Loading...
64-534 - 3 NURSE WAY - CONSERVATION COMMISSION (w i'� ld-1 �I� ,�coriwr' `E2 " CITY OF SALEM J'. CONSERVATION COMMISSION August 21, 2015 George Atkins 59 Federal Street Salem, MA 01970 Re: Extension Permit for Order of Conditions—DEP #64-534-3 Nurse Way Dear Attorney Atkins: Enclosed, please find the Extension Permit for the above-referenced Order of Condition. Please record the original Order of Conditions at the South Essex Registry of Deeds and note the book and page on this Extension Permit. Then record the Extension Permit and provide me with a copy of the recording information pages of both documents, which will indicate to the Commission that the documents have been recorded. If you have any further questions, please feel free to contact me 978-619-5685. Sincerely, To vine Conservation Agent Enclosure CC: DEP Northeast Regional Office Kenneth Steadman L1Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands 1 WPA Form 7 — Extension Permit for Orders of Conditions 64-534 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. General Information Important: When filling out 1. Applicant: forms on the Kenneth G. Steadman computer, use Name only the tab key to move 67 Village Street your cursor- Mailing Address do not use the Marblehead MA 01945 return key. City/Town State Zip Code 2. Property Owner(if different): Name reN Mailing Address Cityrrown State Zip Code B. Authorization The Order of Conditions (or Extension Permit) issued to the applicant or property owner listed above on: 9/17/2012 Issued by: Salem Date Conservation Commission for work at: 3 Nurse Way 9 216 Street Address Assessor's Map/Plat Number Parcel/Lot Number recorded at the Registry of Deeds for: County Book Page Certificate(if registered land) �is hereby extended Until: DA Date a Ord was last extended(if applicable) This date can be no more than 3 years from the expiration date of the Order of Conditions or the latest extension. Only unexpired Orders of Conditions or Extension may be extended. This Extension Permit must be signed by a majority of the Conservation Commission and a copy sent to the applicant and the appropriate DEP Regional Office htt ://www.mass. v/eea/a encies/m a /about/contacts/find-the-massde -re ional-office-for- our-cit -or- town.html . Signatures Date wpaform7.doc•rev.5MM14 Page 1 of 2 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 7 — Extension Permit for Orders of Conditions 64-534 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP C. Recording Confirmation The applicant shall record this document in accordance with General Condition 8 of the Order of Conditions (see below), complete the form attached to this Extension Permit, have it stamped by the Registry of Deeds, and return it to the Conservation Commission. Note: General Condition 8 of the Order of Conditions requires the applicant, prior to commencement of work, to record the final Order(or in this case, the Extension Permit for the Order of Conditions) in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, it shall be noted in the Registry's Granter Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, it shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. Detach this page and submit it to the Conservation Commission prior to the expiration of the Order of Conditions subject to this Extension Permit. To: Conservation Commission Please be advised that the Extension Permit to the Order of Conditions for the project at: Project Location DEP File Number has been recorded at the Registry of Deeds of: County for: Property Owner and has been noted in the chain of title of the affected property in accordance with General Condition 8 of the original Order of Conditions on: Dale Book Page If recorded land the instrument number which identifies this transaction is: Instrument Number If registered land, the document number which identifies this transaction is: Document Number Signature of Applicant waaform7.doc•rev.5/29/2014 Page 2 of 2 Tom Devine From: Ken Steadman <ken@bartlettandsteadman.net> Sent: Monday, August 17, 2015 12:24 PM To: Tom Devine; gwa@ronansegal.com Subject: RE: Order of conditions to expire Att. Tom Devine AICP/Senior Planner and City of Salem Conservation Commission : Bartlett and Steadman development Corp is requesting an extension of the order of conditions for 3 Nurse Way.The reason for the extension is to allow us to finish the detention structure for the drainage system for the subdivision. With access through 3 Nurse Way.We should be completing this project soon and will be moving forward and developing this lot. Thank you and the board for considering this request. Ken Steadman From:Tom Devine [mailto:tdevine@Salem.com] Sent:Wednesday, August 12, 2015 1:44 PM To: Ken Steadman<ken@bartlettandsteadman.net> Subject: RE: Order of conditions to expire Yes. I saved a spot on the August 20 agenda. Tom Devine, AICP I Senior Planner City of Salem Department of Planning &Community Development 120 Washington St., 3rd Floor I Salem, MA 01970 978-619-5682 1 Fax: 978-740-0404 1 tdevine(a)salem.com From: Ken Steadman [mailto:ken(&ba rtletta ndsteadman.net] Sent: Wednesday, August 12, 2015 1:25 PM To: Tom Devine Subject: RE: Order of conditions to expire I will have a letter for you Monday the17 is that ok? From:Tom Devine [mailto:tdevine@Salem.com] Sent:Thursday,July 16, 2015 9:31 AM To: Ken Steadman <ken@bartlettandsteadman.net> Subject: RE: Order of conditions to expire You should submit a brief letter explaining your request.The next ConCom meeting is August 20 and you are welcome to have your request on that agenda. Tom Tom Devine, AICP ( Senior Planner City of Salem Department of Planning &Community Development 120 Washington St., 3rd Floor I Salem, MA 01970 (V) 978-619-56821 (F) 978-740-0404 tdevine(a)salem.com I salem.com From: Ken Steadman [mailto:ken@bartlettandsteadman.net] — Sent: Thursday, July 16, 2015 8:26 AM 1 �ONOIT9; vt� qA jL CITY OF SALEM CONSERVATION COMMISSION SITE VISIT FORM PROJECT LOCATION: DATE OF SITE VISIT• /�_� PROJECT PROPONENT: DEP FILE NUMBER:—C; / -- PROPOSED WORK: b i I t 1 I ATTENDANCE: Commission Members/Agent: Abutters: • Applicant/Property Owner/Representative: 4-- li U,.. U SSTTE VISkf PURPOSE r n. < < : ;a E!='Ry :, m :';: i,, =..•e�,n ...,.,,` r=o-�..,. ..u.:... ,..,n�3.. ..,=tltr Anus__ �m mcair:.u....a➢W SITE VISITj,DOCUM,ENTATION �'";°�� w`irA % �Eijd;�u �'l9aA�r « s3Bd�n;,._„���� ❑Photos ❑ Site Map El Other: Take into account relevant aspects or features such as: natural or piped drainage or obvious pollution; topography; existing vegetation; possible alternative sites; signs of wildlife, possible vernal pools, rare species habitat; landmarks; recentor storical disturbances; proximity to other water bodies or drainage areas; adjacent land uses. !� i ma. ux 9, _.emmxnyu RZC72S MENDAT`IONS P Ad a v C�J \ 1 k€ ;n 8�, .gyp E RONAN, SEGAL & HARRINGTON WED ATTORNEYS AT LAW q r'� 7f1 FIFTY-NINE FEDERAL STREET NOY U 5 2015 JAMES T.RONAN(19221987) SALEM,MASSACHUSETTS 01970-3470 JACOB SSEGAL DEPT. OF PLANNING& . MARY PIEW.AT HTON COMMUNITY DEVELOPMENT GEORGE W. TKINS III III TEL(978)7447350 FAX(978)7447493 FILE NO.5-1041.6 OF COUNSEL JOHN H.RONAN MICHAEL J.ESCHELBACHER November 2, 2015 Salem Conservation Commission 120 Washington Street Salem, MA 01970 ATTN: Thomas Devine RE: Witch Hill Subdivision Dear Mr. evine�y-+ .r Enclosed please find the recording information for the original Order of Conditions for 3 Nurse Way and recording confirmation of the Extension Permit for the same property, Also enclosed is a copy of the Conservation Commission Restriction and Easement recorded in connection with the subdivision. V.ery'truly yours, G rge W. Atkins, III GWA/dap Enclosures Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-534 WPA Form 5 — Order of Conditions MassDEP File Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction k Salem City/Town G. Recording Information Prior to commencement of work,this Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district In which the land is located, within the chain of title of the affected property. In the case of recorded land,the Final Order shall also be noted In the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land,this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions.The recording information on this page shall be submitted to the Conservation Commission listed below. Conservation Commisslon Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. ------------------------------------------------------------------------------------------ -------- To: a /P- Conservation Commission Please be advised that the Order of Conditions for the Project at: Project Location —� MassDEP File Number Has been recorded at the Registry of Deeds of: County Book Page Bartlett & Steadman Development Corp. for: Property Omer and has been noted In the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: 9/17/2012 Date If recorded land, the instrument number identifying this transaction Is: Instrument hYimoer If registered land, the document number Identifying this transaction is: Docum t um r igna r I Applicant wPalormS Eoc• ray.09182010 Page 12 o112 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 7 — Extension Permit for Orders of Conditions 64-534 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP C. Recording Confirmation The applicant shall record this document in accordance with General Condition 8 of the Order of Conditions (see below), complete the form attached to this Extension Permit, have it stamped by the Registry of Deeds, and return it to