64-534 - 3 NURSE WAY - CONSERVATION COMMISSION (w i'� ld-1 �I�
,�coriwr'
`E2 " CITY OF SALEM
J'.
CONSERVATION COMMISSION
August 21, 2015
George Atkins
59 Federal Street
Salem, MA 01970
Re: Extension Permit for Order of Conditions—DEP #64-534-3 Nurse Way
Dear Attorney Atkins:
Enclosed, please find the Extension Permit for the above-referenced Order of Condition. Please
record the original Order of Conditions at the South Essex Registry of Deeds and note the book
and page on this Extension Permit. Then record the Extension Permit and provide me with a
copy of the recording information pages of both documents, which will indicate to the
Commission that the documents have been recorded.
If you have any further questions, please feel free to contact me 978-619-5685.
Sincerely,
To vine
Conservation Agent
Enclosure
CC: DEP Northeast Regional Office
Kenneth Steadman
L1Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection -Wetlands
1 WPA Form 7 — Extension Permit for Orders of Conditions 64-534
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. General Information
Important:
When filling out 1. Applicant:
forms on the Kenneth G. Steadman
computer, use Name
only the tab
key to move 67 Village Street
your cursor- Mailing Address
do not use the Marblehead MA 01945
return key. City/Town State Zip Code
2. Property Owner(if different):
Name
reN
Mailing Address
Cityrrown State Zip Code
B. Authorization
The Order of Conditions (or Extension Permit) issued to the applicant or property owner listed above on:
9/17/2012 Issued by: Salem
Date Conservation Commission
for work at: 3 Nurse Way 9 216
Street Address Assessor's Map/Plat Number Parcel/Lot Number
recorded at the Registry of Deeds for:
County Book Page
Certificate(if registered land)
�is hereby extended Until: DA Date a Ord was last extended(if applicable)
This date can be no more than 3 years from the expiration date of the Order of Conditions or the latest
extension. Only unexpired Orders of Conditions or Extension may be extended.
This Extension Permit must be signed by a majority of the Conservation Commission and a copy sent to
the applicant and the appropriate DEP Regional Office
htt ://www.mass. v/eea/a encies/m a /about/contacts/find-the-massde -re ional-office-for- our-cit -or-
town.html .
Signatures
Date
wpaform7.doc•rev.5MM14 Page 1 of 2
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 7 — Extension Permit for Orders of Conditions 64-534
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
C. Recording Confirmation
The applicant shall record this document in accordance with General Condition 8 of the Order of
Conditions (see below), complete the form attached to this Extension Permit, have it stamped by the
Registry of Deeds, and return it to the Conservation Commission.
Note: General Condition 8 of the Order of Conditions requires the applicant, prior to commencement of
work, to record the final Order(or in this case, the Extension Permit for the Order of Conditions) in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of
the affected property. In the case of recorded land, it shall be noted in the Registry's Granter Index under
the name of the owner of the land upon which the proposed work is to be done. In the case of registered
land, it shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the
proposed work is done.
Detach this page and submit it to the Conservation Commission prior to the expiration of the Order of
Conditions subject to this Extension Permit.
To:
Conservation Commission
Please be advised that the Extension Permit to the Order of Conditions for the project at:
Project Location DEP File Number
has been recorded at the Registry of Deeds of:
County
for:
Property Owner
and has been noted in the chain of title of the affected property in accordance with General Condition 8 of
the original Order of Conditions on:
Dale Book Page
If recorded land the instrument number which identifies this transaction is:
Instrument Number
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applicant
waaform7.doc•rev.5/29/2014 Page 2 of 2
Tom Devine
From: Ken Steadman <ken@bartlettandsteadman.net>
Sent: Monday, August 17, 2015 12:24 PM
To: Tom Devine; gwa@ronansegal.com
Subject: RE: Order of conditions to expire
Att. Tom Devine AICP/Senior Planner and City of Salem Conservation Commission : Bartlett and Steadman development
Corp is requesting an extension of the order of conditions for 3 Nurse Way.The reason for the extension is to allow us to
finish the detention structure for the drainage system for the subdivision. With access through 3 Nurse Way.We should
be completing this project soon and will be moving forward and developing this lot. Thank you and the board for
considering this request. Ken Steadman
From:Tom Devine [mailto:tdevine@Salem.com]
Sent:Wednesday, August 12, 2015 1:44 PM
To: Ken Steadman<ken@bartlettandsteadman.net>
Subject: RE: Order of conditions to expire
Yes. I saved a spot on the August 20 agenda.
Tom Devine, AICP I Senior Planner
City of Salem Department of Planning &Community Development
120 Washington St., 3rd Floor I Salem, MA 01970
978-619-5682 1 Fax: 978-740-0404 1 tdevine(a)salem.com
From: Ken Steadman [mailto:ken(&ba rtletta ndsteadman.net]
Sent: Wednesday, August 12, 2015 1:25 PM
To: Tom Devine
Subject: RE: Order of conditions to expire
I will have a letter for you Monday the17 is that ok?
From:Tom Devine [mailto:tdevine@Salem.com]
Sent:Thursday,July 16, 2015 9:31 AM
To: Ken Steadman <ken@bartlettandsteadman.net>
Subject: RE: Order of conditions to expire
You should submit a brief letter explaining your request.The next ConCom meeting is August 20 and you are welcome to
have your request on that agenda.
Tom
Tom Devine, AICP ( Senior Planner
City of Salem Department of Planning &Community Development
120 Washington St., 3rd Floor I Salem, MA 01970
(V) 978-619-56821 (F) 978-740-0404
tdevine(a)salem.com I salem.com
From: Ken Steadman [mailto:ken@bartlettandsteadman.net] —
Sent: Thursday, July 16, 2015 8:26 AM
1
�ONOIT9;
vt� qA
jL
CITY OF SALEM
CONSERVATION COMMISSION
SITE VISIT FORM
PROJECT LOCATION: DATE OF SITE VISIT• /�_�
PROJECT PROPONENT: DEP FILE NUMBER:—C; / --
PROPOSED WORK: b i I t
1 I ATTENDANCE:
Commission Members/Agent: Abutters:
• Applicant/Property Owner/Representative: 4-- li U,.. U
SSTTE VISkf PURPOSE r n. < < : ;a E!='Ry :, m :';: i,,
=..•e�,n ...,.,,` r=o-�..,. ..u.:... ,..,n�3.. ..,=tltr Anus__ �m mcair:.u....a➢W
SITE VISITj,DOCUM,ENTATION �'";°�� w`irA % �Eijd;�u �'l9aA�r « s3Bd�n;,._„����
❑Photos ❑ Site Map El Other:
Take into account relevant aspects or features such as: natural or piped drainage or obvious pollution;
topography; existing vegetation; possible alternative sites; signs of wildlife, possible vernal pools, rare species
habitat; landmarks; recentor storical disturbances; proximity to other water bodies or drainage areas;
adjacent land uses.
!�
i
ma. ux 9, _.emmxnyu
RZC72S
MENDAT`IONS P Ad a v C�J \ 1 k€ ;n
8�, .gyp E
RONAN, SEGAL & HARRINGTON WED
ATTORNEYS AT LAW q r'� 7f1
FIFTY-NINE FEDERAL STREET NOY U 5 2015
JAMES T.RONAN(19221987) SALEM,MASSACHUSETTS 01970-3470
JACOB SSEGAL DEPT. OF PLANNING&
.
MARY PIEW.AT HTON COMMUNITY DEVELOPMENT
GEORGE W. TKINS III III
TEL(978)7447350
FAX(978)7447493 FILE NO.5-1041.6
OF COUNSEL
JOHN H.RONAN
MICHAEL J.ESCHELBACHER
November 2, 2015
Salem Conservation Commission
120 Washington Street
Salem, MA 01970
ATTN: Thomas Devine
RE: Witch Hill Subdivision
Dear Mr. evine�y-+
.r
Enclosed please find the recording information for the original Order of
Conditions for 3 Nurse Way and recording confirmation of the Extension Permit for the
same property,
Also enclosed is a copy of the Conservation Commission Restriction and
Easement recorded in connection with the subdivision.
V.ery'truly yours,
G rge W. Atkins, III
GWA/dap
Enclosures
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-534
WPA Form 5 — Order of Conditions MassDEP File
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction k
Salem
City/Town
G. Recording Information
Prior to commencement of work,this Order of Conditions must be recorded in the Registry of
Deeds or the Land Court for the district In which the land is located, within the chain of title of
the affected property. In the case of recorded land,the Final Order shall also be noted In the
Registry's Grantor Index under the name of the owner of the land subject to the Order. In the
case of registered land,this Order shall also be noted on the Land Court Certificate of Title of
the owner of the land subject to the Order of Conditions.The recording information on this page
shall be submitted to the Conservation Commission listed below.
Conservation Commisslon
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation
Commission.
------------------------------------------------------------------------------------------ --------
To:
a /P-
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
Project Location —� MassDEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
Bartlett & Steadman Development Corp.
for: Property Omer
and has been noted In the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
9/17/2012
Date
If recorded land, the instrument number identifying this transaction Is:
Instrument hYimoer
If registered land, the document number Identifying this transaction is:
Docum t um r
igna r I Applicant
wPalormS Eoc• ray.09182010 Page 12 o112
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 7 — Extension Permit for Orders of Conditions 64-534
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
C. Recording Confirmation
The applicant shall record this document in accordance with General Condition 8 of the Order of
Conditions (see below), complete the form attached to this Extension Permit, have it stamped by the
Registry of Deeds, and return it to the Conservation Commission.
Note: General Condition 8 of the Order of Conditions requires the applicant, prior to commencement of
work, to record the final Order(or in this case, the Extension Permit for the Order of Conditions) in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of
the affected property. In the case of recorded land, it shall be noted in the Registry's Granter Index under
the name of the owner of the land upon which the proposed work is to be done. In the case of registered
land, it shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the
proposed work is done.
Detach this page and submit it to the Conservation Commission prior to the expiration of the Order of
Conditions subject to this Extension Permit.
To:
SALEM
Conservation Commission
Please be advised that the Extension Permit to the Order of Conditions for the project at:
3 Nurse Way 64-534
Project Location DEP File Number
has been recorded at the Registry of Deeds of:
Essex South District
County
for:
Bartlett & Steadman Development Corp.
Property Owner
and has been noted in the chain of title of the affected property in accordance with General Condition 8 of
the original Order of Conditions on:
9/17/2012 536277
Date Document No. Book Page
If recorded land the instrument number which identifies this transaction is:
Instrument Number
If registered land, the document number which identifies this transaction is:
MMU 566110
Document N'u(\'mbbeerr
n re of Applicant
wpaform]doc•rev.5129/2014 Page 2 of 2
Attachment to Order of Conditions # 64-534
a_Zt�p V
Page 1 of 5
SALEM CONSERVATION COMMISSION
DEP FILE #64-534
3 Nurse Way
City of Salem, Massachusetts
ADDITIONAL FINDINGS
Based on the Estimated Habitats of Rare Wildlife and Certified Vernal Pools Map (October I, 2008) from Natural
Heritage & Endangered Species Program (NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has
been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contains any
vernal pools.
This Order is issued under the Massachusetts Wetlands Protection Act,M.G.L. Chapter 131, Section 40 and the City
of Salem Wetlands Protection and Conservation Ordinance,Salem Code Chapter 50.
This order permits the construction of a single-family house and appurtenances per Notice of Intent submitted June
20, 2012.
SPECIAL CONDITIONS
1. This Order of Conditions must be recorded in its entirety (including all 5 pages of Special Conditions)
at the Essex County Registry of Deeds or the Land Court for the district in which the land is located,
after the expiration of the 10-day appeal period and within 30 days of the issuance. A copy of the
recording information must be submitted to the Salem Conservation Commission before any
work approved in this Order commences.
2. Approval of this application does not constitute compliance with any law or regulation other than
M.G.L Chapter 131, Section 40, Wetlands Regulations 310 CMR 10.00 and the f Salem Wetlands
Protection and Conservation Ordinance,Salem Code Chapter 50. i
3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No
alteration of wetland resource areas or associated buffer zones, other than that approved in this Order,
shall occur on this property without prior approval from the Commission.
