64-60 - PIERCE ROAD - CONSERVATION COMMISSION :.G• ;
�.-
- - - - - - -�
t, �
�' .,, �
n
��
s
:. 1 �;
BK7095 P6220
CdwlmhlPntrd OF OASAME1i3 :
. WMANDS PRlgietiidd ACT .
O.t.C.131 s. 43 �.
CERrIPitdre
►gDJE1.T 10mm .p}w;de imed. 6•la, M. . are Farb. 34. 1913:
It W 11de to testified that the eat rpalasd by u Rbdm of Cmmtlem . .
bftl wr xt.'Sfep '61 the Omfrt ent of En"rannanal
Qual(q
eplrerlp[7 tgmsnatir Carluir Lal bu hm•atistacmrlly Completed.
••ibis Certificate sari he rlardta.16 the Registry of gym for the
dlsiimct t1.With ao land is locitaL its
OOrder me originally.warded
op wy 33, 1961 1n IBM) a .
4
. Oa tMr :bnro..,.
da... day if .Pobrlary ally
wea.J
to r team to be the parse described in ad WO a ted the farpoing '
:1mtn•eet and actimoledged.that he wasted the sem as his fres teat and deed.'..., .
7677
.e .,Ssfm expires
- •F•
.' Wt a. esteIDa...ai�jg).T1StJ}y�).lmT.(141
Yom., A1,2NDED ORDER OF CONDITIONS
FORM 4 1
{ , ORDER OFA CONDITIONSil
THIS ORDER OF CONDITIONS SUPERSEDES AVY-/FREVIOUS ORDER OF CONDITIONS
WETLAND S PROTECT ION--A-C-T-—
P _ _ kJ J
G.L. C. 131, s. 40 .,
CITY/TOWN SALEM FILE NUMBER 64-60
TO: NAME Clayton W. Smith ADDRESS47 Beach Avenue. Swamncrntt
CERTIFIED MAIL NUMBER
PROJECT LOCATION:
Address Pierce Road Salem Macaw rhn }tom
Recorded at Registry ofEssex sn Book 5653 , Page 743 —
Certificate (if registered)
\. REGARDING:
Notice of Intent dated r March 3, 1980 '
and plans titled and dated"Site Plan prepared for Clayton smith, Salem, Mass.
_dated 2/14/80 -revised. 2/29/80
THIS ORDER IS ISSUED ON (date) May 22, 1980
------------------------------------------------
Pursuant to the authority of C.L. c. 131, 'x."'40, the Salem - -
Conservation Commission has,reviewed your. NoticeofIntent
and plans identified above, and has determined that the area on which
the proposed work is to be done is significant to one or more of the
interests listed in G.L. c. 131, s. 40. The
hereby orders that the following conditions are necessary to protect
said interests and all work shall be performed in strict accordance
with them and with the Notice of Intent and plans identified above
except where such plans are modified by said conditions.
---------------------------------------------------------------------
CONDITIONS
1. Failure to comply with all conditions stated herein, and with-
all related statutes and other regulatory measures, shall be
deemed cause to revoke or modify this order.
t
-1-
f
FORM 4
ORDER OF CONDITIONS CONTINUED FILE NUMBER 64-60
2. This order does not grant any property rights or any exclu-
sive privileges; it does not authorize any injury to private _
property or invasion of private rights.
3. This order does not relieve the permittee or any other per-
son of the necessity of complying with all other applicable
federal, state or local statutes; ordinances, by-laws and/
or regulations.
4. The work authorized hereunder shall be completed within one
(1) year from the date of this order unless it is for a
maintenance dredging project subject to Section 5(9) . The
order may be extended -by the issuing authority for one or
more additional one-year periods upon application to the
said issuing authority at least thirty (30) days prior to
the expiration date of the order or its extension.
5. Any fill used in connection with this project shall be clean
fill, containing no trash, refuse, rubbish or debris, includ-
ing; without limiting the generality of the foregoing, lumber;
bricks, plaster, wire, lath, paper, cardboard, pipe, tires,
ashes, refrigerators, motor vehicles or parts of any of the
foregoing.
6. No work may be commenced untill all appeal periods have
elapsed from the -order of the Conservation Commission or from
a final order by the Department of Environmental Quality
Engineering.
7. No'work' shall be 'undertaken until the final order; with
respect to the proposed project, has been recorded in the
Registry of Deeds for the district in which the land is
located within the cha[n of title of the affected property.
The Document number indicating such recording shall be sub-
mitted on the form at the end of this order to the issuer
of this order prior to commencement of work.
B. A.sign shall be displayed at the site not less than two
square feet or more than three square feet bearing the
words, "Massachusetts Department of Environmental Quality
Engineering, Number 64-60 "
9. Where the Department of Environmental Quality Engineering
is requested to make a determination and to issue a super-
seding order, the Conservation Commission shall be a party
to all agency proceedings and hearings before the Depart-
ment.
_2_
ORDER OF CONDITIONS CONTINUED FILE NO. 64-60
10. Upon completion of the work described herein, the applicant
shall forthwith request, in writing, that a Certificate of
Compliance be issued stating that the work has been satis-
factorily completed. -
].1. The work shall conform to the following described plans and
additional conditions.
The Conservation Commission has determined that the proposed work
is significant to storm damage prevention and therefore issued this order:
1. The structure shall be placed on site as shown on submitted
drawings '"Mortgage- Survey Plot Plan, Salem, MA" prepared-by
Towers Engineering Corp,. , Swampscott, MA. and attached to this
order of conditions.'
2. The structure shall have no basement and the first floor elevation
shall be at least 16 feet, mean low water.
3. There shall be no filling or removal of soil from the site.
4. This order allows for filling or excavation for the construction .
of a driveway only in so far as it complies with a letter from
Joseph CarterofCarter & Towers Engineering Corporation too ,,`tif`e •:
f,
petitioner Clayton W. Smith, dated April 23, 1980 and an Attached ..' , '•;
�- drawing dated May 1, 1980 attached hereto and made a pariereafi
` I
-3-
ORDERS OF CONDITIONS -continued
The applicant, any person aggrieved by this order, any owner
of land abutting the land upon which the proposed work is to be
done, or any ten residents of the city or town in which such land
is located, are hereby notified of their right to appeal this order
to the Department of Environmental Quality Engineering provided the
request is made in writing and by certified mail to the Department
within ten (10) days from the issuance of this order.
ISSUED BY cOASERVATIaTnN
n
9 �efor
e me personally
day of P Y
On this 22nd Y May BO
appeared the ab_oye�eraona to me
executed o
known to be the person described in; and who the foregoing
g
.,,,.,., ,.instrument' s rument and acknowledged that
he executed the
same as his free act
6d-,deed.
My .Commission expires
DETACH ON DOTTED LINE AND SUBMIT TO THE ISSUER OF THIS ORDER PRIOR TO
COMMENCEMENT OF WORK.