the Conservation Commission. Note: General Condition 8 of the Order of Conditions requires the applicant, prior to commencement of work, to record the final Order(or in this case, the Extension Permit for the Order of Conditions) in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, it shall be noted in the Registry's Granter Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, it shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. Detach this page and submit it to the Conservation Commission prior to the expiration of the Order of Conditions subject to this Extension Permit. To: SALEM Conservation Commission Please be advised that the Extension Permit to the Order of Conditions for the project at: 3 Nurse Way 64-534 Project Location DEP File Number has been recorded at the Registry of Deeds of: Essex South District County for: Bartlett & Steadman Development Corp. Property Owner and has been noted in the chain of title of the affected property in accordance with General Condition 8 of the original Order of Conditions on: 9/17/2012 536277 Date Document No. Book Page If recorded land the instrument number which identifies this transaction is: Instrument Number If registered land, the document number which identifies this transaction is: MMU 566110 Document N'u(\'mbbeerr n re of Applicant wpaform]doc•rev.5129/2014 Page 2 of 2 Attachment to Order of Conditions # 64-534 a_Zt�p V Page 1 of 5 SALEM CONSERVATION COMMISSION DEP FILE #64-534 3 Nurse Way City of Salem, Massachusetts ADDITIONAL FINDINGS Based on the Estimated Habitats of Rare Wildlife and Certified Vernal Pools Map (October I, 2008) from Natural Heritage & Endangered Species Program (NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contains any vernal pools. This Order is issued under the Massachusetts Wetlands Protection Act,M.G.L. Chapter 131, Section 40 and the City of Salem Wetlands Protection and Conservation Ordinance,Salem Code Chapter 50. This order permits the construction of a single-family house and appurtenances per Notice of Intent submitted June 20, 2012. SPECIAL CONDITIONS 1. This Order of Conditions must be recorded in its entirety (including all 5 pages of Special Conditions) at the Essex County Registry of Deeds or the Land Court for the district in which the land is located, after the expiration of the 10-day appeal period and within 30 days of the issuance. A copy of the recording information must be submitted to the Salem Conservation Commission before any work approved in this Order commences. 2. Approval of this application does not constitute compliance with any law or regulation other than M.G.L Chapter 131, Section 40, Wetlands Regulations 310 CMR 10.00 and the f Salem Wetlands Protection and Conservation Ordinance,Salem Code Chapter 50. i 3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No alteration of wetland resource areas or associated buffer zones, other than that approved in this Order, shall occur on this property without prior approval from the Commission. 4. Prior to any work commencing on site, a DEP Sign showing DEP File#64-534 must be installed at the entrance to the site and seen from the public way, but not placed on a living tree. 5. No work approved in this Order may commence until the ten(10)business day,appeal period has lapsed from the date of the issuance of this Order. 6• With respect to this Order, the Commission designates the Conservation Agent as its agent with powers to act on its behalf in administering and enforcing this Order. 7. The Commission or its Agent,officers, or employees shall have the right to enter and inspect the property at any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131, Section 40, the Wetlands Regulations 310 CMR 10.00, and shall have the right to require any data or documentation that it deems necessary for that evaluation. Attachment to Order of Conditions # 64-534 atirt` Page 2 of 5 8. The term "Applicant" as used in this Order of Conditions shall refer to the owner,any successor in interest or successor in control of the property referenced in the Notice of intent, supporting documents and this Order of Conditions. The Commission shall be notified in writing within 30 days of all transfers of title of any portion of the property that takes place prior to issuance of the Certificate of Compliance. 9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and approvals associated with this project. These permits may include but are not necessarily limited to the following: (l) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816), U.S. Army Corps of Engineers. (2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00. (3) Sewer Extension Permit from the DEP Division of Water Pollution Control under G. L. Ch. 21 A ss7 and 314 CMR 7.00. Any Board of Health permit for septic system design for any portion of the septic system within 100 feet of wetlands shall be submitted to the Commission prior to construction initiation. (4) Design Requirements for Construction in Floodplains under the State Building Code (780 CMR 744.). 10. If there are conflicting conditions within this Order, the stricter condition(s) shall rule. 11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters during construction or after completion of the project. 12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods and boundary during constriction if necessary. 13. The Commission reserves the right to impose additional conditions on portions of this project or this site to mitigate any actual or potential impacts resulting from the work herein permitted. 14. The work shall conform to the following attached plans and special conditions: Final Approved Plans Site Development Permit Plan Located in Salem, Mass. (Title) 9/7/2012 (Dated) Clayton Morin (Signed and Stamped by) City of Salem Conservation Commission (On file with) 15. Any proposed changes in the approved plan(s)or any deviation in construction from the approved plan(s) shall require the applicant to file a Notice of Project Change with the Commission. The Notice shalt be accompanied by a written inquiry prior to their implementation in the field, as to whether the change(s) is substantial enough to require filing a new Notice of Intent or a request to correct or amend Attachment to Order of Conditions # 64-534 Page 3 of 5 this Order of Conditions. A copy of such request shall at the same time be sent to the Department of Environmental Protection. 16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has been issued, the applicant or current landowner shall submit to the Commission a statement signed by the buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of the Order of Conditions. PRIOR TO CONSTRUCTION 17. Prior to the commencement of any activity on this site other than activities listed above, there must be a Pre-Construction Meeting on site between the project supervisor, the contractor responsible for the work, and the Conservation Agent and/or a member of the Conservation Commission to ensure that the requirements of the Order of Conditions are understood. The staked erosion control line shall be adjusted, if necessary, during the pre-construction meeting. Please contact the Conservation Agent at (978) 619-5685 at least forty-eight (48) hours prior to construction to arrange for the Pre- Construction Meeting. 18. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The Commission and/or its Agent shall inspect and approve such installation at the pre-construction meeting. 19. No clearing of vegetation, including trees,or disturbance of soil shall occur prior to the pre-construction meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre- construction meeting if absolutely necessary in order to place erosion control stakes where required. 20. There shall be sufficient erosion controls stored under cover on the site to be used for emergency erosion control purposes. EROSION CONTROL 21. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction, and shall be maintained during construction in any wetland resource area and/or buffer zones. The erosion control measures shown on the approval plan(s)and provisions in the Order will be the minimum standards for this project; the Commission or its Agent may require additional measures. 22. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland resource areas to prevent sediment from entering wetland resource areas. 23. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 24. The area of construction shall remain in a stable condition at the close of each construction day. 25. Any de-watering of trenches or other excavation required during construction shall be conducted so as to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered through hay bale sediment traps, silt filter bags or other means approved by the Commission or its Administrator. ..ry S A` Attachment to Order of Conditions # 64-534 Page 4 of 5 26. Within thirty(30) days of completion of construction on any given portion of the project, all disturbed areas in the completed portion of the site shall be permanently stabilized with rapidly growing vegetative cover, using sufficient top soil to assure long-term stabilization of disturbed areas. 27. If soils are to be disturbed for longer than two(2) months, a temporary cover of rye or other grass should be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth, exposed surface shall be stabilized by other appropriate erosion control measures, firmly anchored, to prevent soils from being washed by rain or flooding. DURING CONSTRUCTION 28• A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all times when work is in progress. 29. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on the approved plan(s). 30. All waste products,grubbed stumps,slash;construction materials,etc. shall be deposited at least 100 feet from wetland resource areas and 200 feet from river. 31. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be immediately removed. 32. All exposed sub-soils shall be covered by a minimum of three(3) inches of quality screened loam topsoil prior to seeding and final stabilization. 33. Immediately following drainage structure installation all inlets shall be protected by silt fence, haybale barriers and/or silt bags to filter silt from stormwater before it enters the drainage system. 34. There shall be no pumping of water from wetland resource areas. 35. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other components shall be fixed immediately. 36. During construction,all drainage structures shall be inspected regularly and cleaned as necessary. 37. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance of enforcement actions by the Conservation Commission including, but not limited to,civil administrative penalties under M.G.L Chapter 21A, section 16. AFTER CONSTRUCTION 38. Upon completion of construction and final soil stabilization, the applicant shall submit the following to the Conservation Commission to request a Certificate of Compliance (COC): (1) A Completed Request for a Certificate of Compliance form (WPA Form 8A or other form if required by the Conservation Commission at the time of request). (2) A letter from a Registered Professional Engineer certifying compliance of the property with this Order of Conditions. (3) An "As-Built" plan signed and stamped by a Registered Professional Engineer or Land Surveyor showing post-construction conditions within all areas under the jurisdiction of the Massachusetts Wetlands Protection Act. This plan shall include at a minimum: Attachment to Order of Conditions # 64-534 Page 5 of 5 S' j (a) All wetland resource area boundaries with associated buffer zones and regulatory setback f areas taken from the plan(s)approved in this Order of Conditions; (b) Locations and elevations of all stormwater management conveyances, structures and best management designs, including foundation drains,constructed under this Order within any wetland resource area or buffer zone; (c) Distances from any structures constructed under this Order to wetland resource areas- 11structures"include, but are not limited to, all buildings,septic system components, wells, utility lines, fences, retaining walls,and roads/driveways; (d) A line delineating the limit of work-"work" includes any filling,excavating and/or disturbance of soils or vegetation approved under this Order; 39. When issued, the Certificate of Compliance must be recorded at the Southern Essex County Registry of Deeds and a copy of the recording submitted to the Salem Conservation Commission. 40. If the completed work differs from that in the original plans and conditions, the report must specify how the work differs; at which time the applicant shall first request a modification to the Order. Only upon review and approval by the Commission, may the applicant request in writing a Certificate of Compliance as described above. 41. Erosion control devices shall remain in place and properly functioning until all exposed soils have been stabilized with final vegetative cover and the Conservation Commission and/or its Agent has authorized their removal. ADDITIONAL CONDITIONS 42. Prior to construction, a plantings plan developed by a wetlands scientist must be submitted to the conservation commission for review and approval. 4 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-534 WPA Form 5 - Order of Conditions MasSDEP File H Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction k Salem Citylrown A. General Information Please note` Salem this form has t. From: been modified Conservation Commission with added 2. This issuance is for space to accommodate (check one): a. ®Order of Conditions b. ❑Amended Order of Conditions the Registry of Deeds 3. To: Applicant: Requirements Kenneth G. Steadman Important: a. First Name b.Last Name When filling out forms c.Organization on the 67 Village Street computer, use only the d Mailing Address tab key to Marblehead MA move your e.City/Town 01945 cursor-do I.State g.Zip Code not use return keye 4. Property Owner(if different from applicant): rtl a. First Name b.Last Name c.Organization rerun d.Mailing Address e.City/rown I.State g.Zip Code e. Project Location: 3 Nurse Way Salem a. Street Address 9 b.Citylrown c.Assessors Map/Plat Number 216 d. Parcel/Lot Number Latitude and Longitude, if known: 42d30m35s 70d55mO9s d. Latitude e. Longitude wpaforra5.dPa- rev.o5/iw2oio - Page I of 12 is f r Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-534 WPA Form 5 - Order of Conditions MassDEPFIIe# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem A. General Information (cont.) City/Town 6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel): Southern Essex 80814&80815 a.County b.Certificate Number(if registered land) c. Book d.Page 7. Dates: 6/20/2012 9/13/2012 9/17/2012 a.Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance 8. Final Approved Plans and Other Documents (attach additional plan or document references as needed): Site Development Permit Plan Located in Salem Mass a.Plan Title _Eastern Land Survey AssociatesClayton A. Morin b.Prepared By - c.Signed and stamped by 9/7/2012 1"=20' d.Final Revision Date e.Scale I.Additional Plan or Document Title g.Date B. Findings t. Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act(the Act). Check all that apply: a. ® Public Water Supply b. ❑ Land Containing Shellfish c' ® Prevention of Pollution d. ® Private Water Supply e. ® Fisheries f. ® Protection of Wildlife Habitat g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control 2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes) Approved subject to: a. ® the following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. wpalorm5.doc• rev.05/19/2010 Page 2 of 12 az Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands WPA Form 5 - sa-s E ' Order of Conditions MassDEP F---- Ile g Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 -- eDEP Transaction k Salem B. Findings (cont.) °ia�°— --- Denied because: b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect the interests of the Act, and a final Order of Conditions is issued. A description of the performance standards which the proposed work cannot meet is attached to this Order. c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific Information which is lacking and why it Is necessary is attached to this Order as per 310 CMR 10.05(6)(c). 3. ® Buffer Zone Impacts: Shortest distance between limit of project 10' +/- disturbance and the wetland resource area specified in 310 CMR 10.02(1)(a) a.-linear feet Inland Resource Area Impacts: Check all that apply below. (For Approvals Only) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 4. ❑ Bank a.linear feet bc ,linear feet .linear feet a. El Bordering d. linear feet Vegetated Wetland a.square feet b.square feet c.-square feet s. ❑ Land Underd.square feet Waterbodies and a,square feet b.square feet c.-square feet Waterwaysd.square feet e.c/y dredged f.Gy-dredged 7. El Bordering Land Subject to Flooding a.square feet b.square feet c.square feet d.square feet Cubic Feet Flood Storage e. D Isolated Land e.cubic feet f.cubic feet g' cubic feet h.cubic feet Subject to Flooding a.square feet b.square feet Cubic Feet Flood Storage c.cubic feet d.cubic feet s• ❑ Rivertront Area e.cubic feet f.cubic feet 1^r,1<^ rove b.total sq.feet Sq ft within 100 ft <^ =.a r=er d.square feet o f.square feet Sq ft between 100- <^��=r ro<r 200 ft <^ �•a rom h.square feet <^,„e roor j.square feet wpafO1.5.d=- rev.05/19/2010 Page 3 of 12 ' Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-534 WPA Form 5 - Order of Conditions MassDEP File R Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction f! Salem B. Findings (cont.) City/Town Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only) Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement o. [I Designated Port Areas Indicate size under Land Under the Ocean, below 'I. ❑ Land Under the Ocean a.square feet b.square feet c.ply dredged d.c/y dredged 12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 13. ❑ Coastal Beaches cu yd cu yd a.square feet b.square feet c.nourishment d.nourishment 14. ❑ Coastal Dunescu yd _ Cu yd a.square feet b.square feet c.nourishment d.nourishment 15. ❑ Coastal Banks a. linear feet b.linear feet ts. ❑ Rocky Intertidal Shores a.square feet b.square feet 17. ❑ Salt Marshes ts. Land Under Salt a.square feet b.square feet c.square feet d.square feet ❑ Ponds a.square feet b.square feet c.Gy dredged d.c/y dredged ts. El Land Containing Shellfish a.square feet b.square feet c.square feet d.square feet 20. ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above a.c/y dredged b.c/y dredged zt. El Land Subject to Coastal Storm a.square feet b.square feet Flowage wpatorm&doc• rev.091912010 Page 4 d 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-534 WPA Form 5 — Order of Conditions MassDEP FileN Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction If Salem City/Town B. Findings (cont.) p 22.I is for the 22. F­1Restoration/Enhancement the purpose of restoring or a.square feet of BVW b.square feet of salt marsh enhancing a wetland resource area 23. ❑ Stream Crossing(S): ' in addition to the square footage that a.number of new stream crossings b.number of replacement stream crossings has been C. General Conditions Under Massachusetts Wetlands Protection Act entered in Section B.5.c (BVW)or The following conditions are only applicable to Approved projects. B.1 Te(Salt Marsh)above, 1. Failure to comply with all conditions stated herein, and with all related statutes and other please enter regulatory measures, shall be deemed cause to revoke or modify this Order. the additional 9 Y Y amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not extend the issuance date of the original Final Order of Conditions and the Order will expire on 9/17/2012 unless extended in writing by the Department. 7. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 8. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. wpaform5.tloc• rev.05/19/2010 Page 5 of 12 Massachusetts Department of Environmental Protection Provided by MaSSDEP: Bureau of Resource Protection - Wetlands 64-534 WPA Form 5 - Order of Conditions MassDEP File# \ Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem CityTown C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) 9. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registrys Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to the Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 10. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection"[or, "MassDEP"] "File Number 64-534 " 11. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before MassDEP. 12. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A)to the Conservation Commission. 13. The work shall conform to the plans and special conditions referenced in this order. 14. Any change to the plans identified in Condition #13 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. wpaform5.doc• rev.05/19/2010 Page 6 of 12 r� Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-534 WPA Form 5 - Order of Conditions assDE MassDEP F— iie p Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 TD eDEP Transaction# Salem C. General Conditions Under Massachusetts Wetlands Protection Ac 18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant orhis/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS The work associated th 19 Mas ac usetts Stormwater r St an Standards. If the wrder(the ork)is subject to the Sto subject mwaterto the Standards, then the project is subject to the following conditions: a) All work, including site preparation, land disturbance, construction and redevelopment, shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Construction General Permit as required by Stormwater Condition 8. Construction period erosion, sedimentation and pollution control measures and best management practices (BMPs) shall remain in place until the site is fully stabilized. b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/or treatment, the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures; ii. as-built final construction BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized; W. any illicit discharges to the stormwater management system have been removed, as per the requirements of Stormwater Standard 10; iv. all post-construction stormwater BMPs are installed in accordance with the plans (including all planting plans)approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetation associated with post-construction BMPs is suitably established to withstand erosion. wpaf0rm5.tloc• rev.mig/2olo Page 7 of 12 ik 5. Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-534 WPA Form 5 — assDE Order of Conditions MassDEP F--- iiap ---' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 ---__ eDEP Transaction# Salem C. General Conditions Under Massachusetts Wetlands Protection Ac c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible party(defined in General Condition 18(e)) shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement("O&M Statement) for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan ("O&M Plan") and certifying the following: i.) the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance, and ii.) the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. d) Post-construction pollution prevention and source control shall be implemented in accordance with the long-term pollution prevention plan section of the approved Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Multi-Sector General Permit. e) Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement, assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of the property must submit to the issuing authority a legally binding agreement of record, acceptable to the issuing authority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 18(f) through 18(k)with respect to that BMP. Any failure of the proposed responsible party to implement the requirements of Conditions 18(f) through 18(k) with respect to that BMP shall be a violation of the Order of Conditions or Certificate Of Compliance. In the case of stormwater BMPs that are serving more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans, the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. wpalorm5eoc• rev.o5/19/2o10 Page a of 12 f Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-534 WPA Form 5 - Order of ConditionsassDE MassDEP F---- ije g Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 --EP —__ -e—DEP Transaction# Salem C. General Conditions Under Massachusetts Wetlands Protection Act g) The responsible party shall: 1. Maintain an operation and maintenance log for the last three (3) consecutive calendar years of inspections, repairs, maintenance and/or replacement of the stormwater management system or any part thereof, and disposal (for disposal the log shall indicate the type of material and the disposal location); 2. Make the maintenance log available to MassDEP and the Conservation Commission ("Commission") upon request; and 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. changed without the prior written approval of the issuing authority. j) The stormwater management system approved in the Order of Conditions shall not be k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit(as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits)shall not be altered without the prior written approval of the issuing authority. 1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions (if you need more space for additional conditions, please attach a text document): wpaf0rm5.tloc• rev.o6rl9/2olo Page 9 of 12 jy. �5. Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands -534 WPA Form 5 - sassDE k Order of Conditions MassDEP F------ije g —"-- Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 -- eDEP Transaction p Salem r D. Findings Under Municipal Wetlands Bylaw or ordinance t. Is a municipal wetlands bylaw or ordinance applicable? ® Yes 2. The Salem El No conservation Commission hereby finds (check one that applies): a. ❑that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw, specifically: 1.Municipal Ordinance or Bylaw 2.Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. b. ®that the following additional conditions are necessary to comply with a municipal ordinance or bylaw: Wetlands Protection and Conservation 1. Municipal Ordinance or Bylaw c.50 2. 3. The Commission orders that all work shall be performed in accordance with the folllotwing conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows (if you need more space for additional conditions, attach a text document): Attached special conditions are issued under the Wetlands Protection Act and are sufficient for compliance with the local ordinance c.50 wpaform5.doc• rev.05r19/2010 t Page 10 of 12 b I t, Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands G —r3 WPA Form 5 - Order of Conditions MassDEP Fite Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 --eDEPTr n sact CityCity/Tow E. Signatures Important: This Order is valid for three years, unless otherwise specified as a special _ When filling out forms on the condition pursuant to General Conditions#4, from the date of issuance. 1.Dae of Issuance comcate he number rs who will sign this m. onlypthe tab key This Order ur,use Please itmust signed byfa majority of the Conservation Commission. 2.Num er of Signers to move your cursor- not The Order must be mailed by certified m ' return receipt re u sled)or hand delivered to use the return theapplicant.pplicant. A copy must be mailed, hand edor fil del ctro ieally At the same time with the appro sDEP Regional Office. �/ ,d • i e oar, C ❑ by ha d delivery on {-by certified mail, return receipt requested, ann Date Date F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order.A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act(M.G.L. C. 131, §40), and is inconsistent with the wetlands regulations(310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. wpasslgs.doc• rev.0225M10 Pagell a/j_�, f Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-534 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem G. Recording Information 61tylTown Prior to commencement of work, this Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on this page shall be submitted to the Conservation Commission listed below. Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. ---------------------------------------------------------------------------------- - To: ------ ---------- Conservation Commission Please be advised that the Order of Conditions for the Project at: Project Location MassDEP File Number Has been recorded at the Registry of Deeds of: County Book pag_—e'_------ for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant 11paform5.tloc• rev.05/19/2010 Page 12 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 3 - Notice of Intent Document transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem City/Town Important: When filling out A. General Information forms on the computer,use 1. Project Location (Note: electronic filers will click on button to locate project site): only the tab key to move your 3 Nurse Way Salem 01970 cursor-do not a.Street Address b.City/Town c.Zip Code use the return key. Latitude and Longitude: 42-30-35 70-55-09 d.Latitude e.Longitude d Map 9 Part Parcel 30 Lot 216 f.Assessors Map/Plat Number g.Parcel/Lot Number 2. Applicant: Kenneth G. Steadman a.First Name b.Last Name Note: Before c.Organization completing this form consult 67 Village Street your local d.Street Address Conservation Marblehead MA 01945 Commission e.City/Town f.State g.Zip Code regarding any 781-631-3751 municipal bylaw or ordinance. h.Phone Number i.Fax Number j.Email Address 3. Property owner(required if different from applicant): ❑ Check if more than one owner Same a.First Name b.Last Name c.Organization d.Street Address e.City/Town f.State g.Zip Code h.Phone Number i.Fax Number j.Email address 4. Representative (if any): Attorney George W. Atkins III a.First Name b.Last Name Ronan, Segal & Harrington c.Company 59 Federal Street d.Street Address Salem MA 01970 e.City/Town f.State \g.Zip Code 978-744-0350 h.Phone Number i.Fax Number j.Email address 5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form): 500.00 237.50 262.50 a.'Cotal Fee Paid b.State Fee Paid c.City/Town Fee Paid wpaform3.doc•rev.11/16/09 Page 1 of 8 LlMassachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands MaaaoEP Fde Number WPA Form 3 - Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 pocument Transaction NumberSalem city/Town A. General Information (continued) 6. General Project Description: Construction of single family dwelling driveway, utilities grading and landscaping 7a. Project Type Checklist: 1. Z Single Family Home 2. ❑ Residential Subdivision 3. ❑ Limited Project Driveway Crossing 4. ❑ Commercial/Industrial 5. ❑ Dock/Pier 6. ❑ Utilities 7. ❑ Coastal Engineering Structure 8. ❑ Agriculture(e.g., cranberries, forestry) 9. ❑ Transportation 10. ❑ Other 7b. Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 (coastal) or 310 CMR 10.53 (inland)? 1. ❑ Yes Z No If yes, describe which limited project applies to this project: 2.Limited Project 8. Property recorded at the Registry of Deeds for: Essex South 80814 & 80815 a.County b.Certificate#(if registered land) c.Book d.Page Number B. Buffer Zone & Resource Area Impacts (temporary & permanent) 1. Z Buffer Zone Only—Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland, Inland Bank, or Coastal Resource Area. 2. ❑ Inland Resource Areas (see 310 CMR 10.54-10.58; if not applicable, go to Section 8.3, Coastal Resource Areas). Check all that apply below. Attach narrative and any supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. For all projects affecting other Resource Area Size of Proposed Alteration Proposed Replacement(if any) Resource Areas, please attach a narrative a. F-1 Bank 1.linear feet 2.linear feet explthe resource how b. ❑ Bordering Vegetated a e resource area was Wetland 1.square feet 2.square feet delineated. c.❑ Land Under 1.square feet 2.square feet Waterbodies and Waterways 3.cubic yards dredged wpaform3.doc•rev. 11116109 Page 2 of 8 L1Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - WetlandsMaaaDEP File Number WPA Form 3 — Notice ofsIntent ,Document TransactionNumbei Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem CttylTown B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont'd) Resource Area Size of Proposed Alteration Proposed Replacement(if any) d. ❑ Bordering Land Subject to Flooding 1,square feet 2.square feet 3,cubic feet of flood storage lost 4.cubic feet replaced e. ❑ Isolated Land Subject to Flooding 1.square feet 2.cubic feet of flood storage lost 3.cubic feet replaced f. ❑ Riverfront Area 1.Name of Waterway(if available) 2.Width of Riverfront Area (check one): ❑ 25 ft. - Designated Densely Developed Areas only ❑ 100 ft. -New agricultural projects only ❑ 200 ft. -All other projects 3.Total area of Riverfront Area on the site of the proposed project: square feet 4. Proposed alteration of the Riverfront Area: a.total square feet b.square feet within 100 ft. c.square feet between 100 ft.and 200 ft. 5. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes❑ No 6.Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes❑ No 3. ❑ Coastal Resource Areas: (See 310 CMR 10,25-10.35) Check all that apply below. Attach narrative and supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online Users: Include your Resource Area Size of Proposed Alteration Proposed Replacement (if any) document transaction a. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below number (provided on your receipt b. ❑ Land Under the Ocean 1 page)with all .square feet supplementary Information you 2.cubic yards dredged submit to the Department. c. ❑ Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below d.❑ Coastal Beaches 1,square feet 2.cubic yards beach nourishment e. ❑ Coastal Dunes 1,square feet 2.cubic yards dune nourishment wpaform3.doc•rev. 11116/09 Page 3 of 8 Massachusetts Department of Environmental Protection Provided by'MassoEP: Bureau of Resource Protection - Wetlands MassDEPFile Number. WPA Form 3 - Notice of Intent et Document TransILI action Number` Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem Cityfrown B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont'd) Size of Proposed Alteration Proposed Replacement (if any) f. ❑ Coastal Banks 1,linear feet g. ❑ Rocky Intertidal Shores 1.square feet h.❑ Salt Marshes 1.square feet 2.sq R restoration,rehab.,creation i. ❑ Land Under Salt Ponds 1.square feet 2.cubic yards dredged - j. ❑ Land Containing Shellfish 1,square feet k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above 1.cubic yards dredged I. ❑ Land Subject to Coastal Storm Flowage 1.square feet 4. ❑ Restoration/Enhancement If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional amount here. a.square feet of BVW b.square feet of Sad Marsh 5. ❑ Project Involves Stream Crossings a.number of new stream crossings b.number of replacement stream crossings C. Other Applicable Standards and Requirements Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review 1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and Endangered Species Program (NHESP)7 To view habitat maps, see the Massachusetts Natural Heritage Atlas or go to http://www.mass.gov/dfwele/dfw/nhesp/regulatory review/priority habitatlonline viewer htm. a. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife 2006 Route 135, North Drive b.Date of map Westborough, MA 01581 wpaform3.doc•rev.11/16/09 Page 4 of 8 P. vi ,MassDEP: Massachusetts Department of Environmental Protection -y- Bureau of Resource Protection - Wetlands MaaeDEP 1 ileNumber WPA Form 3 - Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem cily/Town C. Other Applicable Standards and Requirements (cont'd) If yes, the project is also subject to Massachusetts Endangered Species Act(MESA) review(321 CMR 10.18). To qualify for a streamlined, 30-day, MESANVetlands Protection Act review, please complete Section CA.C, and include requested materials with this Notice of Intent (NO I); OR complete Section C.1.d, if applicable. If MESA supplemental information is not included with the N01, by completing Section 1 of this form, the NHESP will require a separate MESA filing which may take up to 90 days to review(unless noted exceptions in Section 2 apply, see below). 1. c. Submit Supplemental Information for Endangered Species Review' 1. ❑ Percentage/acreage of property to be altered: (a)within wetland Resource Area percentage/acreage (b)outside Resource Area percentage/acreage 2. ❑ Assessor's Map or right-of-way plan of site 3. ❑ Project plans for entire project site, including wetland resource areas and areas outside of wetlands jurisdiction, showing existing and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work***' (a)❑ Project description (including description of impacts outside of wetland resource area& buffer zone) (b) ❑ Photographs representative of the site (c)❑ MESA filing fee(fee information available at: http://www.mass.gov/dfwele/dfw/nheso/regulatory review/mesa/mesa fee schedule htm). Make check payable to"Commonwealth of Massachusetts-NHESP" and maff to NHESP at above address Projects altering 10 or more acres of land, also submit: (d)❑ Vegetation cover type map of site (e)❑ Project plans showing Priority& Estimated Habitat boundaries d. OR Check One of the Following 1.❑ Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14, http://www.mass.gov/dfwele/dfw/nhesp/requlatory review/mesa/mesa exemptions htm; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.) 2.❑ Separate MESA review ongoing. a.NHESP Tracking# b.Date submitted to NHESP ' Some projects not in Estimated Habitat may be located in Priority Habitat,and require NHESP review(see http://www.mass.oov/dfwele/dfw/nheso/nhesp,him, regulatory review tab). Priority Habitat includes habitat for state-listed plants and strictly upland species not protected by the Wetlands Protection Act. ** MESA projects may not be segmented (321 CMR 10.16).The applicant must disclose full development plans even if such plans are not required as part of the Notice of Intent process. wpaform3.doc•rev.11/16/09 Page 5 of 8 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands Vas'sDEP File Number WPA Form 3 - Notice of Intent Document Transaction_ Number,� Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem City/Town C. Other Applicable Standards and Requirements (cont'd) 3.