4/Subtotal Activity of Activities 3/Individual Fee Activity Fee ' Cat. 1.a—Construction of a Garage Accessory Structure 1 $ 110.00 x1.5 $ 165.00 Step 5/Total Project Fee: $ 165.00 ' Step 6/Fee Payments: ' Total Project Fee: $ 165.00 a.Total fee from Step 5 State share of filing fee: $ 70.00 ' b. 1/2 total fee less$12.50 CitylTown share of filling fee: $95.00 c. 1/2 total fee plus$12.50 ' C. Submittal Requirements ' a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to the Commonwealth of Massachusetts. Department of Environmental Protection Box 4062 Boston, MA 02211 t b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and the city/town fee payment. c.) To DEP Regional Office (see Instructions): Send a copy of the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these electronically.) ' Wpaform3 aoc•Slonn"ter Management Form•rev.311105 Page 2 of 5 ' FILING FEE CALCULATION SHEET Massachusetts Wetland Protection Act 310 CMR 10.03(7) ' Category 1.a: Construction of a Garage $ 110.00 Construction in the Riverfront Area 55.00 ' Total $ 165.00 State Share = (50% of Amt - $ 12.50) _ $165/2 - $12.50 = $ 70.00 City Share = (50% of Amt + $12.50) _ $165/2 + $12.50 = $ 95.00 I 1 I Danvers Savings Bank 2273 GRIFFIN ENGM:ERING GROUP,LLC " ONE CONANT ST.,DANVERS,MA 01923 P.O.BOX 7061 537116/2113 BEVERLY,MA 01915 8/25/2005 +f (978)9275111 PAY fi TOTHE ?� ORDER OF Commonwealth of Massachusetts $ "70.00 e a Seventy and 00/100 ++...++.«++++«„«,.«,,,«,«„«,,,«„«,.++++++++«««,.«,,.,,,,«,,,«++++..+,.«+,.«,,.«««„+++,+„««,«,««„,+«,,,, DOLLARS 2 N Comm.of Mass. 8 Dept.of Environmental Protection Box 4062 MEMO Boston, MA 02211 ALTHORIZEUMATURE Farrell- 1 Smith St Garage NOI 1.00227311• 1: 2LL3 ? 1L621: 35 10434011' I- Danvers Savings Bank 2274 GRIFFIN FNGIN=MG GROUP,LLC ONE CONANT ST.,DANVERS,MA 01923 P.O.BOX 7061 BEVERLY,MA 01915 ,, l 53-7116/2113 8/25/2005 (978)9275111 PAYTO THE 5 ORDER OF City of Salem $ ""95.00 8 "e a Ninety-Five and 00/100""++.+++,,,++„+„«,,,«,,,+,++„+«+,««,»„«,««,.,,,,+„+„+»,+«»«,,,,,«+++++,+++«,,.»,.,,,,+„+,.+..,.«,.«.„, DOLLARS 3 z• a City of Salem City Hall 8 93 Washington Street L Salem, Ma 01970 MEMO AUTHORIz sI R Farrell Garage NOI 1 Smith Street 1.00227411' 1: 2LL3 ? IL621: 35 L04340i1' 1 ' ATTACHMENT A PROJECT DESCRIPTION 1 1 1 1 1 1 1 1 1 ' 1.0 INTRODUCTION ' The project site consists of two parcels located at 1 Smith Street and 27R March Street (Map 36, Lot 227 & 228), in Salem, Massachusetts. The site is presently developed with a single-family residence. The total lot size is approximately 21,375 square feet. The properties are bounded to the east by the Mass Bay Transportation Authority, to the north by land owned by the Commonwealth of Mass., to the south by the North River, and to the west by a single-family residential property and Smith Street. Figure 1 - United States Geological Survey (USGS) Locus Map depicts the general location of the proposed project. ' The applicant propose to combine the two parcels and constructing a detached garage for the single-family residence. This Notice of Intent is for the associated work within ' the Riverfront Area and in the buffer zone to a Coastal Bank. The resource areas are further described in Section 2.0. A detailed description of the proposed work is provided in Section 3.0. Mitigation measures associated with the project are described in Section 4.0 of this narrative. The reader is referred to Attachment B for a site plan showing the proposed work. ' 2.0 WETLAND RESOURCE AREAS Griffin Engineering Group reviewed information regarding the project site to determine if ' the area of proposed work is located within resource areas regulated under the Massachusetts Wetlands Protection Act (MA WPA) and the City of Salem Wetlands Ordinance. The review included an on-site inspection, topographic survey, and a review of pertinent published information regarding the area. Information reviewed included: ' USGS Topographic Quads (Salem, MA 1:25,000 - Metric - 1985); FEMA Flood Insurance Rate Maps, City of Salem, (Comm. Panel 250102 