TO (Issuing Authority)
PLEASE BE ADVISED THAT THE ORDER OF CONDITIONS FOR THE PROJECT AT
FILE NUMBER , HAS BEEN RECORDED AT THE REGISTRY OF
ON (DATE) _
If recorded land, the instrument number which identifies this trans-
action is
If registered land, the document number which identifies this trans-
action is r
Signed
Applicant
-4-
F,
,
.CARTER & T0WERS ENGINEERING CORP.
y , Z�a�rrrePerree�
% ulk�e,
Joseor. D Caner C O
rrorssans:Enprneer '6 FAIRVIEW AVENUE
Regrserec Land Surveyor SWAMPSCOTT. MASS. 01907
Tel. 592-8386 �>
April 23 , 1980
Mr. Clayton td. Smith
47 beach Avenue ite : Pierce Rd, ,
Swampscott, Mass. 01907 Salem, Blass.
Dear Clayton:
I have reviewed the above-captioned site and with particular
attention to the proposed driveway, I see no proLlem associated
with the construction slopes or grading of a bituminous drive.
I think that everyone is under the impression that the drive-
way will be out on the uncut grass area. i'he driveway will be
entirely within the landscaped area that is being used by your
neighbor.
My suggestion for construction would be to excavate the
organic material to the width of the driveway and replace it
with compacted bank run gravel or Lynn Pac as a base, then pave
the drive with 32-"" bituminous concrete. The driveway elevation
should run with the contour of the land so that you .s�ill not
interfere with the . existing overland runoff from your neighbor' s
property.
Very truly yours,
JOSEPH D. CARTER
JDC:amp /
CIVIL ENGINEERING PERCOLATION TESTS SEWAGE DISPOSAL DESIGNS SURVEYING
CARTER & TOWERS ENGINEERING CORP.
Joseph D Carter
Professional Engineer �---� - 6 FAIRVIEW AVENUE
Registered Land Surveyor -------- `�•---- SWAMPSCOTT. MASS. 01907
Tel. 592-8386
•� s I
e -
s
•
3 + _
0
J
5
�aPIF
S
S
ei �, fo re'O o
01" Lc,cl
Iq ke
Loam
oENs
L �
'2TG PATEQ Fol
irAu-nTr,,U of -
i':_rTES
5 u'Q
- w ermX-1
12'
-
3
CIVIL ENGINEERING PERCOLATION TESTS SEWAGE DISPOSAL DESIGNS SURVEYING
CAR`T'ER , & TOWERS ENGINEERING CORP.
likecn D Carter
J'u�aec�d, 7�aun6eLcznc�
?;"econg,Enq.-eer 6 FAIRVIEW AVENUE
pe rareu_a^.e c,,,,evp, SWAMPSCOTT. MASS 01907-7,,'
- Tel. 592-8386
� crux Foc7'ay:
Ir ri _ » 5��• 3tc
22e 2 4, 5 2 o s F i
- D
0
tD
A 3'i-
ti2.00 7G co
I g��kc . O Jonne��
2760 ,
t53G= loo ye-a' t looc� elev. Tothosaksm 5� savinys ea•'
g�Q S-6 -1741c s
hereby certify that t have examined
the premises and all easements,
encroachments and buildings are
located on the ground as shorn. 1
further certify that the buildings shown
conformed to the zoning la-,vs of
tH
Su
OF ttlger.,, Ma, when constructed.
(� f�
DQTGAG E SURV;y p,pr PLA ij. r`° I further certify that this property
SA.�e M M n• / DAVID ^t 15 h OA— located in e
GARTER yi
U .0 N..9387, Esta fished fl h
4,C)4,C) a
�:..
No su4/ Jo h D.Carter RLS. #9387
4 i $URVEYIPiG � :'
CIVIL ENGINEERING PERCOLATION TESTS SEWAGE DISPOSAL DESIGNS
COPHONWEALTH OF MASSACHUSETTS
WETLANDS PROTECTION ACT
` , G.L. C.131 s. 40
CERTIFICATE OF COMIPLIANCE
Pierce Road. Salem, MA, Feb. 24 � 1983 :
PROJECT LOCATION DATE
FILE NO. 64-60
It hereby certified that the work regulated by an Order of Conditions
dated Ma_y 22.;
by the Department of Environmental Quality
Engineering [ ] , .Conservation Commission Ex] has been satisfactorilycompleted.
This Certificate shall . be .recorded in the Registry of Deeds for the
district in which the land is. located. The Order was originally. recorded
Un Mav z2" 1980 in 6803 528
Date Book Page
Signatur of Issuing Authority
Dn this / 24 day of 'February TcaA3`; ,. before mepersonally.
appeared m e
to me known to be the person described in .and who executed the foregoing
instrument and acknowledged. that he executed the same as his free act and deed. :;
r ,
hotar Puo is My commission expires
"F"
-30-
�f AMENDED ORDER OF CONDITIONS
G - FORM 4
{ ORDER OF CONDITIONS
THIS ORDER OF CONDITIONS SUPERSEDES AITY PREVIOUS ORDER OF CONDITIONS
WETLANDS PROTECTION ACT
G.L. C. 131, s. 40
-------------------------------------------------------------------
CITY/TOWN - SALEM _ FILE NUMBER 64-60
TO: , NAME Clayton W. Smith ADDRESS47 Beach Avenue. swamlasnott
CERTIFIED MAIL NUMBER
PROJECT LOCATION:
Address Pierce Road, Salem Maccarh„cetts
Recorded at Registry ofEsaex Sn Book 5653 , Page 743 —
Certificate (if registered)
\. REGARDING:
• Notice of. Intent dated March 3, 1980
and plans titled and dated"Site Plan prepared for Clayton Smith, Salem, Mass."
dated 2/14/80 revised 2/29/80
THIS ORDER IS ISSUED ON (date) May 22, 1980
-------------------------------------------------------------------
Pursuant to the authority of G.L. c. 131, s. 40, the Salem
Conservation Commission has reviewed your Notice of Intent
and plans identified above, and has determined that the area on which
the proposed work is to be done is significant to one or more of the
interests listed in G.L. c. 131, s. 40. The
hereby orders that the following conditions are necessary to protect
said interests and all work shall be performed in strict accordance
with them and with the Notice of Intent and plans identified above
.except where such plans are modified by said conditions.
---------------------------------------------------------------------
CONDITIONS \
1. Failure to comply with all conditions stated herein, and with-
all related statutes and other regulatory measures, shall be
deemed cause to revoke or modify this order.
•
_1_
FORM 4
ORDER OF CONDITIONS CONTINUED FILE NUIUMER 64-60
2. This order does not grant any property rights or any exclu- •
sive privileges; it does not authorize any injury to private _
property or invasion of private rights.
3. This order does not relieve the permittee or any other per-
son of the necessity of complying with all other applicable
federal, `state or local statutes; ordinances, by-laws and/
or regulations.
4. The work authorized hereunder shall be completed within one
(1) year from the date of this order unless it is for a
maintenance dredging project subject to Section 5(9). The
order may he extended by the issuing authority for one or more additional one-year periods upon application to the
said issuing authority at least thirty (30) days prior to
the expiration date of the order or its extension.
5. Any fill used in connection with this project shall be clean
fill, containing no trash, refuse, rubbish or debris, includ-
ing, without limiting the generality of the foregoing, lumber,
bricks, plaster, wire, lath, paper, cardboard, pipe, tires,
ashes, refrigerators, motor vehicles or parts of any of the
foregoing.
