64-335 - 9 PARALLEL STREET - CONSERVATION COMMISSION N��. �. ���ue� �. Ga�.3�5
' i- �_ - `_`- -�- -
y
C
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands 64-335
WPA Form 5 - Order of Conditions Provided by DEP
�w
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
D. Recording Information (cont.)
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
To:
Salem
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
9 Parallel Street 64-335
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
for:
Property Owner
and has been noted inte chain of title of the affected property in:
io
Book Page
In accordance wit the Or er of Conditions issued on:
��a� �o�
Date
If recorded land, the instrument number identifying this transaction is:
a�g
Instrument Number
If registered land, the document number identifying this transaction is:
a
ericant
NPA Form 5
Rev,02100 Page]or]
l
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection -Wetlands 64-335
WPA Form 5 - Order of Conditions Provided by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. General Information
Important:
When filling From:
out forms on Salem
the computer, Conservation Commission
use only the
tab key to This issuance if for(check one):
move your
cursor-do ® Order of Conditions
not use the
return key. ❑ Amended Order of Conditions
'Q To: Applicant: Property Owner(if different From applicant):
Chris Kinnon Same
Name Name
9 Parallel Street
Mailing Address Mailing Address
Salem MA 01970
City/Town State Zip Code City/Town State Zip Code
1. Project Location:
9 Parallel Street Salem
Street Address City/Town
Map 23 Parcel 0141
Assessors Map/Plat Number Parcel/Lot Number
2. Property recorded at the Registry of Deeds for:
Essex 3361 324
County Book Page
NA
Certificate(if registered land)
3. Dates:
May 30, 2002 July 11, 2002 July 11, 2002
Date Notice of Intent Filed Date Public Hearing Closed Date of Issuance
4. Final Approved Plans and Other Documents (attach additional plan references as needed):
Conservation Plan for Chris Kinnon at 9 Parallel Street in Salem, MA 5/2/02
Title Date
5. Final Plans and Documents Signed and Stamped by:
Bruce P. Eaton
Name
6. Total Fee:
$110.00
(from Appendix B:Wetland Fee Transmittal Form)
NPA Form 5 Page i of 7
Rev.02/00
Massachusetts Department of Environmental Protection DEP rile Number:
Bureau of Resource Protection - Wetlands 64-335
WPA Form 5 - Order of Conditions Provided by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings
Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information provided in
this application and presented at the public hearing, this Commission finds that the areas in which work is
proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply:
❑ Public Water Supply ❑ Land Containing Shellfish ® Prevention of Pollution'
❑ Private Water Supply ❑ Fisheries ® Protection of Wildlife Habitat
❑ Groundwater Supply ❑ Storm Damage Prevention ® Flood Control
Furthermore, this Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
® the following conditions which are necessary, in accordance with the performance standards set forth
in the wetlands regulations, to protect those interests checked above. This Commission orders that all
work shall be performed in accordance with the Notice of Intent referenced above, the following
General Conditions, and any other special conditions attached to this Order. To the extent that the
following conditions modify or differ from the plans, specifications, or other proposals submitted with
the Notice of Intent, these conditions shall control.
Denied because:
❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland
regulations to protect those interests checked above. Therefore, work on this project may not go
forward unless and until a new Notice of Intent is submitted which provides measures which are
adequate to protect these interests, and a final Order of Conditions is issued.
❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect
of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project
may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient
information and includes measures which are adequate to protect the Act's interests, and a final
Order of Conditions is issued. A description of the specific information which is lacking and why it is
necessary is attached to this Order as per 310 CMR 10.05(6)(c).
General Conditions (only applicable to approved projects)
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory
measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any
injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
WPA Form 5 Page 2 or 7
Rev.02100
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands 64-335
WPA Form 5 - Order of Conditions Provided by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings (cont.)
4. The work authorized hereunder shall be completed within three years from the date of this Order
unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years, but less
than five years, from the date of issuance. If this Order is intended to be valid for more than three
years, the extension date and the special circumstances warranting the extended time period are
set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse,
rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard,
pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing.
7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such
an appeal has been taken, until all proceedings before the Department have been completed.
8. No work shall be undertaken until the Order has become final and then has been recorded in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title
of the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to
be done. In the case of the registered land, the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done. The recording
information shall be submitted to this Conservation Commission on the form at the end of this Order,
which form must be stamped by the Registry of Deeds, prior to the commencement of work.
9. A sign shall be displayed at the site not less then two square feet or more than three square feet in
size bearing the words,
"Massachusetts Department of Environmental Protection" [or, WA DEP"]
"File Number 64-335
10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the
Conservation Commission shall be a party to all agency proceedings and hearings before DEP.
11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of
Compliance (WPA Form 8A)to the Conservation Commission.
12. The work shall conform to the plans and special conditions referenced in this order.
13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the
Conservation Commission in writing whether the change is significant enough to require the filing of a
new Notice of Intent.
14. The Agent or members of the Conservation Commission and the Department of Environmental
Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours
to evaluate compliance with the conditions stated in this Order, and may require the submittal of any
data deemed necessary by the Conservation Commission or Department for that evaluation.
WPA Forth 5 Page 3 of 7
Rev.02/00
Massachusetts Department of Environmental Protection DEP File Number.
Bureau of Resource Protection - Wetlands 64-335
Y WPA Form 5 - Order of Conditions Provided by DEP
e Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings (cont.)
15. This Order of Conditions shall apply to any successor in interest or successor in control of the
property subject to this Order and to any contractor or other person performing work conditioned by
this Order.
16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland,
the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden
stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a
Certificate of Compliance has been issued by the Conservation Commission.