0001 B), August 5, 1985; Massachusetts Natural Heritage Atlas, July 2003 Edition, Salem Quad; and National Wetlands Inventory Map -West Half of Salem, Mass., 1995. Based on the review, there is a resource area and a buffer zone to a resource area located on the subject property regulated under the Massachusetts Wetland Protection Act (MA WPA) and the City of Salem Wetlands Ordinance. The resource area is the Riverfront Area (310 CMR 10.58)while buffer zone is to the Coastal Bank (310 CMR 10.30) located on the project site. Therefore, the proposed work requires filing a Notice of Intent in accordance with the MA WPA and the City of Salem Wetlands Ordinance. 2.1 Riverfront Area Based on the aforementioned review, the entire site is located within the Riverfront Area ' (310 CMR 10.58) to the North River (located along the south property line). The Riverfront Area extends 200 feet landward from the upper boundary of Mean High Water (El. 4.7 1929 NGVD). A- 1 y # zq bio ,u h SITE R � � � � '� ,� • � O sit' �0 P' 4 i �° y • 1 y ,L L t ` 4Y+ .� � •�• V � .j lj + G endej Sch 1 N w.3a�`} :*{°,_ } + i ✓X } c 1 .tR' � a+-,`h �U e p �.��,� S '� 4.$^•. F YA `U, Salem �+r 0 250500 1,000 1,500 2,000 Figure 1 Feet Site Locus Plan t Ref: USGS Scanned Topo Maps(MassGIS). N Notice of Intent PATRICK&CAROL FARRELL Griffin Engineering Group, LLC t Smith Street Beverly, MA Salem, MA A-2 2.2 Coastal Bank ' As defined by the Act, the Coastal Bank corresponds to the seaward edge of the existing timber and elevated landform located adjacent to the North River. The top of the Coastal Bank was delineated by a wetland scientist from the Gulf of Maine ' Research Center and located by an instrument survey (see Site Plan). The bank is assumed to prevent storm damage and control flooding of the subject property ' 2.3 Additional Information ' According to the Massachusetts Natural Heritage Atlas 2003 Edition, the project site is not within an area mapped as having Estimated Habitat of Rare Wildlife or Vernal Pools. ' The National Wetlands Inventory Map indicates the project area as being landward of a regularly flooded intertidal area. ' 3.0 PROPOSED PROJECT /WETLAND RESOURCE AREA IMPACTS This Notice of Intent addresses the construction of a garage with associated ' driveway and utilities. The garage is to be located on a parcel currently known as 27R March Street. The subject parcel is in common ownership and is to be combined with the adjacent parcel known as 1 Smith Street. The garage is intended ' to be an accessory structure to the single-family residence. The reader is referred to Attachment B for a site plan showing the proposed work. Specific elements of the project include: ' (1) constructing a 26'x38' garage accessory structure; (2) connecting utilities from the 1 Smith Street residence to the proposed garage; (3) extending the 1 Smith Street driveway to the proposed garage. Approximately 17% (3,600 square feet) of the site will be disturbed during ' construction. Erosion control measures are proposed as specified in Attachment D. Haybales or silt fence will be placed downgradient of the proposed construction activities. All disturbed area are intended to be re-vegetated, and/or restored to pre- disturbance conditions as soon as possible. 3.1 Riverfront Area ' As noted in Section 2, the entire parcel is within the Riverfront Area. The garage footprint has been located as far from the North River as possible. Nonetheless, ' within the Inner Riparian Zone (0-100 feet) of the Riverfront area, there is no disturbance anticipated. Approximately 3,600 square feet of disturbance is projected within the Outer Riparian Zone (100-200 feet). In accordance with 310 CMR 10.58 (6), certain activities or areas are grandfathered or exempted from the requirement for the Riverfront area. This includes the ' conversion of lawn use to accessory uses to an existing single-family house in A - 3 1 � 1 existence on August 7, 1996 provided that the activity is located more than 50 feet from the mean annual high-water line within the