6. No work may be commenced untill all appeal periods have
elapsed from thecorder of the Conservation Commission or from •`
a final order by the Department of Environmental Quality
Engineering.
7. • No work shall be ,undertaken until the final order; with
respect to the proposed project, has been recorded in the
Registry of Deeds for the district in which the land is
located within the chain of title of the affected property.
The. Document number indicating such recording shall be sub-
mitted on the form at the end of this order to the issuer
of this order prior to commencement of work.
8. A_sign shall be displayed at the site not less than two
square feet or more than three square feet bearing the
words, "Massachusetts Department of Environmental Quality
Engineering, Number 64-60
9. Where the Department of Environmental Quality Engineering
is requested to make a determination and to issue a super-
seding order, the Conservation Commission shall be a party
to all agency proceedings and hearings before the Depart-
ment. -
ORDER OF CONDITIONS CONTINUED FILE N0, 64-60
10. Upon completion of the work described herein, the applicant
shall forthwith request, in writing, that a Certificate of
Compliance be issued stating that the work has been satis-
factorily completed.
11. The work shall conform to the following described plans and -
additional conditions.
The Conservation Commission has determined that the proposed work
is significant to storm damage prevention and therefore issued this order:
1. The structure shall,be placed on site as shown on submitted '
drawings "Site Plan prepared 'for Clayton S. Smith, Salem, Mass.",
prepared by Carter & Towers Engineering Corp. , Swampscott, Mass. ,
dated 2/14/80 revised 2/29/80.
2. The structure shall have no basement and the first floor elevation
shall be at least 16 feet, mean low water.
3. There shall be no filling or removal of soil from the site.
4. This order allows for filling or excavation for the construction .
of a driveway only in so far as it complies with a letter from
Joseph Carter of Carter & Towers En
P Engineering Corporation 0
petitioner"Clayton W. Smith, dated April 23, 1980 and an Attached,
�. drawing dated May 1, 1980 attached hereto and made a partIiereo '
z
i
l
• -3-
ORDERS OF CONDITIONS -'continued
The applicant, any person aggrieved by this order, any owner
of land abutting the land upon which the proposed work is to be
done, or any ten residents of the city or town in which such land
is located, are hereby notified of their right to appeal this order
to the Department of Environmental Quality Engineering provided the
request is made in writing and by certified mail to the Department
within ten (10) days from the issuance of this order.
ISSUED BY'
co ATTONroMMrcGTnrs
c _
On this 22nd day of May 980, efore me personally
appeared the gbpvP nprsona to me
known to be the person described in, and who executed, the foregoing
i;r" Anstrument and acknowledged that he executed the same as his free act
Jrnd,,deed.
My Commission. expires n
1
DETACH ON DOTTED LINE AND SUBMIT TO THE ISSUER OF THIS ORDER PRIOR TO
COMMENCEMENT OF WORK.
TO (Issuing Authority)
PLEASE BE ADVISED THAT THE ORDER OF CONDITIONS FOR THE PROJECT AT
FILE NUMBER , HAS BEEN RECORDED AT THE REGISTRY OF
ON (DATE)
If recorded land, the instrument number which identifies this trans-
action is _
If registered land, the document number which identifies this trans-
action is
Signed
Applicant
-4-
CARTER & TOWERS ENGINEERING CORP.
J Jcu«rP�ld, 7�a�uzaPaz�� Q`iok�e'
Josepn D Carter
\possrc\ns:Fngmee, '6 FAIRVIEW AVENUE
aegrsrered Land Surveyor SWAMPSCOTT. MASS. 01907
'
Tel 592-8386
April 23 , 1950
Mr. Clayton W. Smith
47 Beach Avenue Re : Pierce Rd. ,
Swampscott, Mass. 01907 Salem, Plass.
Dear Clayton:
I have reviewec.C'the above-captioned site and with particular
attention to the proposed driveway, I see no problem associated
with the construction slopes or grading of a bituminous drive.
1 think that everyone is under the impression that the drive-
way will be out. on the uncut grass area. Tile driveway will be
entirely within the landscaped area that is being used by your
neighbor.
My suggestion for construction would be to excavate the
. organic material to the width of the driveway and replace it
with compacted bank run gravel or Lynn Pac as a base, then pave
the drive with 3Z" bituminous concrete. The driveway elevation
should run with the contour of the land so that you.w'ill not
interfere with the existing; overland runoff from your neighbor' s
property.
Very truly yours,
�JJSErH D. CARTER
JDC:amp
CIVIL ENGINEERING PERCOLATION TESTS SEWAGE DISPOSAL DESIGNS SURVEYING
CARTER & TOWERS ENGINEERING CORP.
:7cuuaee, T�accne�La�rt �� 7 ^"`d•
Joseph p Carter
Professional Engineer �w�r` 6 FAIRVIEW AVENUE
Prof sferedsion Land Surveyor --- SWAMPSCOTT, MASS. 01907 -
Tel. 592-6366
I �
2
9
I
E�
W
I
0
/v.
e -
- s
J 5 oPF
S
y � LoT L�. z�• �8
CIAy '�� 11
T'd
n
SJE..�SE V �
'•'SOIL PavB1.FW ,r`\\VY1'• - '
JTrG 17A7Ep Fa Q,
SrawATw�J OF
.j (�O CQQVJ�.I) c � '�,JJcFF -To E✓L
�
G,pa/0 GFZaG
cj'Nrn '
12'
�SM %T%A LCsj• _ �J OT ��`O SG�.L�.
CIVIL ENGINEERING PERCOLATION TESTS SEWAGE DISPOSAL DESIGNS SURVEYING
'f FORM 4
ORDER OF CONDITIONS
W E T L A N D S P R O T E C T I O N A C T
G.L. C. 131, s. 40
-------------------------------------------------------------------
CITY/TOWN SALEM FILE NUMBER 64-60
TO: NAME Clayton W. Smith ADDRESS 47 Beach Avenue, Swampscott
CERTIFIED MAIL NUMBER
PROJECT LOCATION:
Address Pierce Road, Salem, Mass.
Recorded at Registry of Essex So. Dist.Book 5653 , Page 743
Certificate (if registered)
REGARDING:
Notice of Intent dated March 3 1980
and plans titled and dated "Site Plan prepared for Clayton Smith, Salem,
Mass" dated 2/14/80 revised 2/29/80
THIS ORDER IS ISSUED ON (date) may 8 1980
Pursuant to the authority of G.1.. c. 131, s. 40, the Salem
Conservation Commission has reviewed your Notice of Intent
and plans identified above, and has determined that the area on which
the proposed work is to be done is significant to one or more .of the
interests listed in G.L. c. 131, s. 40. TheSalem Conservation Commission
hereby orders that the following conditions are necessary to protect
said interests and all work shall be performed in strict accordance
with them and with the Notice of Intent and plans identified above
except where such plans are modified by said conditions.
---------------------------------------------------------------------
CONDITIONS
1. Failure to comply with all conditions stated herein, and with
all related statutes and other regulatory measures, shall be
deemed cause to revoke or modify this order.
