Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
64-281 - 127 MARLBOROUGH ROAD - CONSERVATION COMMISSION
�� � � � Ste- � \\\ � � � � r 1 � � ,fes � n � �1 � ©� I t ' 310 CMR 19-99 DEP file No. (iv tie provided by 0Ea) City/i mer Amended 6/24//99 Amended May 13., 19991pp1 scant Cnomionwealth Amended 1/38//99 of Hassachusetts -Amended 116/98. Amended 11/12/98 Order of Conditions Massachuetts Wetlands Protection Act G.L. c. 131, 540 From G , ✓ � `4�_"�"` � Qa Issuing Authority To (Name of` Ap pli cant) (Name of propercy owner) Address This Order is issued and delivered/as follows! 1 by hand delivery to applicant or representative on v �I (date) by certified mail, return receipt requested on ii (date) This project is located at The propert yis recorded at the Registry o: 3ook 41 - Page, �-I z Certificate (if registered) - o The Notice of intent for this project was filed on J hic- 0 (date) I 98 (dace) The public :searing was closed on i—Ij {. 01 'I Findings The �p,M�•saj.r7rN _ has revicwed the above-referenced wotice at Intent and plans a as held a public hearing on the pro)ect. Based en the infarmatien available to the at this Time, The has determined that the area on which the proPosetl work is To be done is in accordaOce with the PresVMtions of significance set forth in the significant To enc following interests regulations for each Area subject to Protection Under the Act (cheek as appropriate): I Public water supply flood Controllard containing aFel if ish R�1 Private water supply storm damage prevention Fisheries ,461 Grand water supply Prevention of pollution 111 Protection of wildlife wabitat 2f5o iIZIS� Total filing fee submitted state share, (t/j fee in excess Of SZ5) City/Town 5hare ((�� l•.' city/Sown Portion $ state portions - (1/2 Refund Due S ( (1/2 total) 1/2 total) SII RUE COPY ATTEST r � 1/ C ;SALEM, MASS. r. Therefore, the �' ^'l `�J�O'^ hereby finds that the following conditions are necessazy, in accordance with the Performance standards sggc forth in the regulations, tc protect those interests checked above. ' The (.� .... �x.y orders that all work shall be periormed in accordance with said conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of intent, the conditions shall control. General conditions 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures. shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local. statutes, ordinances. by-laws or regulations. 4. The work authorized hereunder shall be completed within three vears from the date of this Order unless either of the following apply: (a) the work is a maintenance dredging project as provided for in the Act; or (b) the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance and both that date and the special circumstances warranting the. _ extended time period are set forth in this Order. 5. This order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any sill used in connection with this project shall be clear. fill, containing no crash. refuse, rubbish or debris. including but not limited to lumber. bricks, plaster, wire, lath, caner, cardboard, pipe, tires. ashes. refrigerators, motor vehicles or parts of any of the foregoing. 7. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department have been completed. - '- - 8, xo work shall be undertaken untilthe-final -order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. in the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the pr000sed work is to be done. In the case of registered land. the Final order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording informatin shall be submitted to the ('v...,.v�SS,n.. on the form at the end of this order prior to commencement of the work. 9. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection. File Number ( � - 2e( _ 10. Where the Department of Environmental Protection is requested to make a determination and to issue a Sucerseding Order. the conservation Commission shall be a party cc all agency proceedings and hearings before the Deoartment. y`j SUG _COPT ATTEST T®E ` /CI SALEM, MASS, 11. Upon completion of the work described herein, the applicant shay_ forthwith request in writing chat a Certificate of Compliance be issued stating that the work has been satisfactorily completed. 12. The work shall conform to the following plans and special conditions: Plans: Title Pared Signed and Stamped by: On File with: 0asT� 31 3 .20'10 5-a,.. Cd�� Ghon . 15 To �,MM,s3 moo. ACV- 03119 VoiGIaJ Talgcko /41192Y 5 . G , G. STKe�6. f' cK Revised Plan: Plan of Land Strongwater Realty Trust Jan. 21, 1999 Vaclav Talacko 1/22/99 S( special conditions (Use additional paper if necessary) See A�U� Note - Retaining wall shall have 6" reveal from lawn from road to elevation 60 at driveway Ammeded 5/13/99- As Built location of driveway retaining wall per 5/6/99 survey stamped by Ralph W. Reid approved as constructed. Pool permitted to be constructed 10' beyond deck. Stone bounds (5) shall be 2' 62 with 6" reveal. Removal from plan 5' retaining walls, left & rear of building, no longer needed, and shall be deleted from plan.6" curbing on perimeter of end of driveway with cuts for drainage _into Swale. _ AmendedA/24/99- to allowL'for 8' driveway extention and stene bounds shall be 6"x6"x33". (Lea.e.5 ace 81 ank) I L COPTATTEST c (` SALEM, Mass. Issued By Conservation Commission Sig Ll7re(S) i This Order must 3e signed by a major.ity of the Conservation Commission. On this _ �� day. of_�i/h2_. before me personally appeared r3bOl� 6ha-.,�,a„wCol person described in and wto me known to be the ho executed the foregoing instrument and acknowledged th*he/slhe xecu d h same ashis/her free act and deed. ., SeHEN Drgg(E ;ny commassio. erpire ' The applicant, The owner, any person agrrieved by this Order, any owner of the etor M it( proposed work is LO be dant, any ten residents of the ci[y or town in which sten (and is lab abutting the landn which located upoupo , are n�iTd of tAeir right to rtgueft the Department of Envirormtntal prptec"On to issue a Superseding Order, providing the rtgwest is made by certified mail Or hand delivery To the department, with the appropriate filing fel and lee Trazi,ii, tdl form data of izsas provided In 310 Cwa 10.03(7), within ten days from the uar.ce of This tle:ermi.^.ati on, A Copy of The request shall at the same time be sent mail or hart/ delivery to the Conservation Comaizsi on arid the applicant. by certified Detach ter dottad tine and it6ait to the -- - - - - -------- prior to Co rieement of w<rk. ....................................................................................�........................ Te Isswing Avthority Please tR edvisrd that the Order of Conditions for the projstt at File tuber has been recorded at The Rtgistry or and ha$ been noted in the chain of title Of the affected property in accordance with General Condition B on 29 If recorded land, the instrtment ntnber which identifies this transaction is If regi3ttred is:d, the doaamnt ntrber which idencif its this Tronsaerion is signature Applicant' GFY ATTEST L �. �EKK SALEM, MASS. SALEM CONSERVATION COMMISSION SPECIAL CONDITIONS-DEP FILE#64-281 ADDRESS: 127 Marlborough Road Lot 3 (revised 11/12/98& 12/10/98) 1. All work shall conform to the above-referenced Notice of Intent,site plan stamped and dated 12/10/98 and supporting documents and those final specifications which shall be filed with the Commission prior to construction. Any change made or intended to be made to the approved plans shall require the applicant to inquire of the Commission in writing whether the change is substantial enough to require the filing of a new Notice of Intent. 2. Members and agents of the Commission shall have the right to enter and inspect the premises at all reasonable times to evaluate compliance with the conditions in this Order. The Commission may require the applicant to submit additional data or information necessary for the Commission to conduct that evaluation. 3. Upon completion of the project,the applicant shall submit,with the request for a Certification of Compliance, an affidavit,prepared by a professional engineer or land surveyor registered in the Commonwealth of Massachusetts, stating that the site has been developed in accordance with the requirements of this Order of Conditions,the referenced site plan and supporting documents. 4. This Order shall apply to every successor in control or successor in interest of the property described in the Notice of Intent and accompanying plans or part thereof. In the event this land or any part thereof changes ownership before or during construction,the current owner shall notify the new owner, by registered mail, of this Order prior to the transfer of ownership and shall forward proof of this notification to the Commission. 