Riverfront Area and erosion and ' sediment controls are provided. Insofar as the Riverfront Area performance standards are concerned, we note the following: ' (1) The proposed garage is an accessory structure to an existing single-family residence and is to be constructed on the existing lawn. ' (2) The garage has been located as far from the river as possible (112+/- feet), and existing vegetation is proposed to be maintained between the constructed garage and the river. Minimal tree removal is proposed. Any ' existing wildlife habitat functions provided on the parcel will continue to be provided. ' (3) Appropriate erosion control measures are proposed to protect the Riverfront Area. ' (4) Stormwater management provisions are consistent with DEP policy for single family residence projects. ' For these reasons, we conclude that the project meets the performance standards for the Riverfront Area to the maximum extent feasible ' 3.2 Coastal Bank ' The proposed project is located within the 100-foot buffer zone to the Coastal Bank resource area. The project is located at least 80 feet from the edge of the bank at its closest point. ' The performance standard for work within 100 feet to a Coastal Bank is that the work shall have no adverse effects on the stability of the coastal bank. By installing erosion control measures between the bank and the proposed garage, and by maintaining construction activities away from the bank, the stability of the bank will not be changed due to the project. ' 4.0 MITIGATION MEASURES ' Proposed mitigation measures are included to minimize the potential impacts to the wetland resource area throughout the construction process. ' Prior to work commencing on the Site, there will be a preconstruction conference with the contractor. The purpose of this meeting will be to coordinate the best methods for erosion and sedimentation control, protection of the wetland resource ' areas, and other construction-related issues. The implementation of a comprehensive soil and erosion control plan will occur prior any construction activities within the project area. In general, the following sequence of events will toccur: A - 4 • Erosion and sedimentation control devices will be installed along the edge of the down gradient side of the project area prior to construction as depicted on ' the site plan (Attachment B). In addition to providing for sedimentation deposition and reducing runoff during storm events, this barrier will limit the work area for the equipment operators. ' Erosion and sedimentation control devices will be inspected daily during periods of active construction and bi-weekly during the remainder of the ' construction period. Sediments will be removed from the barriers as soon as they reach a depth of 6 inches. ' Runoff from the site will be directed through sedimentation control barriers. • During construction, disturbed areas will be kept to a minimum and vegetative stabilization of these areas will occur as soon as possible. • Temporary seeding, mulching, or other suitable stabilization measures will be ' used to protect exposed critical areas should unprotected soils remain exposed for prolonged periods. ' Construction activities shall be monitored on-site by the construction supervisor to ensure that the soil erosion and sediment control features are installed properly, ' maintained, and to evaluate the need for additional erosion control and/or stabilization measures. The inspector will perform the following tasks: ' Supervise the installation and maintenance of the soil erosion and sediment control features. • Evaluate the need for additional soil erosion and sediment control features. ' Scheduled inspections of erosion control features, including construction entrance, haybales, and dust control. • Supervise and monitor temporary and permanent stabilization activities. ' 5.0 CONCLUSION ' The proposed construction of the garage at 1 Smith Street is designed to comply with both state and local wetland regulations and to minimize impacts on the