4. Prior to any work commencing on site, a DEP Sign showing DEP File#64-534 must be installed at the
entrance to the site and seen from the public way, but not placed on a living tree.
5. No work approved in this Order may commence until the ten(10)business day,appeal period has lapsed
from the date of the issuance of this Order.
6• With respect to this Order, the Commission designates the Conservation Agent as its agent with powers
to act on its behalf in administering and enforcing this Order.
7. The Commission or its Agent,officers, or employees shall have the right to enter and inspect the property at
any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131,
Section 40, the Wetlands Regulations 310 CMR 10.00, and shall have the right to require any data or
documentation that it deems necessary for that evaluation.
Attachment to Order of Conditions # 64-534
atirt` Page 2 of 5
8. The term "Applicant" as used in this Order of Conditions shall refer to the owner,any successor in
interest or successor in control of the property referenced in the Notice of intent, supporting documents
and this Order of Conditions. The Commission shall be notified in writing within 30 days of all
transfers of title of any portion of the property that takes place prior to issuance of the Certificate of
Compliance.
9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and
approvals associated with this project. These permits may include but are not necessarily limited to the
following:
(l) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816), U.S. Army
Corps of Engineers.
(2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority
of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00.
(3) Sewer Extension Permit from the DEP Division of Water Pollution Control under G. L. Ch. 21 A ss7
and 314 CMR 7.00. Any Board of Health permit for septic system design for any portion of the
septic system within 100 feet of wetlands shall be submitted to the Commission prior to
construction initiation.
(4) Design Requirements for Construction in Floodplains under the State Building Code (780 CMR
744.).
10. If there are conflicting conditions within this Order, the stricter condition(s) shall rule.
11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and
surface waters during construction or after completion of the project.
12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods
and boundary during constriction if necessary.
13. The Commission reserves the right to impose additional conditions on portions of this project or this site
to mitigate any actual or potential impacts resulting from the work herein permitted.
14. The work shall conform to the following attached plans and special conditions:
Final Approved Plans
Site Development Permit Plan Located in Salem, Mass.
(Title)
9/7/2012
(Dated)
Clayton Morin
(Signed and Stamped by)
City of Salem Conservation Commission
(On file with)
15. Any proposed changes in the approved plan(s)or any deviation in construction from the approved
plan(s) shall require the applicant to file a Notice of Project Change with the Commission. The Notice
shalt be accompanied by a written inquiry prior to their implementation in the field, as to whether the
change(s) is substantial enough to require filing a new Notice of Intent or a request to correct or amend
Attachment to Order of Conditions # 64-534
Page 3 of 5
this Order of Conditions. A copy of such request shall at the same time be sent to the Department of
Environmental Protection.
16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has
been issued, the applicant or current landowner shall submit to the Commission a statement signed by the
buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of
the Order of Conditions.
PRIOR TO CONSTRUCTION
17. Prior to the commencement of any activity on this site other than activities listed above, there
must be a Pre-Construction Meeting on site between the project supervisor, the contractor responsible
for the work, and the Conservation Agent and/or a member of the Conservation Commission to ensure
that the requirements of the Order of Conditions are understood. The staked erosion control line shall be
adjusted, if necessary, during the pre-construction meeting. Please contact the Conservation Agent at
(978) 619-5685 at least forty-eight (48) hours prior to construction to arrange for the Pre-
Construction Meeting.
18. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and
erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The
Commission and/or its Agent shall inspect and approve such installation at the pre-construction
meeting.
19. No clearing of vegetation, including trees,or disturbance of soil shall occur prior to the pre-construction
meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre-
construction meeting if absolutely necessary in order to place erosion control stakes where required.
20. There shall be sufficient erosion controls stored under cover on the site to be used for emergency
erosion control purposes.
EROSION CONTROL
21. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction,
and shall be maintained during construction in any wetland resource area and/or buffer zones. The
erosion control measures shown on the approval plan(s)and provisions in the Order will be the minimum
standards for this project; the Commission or its Agent may require additional measures.
22. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland
resource areas to prevent sediment from entering wetland resource areas.
23. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or
replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed.
24. The area of construction shall remain in a stable condition at the close of each construction day.
25. Any de-watering of trenches or other excavation required during construction shall be conducted so as
to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered
through hay bale sediment traps, silt filter bags or other means approved by the Commission or its
Administrator.
..ry
S A` Attachment to Order of Conditions # 64-534
Page 4 of 5
26. Within thirty(30) days of completion of construction on any given portion of the project, all disturbed
areas in the completed portion of the site shall be permanently stabilized with rapidly growing
vegetative cover, using sufficient top soil to assure long-term stabilization of disturbed areas.
27. If soils are to be disturbed for longer than two(2) months, a temporary cover of rye or other grass
should be established to prevent erosion and sedimentation. If the season is not appropriate for plant
growth, exposed surface shall be stabilized by other appropriate erosion control measures, firmly
anchored, to prevent soils from being washed by rain or flooding.
DURING CONSTRUCTION
28• A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all
times when work is in progress.
29. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on
the approved plan(s).
30. All waste products,grubbed stumps,slash;construction materials,etc. shall be deposited at least 100 feet
from wetland resource areas and 200 feet from river.
31. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage
system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be
immediately removed.
32. All exposed sub-soils shall be covered by a minimum of three(3) inches of quality screened loam topsoil
prior to seeding and final stabilization.
33. Immediately following drainage structure installation all inlets shall be protected by silt fence, haybale
barriers and/or silt bags to filter silt from stormwater before it enters the drainage system.
34. There shall be no pumping of water from wetland resource areas.
35. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other
components shall be fixed immediately.
36. During construction,all drainage structures shall be inspected regularly and cleaned as necessary.
37. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance
of enforcement actions by the Conservation Commission including, but not limited to,civil administrative
penalties under M.G.L Chapter 21A, section 16.
AFTER CONSTRUCTION
38. Upon completion of construction and final soil stabilization, the applicant shall submit the following to
the Conservation Commission to request a Certificate of Compliance (COC):
(1) A Completed Request for a Certificate of Compliance form (WPA Form 8A or other form if
required by the Conservation Commission at the time of request).
(2) A letter from a Registered Professional Engineer certifying compliance of the property with this
Order of Conditions.
(3) An "As-Built" plan signed and stamped by a Registered Professional Engineer or Land Surveyor
showing post-construction conditions within all areas under the jurisdiction of the Massachusetts
Wetlands Protection Act. This plan shall include at a minimum:
Attachment to Order of Conditions # 64-534
Page 5 of 5
S'
j (a) All wetland resource area boundaries with associated buffer zones and regulatory setback
f areas taken from the plan(s)approved in this Order of Conditions;
(b) Locations and elevations of all stormwater management conveyances, structures and best
management designs, including foundation drains,constructed under this Order within any
wetland resource area or buffer zone;
(c) Distances from any structures constructed under this Order to wetland resource areas-
11structures"include, but are not limited to, all buildings,septic system components, wells,
utility lines, fences, retaining walls,and roads/driveways;
(d) A line delineating the limit of work-"work" includes any filling,excavating and/or
disturbance of soils or vegetation approved under this Order;
39. When issued, the Certificate of Compliance must be recorded at the Southern Essex County Registry of
Deeds and a copy of the recording submitted to the Salem Conservation Commission.
40. If the completed work differs from that in the original plans and conditions, the report must specify how
the work differs; at which time the applicant shall first request a modification to the Order. Only upon
review and approval by the Commission, may the applicant request in writing a Certificate of
Compliance as described above.
41. Erosion control devices shall remain in place and properly functioning until all exposed soils have been
stabilized with final vegetative cover and the Conservation Commission and/or its Agent has authorized
their removal.
ADDITIONAL CONDITIONS
42. Prior to construction, a plantings plan developed by a wetlands scientist must be submitted to the
conservation commission for review and approval.
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-534
WPA Form 5 - Order of Conditions MasSDEP File H
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
eDEP Transaction k
Salem
Citylrown
A. General Information
Please note` Salem
this form has t. From:
been modified Conservation Commission
with added 2. This issuance is for
space to
accommodate (check one): a. ®Order of Conditions b. ❑Amended Order of Conditions
the Registry
of Deeds 3. To: Applicant:
Requirements
Kenneth G. Steadman
Important: a. First Name b.Last Name
When filling
out forms c.Organization
on the 67 Village Street
computer,
use only the d Mailing Address
tab key to Marblehead MA
move your e.City/Town 01945
cursor-do I.State g.Zip Code
not use
return keye 4. Property Owner(if different from applicant):
rtl a. First Name b.Last Name
c.Organization
rerun
d.Mailing Address
e.City/rown
I.State
g.Zip Code
e. Project Location:
3 Nurse Way Salem
a. Street Address
9 b.Citylrown
c.Assessors Map/Plat Number 216
d. Parcel/Lot Number
Latitude and Longitude, if known: 42d30m35s 70d55mO9s
d. Latitude e. Longitude
wpaforra5.dPa- rev.o5/iw2oio -
Page I of 12
is
f
r
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-534
WPA Form 5 - Order of Conditions MassDEPFIIe#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
eDEP Transaction#
Salem
A. General Information (cont.) City/Town
6. Property recorded at the Registry of Deeds for(attach additional information if more than
one parcel):
Southern Essex 80814&80815
a.County b.Certificate Number(if registered land)
c. Book
d.Page
7. Dates: 6/20/2012 9/13/2012 9/17/2012
a.Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance
8. Final Approved Plans and Other Documents (attach additional plan or document references
as needed):
Site Development Permit Plan Located in Salem Mass
a.Plan Title
_Eastern Land Survey AssociatesClayton A. Morin
b.Prepared By - c.Signed and stamped by
9/7/2012 1"=20'
d.Final Revision Date e.Scale
I.Additional Plan or Document Title
g.Date
B. Findings
t. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information
provided in this application and presented at the public hearing, this Commission finds that
the areas in which work is proposed is significant to the following interests of the Wetlands
Protection Act(the Act). Check all that apply:
a. ® Public Water Supply b. ❑ Land Containing Shellfish c' ® Prevention of
Pollution
d. ® Private Water Supply e. ® Fisheries f. ® Protection of
Wildlife Habitat
g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance
standards set forth in the wetlands regulations. This Commission orders that all work shall
be performed in accordance with the Notice of Intent referenced above, the following
General Conditions, and any other special conditions attached to this Order. To the extent
that the following conditions modify or differ from the plans, specifications, or other
proposals submitted with the Notice of Intent, these conditions shall control.
wpalorm5.doc• rev.05/19/2010
Page 2 of 12
az
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands
WPA Form 5 - sa-s E
' Order of Conditions MassDEP F---- Ile g
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 --
eDEP Transaction k
Salem
B. Findings (cont.) °ia�°— ---
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth
in the wetland regulations. Therefore, work on this project may not go forward unless and
until a new Notice of Intent is submitted which provides measures which are adequate to
protect the interests of the Act, and a final Order of Conditions is issued. A description of
the performance standards which the proposed work cannot meet is attached to this
Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site, the
work, or the effect of the work on the interests identified in the Wetlands Protection Act.
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides sufficient information and includes measures which are
adequate to protect the Act's interests, and a final Order of Conditions is issued. A
description of the specific Information which is lacking and why it Is necessary is
attached to this Order as per 310 CMR 10.05(6)(c).
3. ® Buffer Zone Impacts: Shortest distance between limit of project 10' +/-
disturbance and the wetland resource area specified in 310 CMR 10.02(1)(a) a.-linear feet
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. ❑ Bank
a.linear feet bc
,linear feet .linear feet
a. El Bordering d. linear feet
Vegetated Wetland a.square feet b.square feet c.-square feet
s. ❑ Land Underd.square feet
Waterbodies and a,square feet b.square feet c.-square feet
Waterwaysd.square feet
e.c/y dredged f.Gy-dredged
7. El Bordering Land
Subject to Flooding a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood Storage
e. D Isolated Land
e.cubic feet f.cubic feet g'
cubic feet h.cubic feet
Subject to Flooding a.square feet b.square feet
Cubic Feet Flood Storage
c.cubic feet d.cubic feet
s• ❑ Rivertront Area e.cubic feet
f.cubic feet
1^r,1<^ rove b.total sq.feet
Sq ft within 100 ft
<^ =.a r=er d.square feet o f.square feet
Sq ft between 100- <^��=r ro<r
200 ft
<^ �•a rom h.square feet <^,„e roor j.square feet
wpafO1.5.d=- rev.05/19/2010
Page 3 of 12 '
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-534
WPA Form 5 - Order of Conditions MassDEP File R
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
eDEP Transaction f!