17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully
stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or
water body. During construction, the applicant or his/her designee shall inspect the erosion controls
on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately
control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission, which reserves the right to require additional erosion and/or damage prevention controls
it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
Special Conditions (use additional paper, if necessary):
See Attached
Findings as to municipal bylaw or ordinance
Furthermore, the Salem hereby finds (check one that applies):
Conservation Commission
❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal
ordinance or bylaw specifically:
Name Municipal Ordinance or Bylaw
Therefore, work on this project may not go forward unless and until a revised Notice of Intent is
submitted which provides measures which are adequate to meet these standards, and a final Order of
Conditions is issued.
❑ that the following additional conditions are necessary to comply with a municipal ordinance or bylaw,
specifically:
Name Municipal Ordinance or Bylaw
The Commission orders that all work shall be performed in accordance with the said additional
conditions and with the Notice of Intent referenced above. To the extent that the following conditions
modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent,
the conditions shall control.
WPA Form 5
Rev,02/00 Page 4 of 7
lugMassachusetts Department of Environmental Protection DEP File Number.
Bureau of Resource Protection - Wetlands 6k -335
WPA Form 5 - Order of Conditions Provided by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings (cont.)
Additional conditions relating to municipal ordinance or bylaw:
This Order is valid for three years, unless otherwise specified as a special condition pursuant to General
Conditions#4, from the date of issuance.
Date
This Order must be signed by a majority of the Conservation Commission. The Order must be mailed by
certified mail (return receipt requested)or hand delivered to the applicant. A copy also must be mailed or
hand delivered at the same time to the appropriate Department of EuXironmental Protection Regional
Office (see Appendix A) and the property owner(if different fro appf airy-
Signatures: J
On Of
Day Month and Y air
before me personally appeared
tb,me known to be the person described in and who executed the foregoing instrument and
actino ged that h Is e�q d t e cutesame as his/her free act and deed.
J N/�—
Notary Public My Commission n Expirest
This Order is issued to the applicant as follows:
❑ by hand delivery on )<by certified mail, return receipt requested, on
Date Date
WPA Form 5
Rev 02= Paga 5 of 7
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection -Wetlands 64-335
WPA Form 5 - Order of Conditions Provided by DEP
arvC4
�4 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject
to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of
their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions.
The request must be made by certified mail or hand delivery to the Department, with the appropriate filing
fee and a completed Appendix E: Request of Departmental Action Fee Transmittal Form, as provided in
310 CMR 10.03(7)within ten business days from the date of issuance of this Order. A copy of the request
shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to
the applicant, if he/she is not the appellant.
The request shall state clearly and concisely the objections to the Order which is being appealed and how
the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands
Protection Act, (M.G.L. c. 131, §40) and is inconsistent with the wetlands regulations (310 CMR 10.00).
To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts
Wetlands Protection Act or regulations, the Department has no appellate jurisdiction.
D. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located, within the chain of title of the affected property. In the case of recorded land, the
Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land
subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court
Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information
on Page 7 of Form 5 shall be submitted to the Conservation Commission listed below.
Salem
Conservation Commission
WPA Farm 5
Rev,02/00 Page 6 of 7
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands 64-335
WPA Form 5 - Order of Conditions Provided by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
4
D. Recording Information (cont.)
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
To:
Salem
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
9 Parallel Street . 64-335
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
for:
Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
WPA Forth 5
Page 7 of 7
Rev.02/00
Salem Conservation Commission
SPECIAL CONDITIONS—DEP FILE #64-335
Chris Kinnon,9 Parallel Street
1. The Conservation Agent will be notified 48 hours prior to commencement of construction activities(978-745-
9595 ext. 311). Members and agents of the Salem Conservation Commission(Commission)shall have the right
to enter and inspect the premises to evaluate and ensure compliance with the conditions and performance
standards stated in this Order,the Notice of Intent,the referenced plans,the Act,and 310 CMR 10.00,and may
require any information,measurements,photographs,observation and/or materials or may require the submittal
of any data or information deemed necessary by the Commission,agent,or DEP determines that any of the
work is not in compliance with this Order of Conditions. Work shall not resume until the Commission is
satisfied that the work will comply,and has so notified the applicant in writing.
2. Approval of this application does not constitute compliance with any law or regulation other than MGL Chapter
131, Section 40,and Wetlands Regulations 310 CMR 10.00.
3. This Order shall apply to any successor in control or successor in interest of the property described in the Notice
of Intent and accompanying plans. These obligations shall be expressed in covenants in all deeds to succeeding
owners or portions of the property.
4. The form provided at the end of this Order shall be completed and stamped at the Registry of Deeds after the
expiration of the 10-day appeal period and within 30 days of the issuance if no request for appeal has been filed
with the Department of Environmental Protection. This form shall be returned to the Commission within 21
days of recording accordance and prior to commencement of any activities subject to the Order of Conditions.
5. Prior to any work commencing,a sign shall be displayed showing DEP file#64-335, and not placed on a living
tree.
6. The term"Applicant'as used in this Order of Conditions shall refer to the owner, any successor in interest or
successor in control of the property referenced in the Notice of Intent, supporting documents and this Order of
Conditions. The Commission shall be notified in writing within 30 days of all transfers of title of any portion of
the property.that takes place prior to issuance of the Certificate of Compliance.
7. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and
approvals associated with this project. These permits may include but are not necessarily limited to the
following:
(1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816),U.S.Army Corp of
Engineers.
(2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of sec.
27(5)of Chapter 21 of the Massachusetts General Laws as codified
(3) Flood Plain
(4) Grading Ordinance
8. If there are conflicting conditions within this Order, the stricter condition(s)shall rule.
9. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters
during construction or after completion of the project.
10. The Commission and its Administrator shall have the discretion to modify the erosion/siltation control methods
and boundary during construction if necessary.