surrounding and adjacent wetland resource areas. The proposed work meets the ' applicable performance standards for work to be performed within the pre-disturbed Riverfront Area, and the buffer zone to the Coastal Bank. Permanent unavoidable impacts and temporary impacts have been minimized. Adequate mitigating ' measures are proposed as to not compromise the function of the resource areas. The proposed project with it's mitigation measures meet the performance standards and protect the interests of the Massachusetts Wetlands Protection Act and the City tof Salem Wetlands Ordinance. A - 5 1 1 1 1 ' ATTACHMENT B PLAN TO ' ACCOMPANY NOI 1 1 1 1 1 1 1 1 1 ATTACHMENT C ' RIVERFRONT FORM 1 1 1 1 1 1 1 1 1 1 ' Notice of Intent Supplemental Form for Riverfront Area The Notice of Intent Supplemental Form for Riverfront Area is recommended for use with the Notice of Intent (Form 3)in the wetland regulations(3 10 CMR 10.99). This form should be used for activities that are located in the Riverfront Area. See instructions for information about completing this form.Applicants also may refer to the "Checklist for Review of Activities in the Riverfront Area"issued by the Department of Environmental Protection in November 1996. The checklist should not be submitted with the form;it is included to indicate how a conservation ' commission may evaluate application information.Attach the completed supplemental form to the Notice of Intent, including any appropriate documentation as needed. Use additional pages if necessary. 1. Mean annual high-water line determined by: ❑ Changes in soil,vegetation;water marks;scouring ❑Top of bank(inland rivers) ❑ First observable break in slope ❑Mean annual flood level E(Mean high water(for coastal rivers only) (Idents the mean annual high-water line on the Notice offinent plans.) 2. Width of Riverfront Area: ET 200 feet ❑ 25 feet (Idents the Inner and Outer Riparian Zones on the Notice ofrntent plans) 3. Activity is not subject to Rivers Protection Act because: ❑ Expansion of publicly owned structures,airports,marine cargo terminals begun before November 1, 1996 ' ❑ Draft EIR filed on project before November 1, 1996 ❑ Building permit filed before October 1,1996 and granted before April 1, 1997 ❑ Roads,utilities,drainage structures under a definitive plan approved or endorsed on or before August 1, 1996 pursuant to the subdivision control law(MGL c.41 §81U) ❑ Subject to Chapter 91 waterways license or permit ❑ Other-describe: ' 4. Project type: ❑ Single family home ❑ Residential subdivision ❑ Commercial development ❑ Industrial development ❑ Transportation 1Z Other-describe: Garage at Single-Family House ' S. Amount of alteration in Riverfront Area: a. If Riverfront Area is 200 feet wide,identify amount of alteration: ' 0 square feet of Inner Riparian Zone (0-100 feet from river) 3,600 square feet of Outer Riparian Zone (100-200 feet from river) b. If Riverfront Area is 25 feet wide,identify amount of alteration: square feet of Inner Riparian Zone (0-15 feet from river) 11196 (over) 1 6. Describe why the proposed project needs to be located in the Riverfront Area. Address the following questions in your answer: • Can the project be moved out of the Riverfront Area?Can the project be located further away from the river or stream?If not,why? • How do costs and logistical constraints(e.g.,physical site conditions,local zoning requirements)limit the alternatives? • What alternatives were considered? ' The lot was created prior to August 1, 1996 and the alternatives are limited to the options available on the lot. The lot area is approximately 21,375 sq.ft.within the property lines. The entire lot is located within the 200 foot Riverfront area,therefore no alternatives are possible outside the Riverfront area. The project will be located outside the Inner Riparian Zone(0-100 feet). (Use additional pages if necessary.) _ 7. Does the proposed project meet the criteria for no significant adverse impacts? a.Check criteria that apply: ' J?meets performance standards for all other