Salem
B. Findings (cont.) City/Town
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
o. [I Designated Port
Areas Indicate size under Land Under the Ocean, below
'I. ❑ Land Under the
Ocean a.square feet b.square feet
c.ply dredged d.c/y dredged
12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes
below
13. ❑ Coastal Beaches cu yd cu yd
a.square feet b.square feet c.nourishment d.nourishment
14. ❑ Coastal Dunescu yd _ Cu yd
a.square feet b.square feet c.nourishment d.nourishment
15. ❑ Coastal Banks
a. linear feet b.linear feet
ts. ❑ Rocky Intertidal
Shores a.square feet b.square feet
17. ❑ Salt Marshes
ts. Land Under Salt
a.square feet b.square feet c.square feet d.square feet
❑
Ponds a.square feet b.square feet
c.Gy dredged d.c/y dredged
ts. El Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
20. ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under
the Ocean, and/or inland Land Under Waterbodies and
Waterways, above
a.c/y dredged b.c/y dredged
zt. El Land Subject to
Coastal Storm a.square feet b.square feet
Flowage
wpatorm&doc• rev.091912010
Page 4 d 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-534
WPA Form 5 — Order of Conditions MassDEP FileN
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction If
Salem
City/Town
B. Findings (cont.)
p 22.I is for the 22. F1Restoration/Enhancement
the purpose of
restoring or a.square feet of BVW b.square feet of salt marsh
enhancing a
wetland
resource area 23. ❑ Stream Crossing(S): '
in addition to
the square
footage that a.number of new stream crossings b.number of replacement stream crossings
has been C. General Conditions Under Massachusetts Wetlands Protection Act
entered in
Section B.5.c
(BVW)or The following conditions are only applicable to Approved projects.
B.1 Te(Salt
Marsh)above, 1. Failure to comply with all conditions stated herein, and with all related statutes and other
please enter regulatory measures, shall be deemed cause to revoke or modify this Order.
the additional 9 Y Y
amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying
with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this
Order unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years,
but less than five years, from the date of issuance. If this Order is intended to be valid
for more than three years, the extension date and the special circumstances warranting
the extended time period are set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three
years each upon application to the issuing authority at least 30 days prior to the expiration
date of the Order.
6. If this Order constitutes an Amended Order of Conditions, this Amended Order of
Conditions does not extend the issuance date of the original Final Order of Conditions and
the Order will expire on 9/17/2012 unless extended in writing by the Department.
7. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash,
refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath,
paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the
foregoing.
8. This Order is not final until all administrative appeal periods from this Order have elapsed,
or if such an appeal has been taken, until all proceedings before the Department have
been completed.
wpaform5.tloc• rev.05/19/2010 Page 5 of 12
Massachusetts Department of Environmental Protection Provided by MaSSDEP:
Bureau of Resource Protection - Wetlands 64-534
WPA Form 5 - Order of Conditions MassDEP File#
\ Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
eDEP Transaction#
Salem
CityTown
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
9. No work shall be undertaken until the Order has become final and then has been recorded
in the Registry of Deeds or the Land Court for the district in which the land is located, within
the chain of title of the affected property. In the case of recorded land, the Final Order shall
also be noted in the Registrys Grantor Index under the name of the owner of the land upon
which the proposed work is to be done. In the case of the registered land, the Final Order
shall also be noted on the Land Court Certificate of Title of the owner of the land upon
which the proposed work is done. The recording information shall be submitted to the
Conservation Commission on the form at the end of this Order, which form must be
stamped by the Registry of Deeds, prior to the commencement of work.
10. A sign shall be displayed at the site not less then two square feet or more than three
square feet in size bearing the words,
"Massachusetts Department of Environmental Protection"[or, "MassDEP"]
"File Number 64-534 "
11. Where the Department of Environmental Protection is requested to issue a Superseding
Order, the Conservation Commission shall be a party to all agency proceedings and
hearings before MassDEP.
12. Upon completion of the work described herein, the applicant shall submit a Request for
Certificate of Compliance (WPA Form 8A)to the Conservation Commission.
13. The work shall conform to the plans and special conditions referenced in this order.
14. Any change to the plans identified in Condition #13 above shall require the applicant to
inquire of the Conservation Commission in writing whether the change is significant enough
to require the filing of a new Notice of Intent.
15. The Agent or members of the Conservation Commission and the Department of
Environmental Protection shall have the right to enter and inspect the area subject to this
Order at reasonable hours to evaluate compliance with the conditions stated in this Order,
and may require the submittal of any data deemed necessary by the Conservation
Commission or Department for that evaluation.
16. This Order of Conditions shall apply to any successor in interest or successor in control of
the property subject to this Order and to any contractor or other person performing work
conditioned by this Order.
17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated
Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be
marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall
be maintained until a Certificate of Compliance has been issued by the Conservation
Commission.
wpaform5.doc• rev.05/19/2010
Page 6 of 12
r�
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands
64-534
WPA Form 5 - Order of Conditions assDE
MassDEP F— iie p
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 TD
eDEP Transaction#
Salem
C. General Conditions Under Massachusetts Wetlands Protection Ac
18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have
been fully stabilized with vegetation or other means. At no time shall sediments be
deposited in a wetland or water body. During construction, the applicant orhis/her
designee shall inspect the erosion controls on a daily basis and shall remove accumulated
sediments as needed. The applicant shall immediately control any erosion problems that
occur at the site and shall also immediately notify the Conservation Commission, which
reserves the right to require additional erosion and/or damage prevention controls it may
deem necessary. Sedimentation barriers shall serve as the limit of work unless another
limit of work line has been approved by this Order.
NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS
The work associated
th
19 Mas ac usetts Stormwater r St an Standards. If the wrder(the ork)is subject to the Sto subject
mwaterto the
Standards, then the project is subject to the following conditions:
a) All work, including site preparation, land disturbance, construction and redevelopment,
shall be implemented in accordance with the construction period pollution prevention and
erosion and sedimentation control plan and, if applicable, the Stormwater Pollution
Prevention Plan required by the National Pollution Discharge Elimination System
Construction General Permit as required by Stormwater Condition 8. Construction period
erosion, sedimentation and pollution control measures and best management practices
(BMPs) shall remain in place until the site is fully stabilized.
b) No stormwater runoff may be discharged to the post-construction stormwater BMPs
unless and until a Registered Professional Engineer provides a Certification that:
i. all construction period BMPs have been removed or will be removed by a date certain
specified in the Certification. For any construction period BMPs intended to be converted
to post construction operation for stormwater attenuation, recharge, and/or treatment, the
conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that
the BMP has been properly cleaned or prepared for post construction operation, including
removal of all construction period sediment trapped in inlet and outlet control structures;
ii. as-built final construction BMP plans are included, signed and stamped by a Registered
Professional Engineer, certifying the site is fully stabilized;
W. any illicit discharges to the stormwater management system have been removed, as per
the requirements of Stormwater Standard 10;
iv. all post-construction stormwater BMPs are installed in accordance with the plans
(including all planting plans)approved by the issuing authority, and have been inspected to
ensure that they are not damaged and that they are in proper working condition;
v. any vegetation associated with post-construction BMPs is suitably established to
withstand erosion.
wpaf0rm5.tloc• rev.mig/2olo
Page 7 of 12
ik
5.
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands
64-534
WPA Form 5 — assDE
Order of Conditions MassDEP F--- iiap ---'
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 ---__
eDEP Transaction#
Salem
C. General Conditions Under Massachusetts Wetlands Protection Ac
c) The landowner is responsible for BMP maintenance until the issuing authority is
notified that another party has legally assumed responsibility for BMP maintenance. Prior
to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the
responsible party(defined in General Condition 18(e)) shall execute and submit to the
issuing authority an Operation and Maintenance Compliance Statement("O&M Statement)
for the Stormwater BMPs identifying the party responsible for implementing the stormwater
BMP Operation and Maintenance Plan ("O&M Plan") and certifying the following: i.) the
O&M Plan is complete and will be implemented upon receipt of the Certificate of
Compliance, and ii.) the future responsible parties shall be notified in writing of their
ongoing legal responsibility to operate and maintain the stormwater management BMPs
and implement the Stormwater Pollution Prevention Plan.
d) Post-construction pollution prevention and source control shall be implemented in
accordance with the long-term pollution prevention plan section of the approved
Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by
the National Pollution Discharge Elimination System Multi-Sector General Permit.
e) Unless and until another party accepts responsibility, the landowner, or owner of any
drainage easement, assumes responsibility for maintaining each BMP. To overcome this
presumption, the landowner of the property must submit to the issuing authority a legally
binding agreement of record, acceptable to the issuing authority, evidencing that another
entity has accepted responsibility for maintaining the BMP, and that the proposed
responsible party shall be treated as a permittee for purposes of implementing the
requirements of Conditions 18(f) through 18(k)with respect to that BMP. Any failure of the
proposed responsible party to implement the requirements of Conditions 18(f) through
18(k) with respect to that BMP shall be a violation of the Order of Conditions or Certificate
Of Compliance. In the case of stormwater BMPs that are serving more than one lot, the
legally binding agreement shall also identify the lots that will be serviced by the stormwater
BMPs. A plan and easement deed that grants the responsible party access to perform the
required operation and maintenance must be submitted along with the legally binding
agreement.
f) The responsible party shall operate and maintain all stormwater BMPs in accordance
with the design plans, the O&M Plan, and the requirements of the Massachusetts
Stormwater Handbook.
wpalorm5eoc• rev.o5/19/2o10
Page a of 12
f
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-534
WPA Form 5 - Order of ConditionsassDE
MassDEP F---- ije g
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 --EP —__
-e—DEP Transaction#
Salem
C. General Conditions Under Massachusetts Wetlands Protection Act
g) The responsible party shall:
1. Maintain an operation and maintenance log for the last three (3) consecutive
calendar years of inspections, repairs, maintenance and/or replacement of the
stormwater management system or any part thereof, and disposal (for disposal the
log shall indicate the type of material and the disposal location);
2. Make the maintenance log available to MassDEP and the Conservation
Commission ("Commission") upon request; and
3. Allow members and agents of the MassDEP and the Commission to enter and
inspect the site to evaluate and ensure that the responsible party is in compliance
with the requirements for each BMP established in the O&M Plan approved by the
issuing authority.
h) All sediment or other contaminants removed from stormwater BMPs shall be disposed
of in accordance with all applicable federal, state, and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04
are prohibited.
changed without the prior written approval of the issuing authority.
j) The stormwater management system approved in the Order of Conditions shall not be
k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site
Design Credit(as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1,
Low Impact Development Site Design Credits)shall not be altered without the prior written
approval of the issuing authority.
1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld.
Any fencing constructed around stormwater BMPs shall include access gates and shall be
at least six inches above grade to allow for wildlife passage.
Special Conditions (if you need more space for additional conditions, please attach a text
document):
wpaf0rm5.tloc• rev.o6rl9/2olo
Page 9 of 12
jy.
�5.
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands
-534
WPA Form 5 - sassDE
k Order of Conditions MassDEP F------ije g —"--
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 --
eDEP Transaction p
Salem
r
D. Findings Under Municipal Wetlands Bylaw or ordinance
t. Is a municipal wetlands bylaw or ordinance applicable? ® Yes
2. The Salem El No
conservation Commission hereby finds (check one that applies):
a. ❑that the proposed work cannot be conditioned to meet the standards set forth in a
municipal ordinance or bylaw, specifically:
1.Municipal Ordinance or Bylaw
2.Citation
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides measures which are adequate to meet these
standards, and a final Order of Conditions is issued.
b. ®that the following additional conditions are necessary to comply with a municipal
ordinance or bylaw:
Wetlands Protection and Conservation
1. Municipal Ordinance or Bylaw c.50
2.
