Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
64-361 - PEARL STREET - CONSERVATION COMMISSION
p sem - coti G4 f �0 CITY OF SALEM CONSERVATION COMMISSION January 25, 2007 Tom and Diane Kulak 8 Pearl Street Salem, Massachusetts 01970 Re: DEP #64-361— Construction of Two Homes, Driveways and Associated Utilities—8 Pearl Street, Salem, Massachusetts Dear Mr. and Mrs. Kulak: Please be advised that the Order of Conditions for the above referenced project will expire on February 12, 2007. If this development project is complete,you should Request a Certificate of Compliance (enclosed form) from the Salem Conservation Commission. If this development project has not been completed, than you must submit a written request for an extension of the existing Order of Conditions to the Conmiission at least 30-days prior to the expiration of the order, as required in the Wetland Protection Act. If the project has not been completed and your Order of Conditions expires,you will be required to file a new Notice of Intent to complete this previously approved project. Please contact me at (978) 619-5685 if you have any questions. Sincerely, Carey Duques Conservation Agent/Planner enclosure 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 • TEL: 978.745.9595 FAx: 978.740.0404 WWW.SALEM.COM CITY OF SALEM CONSERVATION COMMISSION December 12, 2006 Keith A. Nadeau &Robert R. Hamel Trustees Cousins Realty Trust 11 Green Lawn Avenue (� Salem, Massachusetts 01970 VJ Xz Re: DEP #64-361—Construction of Two Homes, Driveways and Associated Utilities—8 Pearl Street, Salem,Massachusetts Dear Mr. Nadeau and Mr. Hamel: Please be advised that the Order of Conditions for the above referenced project will expire on February 12, 2007. If this development project is complete, you should Request a Certificate of Compliance (enclosed form) from the Salem Conservation Commission. If this development project has not been completed, than you must submit a written request for an extension of the existing Order of Conditions to the Commission at least 30-days prior to the expiration of the order, as required in the Wetland Protection Act. If the project has not been completed and your Order of Conditions expires, you will be required to file a new Notice of Intent to complete this previously approved project. Please contact me at (978) 619-5685 if you have any questions. Sincerely, Carey D ques Conservation Agent/Planner enclosure 120 WASHINGTON STREET, .SALEM, MASSACHUSETTS 01970 •TEL: 978.745.9595 FAx: 978.740.0404 WWW.SALEM.COM Don Cefalo From: Joe Nerden Sent: Thursday, February 12, 2004 12:34 PM To: Don Cefalo Cc: Denise McClure; Bruce Thibodeau Subject: Pearl Street proposed project-Con Comm Don Here are my comments for the Pearl Street site. I've quickly looked over the proposed two bldg single family homes for the site. The only concern from Engineering/DPW would be the potential storm water run-off from the site onto abutting properties. The roof of the deck will generate run-off as well as the paved parking/driveway. Even if the property is "taken" by the State/MHD for the by-pass road there still may be impacts to either the proposed road or bike path. It isn't clear how the unaccounted for run-off will effect adjacent properties. Joseph E. Nerden Asst. DPW Director& Asst. City Engineer Department of Public Services 120 Washington Street, 4th Floor Salem, Massachusetts 01970 tel. 978.745.9595 x321 fax. 978.745.0349 email:jnerden@salem.com 1 CITY OF SALEM, MASSACHUSETTS PUBLIC PROPERTY DEPARTMENT 120 WASHINGTON STREET, 3RD FLOOR ��MIN611� SALEM, MASSACHUSETTS 01970 STANLEY J. LISOVICZ, JR. TELEPHONE: 978-745-9595 EXT. 380 MAYOR FAX: 978-740-9846 April 5, 2004 Paul Ward Andrew Goldman 12 Pearl Street 11 Pearl Street Apt. B Salem, Ma. 01970 Salem, Ma. 01970 RE: 14-16 Pearl Street Gentleman: I have received your letter dated March 30, 2004. In response, I am copying you the Stop Work Order that I issued to the contractor for the job at 14-16 Pearl Street. My Stop Work Order brings to a stop, all work on the site. However, please understand that the building department oversees construction of foundations, buildings and retaining walls that hold back more than six feet of material. We do not have anything to do with water service or water supplies. These issues are the jurisdiction of the City Engineer. Also, any change in contour or elevation of more than 2 feet requires a drainage alteration permit from the City Engineer. All questions regarding these matters will be addressed through the City Engineer's Office. The retaining wall refers to the wall adjacent to the side of the house at 12 Peal Street only. As outlined in my Stop Work Order, I have required that plans be submitted to my office for the retaining wall. I have also required the contractor to submit drawings to the Engineering Department for the other issues on the property. In regards to the retaining wall that was constructed on March 22, I agree that it was not finished until the 23`a I was present with the Representative of the Hobbs Endeavor Company the evening of the 22"d when he stopped work For the evening. The representative was satisfied that the work completed to that point was adequate for that evening. He also clearly directed the completion of the wall the next morning. The Representative had prepared the letter on the 22"d anticipating being able to approve the wall as constructed. He with held the letter until the morning of the 23`d after he reviewed the finished wall. Please note that the retaining wall along 12 Pearl Street is temporary and will no longer be needed once the foundation for the 14-16 structures is complete. This new foundation is being designed to retain the soil between it and 12 Pearl Street and will be submitted to our office in accordance with the provisions of Massachusetts State Building Code CMR etc. This Department anticipates receiving plans for this retaining wall next week. The contractor has also informed me that Engineering will be receiving their plans on Tuesday or Wednesday of next week. The Planning Department is still going to set up a meeting with the neighbors before work commences again. I hope this answers some of your questions. Sincerely, Thomas St. Pierre Acting Building Commissioner cc: Mayor Stanley Usocivz Bruce Thibodeau, City Engineer James Gilbert, City Solicitor Kevin Cornarchio, Chairman, Salem Conservation Mike Sosnowski, Ward 2 Jeff Sweeney, Esq. Cousins Realty Trust CITY OF SALEM9 MASSACHUSETTS e PUBLIC PROPERTY DEPARTMENT 120 WASHINGTON STREET, 3RD FLOOR SALEM, MASSACHUSETTS 01970 STANLEY J. USOVICZ, JR. TELEPHONE: 978-745-9393 EXT. 380 MAYOR FAX: 978-740-9846 i March 23, 2004 copy Cousins Realty Trust 27 Intervale Road Salem, MA. 01970 I RE: 14-16 Pearl Street Dear Mr. Hamel: j Please be advised, no further work is to proceed on 14-16 Pearl Street until the following ! conditions are mer. ii 1. A retaining wall must be designed to hold back the abutters property. Plans for r the wall need to be submitted and approved and a building permit issued from this j \ office "State Building Code 780 CMR, Section 1825.1" and "Section 1825.3". 2. Final plans and approvals for utilities and site work to be submitted and approved by the City of Salem Engineering Department. If you have any questions regarding the wall, please contact me directly. If you have any questions regarding the site or utility work, please contact the Engineering Department Sincerely, Thomas St. Pierre Acting Building Commissioner cc: Mayors Office Kate Sullivan Councillor Sosnowski Denise McClure, Planning Joe Nerden, Assistant City Engineer II _ 2004-APHI 15:52 FROLFSIUAT HELLIESEN d EICHNER, INC. +6172250328 T�fT3 ip Dpl/008' f• 9810 r IMI$Heliesen&SH&E international Air Transport Consultancy t+1-617-2252MO ! Oqe[ddn Street „t hw. 8aMassachaegteORa 2. f+1-617.273.0328 ormul: a8oldmm�sha.com Deliver to: Kevin Cornacchio, ConCom Chairman f=ax#: 978~-0404 From: Andrew Goldman Date: April 1,2004 Tate)pages(Inc.cover): 3 Project#: Kevin, ;y�L .fYYZ t(Yr. a ��� Attached is a copy of a letter;from my self and Paul Ward regarding t�, i4.lb��'earl Strep apt, r'1!fi'e are simply seeking details on the Stop Work orders issued Manch 22,2Mfh An offici8l.toeybasbeep-mailed 'q ti r '! to you,but we decided afterwards it might speed up receiving a respook if we faxod atopy as well. TY, Thank you very much for your help. We know this is as much a cohi%u to your4-4t Airs to us neighbors. ry :--. 