Loading...
64-313 - 5 RIVERBANK ROAD - CONSERVATION COMMISSION (002) DEP 64- 3�3 \ Plans 1 roximate 100 ft. Buffer Zone to Top _ of Coastal Bank 5 Riverbank Road ' Paving Block Driveway and Walkway 1 Roof Downspout Roof Downspout Drain into Dry Well Drain into Dry Well ' Approximate house location based on Assessors map. Concrete Hot Approximate 100 ft._ " Tub Pad � � N{ 4 ' Riverfront Area Boundary I Paving Block Patio T ]1; , Low stone o + � ro gg h a retaining wall 1t96P ' Approximate Top of Coastal Bank Coastal Bank Approximate Toe------------------------------------- --------- of Coastal Bank m E iS ' o CL N Salt Marsh _ Scale _ _ _ - -- - - i,. = 20' ' Approximate Mean_-= _ — — 5 Riverbank Road, Salem, MA High Water(Mean Approximate Lot Lines, Proposed Work, High Tide). Based on and Welland Resource Areas. M9 ft. contour line shown Forest River NOTE: For diagramatic purposes only. on Registry Plan. Not to be interpreted as a surveyed plan. 1 Gulf of Maine Research Center, Inc. 7