_1_
FORM 4 `
• Y
ORDER OF CONDITIONS CONTINUED FILE NtJ%MER 64-60
2. This order does not grant any property rights or any exclu-
sive privileges; it does not authorize any injury to private
property or invasion of private rights.
3. This order does not relieve the permittee or any other per-
son of the necessity of complying with all other applicable
federal, .state or local statutes; ordinances, by-laws and/
or regulations.
4. The work authorized hereunder shall be completed within one
(1) year from the date of this order unless it is for a
maintenance dredging project subject to Section 5(9) . The
,order may be extended by the issuing authority for one or
more additional one-year periods upon application to the
said issuing authority at least thirty (30) days prior to
,the expiration date of the order or its extension.
5. Any fill used in connection with this project shall be clean
fill, containing no trash, refuse, rubbish or debris, includ-
ing, without limiting the generality of the foregoing, lumber,
bricks, plaster, wire, lath, paper, cardboard, pipe, tires,
ashes; refrigerators, motor vehicles or parts of any of the
foregoing.
6. No work may be commenced untill all appeal periods have
elapsed from the.,.;order of the Conservation Commission or from
a final order by the Department of Environmental Quality
Engineering. -
7.'' No work shall be undertaken until the final order, with
. respect to the proposed project, has been recorded in the
Registry of Deeds for the district in which the land is .
located within the chain of title of the affected property.
The Document number indicating such recording shall be sub-
mitted on the form at the end of this order to the issuer
of this order prior to commencement of work'.
8. A sign shall be displayed at the site not less than two
square feet or more than three square feet bearing the
words, "Massachusetts Department of Environmental Quality
Engineering, Number 64-60 "
9. Where the Department of Environmental Quality Engineering
is requested to make a determination and to issue a super-
seding order, the Conservation Commission shall be a party
to all agency proceedings and hearings before the Depart-
ment.
,
JRDER OF CONDITIONS CONTINUED FILE NO. 64-60
1
10. Upon completion of the work described herein, the applicant
shall forthwith request, in writing, that a Certificate of
Compliance be issued stating that the work has been satis-
factorily completed.
II. The work. shall conform to the following described plans and
additional conditions.
The Conservation Commission has determined that the proposed work
is significant to storm damage prevention and therefore issued this order:
1. The structure shall be placed on site as shown on submitted drawings
"Site Plan prepared- for Clayton Smith, Salem, Mass." prepared by Carter &
Towers Engineering Corp. , Swampscott, Dated 2/14/80 revised 2/29/80.
2. The structure shall have no basement. and the first floor elevation
shall be at least 16 feet, mean low water.
3. There shall be no filling or removal of soil from the site.
4. This order does not allow filling or excavation for the construction
of a driveway or road because the application contains no information on
such construction.
l� -3-
ORDERS OF CONDITIONS -continued
The applicant, any person aggrieved by this order, any owner \\
of land abutting the land upon which the proposed work is to be �.. !
done, or any ten residents of the city or town in which such land
is located, are hereby notified of their right to appeal this order
to the Department of Environmental Quality Engineering provided the
request is made in writing and by certified mail to the Department
within ten (10) days from the issuance of this order.
ISSUED BY SALEM CONSERVATION COMMISSION
On. this 8th day of May 1%0 , before me personally
appeared the above_persons______ to me
known to,''be the person described in, and who executed, the foregoing
instrument.and acknowledged that he executed the same as his free act
and 'deed: .
My Commission expires e, 8
DETACH ON DOTTED LINE AND SUBMIT TO THE ISSUER OF THIS ORDER PRIOR TO
COMMENCEMENT OF WORK.
TO (Issuing Authority)
PLEASE BE ADVISED THAT THE ORDER OF CONDITIONS FOR THE PROJECT AT
FILE NUMBER , HAS BEEN RECORDED AT THE REGISTRY OF
ON (DATE)
If recorded land, the instrument number which identifies this trans—
action is _
If registered land, the document number which identifies this trans-
action is
——
Signed _
Applicant
_q-
THE COMMONWEALTH OF MASSACHUSETTS
ORDER
�` WETLANDS PROTECTION ACT
lv
G.L. C. 131 s.40
FILE NUMBER: PROJECT LOCATION:
_ Pierce Road -
Salem, Mass.
TO: Clayton W. Smith CERT. MAIL NO:
47 Beach Avenue, Swampscott
RE: NOTICE OF INTENT AND PLANS DATED: DATE OF RECEIPT BY
March 3;`1980 CONSERVATION COMMISSION: March 5, 1980
DATE OF PUBLIC HEARING:
April 10, 1980
Pursuant to the authority of G.L. C. 131 s:40, the Salem Conservation
Commission has considered your notice of intent and plans submitted
therewith, and has determined that the area on which the proposed work is to be
done is significant to one or more of the interests described in the said act.
The .Salem Conservation Commission hereby orders that the
following conditions are necessary and all work must be performed in strict con-
formance therewith:
CONDITIONS
1. Failure to comply with all condition stated herein, and with all related
statutes and other regulatory measures, shall be deemed cause to revoke or
{ modify this order.
2. This order does not grant any property rights or any exclusive privileges;
it does not authorize any injury to private property or invasion of private
rights.
3. This order does not relieve the permittee or any other person of the neces-
sity of complying with all other applicable federal,state,or local statutes,
ordinances, by-laws and/or regulations. II
4. The work authorized hereunder shall be completed within one (1) year from P
the date of this order. The order may be extended by the issuing authority
for one or more additional one-year periods upon application to the said
issuing authority at least thirty days prior to the expiration date of .the
order or its extension.
5. Any fill used in connection with this project shall be clean fill, contain-
ing no trash, refuse, rubbish or debris, including, without limiting the
generality of the foregoing, lumber, bricks plaster,wire, lath, paper, card-
board, pipe, tires, ashes, refrigerators, motor vehicles or parts of any of
the foregoing.
6. No work may be commenced untill all appeal periods have elapsed from the or-
der of the Conservation Commission or from a final order by the Department
of Natural Resources has elapsed.
CONDITIONS CONTINUED PAGE 2 FILE NO.
7. No work shall be undertaken untill the final Order, with respect to the
proposed project, has been recorded in the Registry of Deeds for the dis—
trict in which the land is located. Copy to be furnished to issuer of this
Order showing book and page.
8. . Upon completion of the work described herein, the applicant shall forthwith
request, in writing, that a certificate of compliance be issued stating that
the work has been satisfactorily completed.
9. A sign shall be displayed at the site not less than two square feet or more
than three square feet bearing the words,"Massachusetts Department of
Natural Resources, File Number "
10. Where the Department of Natural Resources is requested to make a determina—
tion and to issue a supperceding order, the Conservation Commission shall be
the party to all agency proceedings and hearings before the Department of
Natural Resources.
11. The work shall conform to the following described plans and additional
conditions;
CONDITIONS CONTINUED PACE 3 FILE NO.
The applicant, any person aggrieved by this order, any owner of land abut-
ting the land upon which the proposed work is to be done, or any ten residents
of the city or town in which such land is located, are hereby notified of their
right to appeal this order to the Department of Natural Resources, provided the
request is made in writing and sent by certified mail to the Department of-
Natural Resources within ten (10) days from the issuance of this order.