1r ,' i xa r y j lA This facstrn0e transmission is intended for the addressee(s)indicated above. It may contain information that is privileged, confidential, or otherwise protected from disclosure. Any review,dissemination,or use of this transmission or Ss contents by persons other than the addressees)is strictly prohibited. If you have received this transmission in error, please notify us immediately by telephone,and mail the original to us at the address above. —_J J 2004-APR-01 15:52 FROIH]MAT HELLIESEN & EICHNER, INC. +6172250328 ?+T Pep, t' 0031'Bt f 1 March 30,2004 Kevin Comacchio,Chairman Salem Conservation Commission City of Salem 120 Washington Street Salem,MA 01970 Dear Mr. Cornacchio, Last week a stop work order was issued by the Building Department theseg Department and the Conservation Commission for the developpnent of 14-16 Pear] As abutting neighbors,we would like to know specifically why your dept-tment this stop work order,and we would like to know what steps V -Mopt $aVC t Ioe by order to remedy to these issues. We would appreciate a prompt reply,in writing. Due to*4 even*we legal counsel,and it is important to know specifically what pin8 di;wti In addition,we have a few specific questions in regar&tq the retlti wa�lt rnaiiu conning through this property. We realize that som0$h9waa t�' Y,�fe in request above,and that others may be longer in coming,but we�ota�3;'sr response to them. I �'J l The Retaining Wall. ) Ina Salem News article dated 312412004,the developers statedth h e planned to replace the old wall with a new one." To our knowied ,itis ] a, wall is not indicated on plans approved by the Conservation Co Or9tha2"antifig Board. We would like to know what the developer's plans are for this they differ from the original wall and the tempor'hty wall which is now iq plam add$ they relate to the existing house at 12 Pearl Sarah ' On March 22,2004,a letter was sent by an engineering firm,Hobbi Corporation, stating they had provided directive and inspection of;161C "1 wttli. ., Salem's Engineering Department provide the same? Also,please iCt{gtt bf' the temporary wall was not finished until March 23,2004,a day t�tbits 1 was%, 0& The Water Main. What is the entirety of this water main? Where does it originate? What it service? Is there an easement for accessing and maintaining this water main as it pertains to the 2004-APR-01 15:52 FROLHiMAT HELLIESEN & EICNNER, INC. +6172250320 P.`011t 0A2 "F i08' ` developers plans? Have the fire hydrants at the ends of saundets,Pad Ccmatit abets been impacted by the receut damage to the water main,and aze°+H SO Sincerely, } Paul W.ward Andrew Goldinatt 12 Pearl Street l l Pearl Soret,Apt.B Salem MA 01970 Salem,MA 01 770 Cc: Bruce Thibodeau,Salem City Engine Thomas St. Pierre,City Building Inspdo* / Thomas Knowlton, Superintendent Saiem�'il ftrf"" Mayor Stanley J.Usovicz,Jr. Michael Sosnowski,ward 2 Cot James Gilbert,Salem City Solicitor Jeff Sweeney,Esq. lip • 1 r r y ` 4 gip.. . 0 T m � CITY OF SALEM 3 DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT STANLEY J.USOVICZ,JR. MAYOR 120 WASHINGTON STREET•SALEM,MASSACHUSETTS 01970 JOSEPH P.WALSH,JR. TEL:978-745-9595• FAX:978-740-0404 DIRECTOR February 11, 2004 George Fallon Riverview Realty Trust 208 Derby Street Salem, MA 01970 RE: DEP File # 64-361: Lot A on Pearl Street Dear Mr. Fallon: This letter is a follow up to our phone conversation today.As we spoke about on the phone, the Salem Conservation Commission has raised several issues concerning the drainage at the parcel located on Pearl Street. The Commission requested at their meeting of January 15, 2004 that the Assistant City Engineer review the plans and provide comments/recommendations to the Commission for their review. As of today,we have not yet received written comment from the Assistant City Engineer. Furthermore, the Commission stated at their January 29, 2004 meeting that they are expecting a final determination from the Acting Building Commissioner as to whether the current plan before the Commission is in compliance with the Salem Zoning Ordinance. In addition,the Commission stated that once the determination is made the plans should be revised accordingly. The Conservation Commission looks forward to reviewing your revised plans. Please feel free to contact me at the Department of Planning and Community Development at (978) 745-9595, extension 311 if you have any questions. Sincerely, Denise S. McClure, AICP Deputy Director Cc: Tom St. Pierre, Acting Building Commissioner Joe Nerden, Assistant City Engineer Don Cefalo, Conservation Commission Agent Massachusetts Department of Environmental Protection DEP File Number: " Bureau of Resource Protection - Wetlands WPA Form 5 — Order of Conditions 64-361 Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 1.31, §40 A. General Information I IIII II IIII I IIIIIIIIIIII III Important: When filling From: 2004031500299 Bk;22510 Pg;484 out forms Salem 03/15/2004 10:06:00 OTHER Pe 1/10 the computer, - Conservation Commission use only the tab key to This issuance if for(check one): move your cursor-do ® Order of Conditions not use the return key. ❑ Amended Order of Conditions e To: Applicant: Property Owner(if different from applicant): Cousins Realty Trust, Keith A. Nadeau & Robert Same R. Hamel Trustees Name Name 11 Green Lawn Avenue Mailing Address Mailing Address Salem MA 01970 City/Town State - Zip Code Cty/Town State Zip Code I' 1. Project Location: Lot A—Pearl Street Salem .Street Address Citylrown Map.36 Lot 0087 Assessors Map/Plat Number Parcel/Lot Number i 2. Property recorded at the Registry of Deeds for: Essex South 21260 316 County Book NA Page Certificate(if registered land) :I 3. Dates: December 23, 2003 February 12 2004 February 12 2004 Date Notice of Intent Filed Date Public Heanng Closed Date of Issuance 4. Final Approved Plans and Other Documents (attach additional plan references as needed): j Site Development Permit Plan of Land Located in Salem, Mass. Prepared by Eastern Revised Feb. Land Survey Associates Inc. See Special Condition Number 44 10 2004 A 5. Final Plans and Documents Signed and Stamped by: Christopher R. Mello PLS and Clayton A Morin Civil Name 6. Total Fee: $1575.00 i i (from Appendix B:Wetland Fee Transmittal Form) .'I WPA Form 5 x4 pbw e t^zGj Rev.02100 _ 1 St" St l Page i of 7 I _. 31 Massachusetts Department of Environmental Protection DEP File Number: sti ; Bureau of Resource Protection - Wetlands 64-361 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information - Important: When filling From: out forms on Salem the computer, Conservation Commission use only the tab key to This issuance if for(check one): move your cursor-do ® Order of Conditions not use the return key. ❑ Amended Order of Conditions To: Applicant: Property Owner(if different from applicant): Cousins Realty Trust, Keith A. Nadeau & Robert Same .re R. Hamel Trustees Name Name 11 Green Lawn Avenue Mailing Address Mailing Address Salem MA 01970 City/Town State Zip Code City/Town - State Zip Code 1. Project Location: Lot A-Pearl Street Salem Street Address Cityrrown Map 36 Lot 0087 Assessors Map/Plat Number Parcel/Lot Number 2. Property recorded at the Registry of Deeds for: Essex South 21260 316 County Book Page NA Certificate(if registered land) 3. Dates: December 23, 2003 February 12, 2004 February 12, 2004 Date Notice of Intent Filed Date Public Hearing Closed Date of Issuance 4. Final Approved Plans and Other Documents (attach additional plan references as needed): Site Development Permit Plan of Land Located in Salem, Mass. Prepared by Eastern Revised Feb. Land Survey Associates, Inc. See Special Condition Number 44 10 2004 5. Final Plans and Documents Signed and Stamped by: Christopher R. Mello, PLS, and Clayton A. Morin, Civil Name 6. Total Fee: $1575.00 _ (from Appendix Br Wetland Fee Transmittal Form) WPA Form 5 ] Rev.02/00 Page 1 0l Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands 64-361 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: ❑ Public Water Supply ❑ Land Containing Shellfish ® Prevention of Pollution s - ❑ Private Water Supply ❑ Fisheries ❑ Protection of Wildlife Habitat ® Groundwater Supply ❑ Storm Damage Prevention ® Flood Control Furthermore,this Commission hereby finds the project, as proposed, is:(check one of the following boxes) Approved subject to: ® the following conditions which are necessary, in accordance with the performance standards set forth in the wetlands regulations, to protect those interests checked above. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order.To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations to protect those interests checked above. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect these interests, and a final Order of Conditions is issued. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). General Conditions (only applicable to approved projects) 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. WPA Porn 5 Pape 2 of l Rev.02/00 f Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands 64-361 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years,from the date of issuance. If this Order is intended to be valid for more than three years,the extension date and the special circumstances.warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster,wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to this Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or,"MA DEP I "File Number 64-361 10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before DEP. 11. Upon completion of the work described herein,the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A)to the Conservation Commission. 12. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. WPA Fa 5 Page 3of7 Rev.02/00 Massachusetts Department of Environmental Protection DEP File Number. j Bureau of Resource Protection - Wetlands 64-361 w WPA Form 5 - Order of Conditions Provided by DEP a Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 W B. Findings (cont.) 15. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means.At no time shall sediments be deposited in a wetland or water body. During construction,the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed.The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission,which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. Special Conditions (use additional paper, if necessary): See Attached Special Conditions Findings as to municipal bylaw or ordinance Furthermore, the Salem hereby finds (check one that applies): Conservation Commission ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: Name Municipal Ordinance or Bylaw Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or bylaw, specifically: Name Municipal Ordinance.or Bylaw The Commission orders that all work shall be performed in accordance with the said additional conditions and with the Notice of Intent referenced above. To the extent that the following conditions modifv or differ from the plans. specifications. or other or000sals submitted with the Notice of Intent. WPA Fam 5 Page<of 7 Rev.G7 \ Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands ui_&,t WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) Additional conditionsitions relating to municipal or inance orb law: This Order is valid for three years, unless otherwise specified as a special condition pursuant to General Conditions#4,from the date of issuance. cb Z Zoa`I Date This Order must be signed by a majority of the Conservation Commission.The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant.A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office (see Appen ix A)and the property wner(if different from applicant). Signature . lJ.1u.t.o On Of Fabswti ZcC�`I Day Month and Year before me personally appeared to me known to be the person described in and who executed the foregoing instrument and actin leed that he/sh4e,'Nxcut d the same as his/her free act and deed. r. AKsr .3� zoo — ' Notary Public My Commission ExpAes This Order is issued to the applicant as follows: by hand delivery on ZM by certified mail, return receipt requested, on F 27 c 0 Date Dale Page 5 of 7 WPA Form 5 Rev_02100 -,E ' Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands 64-361 - WPA Form 5 — Order of Conditions Provided by DEP se Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Appendix E: Request of Departmental Action Fee Transmittal Form,as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order.A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act, (M.G.L. c. 131,§40)and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations,the Department has no appellate jurisdiction. . D. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions.The recording information on Page 7 of Form 5 shall be submitted to the Conservation Commission listed below. Salem Conservation Commission WPA Form 5 Page 6 d 7 Rev.02100 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands c 64-361 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Recording Information (cont.) Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. To: Salem Conservation Commission Please be advised that the Order of Conditions for the Project at: Lot A- Pearl Street 64-361 Project Location DEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant WPA F.5 Page 7 of 7 Rev.O2 Salem Conservation Commission SPECIAL CONDITIONS—DEP FILE#64-361 Pearl Street—Lot A, Salem,MA 1. The Conservation Agent will be notified 48 hours prior to commencement of construction activities(978-745- 9595 ext. 311). Members and agents of the Salem Conservation Commission(Commission)shall have the right to enter and inspect the premises to evaluate and ensure compliance with the conditions and performance standards stated in this Order,the Notice of Intent,the referenced plans,the Act,and 310 CMR 10.00,and may require any information,measurements,photographs,observation and/or materials or may require the submittal of any data or information deemed necessary by the Commission,agent,or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the Commission is satisfied that the work will comply,and has so notified the applicant in writing. 2. Approval of this application does not constitute compliance with any law or regulation other than MGL Chapter 131,Section 40,and Wetlands Regulations 310 CMR 10.00. 3. This Order shall apply to any successor in control or successor in interest of the property described in the Notice of Intent and accompanying plans. These obligations shall be expressed in covenants in all deeds to succeeding owners or portions of the property. 4. The form provided at the end of this Order shall be completed and stamped at the Registry of Deeds after the expiration of the 10-day appeal period and within 30 days of the issuance if no request for appeal has been filed with the Department of Environmental Protection. This form shall be returned to the Commission within 21 days of recording accordance and prior to commencement of any activities subject to the Order of Conditions. 5. Prior to any work commencing,a sign shall be displayed showing DEP file#64-361,and not placed on a living tree. 6. The term"Applicant"as used in this Order of Conditions shall refer to the owner,any successor in interest or successor in control of the property referenced in the Notice of Intent,supporting documents and this Order of Conditions. The Commission shall be notified in writing within 30 days of all transfers of title of any portion of the property that takes place prior to issuance of the Certificate of Compliance. 7. It is the responsibility of the applicant to procure all other applicable federal,state and local permits and approvals associated with this project. These permits may include but are not necessarily limited to the following: (1) Section 404 of the Federal Water Pollution Control Act(P.L.92-500,86 stat. 816),U.S. Army Corp of Engineers. (2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified (3) Flood Plain (4) Grading Ordinance 8. If there are conflicting conditions within this Order,the stricter condition(s)shall rule. 9. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters during construction or after completion of the project. 10. The Commission and its Administrator shall have the discretion to modify the erosion/siltation control methods and boundary during construction if necessary. 11. All work shall be performed in accordance with this Order of Conditions and approved site plans(s). No alteration of wetland resource areas or associated buffer zone,other than that approved in this Order,shall occur on this property without prior approval from the Commission. 12. If any changes are made in the above-described plan(s)which may or will alter an area subject to protection under the Wetlands Protection Act,or any changes in activity subject to regulations under G.L.Ch. 131,Section 40,the applicant shall inquire from this Commission in writing,prior to their implementation in the field, whether the change(s)is significant enough to require the filing of a new Notice of Intent. Any error in the r plans or information submitted by the applicant shall be considered changes and the above procedures shall be followed. A copy of such request shall at the same time be sent to the Department of Environmental Protection. 13. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has been issued,the applicant or current landowner shall submit to the Commission a signed statement by the buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of the Order of Conditions. 14. Conditions number_as indicated shall continue in force beyond the Certificate of Compliance,in perpetuity, and shall be referred to in all future deeds to this property. PRIOR TO CONSTRUCTION 15. Prior to commencement of any activity on this site,there shall be a PRECONSTRUCTION MEETING between the project supervision;the contractor responsible for the work or its administrator to and phone numbers of all responsible parties shall be registered with the Commission at the pre-construction meeting. 16. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The Commssion and/or its Administrator shall inspect and approve such installation at the pre-construction meeting. 17. Prior to the commencement of any activity on this site,the applicant or current landowner shall submit to the Commission in writing a construction schedule/sequence of work to complete this project. 18. Prior to any work on site,the proposed limits of work shall be clearly marked with stakes or flags and shall be confirmed by the Commission or its Administrator. Such markers shall be checked and replaced as necessary t no use of machine and shall be maintained until all construction is complete. Workers shall be informed tha rY, storage of machinery or materials,stockpiling of soil or construction activity is to occur beyond this line at anytime. 19. Prior to commencement of construction on site,the limits of wetland resource areas closest to construction activity shall be flagged with surveyor's tape and shall remain in place during construction. The limits of areas to be impacted and the limits of work in the replication area(s)shall be clearly flagged. 20. There shall be 25 hay bales and wooden staked stored under cover on the site to be used only for emergency erosion control. EROSION CONTROL 21. Appropriate erosion control devices shall be in place prior to the beginning of any phases of construction,and shall be maintained during construction in the wetland areas and buffer zones. The erosion control specification Provided in the Notice of Intent and the erosion control provision in the Order will be the minimum standards for this project;additional measures may be required by the Commission. 22. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland resource areas to prevent sediment from entering wetland resource areas. 23. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 24. The areas of construction shall remain in a stable condition at the close of each construction day. 25. Any de-watering of trenches or other excavations required during construction shall be conducted so as to prevent siltation of wetland resource areas. All discharges from de-watering activities shall be filtered through haybale sediment traps,silt filter bags or other means approved by the Commission or its Administrator. 26. Within thirty days of completion of construction on any given portion thegrowingct,all vegetative covert using in the completed portion of the site shall be permanently stabilized with rapidly gr g sufficient top soil to assure long-term stabilization of disturbed areas. 27. If soils are to be disturbed for longer than two months,a temporary cover of rye or other grass should be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,exposed surfaces shall be stabilized by other appropriate erosion control measures,firmly anchored,to prevent soils from being washed by rain or flooding. DURING CONSTRUCTION 28. A copy of the Order of Conditions,construction plans,and copies of the documents work for repoontraors cited in ew and Condition# 11,shall be on the site upon commencement and during any adhere to. , 29. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 30. Only clean fill,free of masonry,stumps,asphalt,and any other kind of waste material shall be used on the site. 31. All waste products,grubbed stumps,slash,construction materials,etc.shall be deposited at least 100 feet from wetland resource areas and 200 feet from rivers. 32. All filling or removal of waste material from the site shall be done in accordance with the regulations of the City of Salem Health Department. uffer zone area. 33. cCement trucks shll not be washed out in oncrete products into a buffer zone or wetl nd resource are shally wetland reurce or bbe removed by handy deposit of cement or 34. No fuel,oil,or other pollutants shall be stored in any resource area or the buffer zone thereto,unless specified in this Order of Conditions. 35. There shall be no pumping of water from wetland resource areas. 36. During construction,all drainage structures shall be inspected regularly and cleaned as necessary. off onto adjacent properties,either during construction or when 37. The project shall not cause an increase in run- completed. 38. The applicant is hereby notified that failure to comply with all requirements herein may result in the issuance of enforcement actions by the Conservation Commission including,but not limited to,civil administrative penalties under M.G.L.Chapter 21 A,section 16. POST CONSTRUCTION 39. All disturbed areas,slopes and proposed landscape areas shall be learned and seeded or stabilized through the use of erosion control blankets or other approved means. All disturbed areas will be graded,learned,and seeded prior to November 1 of each year,if possible. No disturbed areas or stockpiled material will be left unprotected or without erosion controls during the winter. I _ r, 40. Upon completion of construction,the applicant or current landowner shall submit the following to the Commission to request a Certificate of Compliance: (1) A letter requesting a Certificate including the following information: a. Name and address of current landowner; b. Name and address of the individual/trust or other entity to whom the Certificate is to be issued: c. Street address and lot number for the project;and d. DEP file number (2) A letter from a Registered Professional Engineering or Land Surveyor certifying compliance of the property with this Order of Conditions (3) An"As-Built"plan signed and stamped by a Registered Professional Engineer showing post-construction conditions and: a. As-built elevations of all drainage ways constructed within 100 feet of any wetland resource area; b. As-built elevations and grades of all filled or altered wetland 'resource areas,buffer zones and replicated areas;and c. Distances to all structures within 100 feet of any wetland resource area. 41. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds. 42. If the completed work differs from that in the original plans and conditions,the report must specify how the work differs;at which time the applicant shall first request a modification to the Order. Only upon review and approval by the Commission,may the applicant request in writing a Certificate of Compliance as described above. 43. Erosion control devices shall remain in place and properly functioning until all exposed soils have been stabilized with final vegetative cover and the Commission and/or its Administrator has authorized their removal. ADDITIONAL CONDITIONS 44. The four space guest parking lot area as shown on the plan entitled"Site Development Permit Plan of Land Located in Salem,Mass."Prepared by Easter Land Survey Associates,Inc.,Christopher R.Mello,PLS, Revised Feb. 10,2004 shall be replaced with crusted stone.The stone parking area shall be approximately 36 feet long x 17 feet wide and have a depth of 12 inches in size. 1 jCWX IL KEIIW COUNSELOR AT LAW 40 LOWELL STREET TELEPHONE (978) 531-7900 PEA6OCY, MA 01960 FAcsIMILE (979) 531-2479 1i 1 January 28,2004 Conservation Commission City of Salem 120 Washington Street Salem,MA 01970 Atm: Kevin P.Cornacchio,Chairman Re: 24 Saunders Street,Sakur,Massachusetts + DEP He No.0644355 Dear rt, ip rman Comacchio: I represent Julianne Tache,Trustee of Riverside Realty Trust with regard to a Notice of Intent filed with the City of Salem regarding the above-captioned property. Please accept this letter as a request that the deliberations of the Conservation Commission be extended until March 12,2004. Very truly yours, / John R.Keilty,Esquire JRKlernb (� ;e 2018 bsa ')S iiax Nmor 6LVZTES9L6 %V3 WH 6002/9Z/TO . o CITY OF SALEM ms's DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT STANLEY J.USOVICZ,JR. MAYOR 120 WASHINGTON