3. The Commission orders that all work shall be performed in accordance with the folllotwing
conditions and with the Notice of Intent referenced above. To the extent that the following
conditions modify or differ from the plans, specifications, or other proposals submitted with
the Notice of Intent, the conditions shall control.
The special conditions relating to municipal ordinance or bylaw are as follows (if you need
more space for additional conditions, attach a text document):
Attached special conditions are issued under the Wetlands Protection Act and are sufficient
for compliance with the local ordinance c.50
wpaform5.doc• rev.05r19/2010 t
Page 10 of 12 b
I
t,
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands G —r3
WPA Form 5 - Order of Conditions MassDEP Fite
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 --eDEPTr n sact
CityCity/Tow
E. Signatures
Important: This Order is valid for three years, unless otherwise specified as a special _
When filling out
forms on the condition pursuant to General Conditions#4, from the date of issuance. 1.Dae of Issuance
comcate
he number
rs who will sign this
m.
onlypthe tab key This Order ur,use Please itmust signed byfa majority of the Conservation Commission. 2.Num er of Signers
to move your
cursor- not The Order must be mailed by certified m ' return receipt re u sled)or hand delivered to
use the return theapplicant.pplicant. A copy must be mailed, hand edor fil del ctro ieally At the same
time with the appro sDEP Regional Office. �/
,d •
i e
oar,
C
❑ by ha d delivery on {-by certified mail, return receipt
requested, ann
Date
Date
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting
the land subject to this Order, or any ten residents of the city or town in which such land is
located, are hereby notified of their right to request the appropriate MassDEP Regional
Office to issue a Superseding Order of Conditions. The request must be made by certified
mail or hand delivery to the Department, with the appropriate filing fee and a completed
Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)
within ten business days from the date of issuance of this Order.A copy of the request
shall at the same time be sent by certified mail or hand delivery to the Conservation
Commission and to the applicant, if he/she is not the appellant.
Any appellants seeking to appeal the Department's Superseding Order associated with this
appeal will be required to demonstrate prior participation in the review of this project. Previous
participation in the permit proceeding means the submission of written information to the
Conservation Commission prior to the close of the public hearing, requesting a
Superseding Order, or providing written information to the Department prior to issuance of
a Superseding Order.
The request shall state clearly and concisely the objections to the Order which is being
appealed and how the Order does not contribute to the protection of the interests identified
in the Massachusetts Wetlands Protection Act(M.G.L. C. 131, §40), and is inconsistent
with the wetlands regulations(310 CMR 10.00). To the extent that the Order is based on a
municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or
regulations, the Department has no appellate jurisdiction.
wpasslgs.doc• rev.0225M10
Pagell a/j_�,
f Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-534
WPA Form 5 - Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
eDEP Transaction#
Salem
G. Recording Information 61tylTown
Prior to commencement of work, this Order of Conditions must be recorded in the Registry of
Deeds or the Land Court for the district in which the land is located, within the chain of title of
the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land subject to the Order. In the
case of registered land, this Order shall also be noted on the Land Court Certificate of Title of
the owner of the land subject to the Order of Conditions. The recording information on this page
shall be submitted to the Conservation Commission listed below.
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation
Commission.
---------------------------------------------------------------------------------- -
To: ------ ----------
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
Project Location
MassDEP File Number
Has been recorded at the Registry of Deeds of:
County
Book pag_—e'_------
for: Property Owner
and has been noted in the chain of title of the affected property in:
Book
Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
11paform5.tloc• rev.05/19/2010
Page 12 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 - Notice of Intent
Document transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
Important:
When filling out A. General Information
forms on the
computer,use 1. Project Location (Note: electronic filers will click on button to locate project site):
only the tab key
to move your 3 Nurse Way Salem 01970
cursor-do not a.Street Address b.City/Town c.Zip Code
use the return
key. Latitude and Longitude: 42-30-35 70-55-09
d.Latitude e.Longitude
d Map 9 Part Parcel 30 Lot 216
f.Assessors Map/Plat Number g.Parcel/Lot Number
2. Applicant:
Kenneth G. Steadman
a.First Name b.Last Name
Note:
Before c.Organization
completing this
form consult 67 Village Street
your local d.Street Address
Conservation Marblehead MA 01945
Commission e.City/Town f.State g.Zip Code
regarding any 781-631-3751
municipal bylaw
or ordinance. h.Phone Number i.Fax Number j.Email Address
3. Property owner(required if different from applicant): ❑ Check if more than one owner
Same
a.First Name b.Last Name
c.Organization
d.Street Address
e.City/Town f.State g.Zip Code
h.Phone Number i.Fax Number j.Email address
4. Representative (if any):
Attorney George W. Atkins III
a.First Name b.Last Name
Ronan, Segal & Harrington
c.Company
59 Federal Street
d.Street Address
Salem MA 01970
e.City/Town f.State \g.Zip Code
978-744-0350
h.Phone Number i.Fax Number j.Email address
5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form):
500.00 237.50 262.50
a.'Cotal Fee Paid b.State Fee Paid c.City/Town Fee Paid
wpaform3.doc•rev.11/16/09 Page 1 of 8
LlMassachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands MaaaoEP Fde Number
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 pocument Transaction NumberSalem
city/Town
A. General Information (continued)
6. General Project Description:
Construction of single family dwelling driveway, utilities grading and landscaping
7a. Project Type Checklist:
1. Z Single Family Home 2. ❑ Residential Subdivision
3. ❑ Limited Project Driveway Crossing 4. ❑ Commercial/Industrial
5. ❑ Dock/Pier 6. ❑ Utilities
7. ❑ Coastal Engineering Structure 8. ❑ Agriculture(e.g., cranberries, forestry)
9. ❑ Transportation 10. ❑ Other
7b. Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR
10.24 (coastal) or 310 CMR 10.53 (inland)?
1. ❑ Yes Z No If yes, describe which limited project applies to this project:
2.Limited Project
8. Property recorded at the Registry of Deeds for:
Essex South 80814 & 80815
a.County b.Certificate#(if registered land)
c.Book d.Page Number
B. Buffer Zone & Resource Area Impacts (temporary & permanent)
1. Z Buffer Zone Only—Check if the project is located only in the Buffer Zone of a Bordering
Vegetated Wetland, Inland Bank, or Coastal Resource Area.
2. ❑ Inland Resource Areas (see 310 CMR 10.54-10.58; if not applicable, go to Section 8.3,
Coastal Resource Areas).
Check all that apply below. Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including standards
requiring consideration of alternative project design or location.
For all projects
affecting other Resource Area Size of Proposed Alteration Proposed Replacement(if any)
Resource Areas,
please attach a
narrative a. F-1 Bank 1.linear feet 2.linear feet
explthe resource
how b. ❑ Bordering Vegetated
a e resource
area was Wetland 1.square feet 2.square feet
delineated. c.❑ Land Under
1.square feet 2.square feet
Waterbodies and
Waterways 3.cubic yards dredged
wpaform3.doc•rev. 11116109 Page 2 of 8
L1Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - WetlandsMaaaDEP File Number
WPA Form 3 — Notice ofsIntent ,Document TransactionNumbei
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
CttylTown
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont'd)
Resource Area Size of Proposed Alteration Proposed Replacement(if any)
d. ❑ Bordering Land
Subject to Flooding 1,square feet 2.square feet
3,cubic feet of flood storage lost 4.cubic feet replaced
e. ❑ Isolated Land
Subject to Flooding 1.square feet
2.cubic feet of flood storage lost 3.cubic feet replaced
f. ❑ Riverfront Area 1.Name of Waterway(if available)
2.Width of Riverfront Area (check one):
❑ 25 ft. - Designated Densely Developed Areas only
❑ 100 ft. -New agricultural projects only
❑ 200 ft. -All other projects
3.Total area of Riverfront Area on the site of the proposed project: square feet
4. Proposed alteration of the Riverfront Area:
a.total square feet b.square feet within 100 ft. c.square feet between 100 ft.and 200 ft.
5. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes❑ No
6.Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes❑ No
3. ❑ Coastal Resource Areas: (See 310 CMR 10,25-10.35)
Check all that apply below. Attach narrative and supporting documentation describing how the project
will meet all performance standards for each of the resource areas altered, including standards
requiring consideration of alternative project design or location.
Online Users:
Include your Resource Area Size of Proposed Alteration Proposed Replacement (if any)
document
transaction a. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
number
(provided on
your receipt b. ❑ Land Under the Ocean 1
page)with all .square feet
supplementary
Information you 2.cubic yards dredged
submit to the
Department. c. ❑ Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below
d.❑ Coastal Beaches 1,square feet 2.cubic yards beach nourishment
e. ❑ Coastal Dunes 1,square feet 2.cubic yards dune nourishment
wpaform3.doc•rev. 11116/09 Page 3 of 8
Massachusetts Department of Environmental Protection Provided by'MassoEP:
Bureau of Resource Protection - Wetlands MassDEPFile Number.
WPA Form 3 - Notice of Intent
et
Document TransILI action Number`
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
Cityfrown
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont'd)
Size of Proposed Alteration Proposed Replacement (if any)
f. ❑ Coastal Banks 1,linear feet
g. ❑ Rocky Intertidal
Shores 1.square feet
h.❑ Salt Marshes 1.square feet 2.sq R restoration,rehab.,creation
i. ❑ Land Under Salt
Ponds 1.square feet
2.cubic yards dredged -
j. ❑ Land Containing
Shellfish 1,square feet
k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
1.cubic yards dredged
I. ❑ Land Subject to
Coastal Storm Flowage 1.square feet
4. ❑ Restoration/Enhancement
If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the
square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional
amount here.
a.square feet of BVW b.square feet of Sad Marsh
5. ❑ Project Involves Stream Crossings
a.number of new stream crossings b.number of replacement stream crossings
C. Other Applicable Standards and Requirements
Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review
1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on
the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural
Heritage and Endangered Species Program (NHESP)7 To view habitat maps, see the Massachusetts
Natural Heritage Atlas or go to
http://www.mass.gov/dfwele/dfw/nhesp/regulatory review/priority habitatlonline viewer htm.
a. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
2006 Route 135, North Drive
b.Date of map Westborough, MA 01581
wpaform3.doc•rev.11/16/09 Page 4 of 8
P. vi
,MassDEP:
Massachusetts Department of Environmental Protection -y-
Bureau of Resource Protection - Wetlands MaaeDEP 1 ileNumber
WPA Form 3 - Notice of Intent Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
cily/Town
C. Other Applicable Standards and Requirements (cont'd)
If yes, the project is also subject to Massachusetts Endangered Species Act(MESA) review(321
CMR 10.18). To qualify for a streamlined, 30-day, MESANVetlands Protection Act review, please
complete Section CA.C, and include requested materials with this Notice of Intent (NO I); OR
complete Section C.1.d, if applicable. If MESA supplemental information is not included with the N01,
by completing Section 1 of this form, the NHESP will require a separate MESA filing which may take
up to 90 days to review(unless noted exceptions in Section 2 apply, see below).
1. c. Submit Supplemental Information for Endangered Species Review'
1. ❑ Percentage/acreage of property to be altered:
(a)within wetland Resource Area percentage/acreage
(b)outside Resource Area percentage/acreage
2. ❑ Assessor's Map or right-of-way plan of site
3. ❑ Project plans for entire project site, including wetland resource areas and areas outside of
wetlands jurisdiction, showing existing and proposed conditions, existing and proposed
tree/vegetation clearing line, and clearly demarcated limits of work***'
(a)❑ Project description (including description of impacts outside of wetland resource area&
buffer zone)
(b) ❑ Photographs representative of the site
(c)❑ MESA filing fee(fee information available at:
http://www.mass.gov/dfwele/dfw/nheso/regulatory review/mesa/mesa fee schedule htm).