ISSUED BY SALEM CONSERVATION COMMISSION
c
On this day of 19 , before me personally
appeared
to me known to be the person described in and who executed the foregoing
instrument and acknowledged that he executed the same as his free act and deed.
My commission expires:
r
April 2, 1981
City of Salem
Conservation Commission Re: File'Number 64-60
1 Salem Green Pierce Poad, Salem
Salem, MA
Gentlemen:
The above Order of Conditions is due to expire May 8, 1981. Work is
about to begin, however, it may not be completed by May 8. Therefore, I
would appreciate an extension of time in order to complete the required
work.
Very truly yours,
fC
W. Smith
Q l�
NL Conservation Commission
" Salem, Massachusetts 01970
Telephone (6171745-5056
ASS-
April 28, 1981
Clayton Smith
47 Beach Avenue
Swampscott, MA 01907
Dear Clayton,
Enclosed please find a copy of an amended order of conditions
(64-60) for the building of a residential unit on Pierce Road in
Salem voted by the Conservation Commission at their meeting of
April 23, 1981.
Attached, and made a part of this amended order is a plan
showing the new location of the dwelling on the Pierce Road property.
This plan was prepared by Carter & Towers Engineering Corp. and is
entitled "Mortgage Survey Plot Plan, Salem, MA."
These order of conditions will be in force until April 23, 1982.
Sincerely,
y
Brian French
Chairman
BF/cm
Enclosure
r .
CARTER & TOWERS ENGINEERING CORP.
Jurrt� a�uz�e�a coXla _
Jcseph D,Earter
Professional Engineer - - - 6 FAIRVIEW AVENUE
Registered Land Surveyor SWAMPSCOTT, MASS. 01907
April 16, 1980 Tel, 592-8386
Salem Planning Board
ATTN: . Ms. .Susan .Maddison ReE Pierce Rd. , Salem
One .Salem-Green Clayton Smith
' Salem_:;-Mass., - 01970 :
Dear Susan:
We have performed additional engineering at the above-captioned
site. �
It might be of interest to the Board, and to some of the con-
cerned.. residents., that the Tennis Court. is --(elev. 12.14) 3.3 below -..'
the basement floor level; of-the proposed Smith dwelling. Also, '
the end of the paving at the end of Pierce Road is (elev. 16. 3)
10" above the basement floor level.
I don' t see any problem areas associated with flooding of the
`" Smith basement .if it 'is: constructed in accordance with the proposed .
plans.' `However, - to-alleviate the concern of the- residents, Mr; -Smith -
could elevate the foundation to elev. 16.0 :without being -burdened
with additional costs.
Ve� truly yours,
J SEPH D. CARTER
JDC:am.n
CIVIL ENGINEERING PERCOLATION TESTS SEWAGE DISPOSAL DESIGNS SURVEYING
CITY OF SALEM, MASSACHUSETTS
APPLICATION
SPECIAL PERMIT
WETLANDS AND FLOOD HAZARD DISTRICTS
Applicant: Clayton Smith
Address: 47 Beach Ave_ , SwamnsrnY+ , Mans- - City Clerk Stamp
Telephone: - 592-4627
Owner: Salem Acres, Inc.
Address 71 Hancock St. , Everett, Mass.
Location of Property: Lots B-E Pierce Rd.
Project Description: Single family dwelling
1
I. It has been determined by the Building Inspector that the above property
lies in the following area(s) :
A. Wetlands District
Wetlands ( ) Buffer Zone ( X )
B. Flood Hazard District None
Zone A ( ) Zone A3 ( ) Zone V3 ( )
II. Information required includes this application and the following additional
information (file one copy of everything with the City Clerk and five
copies with the Planning Board ; all copies must be stamped by the City Clerk) :
A. A site plan at a scale of 1" equals 20' prepared by a registered
land surveyor or registered professional engineer and showing at
least the following:
d
1. Lot lines ,within which the development is proposed and the tie-
in" to the nearest road intersection;
2. The location, boundaries, and dimensions of each lot in question;
3. Two-foot contours of the existing and proposed land surface;
4. Location of existing and proposed structures, water-courses,
drainage and drainage easements, means of access, utilities,
and sewer disposal facil'ities ._including.leaching fields, if .
any. Proposed elevations should be noted.
5: Boundaries of all districts, areas and zones as noted in
Section I.
c.
-2-
B. In the Wetlands District, a determination by a qualified engineer
of the seasonal high water table, performed during the last two
weeks of March or the first three weeks of April. A minimum of
two -percolation tests for each leaching area shall be performed. _
C. In-_cases of flood-proofing or pile construction, certification .
by•a registered professional engineer or architect as to the
eievation of flood-proofing measures and as to compliance with the
apAicable sections of the Massachugo#pio:State;$uilding Code
concerned with flood depths, presswes;'Velocities, --m and
uplift forces, and other factors associated with the base flood.
Where specific methods or techniques have beenpreviouslycerti_
fied, the Planning Board may waive this requirement. t
."0
D. A list of Federal, State, and ot4er local permits 0 uired, by the
applicant.
E. Descriptions relative 'to all conditions applicable in Section III
below.
III. Conditions (Complete those sections indicated (x) by the Building Inspector)
In the Vetlands and Flood Hazard Districts no structure or building.,
including pipes and wells, shall be erected, constructed, substantiA.11y
improved, enlarged, or otherwise created or moved; no area shall be ',
paved; no earth or other material shall be stored, dumped, used as
fill, excavated, or transferred; and no sediment shall be caused to
be discharged from or onto a wetland, unless all the following condi-
tions are found to exist as part of the granting of a Special Permit by
the Planning Board (Use additional pages if necessary) :
A. All Districts:
(X) 1. =The proposed use will comply in all respects to the uses and
provisions of the underlying District in which the land is
located. Yes X No
(X) 2. There is adequate convenience and safety of vehicular and pedes-
trian movement within the site, and in relation to adjacent
streets and property, particularly. in the event of flooding -
ofE;the lot(s) or adjacent lot(s) caused by either overspill
__from water bodies or high runoff.
All roadways, drives, and basement floor will be
constructed above elev. 11.00 M.S.L. 100 year flood
elevation.
-3-
(X) =3. Utilities, including gas, electrictity, fuel, water, and
set77age disposal, shall be located and constructed so as to
protect against breaking, leaking, shortcircuiting, grounding
or igniting or any other damage due to flooding. (Provide
details)
4
All utilities will be, installed by licensed ae Gr onnel
and shall be installed in accordance with all
regulations.
(X) 4. The cumulative effect of the proposed development or use, when
combined with all other existing and anticipated development
and uses will not obstruct or divert flood flow; substantially
reduce natural flood-water storage capacity in the local
drainage area; destroy valuable habitat for wildlife including
fisheries or shellfisheries; adversely affect groundwater
resources or increase storm water run-off velocity so that
water levels on other land are substantially raised or the
danger from flooding increased.