wetland resource areas Vundisturbed vegetation in the 100-foot Inner Riparian Zone(15 feet in 25-foot Riverfront Area) a'alteration in the 100-foot Outer Riparian Zone limited to 5,000 square feet or 20%of zone,whichever is greater* a'meets performance standards for stormwater management** *This performance standard is waived for the 10-foot Outer Riparian Zone when the Riverfront Area is 25 feet. •*Stormwater management is not required for single family houses and small subdivision projects as described in the Department's Stormwater Management Policy. b. Is the project site located in estimated rare species habitat or to a certified veinal pool as noted on the Massachusetts Natural Heritage Atlas? _yes ✓no If yes,has a copy of the Notice of Intent and this form been sent to the Natural Heritage and Endangered Species Program according to Notice instructions? _yes no If any of the criteria listed in(a.)above are not met,describe why the project will have no significant adverse impacts on the Riverfront Area. (Note:for single family house projects on lots recorded as of August 1,1996 which cannot meet the performance standards,describe how the project minimizes all impacts.) (Use additional pages if necessary.) L ' ' ATTACHMENT D ' EROSION CONTROL SPECIFICATIONS 1 1 1 1 1 1 1 1 Section 01568 Erosion Control, Sedimentation and Containment of Construction Materials Part 1 - General ' 1.1 Provide all work and undertake all measures necessary to control soil erosion from the work site throughout the Construction Phase and continuing until removal of siltation controls are authorized by the Engineer or Local Authority. This work shall be continuous throughout the project, regardless of the construction schedule undertaken by the Contractor. The contractor must ensure that controls perform as specified even ' when he is not present at the work site. 1.2 Prevent soil and construction materials from the work area from reaching wetlands or waterways at all times. 1.3 Install and maintain erosion controls as shown on the drawings and as specified. Should additional controls or measures be necessary to control erosion, as determined by the Owner or Engineer, then provide and maintain same. 1.4 Controls installed and maintained must prevent movement of soil and construction materials from the work areas at all times. Controls must be capable of performing adequately during normal and severe storm events. ' 1.5 Controls are to be installed prior to disturbing earth or vegetation at the project. 1.6 Compliance with all.requirements of the Order of Conditions issued by the Local Authority is the responsibility of the Contractor, with the following exceptions: Filing of the Order on the property deed. Requirements for actions at the property after the authorized removal of erosion controls. Part 2 - Quality Assurance 2.1 All erosion controls to be constructed of new materials approved by the Engineer and consistent with these specifications. Replace inadequate or worn controls with new ' materials. 2.2 Inspect and maintain as necessary erosion controls within 24 hours following every ' storm event. 2.3 Disturbance of soils or vegetation and construction activities of any type beyond the ' limits of work shown on the drawings are prohibited. Do not disturb adjacent vegetation. 2.4 The Contractor is solely responsible, at no additional cost to Owner, for repairs, replanting, remediation, or reconstruction or other any actions ordered by the Local I ' Authority resulting from non-compliance with these requirements. Non-compliance includes, but is not limited to, failure to prevent soil and construction materials from reaching a wetlands or waterbody. ' 01568-1 I ' 2.5 The Contractor is required to keep on-site, throughout the project, 12 additional haybales and 50 feet additional silt fence. These additional erosion control materials are to be available for use solely at the project site and are to be installed immediately upon direction of the Engineer or the Local Authority. ' 2.6 Follow preventative erosion control practices established by the United States Soil Conservation Service. 