STREET•SALEM,MASSACHUSETTS 01970 JOSEPH P.WALSH,JR. TEL:978-745-9595•FAX:978-740-0404 DIRECTOR February 11, 2004 George Fallon Riverview Realty Trust 208 Derby Street Salem, MA 01970 RE: DEP File # 64-361: Lot A on Pearl Street Dear Mr. Fallon: This letter is a follow up to our phone conversation today.As we spoke about on the phone, the Salem Conservation Commission has raised several issues concerning the drainage at the parcel located on Pearl Street. The Commission requested at their meeting of January 15, 2004 that the Assistant City Engineer review the plans and provide comments/recommendations to the Commission for their review. As of today,we have not yet received written comment from the Assistant City Engineer. Furthermore, the Commission stated at their January 29, 2004 meeting that they are expecting a final determination from the Acting Building Commissioner as to whether the current plan before the Commission is in compliance with the Salem Zoning Ordinance. In addition,the Commission stated that once the determination is made the plans should be revised accordingly. The Conservation Commission looks forward to reviewing your revised plans. Please feel free to contact me at the Department of Planning and Community Development at (978) 745-9595, extension 311 if you have any questions. Sincerely, O W11 PAIC Denise S. McClure, AICP Deputy Director Cc: Tom St. Pierre, Acting Building Commissioner Joe Nerden, Assistant City Engineer Don Cefalo, Conservation Commission Agent COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION ONE WINTER STREET, BOSTON, MA 02108 617-292-5500 MITT ROMNEY -`� ELLEN ROY HERZFELDER Governor (.. i �A� A .r L U qo{I4 Secretary KERRY HEALEY ROBERT W.GOLLEDGE,Jr. Lieutenant Governor DEN QF 4 LM�JM1G P. I Commissioner -'a'- DEP File# 064-0361 RE: NOTIFICATION OF WETLANDS PROTECTION ACT FILE NUMBER SALEM DATE: 1/16/2004 11:48 AM (city/town) The Department of Environmental Protection has received a Notice of Intent filed in accordance with the Wetlands Protection Act(M.G.L. c. 131, §40): Applicant: Keith Nadeau Owner: Cousins Realty Trust Address: 11 Green Lawn Avenue Address: Salem, MA 01970 LOCUS: 'T,of A PearI Street IF CHECKED, THE FOLLOWING11TEM(S)APPLY TO THIS NOTICE OF INTENT A.-(X)-This project has been assigned tfie'followmg'file# : 064-0361 Although,'a file#is being issued,please note the following C.() Other Regulatory Jurisdiction 1. O Application has been forwarded to Waterways Regulatory Program to determine if a Chapter 91 License is required. 2. () Applicant is advised to forward a copy of the Notice of Intent to the Corps of Engineers for review (call 1-800-362-4367 for information). D. O 401 Water Quality Certification The project described in your Notice of Intent requires a 401 Water Quality Certification from the Department of Environmental Protection and may require submittal of a 401 application form. See below for further details: 1. O Based upon the information submitted in and with your Notice of Intent a separate 401 Water Quality Certification application form is not required. The Department has reviewed the plans submitted by the applicant and finds that there is reasonable assurance that the project or activity will be conducted in a manner that will not violate the Massachusetts Surface Water Quality Standards provided that. La),-the applicant.receives:and complies with Final Order of Conditions from the local conservation commission or the Department; A' sA b) The Order of Condltio'n''s does not cause the. nss of more'th'an,5;000sq.ft. of bordering 711 . f vegetated wetlands and land under water and/or the dredging of more than 100 cubic yards of landunderwater; This information is available in alternate format.Call Aprel McCabe,ADA Coordinator at 1-617-556-1171.TDD Service-1.800-298-2207. DEP on the�World Wide Web: hftp://v .mass.gov/dep Lri Printed on Recycled Paper c) any loss of vegetated wetlands has been mitigated with a minimum replication of 1:1; and is not part of a subdivision; does not cause the loss of any Wetlands designated as d) The project is not exempt from the M.G.L. c. 131, §40-the Wetlands Protection Act; Outstanding Resource Waters; and does not cause the loss of any salt marsh. Therefore,provided that the above conditions are satisfied,the Final Order of Conditions will serve as the Water Quality Certification for this project. This does not relieve the applicant of the duty to comply with any other statutes or regulations. 2. Q Before the activity described in the Notice of Intent can commence,you must obtain a Water Quality Certification form from this Regional Office. Please complete the enclosed 401 Water Quality Certification application form and file it with this Regional Office for review. 3. Q Your project involves dredging of greater than 100 cubic yards of material or requires a permit from the Federal Energy Regulatory Commission for work in "waters of the Commonwealth." Therefore,your proposed project is subject to 314 CMR 9,00 and requires a Water Quality Certification. Please complete the enclosed 401 Water Quality Certification application form and file it with the Department of Environmental Protection, Waterways Program, and One Winter Street,Boston,MA 02108. Contact the Division of Waterways program at 617-292-5655 if you have and questions. For more information please contact: Ms. JILL PROVENCAL at 617 654-6681. Cc: Conservation Commission: Salem Conservation Commission, City Hall 1 Salem Green Professional Land Surveyors&Civil Engineers ESSEX SURVEY SERVICE 1958- 1986 OSBORN PALMER 1911 - 1970 BRADFORD&WEED 1885- 1972 STORMWATER CALCULATIONS LOT A PEARL STREET SALEM, MASSACHUSETTS DECEMBER 2003 �'AAAeda -;> CLAYTCi:A. .� �.•> J o CIVIL No.3G�S9 IST AL r�Vs%ONALEti?�ga re°Yt'It+� 104 LOWELL STREET PEABODY, MASS. 01960 TELEPHONE: 978-531-8121 TELECOPIER: 978-531-5920 E-MAIL: elsai@prodigy.net EASTERN LAND SURVEY ASSOCIATES, INC. Christopher R. Mello PLS SKEET NO. t OF '7- 104 104 Lowell Street CALCULATED BY -A"c"\ DATE \z-Z-03 PEABODY, MA 01960 (978) 531-8121 CHECKED BYDATE SCALE _-7 kkAv-' <.-E .S`1'S'(E'^'�._ �TJE s) \. C.ca� �v Ls>�F 2ZviJafF .,Yu�u.rY\QS . rR@VeuS�� _EVew�_�j. (,'Y RF C� fP I."#Gt l\Q .tel: L?A-1P• -FSe C�rv,\_.. :QFC t4 t� _"'P APt1L ..'40� :.......-• TGO OF... jaRFQ, = 1"ZOO \4oJS� -Pvt.s1 YOk.OM2....... _ 1zosF. .:2 3zocR_ 4(�r.F 18o cp, cF > Z•c- zoo c r 4&o cF.... _'Z C'a.LCJ� 016 ��'�QRecE cn,4.x� .. LT C Naw\P1e c S \,J_ Ant $•.x 1k' k . \ s6' U0%0 : -W-^T\o =L35`Si�o cw. .66rt €�Iot>Jche. = 111 4.= 8. cF. S-\�� �(OwYr\e =�($ x\t�xx.\.8�> -.SS•8]_x •35 _ = 4.1,.4 < _.. Szntigcg- _ . 12Cs2 fir.. �\1Fi -CM'itq-). +�k . .Fo2. < o,(Z 0U5 1.!WtE -M)vRG-jl6�) ....... 1 U a.J DvR4 i.loaYCe k21J�t? 2t'a. 3 c-, ._ "x ukr EASTERN LAND SURVEY ASSOCIATES, INC. aD �� M Christopher R. Mello PLS SHEET NO. z OF 104 Lowell Street CALCULATED ev DATE PEABODY, MA 01960 (978) 531-8121 CHECKED BY DATE` SCALE __. Lt ....Co.v�gsaai6 Corn6Tt3.FD SToSZASE.. •grJp ��JSrl':�7KA`l�o�J �Lo�JMF :_. ...S.J,x-11-1 ..._�Z_d:rl_nF� IY6�J•M&S ' ... . ,.. ... ':.. :._... JYLA"f.\V•J _ S'Cdjo06E \2o.ZZ2s.g coo .rnsy ► zo.Z 2133 333.5 . 2�( '+(2• YTO Z ......... 530 .... �� rs-te+t� AAS.@ V fl iE F 2 0�1 raN p� y`� �a t©(t rnS _ J' Hydrograph Plot Hydraflow Hydrographs by brterisolve Hyd. No. 1 PREDEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 0.04 cfs Storm frequency = 2 yrs Time interval = 2 min Drainage area = 0.38 ac Curve number = 56 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = USER Time of conc. (Tc) = 10 min Total precip. = 3.10 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume=354 cult 1 - SCS Runoff - 2 Yr - Qp = 0.04 CfS 0.04- 0.03- 0.02-- 0.01 .040.00.020.01 L i i --------F- 0.00 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 1 Hydrograph Plot Hyftftow Hy&ogmphs by We6soke Hyd. No. 1 PREDEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 0.24 cfs Storm frequency = 10 yrs Time interval = 2 min Drainage area = 0.38 ac Curve number = 56 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = USER Time of conc. (Tc) = 10 min Total precip. = 4.60 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 "rograph Volume=1,199 wft 1 - SCS Runoff - 10 Yr - Op = 0.24 cfs 0.25- 0.20- cc .20.2cc 0.1 CYv 0.10- 0.05- 0.00 .10.00.00 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 1 Hydrograph Plot Hydreflow Hy&Waphs by Inte®soNe Hyd. No. 1 PREDEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 0.78 cfs Storm frequency = 100 yrs Time interval = 2 min Drainage area = 0.38 ac Curve number = 56 