Plan chnws cnnnnrfisn Aatn to s„hctantinta no .+ffent
B. Wetlands District:
( ) 1. =The proposed development or use shall not include the storage
of salt, chemicals,. petroleum products or other conta urinating
=Substances or discharge of any polluting liquids or materials
=into streams, _brooks or wetlands. (The polluting effects of
substances on the Wetlands are to be gauged by the "Rules and
Regulations for the Establishment of Minimum Water Quality
Standards and for the Protection of the Quality and Value of
Water Resources" of .the Commonwealth of Massachusetts. )
-4-
2. The floor level of areas to be occupied by human beings as
�1 'living or work space shall be four (4), feet or more above
the seasonal high water table.
- - Baaem n loo will he At 11 -04 F i Id-
i
First floor will be at elev. 20-0 M r w
00 3. If the basement floor level is below the seasonal high water
table and affords the possibility of human occupancy at some
future date, although not originally intended, adequate
perimeter drainage and foundation shall be installed to wii:h-
stand the effect of pressure and seepage. - Furnace and -ur pities
are to be protected from the effects of leaching. (PTo3*de.details)
Applies ( ) Does not Apply ( )
X
(g) 4. If the lot is to be served by an on lot septic system, the
leaching area designed for use, as well as a reserved area
for future expansion or total future use, shall be plotted with
dimensions on the site plan, and the leaching areas shallrnot
be constructed where the seasonal high=-water table is less
than 4 feet below the bottom of the leaching areas.
Applies ( ) See site plan
Does not apply (X )
C. Flood Hazard District (all zones):
(}� 1.. The floor of the basement, or if none, the lowest floor of
new construction or substantial improvement -of structures for
__residential uses shall be at or above the 100 year flood level.
Above the 100 year flood level elev. 11. 00 M.L.W.
Basement Floor = 11.04 M.L.W.
(X) 2."The floor of the basement, or if none, the lowest floor of
new construction or substantial improvement of structures for non-
residential uses shall be at or above the 100 year flood level
_ or the structures shall be flood-proofed to that level in .
compliance with the applicable requirements of the Massachusetts
State Building Code. Flood-proofing measures shall insure
that-th=e=st-ructure is watertight and that structural components
have the capability of resisting hydrostatic and hydrodynamic
ltadg -and the effects of bouyancy.
-5-
,:D. _Flood Hazard District, Coastal High Haza10 Area r(Zone .V3) :
Pe structures or substantial improvements shall be located
ltdward of the reach of Mean High Tide.
2. New structures or substantial Tmoo�r ments shall be elevated
on adequately anchored pilings or columns, ;ank,securely
anchored to such pilings or columns..ze.that the lowest
portion of the structural memb@rS4 ' ' e'lowest floor (ex-
I eluding the pilings or column s)ris elevated to or above the 100
year flood level. Space below- the lowest floor shall be free
of `fixed obstruction. (Provide details)
( ) 3. The support of new structures or substantial improvements shall
riot be, in whole or in part, by the use of fill. (Provide details)
IV. Procedure
The Planning Board shall, within 7 days after the filing of this
application, transmit one copy of said application, plans and all other
submitted information to the Inspector of Buildings, City Engineer, Board
Health and Conservation Commissiom who may, at their discretion,
A
nvestigate the application and report in writing their recommendation
o the Planning Board. The Planning Board shall not take final action
_5�on such aWication until it has received a report thereon from the
Insp'lctor of Buildings, City Engineer, Board of Health and Conservation -
-=Commssion or until thirty-five (35) days have elapsed after dis-
trib �tion of such application without a submission of a report. The
` P3 ptffg�-Board Shall hold a Public Hearing on said application as soon
as pdssible after_rece-Uing the above reports, in accordance with
Chapter 40A of thesachusetts General 3:aws. The Planning Board
shall notify the appliAnt`�in writing of :its .decision on the special
permit. The decision shall document' t4_4propose�dl:development or use
-,;rand qhe grounds for granting or refusing•'the special permit-. -The
f
-6-
Planning Board may, as a condition of approval, require that the appli-
cant give effective notice to prospective purchasers, by signs or
by recording the special permit at the Registry of Deeds, of the wet-
land or flood hazard conditions associated with said premises and the
steps undertaken by the petitioner or his successor in title to
alleviate the effects of same.
Signed
Title
Date
i
NOVc('11
l� . Conservation
s.p vaigyp mmss7 'pq
L
v. Salem, Massachusetts 01970
,Ctf� wy� Telephone 1617) 745-5056
sn��
May 12, 1980
Clayton W. Smith
47 Beach Avenue -
Swampscott, Massachusetts Re: Pierce Road, Salem
Dear Mr. Smith:
Enclosed you will find the 'Order of Conditions" for Pierce Road
DEQE # 64-60 that was voted by the Conservation Commission at their
meeting on May 8, 1980.
I would also like to inform you at this time that there is a 10 day
appeal period to these "Order of Conditions.
If you have any questions relevant to these 'Order of Conditions"
please do not hesitate to 'call.
Thank you for your cooperation in this matter.
Very truly yours,
Sheila Morin
Clerk
Encl.
r sass
NOTICE SF
ALl parts of this form and the attached EnvaraL.�ent-'_1 Data For..^_ shall be completed under
the pains and penalties of perjury. Incomplete filings may be rejected.
DATE: March 3, 1980
�f f Conservation Commission of (city/t$fatk) Salem
1. Notice is hereby given in accordance with the provisions of Massachusetts G.L.C.131,
s:40 that the proposed activity described herein is within the jurisdiction of
(City/.W1 Salem ,at Pierce Road $�$i$
Most recent recording at the Registry of Essex South Dis,tBook 5653 ,
Pagei74 3
Certificate (if registered)
2. The land on which tFie work is proposed to be done is owned by:
NAME(s)Salem Acres Inc. ADDRESS 71 Hancock Street, Everett
3. The Applrcant��suti tting this Notice is:
NAME Clayton Smith ADDRESS47 Beach Ave. , Swampscott
TELEPHONE
(Optional) The following person is hereby designated to represent the
applicant in matters arising hereunder:
Carter &Towers Eng'r. Corp.
NAME Joseph D. Carter, P.E. ADDRESS Fairview Ave. , Swampscott
TELEPHONE ;592-8386
4. , ,Plans describing and defining the work, included herewith and made a part hereof,
are titled and dated: SITE PLAN prepared for Clayton Smith, Salem, Mass.
Scale 1"=40' -2-14-80 Revised 2-29-80 Carter & Towers Engineering Corp.
5. Identical material has beep submitted by certified mail as follows:
Original to C'onse;rvation Commission (Date) 3,7-80
Tree conies spn on -ia e regi _' e of _rtment of En��yr�-n^2nt=1
DATE:
Northeast x Southeast Central .'estern�
n . Has the required $25.00 filing fee, payable to the cit-: or toG%n. been incl:_;icd
with the submission to the Conservation Co—i=.ion? yes-
i, iias the Environmental Data Form been completed and .submitted with each copy? Yes
8. Has -a locus map (83-," x 11" copy of USGS top35raohic sheet with the site marked) been
included with each copy? Yes
9. a. Have all obtainable permits, variances, and approvals required by local by-law
been obtained? No
b. If they have not been obtained, have they been applied for? Yes
If yes, include with this Notice of Intent any information which has been
submitted with such applications which is necessary to_describe the effect of
the proposed activity on the environment.