Make check payable to"Commonwealth of Massachusetts-NHESP" and maff to
NHESP at above address
Projects altering 10 or more acres of land, also submit:
(d)❑ Vegetation cover type map of site
(e)❑ Project plans showing Priority& Estimated Habitat boundaries
d. OR Check One of the Following
1.❑ Project is exempt from MESA review.
Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14,
http://www.mass.gov/dfwele/dfw/nhesp/requlatory review/mesa/mesa exemptions htm;
the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to
310 CMR 10.37 and 10.59.)
2.❑ Separate MESA review ongoing. a.NHESP Tracking# b.Date submitted to NHESP
' Some projects not in Estimated Habitat may be located in Priority Habitat,and require NHESP review(see
http://www.mass.oov/dfwele/dfw/nheso/nhesp,him, regulatory review tab). Priority Habitat includes habitat for state-listed plants and
strictly upland species not protected by the Wetlands Protection Act.
** MESA projects may not be segmented (321 CMR 10.16).The applicant must disclose full development plans even if such plans are
not required as part of the Notice of Intent process.
wpaform3.doc•rev.11/16/09 Page 5 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands
Vas'sDEP File Number
WPA Form 3 - Notice of Intent Document Transaction_ Number,�
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
C. Other Applicable Standards and Requirements (cont'd)
3.❑ Separate MESA review completed.
Include copy of NHESP "no Take" determination or valid Conservation & Management
Permit with approved plan.
2. For coastal projects only, is any portion of the proposed project located below the mean high water
line or in a fish run?
a. ❑ Not applicable—project is in inland resource area only
b.❑ Yes ❑ No If yes, include proof of mailing or hand delivery of NOI to either:
South Shore-Cohasset to Rhode North Shore- Hull to New Hampshire:
Island, and the Cape&Islands:
Division of Marine Fisheries- Division of Marine Fisheries-
Southeast Marine Fisheries Station North Shore Office
Attn: Environmental Reviewer Attn: Environmental Reviewer
1213 Purchase Street—3rd Floor 30 Emerson Avenue
New Bedford, MA 02740-6694 Gloucester, MA 01930
Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region,
please contact MassDEP's Boston Office. For coastal towns in the Southeast Region, please contact
MassDEP's Southeast Regional Office.
3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
Online Users: a.EI Yes ® No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP
Include your Website for ACEC locations). Note: electronic filers click on Website.
document
transaction b.ACEC
number
(provided on 4. Is any portion of the proposed project within an area designated as an Outstanding Resource Water
your receipt (ORW)as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00?
page)with all
supplementary a. ❑ Yes ® No
information you
submit to the 5. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Department. Restriction Act (M.G.L. c. 131, §40A)or the Coastal Wetlands Restriction Act(M.G.L. c. 130, § 105)?
a. ❑ Yes ® No
6. Is this project subject to provisions of the MassDEP Stormwater Management Standards?
a. ® Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management
Standards per 310 CMR 10.05(6)(k)-(q) and check if:
1.❑ Applying for Low Impact Development(LID) site design credits (as described in
Stormwater Management Handbook Vol. 2, Chapter 3)
2.❑ A portion of the site constitutes redevelopment
3.❑ Proprietary BMPs are included in the Stormwater Management System.
b.❑ No. Check why the project is exempt: Project Stormwater Management was
1.EJ Single-family house addressed under DEP File No. 64-391
wpaform3.doc•rev.11/16/09 Page 6 of 8
Massachusetts Department of Environmental Protection Provided,i by MassDEP.
Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number,
Salem
City/Town
C. Other Applicable Standards and Requirements (cont'd)
z.❑ Emergency road repair
3.❑ Small Residential Subdivision (less than or equal to 4 single-family houses or less than or
equal to 4 units in multi-family housing project)with no discharge to Critical Areas.
D. Additional Information
Applicants must include the following with this Notice of Intent(N01). See instructions for details.
Online Users:Attach the document transaction number(provided on your receipt page)for any of the
following information you submit to the Department.
1. ® USGS or other map of the area(along with a narrative description, if necessary)containing
sufficient information for the Conservation Commission and the Department to locate the site.
(Electronic filers may omit this item.)
2. ® Plans identifying the location of proposed activities(including activities proposed to serve as a
Bordering Vegetated Wetland [BVVVj replication area or other mitigating measure) relative to
the boundaries of each affected resource area.
3. ❑ Identify the method for BVW and other resource area boundary delineations(MassDEP BVW
Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.),
andattach documentation of the methodology.
4. ® List the titles and dates for all plans and other materials submitted with this NOI.
Site Development Permit Plan
a.Plan Tide
Eastern Land Survey Associates Inc. Christopher R. Mello, PLS
b.Prepared By c.Signed and Stamped by
May 15, 2012 1"=20'
d.Final Revision Date e.Scale
f.Additional Plan pr Document Title 9.Date
s. ❑ If there is more than one property owner, please attach a list of these property owners not
listed on this form.
6.❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
s. ® Attach NOI Wetland Fee Transmittal Form
9.❑ Attach Stormwater Report, if needed.
wpaform3.doc•rev. 11/16/09 Page 7 of 8
Massachusetts Department of Environmental Protection Provided byblassoEP:
Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 — Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 gocumentTrans-action Number
Salem
City/Town
E. Fees
1. ❑ Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of
the Commonwealth, federally recognized Indian tribe housing authority, municipal housing
authority, or the Massachusetts Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee
Transmittal Form)to confirm fee payment:
2.Municipal Check Number 3.Check date
4.State Ch9Im
mber / 5.Check date
e 2! A �S'fers, ccheck: First Name 7.Payor name on check:Last Name
F. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans,
documents, and supporting data are true and complete to the best of my knowledge. I understand that
the Conservation Commission will place notification of this Notice in a local newspaper at the expense of
the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the
requirements of M.G.L. c. 131, §40. Notice must be made by Certificate of Mailing or in writing by hand
delivery or certif d mail (return receipt requested)to all abutters within 100 feet of the property line of the
project loc tion
� 4Z
.SI ature of Applicant 2.Date
3.Signature of Property Owner(if different) 4.Date
5.Signature of Representative(if any) 6.Date
For Conservation Commission:
Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents, two
copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the Conservation
Commission by certified mail or hand delivery.
For MassDEP:
One copy of the completed Notice of Intent(Form 3), including supporting plans and documents, one
copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP
Regional Office (see Instructions) by certified mail or hand delivery.
Other:
If the applicant has checked the"yes" box in any part of Section C, Item 3, above, refer to that section
and the Instructions for additional submittal requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a
timely manner may result in dismissal of the Notice of Intent.
wpaform3.doc•rev.11/16/09 Page 8 of 8
>�? t SI a s uw
�yy ! '1 vit4roy, '9 :y.n'� afd s9�,,
e r ryrg aJ ?s °w
I,0.�ap3� �1s;�rx�� J����.to ,1 r'Y v�•`�1a
` r
Mi
if!�
r
x�R�tr!•;Gtl ����.�� �,,,'�'2��1�)rJl' �,��i���f ' F'� � 1���"
�-V-3!
d
/T�"'' ���_..�)r v't.,✓ ri:_ �I r��.4( 1��� � � lrs'�1�"_' �l �\, Y�'�`lltti l�� ,\
ti)fXx
n. W a 4' P`'Siir� -� e iii ��'�sF b'�' , •'`lt � ���#.ya
Ci.�yrfhalvl �y Us 1�yHFit . ) 4" (�M �p lcv°n7<>m C•' ri: r{4 ''nail �?e ly�r IR 't
t r 'y .4 t-'°e �, „ s., tee, M.>'�6 ✓ y t �',2 t
i } i�tWk�d .\, z< �y J et'€,n•+KE @61 ! c a n it M rt�tol Y e T+.11
v9�t��a ,s
��,1 ��"dy4t n.'!1 Nt e,F S�F y �'r ✓ 1� Ik"y
„ r�/ ,p
m�erli
". l p(;t�>r ,art �z4 „h � > f v{� y .,ry Z
a+ ,. �, ✓ 1rhr,, 'r-t r 7.. �C ✓ ��.1�� � a
�� ,� 1 f'^•- i *+: � r `ry�r t n"� 1 ° 'F 4! °x r7n d, "3y � sar!
� � v A <. � �, � ✓ { , SPI �r d IS� ) � rs � en! + ° If � ,/`te ws F'A� , �.- .'"1u
,
n� �rcV 1 ! r Fit>f �+✓4." P� n t qV l pkrl Pdt._ 1 t � t f rP > n� s �� -s '�° � a`Lti JS �>> 'rl) ' _ rr `n r?
FA -\Vytt
�Ny " '211
f"f f•.i y,u '� > ro4(n YOB A a" p C> ni} tr r�Rv 1�'A � f,1J�lr Ll��"'' 4\ Hyl v/✓ w s r !t � � f.
u ! t"t a ( t SV y v sub r,Y"{� c N pn h1-'r"- r.r' ✓ / : •<
1-I'ViII sr >,
M
rrl; l Lt E>n v �7F I..•.'ya x � apt • n � � a � f t:" s vk\S t-* i: {( w�. v �r d { /�" f
.��. � i '�� Pi" ✓r 4 p tz ^✓ t r r ,v y^�V..r. �"7���V.t t i�r 3'' yy,,���f� pis' r��a"(1.
fY, D,v i'"rq YryraF fa.dl IeA. l ii ii.+. r� �-. Il
'A ✓ ' ✓r� v f a flpj✓f sylr"l wto cr �+.r+�a
rFj�t P '4 !N! w a v -, ti bl 2,� i� r a s, ,r t d r +rli
t� / r: f' Y: F F w >r n, llr \ ��. 3! `'1* r
5r 5 r yt 0 4 r` :✓J n yt u y lu t"
� � � C �Vw.h ltd /l �K✓'.F rl yrrf �'ai 7" X
. �a•� �a it 6t roa Gro i fs< 'i+rd ✓p r Ike V >' F at < ,ar t rru,' (f d., Iry
� r�n'"if � ✓f J s ro "` t d yryaa 'e, h`t'FA\ eS �+ V N C' t S � n f It tT, U'
t / 4�'''f T v �< d✓ l rti1 rt x .`v s uP ax s n�4J . ,. G^i ur.a/(, r 3 F
! JJ,,iqt �n k" § h §1 Ir .1 r w Y rr {� t < „� r �a r , .�
" J' < C4 �4 Cr ax's ��"��ln! a }rQ tc 'a�74�)1 v+lla rytr" r� .lY d{1Syy yMi 4'.3pt�m rVra ttl � SL.'ar W n Se
s ♦ ro! g >) 1r$t It a A� 1t1,F'* rP t`a s
��.da. tASt.+ f� y� r rp r .lr rn
-ta sfi1� > 'S F iu ttt ro D fy;'r^ r+' 3 T 'Vti Vj�, b,.<1+2 ,l''�` ✓- r-e x w�rG`zi sr✓ �, I P��
sA frt� 1 r >� ;t d� r a (•Lr 1� d nI�M •'3t �S n �� � fr t
!' �,.,, u ,c v Y a �..i%�� s 5 f ba4 ;,e �' t1".r +tvr ' � ► �t) fns).+t J ��n c nt�3�< )✓ 1r
c x-a—OR
! v
r e��St: a � > �8 r(•ul 'It1 atn'r x' ♦y >✓�£rt" tin e- �t r8� "fF✓ i'i lad ,l
�
,
ll
m �� � � '�§c> �" "-:da2, i1✓ r`rr ✓lSct-�
f ro 11 ?n - 3 ' a ibr y�,r� �pl ✓ - l �e tll
M7 ay+ \� � .��, �•G I"i q,4 1(/er�1:M1 � ar�A:�\�i•} f y) �� �� �+ih�.� r r� a}t '4fi '1 . 1� r " n x}x$1!4-
1 MOP C�
t ~, �5 ` �� � r *�yM trf� r" ���'�Fvr ',E:. ,� �' n � � 4« �4✓� v � a\.em
am
f1
! } '� a � t IrY Jw
l ti f {�� � a i � " ♦ 1 r• tt tibd'r-
, i'
'` s r t tr .ItT�t♦ •�/j¢(6 .1,` a c.f I1�4"pt7R'.v i
" :`�.""-.�+..�f V1VI `K�rO
rSNr r �' �t l.. >"dPAN-pr
� p�j •^ !'jl•` d rte. f/� r' rrP
�. c ,. gfP.1 PAY Q� l►//f !a If\ i 1
;�,lO�gg P�V� � / ``"'''t.� f '" 7
�� �r8 � � ♦` � �J. F� iy qnS ;vc t, � to ?a qi't y .