5. Prior to commencement of construction activity, a haybale barrier shall be placed downgradient of construction to prevent siltation of the adjacent wetland. Haybales shall be anchored with stakes and entrenched 4 to 6 inches in depth. Trench material shall be deposited on the upgradient side of the haybale barrier. Haybales shall be inspected daily;those showing signs of deterioration shall be replaced immediately. The haybale barrier shall remain in proper ' functioning condition until all disturbed areas have been stabilized. UJ 6, Additional erosion and sedimentation control measures deemed necessary hX1he P— ,� � « Commission shall be instituted by the applicant. Any siltation caused onto any wetland or m a waterway area shall be promptly reported to the Commission. Such areas shall be restored to the '"_ satisfaction of the Commission. e w cs 7. *No spill or discharge of petroleum products or other pollutants will occur within 100 feet of any wetland resource area. 8. `Use or storage of rock salt(sodium chloride)or other toxic de-icing chemicals is " s prohibited within 100 feet of the resource area. Any arrangement for snow removal shall stipulate the ban. 9. Notice shall be given this Commission no more than 2 weeks nor less than 2 days prior to the commencement of construction activities. Said notice shall include,in writing,the names(s), address(es), and business and home telephone numbers of the project supervisor(s) responsible for insuring that operations are conducted in compliance with this Order. A 10. *Minimal pruning and no removal of any buffer zone or wetland vegetation will occur downgradient of the staked haybale line. 11. *Only organic fertilizers shall be used for landscaping and lawn care and shall contain a low nitrogen content and be used in moderation. Pesticides and herbicides shall not be used within 100 feet of the resource area. 12. A No Cut/No Disturbance Zone of the entire inner riparian zone and entire wetlands shall be created and mathmatized on the individual plot plan with limits delineated with the installation of five stone bounds per site plan stamped and dated 12/10/98. Deed restrictions shall be placed on the lot to reference and identify the No Cut/No Disturbance Zone. Individual deed for the lot shall include these Special Conditions. A 5' wide vegetated setback shall be maintained between parking area and wetland. 11 A 30' x 30' drainage easement be created and mathmatized on the individual plot plan and recorded,with plan to be approved by City prior to construction_ 14. The Order of Conditions including these Special Conditions shall be posted on site. *ongoing conditions that do not expire upon completion of the project or issuance of a Certificate of Compliance. —' sd\concom\oocV=1b9Nush 1271oc3 UE COPY ATTUT CITY CLERK SALEW LASS. 06/15/99 TOTE 07:31 FAX 7815991983 GLSS HOMECARE 1@002 i June 14, 1999 Conservation Commission_ Re: 145 Marlborough Road Please schedule us for the June 24th Conservation Commission Hearing. We propose to extend the driveway in the rear approximately eight feet in order to back out of the garage. If you have any further questions please feel free to call us at 781-599-0684. Janet and Ray Dembkoski rt January 31, 1999 FEB 01 0129 Salem r6 City of Salem, Massachusetts Stephen Dibble Conservation Commission One Salem Green Salem MA 01970 Dear Mr. Dibble: We are writing to inform you that as of February 5, 1999 we will be the new owners of 134 Marlborough Road Lot 3.and will commence with building activity within a f ti £ veeks. The supervisor for the project will be George Eisener of Design and �� _ A`ttstrstelion. Mr. Eisener resides at 60 Puritan Lane, Swampscott. His business y a x attd`11fitelephone number are 781-598-1844. This project will adhere to all R`° t#fifitS ut forward in the order of conditions. zyott Iae any questions please feel free to contact any of the above with any ions or concerns. Our home telephone number is 781-599-0684 or 617-510- �' a' kcerely, Raymond and Janet Dembkoski 5 Erie Street Swampscott, MA 01907 g°3 °-3`t} t.aa�°��t: 3i2�. PFaft`.+ ^��2� ,ues`�•-�° ,! 5 'y+ 3' 70162. �vrr, amu- ruwuui r,yy 7 15)00 J.F. S I PIK LOT 3 40,88 7 t 5 F. 0.9386 . AC. - µ PLAN BK. 325/PL. 47 �R B/TUM/NOUS CONC, STONE BOUND TO `L PARK/NG AREA BE SET (5 TOTAL) cb MAINTAIN 5' n Q) - - • VEGETATED l SETBACK TO ^0� 00. WETLAND S Poo �� 28L °OSFo 0.6 1 \ °• 58 tido 3G� l/'^ \sc� ` AN f TFCC/ SIL T FENCE 595 1p I O�WITH HAY RETi BALES (T P.) 60 WA0 MATCH 6Elyls PROPER PROPER EXISTING 30:.30' / °• -LINE \ DRAINAGE / EASEMENT \• DRIVE ; 6Q Oty T/NG • r 0� v/�� S 42'74"76 E 66 OB4 68 OJ 25.00" M�li1t( X69+0 �} S 5637 05" E i <l ? S 15.00' ' CRUSHED. a��/ � % • i' � / STONE S,;, / O�0 � OR TAKES //V O%/II ND �Fn hF O pN I NO (/NF/ February 19, 1999 Salem Conservation Commission Re: File No. 64-281 To Whom It May Concern: After review of house placement, we would like to move proposed single family dwelling forward approximately 6-10 feet depending on engineer assuring us of setback and side requirements. We will adhere to all specifications on the order of conditions regarding driveway placement 5' from wetland boundary and 10' on right side boundary. Thank you for your consideration, look forward to seeing you at the next conservation hearing. Sincerely, / p� Joseph Grenier 02/02/99 11:47 FAX 201 I AN6 CI_�ENVIRONMENTAL CON�ULTANTS (978 777-3050 Salem;l . f,AX (978) 77¢4203 FAX TRANSMITTAL C VER PAGE To: k George From: John Dick Co. ame: Salem Con Comm Date: February 2, 1999 I Faz : 7 5 - 5877 HEC File!1: ¢432-3 i Total no ber of pages including cover page= 1 Regardi ig Greni r Marlborough Road Salem lot 3 order of conditions Mr. Gr er asked me to address the erosion control measures proposed for Lot 3_ Silt fence and haybales were specified. The use of haybales in residential constructi an is not recommended. The bales rot in place, generally becoming impossiAm to remove after a few Months, and contribute 1ge quantities of weed seeds t e adjacent wetlands, along with a heavy dose o7nitrates. In the 41 i instances where additional weight is required over the skirt of the silt fence, ( example, at the base of lgng, steep slopes or in drainage swales), haybales�ight effectively be used alone or in combinatip with sandbags. This is ply not the case on Lot 13. the ev that the silt fence breaches wring heavy rains, or at points where empor runoff pools against the fence, a bene of T" stone servel to protect the etland d remains relatively easy to remove. To the same end, t4e silt fence, ather bein torn from the ground, may be cut at grade and left in place pvithout er turbai ice of the surface. I i i request n bet alf of Mr. Gren'er that this minor revision be incorporated in the T odified der of ogg4tions. rank you for your attention to tb�s mattgr. PLV AJ L Ir 1 OU PQ NOT RECETVL ALL PAGES Tl- kNK YOU I �f OF - z 310 CMR 10. 99 DEP File No. (To be provided by DEP) Form 5 City/Torn Applicant 1 rz, Jfls�.f Conzmonwealth ' of Massachusetts Amended 12/10/98 Amended 11/12/98 Order of Conditions Massachuetts Wetlands Protection Act G.L. c . 131, §40 From G ( �2/n yI��q SaJy�R o(J �"�-r^ S'�^o�- Issuing Authority To (Name of Applicant) (Name of property owner) Address ��o) �7�k S� �� Address This Order is issued and delivered as follows : \ c� Aby hand delivery to applicant or representative on J�I '� �I) 1(� (date) ❑ by certified mail, return receipt requested on (date). This project is located ac 12_� iM-�'A�� The property 'li�s� recorded at the Registry of ly Book ` �I 'i � Page Certificate (if registered) O, The Notice of Intent for this project was filed on J-) fit- �� /moo (date) J The public hearing was closed on y)Oe_ �� � I � (date) Findings /� The l � `7^ has reviewed the above-referenced Notice of Intent and plans and has held a public hearing on the project. Based on the information available to the at this time, the has determined that the area on which the proposed work is to be done is significant to the following interests in accordance with the Presumptions of Significance set forth in the regulations for each Area Subject to Protection Under the Act (check as appropriate): Public water supply Flood Control land containing shellfish Private water supply Storm damage prevention Fisheries Ground water supply Prevention of pollution I Protection of Wildlife Habitat Total Filing Fee Submitted 2 ( J O State Share t I� ( " 0 (1/2 fee in excess of $25) City/Town Share /� Total Refund Due S V City/Town Portion S State Portion$ (1/2 total) (1/2 total) Effective 11/10/89 5-1 Therefore, the C✓'^'rt,SSto✓\ hereby finds that the following conditions are necessary, in accordance with the Performance Standards sgt forth in the regulations, tc protect those interests checked above. The Cam� • ss orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. General Conditions 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 4 . The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: (a) the work is a maintenance dredging project as provided for in the Act; or (b) the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance and both that date and the special circumstances warranting the extended time period are set forth in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6 . Any Till used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts of any of the foregoing. 