10. a. Is the site of the proposed work subject to a wetland restriction order recorded
pursuant to G.L. c. 131, s. 40A, or G.L. C. 130, s. 105, by the Department of
Invironmental Management? YES NO x Do not know
b. Is the site of the proposed work in, or within 100 feet of: a coastal dune No ;
coastal bank ,,; coastal beach ; salt. marshypg ; land under the ocean No ;
i a salt.pond Yes; anadromous/cat adromous fish run Yes ; do not know ?
11. Signature(s) of owner(s) of the land (if by agent or option holder, written authori-
zabion must be attached) .
12. What is the purpose of the proposed project?
Construct a dwelling, utilities and driveway for Smith Family
I3. I HEREBY CERTIFY UNDER THE- PAINS AND PENALTIES OF PERJURY THAT THE FOREGOING NOTICE
OF INTENT AND ACCOMPANYING Fr7'IROXMENTAL DATA FORM ARE TURE AND COMPLETE.
/ 7 /%ap-a
Sic-:tet _re of Appl._cant _gate
WETLANDS PROTECTION ACT
Environmental Data Form
1. All parts of this form are to be filled out by the applicant or
his agent under the provisions of G.L. C.131 s.40.
2. Where a section is not relevant to the application in question,
the words "NOT APPLICABLE" should'be entered on the appropriate
line.
NAME OF APPLICANT CLAYTON SMITH
ADDRESS OF APPLICANT 47 Beach Avenue, Swampscott
MUNICIPALITIES 14HERE ACTIVITY IS PROPOSED AND NOTICE IS FILED.
Salem
DESCRIPTION OF PROPERTY INVOLVED
IN APPLICATION (including the dimensions Lots B — E# 24, 520 S.F.
of any Existing buildings,decks,marinas, 280' frontage
existingacesspools) . Pierce Road (see Plan)
DESCRIPTION OF MODIFICATIONS PROPOSED
ON THE SITE, including grading, dredging,
removal of vegetation, ect.
A. SOILS
1. United States Department of N/A
Agriculture Soil Types (show on map )
2. Permeability of soil on the site. (dates of testing)
N/A
3. Rate of percolation of water through N/A
the soil. -- (Dates of testing)
B. SURFACE WATERS
�_.._
D15 CanC C` G_ .__,_ __... _.230;
surraCe Water 6 ( Date of measurement )
75 ' (2-14-80)
2. Sources of runoff water. Adjacent Land
}
ti
3. Rate of runoff froc the site 1.0 C.F.S .
4. Destination of 'runoff water Forest River
5. Chemical additives to runoff
water on site None
C. GROUND- COVER
,4
{ 1. Extent of existing impervious
ground cover on site 08
2. Extent of proposed impervious
ground cover on site 108 (Roof & Drive)
t.
3. Extent of existing vegetative -
cover on the site 1008
4. Extent of proposed vegetative
1
cover on site 908
D. TOPOGRAPHY
1. Maximum existing elevation on site 24.0 M.L.W.
2. Minimum existing elevation on site 14.0
3. Maximum proposed elevation on site 24.0
r, 4. Minimum proposed elevation on site 14.0
Minor site grading to
5. Description of proposed change in topography accomodate House
(See Plan)
4 E. GROUND WATER
1. Minimum depth to water table on site (at time of filing)
6.0
2. Maximum depth to water table on site (at time of filing)
Unknown
3. Seasonal maximum ground water elevation 8.5 M.H.W.
F. WATER SUPPLY
1. The source of the water to he provided to the site Municipal
r
U--
400 G.P .D.
3. The uses to which will be put Domestic
G. SEWAGE DISPOSAL
1. Sewer disposal system (description
and Ilocation on the site, of system
Municipal- South Essex Sewerage
A
2. r Expected content of the sewage
effluents (human waste, pesticides,
I detergents, oils, heavy metals, other chemicals)
Human Waste
3. Expected daily volumes of sewage 350 G.P.D.
H. SOLID WASTE
1. Estimated quantity of solid waste-
to be developed on the site
N/A
2. Method for disposal of solid waste Municipal Collection
c
3. Plans for recycling of solid waste
i
I,. BOAT YARDS,DOCKS AND MARINAS,
i 1. Capacity of marina (number of boats running feet)
N/A
2. Description of docks and floats
(site, dimensions) N/A
3. Description of sewage pumpout .
facilities (type of waste disposal) N/A
I
I
w 4. Description of fuelling facilities N/A
and .fuel storage tanks
5. Description of fuel spill prevention
measures and equipment N/A
J_ I`PAC. Or r<:u0z=DCTI--ON APPLIED -r.q
1. Effects on plant species
( upland and marine ) None
2. Effects on marine species (shellfish, finfish)
None
3. Effects on drainage and runoff Insignificant increase
4. Effects on siltation of surface waters None
5. Effects on groundwater quality None
6. Effects on surface water quality None
K. ALTERNATIVES TO PROPOSED ACTION
1. Discribe alternatives to the
requested action None
2. Describe the benefits of the requested
action over the alternatives
None
CARTER & TOWERS ENGINEERING CORP.
�cck«e�d, �aurwPLaizd� P�iakCe' c
Joseph D Carter
Pw ss,nnaiEngineer 'b FAIRVIEW AVENUE
Registered Land Surveyor SWAMPSCOTT, MASS. 01907 _
'
Tel 592-$_386
April 23 , 1980
Mr. Clayton td. Smith
47 beach Avenue Re : Pierce Rd. ,
Swampscott, Mass. 01907 Salem, Mass.
Dear Clayton:
I have reviewer,"the above-captioned site and with particular
attention to the proposed driveway, I see no problem associated
with the construction slopes or grading of a bituminous drive.
I think that everyone is under the impression that the drive-
way will be out on the. uncut grass area. 'file driveway will be
entirely within the landscaped area that is being used by your
neighbor.
My suggestion for construction would be to excavate the
organic material to the width of Che driveway and replace it
with compacted bank run gravel or Lynn Pac as a base, then pave
the drive with 32" bituminous concrete. The driveway elevation
should run with the contour of the land so that you .w-ill not
interfere with the existing overland runoff from your neighbor' s
property.
Very truly yours,,
�JJSEPH D. CARTER
JDC :amp
CIVIL ENGINEERING PERCOLATION TESTS SEWAGE DISPOSAL DESIGNS SURVEYING
0\ Cpl/!r
Nz Conservati®n Commissi®n
v. Salem, Massachusetts 01970
Telephone (617) 745-5056
"'ildSS>C
May 28, 1980
Clayton Smith
47 Beach Avenue
Swampscott, Mass.
Dear Mr. Smith:
I am enclosing the "Amended Order of Conditions" per our
meeting on May 22 , 1980. You will note that this "Order of
=.Cond.itions" supersedes any previously issued "Order of Conditions. "
I would also like to inform you that there is a 10 day appeal
period to these orders.
If you have any questions, please feel free to call.