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = USER Time of conc. (Tc) = 10 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume=3,155 cult 1 - SCS Runoff - 100 Yr - QP = 0.78 cfs 0.8- 0.6-- 0.4- 0.2-- 0.0 .s0.s0.40.20.0 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hm) / Hyd. 1 Hydrograph Plot Hydregow Hydrographs by brtertswe Hyd. No. 2 POSTDEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 0.15 cfs Storm frequency = 2 yrs Time interval = 2 min Drainage area = 0.32 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = oft Tc method = USER Time of conc. (Tc) = 10 min Total precip. = 3.10 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume=711 curl 2 - SCS Runoff - 2Yr - Qp = 0.16cfs 0.15- 0.10----- 0.05- 0.00 .10.10.00.00 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 2 Hydrograph Plot Hydmflow Hy&ogmphs by IntefsoW Hyd. No. 2 POSTDEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 0.43 cfs Storm frequency = 10 yrs Time interval = 2 min Drainage area = 0.32 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = USER Time of conc. (Tc) = 10 min Total precip. = 4.60 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Hy&ograph VoWme=1,750 tuft 2 - SCS Runoff - 1OYr - Qp = 0.43cfs 0.5- 0.4-- 0.3-- CF .0.40.3 0.2-- 0.1-- 0.0 .20.10.0 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 2 Hydrograph Plot Hydraflow Hydrographs by Udefisolve Hyd. No. 2 POSTDEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 0.99 cfs Storm frequency = 100 yrs Time interval = 2 min Drainage area = 0.32 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = USER Time of conc. (Tc) = 10 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume=3.839 cult 2 - SCS Runoff - 100 Yr - QP = 0.99 ds 1. 0.8 0. a 0.4-- 0.2-- 0.0 .40.20.0 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 2 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 3 - Notice of Intent -Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem Town A. General Information Important: When filling out 1. Applicant: forms on the Cousins Realty Trust Keith A. Nadeau & Robert R. Hamel Trustees computer, use Name E-Mail Address(if applicable) only the tab key to move 11 Green Lawn Avenue your cursor- Mailing Address do not use the Salem MA 01970 return key. City/Town State Zip Code c/o (978) 745-8274 -Stephen P. Lovely Esquire Phone Number Fax Number(if applicable) 2. Representative (if any): a�a Finn Stephen P. Lovely, Esquire Note: Contact Name E-Mail Address(if applicable) Before 14 Story Street completing this Mailing Address form consult Salem MA 01970 yourlocal Conservation City/Town State. Zip Code Commission (978) 745-8274 (978) 745-6573 regarding any Phone Number Fax Number(if applicable) municipal bylaw or ordinance. 3. Property Owner(if different from applicant): Same Name Mailing Address City/Town State Zip Code 4. Total Fee: $1575.00 (from Appendix B:Wetland Fee Transmittal Form) 5. Project Location: Lot A Pearl Street Salem Street Address City/Town 36 87 Assessors Map/Plat Number Parcel/Lot Number 6. Registry of Deeds: Essex(So. District) 21260 316 County Book Page Certificate(if Registered Land) WPA Forth3 --- Page 1 of 8 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 3 - Notice of Intent Provided-by—DEP N Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 SalemTown A. General Information (cont.) 7. Summary of Project Impacts: a. Is any work being proposed in the Buffer Zone? ❑ Yes If yes, how many square feet? ® No b. List the impacts of proposed activities on each wetland resource areas (temporary and permanent impacts, prior to restoration and mitigation): Resource Area Size of Impact (e.g., sq.ft.) Riverfront 6800 S.F. total, 2500 SF permanent B. Project Description 1. General Project Description: Construction of two dwellings driveways utilities landscaping and grading 2. Plan and/or Map References: Site Development Permit Plan 12/01/03 Title Date WPA Form 3 Rev.02/00 Page 2 of 8 Massachusetts Department of Environmental Protection DEP File Number. Bureau of Resource Protection -Wetlands WPA Form 3 - Notice of Intent Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem C. Activities Subject to Regulation 1. a. Check the applicable resource areas if work is to be conducted in an associated Buffer Zone: Inland Resource Areas Coastal Resource Areas ❑ Inland Bank ❑ Coastal Beach ❑ Barrier Beach ❑ Bordering Vegetated Wetland (BWV) ❑ Rocky Intertidal Shore ❑ Coastal Dune ❑ Salt Marsh ❑ Coastal Bank b. Complete for all pkroposed activities located, in whole or in part, in Wetland Resource Area(s). Inland Resource Areas: Bordering Vegetated Wetlands: Bordering Land Subject to Flooding: Square Feet altered Volume of Flood Storage Lost(cubic feet) Square Feet replaced Volume of Flood Storage Compensation(cubic feet) Land Under Water Bodies: Isolated Land Subject to Flooding: Square Feet altered Volume of Flood Storage Lost(cubic feet) Cubic Yards dredged Volume of Flood Storage Compensation(cubic feet) Bank: Linear Feet altered Coastal Resource Areas: Coastal Dune: Land Under Salt Pond: Square Feet altered Square Feet altered Cubic Yards/Volume removed Cubic Yards dredged Salt Marsh: Rocky Intertidal Zone: Square Feet altered Square Feet altered - Coastal Bank: Designated Port Area: Linear Feet altered Square Feet altered _ Massachusetts Department of Environmental Protection DEP File Number. Bureau of Resource Protection -Wetlands ` WPA Form 3 — Notice of Intent Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem C. Activities Subject to Regulations (cont.) Fish Run: Land Containing Shellfish: Linear Feet altered Square Feet altered Land Subject to Coastal Storm Flowage: Beach: Square Feet altered Square Feet altered Land Under Ocean: Square Feet altered Cubic Yards dredged Riverfront Area: a. Name of Waterway (f available): North River b. Width of Riverfront Area (check one): ❑ 25 ft.- Designated Densely Developed Areas only ❑ 100 ft.- New agricultural projects only ® 200 ft.-All other projects c. Describe how the Mean Annual High-Water Line was determined: Mean Annual High Tide d. Distance of proposed activity closest to the Mean Annual High-Water line: 150 Feet e. Total area of Riverfront Area on the site of the proposed project: 6800 Square Feet f. Proposed alteration of the Riverfront Area: 2500 -0- 2500 Total Square Feet Square Feet witNn 100 R Square Fed betxRen 1 MfL and 200 R Massachusetts Department of Environmental Protection DEP File Number. Bureau of Resource Protection -Wetlands WPA Form 3 - Notice of Intent Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 SalemTom C. Activities Subject to Regulation (cont.) 2. Check all methods used to delineate the.Bordering Vegetated Wetland (BVW) boundary: ❑ Final Order of Resource Area Delineation issued by Conservation Commission or DEP (attached) ❑ DEP BVW Field Data Form (attached) ❑ Final Determination of Applicability issued by Conservation Commission (attached) ❑ Other Methods for Determining the BVW boundary (attach documentation): ❑ 50% or more wetland indicator plants ❑ Saturatedfinundated conditions exist ❑ Groundwater indicators ❑ Direct observation ❑ Hydric soil indicators ❑ Credible evidence of conditions prior to disturbance. 3. a. Is any portion of the proposed project located in estimated habitat as indicated on the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and Endangered Species Program? ❑ Yes If yes, include proof of mailing or hand delivery of NO[to Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife Route 135, North Drive Westborough, MA 01581 ® No 2000-2001 Atlas Date of Map b. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? ❑ Yes If yes, provide name of ACEC (see Appendix D for ACEC locations): ACEC ® No c. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act(M.G.L. c. 131, § 40A) or the Coastal Wetlands Restriction Act (M.G.L. c. 130, § 105)? ❑ Yes ® No ILIMassachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands WPA Form 3 — Notice of Intent Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Townm D. Performance Standards 1. Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 or 310 CMR 10.53? ❑ Yes If yes, describe which limited project applies to this project: Dmited Project ® No 2. Is any activity within any Resource Area or Buffer Zone exempt from performance standards of the wetlands regulations, 310 CMR 10.00. ❑ Yes If yes, describe which exemption applies to this project: Exemption ® No 3 a. Is the project located in the Riverfront Area? ® Yes If yes, indicate the proposed project purpose: ❑ Single Family House ❑ Industrial Development ® Residential Subdivision ❑ Commercial Development ❑ Transportation ❑ Other(describe) b. Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes ® No 4. a. Describe how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location.Attach narrative and supporting documentation. b. Is this project exempt from the DEP Stormwater Policy? ® Yes If yes, explain why the project is exempt: Two dwellings are dwellings are promised. ❑ No If no,stormwater management measures are required. Applicants are encouraged to complete Appendix C:Stormwater Management Form and submit it with this form. Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands WPA Form 3 - Notice of Intent Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131 §40 Salem Town E. Additional Information Applicants must include the following with this Notice of Intent(NOI): • USGS or other map of the area (along with a narrative description, if necessary), containing sufficient information for the Conservation Commission and the Department to locate the site. • Plans identifying the location of proposed activities(including activities proposed to serve as a Bordering Vegetated Wetland (BVW) replication area or other mitigating measure) relative to the boundaries of each affected resource area. • Other material identifying and explaining the determination of resource area boundaries shown on plans (e.g., a DEP BVW Field Data Form). • List the titles and final revision dates for all plans and other materials submitted with this NO]. F. Fees The fees for work proposed under each Notice of Intent must be calculated and submitted to the Conservation Commission and the Department(see Instructions and Appendix B.Wetland Fee Transmittal Form). No fee shall be assessed for projects of the federal government,the Department, or cities and towns of the Commonwealth. Applicants must submit the following information (n addition to pages 1 and 2 of Appendix B)to confirm fee payment: Check Number Check date Payor name on check Applicant name(if different from payor) G. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, §40. Notice must be made in writing by hand delivery or certified mail (return receipt requested)to all abutters within 100 feet of the property line of the project location. ` aa� 103 Signature of Applicant ` Date Signature o Property Owner(if different) Date /2/ 11 Signa o Re esentAve fd any) Pate Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Appendix B — Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Important: A. Applicant Information When filling out forms on the 1. Applicant: computer, use only the tab Cousins Realty Trust, Keith A. Nadeau & Robert R. Hamel Trustees key to move Name your cursor- 11 Green Lawn Avenue do not use the Mailing Address return key. Salem MA 01970 City/Town State Zip Code c/o (978) 745-8274 Stephen P. Lovely Esquire Phone Number 2. Property Owner(if different): Same Name Mailing Address City/rown State Zip Code Phone Number 3. Project Location: Lot A Pearl Street Salem Street Address Citylrown B. Fees To calculate filing fees, refer Abbreviated Notice of Resource Area Delineation (Form 4A): to the category fee list and The fee is calculated as follows (check applicable project type): examples in Section D of this form. ❑ single family house project X$1.00= (feet of BVW) Total fee(not to exceed$100) ❑ all other projects X$1.00= (feet of BVW) Total fee(not to exceed$1,000) State share of filling fee: (1/2 of total fee less$12.50) City/Town share of filling fee: (1/2 of total fee plus$12.50) Wpaform3.dm•Appendix B•rev.12/1 Ono Page 1 of 6 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Appendix B — Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Fees (cont.) Abbreviated Notice of Intent(Form 4) or Notice of Intent(Form 3): The fee should be calculated using the following six-step process and worksheet: Step 11Type of Activity: Describe each type of activity(see Section D for a list of activities)that will occur in wetland resource area and buffer zone. Step 2/Number of Activities: Identify the number of each type of activity. Step 3/Individual Activity Fee: Identify each activity fee from the six project categories in Section D. Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2)times the fee per category(identified in Step 3) to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be multiplied by 1.5 and then added to the subtotal amount. Step 5/rotal Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4. Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract $12.50.To calculate the city/town share of the fee, divide the total fee in half and add $12.50. Step 1/Type of Activity Step 2/Number Step 3/Individual Step 4/Subtotal of Activities Activity Fee Activity Fee 3b Proposed Buildings 2 $525.00 x 1.5 $1575.00 Step 5/rotal Project Fee:$1575.00 Step 6/Fee Payments: Total Project Fee:$1575.00 (Total fee from Step 5) State share of filing fee:$775.00 (V2 total fee less$12.50) City/Town share of filling fee:$800.00 (1/2 total fee plus$12.50) Wpaform3.dm•Appendix 8•rev.M Q/03 Page 2 of 6 1'Call- no; ®�,� �,� 0t+ �� 7•j1� YQ o-�,y � f. • '� P�;� , ti_�,���io�.I—'.� . ��® `° IVA ROOM \ t l` ti ' {1 ORIN p fill IF r/�� 1T® 1RAI \�T� •/ � Y , �• 1�i1 1 �� a�'illh�•ar `� 7'.��'<"f11 1 �t`�(a _\ 4:r�t ` tl1Y �i . r �Ftjj �• 11MMOM IN om .• • ,N ♦ • PROJECT NARRATIVE 14 Pearl Street • Salem, Mass. The site of the proposed construction previously contained the north portion of a 30,300 square foot (approximate) building, which housed the Salem Shoe Manufacturing Company. The property is located within the riverfront associated with the North River, but is separated by the river by the MBTA trackage running north from Salem. The proposed development consists of two single family dwellings on a lot comprised of 16,570 square feet, approximately 6,500 square feet of which is located in the riverfront. No portion of the property is located in the Buffer Zone associated with the North River. Both houses will be served by municipal water and sewer. Roof runoff is to be recharged into the ground. L LonA61oma 2m& Professional Land Surveyors&Civil Engineers ESSEX SURVEY SERVICE 1958- 1986 OSBORN PALMER 1911 - 1970 BRADFORD&WEED 1885- 1972 STORMWATER CALCULATIONS LOT A PEARL STREET SALEM, MASSACHUSETTS DECEMBER 2003 �`p \ CL4YiCAl;1. ys J,`�ivhL Gla ,'a 9VV V1`i® 104 LOWELL STREET PEABODY, MASS. 01960 TELEPHONE: 978-531-8121 TELECOPIER: 978-531-5920 E-MAIL: elsai@prodigy.net EASTERN LAND SURVEY ASSOCIATES, INC. .roe SOT GfLL = <,, Christopher R. Mello PLS SHEET NO. 1 of 'Z- 104 Lowell Street CALCULATED BY —»M DATE \z-7-03 PEABODY, MA 01960 (978) 531-8121 CHECKED BY<A _ DATE SCALE i.ck.7E "1Z.v N Of—F .__Y uc.U,.ry\F^a ;.__F.O R pfd.2\Ou5 i..F.v�N'-(S.. emir c AY� i"I.MIQ ...I 'DA?ZP• -FROYVI..._... 00 R-.......... @ ...... 70A V 0 Lt.WSEP 11 YQ1'uME.._. Z (E -JLct120izr 321. 3ZocF. xc) (sav . ioo._�ra.n— _ 2.,_I. z\o._eF , _ ?•�-' z.�o cF Vic:$ •• �&o et=... TORccE_ crn� "Cozo En _Fc�R 1Z�ci.r RsE t 2(J �« c�L.o rnbec S „J.... x ..... C\�cr. asrt �lo�ornE, 1t•-1 4 me.. -� xlc. c 1.8�� '._58•S' x 35 i.... -Ta.. a� S rotioc..g 1^tco•2 � . 3 ^^ cnnl�lE .�NF.�.LZt� 1l5sJ �JP11 (4.y3 -t.1wlF �VRGIIgJs__. _ ...... !. Z..et woacra.r m.�s.mAs�mmm EASTERN LAND SURVEY ASSOCIATES, INC. JOB �-cr-r Q �cA�� 1>1E TK Christopher R. Mello PLS SHEET NO. Z of L 104 Lowell Street CALCULATED BY DATE PEABODY, MA 01960 �/ (978) 531-8121 CHECKED BY DATE` SCALE _...�. Cempal2t Ccirv�(�1Nl�P SZo2Ac�. _ 'AtJO f ►JF ILTQ�A`11tfJ �L01-.vr'1F e,„_ Y v�u_mF5 i`cG� .�rzn~cv.) SCOg�6E _ 1�1F��C�A1f4*t -�c� i�� 3o mea \6!..n _._ . quay, !;. cao rna y Van L 2133 333 5 . A S .....SYszE�' ;).9 •A9E@uf�']'r. .�2 o.l_L raNp�.