� R/ n /
, �p ��/� ♦ '`O Al tVii
�0112N v
!"_ � _ ✓r3r1..
WAN
rY'{O� 1 f �� ® 1'_J% �/�✓ � �� ,'"�:. 4 ��' .�� � f�t@v � "�f r j t �J/�r�?,:1.
77
174711
'rrrx�,' aa/� •-�" 0J('� /`G*� `q\�fr,k��t•1✓n�y��.,,� 7►��aN rti .«r C r ti
a11�� �..,,,,.+�l: d'� ��lYr11�11�L1tf ����:�ln'o�\� � ✓•"1�! \e/as..� ��al�../A/�/a?�,s��.. .'t�",�a„� ;. T '".:
—s
NOTES: \ \_ s� AIL
1) BOUNDARY AND AS-BUILT SURVEY BY LEBLANC SURVEY zv LP \ A,
ASSOCIATES OF DANVERS, MA. \H _p
PLANTING o A�
2) PLAN DATUM = DEFINITIVE SUBDIVISION PLAN DATUM. � \' O 9�EnTING
AREA #2 0 / \
3) THIS PLAN IS PREPARED FOR THE SOLE PURPOSE OF
./ - WQS �� \
DOCUMENTING AS-BUILT CONDITIONS OF THE SPECIFIED v0
\RESIDENTIAL LOTS (LOT 215 & 228, 230-234) FOR
COMPLIANCE WITH ORDER OF CONDITIONS ISSUED BY THE MAP 9 LOT 335 -
SALEM CONSERVATION COMMISSION ON SEPTEMBER 17, NIF -
2012. THIS PLAN IS NOT SUITABLE FOR ANY OTHER NURSE WAY BUILDERS LLC
PURPOSE OR PROJECT. w E 24 9 NURSE WAY �7
� ��. • Grass \
4) WETLAND RESOURCE AREAS SHOWN HEREON ARE SCALED 20 /- - �y DRIVE #8 Deck \ � LOT 218 \
R \ SINGLE-FAMILY Lot 218
FROM THE SITE DEVELOPMENT PERMIT PLANS (TWO SHEETS) / Rap ^ _Over q PLANTING
AREA
ml
^ RESIDENCE 7,703 s ft. � JC ARE ul
PREPARED BY EASTERN LAND SURVEYORS, REV. DATE / AL aVF B23 Ret. w'au /�/ e �,, Gas- GRG-114.6' / o fr \
�!� �// b5 - DRIVE � -�, '�� Meter '�- FF=119.5' _
917112. B21 822 / /5 - _ \ Ret/ R MAP 14 LOT 327 t
�a11 �u11 Ni \ LOT 217
REFERENCES: / o
\ PLANTING
_ NURSE WAY BUILDERS LLC + /�
1) LAND COURT DOC. #539402 I �� �5 8 NURSE WAY c . All A #1
2) L.C. PLAN 856-13 44 �/ ARE PLANTING _ #9 Shrubs \ �. cN Elec. G x o
3) L.C. PLAN 856-J g j j / / # Z SINGLE-FAMILR Meter ^
RESIDENCE
4) O.O.C. FOR DEP FILE #64-528 (LOT 231) D63 N6/800� 6�1 N -ERF=i2s.87
5) O.O.C. FOR DEP FILE #64-529 (LOT 232) �� UO ,��
6) O.O.C. FOR DEP FILE #64-530 (LOT 230) i RAP SN " \
7) O.O.C. FOR DEP FILE #64-533 (LOT 233) D61 '` 16' _ IR FIyQ �/ RIP 120 N LOT 228 ✓y-FORMER Meter Grass o
8 O.O.C. FOR DEP FILE 64-535 LOT 234 ' � - - \ \
# ( ) / / DECIt _ 6,991 sq.ft.
9) O.O.C. FOR DEP FILE #64-536 (LOT 215) / 122 0\ r e 1 Tree
1 44' !` PLANTING �' Deck
10) O.O.C. FOR DEP FILE #64-531 (LOT 228) � o�AREA 2 A.C. - #5 \cam \
11) 0.0.C. FOR DEP FILE #64-532 (LOT 217) �`1l # SINGLE-FA T T \ DRIVE _ _ PLANTING "
RESIDENCE T �.! AREA #2 \
12) 0.0.C. FOR DEP FILE #64-537 (LOT 218) ���1 AIL � � � GRG=126.2 ��R � Gas eE
FF=128.6 c / \ Meter SINGLE-FAMILY=
Deck
_�_ . �v? Exposed `. Over �
6 /L ry �N N� 100 tf3dSle - � RESIDENCE - / A
\ F, � � w +n� / � a� � 1� _ GRG=11,9.3'
� � 7�\ 230 .-• I FF=122.2' \
809 sq.ft. \ - p
/ ^rye S �,")Ak , _ Lot 217
/ III12� v \/\BIL CONC: l• �'. oW 12,017 sq.ft, o
DRi VE
17' j.1 6 � `H�i �ry� ry`0 I I MAP 14 LOT 326
v �50•�'Yn
DECK #3 \ \ NURSE WAY BUILDERS LLC
/ PLANTIN RAVE �\ / Lot 229 9 6 NURSE WAY
gREA 2 SINGLE-FAMILY 2vJ �, i" Tree 2 /26/15 d o 1
D61 # RESIDENCE. / \ 8,673 sq.ft. \ \ to Plan,
i GRG=126.6BIL CON
tv DMH v�
FF=129.0 000
I a Ji , DRIVE " \ MAP N/�OT 31 - — — - �<" I (1 1 1/5/14 A Lot o an,
IL 27'/ av
1AL 1 INA K 3 / NURSE WAY BUILDERS LLC N
O a
a p / Builders to Title Block
p 7 NURSE WAY
Q; �� No. Date Description
N ^ LOT 231 Revisions
�
9 q.71.
X-FORME
PLANTING
Qe MAP 14 LOT 325
v AREA #1 t / NIF
BARTLETT & STEADMAN
DEVELOPMENT CORP. ROBERT y�
4 NURSE WAY o GR H.
FEIN
BIT. CONC. <\
N PLANTING DRIVE s\ =7.400gas ass
AREA #1 �o\s --- "-122 E OF LAW/V
,� =16. HH
LEDGE LOT 232 / R=25, 09 ~" / S� APPROX. LIMIT
059 \ OUTCROP 9,154 sq.ft. ! i 00 .\ Ss, \ ' X-FORM�ER ( OF WORK
N l�� LOT 215 V cryo /
�P� - ?9R. F GG 11,574 sq.ft. \/ !
Q o E #1 / 0
\ �\0, PLANNG
AR D#2 SINGLE-FAMILY 126 81 L CONC.
`\ �\ RESIDENCE / D < `a !f / 1 OS
e 3R s.. D44 Griffin
32' A GRG 134.2 SS `c / /
�l FF=134,2 ��\`' / i #2 /PLANTING / Englneeling
LOT 233 `'� / q1,
Al � 8,579 sq.ft. o - \ / SINGLE-FAMILY AREA #2 / /\/ � ik / Group, LLC
31c ` #5 ^ C� RESIDENCE / \ / A', .
058 \ s� l l r+'�� INGLE-FAMILY BAYBERRY 70 , GRG=118.1 DECK �� / j/�� ENS 777 / P.O Box 7061
�p�� DEC ,� ' I �,'
RESIDENCE 1 f y� ^�o FF=17.7.0 �� / / / EPSE�A 100 Cummings Center, Suite 224G
A.C GRG-124.4 , 0 / D45 1N
` FF=133.3 �ry A VIBURNUM A.C. ��� pRP Beverly, MA 01915
h U��E TYP OF 3 0� / 5 -
\ 2
23' - " 1^� �p4 / ( �� // / ^off <<< ` Tel: 978-927-5111
"OPEN SPACE" \ << cv D CK AREA (w^ A �y/ , ^^� 36 ry� /' Fax: 978-927-5103
ZRAI/ 14 9�h �rn�� l F� \ �� ^^�/ / 56� 10�'
T MAP 9 LOT 260 N AD
70' �,� \ / �/ /�aD Nurse Way Builders, LLC and
o AS-BUILT MITIGATION PLANTING SCHEDULE N / 76 h �1 BIT. CONC. i
N/F 1 7 43 U4• / Salem Home Builders, LLC
LOT AREA TREE SHRUB QUANTITY BARTLETT & STEADMAN �IBURNUM II / DRIVE \
215 1 RED OAK 1 DEVELOPMENT CORP. � (TYP OF 2) T?o cn f \ MAP 14 LOT 32 /
SWEET PEPPERBUSH 5 40 CIRCLE HILL ROAD �1l, �1� ' \ C 29' S NIF Nurse Way and Good Circle,
IN 2 BAYBERRY 3 n I x� �c ' I '�\ / � ' MARION BARNET MORRIS Salem, MA
�_�• LANTIN PLANTING r' /
A EA #3 AREA #1 > PLANTING �G / !� Villa. I /
230 1 VIKING BLACK CHOKEBERRY 2 13 DELL STREET
H 2 SWEET PEPPERBUSH 3 \ �. 15.00' _=�_ S8824'28"E 102.46' ,l I ` / / AREA #1
231 1 SWEET PEPPERBUSH 4
2 BLACK CHOKEBERRY 3 1 t\FND 117.46' per, tl
232 1 VIKING BLACK CHOKEBERRY 4 PLANTING HHI o V1
2 SWEET PEPPERBUSH 3 D�7 \� REA #1
3 BLUEBERRY 4 \ ' LOT 234 X00 Na D7 \ / AS—BUILT
233 1 BLUEBERRY 4 \ \ u 9,179 sq.ft. cr
N 234 1 SWEET PEPPERBUSH 3 z 128 `'' '' / / SITE PLAN
2 BLUEBERRY 4 \ �m 6 'Q
BIT. CONC. I o
3 VIKING BLACK CHOKEBERRY 3 �� \ #3 DRIVE '
5 228 1 IGRAY DOGWOOD 4
1`
217 1 GREYTWIG DOGWOOD 1 \ ` � INGLE-FAMIL / y
1 BAYBERRY 2 D RESIDENCE A r /
2 BAYBERRY 3 ^ D56 \ ' GRG=125.5 �I 1� , ` /VJ y D48 / SGS 1�=20'
8 ,/q\\ PLANTING A. FF=1.34.4 WAL w / 5 J4b4,; TBD
t 218 1 GREYTWIG DOGWOOD 2 I L Y 2 AREA #2 � 565'3g' /� p —
e 1 BAYBERRY ` cT D51 4 S A p 1
2 SHADBLOW 3 N N` V� \ D49 File e P/P/s/ho
3 RHODODENDRON 4 ` 06� DECK R��• VHF / !! p "!ts �P`N D 7/3/13
N
N
0
NOTES: \ \.