11. All work shall be performed in accordance with this Order of Conditions and approved site plans(s). No
alteration of wetland resource areas or associated buffer zone, other than that approved in this Order,shall occur
on this property without prior approval from the Commission.
12. If any changes are made in the above-described plan(s)which may or will alter an area subject to protection
under the Wetlands Protection Act,or any changes in activity subject to regulations under G.L. Ch. 131,Section
40,the applicant shall inquire from this Commission in writing,prior to their implementation in the field,
whether the change(s)is significant enough to require the filing of a new Notice of Intent. Any error in the
plans or information submitted by the applicant shall be considered changes and the above procedures shall be
followed. A copy of such request shall at the same time be sent to the Department of Environmental Protection.
13. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has been
issued,the applicant or current landowner shall submit to the Commission a signed statement by the buyer that
he/she is aware of an outstanding Order of Conditions on the property and has received a copy of the Order of
Conditions.
14. Conditions number 50&53 as indicated shall continue in force beyond the Certificate of Compliance,in
perpetuity, and shall be referred to in all future deeds to this property.
PRIOR TO CONSTRUCTION
15. Prior to commencement of any activity on this site,there shall be a PRECONSTRUCTION MEETING
between the project supervision;the contractor responsible for the work or its administrator to and phone
numbers of all responsible parties shall be registered with the Commission at the pre-construction meeting.
16. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and erosion
control barriers shall be installed as shown on the approval plan(s)and detail drawings. The Commssion and/or
its Administrator shall inspect and approve such installation at the pre-construction meeting.
17. Prior to the commencement of any activity on this site,the applicant or current landowner shall submit to the
Commission in writing a construction schedule/sequence of work to complete this project.
18. Prior to any work on site,the proposed limits of work shall be clearly marked with stakes or flags and shall be
confirmed by the Commission or its Administrator. Such markers shall be checked and replaced as necessary
and shall be maintained until all construction is complete. Workers shall be informed that no use of machinery,
storage of machinery or materials,stockpiling of soil or construction activity is to occur beyond this line at
anytime.
19. Prior to commencement of construction on site,the limits of wetland resource areas closest to construction
activity shall be flagged with surveyor's tape and shall remain in place during construction. The limits of areas
to be impacted and the limits of work in the replication area(s)shall be clearly flagged.
20. There shall be 12 hay bales and wooden staked stored under cover on the site to be used only for emergency
erosion control.
EROSION CONTROL
21. Appropriate erosion control devices shall be in place prior to the beginning of any phases of construction,and
shall be maintained during construction in the wetland areas and buffer zones. The erosion control specification
provided in the Notice of Intent and the erosion control provision in the Order will be the minimum standards
for this project;additional measures may be required by the Commission.
22. All debris,fill and excavated material shall be stockpiled a location far enough away from the wetland resource
areas to prevent sediment from entering wetland resource areas.
23. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as
necessary. Any accumulated silt adjacent to the barriers shall be removed.
24. The areas of construction shall remain in a stable condition at the close of each construction day.
25. Any de-watering of trenches or other excavations required during construction shall be conducted so as to
prevent siltation of wetland resource areas. All discharges from de-watering activities shall be filtered through
haybale sediment traps, silt filter bags or other means approved by the Commission or its Administrator.
26. Within thirty days of completion of construction on any given portion of the project,all disturbed areas in the
completed portion of the site shall be permanently stabilized with rapidly growing vegetative cover,using
sufficient top soil to assure long-term stabilization of disturbed areas.
27. If soils are to be disturbed for longer than two months,a temporary cover of rye or other grass should be
established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,exposed
surfaces shall be stabilized by other appropriate erosion control measures,firmly anchored,to prevent soils
from being washed by rain or flooding.
DURING CONSTRUCTION
28. A copy of the Order of Conditions,construction plans,and copies of the documents and reports cited in
Condition# 11,shall be on the site upon commencement and during any site work for contractors to view and
adhere to.
29. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as
necessary. Any accumulated silt adjacent to the barriers shall be removed.
30. Only clean fill, free of masonry,stumps,asphalt,and any other kind of waste material shall be used on the site.
31. All waste products, grubbed stumps,slash; construction materials, etc. shall be deposited at least 100 feet from
wetland resource areas and 200 feet from rivers.
32. All filling or removal of waste material from the site shall be done in accordance with the regulations of the
City of Salem Health Department.
33. Cement trucks shall not be washed out in any wetland resource or buffer zone area. Any deposit of cement or
concrete products into a buffer zone or wetland resource area shall be removed by hand.
34. No fuel, oil,or other pollutants shall be stored in any resource area or the buffer zone thereto,unless specified
in this Order of Conditions.
35. There shall be no pumping of water from wetland resource areas.
36. During construction,all drainage structures shall be inspected regularly and cleaned as necessary.
37. Immediately following drainage structure installation,all inlets shall be protected by silt fence,hayblae barriers
and/or silt bags to filter silt from stormwater before it enters the drainage system.
38. The project shall not cause an increase in run-off onto adjacent properties,either during construction or when
completed.
39. The applicant is hereby notified that failure to comply with all requirements herein may result in the issuance of
enforcement actions by the Conservation Commission including,but not limited to,civil administrative
penalties under M.G.L. Chapter 21A,section 16.
POST CONSTRUCTION
40. All disturbed areas, slopes and proposed landscape areas shall be loamed and seeded or stabilized through the
use of erosion control blankets or other approved means. All disturbed areas will be graded,loamed,and
seeded prior to November 1 of each year, if possible. No disturbed areas or stockpiled material will be left
unprotected or without erosion controls during the winter.