❑ Separate MESA review completed. Include copy of NHESP "no Take" determination or valid Conservation & Management Permit with approved plan. 2. For coastal projects only, is any portion of the proposed project located below the mean high water line or in a fish run? a. ❑ Not applicable—project is in inland resource area only b.❑ Yes ❑ No If yes, include proof of mailing or hand delivery of NOI to either: South Shore-Cohasset to Rhode North Shore- Hull to New Hampshire: Island, and the Cape&Islands: Division of Marine Fisheries- Division of Marine Fisheries- Southeast Marine Fisheries Station North Shore Office Attn: Environmental Reviewer Attn: Environmental Reviewer 1213 Purchase Street—3rd Floor 30 Emerson Avenue New Bedford, MA 02740-6694 Gloucester, MA 01930 Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office. For coastal towns in the Southeast Region, please contact MassDEP's Southeast Regional Office. 3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? Online Users: a.EI Yes ® No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP Include your Website for ACEC locations). Note: electronic filers click on Website. document transaction b.ACEC number (provided on 4. Is any portion of the proposed project within an area designated as an Outstanding Resource Water your receipt (ORW)as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00? page)with all supplementary a. ❑ Yes ® No information you submit to the 5. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Department. Restriction Act (M.G.L. c. 131, §40A)or the Coastal Wetlands Restriction Act(M.G.L. c. 130, § 105)? a. ❑ Yes ® No 6. Is this project subject to provisions of the MassDEP Stormwater Management Standards? a. ® Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR 10.05(6)(k)-(q) and check if: 1.❑ Applying for Low Impact Development(LID) site design credits (as described in Stormwater Management Handbook Vol. 2, Chapter 3) 2.❑ A portion of the site constitutes redevelopment 3.❑ Proprietary BMPs are included in the Stormwater Management System. b.❑ No. Check why the project is exempt: Project Stormwater Management was 1.EJ Single-family house addressed under DEP File No. 64-391 wpaform3.doc•rev.11/16/09 Page 6 of 8 Massachusetts Department of Environmental Protection Provided,i by MassDEP. Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 3 - Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number, Salem City/Town C. Other Applicable Standards and Requirements (cont'd) z.❑ Emergency road repair 3.❑ Small Residential Subdivision (less than or equal to 4 single-family houses or less than or equal to 4 units in multi-family housing project)with no discharge to Critical Areas. D. Additional Information Applicants must include the following with this Notice of Intent(N01). See instructions for details. Online Users:Attach the document transaction number(provided on your receipt page)for any of the following information you submit to the Department. 1. ® USGS or other map of the area(along with a narrative description, if necessary)containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) 2. ® Plans identifying the location of proposed activities(including activities proposed to serve as a Bordering Vegetated Wetland [BVVVj replication area or other mitigating measure) relative to the boundaries of each affected resource area. 3. ❑ Identify the method for BVW and other resource area boundary delineations(MassDEP BVW Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.), andattach documentation of the methodology. 4. ® List the titles and dates for all plans and other materials submitted with this NOI. Site Development Permit Plan a.Plan Tide Eastern Land Survey Associates Inc. Christopher R. Mello, PLS b.Prepared By c.Signed and Stamped by May 15, 2012 1"=20' d.Final Revision Date e.Scale f.Additional Plan pr Document Title 9.Date s. ❑ If there is more than one property owner, please attach a list of these property owners not listed on this form. 6.❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. 7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. s. ® Attach NOI Wetland Fee Transmittal Form 9.❑ Attach Stormwater Report, if needed. wpaform3.doc•rev. 11/16/09 Page 7 of 8 Massachusetts Department of Environmental Protection Provided byblassoEP: Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 3 — Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 gocumentTrans-action Number Salem City/Town E. Fees 1. ❑ Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form)to confirm fee payment: 2.Municipal Check Number 3.Check date 4.State Ch9Im mber / 5.Check date e 2! A �S'fers, ccheck: First Name 7.Payor name on check:Last Name F. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, §40. Notice must be made by Certificate of Mailing or in writing by hand delivery or certif d mail (return receipt requested)to all abutters within 100 feet of the property line of the project loc tion � 4Z .SI ature of Applicant 2.Date 3.Signature of Property Owner(if different) 4.Date 5.Signature of Representative(if any) 6.Date For Conservation Commission: Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery. For MassDEP: One copy of the completed Notice of Intent(Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery. Other: If the applicant has checked the"yes" box in any part of Section C, Item 3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. wpaform3.doc•rev.11/16/09 Page 8 of 8 >�? t SI a s uw �yy ! '1 vit4roy, '9 :y.n'� afd s9�,, e r ryrg aJ ?s °w I,0.�ap3� �1s;�rx�� J����.to ,1 r'Y v�•`�1a ` r Mi if!� r x�R�tr!•;Gtl ����.�� �,,,'�'2��1�)rJl' �,��i���f ' F'� � 1���" �-V-3! d /T�"'' ���_..�)r v't.,✓ ri:_ �I r��.4( 1��� � � lrs'�1�"_' �l �\, Y�'�`lltti l�� ,\ ti)fXx n. W a 4' P`'Siir� -� e iii ��'�sF b'�' , •'`lt � ���#.ya Ci.�yrfhalvl �y Us 1�yHFit . ) 4" (�M �p lcv°n7<>m C•' ri: r{4 ''nail �?e ly�r IR 't t r 'y .4 t-'°e �, „ s., tee, M.>'�6 ✓ y t �',2 t i } i�tWk�d .\, z< �y J et'€,n•+KE @61 ! c a n it M rt�tol Y e T+.11 v9�t��a ,s ��,1 ��"dy4t n.'!1 Nt e,F S�F y �'r ✓ 1� Ik"y „ r�/ ,p m�erli ". l p(;t�>r ,art �z4 „h � > f v{� y .,ry Z a+ ,. �, ✓ 1rhr,, 'r-t r 7.. �C ✓ ��.1�� � a �� ,� 1 f'^•- i *+: � r `ry�r t n"� 1 ° 'F 4! °x r7n d, "3y � sar! � � v A <. � �, � ✓ { , SPI �r d IS� ) � rs � en! + ° If � ,/`te ws F'A� , �.- .'"1u , n� �rcV 1 ! r Fit>f �+✓4." P� n t qV l pkrl Pdt._ 1 t � t f rP > n� s �� -s '�° � a`Lti JS �>> 'rl) ' _ rr `n r? FA -\Vytt �Ny " '211 f"f f•.i y,u '� > ro4(n YOB A a" p C> ni} tr r�Rv 1�'A � f,1J�lr Ll��"'' 4\ Hyl v/✓ w s r !t � � f. u ! t"t a ( t SV y v sub r,Y"{� c N pn h1-'r"- r.r' ✓ / : •< 1-I'ViII sr >, M rrl; l Lt E>n v �7F I..•.'ya x � apt • n � � a � f t:" s vk\S t-* i: {( w�. v �r d { /�" f .��. � i '�� Pi" ✓r 4 p tz ^✓ t r r ,v y^�V..r. �"7���V.t t i�r 3'' yy,,���f� pis' r��a"(1. fY, D,v i'"rq YryraF fa.dl IeA. l ii ii.+. r� �-. Il 'A ✓ ' ✓r� v f a flpj✓f sylr"l wto cr �+.r+�a rFj�t P '4 !N! w a v -, ti bl 2,� i� r a s, ,r t d r +rli t� / r: f' Y: F F w >r n, llr \ ��. 3! `'1* r 5r 5 r yt 0 4 r` :✓J n yt u y lu t" � � � C �Vw.h ltd /l �K✓'.F rl yrrf �'ai 7" X . �a•� �a it 6t roa Gro i fs< 'i+rd ✓p r Ike V >' F at < ,ar t rru,' (f d., Iry � r�n'"if � ✓f J s ro "` t d yryaa 'e, h`t'FA\ eS �+ V N C' t S � n f It tT, U' t / 4�'''f T v �< d✓ l rti1 rt x .`v s uP ax s n�4J . ,. G^i ur.a/(, r 3 F ! JJ,,iqt �n k" § h §1 Ir .1 r w Y rr {� t < „� r �a r , .� " J' < C4 �4 Cr ax's ��"��ln! a }rQ tc 'a�74�)1 v+lla rytr" r� .lY d{1Syy yMi 4'.3pt�m rVra ttl � SL.'ar W n Se s ♦ ro! g >) 1r$t It a A� 1t1,F'* rP t`a s ��.da. tASt.+ f� y� r rp r .lr rn -ta sfi1� > 'S F iu ttt ro D fy;'r^ r+' 3 T 'Vti Vj�, b,.<1+2 ,l''�` ✓- r-e x w�rG`zi sr✓ �, I P�� sA frt� 1 r >� ;t d� r a (•Lr 1� d nI�M •'3t �S n �� � fr t !' �,.,, u ,c v Y a �..i%�� s 5 f ba4 ;,e �' t1".r +tvr ' � ► �t) fns).+t J ��n c nt�3�< )✓ 1r c x-a—OR ! v r e��St: a � > �8 r(•ul 'It1 atn'r x' ♦y >✓�£rt" tin e- �t r8� "fF✓ i'i lad ,l � , ll m �� � � '�§c> �" "-:da2, i1✓ r`rr ✓lSct-� f ro 11 ?n - 3 ' a ibr y�,r� �pl ✓ - l �e tll M7 ay+ \� � .��, �•G I"i q,4 1(/er�1:M1 � ar�A:�\�i•} f y) �� �� �+ih�.� r r� a}t '4fi '1 . 1� r " n x}x$1!4- 1 MOP C� t ~, �5 ` �� � r *�yM trf� r" ���'�Fvr ',E:. ,� �' n � � 4« �4✓� v � a\.em am f1 ! } '� a � t IrY Jw l ti f {�� � a i � " ♦ 1 r• tt tibd'r- , i' '` s r t tr .ItT�t♦ •�/j¢(6 .1,` a c.f I1�4"pt7R'.v i " :`�.""-.�+..�f V1VI `K�rO rSNr r �' �t l.. >"dPAN-pr � p�j •^ !'jl•` d rte. f/� r' rrP �. c ,. gfP.1 PAY Q� l►//f !a If\ i 1 ;�,lO�gg P�V� � / ``"'''t.� f '" 7 �� �r8 � � ♦` � �J. F� iy qnS ;vc t, � to ?a qi't y . � R/ n / , �p ��/� ♦ '`O Al tVii �0112N v !"_ � _ ✓r3r1.. WAN rY'{O� 1 f �� ® 1'_J% �/�✓ � �� ,'"�:. 4 ��' .�� � f�t@v � "�f r j t �J/�r�?,:1. 77 174711 'rrrx�,' aa/� •-�" 0J('� /`G*� `q\�fr,k��t•1✓n�y��.,,� 7►��aN rti .«r C r ti a11�� �..,,,,.+�l: d'� ��lYr11�11�L1tf ����:�ln'o�\� � ✓•"1�! \e/as..� ��al�../A/�/a?