1) BOUNDARY AND AS–BUILT SURVEY BY LEBLANC SURVEY N � ���� D�D
ASSOCIATES OF DANVERS, MA. HH
® G
2) PLAN DATUM = DEFINITIVE SUBDIVISION PLAN DATUM. -
3) THIS PLAN IS PREPARED FOR THE SOLE PURPOSE OF I \
DOCUMENTING AS-BUILT CONDITIONS OF THE SPECIFIED / V "AD�
RESIDENTIAL LOTS (LOT 215 & 228, 230-234) FOR /
COMPLIANCE WITH ORDER OF CONDITIONS ISSUED BY THE MAP 9 LOT 335 \
SALEM CONSERVATION COMMISSION ON SEPTEMBER 17, N/F o
2012. THIS PLAN IS NOT SUITABLE FOR ANY OTHER NURSE WAY BUILDERS LLC \
PURPOSE OR PROJECT. w E v24 9 NURSE WAY Lot 218
\ 7,703 sq.ft. o
4) WETLAND RESOURCE AREAS SHOWN HEREON ARE SCALED '20 _�
FROM THE SITE DEVELOPMENT PERMIT PLANS (TWO SHEETS) / Rtroa I / MAP 14 LOT 327 \
PREPARED BY EASTERN LAND SURVEYORS, REV. DATE / a+s 3 .t B23 / N/F \
05 DRIVE \l \ NURSE WAY BUILDERS LLC
9/7/12. B21 B22 / /5 \ 8 NURSE WAY
REFERENCES: / \
1) LAND COURT DOC. #539402 44' PLANTING #9 -;53
2) L.C. PLAN 856-13 AREA #1SINGLE-FAMiI Shrubs
3) L.C. PLAN 856–J opj / RESIDENCES
4) O.O.C. FOR DEP FILE #64-528 (LOT 231) 063 N6/SD�1 6� e� N — GFF=i?5.87 6� + 00 /
5) 0.0.C. FOR DEP FILE #64-529 (LOT 232) �1i 15�oPE s
6) O.O.C. FOR DEP FILE #64-530 (LOT 230) 2''.. RPP
7) O.O.C. FOR DEP FILE #64-533 (LOT 233) _'' 16 IR F, RIP 12p/ \N �, LOT 228 • ` �- -FORMER \
8) O.O.C. FOR DEP FILE #64-535 (LOT 234) D61 ' / DECK "S� \ 6,991 sq.ft. N
9) O.O.C. FOR DEP FILE #64-536 (LOT 215) \ � \- \. ® \
10) O.O.C. FOR DEP FILE #64-531 (LOT 228) �( ' 44' i PLANTING A.C. #5 �\�n \ Deck _ \ \ MAP 14 LOT 326 \
����/// o• AREA #2 N F
/ n SINGLE-FAMILY o
rr' 0 0 - NURSE WAY BUILDERS LLC o
�� O� o• RESIDENCE / \ 6 NURSE WAY \
��1 ,dr,_ ,++•� / � GRG=126.2 R \
G \ FF=128.6 0J ' Exposed a
,y -A
r F�� Dn �QF ryry Oc X �' �p Ledge �11a�1 Lot 217
\ r
/ V�QPe /k0°o6 / / coo /1 /� "u, \ \ \ LOT 230 \ l 12,017 sq.ft.
tij Q 6, o- a 6,809 sq.ft.
O ' kti v
o I
`KBIT. CONC.
A C. 1L6 vv \\\ DRI�/ 16 H ry I \
R�5 iXf
1T / 0 I
DECK #3
Lot 229 I �I o \
PREASN2 RAVE SINGLE-FAMILY 126/ \` \ / / \
q # \ 8,673 sq.ft.
D61 RESIDENCE.
%DMH �o
i I Q GRG 129.0 BIT. CONC. \
-o
o DRIVE \ MAP 14 LOT 31 �� \ 1 1/5/14 Ad Lot o on,
2T V / Add Nurse Way
N/F / / -- — — — N Builders to Title Block
/ nn / NURSE WAY BUILDERS LLC
�1 V
DE^SAI �K. a o ' \ 7 NURSE WAY / ��
\ I Description
_j Q:
_
Revisions
co m o LOT 231 12
N 1 m 9,196 sq.ft. O
� � X-FORME \ 00. / F
D60 I a PLANTING ®�G`.c� MAP 14 LOT 325
�W F / ,�0� NIF r t.
C AREA #1 32 21 , BARTLETT & STEADMAN /z �
57%7 DEVELOPMENT CORP. /s° ROBERT
4 NURSE WAY o GRIFFIN yIl?
81T CONC. 3'68
\ N PLANTING �� - R=50.0(0 bsas \? �
/ \ \ AREA #1 DRIVE F'�, L=7.47" \ GF OFCq t^u i t ,c „s
���»+»' 00 HH 122 —7 Wly
6.09' / APPROX. LIMIT
D59' OUTCROP LEDGE LOT 23ft ' R=25.0o X-FORMEr�
\ - 9,154 sq.ft. i J �/—OF WORK
OT 2 5 �o /
�N ROOF GG 11,57�t.
\ 0�`oPLANTING #1 / 126 ® \ O / � 2� \ siffi SINGLE-FAMILY B T CGNC. / OD44 r
AREA #2 /r
\ RESIDENCE
32' GRG=125.3 / \ �iA \ Ass / / / Yi!;i °a}
A. 7 -ri,�• �.
\ FF=134.2 ` / �' -� / #2 /PLANTWG / / ;. Engineering
O LOT 233 R� I w� AREA #2 //� / Group LLC
A+ ��+ 8,579 s ft. 1 d " SINGLE-FAMILY 1 t+c. / '
q / ✓� RESIDENCE / '!� 7 /
\ #5 BAYBERRY O GRG=118.1 / ��/ SNS 77 P.0 BOX 7061
D58 r� ' INGLE-FAMILY X I ^� 1 DECK P / M
DEC 4, �' \, RESIDENCE �l \ r / �� / /�� ^� FF=127.0 j / APSE g
\ (, / 100 Cummings Center, Suite 224G
�p GRG=124.4 ` A C'
�0 / '/ Beverly, MA 01915
A.0 ry VIBURNUMP
\ ��� /� ® FF=133.3 100 BU R /�/ / �/ (TYP OF 3 l��G / /� ^o/ 444 25 % Tel: 978-927-5111
l23' v� N �ry ^ �V ; `b�a/ 36 �ry� /� Fax: 978-927-5103
"OPEN SPACE" \ \ AREA Q��
DRAIN
� ) / \ �� 10%
�0 �q�� �rn �� 5% q0 op Nurse Way Builders, LLC and
MAP NLFT 260 ` N 70 / 76, / moi / / BIT. CODRIVENC. 43' / / 04c 1 / Salem Home Builders, LLC
BARTLETT & STEADMAN N ZVIBURNUM I \� / ` / Nurse Way and Good Circle,
DEVELOPMENT CORP. (TYP OF 2) �0 w 29' / MAP 14 LOT 32 y
40 CIRCLE HILL ROAD a,, III I I N�F Salem, MA
} .
.. I MARION BARNET MORRIS
MITIGATION PLANTING SCHEDULE �
AS-BUILT
� '- LANTIN PLANTING r'6 I / 13 DELL STREET //
LOT AREA TREE SHRUB QUANTITY I � � /
215 1 RED OAK \AJ?EA #3 AREA #1 _ AREA PLANTING / �,,,, sir, I / /
SWEET PEPPERBUSH 5 \ ;5.00' _ 588'24'28"E 102.46' _ ,1 I I v 00
h �/
2 BAYBERRY 3 FND 117.46
230 1 VIKING BLACK CHOKEBERRY 2 Dpi \ PLANTING HHS
2 SWEET PEPPERBUSH 3
231 1 SWEET PEPPERBUSH 4 \ RE 1 #1 LOT 234 -- - -� EDG p r U'a / D 7 \ / AS—BUILT
2 BLACK CHOKEBERRY 3 \ 9,179 sq.ft. Q\ I / SITE PLAN
232 1 VIKING BLACK CHOKEBERRY 4 \ o L I I �.-
2 SWEET PEPPERBUSH 3 \
126 BIT. CONC. a_Q,
3 BLUEBERRY 4 � ` \ � \ #3 DRIVE I I (�
233 1 BLUEBERRY 4
234 1 SWEET PEPPERBUSH 3 \ \ INGLE-FAMIL 1 \ / SGS: 1"=20'
2 BLUEBERRY 4 \� ➢ RESIDENCE
3 VIKING BLACK CHOKEBERRY 3 5 1 GRG=125.5 \ / 5*VJ � ' �D48 �. Job No.: TBD
228 1 GRAY DOGWOOD 4 D56 Zl TING A. FF=134.4 WAL w � 65.3 9 AB- 1
AREA
I #2 03
cn ` D51 \ S ��8 049 Fie Name P/P/s/ho
0_QtC 7/3/13
B ! 20 122 120 E 1�8 I I sS 1 14 IE 61 oT 2 los
Ld
122 II \6 I� 106 1 0 / � FRONT YARD 15 FT.
L O T 228 y 108, w /
SIDE YARD 10 FT.
LOT 218 i F REAR YARD 30 FT.
J
20 \ LOT H 0� �
2.30 N71'10'16"E \ o_ ( o o � 3 o LOCUS IS SHOWN ON DEFINITIVE SUBDIVISION PLAN OF LAND
ye' • a N7 12'07'E 3 I i I BY EASTERN LAND SURVEY ASSOCS., REVISED TO DEC. 30, 2004,
S 86.34' \ J
ytK O� LOT 229 0l I 88'98 I ZONING DISTRICT: R1
`L� m �' I I ASSESSORS MAP 9 PART PARCEL 30
\ ° i RECORD OWNER: KENNETH G. STEADMAN
22 1 I \\$ I
I 1
2q \ I I a x1 1 i BUFFER ZONE
BOUNDARY
1
1 I
BUFFER ZONE 26 18.
\ 0
U0 m v� o a Y
BOUNDARY ° \ �� O p Q- p
L DETAIL
LOT 21 7 SILT SOCK FOR EROSION CONTROL
�� �,i% M 0 1 2,01 7 SF. 1"xl"x3' WOODEN POSTS
A AT 8' O.C. (MAX.)
Z o
128 a
\ / ` O # 0 --'t 3 0: �- FLOW DIRECTION
/ a o
\ I �►� I` 0p W —� 8" DIAM. SILT SOCK
126 8
120 I 26• in
EXISTING GROUND
5 �i ao o
8 m I w o`g
z; 0N N +� Vl ��
i 9 A� r J V 6 j y 3 w
100 FEET �P+? �O 0s� J J I w1� o I I 0 0 l A, In
¢
G D
120 ''"✓��A9'� o��\\ I I ��rprjY �q
10 � /—� UPSTREAM CONTRIBUTARY AREA SHALL NOT EXCEED
p, .25 AC. PER 100 LF OF SOCK FOR 8" DIAMETER.
�' -4 / r, SILT SOCK SHALL BE FILLED WITH A MIX OF
LOT 232 l �, y `��0 Gj Lam 26• �` �, 0��°pa / / w W 30-40% WEED FREE COMPOST AND 60 TO 70 9.
122 124 p �' \ a'�. �� �� �� Rm2&00 pQ�"� WOOD CHIPS.
00 Fs0p� I OQQ�v, sy Z Qw DENOTES WETLAND BOUNDARY MARKER
s L
Qo p 6 122 /� I ¢ C� TO BE INSTALLED WITH SALEM CONSERVATION
�� O COMMISSION DISC
O
a Ce i
tzs Q`°Q\° o Fro ti ,�,;
G P?P -j 0: Y o . / / o SMH EXISTING SEWER MANHOLE
T.O.WA245 COQ ��o �p �A/ �`O c~il 0 DMH EXISTING DRAIN MANHOLE
B.o. =122.1
LOT 233 e o 1 _ z EXISTING CATCH BASIN
p .� / oQ 0
5 4 580± �� / 0 P" EXISTING HYDRANT
8
Q °p • / .(� �I O ��T z ,nc EXISTING WATER GATE
1 2A a �r� M10 �0 120 1 •wso EXISTING WATER SHUTOFF
/' ."s EXISTING GAS SHUTOFF
ts�4 �� �' 4 yam — — 100 — EXISTING CONTOUR
y G 100.00 EXISTING SPOT GRADE
\ O I /' UTILITY POLE
S �� �6 O / ' LOT 216 RETAINING WALL
¢ X74" 70"16'
� / r'° `'�`
Q �8' ?�' QO i o0000000o STONE WALL
I l F "6• >> y \� �yo �Q<°0�� `� wAN 17,389± SF. CURB
— FENCE
a LOT 234 / F ,may O �� % PIROPOS D FENCE " JI 1� obi —X—X
N 0 y 9 7 1 79± SF . / / �I 0� / / ' / °�, ' RESOURCE AREA BOUNDARY
LLAV) 9 Cw 2s• f g O ��� \\0 l� /—�� o4i
(� A70 RESOURCE AREA BOUNDARY FLAG
U 0 Py p5�` y oz.s RESOURCE AREA
ROPOSED ryh o �'��� Q�cl? /I_� 7�-- 1ov 100 PROPOSED CONTOUR
(CL n ' tET. WALL 2 p44 TT-/fid p43 BOUNDARY -��
g o Q� o��� / v�� v4� ° 100x0 PROPOSED RETAININGWALLS - o e, ���, Q 3 p LOT 15 z
2 Z2 �2 1 1.9 08[8 \ — - — PROPOSED WATER SERVICE
� N N \ \ oQ � � �aIe i �� ; 11 ,573± SF. / / ° s
— Ss — PROPOSED SEWER SERVICE
.z Q\�o y \\� / DRAINAGE EASEMEN T
140.00'140.00' RES 0 U R C E AREA 91.67'
` /
�–j / S677040 W l RETAINING WALLS OVER FOUR FEET IN HEIGHT SHALL BE DESIGNED BY A
N T.O.W.=124.5 i2 I / / �l ' Q, MASSACHUSETTS REGISTERED PROFESSIONAL ENGINEER AND PERMITTED IN
T.O.W._Iz7.0 w °
121 � 0 120 NSF � vo� ACCORDANCE WITH THE REQUIREMENTS OF THE SALEM BUILDING INSPECTOR.