2.7 Do not allow litter or construction materials to blow from the work area and enter wetlands. Immediately remove by hand any such materials entering wetlands. Part 3 - Submittals 3.1 Two weeks prior to disturbing soil at the project site, submit to Engineer for review and approval, catalog cuts showing the proposed materials to be used during construction. ' Part 4 - Materials 4.1 Haybales shall be made of straw or hay, tightly bound with string, and measure approximately 18" x 18"' x 3' or larger. 4.2 Silt Fence - shall be made of a woven geotextile with a metal reinforcing mesh fully integrated during the manufacturing process into the geotextile. 4.3 Stakes - Stakes for securing haybales and silt fence shall be made of oak, and shall ' have nominal dimensions of 2" x 2" x 4'. Metal fence posts for silt fence acceptable. Part 5 - Dewatering Discharges 5.1 Water discharged from the construction area must be completely free of petroleum products. 5.2 The maximum rate of pumping, without special approval of the Engineer, shall be 150 gallons per minute. 5.3 Dewatering waters shall pass through a silt removal chamber having an overflow rate less than 3,500 gallons per square foot per day and a depth of at least three feet, and ' then be filtered through haybales prior to being allowed to flow to a wetlands or waterbody. Effluent shall have turbidity less than 10 NTU. ' Part 6 -Additional Requirements ' 6.1 Install silt fence around all stockpiles of soil placed within 200' of a wetlands. 6.2 Controls are to be removed after vegetation in the work area has been established, and is determined by the Engineer or Local Authority as being effective at controlling erosion. I , 01568-2 ATTACHMENT E ' AFFIDAVIT OF SERVICE, NOTICE TO ABUTTERS, i & CERTIFIED LIST OF ABUTTERS. 1 1 1 1 1 1 ' Affidavit of Service Under the Massachusetts Wetlands Protection Act (to be submitted to the Massachusetts Department of Environmental Protection and the local Conservation Commission when filing a Notice of Intent) I, Robert Griffin, hereby certify under the pains and penalties of perjury that on ' 8.26.05 , notification was given to abutters in compliance with the second paragraph of the Massachusetts General Laws Chapter 131, Section 40, and the DEP Guide to Abutter Notification dated April 8, 1994, in connection with the ' following matter: A Notice of Intent filed under the Massachusetts Wetlands Protection Act and the City of Salem Wetlands Ordinance by Patrick & Carol Farrell with the Salem Conservation Commission on 8.26.05 , for the construction of a garage with associated driveway and utilities. The work is to be performed at 1 Smith Street in Salem, Massachusetts. The form of notice, and a list of the abutters to whom it was given and their addresses, are attached to this Affidavit f Service. '/ IGO/fG� TI. - G� - Q� ' Robert H. Griffin, P Date I ' I , i Notification to Abutters Under the Massachusetts Wetlands Protection Act and the ' City of Salem Wetlands Ordinance In accordance with the second paragraph of Massachusetts General Laws Chapter 131, ' Section 40, and the DEP Guide to Abutter Notification dated April 8, 1994, you are hereby notified that: ' A. The name of the applicant is Patrick & Carol Farrell B. The applicant is filing a Notice of Intent with the Salem Conservation Commission seeking permission to construct a garage with associated driveway and utilities, such ' work is within wetland resource areas subject to protection under the Wetlands Protection Act (Mass. General Laws Chapter 131, Section 40) and the City of Salem Wetlands Ordinance. C. The address of the property where the work is proposed is 1 Smith Street (previously 27R March Street) - Mao 36 Lot 227 & 228 in Salem. D. Copies of the Notice of Intent may be examined at the Salem Conservation Commission Office 3rd Floor of the City Hall Annex, 120 Washington Street, Salem. MA between the hours of 8:00 AM and 4:00 PM, Monday through