7 . No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Final order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry' s Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording informatin shall be submitted to the on the form at the end of this Order prior to commencement of the work. 9. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection, File Number �„q - 2n( 1. 10. Where the Department of Environmental Protection is requested to make a determination and to issue a Superseding order, the Conservation - Commission shall be a party to all agency proceedings and hearings before the Department. 5-2 11. Upon completion of the work described herein, the applicant $hall forthwith request in writing that a Certificate of Compliance be issued stating than the work has been satisfactorily completed. 12 . The work shall conform to the following plans and special conditions: Plans: Title Dated Signed and Stamped by: On File with: Pia' of 1-aj RAe V l�3'9':ZTY�or IIdOk Vo d a v Ta g ch 14'/92l S . C . 6 - fl--"UTI TV-'YT- Special `st"Special Conditions (Use additional paper if necessary) See 24 - w �'J, 1,a 5 (Leave-Space Blank) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3A Issued By Conservation Commission Sig tures) This Order must be signed by amajority of the Conservation Commission. I On this / day. of `JJ np— 19 6) before me personally appeared r9'Ly? 6'1n�h���^eaP to me known to be the person described in and who executed the foregoing instrument and acknowledged that he/she execu d h same as his/her free act and deed. STEPHEN DIBBLE MYCommiss0 -- N ary Public My commission expires The applicant, the owner, any person agrrieved by this Order, any owner of land abutting the land upon which the proposed work is to be done, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the Department of Environmental Protection to issue a superseding Order, providing the request is made by certified mail or hand delivery to the Department, with the appropriate filing fee and Fee Transmittal Form as provided in 310 CMR 10.03(7), within ten days from the date of issuance of this determination. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and the applicant. Detach on dotted lire and submit to the prior to commencement of work. ............................................................................................................ To Issuing Authority Please be advised that the Order of Conditions for the project at File Number has been recorded at the Registry of and has been noted in the chain of title of the affected property in accordance with General Condition 8 on ,19 If recorded land, the instrument number which identifies this transaction is If registered land, the document number which identifies this transaction is signature Applicant- 5-4A SALEM CONSERVATION COMMISSION SPECIAL CONDITIONS - DEP FILE 964-281 ADDRESS: 127 Marlborough Road Lot 3 (revised 11/12/98 & 12/10/98) 1. All work shall conform to the above-referenced Notice of Intent, site plan stamped and dated 12/10/98 and supporting documents and those final specifications which shall be filed with the Commission prior to construction. Any change made or intended to be made to the approved plans shall require the applicant to inquire of the Commission in writing whether the change is substantial enough to require the filing of a new Notice of Intent. 2. Members and agents of the Commission shall have the right to enter and inspect the premises at all reasonable times to evaluate compliance with the conditions in this Order. The Commission may require the applicant to submit additional data or information necessary for the Commission to conduct that evaluation. 3. Upon completion of the project, the applicant shall submit, with the request for a Certification of Compliance, an affidavit, prepared by a professional engineer or land surveyor registered in the Commonwealth of Massachusetts, stating that the site has been developed in accordance with the requirements of this Order of Conditions, the referenced site plan and supporting documents. 4. This Order shall apply to every successor in control or successor in interest of the property described in the Notice of Intent and accompanying plans or part thereof. In the event this land or any part thereof changes ownership before or during construction, the current owner shall notify the new owner, by registered mail, of this Order prior to the transfer of ownership and shall forward proof of this notification to the Commission. 5. Prior to commencement of construction activity, a haybale barrier shall be placed downgradient of construction to prevent siltation of the adjacent wetland. Haybales shall be anchored with stakes and entrenched 4 to 6 inches in depth. Trench material shall be deposited on the upgradient side of the haybale barrier. Haybales shall be inspected daily; those showing signs of deterioration shall be replaced immediately. The haybale barrier shall remain in proper functioning condition until all disturbed areas have been stabilized. 6. Additional erosion and sedimentation control measures deemed necessary by the Commission shall be instituted by the applicant. Any siltation caused onto any wetland or waterway area shall be promptly reported to the Commission. Such areas shall be restored to the satisfaction of the Commission. 7. *No spill or discharge of petroleum products or other pollutants will occur within 100 feet of any wetland resource area. 8. *Use or storage of rock salt(sodium chloride) or other toxic de-icing chemicals is prohibited within 100 feet of the resource area. Any arrangement for snow removal shall stipulate the ban. 9. Notice shall be given this Commission no more than 2.weeks nor less than 2 days prior to the commencement of construction activities. Said notice shall include, in writing, the names(s), address(es), and business and home telephone numbers of the project supervisor(s) responsible for insuring that operations are conducted in compliance with this Order. 10. *Minimal pruning and no removal of any buffer zone or wetland vegetation will occur downgradient of the staked haybale line. 11. *Only organic fertilizers shall be used for landscaping and lawn care and shall contain a low nitrogen content and be used in moderation. Pesticides and herbicides shall not be used within 100 feet of the resource area. 12. A No Cut/No Disturbance Zone of the entire inner riparian zone and entire wetlands shall be created and mathmatized on the individual plot plan with limits delineated with the installation of five stone bounds per site plan stamped and dated 12/10/98. Deed restrictions shall be placed on the lot to reference and identify the No Cut/No Disturbance Zone. Individual deed for the lot shall include these Special Conditions. A 5' wide vegetated setback shall be maintained between parking area and wetland. 13. A 30' x 30' drainage easement be created and mathmatized on the individual plot plan and recorded, with plan to be approved by City prior to construction. 14. The Order of Conditions including these Special Conditions shall be posted on site. *ongoing conditions that do not expire upon completion of the project or issuance of a Certificate of Compliance. sd\concom\ooc\mw1borough 1271ot3 sa s"" + S p n h` ,',' '' fi COMMONWEALTH OF MASSACHUSETTS 4 + >. EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PRoTBcmN METROPOLITAN BOSTON-NORTHEAST REGIONAL OFFICE m._ GEOO PAUL s JR 7DY XH a JUN 22 1993 DAVID B.STRUHS Commissioner /� +e�is" i% 'i� :.m# dxtie 7(A�i..l F 1' n 19 ®G Lu S. £# e.�i`4 P.'L�2'L' DEP File # 64-281 RE: NOTIFICATION OF WETLANDS PROTECTION ACT FILE NUMBER SALEM DATE: 6/17/98 (city/town) The Department of Environmental Protection has received a Notice of Intent filed in accordance with the Wetlands Protection Act (M.G.L. c.131, §40) : Applicant : STRONG BROOK REALTY Owner: SAME Address: 339 CABOT STREET Address: BEVERLY. MA 01915 Project Location: 127 MARLBOROUGH ROAD (A PORTION OF) IF CHECKED, THE FOLLOWING ITEM(S) APPLY TO THIS NOTICE OF INTENT: A." This project has been assigned the following file Although a file # is being issued, please note the following: IF PROJECT IS PERMITTED HAYBALES SHOULD EXTEND FURTHER EASTWARD TOWARDS MARLBOROUGH ROAD AND THE HAYBALES SHOULD BE STAKED IN PLACE PRIOR TO ANY EARTH MOVING. ISSUANCE OF A FILE NUMBER INDICATES ONLY COMPLETENESS OF SUBMITTAL, NOT APPROVAL OF APPLICATION B." No File # will be assigned to this project until the following missing information is sent to this office, to meet the minimum submittal requirements in accordance with the Wetlands Protection Regulations at 310 . CMR 10 .00 : 1. ( ) copy(s) of a completed Notice of Intent (Form 3 or Form 4 of Sect. 10. 99, whichever is applicable) and a copy of the Fee Transmittal Form, with a copy of the check for the State' s share of the Notice of Intent filing fee. 2 . ( ) copy(s) of plans, calculations, and other documentation necessary to completely describe "the proposed work and mitigating measures to protect resource areas.'