/ fyQ' I/ MARION MORRIS I A FOUR FOOT FENCE SHALL BE CONSTRUCTED ALONG THE TOP OF ALL RETAINING
> , CIA
1 p 47
DS
PROPOSED InWALL OVER FOUR FEET IN HEIGHT.
SILT FENCE Osj DRAINAGE 2 / I10 108
RESOURCE AREA 44 88'
BOUNDARY— d9•age / r
S64'ST29wW „s3 f p /
r7. 7T7 TTN n3
-.��� f�.0 �1 (���CCC777r;'
/ 949 p4S �� /J'.
EASEMENT DRAINAGE /
RESOURCE AREA \ EASEMENTS
— _
112 SITE DEVELOPMENT PERMIT PLAN
o _ �
114
\ LOCATED IN
"PARKA 18 116 SALEM , MASS .
LOT 235 I '°
PREPARED BY
GENERAL N07ES r ' EASTERN LAND SURVEY ASSOCIATES, INC.
1) THIS PLAN IS THE RESULT OF AN ON THE GROUND FIELD 4) THIS PLAN IS BASED ON THE REFERENCED PLANS, DEEDS P f CHRISTOPHER R. MELL 0, PLS
SURVEY AND PUBLIC AND PRIVATE PLANS. AND TIFRESULTS OF A FIELD SURVEY AS OF THIS DATE �'�,. 104 LOWELL ST. PEABODY, MA. 01960
NO CER7FICA70N IS INTENDED AS TO PROPERTY TITLE
2) U7LI7ES SHOWN ARE BASED UPON FIELD SURVEY AND OR AS TO THE EXISTENCE OF UNWRITTEN OR UNRECORDED �.•` (978) 531 -8121
RECORD PLANS AND ARE NOT NECESSARILY INDICA 7VE OF EASEMENTS
UNDERGROUND CONDITIONS. SCALE: 1 " = 20' MAY 15, 2012
3 THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING AND 5) THE OWNER SHALL CONFIRM COMPLIANCE WITH ALL APPLICABLE PREPARED FOR REV. SEPT. 7, 2012
CODES AND REGULATIONS GOVERNING THE MATERIALS AND/OR
DETERMINING THE LOCATION, SIZE AND ELEVATION OF ALL ME7HOCS OF INSTALLATION OF ANY IMPROVEMENTS DEPICTED
EXISTING UTILITIES, SHOWN OR NOT SHOWN ON THESE PLANS, ON THIS PLAN. KENNETH S TE A D M A N
PRIOR TO ANY CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED
IN WRI7NG OF ANY U7LI7ES FOUND INTERFERING WITH THE
PROPOSED CONSTRUCTION AND APPROPRIATE REMEDIAL ACTION 6) RESOURCE AREA DELINEATION PERFORMED BY RIMMER _-
BEFORE PROCEEDING WITH THE WORK. ENVIRONMENTAL CONSULTING, SEPT. 20, 2000 AND
WETLANDS & LAND MANAGEMENT, INC., ON MAY 24, 2001. 0 10 20 40 60 8
SHEET 1 OF 2 F 11862
I 1 1
�\
RESOURCE AREA BOUNDARY
RESOURCE aav uss I FRONT YARD 15 FT.
SIDE YARD 10 FT.
AREA I110 106 i REAR YARD 30 FT.
Y,9
�\arti` 114 4 I a 10
112 I I I 106 LOCUS IS SHOWN ON DEFINITIVE SUBDIVISION PLAN OF LAND
w / v` DELL (UNC`N TRUCTED) STREET 3 I 1 w BY EASTERN LAND SURVEY ASSOCS., REVISED TO DEC. 30, 2004,
VORTEC�H 1 ZONING DISTRICT: R7
PROPOSED I �-L__ D / fV ASSESSORS MAP 9 PART PARCEL 30
' G6 �7 SILT FENCE 106 F1Li RECORD OWNER: KENNETH G. STEADMAN
0l G� 1 N66'5O'00"E TOW=118.5 BOW = 113.5 I N66'S0' �E � / C�
80.0 '_ 82.00' --r \
7.t97�i
w 116 —'j —�� J * \I ` LOT 218',,
W PROP. CHAIN 20 1 1 PROPOSED TIO I 7,703± SF.
zLOT-230 11� LINK FENCE \ 112
Df� `�EWAY ` \ J I U
1 1 s — :��'v� v°a,w F a6,807± SFS LOT 228 2� tq
W r I 1 �,,
SAX�j 5 w '� Prop. U.'ri ¢ �, 2
,�3 i I Patio 6,991± SF. Q1 s��. I _ - I Lf)o� \ DETAIL
/" 15' '4-j \ 3 o ' l08 SILT SOCK FOR EROSION CONTROL
LOT 231 so' 3 120 a I los
LW Z cc
\\\g Qy�p7 Vv/' I 120 V/ PP �O5E\t�J P � \E•\,R• I gI N $ /g ' v
I � �• �� N 1 .t
q
III� III� IIS1'z1•I I3I'�WO
DEIN I_.PO
S
TS
w9,796± SF. PROPOSED Oo 2 AT 8' O.C. (MAX.)
N p FLOW DRECON
DWNo. 1 04ELLING N in O 8 SILT�q IIDIAM. S120 r � OC
fl) K
.4L, ° N z 4
c�o •GAGE—WAGEZ O N EXISTING
GROUND
Nz EL 126.0 36' Patio p} / N OJ TOEa-oW
24' z a- 3L ,r I I
126 ` 122 a
ro I 3 I 24
.w. 122 24'.e \ \ \ I
p �j I � PROP. SILT
OQpSE� I 1 �s7 6 0 1—N71.10'6'E a ` I I /,,2'0
\ v FENCE 25SAC.APERo00 BUTARY OF SOCKEFORHBLLNOT DAMETER.EED
R a,.°Q ^I P R��KP y�� �" f--1 . N70'12'07'
nl m O o I\ 4j\ Q4--
lL1 ` \22 a 2� O� LOT 229 I \ _ ( 88.99 o9.Z SILT SOCK SHALL BE FILLED WITH A MIX OF
V y, 1 WOOD CHIPS.D FREE COMPOST AND 60 TO 70 Z
co
LOT 17 Io8 I
3 v 120 1 106 w0 DENOTES WETLAND BOUNDARY MARKER
` /Op FEET — / 122 I 1 1 1 i
BUFFER ZONE TO BE INSTALLED WITH SALEM CONSERVATION
W8 11Ow-i 122 e I = BOUNDARY 122 COMMISSION DISC
O t N7J32'21-E \ �� \111 108
L E G E N D
R
�. Z � n.80' / 120 11 1
, � � 1 1
/
PROP. RET. o SMH EXISTING SEWER MANHOLE WALL p DMH EXISTING DRAIN MANHOLE
N ( �
D Q \ �� 1 1 \ I10
r ® EXISTING CATCH BASIN
DRIVEWAY120
I 118 112 opa EXISTING HYDRANT
116 114
oWG EXISTING WATER GATE
oy/Sp EXISTING WATER SHUTOFF
0GAe EXISTING GAS SHUTOFF
26 �� r��` o �\ O\\2��2 — — 100 — EXISTING CONTOUR
I - 100.00 EXISTING SPOT GRADE
I �� UTILITY��' \ ` RETA
RETAINING WALL
3\ N o0000000o STONE WALL
�w
I CURB
'a91 A
U
w io 09ti�OO —X—x— FENCE
o a JJ o �t"cGO RESOURCE AREA BOUNDARY
`y Prop d N A10 RESOURCE AREA BOUNDARY FLAG
I Pow �s`ry' � r 100 PROPOSED CONTOUR
— 100x0 PROPOSED SPOT GRADE
E PROPOSED RETAINING WALL
3t' 24 1, Ba�RZONE \29 h`r%Z Fs 5 -WS — PROPOSED WATER SERVICE
32 \ — SS — PROPOSED SEWER SERVICE
LOT 2
..>e,
9,155± SF. � ' .0 �zro
I 6
7.0.W-p 124.5
II/ B.O.W. _ 121 LOT 233 PROPOSED GRADE
A S,
MND DO' STACKED PROPOSED GRADE
INDIGENOUS
74?e. STONES
F � 6
12�
EXISTING
EXISTING SURFACE
122 124 SURFACE
\tel/��✓/�//�'�:�.�i
SITE DEVELOPMENT PERMIT PLAN
LOCATED IN
SLOPE TREATMENT OPTIONS o
SALEM , MASS .
PREPARED BY
GENERAL NOTES ;. EASTERN LAND SURVEY ASSOCIATES, INC.
{
CHRISTOPHER R. MELL 0, PLS
1) THIS PLAN IS THE RESULT OF AN ON THE GROUND FIELD 4) THIS PLAN IS BASED ON THE REFERENCED PLANS, DEEDS
SURVEY AND PUBLIC AND PRIVATE PLANS. AND THE RESULTS OF A FIELD SURVEY AS OF THIS DATE. 104 LO WE L L ST. P E A B O D Y, MA. 01960� � "
NO CERTIFICAT70N IS INTENDED AS TO PROPERTY TITLE
2) UTIL177ES SHOWN ARE BASED UPON FIELD SURVEY AND OR AS TO THE EXISTENCE OF UNWRITTEN OR UNRECORDED f ' �+ (978) 531 -8121
RECORD PLANS AND ARE NOT NECESSARILY INDICA RVE OF EASEMENTS /
UNDERGROUND CONDI RONS SCALE: 1 " = 20' MAY 159 2012
3) 7HE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING AND 5) THE OWNER SHALL CONFIRM COMPLIANCE WITH ALL APPLICABLE 1 PREPARED FOR REV. SEPT. 7, 2012
DCODES AND REGULAT70NS GOVERNING THE MATERIALS AND/OR
DETERMINING THE LOCATION, SIZE AND ELEVATION OF ALL
METHODS INSTALLA770N OF ANY IMPROVEMENTS DEPICTED KENNETH S TE A D M A N
EXISTING U77Ll77ES, SHOWN OR NOT SHOWN ON THESE PLANS, ON THIS PLAN. �
PRIOR TO ANY CONSTRUC770N. THE ENGINEER SHALL BE N077FIED
IN WRITING OF ANY U77LI77ES FOUND INTERFERING WITH THE
PROPOSED CONSTRUCTION AND APPROPRIATE REMEDIAL ACT70N 6) RESOURCE AREA DELINEATION PERFORMED BY RlMMER
ENVIRONMENTAL CONSULTING, SEPT. RM 2000 AND
BEFORE PROCEEDING WITH THE WORK.
WETLANDS & LAND MANAGEMENT, INC., ON MAY 24, 2001. 0 10 20 Q 60 80
SHEET 2 OF 2 F 11862