41. Upon completion of construction,the applicant or current landowner shall submit the following to the
Commission to request a Certificate of Compliance:
(1) A letter requesting a Certificate including the following information:
a. Name and address of current landowner;
yS
I 1
b. Name and address of the individual/trust or other entity to whom the Certificate is to be issued:
c. Street address and lot number for the project; and
d. DEP file number
(2) A letter from a Registered Professional Engineering or Land Surveyor certifying compliance of the
property with this Order of Conditions
(3) An"As-Built'plan signed and stamped by a Registered Professional Engineer showing post-construction
conditions and:
a. As-built elevations of all drainage ways constructed within 100 feet of any wetland resource area;
b. As-built elevations and grades of all filled or altered wetland resource areas,buffer zones and
replicated areas;and
c. Distances to all structures within 100 feet of any wetland resource area.
42. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds.
43. If the completed work differs from that in the original plans and conditions,the report must specify how the
work differs;at which time the applicant shall first request a modification to the Order. Only upon review and
approval by the Commission,may the applicant request in writing a Certificate of Compliance as described
above.
44. Erosion control devices shall remain in place and properly functioning until all exposed soils have been
stabilized with final vegetative cover and the Commission and/or its Administrator has authorized their
removal.
45. The following condition(s)shall extend beyond the Certificate of Compliance,in perpetuity,and shall
be recorded as such on the Certificate of Compliance and in all future deeds to this property:
PERPETUAL CONDITIONS
46. There shall be no dumping of leaves,grass clippings,trash or any kind of refuse in the resource area.
47. Herbicides shall not be applied within 100 feet of the any resource area.
48. No sodium-based products shall be used for control of ice or snow within 200 feet of the any resource area.
ADDITIONAL CONDITIONS
49. A French drain shall be installed to catch the roof runoff from the downspout located at the east comer of the
new building addition.
50. The pool shall be drained to Parallel Street and not directly into the wetland resource area/Rosies Pond.
51. Pool chemicals shall be stored in the confines of the basement of the resident.
52. A row of staked hay bale shall be installed as indicated on the plan entitled, "Conservation Plan for Chris
Kinnon at 9 Parallel Street in Salem,MA".
53. Grass clippings and or brush trimmings shall not be dumped into the wetland resource area/Rosies Pond.
Massachusetts Department of Environmental Protection DEP File Number:
Bureaw of Resource Protection - Wetlands
WP);A Form 3 — Notice of Intent Provided by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Towyn
A. General Information
Important:
When filling out t• Applicant:
forms on the —C RISi N a
computer, Use
only the tab Narme E-Mail Address(If applicable)
key to move, `t FA2ALLtL 5T'.
your cursor- Malting Address
do not use the At.-(---1 l
(j
return key. - cityirro+m State Zip Code
IC I Phone Number Fax Number(if applicable)
2. Representative(if any):
_
Finn[
Note: Confiact Name - E-Mail Address(if applicable)
Before -i UJ IUTFQ g-TR6w
completing this Madring Address
form consult ?eA5 OV>X KA
Conde altiOn C�/Town - State Zip Code
Commission teller, 531- 19 9�8- h31 - SSo 1
regarding any Phone Number Fax Number(If applicable)
municipal bylaw
or ordinance. 3. Property Owner(if different from applicant):
SAM,)_
Nave
Marling Address
City/Town State Zip Code
4. Total Fee:
m on
(from Appendix B:Wetland Fee Transmittal Form)
5. Project Location:
9 PAr2ALLG1- ST SALFrrl
Street Address City(Toan
Assessors Map/Plat Number Parcel/Lot Number
6. Registry of Deeds:
c>`u 33(0 '3
County Book Page
Certificate(if Registered Land)
WPA Form 3 Peg.1 of e
x
Massachusetts.-Department of Environmental Protection PEP_File Num_ ber:
Bureau of Resource Protection - Wetlands
WPA Form 3 - Notice of Intent Provided by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Tam
A. General Information (cont.)
7. Summary of Project Impacts:
a. Is any work being proposed in the Buffer Zone?
Yes If yes, how many square feet?
11DyD ST:
❑ No
b. List the impacts of proposed activities on each wetland resource areas (temporary and permanent
impacts, prior to restoration and mitigation):
Resource Area Size of Impact (e.g., sq. ft.)
CrFa2 70 PJ �lo`io S F
B. Project Description
1. General Project Description:
(ow,riucl)vo 9T t-loin /W)D17to'� Dhcr AN
PD 0
2. Plan and/or Map References:
3 ` (UR)St=.qVATtoPi EL_ IJ t7oa S-Z- o2
-� TQle Date
C�Irts
a ,.
WPA Form 3 Page 2 of 8-
Rav O9tt10
Massachusetts-Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 3 - Notice of Intent Provided by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town
C. Activities Subject to Regulation
1. a. Check the applicable resource areas if work is to be conducted in an associated Buffer Zone:
Inland Resource Areas Coastal Resource Areas
❑ Inland Bank ❑ Coastal Beach E] Barrier Beach
Bordering Vegetated Wetland (BVW) ❑ Rocky Intertidal Shore ❑ Coastal Dune
❑ Salt Marsh ❑ Coastal Bank
b. Complete for all proposed activities located, in whole or in part, in Wetland Resource Area(s).