Very truly yours,
Sheila Piorin
Clerk
SM
Enclosures
4L�f)
t � t
;- t T t +
•{.-.�:5:*^v p..c ... -_:, .,.,.::..-. «zk X31`a"°F' .rxsRS:I -.k •a2m+n++.�eaa-m«+- — .�.^l�np ;�!r 'Qgy*'^ '
gyri z : aw,w,:iv+.�.R-•-
a DETACH ON DOTTED LINE AND SUBMIT TO THE ISSUER OF THIS ORDER PRIOR TO `
COMMENCEMENT OF WORK. ^--
TO � - J"� l ���unMS'C✓v ssuG'-
� ( ln � Authority)
- -Y ------- - -- - fY/e
PLEASE BE ADVISED THAT THE ORDER OF CONDITIONS FOR THE PROJECT AT
FILE NUMBER —[. HAS BEEN RECORDED AT THE REGISTRY OF u .it"(1_!'S.fEoy
ON (DATE) �Lc�� (� 31 � /9��—•
If recorded la d, the instrument number which identifies this trans-
action is ( ,._� 11t—
If registered land, the document number which identifies this trans-
action is --
---
Signe
Applicant
-4- �
(� X03
g9
f�r
4y
r..
c
LYNN QUADRANGLE
INTERIOR COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS
DEPARTMENT OF PUBLIC WORKS v�
'VEY 75 MINUTE SERIES (TOPOGRAPHIC) 10
,0 57'30•. '40 /SA L 141 143 44
" i• , �A-..-�' � . �... ✓ �:r .:,.'•�°'4GH �.A L•E- 145
-
/Ip:(, '52'30`'
EM. 42 .
30..
N SA
p BORTKt sp. k v
■inOn � > �J/ i �. �
X.
4 0 - GA C\ �' 1 1 / I O �Rd \1 ` J
0 O .i //�
\�.. J� (/r i...� >;a^ `\���i
...J d 1�
'-L `1, .. 1 .<t oseu°/- \ � y, t• .° -R.uPke ��p°o
,.r"M �wrnso_ ��� lf: (v�`
sh
r.a 06
n t
Legg -
rys OL55,. (� 9M
o - -moth _ --
-
( DFA,���
/ l w A���yyy
�`• °� '--'d. - J ' - �ry ` /:� Fri ��TE ,A �,��� V / y
• G o �`` > _
l A��
- ��.P rr FoxlYr- ',t �. !t4 n Ca�n!r�C � .��1 (�` �.i�..��A 9eele
�. ��� �. ,�' �, �U U'� �f � ��r ✓JToaft
b� 4105
_P !� � 4 -/� ���� ,/��/'��.�� �.i �- o ,-�•<- ,_l ;� ,� ;�:c � ���✓� `"W✓fie A�U�,-_,
540000
.. FEET
' °va' ° � �` -1 .. � ire„ � Gxe7Y z � �,�. ny j'• /�\'i o",. _,`dacN�„� // �._. .� -��3d /� Ip ` /'� � _ I
Cr
`'�I J � \ y.'•.. •``( � Ol � e V - v� � \., 1 � ,� j r S /,`5 /'s� J'U _ p
fir. f l
- I/V
1s (� ,✓) ,moi Fraz 36 4704
30
nr ,
f
\ jl � I � _ ° ', r � � ,r - � t4 ✓i -�. � f alb ��'f / ,. �� `\ `�f`I� _. °� \ \�'"'�,,Ite% .
Blaney Rock Bea ✓r ./Q o / •/
L7[;es Pt
a f y _
\ l I
I ; m • .3o t - J / ` S k `,r.. f _ 4/
03
�., s �� �� �4', ��_�e�° � ,�” �� d I ? ^''� 1, ♦�"��3' � e - ' ,.._V '- 6 f,4 P 1 - _� \.) e° I
.. t `yn LZ 50 .� \! \\ \. , I 42 36 "\
m
� ,-g� GOIn IiDuse g0 � -. _
m
\C �r 4
Pt Is
ock
Retl R \�w. z �1(6upe"s Pt
yza� �l lnne �Q'u} 29 30TDN30 68.
�\etl �. vY au` A•�ry - 27'30„
� vh �� , P • ^ ,iw • - ; outer Gut
♦ �CV�1t Dead Ledga4g s z, 4102
y 65
19
E:�° 1 �� •�ti / .
00 yl\ e4 ��'e :� _A\ �oLgnt I y Is
Z t^ 4 1,
'. V ♦ �0 t �� w. / Sand ♦
"� . . .
N ._—A H.'��_il N
m
n �
I \
ZONE A3
IF I MSL)
3/15/77
'ARMs __ ZONE B � I
J -
J
M y 4, /
;; x J ZONE C y /
p RM2 I Qy
� v
OF
y �
- C ZONE KEY TO SYMBOLS
JZONE DESIGNATIONS'WITH
0 DATE OF IDENTIFICATION
IS.,12/2/74
:y fZoNew ,
a,yV�
Base Flood Elevation Line 513
'---1 with elevation in feet
I
Base Flood Elevation IEL 987MSL)
\ where uniform within zone
- Elevation Reference Mark RM7
X
)NE B / Rive,Mile M1.5
r �
^
'EXPLANATION OF ZONE DESIGNATIONS
A flood insurance map displays Ma zone designations for•communhv
1 - according to areae of designated flood bawds. The zone designations
\ and by FIA are: '
Zone Explanation
^ A Areas of 100-year flood;ban flood elevations and
flood hazard factors not detetmine.
1
.nO Aran OI tshallow rooe:flood depth f
/ \ to J feet;;.Product of flood d depth fent) and
velocity lint Per ncontl)Ins than 15.
2
Al-A30 Aran 01 100-Veer flood: ben flood alwatiom ane
\ I
flood hazard factors determined,
d A
�\ \� A99 Arra ti system0 year/lode to c n protected by•flood
4 1 ZONE C / elevProtation system under conazard f can hood
navetlOns end Hood hazard hcmn not
ZONE B determine.� l ,
B Arm betwesn Ilmite of 100 yur flood and
500-Ymr flood;arms o1 100 year Mallow flooding
where depths Ian than 1 foot.
C Arms Outside 500-Year flood.
0 Aram of undetnminaQ but Possible, Ilddd
hiperdi
\ Aram
V AroOfI 100-Yesr coastal flood wires vel«Rv(wave
action): baa flood elevetlone and flood heard J
< �\
factors not detomine.
�e VO Ann of 100-year shallow flooding with velocity
flood depth 1 10 J Imp Product of depth Ileac)
and velecltY Hest per second) more than 15.
V \
VI-V30 Arms of 100ymr coestel llood with v IOClty Iwave
\ acI base flood elavaUons and flood hazed
factor*determine.
CONSULT NFIA SERVICING COMPANY OR LOCAL•INSURANCE
AGENT OR BROKER TO DETERMINE IF PROPERTIES IN THIS
x COMMUNITY ARE ELIGIBLE FOR FLOOD INSURANCE.
INITIAL IDENTIFICATION DATE: JULY 26, 1974
CONVE.RSION TO REGULAR PgOG RA M: MARCH 15iJ7\"
i/
/ APPROXIMATI SCALE IN PEEK v
500 0 50,0
11000
�• �-��u��!•` _ i�(j t+ if BI.i'i^IF Rh'l�`i1N,N'����NW�� � R0Y1dV:.y'y 1e167
^esaaaR+x+r( J .
n.
4