- 3 . reas:"3 . ( ) _ copy(s) of an 8M" X 11" section of the USGS map of the area. 4 . ( ) _ copy(s) of plans showing compliance with Title 5 of the State Environmental Code, 310, CMR 15 . 00 . 5 . ( ) Proof that a copy of your Notice of Intent has been mailed or hand delivered to the Natural Heritage and Endangered Species Program. COMMENTS: 205&Lowell Sl • WfimhWon,Mamchvseds 01887 • FAX (978) 661-7615 0 Telephone (970) 661-7600 • TDD 8(978)661-7679 1 3 tk t P Ak C j1OtherRegulatory Ju�risdictionfi kA 1 . `L ( ) Application has been forwarded to' Waterways Regulatory Program to, determine if a Chapter 91 License is required, 2 . ( ) Applicant is advised to forward a copy of the Notice $of Intent to . the Corps of Engineers for review. (call 1-800-362-4367 for information) . D. 401 Water Quality Certification The project described in your Notice of Intent requires a 401 Water Quality Gertifscation from tie Depa'rt t fl�Invironmental Protection and may require submittal of 'a-401 application°form. `S a below1for further details: 1 . ( ) Based upon the information submitted in and with your Notice of Intent ,a separate 401 WaterQuality Certification application form is not ,required"1VThe bepart ent 6ft8nvironmentalxPiote6tionf'has ` "reviewed the plans submitted'by the applicant-and"£finds°that` there is reasonable assurance that the project or activity will be conducted in a manner that will not violate the Massachusetts Surface Water Quality Standards, provided that : a) the applicant receives and complies with a Final Order of Conditions from the local conservation commission or the Department; , b) the Order of Conditions does not cause the loss of more than 5, 000 sq. ft . of bordering vegetated wetlands and land under water and/or the dredging of more than 100 cubic yards of land under water; c) any loss of vegetated wetlands has been mitigated with a minimum replication of 1 : 1; and d) the project is not exempt from the M.G.L. c. 131, §40 - the Wetlands Protection Act; is not part of a subdivision; does not cause the loss of any wetlands designated as Outstanding Resource Waters; and does not cause the loss of any salt marsh. Therefore, provided that the above conditions are satisfied, the Final Order of Conditions will serve as the Water Quality Certification for -this project. This does not relieve the applicant of the duty to comply with any other statutes or regulations. 2 . ( ) Before the activity described in the Notice of Intent can commence, you must obtain a Water Quality Certification from this Regional Office. Please complete the enclosed 401 Water Quality Certification application form and file it with this Regional Office for review. 3 . ( ) Your project involves dredging of greater than 100 cubic yards of material or requires a permit from the Federal Energy Regulatory Commission for work in "waters of the Commonwealth. " Therefore, your proposed project is subject to 314 CMR_. 9.,U0 and requires a Water Quality Certification. Please complete the enclosed 401 Water Quality Certification application form and file it with the Department of Environmental Protection, Waterways Program, One Winter Street, Boston, MA 02108. Contact the Division of Waterways Program at 617-292-5655 if you have any questions. For more information please contact :WAYNE LOZZI at (617) 932-7600 . cc: Conservation Commission ( ) U.S. Army Corps of Engineers ( ) Owner. - ( ) Coastal Zone .Management ( ) DEP - Water Pollution Control (X) Representative:HANCOCK ENVIRONMENTAL ( ) DEP - Waterways 235 NEWBURY STREET ( ) Other: DANVERS, MA 01923 3 City of Salem Conservation Commission One Salem Green Salem, MA Mr. Chairman, December 1, 1998 Before you is a modification to an approved plan for Lot 3 Marlborough Road. The buyer Attorney instructed them to get any future desired preapproved before the purchase of this lot. At some point in the fixture there is a desire to locate a deck, and probably a pool, in the locations shown on the plan. Would the Commission please consider these request at the December 10th meeting. Respectfully, ose H. er rustee Strong Broo ealty Trust GRANT OF EASEMENT KNOW ALL MEN BY THESE PRESENTS, that STRONG BROOK REALTY TRUST,JOSEPH GRENIER, TRUSTEE, the owner of certain parcels of land situated at Marlborough Road in Salem, Essex County, Massachusetts, more particularly described in a Deed recorded at Essex South District Registry of Deeds in Book 14446, Page 346, for consideration paid grant to the CITY OF SALEM, a municipal corporation, its designees or assignees duly established by law and its successors and assigns forever, with Quitclaim Covenants, the right and easement to enter upon Lot 3 as shown on the accompanying Easement Plan for the purpose of maintaining, improving, constructing or servicing a certain drain culvert beneath Marlborough Road, Salem, Massachusetts. The before mentioned easement area is shown on a plan recorded herewith as"Proposed Drain Maintenance Easement (30'x 30')"on a plan entitled "Exhibit Easement Plan of Land in Salem, MA prepared for Strong Brook Realty Trust, scale 1" =40', dated July 14, 1998, prepared by Hancock Survey Associates, Inc.". For my title, see Deed of Joseph and Ida Furnari, which Deed is recorded at the Essex South District Registry of Deeds in Book 14446, Page 346. WITNESS our hands and seals this day of July, 1998. STRONG BROOK REALTY TRUST C� J eph Grenier, T stee COMMONWEALTH OF MASSACHUSETTS Essex, ss. July �"k'�1998 Then personally appeared before me the above-named, Joseph Grenier, Trustee, and acknowledged the foregoing instrument to be the free act and deed of Strong Brook Realty Trust, before me. "'�7&jx V:o:r� N tary Public My Commission Expires: rc-6 /a , --�06cD C:\Grenier\EASEMENT LOT 3.wpd ASSESSORS.' MAP 9, A PORTION OF LOT 270 REFERENCES.• N �� PLAN BOOK 321, PLAN DEED BOOK 14446, G4 AN BOOK 325, PLAN PL7346 FROM PIAN 8p0K gpi, pLA OWNER OF RECORD, MERIDIAN STRONG BROOK REAL TY TRUST JOSEPH H. GREN/ER, T US TEE LOT 3 LOT 2 ��� 40,887 tSF. PLAN BOOK 325 PLAN 47 0.9386 tAc. GRAIN MAINTENANCE � 0 o EASEMENT h�a (30'X 3o) LOT 4 PLAN BOOK 325 PLAN 47 / A N -3,000, F6g•j I eQ���¢; o3BSBs0, �i9go c , S -' asoag. rJ M/B/T EASEMENT PLAN OF LAND IN SALEM, MA fop, qcy PREPARED FOR JOHN STRONG BROOK REAL TY TRUST DICK SCALE I" = 40' ✓UL Y 14, 1998 . 32 HSA HANCOCK SURVEY ASSOC., INC. OQ' 235 NEWBURY STREET, DANDERS, MA SUP VOICE 978-777-3050 FAX 978-774-7816 Jt�� PROF AL LAND SURVEYOR CHECKED BY. 20 40 80 6432 City of Salem Conservation Commission One Salem Green Salem, MA Mr. Chairman, December 1, 1998 Before you is a modification to an approved plan for Lot 3 Marlborough Road. The buyer Attorney instructed them to get any future desired preapproved before the purchase of this lot. At some point in the future there is a desire to locate a deck, and probably a pool, in the locations shown on the plan. Would the Commission please consider these request at the December 10th meeting. Respectfully, ose H. GVealty stee Strong BrooTrust HANCOCK d TTV12 ti3 OCA 4 a��o44Qd Environmental Consultants 235 Newbury Street,Danvers,MA 01923 (978)777-3050 Fax(978)7747816 ^ ol..- ( l� B NO. ❑12 Farnsworth 3o JO /��h Street 626 Main Street 7 C/J z_ Boston,MA 02210 Bolton,MA 01740 ATTENTION (617)350-7906 (978)779-6767 TO :5r�iC- �/✓�C �� RE: s1ft e S. CoNf�f ^ WE ARE SENDING YOU Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints * Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION ,L F. _ _ a':_ . . sept. THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints For review and comment ❑ ❑ FORBIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIGNED: it enclosures are not as noted,kindly notify us at once. _ 07/15/98 00:16 FAX 1m02 ASSESSORS, MAP 9. A POR7701V OF LOT 270 PLN BOOK 321BOOK 4 PLANG7 J46 000K 32�pjAM PLAN BOOK J2S, PLAN 47 Po ORNER OF RECORD.• M��piAN STRONG BROOK REALTY 7Rusr JOSEPH H. GREN/ER, T USTE£ LOT J LOT 2 �� 40,887 tS.F. PLAN BOOK 32A PLAN 47 0.9J86 tAc. ,,yy DRAIN MANS NCE 7� EAswENT (Jo'.r JO) Z � LOT 4 PLAN 800X J24 PLAN 47 �-6 e 4? zoo Pot �lpo'40 EXH/A'T EASEMENT PLAN OF LAND /N SALEM, MA PREPARED FOR STRONG BROOK REAL TY TRUST SCALE.. I- � 40' JUL Y 14 1998 HSA HANCWr SWIVY A WC, PC 235 NEWBURY S7REFT. DAN*RSa NA IWCC 978-777-J050 FAX 978-774-7816 PR AL LAND SURVEYOR CHECKED B 0 20 40 80 64J2 -- - -- .,-- � -_�I - ��_ 3�__ �-(mac.✓_?�-�G c� - Y?�� �. 7D ----------- --- ----------- - ------ ---------------- cao q i 1'r 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION 10.99: continued##6432-3 (refiling to meet quorum requirements; see DEP 64-275 DEP File No. (To be provided by DEP) Form 3 City/Town Salem Applicant Mr.Joseph Grealer Comnronweait/r Deparbnent ofDefense of Massachusetts United States ofAmerica Notice of Intent Under the City of Salem Wetlands Protection By-Law,. The Massachusetts Wetlands Protection Act, G.L. c. 131, §40 and Application for a Department of the Army Permit Part 1:General Information 1. Location: Street Address A portion of 127 Marlborough Road,Salem,MA,01970 Lot Number Tax Map 9,a portion of Lot 270(Subdivision Lot 3) 2. Project:Type Residential Description The applicant proposes to construct a single family home,with associated driveway and grading located partially within buffer zone to bordering vegetated wetland. 