Inland Resource Areas:
Bordering Vegetated Wetlands: Bordering Land Subject to Flooding:
t
Square Feet altered Volume of Flood Storage Lost(cubic feet)
Square Feet replaced Volume of Flood Storage Compensation(cubic feet)
Land Under Water Bodies: Isolated Land Subject to Flooding:
Square Feet altered Volume of Flood Storage Lost(cubic feet)
' Cubic Yards dredged Volume of Flood Storage Compensation(cubic feet)
Bank:
Linear Feet altered
Coastal Resource Areas:
x
Coastal Dune: Land Under Salt Pond:
Square Feet altered Square Feet altered
Cubic Yards/Volume removed Cubic Yards dredged
Salt Marsh: Rocky Intertidal Zone:
Square Feet altered Square Feet altered
Coastal Bank: Designated Port Area:
Linear Feet altered Square Feet altered
"A Forth 3 age 3 of 8
RAV mmn
4 '
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 3 - Notice of Intent Provided by DEP
4 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town
C. Activities Subject to Regulations (cont.)
*, Fish Run: _ Land Containing Shellfish:
Linear Feet altered Square Feet altered
Land Subject to Coastal Storm Flowage: Beach:
- - Square Feet altered Square Feet altered
Land Under Ocean:
-` - Square Feet altered - -
Cubic Yards dredged
Riverfront Area:
a. Name of Waterway (if available):
b. Width of Riverfront Area(check one):
❑ 25 ft. - Designated Densely Developed Areas only
❑- 100 ft. - New agricultural projects only
w w
❑ 200 ft. -All other projects
C. Describe how the Mean Annual High-Water Line was determined:
d. Distance of proposed activity closest to the Mean Annual High-Water line:
. Feet . . . .
ILe. Total area of Riverfront Area on the site of the proposed project:
Square Feet
f. Proposed alteration of the Riverfront Area:
Total Square Feet Square Feet within 100 ft. Square Feet between 100 R and 200 ft.
•WPA Fom 3 4age 4 of a
Rev 02M
Massachusetts Department-of Environmental Protection ._ DEP File Number:
Bureau of Resource Protection -Wetlands
WPA Form 3 - Notice of Intent Provided by DEP
3` Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Tmn
C. Activities Subject to Regulation (cont.)
2. Check all methods used to delineate the Bordering Vegetated Wetland (BVW) boundary:
❑ Final Order of Resource Area Delineation issued by Conservation Commission or DEP(attached)
❑ DEP BVW Field Data Form (attached)
❑ Fi al Determination of Applicability issued by Conservation Commission (attached)
z7her ethods for Determining the BVW boundary (attach documentation):
50% or more wetland indicator plants
❑ Saturated/inundated conditions exist
❑ Groundwater indicators
❑ Direct observation
Er Hydric soil indicators
❑ Credible evidence of conditions prior to disturbance.
3. a. Is any portion of the proposed project located in estimated habitat as indicated on the most
recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural
Heritage and Endangered Species Program?
❑ Yes If yes, include proof of mailing or hand delivery of NO] to :
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
Route 135, North Drive
Westborough, MA 01581
Er No
Date of Map
b. Is an portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
YP P P
❑ Yes If yes, provide name of ACEC (see Appendix D for ACEC locations):
EKNo
c. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Restriction Act(M.G.L. c. 131, §40A)or the Coastal Wetlands Restriction Act(M.G.L. c. 130, § 105)?
❑-1 Yeses
* Ly No
WPA Foem 3 - Page 5 of 8
Rev 091M
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 3 - Notice of Intent Provided by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Tam
D. Performance Standards
1. Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR
10.24 or 310 CMR 10.53?
❑ Yes If yes, describe which limited project applies to this project:
D"No
2. Is any activity within any Resource Area or Buffer Zone exempt from performance standards of the
wetlands regulations, 310 CMR 10.00.
❑ Yes If yes, describe which exemption applies to this project:
Lr' No
3 a. Is the project located in the Riverfront Area?
❑ Yes If yes, indicate the proposed project purpose:
❑ Single Family House ❑ Industrial Development
❑ Residential Subdivision ❑ Commercial Development
❑ Transportation ❑ Other(describe)
❑ b. Was the lot where the activity is proposed created prior to August 1, 1996?
19 Yes
❑ No
4. a. Describe how the project will meet all performance standards for each of the resource areas
altered, including standards requiring consideration of alternative project design or location. Attach
narrative and supporting documentation.
b. Is this project exempt from the DEP Stormwater Policy?
Yes If yes, explain why the project is exempt:
1;ip6Lri FnTIL/ O's
❑ No If no, stormwater management measures are required. Applicants are encouraged to
complete Appendix C: Stormwater Management Form and submit it with this form.
WPA Form 3 Page 6 of 8
R. 09100
DEP File Number:
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 3 - Notice of Intent Provided by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town
E. Additional Information
Applicants must include the following with this Notice of Intent(NOI):
• USGS or other map of the area(along with a narrative description, if necessary), containing sufficient
information for the Conservation Commission and the Department to locate the site.
• Plans identifying the location of proposed activities(including activities proposed to serve as a
Bordering Vegetated Wetland (BVW) replication area or other mitigating measure) relative to the
boundaries of each affected resource area.
• Other material identifying and explaining the determination of resource area boundaries shown on
plans (e.g., a DEP BVW Field Data Form).
• List the titles and final revision dates for all plans and other materials submitted with this NOI.
F. Fees
The fees for work proposed under each Notice of Intent must be calculated and submitted to the
Conservation Commission and the Department(see Instructions and Appendix B. Wetland Fee
Transmittal Form).
No fee shall be assessed for projects of the federal government, the Department, or cities and towns of
the Commonwealth.
Applicants must submit the following information (in addition to pages 1 and 2 of Appendix B)to confirm
fee payment:
Check Number Check date
Payor name on check Applicant name(if different from payor)
G. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying
plans, documents, and supporting data are true and complete to the best of my knowledge. I understand
that the Conservation Commission will place notification of this Notice in a local newspaper at the
expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the
requireme M.G.L. c. 131, §40. Notice st be made in writing by hand delivery or certified mail
(return cei equested)to all abu ers wit ' 100 feet of the property line of the project location.