�,s��.. .'t�",�a„� ;. T '".: —s NOTES: \ \_ s� AIL 1) BOUNDARY AND AS-BUILT SURVEY BY LEBLANC SURVEY zv LP \ A, ASSOCIATES OF DANVERS, MA. \H _p PLANTING o A� 2) PLAN DATUM = DEFINITIVE SUBDIVISION PLAN DATUM. � \' O 9�EnTING AREA #2 0 / \ 3) THIS PLAN IS PREPARED FOR THE SOLE PURPOSE OF ./ - WQS �� \ DOCUMENTING AS-BUILT CONDITIONS OF THE SPECIFIED v0 \RESIDENTIAL LOTS (LOT 215 & 228, 230-234) FOR COMPLIANCE WITH ORDER OF CONDITIONS ISSUED BY THE MAP 9 LOT 335 - SALEM CONSERVATION COMMISSION ON SEPTEMBER 17, NIF - 2012. THIS PLAN IS NOT SUITABLE FOR ANY OTHER NURSE WAY BUILDERS LLC PURPOSE OR PROJECT. w E 24 9 NURSE WAY �7 � ��. • Grass \ 4) WETLAND RESOURCE AREAS SHOWN HEREON ARE SCALED 20 /- - �y DRIVE #8 Deck \ � LOT 218 \ R \ SINGLE-FAMILY Lot 218 FROM THE SITE DEVELOPMENT PERMIT PLANS (TWO SHEETS) / Rap ^ _Over q PLANTING AREA ml ^ RESIDENCE 7,703 s ft. � JC ARE ul PREPARED BY EASTERN LAND SURVEYORS, REV. DATE / AL aVF B23 Ret. w'au /�/ e �,, Gas- GRG-114.6' / o fr \ �!� �// b5 - DRIVE � -�, '�� Meter '�- FF=119.5' _ 917112. B21 822 / /5 - _ \ Ret/ R MAP 14 LOT 327 t �a11 �u11 Ni \ LOT 217 REFERENCES: / o \ PLANTING _ NURSE WAY BUILDERS LLC + /� 1) LAND COURT DOC. #539402 I �� �5 8 NURSE WAY c . All A #1 2) L.C. PLAN 856-13 44 �/ ARE PLANTING _ #9 Shrubs \ �. cN Elec. G x o 3) L.C. PLAN 856-J g j j / / # Z SINGLE-FAMILR Meter ^ RESIDENCE 4) O.O.C. FOR DEP FILE #64-528 (LOT 231) D63 N6/800� 6�1 N -ERF=i2s.87 5) O.O.C. FOR DEP FILE #64-529 (LOT 232) �� UO ,�� 6) O.O.C. FOR DEP FILE #64-530 (LOT 230) i RAP SN " \ 7) O.O.C. FOR DEP FILE #64-533 (LOT 233) D61 '` 16' _ IR FIyQ �/ RIP 120 N LOT 228 ✓y-FORMER Meter Grass o 8 O.O.C. FOR DEP FILE 64-535 LOT 234 ' � - - \ \ # ( ) / / DECIt _ 6,991 sq.ft. 9) O.O.C. FOR DEP FILE #64-536 (LOT 215) / 122 0\ r e 1 Tree 1 44' !` PLANTING �' Deck 10) O.O.C. FOR DEP FILE #64-531 (LOT 228) � o�AREA 2 A.C. - #5 \cam \ 11) 0.0.C. FOR DEP FILE #64-532 (LOT 217) �`1l # SINGLE-FA T T \ DRIVE _ _ PLANTING " RESIDENCE T �.! AREA #2 \ 12) 0.0.C. FOR DEP FILE #64-537 (LOT 218) ���1 AIL � � � GRG=126.2 ��R � Gas eE FF=128.6 c / \ Meter SINGLE-FAMILY= Deck _�_ . �v? Exposed `. Over � 6 /L ry �N N� 100 tf3dSle - � RESIDENCE - / A \ F, � � w +n� / � a� � 1� _ GRG=11,9.3' � � 7�\ 230 .-• I FF=122.2' \ 809 sq.ft. \ - p / ^rye S �,")Ak , _ Lot 217 / III12� v \/\BIL CONC: l• �'. oW 12,017 sq.ft, o DRi VE 17' j.1 6 � `H�i �ry� ry`0 I I MAP 14 LOT 326 v �50•�'Yn DECK #3 \ \ NURSE WAY BUILDERS LLC / PLANTIN RAVE �\ / Lot 229 9 6 NURSE WAY gREA 2 SINGLE-FAMILY 2vJ �, i" Tree 2 /26/15 d o 1 D61 # RESIDENCE. / \ 8,673 sq.ft. \ \ to Plan, i GRG=126.6BIL CON tv DMH v� FF=129.0 000 I a Ji , DRIVE " \ MAP N/�OT 31 - — — - �<" I (1 1 1/5/14 A Lot o an, IL 27'/ av 1AL 1 INA K 3 / NURSE WAY BUILDERS LLC N O a a p / Builders to Title Block p 7 NURSE WAY Q; �� No. Date Description N ^ LOT 231 Revisions � 9 q.71. X-FORME PLANTING Qe MAP 14 LOT 325 v AREA #1 t / NIF BARTLETT & STEADMAN DEVELOPMENT CORP. ROBERT y� 4 NURSE WAY o GR H. FEIN BIT. CONC. <\ N PLANTING DRIVE s\ =7.400gas ass AREA #1 �o\s --- "-122 E OF LAW/V ,� =16. HH LEDGE LOT 232 / R=25, 09 ~" / S� APPROX. LIMIT 059 \ OUTCROP 9,154 sq.ft. ! i 00 .\ Ss, \ ' X-FORM�ER ( OF WORK N l�� LOT 215 V cryo / �P� - ?9R. F GG 11,574 sq.ft. \/ ! Q o E #1 / 0 \ �\0, PLANNG AR D#2 SINGLE-FAMILY 126 81 L CONC. `\ �\ RESIDENCE / D < `a !f / 1 OS e 3R s.. D44 Griffin 32' A GRG 134.2 SS `c / / �l FF=134,2 ��\`' / i #2 /PLANTING / Englneeling LOT 233 `'� / q1, Al � 8,579 sq.ft. o - \ / SINGLE-FAMILY AREA #2 / /\/ � ik / Group, LLC 31c ` #5 ^ C� RESIDENCE / \ / A', . 058 \ s� l l r+'�� INGLE-FAMILY BAYBERRY 70 , GRG=118.1 DECK �� / j/�� ENS 777 / P.O Box 7061 �p�� DEC ,� ' I �,' RESIDENCE 1 f y� ^�o FF=17.7.0 �� / / / EPSE�A 100 Cummings Center, Suite 224G A.C GRG-124.4 , 0 / D45 1N ` FF=133.3 �ry A VIBURNUM A.C. ��� pRP Beverly, MA 01915 h U��E TYP OF 3 0� / 5 - \ 2 23' - " 1^� �p4 / ( �� // / ^off <<< ` Tel: 978-927-5111 "OPEN SPACE" \ << cv D CK AREA (w^ A �y/ , ^^� 36 ry� /' Fax: 978-927-5103 ZRAI/ 14 9�h �rn�� l F� \ �� ^^�/ / 56� 10�' T MAP 9 LOT 260 N AD 70' �,� \ / �/ /�aD Nurse Way Builders, LLC and o AS-BUILT MITIGATION PLANTING SCHEDULE N / 76 h �1 BIT. CONC. i N/F 1 7 43 U4• / Salem Home Builders, LLC LOT AREA TREE SHRUB QUANTITY BARTLETT & STEADMAN �IBURNUM II / DRIVE \ 215 1 RED OAK 1 DEVELOPMENT CORP. � (TYP OF 2) T?o cn f \ MAP 14 LOT 32 / SWEET PEPPERBUSH 5 40 CIRCLE HILL ROAD �1l, �1� ' \ C 29' S NIF Nurse Way and Good Circle, IN 2 BAYBERRY 3 n I x� �c ' I '�\ / � ' MARION BARNET MORRIS Salem, MA �_�• LANTIN PLANTING r' / A EA #3 AREA #1 > PLANTING �G / !� Villa. I / 230 1 VIKING BLACK CHOKEBERRY 2 13 DELL STREET H 2 SWEET PEPPERBUSH 3 \ �. 15.00' _=�_ S8824'28"E 102.46' ,l I ` / / AREA #1 231 1 SWEET PEPPERBUSH 4 2 BLACK CHOKEBERRY 3 1 t\FND 117.46' per, tl 232 1 VIKING BLACK CHOKEBERRY 4 PLANTING HHI o V1 2 SWEET PEPPERBUSH 3 D�7 \� REA #1 3 BLUEBERRY 4 \ ' LOT 234 X00 Na D7 \ / AS—BUILT 233 1 BLUEBERRY 4 \ \ u 9,179 sq.ft. cr N 234 1 SWEET PEPPERBUSH 3 z 128 `'' '' / / SITE PLAN 2 BLUEBERRY 4 \ �m 6 'Q BIT. CONC. I o 3 VIKING BLACK CHOKEBERRY 3 �� \ #3 DRIVE ' 5 228 1 IGRAY DOGWOOD 4 1` 217 1 GREYTWIG DOGWOOD 1 \ ` � INGLE-FAMIL / y 1 BAYBERRY 2 D RESIDENCE A r / 2 BAYBERRY 3 ^ D56 \ ' GRG=125.5 �I 1� , ` /VJ y D48 / SGS 1�=20' 8 ,/q\\ PLANTING A. FF=1.34.4 WAL w / 5 J4b4,; TBD t 218 1 GREYTWIG DOGWOOD 2 I L Y 2 AREA #2 � 565'3g' /� p — e 1 BAYBERRY ` cT D51 4 S A p 1 2 SHADBLOW 3 N N` V� \ D49 File e P/P/s/ho 3 RHODODENDRON 4 ` 06� DECK R��• VHF / !! p "!ts �P`N D 7/3/13 N N 0 NOTES: \ \. 1) BOUNDARY AND AS–BUILT SURVEY BY LEBLANC SURVEY N � ���� D�D ASSOCIATES OF DANVERS, MA. HH ® G 2) PLAN DATUM = DEFINITIVE SUBDIVISION PLAN DATUM. - 3) THIS PLAN IS PREPARED FOR THE SOLE PURPOSE OF I \ DOCUMENTING AS-BUILT CONDITIONS OF THE SPECIFIED / V "AD� RESIDENTIAL LOTS (LOT 215 & 228, 230-234) FOR / COMPLIANCE WITH ORDER OF CONDITIONS ISSUED BY THE MAP 9 LOT 335 \ SALEM CONSERVATION COMMISSION ON SEPTEMBER 17, N/F o 2012. THIS PLAN IS NOT SUITABLE FOR ANY OTHER NURSE WAY BUILDERS LLC \ PURPOSE OR PROJECT. w E v24 9 NURSE WAY Lot 218 \ 7,703 sq.ft. o 4) WETLAND RESOURCE AREAS SHOWN HEREON ARE SCALED '20 _� FROM THE SITE DEVELOPMENT PERMIT PLANS (TWO SHEETS) / Rtroa I / MAP 14 LOT 327 \ PREPARED BY EASTERN LAND SURVEYORS, REV. DATE / a+s 3 .t B23 / N/F \ 05 DRIVE \l \ NURSE WAY BUILDERS LLC 9/7/12. B21 B22 / /5 \ 8 NURSE WAY REFERENCES: / \ 1) LAND COURT DOC. #539402 44' PLANTING #9 -;53 2) L.C. PLAN 856-13 AREA #1SINGLE-FAMiI Shrubs 3) L.C. PLAN 856–J opj / RESIDENCES 4) O.O.C. FOR DEP FILE #64-528 (LOT 231) 063 N6/SD�1 6� e� N — GFF=i?5.87 6� + 00 / 5) 0.0.C. FOR DEP FILE #64-529 (LOT 232) �1i 15�oPE s 6) O.O.C. FOR DEP FILE #64-530 (LOT 230) 2''.. RPP 7) O.O.C. FOR DEP FILE #64-533 (LOT 233) _'' 16 IR F, RIP 12p/ \N �, LOT 228 • ` �- -FORMER \ 8) O.O.C. FOR DEP FILE #64-535 (LOT 234) D61 ' / DECK "S� \ 6,991 sq.ft. N 9) O.O.C. FOR DEP FILE #64-536 (LOT 215) \ � \- \. ® \ 10) O.O.C. FOR DEP FILE #64-531 (LOT 228) �( ' 44' i PLANTING A.C. #5 �\�n \ Deck _ \ \ MAP 14 LOT 326 \ ����/// o• AREA #2 N F / n SINGLE-FAMILY o rr' 0 0 - NURSE WAY BUILDERS LLC o �� O� o• RESIDENCE / \ 6 NURSE WAY \ ��1 ,dr,_ ,++•� / � GRG=126.2 R \ G \ FF=128.6 0J ' Exposed a ,y -A r F�� Dn �QF ryry Oc X �' �p Ledge �11a�1 Lot 217 \ r / V�QPe /k0°o6 / / coo /1 /� "u, \ \ \ LOT 230 \ l 12,017 sq.ft. tij Q 6, o- a 6,809 sq.ft. O ' kti v o I `KBIT. CONC. A C. 1L6 vv \\\ DRI�/ 16 H ry I \ R�5 iXf 1T / 0 I DECK #3 Lot 229 I �I o \ PREASN2 RAVE SINGLE-FAMILY 126/ \` \ / / \ q # \ 8,673 sq.ft. D61 RESIDENCE. %DMH �o i I Q GRG 129.0 BIT. CONC. \ -o o DRIVE \ MAP 14 LOT 31 �� \ 1 1/5/14 Ad Lot o on, 2T V / Add Nurse Way N/F / / -- — — — N Builders to Title Block / nn / NURSE WAY BUILDERS LLC �1 V DE^SAI �K. a o ' \ 7 NURSE WAY / �� \ I Description _j Q: _ Revisions co m o LOT 231 12 N 1 m 9,196 sq.ft. O � � X-FORME \ 00. / F D60 I a PLANTING ®�G`.c� MAP 14 LOT 325 �W F / ,�0� NIF r t. C AREA #1 32 21 , BARTLETT & STEADMAN /z � 57%7 DEVELOPMENT CORP. /s° ROBERT 4 NURSE WAY o GRIFFIN yIl? 81T CONC. 3'68 \ N PLANTING �� - R=50.0(0 bsas \? � / \ \ AREA #1 DRIVE F'�, L=7.47" \ GF OFCq t^u i t ,c „s ���»+»' 00 HH 122 —7 Wly 6.09' / APPROX. LIMIT D59' OUTCROP LEDGE LOT 23ft ' R=25.0o X-FORMEr� \ - 9,154 sq.ft. i J �/—OF WORK OT 2 5 �o / �N ROOF GG 11,57�t. \ 0�`oPLANTING #1 / 126 ® \ O / � 2� \ siffi SINGLE-FAMILY B T CGNC. / OD44 r AREA #2 /r \ RESIDENCE 32' GRG=125.3 / \ �iA \ Ass / / / Yi!;i °a} A. 7 -ri,�• �. \ FF=134.2 ` / �' -� / #2 /PLANTWG / / ;. Engineering O LOT 233 R� I w� AREA #2 //� / Group LLC A+ ��+ 8,579 s ft. 1 d " SINGLE-FAMILY 1 t+c. / ' q / ✓� RESIDENCE / '!� 7 / \ #5 BAYBERRY O GRG=118.1 / ��/ SNS 77 P.0 BOX 7061 D58 r� ' INGLE-FAMILY X I ^� 1 DECK P / M DEC 4, �' \, RESIDENCE �l \ r / �� / /�� ^� FF=127.0 j / APSE g \ (, / 100 Cummings Center, Suite 224G �p GRG=124.4 ` A C' �0 / '/ Beverly, MA 01915 A.0 ry VIBURNUMP \ ��� /� ® FF=133.3 100 BU R /�/ / �/ (TYP OF 3 l��G / /� ^o/ 444 25 % Tel: 978-927-5111 l23' v� N �ry ^ �V ; `b�a/ 36 �ry� /� Fax: 978-927-5103 "OPEN SPACE" \ \ AREA Q�� DRAIN � ) / \ �� 10% �0 �q�� �rn �� 5% q0 op Nurse Way Builders, LLC and MAP NLFT 260 ` N 70 / 76, / moi / / BIT. CODRIVENC. 43' / / 04c 1 / Salem Home Builders, LLC BARTLETT & STEADMAN N ZVIBURNUM I \� / ` / Nurse Way and Good Circle, DEVELOPMENT CORP. (TYP OF 2) �0 w 29' / MAP 14 LOT 32 y 40 CIRCLE HILL ROAD a,, III I I N�F Salem, MA } . .. I MARION BARNET MORRIS MITIGATION PLANTING SCHEDULE � AS-BUILT � '- LANTIN PLANTING r'6 I / 13 DELL STREET // LOT AREA TREE SHRUB QUANTITY I � � / 215 1 RED OAK \AJ?EA #3 AREA #1 _ AREA PLANTING / �,,,, sir, I / / SWEET PEPPERBUSH 5 \ ;5.00' _ 588'24'28"E 102.46' _ ,1 I I v 00 h �/ 2 BAYBERRY 3 FND 117.46 230 1 VIKING BLACK CHOKEBERRY 2 Dpi \ PLANTING HHS 2 SWEET PEPPERBUSH 3 231 1 SWEET PEPPERBUSH 4 \ RE 1 #1 LOT 234 -- - -� EDG p r U'a / D 7 \ / AS—BUILT 2 BLACK CHOKEBERRY 3 \ 9,179 sq.ft. Q\ I / SITE PLAN 232 1 VIKING BLACK CHOKEBERRY 4 \ o L I I �.