3. Registry: County Essex South Current Book 14446 &Page 346 Certificate(if Registered Land) NIA 4. Applicant Strong Brook Realty Trust,Joseph Greaier Trustee Tel. (978)9274878 Address 339 Cabot Street,Beverly,MA 01915 5. Property Owner Strong Brook Realty Trust,Joseph Grenier Trustee Tel. (978)9274878 Address 339 Cabot Street,Beverly,MA 01915 6. Representative Hancock Environmental Consultants Tel. (978)717-3050 Address 235 Newbury Street Danvers,MA 01923 7. a. Have the Conservation Commission and the Department's Regional Office each been sent,by certified mail or hap deliver,2 copies of completed Notice of Intent,with supporting plans and documents? Yes ip No 0 b. Has the fee been submitted? Yes® No❑ Fee waiver requested(refiling to meet quorum) c. Total Filing Fee Submitted $ 112.50 d. City/Town Share of Filing Fee Waiver requested State Share of Filing Fee $ 112.50 (sent to City/Town) (1/2 of fee in excess of$25,sent to DEP) e. Is a brief statement attached indicating how the applicant calculated the fee? Yes® Non 4/1/94 310 CMR-411 (refiling) NOI Lot 3 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION 10.99: continued #6432-3 (rending to meet quorum requirements) 8. have all obtainable permits,variances and approvals required by local by-taw been obtained? Yes M No F] Obtained: Applied For: Not Applied For. City of Salem Wetlands N/A Protection By-Law N/A 9. Is any portion of the site sub'ect to a Wetlands Restriction Order pursuant to G.L. c. 131, §40A or G.L. c. 130, § 1057 Yes❑ No I� 10. List all plans and supporting documents submitted with this Notice of Intent. Identifying NumberfLetter of Exhibit Title,Date A Plan of Land in Salem,MA,Property of Strong Brook Realty Trust, March 20,1998 B Locus Map—USGS—Salem quad 7.5x15 minute,1988 C 1-3 Abutter List,Notification and Affidavit of Service D 1-2 Filing Fee Calculation Sheet and Statement E-1-2 Stormwater Management Form 11. Check those resource areas within which work is proposed: IN (a) Wd Buffer Zone ❑ Riverfmnt Area (b) Inland: Land Subject to Flooding Bank* ❑ Bordering ❑ Bordering vegetated Wetland* ❑ Isolated ❑ Land Under Water Body&Waterway* (c) Coastal: ❑ Land Under the Ocean* ❑ Designated Port Area* ❑ Coastal Beach* ❑ Coastal Dune ❑ Barrier Beach* ❑ Coastal Bank ❑ Rocky Intertidal Shore* ❑ Salt Marsh* ❑ Land Under Salt Pond* ❑ Land Containing Shellfish* ❑ Fish Run* * Likely to involve U.S. Army Corps of Engineers concurrent Jurisdiction. See General Instructions for Completing Notice of Intent. 4/1/94 310 CMR-412 (refiling) NOI Lor 3 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION 10.99: continued #6432-3 (refiling to meet quorum requirements) 12. Is the project within estimated habitat which is indicated on the most recent Estimated Habitat Map of State- Listed Rare Wetlands Wildlife(if any)published by the Natural Heritage and Endangered Species Program? Yes ❑ No Is Date printed on the Estimated Habitat Map No Map Available ❑ (if any) Salem quad, 1997-98 edition If yes, have you sent a copy of the Notice of Intent to the Natural Heritage and Endangered Species Program via the U.S. Postal Service by certified or priority mail (or otherwise sent it in a manner that guarantees delivery within two days) no later than the date of the filing of this Notice of Intent with the conservation commission and the DEP regional office? Yes ❑ No ❑ If yes, please attach evidence of timely mailing or other delivery to the Natural Heritage and Endangered Species Program. Part II:Site Description Indicate which of the following information has been provided(on a plan, in narrative description or calculations) to clearly,completely and accurately describe existing site conditions. IdentifvinE Number/I.etter of Exhibit Natural Features Soils A Vegetation A,B Topography B Open water bodies(including ponds and lakes) A,B Flowing water bodies(including streams and rivers) Public and private surface water and ground water supplies on or within 100 feet of site Maximum annual ground water elevations with dates and location of test A Boundaries of resource areas checked under Part 1, item 1 I above Other Title: Man-made Features A,B Structures(such as buildings,piers,towers and headwalls) Drainage and flood control facilities at the site and immediately off the site, including culverts and open channels(with inverts),dams and dikes Subsurface sewage disposal systems Underground utilities 4/l/94 310 CMR-413 (refiling) NO/Lot 3 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION 10.99: continued #6432-3 (refiling to meet quorum requirements) A,B Roadways and parking areas A Property boundaries,easements and rights-of-way Other Title: Part III:Work Description Indicate which of the following information has been provided(on a plan, in narrative description or calculations) to clearly, completely and accurately describe work proposed within each of the resource areas checked in Part 1, item 11 above. Identi Number/Letter of Exhibit Planview and Cross Section of: A Structures(such as buildings,piers,towers and headwalls) Drainage and flood control facilities, including culverts and open channels(with inverts), dams and dikes Subsurface sewage disposal systems and underground utilities Filling,dredging and excavating,indicating volume and composition of material Compensatory storage areas,where required in accordance with Part III, Section 10.57(4) of the regulations Wildlife habitat restoration or replication areas Other Title: Point Source Discharee Description of characteristics of discharge from point source (both closed and open channel)when point of discharge falls within resource area checked under Part I, item 11 above, as supported by standard engineering calculations, data and plans, including but not limited to the following: 1. Delineation of the drainage area contributing to the point of discharge; 2. Pre-and post-development peak runoff from the drainage area, at the point of discharge, for at least the 10- year and 100ryear frequency storm; 3. Pre-and post-development rate of infiltration contributing to the resource area checked under Part I, item 11 above; 4. Estimated water quality characteristics of pre-and post-development runoff at the point of discharge. 4/1/94 310 CMR-413 (rehlin,¢) NOI Lot 3 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION 10.99: continued #6432-3 (refiling to meet quorum requirements) Part IV: Mitigating Measures 1. Clearly, completely and accurately describe, with reference to supporting plans and calculations where necessary: (a) All measures and designs proposed to meet the performance standards set forth under each resource area specified in Part II or Part III of the regulations;or (b) Why the presumptions set forth under each resource area specified in Part II or Part III of the regulations do not apply. LJ Coastal Resource Area Type: Identifying ® InlandNumber/Letter N/A of Exhibit No activity is proposed within a resource area LJ Coastal Resource Area Type: Identifying Number/Letter Inland N/A of Exhibit 411/94 310 CMR-413 (refiling) NOI Lot 3 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION 10.99: continued #6432-3(refiling to meet quorum requiremenLJ t Coastal Resource Area Type: Identifying ❑ Inland Number/Letter N/A of Exhibit 2. Clearly, completely and accurately describe, with reference to supporting plans and calculations where necessary: (a) All measures and designs to regulate work within the Buffer Zone so as to ensure that said work does not alter an area specified in Part I, Section 10.02(1)(a)of these regulations;or (b) if work in the Buffer Zone will alter such an area, all measures and designs proposed to meet the performance standards established for the adjacent resource area, specified in Part II or Part III of these regulations. Ll Coastal Resource Area Type Bordered Identifying By 100-Feet Discretionary Zone: Number/Letter Inland Bordering Vegetated Wetland of Exhibit A staked hay bale siltation barrier will be erected and maintained between the A,E limit of work and the resource areas as shown on the permit site plan. The erosion control barriers shall remain in place and proper function until all exposed finish grade surfaces within the buffer zone are adequately stabilized by vegetation. 