'Sygriure of Applicant Date
Signature of Property=� �Owner(ifdifferent) Date
n `�— (o •-02
Signature of Repnmentati��P bhyyY Date
_WPA Forma Page 7 of
Rav 091M
Massachusetts Department of Environmental,P.rotection DEP File Number:
Bureau of Resource Protection - Wetland's
WPA Form 3 - Notice of Intent ProWed by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Twn
G. Signatures and Submittal Requirements (cont.)
For Conservation Commission:
Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents; two
copies of pages 1 and 2 of Appendix B; and the city/town fee payment must be sent to the Conservation
Commission by certified mail or hand delivery.
For DEP:
Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents; two
copies of pages 1 and 2 of Appendix B; and a copy of the state fee payment must be sent to the DEP
Regional Office(see Appendix A) by certified mail or hand delivery.
Other:
If the applicant has checked the"yes"box in any part of Section C, Item 3, above, refer to that section
and the Instructions for additional submittal requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely
manner may result in dismissal of the Notice of Intent. .
WPA Form 3 Page 8 d 8
Rav n2M
_/..CHRISTOPHER KINNON10'7 3.
-DIANNE L.KINNON DATE
7 -9PARALLEL ST
SALEM,MA 01970 53-8390/2113
PAY TO TH
ORDER OFE /d/" � ' ! / LSC JS• I `✓ (CT//�V
ZJYL V W C5 G t� S.B""3pab
,. NORTHERN MASSACHUSETTS ACH RfT:21 01 ACH ACCT:44882
TELEPHONE WORKERS'
CREDIT UNION
3 L1O-WELL,MA55ACHUSETi50t85t
MEMO.
1: 2 L L 38390 L1: 4488 20 LII' 1073
_/ CHRISTOPHER KINNON 1074
DIANNE L.KINNON DATE �� � +
(7/ 9PARALLEL ST
SALEM,MA 01970 53.8390/2113
PAY TO TH
�
'
ORDER OFE 1 O S
B
- DOLLARS '°-
t.. NORTHERN MASSACHUSETTS® A 211383901 ACH ACCT:4488
TELEPHONE WORKERS'CREDIT UNION
5 LOW ELL,MASSPOHUSEi 501051
J\�
.� MEMO � �^" .__.._....__ ._.__.._.
1: 2LL38390Li: 448820 L+I' L074 }
Notification to Abutters Under the
Massachusetts Wetlands Protection Act
In accordance with the second paragraph of Massachusetts General Laws chapter 131, section 40, you are
hereby notified of the following:
A. The name of the applicant is ' C Y R 1.3 k/A/.y&V
B. The applicant has filed a Notice of Intent with the Conservation Commission for the municipality of
C.-r7y F r4 t a ro seeking permission to
remove, fill, dredge or alter an Area Subject to Protection Under the Wetlands Protection-Act) ,
General Laws Chapter 131, section 40).
C. The address of the lot where the activity is proposed is 9' R.r A J!e L sT- S9 14--7 ^ig
D. Copies of the Notice of Intent may be examined at c Ec e q,,A SN R vQ y 02-r_ Pic . 7 41i ro T�4
Sr, P26S0dy , IAZA x
T '
between the hours of 9 4 1 and y 0^9 on the following days of the week.
- lYdna<44 � �/Zr 096
For more information, call:'(4-7&) S'31 ►! 41
Check one: This is the applicant( ), representative 1�O , or other( ) (specify):
E. Copies of the Notice of Intent may be obtained from either(check one)the applicant( ) or the
applicant's representative( ), by calling this telephone number between
the hours of and on the following days of the week:
F. Information regarding the date,time, and place of the public hearing may be obtained from
by calling this telephone number between the hours of and
on the following days of Sne week
Check one: This is the applicant ( ) , representative( ), or other( ) (specify):
NOTE: Notice of the public hearing, including its date, time, and place, will be published at least five (5) days in
advance in the S'4le--J New c
NOTE: Notice of the public hearing, including its date, time and place, will be posted in the City or Town Hall not less
than forty-eight(48) ]tours in advance.
NOTE: You also may contact your local Conservation Commission or the nearest Department of Environmental
Protection Regional Office for more information about this application or the Wetlands Protection Act.