- 2 SWEET PEPPERBUSH 3 \ 126 BIT. CONC. a_Q, 3 BLUEBERRY 4 � ` \ � \ #3 DRIVE I I (� 233 1 BLUEBERRY 4 234 1 SWEET PEPPERBUSH 3 \ \ INGLE-FAMIL 1 \ / SGS: 1"=20' 2 BLUEBERRY 4 \� ➢ RESIDENCE 3 VIKING BLACK CHOKEBERRY 3 5 1 GRG=125.5 \ / 5*VJ � ' �D48 �. Job No.: TBD 228 1 GRAY DOGWOOD 4 D56 Zl TING A. FF=134.4 WAL w � 65.3 9 AB- 1 AREA I #2 03 cn ` D51 \ S ��8 049 Fie Name P/P/s/ho 0_QtC 7/3/13 B ! 20 122 120 E 1�8 I I sS 1 14 IE 61 oT 2 los Ld 122 II \6 I� 106 1 0 / � FRONT YARD 15 FT. L O T 228 y 108, w / SIDE YARD 10 FT. LOT 218 i F REAR YARD 30 FT. J 20 \ LOT H 0� � 2.30 N71'10'16"E \ o_ ( o o � 3 o LOCUS IS SHOWN ON DEFINITIVE SUBDIVISION PLAN OF LAND ye' • a N7 12'07'E 3 I i I BY EASTERN LAND SURVEY ASSOCS., REVISED TO DEC. 30, 2004, S 86.34' \ J ytK O� LOT 229 0l I 88'98 I ZONING DISTRICT: R1 `L� m �' I I ASSESSORS MAP 9 PART PARCEL 30 \ ° i RECORD OWNER: KENNETH G. STEADMAN 22 1 I \\$ I I 1 2q \ I I a x1 1 i BUFFER ZONE BOUNDARY 1 1 I BUFFER ZONE 26 18. \ 0 U0 m v� o a Y BOUNDARY ° \ �� O p Q- p L DETAIL LOT 21 7 SILT SOCK FOR EROSION CONTROL �� �,i% M 0 1 2,01 7 SF. 1"xl"x3' WOODEN POSTS A AT 8' O.C. (MAX.) Z o 128 a \ / ` O # 0 --'t 3 0: �- FLOW DIRECTION / a o \ I �►� I` 0p W —� 8" DIAM. SILT SOCK 126 8 120 I 26• in EXISTING GROUND 5 �i ao o 8 m I w o`g z; 0N N +� Vl �� i 9 A� r J V 6 j y 3 w 100 FEET �P+? �O 0s� J J I w1� o I I 0 0 l A, In ¢ G D 120 ''"✓��A9'� o��\\ I I ��rprjY �q 10 � /—� UPSTREAM CONTRIBUTARY AREA SHALL NOT EXCEED p, .25 AC. PER 100 LF OF SOCK FOR 8" DIAMETER. �' -4 / r, SILT SOCK SHALL BE FILLED WITH A MIX OF LOT 232 l �, y `��0 Gj Lam 26• �` �, 0��°pa / / w W 30-40% WEED FREE COMPOST AND 60 TO 70 9. 122 124 p �' \ a'�. �� �� �� Rm2&00 pQ�"� WOOD CHIPS. 00 Fs0p� I OQQ�v, sy Z Qw DENOTES WETLAND BOUNDARY MARKER s L Qo p 6 122 /� I ¢ C� TO BE INSTALLED WITH SALEM CONSERVATION �� O COMMISSION DISC O a Ce i tzs Q`°Q\° o Fro ti ,�,; G P?P -j 0: Y o . / / o SMH EXISTING SEWER MANHOLE T.O.WA245 COQ ��o �p �A/ �`O c~il 0 DMH EXISTING DRAIN MANHOLE B.o. =122.1 LOT 233 e o 1 _ z EXISTING CATCH BASIN p .� / oQ 0 5 4 580± �� / 0 P" EXISTING HYDRANT 8 Q °p • / .(� �I O ��T z ,nc EXISTING WATER GATE 1 2A a �r� M10 �0 120 1 •wso EXISTING WATER SHUTOFF /' ."s EXISTING GAS SHUTOFF ts�4 �� �' 4 yam — — 100 — EXISTING CONTOUR y G 100.00 EXISTING SPOT GRADE \ O I /' UTILITY POLE S �� �6 O / ' LOT 216 RETAINING WALL ¢ X74" 70"16' � / r'° `'�` Q �8' ?�' QO i o0000000o STONE WALL I l F "6• >> y \� �yo �Q<°0�� `� wAN 17,389± SF. CURB — FENCE a LOT 234 / F ,may O �� % PIROPOS D FENCE " JI 1� obi —X—X N 0 y 9 7 1 79± SF . / / �I 0� / / ' / °�, ' RESOURCE AREA BOUNDARY LLAV) 9 Cw 2s• f g O ��� \\0 l� /—�� o4i (� A70 RESOURCE AREA BOUNDARY FLAG U 0 Py p5�` y oz.s RESOURCE AREA ROPOSED ryh o �'��� Q�cl? /I_� 7�-- 1ov 100 PROPOSED CONTOUR (CL n ' tET. WALL 2 p44 TT-/fid p43 BOUNDARY -�� g o Q� o��� / v�� v4� ° 100x0 PROPOSED RETAININGWALLS - o e, ���, Q 3 p LOT 15 z 2 Z2 �2 1 1.9 08[8 \ — - — PROPOSED WATER SERVICE � N N \ \ oQ � � �aIe i �� ; 11 ,573± SF. / / ° s — Ss — PROPOSED SEWER SERVICE .z Q\�o y \\� / DRAINAGE EASEMEN T 140.00'140.00' RES 0 U R C E AREA 91.67' ` / �–j / S677040 W l RETAINING WALLS OVER FOUR FEET IN HEIGHT SHALL BE DESIGNED BY A N T.O.W.=124.5 i2 I / / �l ' Q, MASSACHUSETTS REGISTERED PROFESSIONAL ENGINEER AND PERMITTED IN T.O.W._Iz7.0 w ° 121 � 0 120 NSF � vo� ACCORDANCE WITH THE REQUIREMENTS OF THE SALEM BUILDING INSPECTOR. / fyQ' I/ MARION MORRIS I A FOUR FOOT FENCE SHALL BE CONSTRUCTED ALONG THE TOP OF ALL RETAINING > , CIA 1 p 47 DS PROPOSED InWALL OVER FOUR FEET IN HEIGHT. SILT FENCE Osj DRAINAGE 2 / I10 108 RESOURCE AREA 44 88' BOUNDARY— d9•age / r S64'ST29wW „s3 f p / r7. 7T7 TTN n3 -.��� f�.0 �1 (���CCC777r;' / 949 p4S �� /J'. EASEMENT DRAINAGE / RESOURCE AREA \ EASEMENTS — _ 112 SITE DEVELOPMENT PERMIT PLAN o _ � 114 \ LOCATED IN "PARKA 18 116 SALEM , MASS . LOT 235 I '° PREPARED BY GENERAL N07ES r ' EASTERN LAND SURVEY ASSOCIATES, INC. 1) THIS PLAN IS THE RESULT OF AN ON THE GROUND FIELD 4) THIS PLAN IS BASED ON THE REFERENCED PLANS, DEEDS P f CHRISTOPHER R. MELL 0, PLS SURVEY AND PUBLIC AND PRIVATE PLANS. AND TIFRESULTS OF A FIELD SURVEY AS OF THIS DATE �'�,. 104 LOWELL ST. PEABODY, MA. 01960 NO CER7FICA70N IS INTENDED AS TO PROPERTY TITLE 2) U7LI7ES SHOWN ARE BASED UPON FIELD SURVEY AND OR AS TO THE EXISTENCE OF UNWRITTEN OR UNRECORDED �.•` (978) 531 -8121 RECORD PLANS AND ARE NOT NECESSARILY INDICA 7VE OF EASEMENTS UNDERGROUND CONDITIONS. SCALE: 1 " = 20' MAY 15, 2012 3 THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING AND 5) THE OWNER SHALL CONFIRM COMPLIANCE WITH ALL APPLICABLE PREPARED FOR REV. SEPT. 7, 2012 CODES AND REGULATIONS GOVERNING THE MATERIALS AND/OR DETERMINING THE LOCATION, SIZE AND ELEVATION OF ALL ME7HOCS OF INSTALLATION OF ANY IMPROVEMENTS DEPICTED EXISTING UTILITIES, SHOWN OR NOT SHOWN ON THESE PLANS, ON THIS PLAN. KENNETH S TE A D M A N PRIOR TO ANY CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED IN WRI7NG OF ANY U7LI7ES FOUND INTERFERING WITH THE PROPOSED CONSTRUCTION AND APPROPRIATE REMEDIAL ACTION 6) RESOURCE AREA DELINEATION PERFORMED BY RIMMER _- BEFORE PROCEEDING WITH THE WORK. ENVIRONMENTAL CONSULTING, SEPT. 20, 2000 AND WETLANDS & LAND MANAGEMENT, INC., ON MAY 24, 2001. 0 10 20 40 60 8 SHEET 1 OF 2 F 11862 I 1 1 �\ RESOURCE AREA BOUNDARY RESOURCE aav uss I FRONT YARD 15 FT. SIDE YARD 10 FT. AREA I110 106 i REAR YARD 30 FT. Y,9 �\arti` 114 4 I a 10 112 I I I 106 LOCUS IS SHOWN ON DEFINITIVE SUBDIVISION PLAN OF LAND w / v` DELL (UNC`N TRUCTED) STREET 3 I 1 w BY EASTERN LAND SURVEY ASSOCS., REVISED TO DEC. 30, 2004, VORTEC�H 1 ZONING DISTRICT: R7 PROPOSED I �-L__ D / fV ASSESSORS MAP 9 PART PARCEL 30 ' G6 �7 SILT FENCE 106 F1Li RECORD OWNER: KENNETH G. STEADMAN 0l G� 1 N66'5O'00"E TOW=118.5 BOW = 113.5 I N66'S0' �E � / C� 80.0 '_ 82.00' --r \ 7.t97�i w 116 —'j —�� J * \I ` LOT 218',, W PROP. CHAIN 20 1 1 PROPOSED TIO I 7,703± SF. zLOT-230 11� LINK FENCE \ 112 Df� `�EWAY ` \ J I U 1 1 s — :��'v� v°a,w F a6,807± SFS LOT 228 2� tq W r I 1 �,, SAX�j 5 w '� Prop. U.'ri ¢ �, 2 ,�3 i I Patio 6,991± SF. Q1 s��. I _ - I Lf)o� \ DETAIL /" 15' '4-j \ 3 o ' l08 SILT SOCK FOR EROSION CONTROL LOT 231 so' 3 120 a I los LW Z cc \\\g Qy�p7 Vv/' I 120 V/ PP �O5E\t�J P � \E•\,R• I gI N $ /g ' v I � �• �� N 1 .t q III� III� IIS1'z1•I I3I'�WO DEIN I_.PO S TS w9,796± SF. PROPOSED Oo 2 AT 8' O.C. (MAX.) N p FLOW DRECON DWNo. 1 04ELLING N in O 8 SILT�q IIDIAM. S120 r � OC fl) K .4L, ° N z 4 c�o •GAGE—WAGEZ O N EXISTING GROUND Nz EL 126.0 36' Patio p} / N OJ TOEa-oW 24' z a- 3L ,r I I 126 ` 122 a ro I 3 I 24 .w. 122 24'.e \ \ \ I p �j I � PROP. SILT OQpSE� I 1 �s7 6 0 1—N71.10'6'E a ` I I /,,2'0 \ v FENCE 25SAC.APERo00 BUTARY OF SOCKEFORHBLLNOT DAMETER.EED R a,.°Q ^I P R��KP y�� �" f--1 . N70'12'07' nl m O o I\ 4j\ Q4-- lL1 ` \22 a 2� O� LOT 229 I \ _ ( 88.99 o9.Z SILT SOCK SHALL BE FILLED WITH A MIX OF V y, 1 WOOD CHIPS.D FREE COMPOST AND 60 TO 70 Z co LOT 17 Io8 I 3 v 120 1 106 w0 DENOTES WETLAND BOUNDARY MARKER ` /Op FEET — / 122 I 1 1 1 i BUFFER ZONE TO BE INSTALLED WITH SALEM CONSERVATION W8 11Ow-i 122 e I = BOUNDARY 122 COMMISSION DISC O t N7J32'21-E \ �� \111 108 L E G E N D R �. Z � n.80' / 120 11 1 , � � 1 1 / PROP. RET. o SMH EXISTING SEWER MANHOLE WALL p DMH EXISTING DRAIN MANHOLE N ( � D Q \ �� 1 1 \ I10 r ® EXISTING CATCH BASIN DRIVEWAY120 I 118 112 opa EXISTING HYDRANT 116 114 oWG EXISTING WATER GATE oy/Sp EXISTING WATER SHUTOFF 0GAe EXISTING GAS SHUTOFF 26 �� r��` o �\ O\\2��2 — — 100 — EXISTING CONTOUR I - 100.00 EXISTING SPOT GRADE I �� UTILITY��' \ ` RETA RETAINING WALL 3\ N o0000000o STONE WALL �w I CURB 'a91 A U w io 09ti�OO —X—x— FENCE o a JJ o �t"cGO RESOURCE AREA BOUNDARY `y Prop d N A10 RESOURCE AREA BOUNDARY FLAG I Pow �s`ry' � r 100 PROPOSED CONTOUR — 100x0 PROPOSED SPOT GRADE E PROPOSED RETAINING WALL 3t' 24 1, Ba�RZONE \29 h`r%Z Fs 5 -WS — PROPOSED WATER SERVICE 32 \ — SS — PROPOSED SEWER SERVICE LOT 2 ..>e, 9,155± SF. � ' .0 �zro I 6 7.0.W-p 124.5 II/ B.O.W. _ 121 LOT 233 PROPOSED GRADE A S, MND DO' STACKED PROPOSED GRADE INDIGENOUS 74?e. STONES F � 6 12� EXISTING EXISTING SURFACE 122 124 SURFACE \tel/��✓/�//�'�:�.�i SITE DEVELOPMENT PERMIT PLAN LOCATED IN SLOPE TREATMENT OPTIONS o SALEM , MASS . PREPARED BY GENERAL NOTES ;. EASTERN LAND SURVEY ASSOCIATES, INC. { CHRISTOPHER R. MELL 0, PLS 1) THIS PLAN IS THE RESULT OF AN ON THE GROUND FIELD 4) THIS PLAN IS BASED ON THE REFERENCED PLANS, DEEDS SURVEY AND PUBLIC AND PRIVATE PLANS. AND THE RESULTS OF A FIELD SURVEY AS OF THIS DATE. 104 LO WE L L ST. P E A B O D Y, MA. 01960� � " NO CERTIFICAT70N IS INTENDED AS TO PROPERTY TITLE 2) UTIL177ES SHOWN ARE BASED UPON FIELD SURVEY AND OR AS TO THE EXISTENCE OF UNWRITTEN OR UNRECORDED f ' �+ (978) 531 -8121 RECORD PLANS AND ARE NOT NECESSARILY INDICA RVE OF EASEMENTS / UNDERGROUND CONDI RONS SCALE: 1 " = 20' MAY 159 2012 3) 7HE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING AND 5) THE OWNER SHALL CONFIRM COMPLIANCE WITH ALL APPLICABLE 1 PREPARED FOR REV. SEPT. 7, 2012 DCODES AND REGULAT70NS GOVERNING THE MATERIALS AND/OR DETERMINING THE LOCATION, SIZE AND ELEVATION OF ALL METHODS INSTALLA770N OF ANY IMPROVEMENTS DEPICTED KENNETH S TE A D M A N EXISTING U77Ll77ES, SHOWN OR NOT SHOWN ON THESE PLANS, ON THIS PLAN. � PRIOR TO ANY CONSTRUC770N. THE ENGINEER SHALL BE N077FIED IN WRITING OF ANY U77LI77ES FOUND INTERFERING WITH THE PROPOSED CONSTRUCTION AND APPROPRIATE REMEDIAL ACT70N 6) RESOURCE AREA DELINEATION PERFORMED BY RlMMER ENVIRONMENTAL CONSULTING, SEPT. RM 2000 AND BEFORE PROCEEDING WITH THE WORK. WETLANDS & LAND MANAGEMENT, INC., ON MAY 24, 2001. 0 10 20 Q 60 80 SHEET 2 OF 2 F 11862