�2� . S-�oRY''1S Hydrograph Plot Hydraflow Hydrographs by Irdefisolve Hyd. No. 1 PREDEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 0.04 cfs Storm frequency = 2 yrs Time interval = 2 min Drainage area = 0.38 ac Curve number = 56 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = USER Time of cone. (Tc) = 10 min Total precip. = 3.10 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume=354 cult 1 - SCS Runoff - 2Yr - Qp = 0.04 ds 0.04 0.0 0.02 CY 0.01 0.00 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 1 Hydrograph Plot Hydraflow.Hydrographs by trrtelisolve Hyd. No. 1 PREDEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 0.24 cfs Storm frequency = 10 yrs Time interval = 2 min Drainage area = 0.38 ac Curve number = 56 Basin Slope = 0.0 % Hydraulic length = Off Tc method = USER Time of conc. (Tc) = 10 min Total precip. = 4.60 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume=1,199 cult 1 - SCS Runoff - 10 Yr - QP = 0.24 ds 0.25- 0.20- 0.15- 0.10- 0.05- 0.00 .20.20.10.10.00.00 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 1 Hydrograph Plot Hydraflow Hydrographs by IntermoNe Hyd. No. 7 PREDEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 0.78 cfs Storm frequency = 100 yrs Time interval = 2 min Drainage area = 0.38 ac Curve number = 56 Basin Slope = 0.0 % Hydraulic length = oft Tc method = USER Time of conc. (Tc) = 10 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume=3,155 cult 1 - SCS Runoff - 100 Yr - Qp = 0.78 cfs 0.8- , 0.6 CY 0.4 0.2 0.0 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 1 Hydrograph Plot Hydraflow Hydrographs by IMermolve Hyd. No. 2 POSTDEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 0.15 cfs Storm frequency = 2 yrs Time interval = 2 min Drainage area = 0.32 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = oft Tc method = USER Time of conc. (Tc) = 10 min Total precip. = 3.10 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume=711 cuft 2 - SCS Runoff - 2Yr - Qp = 0.16CfS 0.1 0.1 CJ 0.0 0.00 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 2 Hydrograph Plot Hydraftow Hydrographs by Interisolve Hyd. No. 2 POSTDEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 0.43 cfs Storm frequency = 10 yrs Time interval = 2 min Drainage area = 0.32 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = off Tc method = USER Time of conc. (Tc) = 10 min Total precip. = 4.60 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume=1,750 tuft 2 - SCS Runoff - 10 Yr - Qp = 0.43 cfs 0.5- 1 0.4 0.3 CY 0.2-- 0.1-- 0.0 .20.10.0 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 2 f Hydrograph Plot Hydraflow Hydrogmphs by IntermoHe Hyd. No. 2 POSTDEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 0.99 cfs Storm frequency = 100 yrs Time interval = 2 min Drainage area = 0.32 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = oft Tc method = USER Time of conc. (Tc) = 10 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume=3,839 wft 2 - SCS Runoff - 100 Yr - Qp = 0.99 ds 1. 0.8-- 0.6-- 0.4-- 0.2----- 0.0 .80.60.40.20.0 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 2 CITY OF SALEM DEPARTMEN I OF PLANNING; .AND COMMUNITY DEVELOPMENT S IAM.BY J-USOVICL.JR. MAYOR 120 WASHINCIO+!SiRi:u,v SALEM,I'Yt`VtiAC;I ItltiLi'is 01970 JOSEPH P. wABIT,JR. TCL:978-745-9595.FAX:97 8-7 40-011 0 1 DIRECTOR January 2,2004 VIA FACSIMILE Stephen P. Lovely, Attorney at Law 14 Story Street Salem, Massachusetts 01970-2820 Dear Attomey Lovely; Thank you for your Conservation Commission permit fee to the City of Salem in the amount of$800.00, which was received by the Commission on December 23, 2003. Attached for your records is a receipt of this transaction. Your application will be placed on the Commission's Agenda at its nest meeting. It has come to my attention from your recent voicemail to this office that there was some confusion regarding this submission and the amount clue. Please accept my apology for any confusion caused by the staff of the Conservation Commission as to the status of this filing or the acceptance of the fee. Si cerely, Jos h alsh Dire for CC: Donald Cefalo, Conservation Agent J Stephen A Lovely,Attorney at Law 14 Story Street Salem,Massachusetts 01970-2820 Telephone 978-745-8274 Fax 978-745-6573 Don Cefalo December 11,2003 City of Salem Planning Department 120 Washington Street Salem,Massachusetts 01970 RE: WAIVER FOR LOT A PEARL STREET Dear Mr. CefaM; Please consider the waiver of the fee for the Conservation Commission application of my client, Cousins Realty Trust, for the property at Lot. A Pearl Street in Salem. This application is a result of a bifurcation of an existing filing pending before the Conservation Commission where filing fees in excess of six thousand five hundred ($6,500) dollars have already been paid by the seller of Lot A on Pearl Street. The project is proceeding in this fashion by agreement with the city of Salem and the original petitioner in order to determine the likelihood of a taking of the land by the Commonwealth of Massachusetts. Thank you for your consideration in this matter. Ve yours, St hen .Lovely A ey t Law B #560533 cc: George Fallon Keith Nadeau File 'I f3�'�; ja�,-_0 DEC 1 1 2003 Stephen P. Lovely,Attorney at Law 14 Story Street Salem, Massachusetts 01970-2820 Telephone 978-745-8274 Fax 978-745-6573 Don Cefalo December 11,2003 City of Salem Planning Department 120 Washington Street Salem,Massachusetts 01970 RE: WAIVER FOR LOT A PEARL STREET Dear Mr. Cefalo; Please consider the waiver of the fee for the Conservation Commission application of my client, Cousins Realty Trust, for the property at Lot A Pearl Street in Salem. This application is a result of a bifurcation of an existing filing pending before the Conservation Commission where filing fees in excess of six thousand five hundred ($6,500) dollars have already been paid by the seller of Lot A on Pearl Street. The project is proceeding in this fashion by agreement with the city of Salem and the original petitioner in order to determine the likelihood of a taking of the land by the Commonwealth of Massachusetts. Thank you for your consideration in this matter. VVyours, SAB cc: George Fallon Keith Nadeau File DEC 1 1- 2003 (� DETAIL GENERAL NOTES EROSION CONTROL SILT FENCE 1) THIS PLAN IS THE RESULT OF AN ON THE GROUND FIELD O 2'x2"x4'-6• WOODEN POSTS SURVEY AND PUBLIC AND PRIVATE PLANS. Tn AT 8' O.C. (MAX) U) MIRAFI No. 100 SEDIMENT 2) UTIL177ES SHOWN ARE BASED UPON FIELD SURVEY AND PAUL LAMPSON CONTROL FABRIC RECORD PLANS AND ARE NOT NECESSARILY INDICATIVE OF U) HAY BALES FLOW DIRECTION UNDERGROUND CONDITIONS EXISTING GROUND 3) THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING AND 20 DETERMINING THE LOCATION, SIZE AND ELEVATION OF ALL ���� � � \rs8 � EXISTING UTILITIES, SHOWN OR NOT SHOWN ON THESE PLANS, PRIOR TO ANY CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED — _ IN WRITING OF ANY U77LI77ES FOUND INTERFERING WITH THE j4 PROPOSED CONSTRUCT70M AND APPROPRIATE REMEDIAL AC77ON ►� NIF / LOT AII I II I II I�II i I II BEFORE PROCEEDING WITH THE WORK. DONALD BLAIS 0 16,5701 SF. — UNDISTURBED SUBGRADE 12 = I I II = I I II 4) THIS PLAN IS BASED ON THE REFERENCED PLANS, DEEDS r AND THE RESULTS OF A FIELD SURVEY AS OF THIS DATE l / NO CERTIFICATION IS INTENDED AS TO PROPERTY T77LE T §3,74, / / OR AS TO THE EXISTENCE OF UNWRITTEN OR UNRECORDED V1 ION OF POSSIBLE TION EASEMENTS OORDINATE RELOC CONTRACT RTO DETERSIVE AND SALEM• 1 IN CROSSING CITY OF WATECM SARY WITH THE NE N 16' r6 _ N I ROOF RECHARGE AREA R OF RECHARGE AREA 1i U! die PROP D 10 \ A DETAIL: No Scale p LLINO I 1 _—p9P DGRINDER P MP (T PI L E G E N D v . PROP. ATER �=20.0 '�� PA KAG 3! I— _ E RIVBO BOUNDARY PLAN r6 0 o I cl SMH EXISTING SEWER MANHOLE N N I �ROpOSED I I o DMH EXISTING DRAIN MANHOLE 1 ft00F RECHARGE MIN. 1 INSPECTION PORT �, I pWELL1N0 10 I 'S AREA r TO FINISH GRADE Ill EXISTING CATCH BASIN 16 / ' l 1-If4' F RCE s�� FM I FFF = 17 0 �I I _ O rna EXISTING HYDRANT EXISTING WATER GATE 100 — EXISTING CONTOUR _ _ � DRIVEWAY _ \ \ < n — ; PRO OS D :h4" C TO DOWNSPOUTS 100.00 EXISTING SPOTGRADE WPRO ERVICE NICAL) -c- c UTILITY POLE 14 x a I o ^ RETAINING WALL m 0000�0000 STONE WALL ALL UTILITY SERVICE INSTALLATION SHALL BE IN T-3 Z D � � % CURB I ACCORDANCE WITH THE REQUIREMENTS OF THE �� I I 2 fT1 4 - STORMTECH SC-310 CHAMBERS FENCE UTILITY AGENCY HAVING AUTHORITY. y IN AN 8' 8Y 16' STONE LINED 12 \ A o 1 142.74' �� -1 EXCAVATION 3 � ��_ � -�• �U0 PROPOSED CONTOUR z / gCTOR Y m 3 OUTLINE FO — �s�T FENCE `0 SECTION ;100x0 PROPOSED SPOT GRADE RME�,Ro OS \ C PROPOSED 1 N GEOTEXTiLE FABRIC 0 0 � � LINED EXCAVATION It I _ _ — — II 4" LOAM AND SEED woSIDE REAL-" TRUST MI te• N \ RIVER To se'MAx z• +• INLET STORMTECH SC-310 CHAMBERS ASSESSORS MAP 36 POR770M OF PARCEL 87 100 FT. BUFFER ZONE BOUNDARY 6• DEED REFERENCE.- BOOK 21260 PAGE 316 00 ' 00 o o 2' Min. 1 1/2" TO 3• WASHED STONE PLAN REFERENCE. PLAN BOOK 368 PLAN 34 ' --�- LOT B EST S.H.W.T. OWNER OF RECORD : COUSINS REALTY TRUST EST. S.H.W.T. AT T-3 = 4.5 BOTTOM STONE R.A. 'A' = 10.0 BOT-TOM STN . R.A. 'B'= 8.5 SITE DEVELOPMENT PERMIT PLAN OF LAND OCA TED IN M . B . T. A �; SALEM , MASS . PREPARED BY _ MEAN HIGH WATER Locus MAP �_�- - - -__ ___ � _-- - - _ EASTERN LAND SURVEY ASSOCIATES, INC. CHRISTOPHER R. MELL 0, PLS NORTH R 1 V E F? 104 104 LOWELL ST. PEABODY, MA 01960 ( TIDAL ) Rr1 C P ' (978) 531 -8121 , SCALE: 1 20 DECEMBER 1 , 2003 FLOOD N c r vp EBB 13 F,t� _ vvv o ' - Na 3131D LL 0 10 20 40 60 80 J pC ET c a A F 10321