11ey shall define the limit of work within the buffer zone. All exposed-soil finish grade surfaces within the buffer zone shall be immediately landscaped, or seeded and mulched with a layer of mulch hay, or covered with mukh until climate conditions allow for seeding, 4/1/94 310 CMR-413 (refiling) N01 Lot 3 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION 10.99: continued #6432-3 (refiling to meet quorum requirements) Part V,Additional Information for a Department of the Army Permit 1. COE Application No. (to be provided by COE) 2. (Name of Waterway) 3. Names and Addresses of property owners adjoining your property: See 4. Document other project alternatives (i.e., other locations and/or construction methods, particularly those that would eliminate the discharge of dredged or fill material into waters or wetlands). 5. 8112"x 11"drawings in planview and cross-section,showing the resource area and the proposed activity within the resource area. Drawings must be to scale and should be clear enough for photocopying. Certification is required from the Division of Water Pollution Control before the Federal permit can be issued. Certification may be obtained by contacting the Division of Water Pollution Control, 1 Winter Street, Boston, Massachusetts 02108. Where the activity will take place within the area under the Massachusetts approved Coastal Zone Management Program, the applicant certifies that his proposed activity complies with and will be conducted in a manner that is consistent with the approved program. Information provided will be used in evaluating the application for a permit and is made a matter of public record through issuance of a public notice. Disclosure of this information is voluntary; however, if necessary information is not provided,the application cannot be processed nor can a permit be issued. I hereby certify under the pains and penalties of perjury that the foregoing Notice of Intent and accompanying plans,documents and supporting data are true and complete,to the best of my knowledge. � +-ori J. 4�Zc-+.��ct�z�s�ieot,x K(�+tc-lL�c.rr rrQusr --:lure of Applica Date CK E May 29,1998 Signature of Applicant Representatu Date `Exception to ENG Foran 4345 approved by HQUSACE,6 May 1982' "This document contains a joint Department of the Army and State of Massachusetts application for a permit to obtain permission to perform activities in United States Waters. The Office of Management and Budget(OMB)has approved those questions required by the US Army Corps of Engineers. OMB Number 0702-0036 and expiration date of 30 September 1983 applies." This statement will be set in 6 point type. 4/1/94 310 CMR-413 (refiling) NOI Lot 3 96432 Exhibit B Locus Map Source: USGS Salem quad 7.5x15 minute, 1988 ore '�.� 3 T - .. . �\ \\ PP n9 n �.•• / Golt Ok I if ', l ♦ INTE CHAE �� .I �� Hla Scn 'V ` r 13a1!co.,; st of el C s lub -.�. /�A Sch �.,`.,•T` / v nr: _ e 1 / O—. armG _ o -;� - � �^•. �'_- - l�/ter �� --f f ' �1'� � I Park - / r opt oil Golf Cow ,, \ edha �gK� � rax. �1 r _ i .,•. � \ u to i ttr F7 I � � Sz •o � j .q ouy i , Wn< a <'�Wa r -. - _ •+� ,�- r - , -cam: SCALE125,000 N KIIOMEURS L MIRES I y 0 #6432-3 Exhibit C-1 Abutter List 9 9 MAUREEN OUELLETTE 163 MARLBOROUGH RD SALEM MA 01970 9 10 JOHN&GLADYS BROUGHTON 5 HOME ST SALEM MA 01970 9 11 HAROLD&PAULA ROBERTS 7 HOME ST SALEM MA '.01970 9 12 DIBIASECORPORATION 10 LOOKOUT TERRACE `';LYNNFIELD MA!01940 - - 9 18 STEPHEN&ELEANOR CAPELLOS ,156 MARLBOROUGH RD !SALEM MA �01970 9 19 FELICIA WEAVER 150 MARLBOROUGH RD SALEM MA 01970 j 9 '39 yCITY OF SALEM 93 WASHINGTON ST SALEM MA 01970 9 Al FELICIA WEAVER AS HEREIN _._. 9 '272 D. OUELLETTE&B.LABONTE 163 MARLBOROUGH RD SALEM MA 01970 9 20.201 JOHN JERMYN 146 MARLBOROUGH RD ^SALEM MA 01970 1 JERMYN REALTY TRUST 9 1148 JOSEPH FRATANGELO 144 MARLBOROUGH RD SALEM MA 01970 11{ 9 _'23 ROCCO&JUNE SOLIMENO 138 MARLBOROUGH RD -SALEM MA 01970 _. _. -f 9 24 EDWARD BOBREK 1134 MARLBOROUGH RD ,SALEM MA 101970 9 25 PATRICK KING 18 MASON ST LBEVERLY MA 501915 { 9 16 PETER&MARY SMITH -- MARLBOROUGH RD SALEM MA 01970 - - _.----- 9 I27 MARYANN TERRY ,108 MARLBOROUGH RD ;SALEM MA 01970 '120 MARLBOROUGH RD TRUST 9 i28 MARK AND MARYANN TERRY _.... 108 MARLBOROUGH RD ;SALEM MA ,:01970 9 273 ANTHONY&KARLYNE FURNARI 125 MARLBOROUGH RD ,SALEM MA :01970 9274 JO , SEPH&MARIANNE FURNARI 1Z3 MARLBOROUGH RD "SALEM MA -01970 �. NOI Lot 3 #6432-3 Exhibit C-2 Notification to Abutters Under the Massachusetts Wetlands Protection Act In accordance with the second paragraph of the Massachusetts General Laws Chapter 131, Section 40, you are hereby notified of the following. A. The name of the applicant is Strong Brook Realty Trust,Joseph Greater Trustee B. The applicant has filed a Notice of Intent with the Conservation Commission for the Municipality of Salem seeking to remove,fill,dredge or alter an Area Subject to Protection Under the Wetlands Protection Act(General Laws Chapter 131, Section 40). Activities Proposed: The applicant proposes to construct a single family home with associated driveway and grading located partially within buffer zone to bordering vegetated wetland. C. The Address of the Lot where the activity is proposed is A portion of 127 Marlborough Road,Salem MA 01970 Tax Map 9,a portion of Lot 270(Subdivision Lot 3) D. Copies of the Notice of Intent may be examined at Hancock Environmental Consultants between the hours of 9 AM and 4 PM on the following days of the week: M—F For more information,call: 978 777-3050 Check one: This is the applicant LJ representative 1K or other n(specify): Name of Representative: Hancock Environmental Consultants E. Copies of the Notice of Inter may be obtained for a fee from either(check one)the applicant or the applicant's representative ®,by calling this telephone number (978)-777-3050 between the hours of 9 AM and 4 PM on the following days of the week: M—F F. Information regarding the date,time,and place of the public hearing may be obtained from: Salem Conservation Commission by calling this telephone number (978)745.9595 between the hours of 8AM and 4PM on the following days of the week M-W SAM-7PM H Iand 8AM-1PM F Check one: This is the applicant Q representative or other B(specify): Salem Conservation Commission NOTE:Notice of the public hearing,including its date,time and place,will be published at least five (5)days in advance in the _ Salem Evening News (name of newspaper) NOTE: Notice of the public hearing,including its date,time and place,will be posted in the City or Town Hall not less than forty-eight(48)hours in advance. NOTE: You also may contact your local Conservation Commission or the nearest Department of Environmental Protection Regional Office for more information about this application or the Wetlands Protection Act. To contact DEP,call Central Region: 508-792-7650 Northeast Region:978-661-7600 Southeast Region: 508-946-2800 Wester Region:413-784-1100 NO[Lot 3 #6432-3 Exhibit D-1 Wetlands Filing Fee Calculation Worksheet For Notices of Intent Filed under the Massachusetts Wetlands Protection Act (G.L. Ch. 131, Sec. 40)" Category 1 $55 Per Activity $ # b. C xistruction of Each Building within Commercial, a. Existing House/Resideirtial Lot(addition,deck,garage,pooh, industrial, Inst"orial, or ApmnxxrVCondo/fowohouse shed or driveway) Developrimat (including site preparation, retention/ ddm- tion basins, septic systeans, Parking lots, utilities, point b: Site Preparation (each Single Family House (SFH) Id; ways/driveways-except discharges, Package sewage treatment plants, mad- removal of vegetatioways/driveways-except render 10.53(3e)if under Bangle NOI) grading where house construction is not proposed under same N01) c. Eadr Roadway/Driveway Crossing(if not reviewable under c Control of Nuisance Vegetation (rernoval, herbicldes, ac.; 10.53(3e)or associated with SFH) per lot under 10.53(4)) d Hazardous Waste Cleanup(except an in Cat.4) d Resource Area improvement (ender 10.53(4); other then TOTAL CATEGORY 3 ACTTVPITES rmaval of aquaticnuisance vegetation) e. Septic System (m my pan thereof; construction, replace. Category 4 $725 Per Activity men;upgrade) E Monitoring Wells(installation activities Each Roadway/Driveway Crossing (under 10.53(3e)activities except access road) associated with commercial, industrial, 'institutional g New Agricultural in Aquacuhural Projects development or residential subdivision 000stnxtlm) TOTAL CATEGORY]ACTIVATES b. Flood Control Structures(cmstrudim,repair,maanmance) c. Landfills(public&private?creation,maarienance,operation) Category 2 $250 Per Activity d Sand and Onvel Operations (creation, maanmance, a. Construction of Each New SFH(including site preparetian, Operation) basins,utilities,septic systems,roadway/ $250.00 1 driveway except under 10.53(3e);under single Non e. Railroad Lines(new a extensions of existing) b. Parking Lot(my size) f. Bridges(construction,reconstruction,expansion,mandmmm, Q Beach Nourislmrent(placemen of sand) except for a SFH Lot) g Aberatim of Resource Area to Divert Water(associated with d Coastal Activates (pursuant to 10.24(7ac) (including hazardous waste cleanup, nmmosquito in this controlelectric generating facilities,Public utilities,limited projects Projects. other Purpose not ideaifed elskwhera erg: repair/ maanenance of existing Piers, buildings, schedule) culverts)) h. Dredging Activities in Water Bodies(except associated with e. Lnnited Project Activities(m 10.53(d and f);Per footprint) new dock,Pier or other structure) E Each10.5 Driveway Crossing(associated with a SFH pursuant m i. Package Sewage Treatment Plant (construction; discharge 10.51(3e)) ) g Any Poen Source Discharge l---� TOTAL CATEGORY 4 ACTTVII'IES I__J b. Control of Nuisance Vegaation(under 10.53(4);except on a SFH Lot) Category 5 $2/linear ft.