Wednesday; 8:00 AM and 7:00 PM Thursday, and 8:00 and 12:00 PM Friday. ' E. Copies of the Notice of Intent may be obtained from (check one) either the applicant or the applicant's representative X by calling this telephone number: 978-927-5111. F. Information regarding the date, time, and place of the public hearing may be obtained from the Salem Conservation Commission Office, 3rd Floor of City Hall Annex, 120 Washington Street, Salem, MA by calling this telephone number (978-745-9595) between the hours of 8:00 AM and 4:00 PM Monday through Wednesday: 8:00 AM and ' 7:00 PM Thursday, and 8:00 and 12:00 PM Friday. Note: Notice of this Public Hearing, including its date, time, and place, will be published at least 5 days in advance in the Salem Evening News . Note: Notice of the Public Hearing, including its date, time, and place, will be posted in the City ' or Town Hall not less than 48-hours in advance. The tentative date for the hearing will be September 8, 2005. ' Note: You may also contact your local Conservation Commission or the nearest Department of Environmental Protection Regional Office for more information about this application or the Wetlands Protection Act. To contact DEP call: Central Region: (508) 792-7650 ow Northeast Region: (617) 292-5500 Southeast Region: (508) 946-2714 Western Region: (413) 784-1100 tList of Property Owners and Abutters ' The Notification to Abutters Form has been forwarded by Certified Mail (return receipt requested) to the following abutters and property owners within one hundred feet of the property line of the land where the activity under the jurisdiction of the Wetlands Protection Act and the City of Salem Wetlands Ordinance is proposed: ' THE FOLLOWING LISTING WAS OBTAINED FROM THE CITY OF SALEM ASSESSORS OFFICE AT SALEM CITY HALL. 1 1 -ceIID Location Owner Co-Owner Mailing Address Citv State Zip )161-0 20 BURNSIDE STREET MASS COMMONWEALTH OF DEPT OF PUBLIC WORKS MA 0170-0 5456 BRIDGE STREET M.V.A.M.NOM tr/PRENTAKIS K C/O 1/0 REALTY TRUST 56 BRIDGE STREET SALEM MA 01970 0181-0 19 MARCH STREET SALEM CITY OF CURTIS PLAYGROUND MA &221- STREET ARGH-ST o:.�EM- MA----64879- 0222-0 37—MARCH STREET MCCUISH STEVEN L MCCUISH BETH M 37 MARCH ST SALEM MA 01970 0223-0 35 MARCH STREET CASSIDY JOEL W DEVINE LOIS R 35 MARCH ST SALEM MA 01970 0224-0 2 SMITH AVENUE FARRELL PATRICK J BRUNACCINI-FARRELL CAR 2 SMITH AVENUE SALEM MA 01970 0225-0 33 MARCH STREET FARRELL PATRICK J FARRELL CAROL 1 SMITH AVE SALEM MA 01970 0226-0 31 MARCH STREET MASS COMMONWEALTH OF MA 0227-0 1 SMITH AVENUE FARRELL PATRICK J BRUNACCINI CAROL A 1 SMITH AVE SALEM MA 01970 0228-0 27 MARCH STREET REAR FARRELL PATRICK J FARRELL CAROL 1 SMITH AVE SALEM MA 01970 0229-0 27 MARCH STREET MASS COMMONWEALTH OF MA 0505-0 25 MARCH STREET MASS COMMONWEALTH OF DEPT OF PUBLIC WORKS MA End of Report ' 36�,p�5 F, � •. tw T 36�&14 363 7 36�&16 3o ag 36-3y 3 $ e9z 36 0 + 3g ' ss Bo 36- 15 z4 s 6- 74 zo a .aos , 36 136 3 '36- 60 36 2 s2 z "0 36x918 w ra �s � . " . - 3E s ,3648 � 3, �3 r 27 3608 36��1 8 ar 36126 z°:�iz?s as16 7w 3619 36- 19 tiYa h S 25 365829 3690 4 RS ; 6 ��0 9 - � 3%9�28 5 I3 ir2 '3 36jpR7 t 6 36jQ 36& 36i9i�7 36- 64 364kja0 6 66 � �, !7 �//(I pcF ✓ °`fit Y^'aT to s4j 9 k7``4a _yam, a stir 365-g5'�5 36 59215L , 36 '1x54 364 �*' q k 361353 1° 3 Q 36344 ,;� 20 2s h Use Avery®TEMPLATE 51620 T m 1-800-GO-AVERY T U VCI<Y" "o[— 1 ' Loc:35 MARCH STREET Parcel ID#: 36-0223-0 Loc:20 BURNSIDE STREET Parcel ID#: 36-0161-0 LUC: 101 LUC: 903 CASSIDY JOEL W/DEVINE LOIS R MASS COMMONWEALTH OF/DEPT OF PUBLIC WORKS t35 MARCH ST SALEM MA 01970 tLoc: 27 MARCH STREET REAR Parcel ID#: 36-0228-0 Loc:31 MARCH STREET Parcel ID#: 36-0226-0 LUC: 132 LUC: 924 ' FARRELL PATRICK J/FARRELL CAROL MASS COMMONWEALTH OF 1 SMITH AVE ' SALEM MA 01970 Loc: 2 SMITH AVENUE Parcel ID#: 36-0224-0 Loc:27 MARCH STREET Parcel ID#: 36-0229-0 LUC: 101 LUC: 924 FARRELL PATRICK J/BRUNACCINI-FARRELL CAROL A MASS COMMONWEALTH OF 2 SMITH AVENUE ' SALEM MA 01970 Lac: 33 MARCH STREET Parcel ID#: 36-0225-0 Loc:37 MARCH STREET Parcel