To contact DEP, call:
Central Region: 508-792-7650 Northeast Region 978-661-7600
Southeast Region: 508-946-2800 WesternRegion 413-784-1100
Name and 7 winter St. suite ♦ Indicate type of mail Check appropriate block for Affix sump here if issued as
Address fwbig"J+ ASA. Registered Return Receipt Registered Mail: certificate of mailing or for
of Sender 01 60 Insured for Merchandise additional copies of this bill. +
COD ❑Int'I Recorded Del. �With Postal Insurance
Certified U Express Mail fR Without Postal Insurance Postmark and Date of Receipt
(Line Article Name of Addressee,Street,and Post Office Address Postage Fee Handling Act.Value Insured Due Sender R.R. S.D. S.H. Rest.Del.Fee
Number Charge If Regis.) Value It COD Fee Fee Fee Remarks
1 7001 0320 000 LtOhq�sF CM.ctr-t
( • 2 hKI Z 3P ,t J/•E S7• S4L� o /f70
2 700 163zo 000.) X4-vt4 r Togiq
S16yf - 2$35- g3 2 8. "J ST 04NViA-i o/923
3 7uo/ -o3io oco3 pb Lt„ r- wY„4/{ / (3y,A /FgVe1
S6Yj 28zb /7 Cac rT iVgbs T o/9: y
loo/ o32o.ccx3 33s J.yta„y Rc.fr7 TRK Y
4 Sb YS 2&11 / n/AIJ+ t O.t s94 . 01970
700/ 0320.00113 1384 cQ Coulc4j
b S6YS. 28eY Por NclJr- S41r.4, 0/ 1/70
70 off - 0 3 20 -Lw 04//.r.Tr t. fir++•/7 T-<a b r
5 SG4s Z)9 f! 6 e4liac sr sa4 . ursrro
7 7100!-0320-000 P)otet F/n 5Cr2 Pr0Y2
a/ac FJ-
81-7o')'-G32d
r87o01-a32d.-0003 j4Jon- CYrrTti.w t7/ #2 t7
SYS% a77Y io PA0*41L Jr .rnti.,, olt7a
700/^032d.Ltru3 -TAeac Vr4104gc'.A.l
9 bYi- a767 /z P4v414t .rr S4U..„, or97o
10 76ol -0210-•0003 4Jlf/ty J7rculc ynrg5r <L-r7 7�e+,Jr
S�YJ- a?Y3 / v 4rty: sr S��.ry o�97a
11 70ol-D32o-cW3 OAV.0 / 0/qhs A7e,eS
wr- a7N6 7 04rta//r.0 Sr J4.tO y 01970
7oal • 031J-COdD CHprt/cnt
12 9%VJ--�27';t /,p _Fe, >JC-ec 7a 67 IVe-4.;4 T- Of%O P
70o1 -032v -Oa3 F-Jtcri2 Aenl>) TRtilr
13 S6YS- a7f2 .28Y C41a4. Jr 044 ori70
-2001 .03'10- 0'301 OOn4/./- 74KL TLje�tl sv�/ ° <ar-/8ar 75ctr. r
14 Sc Yl-.1 Sb /i4ZQgyt�c/rxc Jr J 3(cM h� 0i97�
15Oe1-032,)-000 Z9/- SLF/'clJOh q-vt 2CTy T�C4 JY
SbYr• a7oS 39Y C+ -, col' 6vt S�}xycrJ"Yn 0190(0
Total Number of Pieces -Total Number of Pieces Postmaster, Per (Name of Receiving Employee) The lull declaration of value is required on all domestic and international registered mail.The maximum indemnity
Listed by Sender Received at Post Office payable for the reconstruction of nonnegotiable documents under Express Mail document reconstruction Insurance
is$50,000 per piece subject to a limit of$500,000 per occurrence.The maximum indemnity payable on Express
Mail merchandise insurance is$500.The maximum indemnity payable Is$25,000 for registered mail,sent with
optional postal insurance.See Domestic Mail Manual R900,5913,and 5921 for limitations of coverage an insured
and COD mail. See International Mail Manual for limitations of coverage on international mail.Special handling
charges appy only to third and fourth class parcels.. -
PS Form 3877,February 1994 Form Must be Completed by Typewriter,Ink or Ball Point Pen
. _......._-..,,, v-1v„vy r ypewriter,mK or tiara Point Pen
7 Winter St. Sti 4 Indicate type of marl ; Check appropriate block lot Affix stamphere if issued as
❑Registered ❑Return Receipt
.LG�O�fr MA. Registered Mail: - certificate of mailing or for
IM
Insured for Merchandise additional copies of this bill.
,der I 60 COD ❑Int'I Recorded Del. ❑With Postal Insurance
Certified ❑Express Mail ❑Without Postal Insurance Postmark and Date of Receipt
Line Article - Handling Act.Value Insured Due Sender R.R. S.D. S.H. Rest.Del.Fee
Number Name of Addressee,Street,and Post Office Address Postage Fee Charge If Re is. Value If COD Fee Fee Fee Remarks
700/-04u-oo0o GT7 df fry • ' c.ry ek t
1 S6Yr-o269 93 L-4r';' 7SP4 ff -r'*40", O/y7o
2
3
4
5
0
6
U
a
7
3 8
L
9
�.. 10
11
V 12
13
14
Y 15
^ total Number of Pieces Total Number of Piecespostmaster,Per (Name of Receiving Employee) The full declaration of value is required on all domestic and international registered mail.The maximum indemnity
I. .. Listed by Sender Received at Post Office payable for the reconstruction of nonnegotiable documents under Express Mail document reconstruction insurance
is$50,000 per piece subject to a limit of$500,000 per occurrence.The maximum indemnity payable on Express
Mail merchandise insurance is$500. The maximum indemnity payable is$25,000 for registered mail,sent with
optional postal insurance.See Domestic Mail Manual R900,S913.and 5921 for limitations of coverage on insured
and COD mail.See International Mail Manual for limitations of coverage on International mail.Special handling
charges apply only to third and fourth class parcels.
PS Form 3877,February 1994 Form Must be Completed by Typewriter,Ink or Ball Point Pen
S,
Q)
bt An
JI 0
`X�1
I
344 • INTI
LOCUS sw,a
LOCUS MAP
998.9
1
PARALLEL STREET
i
1 0.3 99.2 FE9 .4
X .
100 _
100.0 99.5 go, 98.2
99.5 8
0 9-IbRIVE -�
= WAY
EXIST DWELLING a T
w #g AvnrT►c� 'a�--CY)
`- •7 10! 97.1 LOT A
9 3 _
HEDGE 197.9 5• _` -
_ — _ _ I PROP o LOT B 1 Z
'n —31
DECK � 5,032 S.F. m ,
•4 PROPOSED
�? LO
POOL 15.0' x9 .4
+ c? w x 97.2 x 97.2 g l 0�w U14
+
2 ' 96.
PROPER —
x5:8- - �
96.2
— — WF-4 —g 896
G` X6.1
WF-3 WF-5
2 WEf1AND LINE
WF 1
SILT FENCE
Few
' x 97.8
a;
STAKED
HAY BALES
•f�, �-�V s;1,y
F— PROTECTED
RESOURCE
AREA —�
TOP OF
GROUND
..