($50min. $1000max) i. Raising or Lowering Surface Water Levels a. Docks, Pias, Revdrucrts, Dikes or Other Engmoerang j. Any Other Activity not described m CaG 1.3,4 and S Seri's (censwction, reconstruction, repair, or replacement;coastal or inland;including placemen of rip-rap or other muterial) TOTAL CATEGORY 2 ACTIVITIES 5250.00 TOTAL CATEGORY 5 ACTIVITIES Category 3 $525 Per Activkv TOTAL FII ING FEE 5250.00 a. Site Preparation for Development (except SFH; including ranoval of vegetation, excavation & grading when actual construction not proposed under same Not) Person Calculating Fee Schedule ICim Curtis Address 235 Newbury Street,Danvers,MA 01923 Telephone 978 777-3050 Signature Date 2,j N'j 9e, NOI Lot 3 `Categories as in 310 CMR 10.03(7)(c);Fees as to 801 CMR 4.02 #6432-3 Exhibit D-2 Filing Fee Statement The applicant proposes to construct a single family dwelling with associated driveway and grading within buffer zone to bordering vegetated wetland. These activities fall under category 2a of the Wetlands Protection Act fee schedule. Total fees equal $250 ($137.50 to the City and $112.50 to the State). A fee waiver has been requested from the Salem Conservation Commission in consideration of the fact that a quorum for the original filing (DEP 64-275; withdrawn 28 May 1998) cannot be met until late in July. The state portion of the fee has not been waived, and is transmitted herewith to facilitate issuance of a file number. NOI Lot 3 t/6432-3 NOTICE OF INTENT FEE TRANSMITTAL FORM DEPARTMENT OF ENVIRONMENTAL PROTECTION DMSION OF WETLANDS AND WATERWAYS )Notice of Intent(NOD Applicant Property Owner Name Strong Brook Realty Trust Name Strong Brook Realty Trust Joseph Grenier,Trustee Joseph Grenier,Trustee Street 339 Cabot Street Street 339 Cabot Street City/Town Beverly City/town Beverly State MA Zip Code 01915 State MA Zip Code 01915 Phone Number (978)927-4878 Project Location: Street/Lot Number A Portion of 127 Marlborough Road Tax Map 9,a portion of Lot 270 (Subdivision Lot 3) City/Town Salem DEP File Number(if available) NOI Filine Fee Disputed Fee Total NOI Filing Fee S250.00 Total Disputed Fee (as determined in Notice of Insufficient Fee letter State Share of Filing Fee $11250 from conservation commission) (1/2 of fee in excess of$25.00) City/Town Share of Filing Fee (waived) $137.50 State Share of Filing Fee (1/2 of total disputed fee) City/Town Share of Filing Fee (1/2 of total disputed fee) ME 1. JOSEPH H. GRENIER, -00 114/2119 : 330 ' KERRI A. GRENIER: -PH. 50&9274878 7 339 CABOT ST - .BEVERLY, MA 01915 e PAY TO ORDERO ✓II��S/d niC PC%V'7' / - �Sa 2. ,l.( '� � G�'�d ��� DOLLARS Bim`m.. 3. b►vprly to the <gOPWQ We 12' c Lot 3 � 1: 211372it. v 00304 6 u' 36 #6432 Stormwater Management Form This form is intended to ensure that proposed stormwater control designs meet the stormwater management standards described in the Department of Environmental Protection's Stormwater Management Policy(November 1996). The Department of Environmental Protection(DEP)recommends that applicants submit this form with the Notice oflntent, as well as supporting documentation and plans, to provide stormwater information for conservation commission review. /f a particular stormwater management standard cannot be met, information should be provided to demonstrate how adequate water quality and water quantity protection will be provided by the project. DEP encourages engineers to use this form to certify that the project meets the stormwater management standards as well as acceptable engineering standards. This form should be completed by checking the appropriate boxes for each standard and by signing and stamping the back of thisform. Project Location: 127 Marlborough Road, Salem (lot 3 of 7 lots/no new roadway construction) The proposed projec is is not(circle one)exempt from one or more of the stormwater management standards. If project is exempt,explain why: No collection and/or discharge of stormwater is proposed Stormwater runoff volumes to be treated for water quality are based on the following calculations: (check one that applies) ❑ I inch of runoff x total impervious area of post-development site for critical areas(e.g. Outstanding Resource Waters and shellfish growing areas) 0.5 inches of runoff x total impervious area of Iwstdevclopment site for other resource areas Roof and drive runoff is not expected to be a source of stormwater which would require treatment. No treatment other than overland flow through lawn is proposed. Standard #1: Untreated stormwater See plan Exhibit A JThe project is designed so that new stormwater conveyances(outfalls/dido not discharge untreated stormwater into,or cause erosion to,wetlands or waters. There are no new stormwater conveyances. Standard #2: Post-development peak discharge rates See plan Exhibit A ❑ Post-development peak discharge rates do not exceed pre-development rates on the site either at the point of discharge or downgradiem property boundary. ❑ N/A:project site contains waters subject to tidal action, so standard is not applicable. ❑ Stormwater controls have been designed for the 2-year and 10-year,24-hour storms. The project's stormwater design will not increase flooding impacts offsite from the 100-year, 24-hour storm. No calculations were performed. The addition of minimal rooftop and drive is not expected to increase off-site flood Impacts. Standard #3: Recharge to groundwater See plan Exhibit A ❑ The annual groundwater recharge for the post-construction site approximates annual recharge from existing site conditions. Soil types have been identified according to either the U.S. Natural Resources Conservation Service(MRCS)County Soils Survey or onsite soil evaluation. Calculations on stormwater flow are based on a soil hydrologic group of D ,and total impervious area of waived (square feet). ❑ The annual groundwater recharge for the poshconslruction site approximates annual recharge from existing site conditions. Annual recharge requirements are waived for sites with D soils. ❑ Soil types at each planned point of stormwater runoff infiltration include: ❑ Infiltration Best Management Practices(BMP's)used for this project include St ndard #4: 80% TSS removal See plan Exhibit A The proposed stormwater management systems will remove 80°/u of the post-development site's average annual load of Total Suspended Solids(TSS). ❑ Infiltration Best Management Practices(BMP's)used for this project include: Page 2 , #6432 Continued response to Standard#4: Runoff from shingled residential rooftops does not require treatment. Drive runoffs not expected to be a source of sto�mwater runoff which would have a significant TSS load,however,treatment is proposed via overland flow through lawn. This"vegetated"treatment is expected to achieve a 60-90% TSS removal(DEP Stormwater Management Standards) Page 3 # 6432 Standard #5: Higher pot e pollutant loads See plan Exhibit A The project site does does not circle one)contain Land Uses with Higher Potential Pollutant Loads. If site contains such I be: ❑ If applicable,BINP's selected for controlling stormwater in these areas are designed to prevent infauahon of untreated stormwater and include: Standard #6: Protection 4 critical areas See plan Exhibit A The project site does does (circle one)contain critical areas with sensitive resources. If site contains criti be: ❑ If applicable,BW's selected for stormwater discharges in these areas include: St dard 67: Redevelopm nt projects See plan Exhibit A The proposed activitycircle one)a redevelopmem project. Nofe:Components o elopment projects which plan to develop previously undeveloped sites do not jolt under the scope of Standard 7. ❑ If the project is a redevelopment project the following stormwater management standards have been met: ❑ The standards which have not been met include: ❑ . The proposed project will reduce the annual pollutant load oa the site with new or expanded stormwater controls. S adard#8: Erosion/sediment control See plan Exhibit A Erosion and sediment controls are incorporated into the project design to prevent erosion,control sediment movement,and stabilize exposed soils, Standard #9: Operation/maintenance pian See plan Exhibit A ❑ An operation and maintenance plan for both construction and post-development stormwater controls has been developed. The plan includes BMP owner(s);parties responsible for operation and maintenance;schedule for inspection and maintenance;routine and non-routine maintenance tasks;and provision for appropriate access and maintenance easements surrounding control(s)and extending to public right-of-way. The project is a single-family residential development of one lot within a 6-lot subdivision. Operation and maintenance in this instance consist of usual and normal yardwork as may be however conditioned by the Conservation Commission -------------------------------------- I attest under the penalties of perjury that I have personally examined and am familiar with the information contained in this submittal, including any and all of as documents, accompanying this certification statement; and that I am fully s authorized to make this attestation on behalf of the project applicant ? 