ID#: 36-0222-0 t LUC: 104 LUC: 101 FARRELL PATRICK J/FARRELL CAROL MCCUISH STEVEN L/MCCUISH BETH M I ' 1 SMITH AVE 37 MARCH ST SALEM MA 01970 SALEM MA 01970 tLoc: 1 SMITH AVENUE Parcel ID M 36-0227-0 41 MARCH STREET Parcel ID#: 36-0221-0 LUC: 104 101 ' FARRELL PATRICK J/BRUNACCINI CAROL A PARSONS WILLIAM H/ 1 SMITH AVE 41 MARCH ST ' SALEM MA 01970 SAL A 01970 Loc: 54 56 BRIDGE STREET Parcel ID#: 36-0170-0 Loc: 19 MARCH STREET Parcel ID#: 36-0181-0 ' LUC: 031 LUC: 922 M.V.A.M. NOM tr/PRENTAKIS K/C/O 1/0 REALTY TRUST SALEM CITY OF/CURTIS PLAYGROUND ' 56 BRIDGE STREET SALEM MA 01970 Loc: 25 MARCH STREET Parcel ID#: 36-0505-0 LUC: 924 MASS COMMONWEALTH OF/DEPT OF PUBLIC WORKS A83AV-O9-008-L ®Z9L5 iuege6 al zasllliD ®Z91vs OAUMV W0:)kane'MMM apldej a6egpas a is a6eimoghue uolssajdwl i o I N/F Existing I N/F I Patrick Farrell ngle-Fa y Residence Patrick Farrell #12 2 Smith Street 2 Sm' n Street 33 March ! 1 / I Street 8.00'00'W � � '� ® L I j - 67.80' r —_ -- ----v+- ao z I ------ f--------------------- I p0• Z4 PL. / i s S S S S S4— S S S S S S S------�---� I S ON S #„ 001' W W yw w W SMITH AVE . � � I W W w�w w w w w 10 ` — — — / I S 8'00' 'W ��� �------------- _ W -- W w _ —SiM'UO" VV- - — I / 87,7 °c /7 / 60.00' — — —_ y�o #g0 / 48" Locus ®m° / I m / I x, x° / \\� 4°® \ 0 •`t o o I I w� ( 36" Maple I Existing i Z I o,�� 8 Single-Family 01 # I Residence I I 1 \r J• / 1 Smith Street I �' o' 7 / ru N/F C� / /_ / I Commonwealth N/F \ f' of Mass. Patrick Farrell Q / 1 Smith Street w — _ S4 0 — — — 0 0 W— _ N/F i 39,00' i / r Patrick Farrell A�' w I 5 / / / ,�,/ I z 40,0/1 ® I7 I �' to I w ® Proposed oo UIIrru i #4 / i I Electrical Proposed I SB/DH oDriveway I No Date Description // W Revisions / c°c ��/� (1)W C4 #3 / •Jo4Et / �7 0D / H- O OCD ©�S' ROBERT I / 2 / — _ - - - � / � Proposed H. GRIFFIN 5�t IL-57, 75 t Garage CML 117, y / L=57, 75' 1 26�x38� SB/DH R=2808, 43' ® Slab Elev. 15.51 NA DO � �I t \ I w% M 8'. 20.03 N/F ,. Mass Bay m 0 4 � 1 Transportation X8.0 �•E ® Authority Ci Griffinn Engineenng \ Group, LLC P.0 Box 7061 100 Cummings Center, Suite 224G 2•x 2• HARDWOOD POST EROSION CONTROL Beverly, MA 01915 NOTES LEGEND: MIN, LENGTH of 4 FABRIC (MIRAFl No. NOTE: CONTRACTOR MAY USE EITHER AT 8• MAX. O.C. STAPLE TO POR OST AT UNLESS SPECIFICALLY DIRECTED BY 1 Boundaryand Topographic Surve b Rural Land Surveys in October 2004. S18.00'001W Tel: 978-927-5111 Y Y Y Property LinehG,!;�", OR CONSERVATION „ 2) Elevations refer to 1929 NGVD. 60,00' s• D.C.o.c. VERTICALLY. I cmc nNSER\�.1P,OP' ''Oh11v"ss!oN. Fax: 978-927-5103 ' 3) Top of Coastal Bank flagged by Gulf of Maine Research Center (Flags #1 - #14) — —Q— — Existing Countour 11 � -7 1 1W 4) Contour Elevation 10 represents land subject to coastal storm flowcge --------- Existing Edge of Pavement Patrick & Carol (FEMA 100-year flood elevation, Zone A2). Existing Building Farrell 5) Utility locations are approximate and may not be complete. Contractor is responsible for ascertaining the presence or absence of utilities in the work area, for notifying Dig-Safe —W W— Existing Water Line 2.5' MIN 28• 2•x 2•x W HARDWOOD 1 Smith Street and municipal utilities in advance of work, and to protect same. — s— s— Existing Sewere Line DSTAKES TO 12" INHGROU oMA Salem, 6) This plan is prepared for conservation permitting only. ` Existing Fence 5' Min. 4 ,,! i REFERENCES: A#10 Coastal Bank Flag (u.N.o.) I�); `1N1 Ir�,� 1 Plan Book 244' Plan 40 2) Plan Book 60 Plan 38 -- --- Proposed Building s• � I,! \,,; tji/ I� + Site Plan to 3) Plan 42 of 1975 ---- Proposed Driveway Ts' Min. I I ' I Accompany N01 � EXCAVATE� CAVATE SHALLOW t 4) Book 11358 Page 417 E Proposed Electrical TRENCH BY HAND & Tq 5) Book 11773 Page 23 BACK FILL AFTER N , — — — Erosion Control INSTALLING FABRIC 6) Assessors Map 36 Lots 224 2' Burr nGHTLY SG4I4: 1.=10' 7) Site Detail Plan of Land prepared by GRAPHIC SCALE T0` TH°� ERural Land Surveys, Danvers, MA fo a S 10 m w Job N ; W5 2 _ SILT FENCE HAYBALE C- 1 ER❑SI❑N C❑NTR❑Lrile P/PIB/f € ( IN n-ET j1 inch = l0 it NOT TO SCALE Q� 8/26/05