GROUND 4NOTE: ESTABLISH TEMPORARY
SURFACEf EROSION CONTROL AT
LIMIT OF WORK UNLESS
EXTEND 8•• OF FABRIC INDICATED OTHERWISE
UNDER HAYBALES
CONSTRUCTION SPECIFICATIONS
1. BALES SHALL BE PLACED AT THE LOCATIONS SHOWN AT THE TOE OF A SLOPE ON
THE CONTOUR AND IN A ROW WITH ENDS TIGHTLY ABUTTING THE ADJACENT BALES.
2. EACH BALE SHALL BE EMBEDDED IN THE SOIL A MINIMUM OF FOUR (4) INCHES,
AND PLACED SO THE BINDINGS ARE HORIZONTAL.
3. BALES SHALL BE SECURELY ANCHORED IN PLACE BY TWO WOODEN STAKES DRIVEN
THROUGH THE BALE. THE FIRST STAKE SHALL BE DRIVEN TOWARD THE PREVIOUS
LAID BALE AT AN ANGLE TO FORCE THE BALES TOGETHER.
4. INSPECTION SHALL BE FREQUENT AND REPAIR OR REPLACEMENT SHALL BE MADE
PROMPTLY AS NEEDED.
5. CONTRACTOR SHALL REMOVE AND DISPOSE OF BARRIER AT COMPLETION of WORK REFERENCES:
AT NO ADDITIONAL COST.
ESSEX COUNTY REGISTRY
D ETA I BK: 3361 PAGE 324
TYPICAL SILT/FENCE HAYBALE BARRIER TITLE: BK: 10946 PAGE 551
NOT TO SCALE
I
CONSER VA TION PLAN
.for
CHRIS KINNON
a t
9 PARALLEL S TREE T
BRUCE P.
SATO •
12, .: Zn
SALEM, MA
GRAPHIC SCALE C .E . C . LAND SURVEYORS INC .
20 0 10 20 40 80G
MWE7 WINTER ST. (SUITE 3) PEABODY, MA 01960 (978) 531 - 1191
I r-73 K3 P. -•
V N
IN FEET 90 o SHEET NO: 1 OF 1 DATE 5-2-02 JOB NO: 1434
1 inch = 20 M ERS a
.yf
�� D RAW N BY: D P B
i
r
t :x
\
An v •—'
_
i
J f �
3440 INTE
LOCUS sw,a
- J
LOCUS MAP
l
inn - w
®98.9
PARALLEL STREET I
99.2
1 0.3
X .cu,98.4 _
100.0 99.5 go, 98.2
100
Li
99.5 , 8
0 9•(bRIVE I'L
= WAY 2°
v EXIST DWELLING
z #9 (\pvrl►o 15
uj
9 3 .7 i� 97.1 LOT A
- - HEDGE 197.9 5
98 I PROP o�n LST B z S
DECK
si -31 5,032 S.F. m
to •4 PROPOSED
POOL
6' LO 15.0' x9 .4
x97.2 x97.2
z �.
u- Hp,YBA�E LINE \2 '1 96.
PROpEFtTY x X5:8- - � i
96.2
X6.1 WF-4 94.896
I � WF-2
WF-3 UNE WF-5 f
WF-1 W�
i
SILT FENCE
i - - - -96
x 97.5 '
STAKED
•��, :•;,j,�� HAY BALES
i,
PROTECTED
RESOURCE
AREA
TOP OF
GROUND
1
4"
GROUND 1 NOTE: ESTABLISH TEMPORARY
SURFACE t EROSION CONTROL AT
LIMIT OF WORK UNLESS
EXTEND 8" OF FABRIC INDICATED OTHERWISE
UNDER HAYBALES I
i
CONSTRUCTION SPECIFICATIONS
1. BALES SHALL BE PLACED AT THE LOCATIONS SHOWN AT THE TOE OF A SLOPE ON I
THE CONTOUR AND IN A ROW WITH ENDS TIGHTLY ABUTTING THE ADJACENT BALES. !
i
2. EACH BALE SHALL BE EMBEDDED IN THE SOIL A MINIMUM OF FOUR (4) INCHES, j
AND PLACED SO THE BINDINGS ARE HORIZONTAL. j
3. BALES SHALL BE SECURELY ANCHORED IN PLACE BY TWO WOODEN STAKES DRIVEN
THROUGH THE BALE. THE FIRST STAKE SHALL BE DRIVEN TOWARD THE PREVIOUS
LAID BALE AT AN ANGLE TO FORCE THE BALES TOGETHER.
4. INSPECTION SHALL BE FREQUENT AND REPAIR OR REPLACEMENT SHALL BE MADE
PROMPTLY AS NEEDED.
5. CONTRACTOR SHALL REMOVE AND DISPOSE OF BARRIER AT COMPLETION OF WORK REFERENCES:
AT NO. ADDITIONAL COST.
ESSEX COUNTY REGISTRY
D ETA I L BK: 3361 PAGE 324
TYPICAL SILT/FENCE HAYBALE BARRIER TITLE: BK: 10946 PAGE 551
NOT TO SCALE
t
CONSER VA TION PLAN
for 1
CHRIS KINNON
at
I
9 PARALLEL S TREE T
ay BRUCE P. ,.
EATO I
121 in
SALEM, MA
GRAPHIC SCALE
C .E . C . LAND SURVEYORS INC .
20 o t o 20 4o so �H Of M 1
Ss
BFUCE 7 WINTER ST. SUITE 3 PEABODY, MA 01960 978 531 - 1191
P.EMy
( IN FEET )
I inch = 20 ft 9os _ ; ER�� r SHEET NO: 1 OF 1 DATE 5-2-02 JOB NO: 1434
DRAWN BY: D P B
I
I
�' 1 1.