340 6 VAC" W V T4 L�'ra s�d�8�`�8 Print Name Date S 05/29/98 21:57 FAX f�01 310 CMR- DEPARTMENT OF ENVIRONMENTAL PROTECTION 10.99: continued #W2-3(rdiliog to meet quorum requirements) Put V.Additional frtformamm for a Department of me Army Permit 1. COE Application No. (to be provided by COE) 2. (Name of Waterway) 3- Names and Addresws of prWaty owners Wpming your property: See 4. Dowmem other project altermurves(i.e., other bastions and/or construction metleda,particularly those that would elimioatt:the discharge of dredged or fill material two waters or wetly). 5. Stir'x 11"drawings in plarriew and truss-salon,showing the teswuce arca and the proposed activity within the resource area. Drawings most be to scale and should be clear enough for pbot000pying. Certification is required from the Division of Water Pollution Control before the Federal permit can be issoad Cwtiffcatim may be obtauted by contacting tie Division of Water Pollution Control, 1 Winter Strew, Boston, Massachusetts 02109, Where the activity will take pias within the area under the Massachusetts approved Coastal Zone Mar mgemrnt Programs,the oxbow cettifim that his proposed activity complies with and will be conducted in a manna that is eonshstem with the approved program. Information provided will be used in evahtating the application for a patent and is made a matter ofpublic record through issuncir of a public oftoc Aiscloame of this information a voluntary;however,if amoeamry,mfarmaum is not provided,the application cannot be processed nor an a permit be issued. I hereby certify under the pea and penalties of perjury that rho fotegoing Notice of Imeat sod accompanying plans,documents and supporting data are true and complete,to the beat of my knowledge. �� � 41Zc-Ur t>'12 r gT flsylG t'S(1cr�L /�C-rir.rY 772i/s r� Signature of Applicant r Data May 29,1998 Of Date (i-/htJCnC�«"r-V t�lAUl4l!r-1irf�- C60iSLA T"yh"I+rr-s "F=eption to ENG Form 4345 appmrod by HQUSACE,6 May 1982" "This document comems a john Depattmrad of the Army and State of Massachusetts application for a permit to obtain pamnam to perform activities is Urdted States Waters. The Office of Maoagemeat and Budget(OMB)has approved naafi gaeedom required by the US Army Corps of Empneem ONIB Number 07024036 and expiration date of 30 September 1983 applies" Tbia steremem will be not in 6 point type- 4/1/94 310 CMR-413 (refilloW ArOI Got 3 .S%oN ('p�� W y�`fr 2� = Conservation Commkion Salem. Massachusetts 01970 ASS City of Salem Conservation Commission Will hold a public hearing for a Notice of Intent under the Wetlands Protection Act, Massachusetts General Laws, Chapter 131, Section 40, at the request of the Joseph Grenier, Strong Brook Realty Trust, 339 Cabot Street, Beverly, MA 01915. The purpose of the hearing is to discuss the proposed construction of a single family home with associated driveway and grading located at 127 Marlborough Road (Subdivision Lot#3), partially within the Bufferzone to Bordering Vegetated Wetland. This hearing will be held on Thursday,June 11, 1998 at 7:00 p.m. in the second floor conference room at One Salem Green. Mark George Chairman June 3, 1998 Please send bill to: Joseph Grenier, Trustee Strong Brook Realty Trust 339 Cabot Street Beverly, MA 01915 City of Salem Conservation Commission One Salem Green Salem,MA 01970 Mr. Chairman: January 4, 1999 Before you is another modification to an approved plan for Lot 3,Marlborough Road. The buyers of this lot have done extensive work to gather cost estimates on the use pavers on the approach area to the garage. These costs of these products, and the labor to install them, have proven to be prohibitive. I am hereby requesting that a change from pavers to pavement be allowed. �r At the request of Steve Dibble, the plan also contains a set of stairs on the rear deck, and the 30' easement shown on the plan. The plan also shows a continuation of a wall bordering the wetland,the driveway widened from 12 to 14 feet, and a stone covered winter parking area up near Marlborough Rd. Would the commission please consider these requests at the January 14th meeting. Respe lly., CIS H. enie rustee Strong Br ealty Trust ` I i rrV k �yh� 14 � �{ja, g• .r� n i Of "^, .kms, - e i' `p + F r A-J3 \Ilk �E � a L E T 4 r�:;5� 'a T � ,,it Aw a , 0 i ti 'o4(er/Or jx 14�'1116 y ,y TD, s' �R*?tj�, I'i'�1 L'd.,�ll Rayl�' '-E`,.`�"",`x�+�'o /�. r• uYr�'-• 1 -ice ��� � pp 1 5a { Mr41 014 1 Z"- A2 ,. Ytr' w ".I` i� 'jf� �l' ,a 4��P x � 7kiy i �1 ,(¢ �. � �ws.JF i��k�'yt �/ �,,.: t�✓ y,AYC � � Y.F �'YP�1 $' {M ko � ' $ `.. _ V �<'S^' °'a � G� Ib ''? /� 4`: p �la�, �%1/�. /a •'+ S�K �1* 1tp..4- 1✓'. ✓ 1� `� �1 ��-/ p1,,�,1 � ( ;�q �I/ e{ �i��F•a-"� �1�'r ��b�1�{� n �Iw 6`xt +° ln �ti a � � %j I`✓Ilt� Blq 4F 1 ✓ � � f.' e� r X -, 1 �l'•. I F 1 � �� LL '. �e,�/�}��1 /7 '. li7rew► Lot 3 -fie wµ4 J&+ TO 6 s �se 1:.:: =:.'`-i-Gi;' f'aN(`{f'aN�+titiSt 088 1 "Vial l y O 1 c.. •w �p�y�R^.'_`1 1 i VS a.. f Y w 7E a c •Y� 'J� g � r' 8 c „y.�,F .,�y,+. - ���^� Sv�� �'{y^,�i� x�r�3v�',V�`.��h'�tl ' . I f 1 +� �MY..dyyn1'4 Y`S�gF..'I'I&'+' ` "� �' °� titin ��i•L�l�yx � -Alt "w ' �, c s..3ak -S '.�a � t r 11•+1 " j-r n�•ry ` .I: J . �� \ 1s • ' f#�R .+tea t iS AAFe'dN �d�?ns ', l ^'r'•n IN � A� � ��J'q 41 � d. ,•i�i' �l� � � h, 1 X r f ' t r r ai Ytt P y ; 0 .(1r+y� t .L". Y'h 8{ x , t r} ka � l {P. •t��t+ saj L�'$ '�`�"�l-w•k�y��� k+�'�PP11y� i�r �„�Y-�``�q ,' ' �1 "k' ��Sy��Al'('��.tRpJ '1 M1y.'"""��' �f ",�Y�n �hr t•'�.I-'�t r :. 7 t �rg 41SSrSYi A Yi 4r , �}mr\+3 5 ''rJ �•Y w 1/ r. f'3 ?jj+xy i}1/X -`Ys-s"' � �¢ s y�-� �yyve < �J�.`-^y,11�'J+4 -c� ��'t+ ?�+"t R qy� cif) '��f K'�t ✓Y� E-}i` Ef. �\l ^+ ~ `�\ R$1.���P ,.`f�.{!)t\ i;�t��♦<ri A. mkt;`{ :F l ?. � d �♦ j tor,t 7�s IN r t*+owc�. rMo r ° �r�.9. .�• °aw4 s,v r'Yc T _ -A o � ,..Gra ❑ ) ��� $ C � w. � r � n ILI ' .;PD i r r nog I ; T �4� yyi3Fh- T��''-��i <w� «may*� R 4 � (( ac>�,;�r•��,�hhaRY ��r�:'�" -7 s? �����3� au�r�'+�?��'` °'r^'f"4`�s�.-�l����1�� s'vv� �•upS'kj,� h L ��rk ��` �f`�{ x�:^S^..r k U r W" �f Lp � if �.� ♦ � -ra � � +•ptie�R �. s'�i'!r a xesir \ ` `iN £�tr \' L�� SPi �S•` I i f I ! X 45 rr"1A'41 Iw\ i f„ J Y r1w T& gam rrom G.A 4' s Lof t 4 P { d � Q YT`� �• � !M Y5 �M kT. S��e �x� � o ,Ai ripInn �� I �, � o � J �S • p ii tti %' ✓.r .i i Yom♦ i b�';1 p, �.:5 Qt � 1`� RA S^O. '' �� in+i'�e�°E, i'�-ts`'1�'t'� l r 5f'c••"q '^'•'�trl;!:�,�t5 -��'� y�5\ �rW�'s s � r 'a.yatT" .'t� t y•'��,arieF„,.a7�y r��k6.t e�i� � '�. (.s t-J 4;?�� �� _• - � h .�l F7 k'ICJ..!>'A�,iasY s t ,i rt *w T i 5a 't�.'�r ��"+�"�a�'a i �k�k„�� �l�d•rt'`'• p Kr�`i M�} `S �� -.. i Nor✓<� •iJ' '�` �} ' -G"y �` • A �Jr i �i ( y t �� Fes/.r a .t'� a. F!r lr +5'" - - A M .r_ 6�, 2.. F ->• '<w y,�,. -�-a � AI .-. Y�y'�C �`y -!� t/'�`"•�'j" t ,.raj �"ei promof( 9 � '.J f.i Y ZONE R- 1 MINIMUM AREA 15,000 SF MINIMUM FRONTAGE 100.00' MAXIMUM LOT COVERAGE 30% AREA CLAIMED BY FURNARI MINIMUM FRONT YARD 15.00' _ �, MINIMUM SIDE YARD 10.00' 9y MINIMUM REAR YARD 30.00' 0 0 52759'45 W 153.00' LOT 3 402887 ± SF _ "I CERTIFY THAT THIS PLAN WAS PREPARED FROM ZONE RC _ — — AN INSTRUMENT SURVEY AND THAT THE STRUCTURES -- - — — AND PHYSICAL FEATURES ARE LOCATED ON THE ZONE RI 3 GROUND AS SHOWN." WM P' — /---------=------ LOT 2 0 EXISTING "' LOT 4 R. W. REID P.L.S. BROOK BANK 2 N .77 N M PI3tW DWELLING o UNDER 4. 13, ' CONST. 8 THREAD OF BROOK 7 WINDS BETWEEN BANKS 14,9. WIDTH VARIES I NEW DWELLING (under const.) EXISTING BROOK BANK \ NEW CONCRETE F RALPH y \\\ RETAI ING WALLS W L EXISTING 30'X30' 1p't , 8 X22 DRAINAGE EASEMENT fd 9 p9 o EXISTING 3 o o GRAPHIC SCALE 30" PIPE to I ;e) 4-j 40 0 z0 40 e0 160 100.84' :. N 36'56'34" E IN FEET ) 1 inch = 40 & MARLBOROUGH ROAD SALEM , MASSACHUSETTS EXISTING CONDITIONS PLAN LOT 3 MARLBOROUGH ROAD "I, HEREBY, CERTIFY TO THE BEST OF MY KNOWLEDGE THAT THE PREMISES SHOWN ON THIS PLAN ARE NOT LOCAT- PREPARED FOR: ED WITHIN A SPECIAL FLOOD HAZARD AREA AS DELINEATED ON THE MAP OF COMMUNITY #250102—B PREPARED BY THE RAYMOND & JANET D E M B K 0 S K FEDERAL EMERGENCY MANAGEMENT AGENCY OR ITS SUCCESSORS DATED 8/5/85, PANEL 4, ZONE C." REID LAND SURVEYORS 365 CHATHAM STREET ? L e LYNN, MASSACHUSETTS R99-030 RWR DATE: MAY 6, 1909 SCALE: 1 " = 40' NOTES.• LOCUS F,y� � /J THIS PLAN HAS BEEN PREPARED TO ACCOMPANY A MODIFICATION OF A NOT/CE OF INTENT FOR LOT 3. S�(LGA\WgTER BROOK 2) STATUS OF AREA OF ADVERSE POSSESS/ON CLAIM PIAN �2 lS UNKNOWN. THIS PLAN IS NOT INTENDED TO ADDRESS THIS CLAIM. 325' STAKE & OJT ooh ROAD PIAN BOOK TACK (FD) MER O aN FROM 772s.a6' 'i 0.07' � DETAIL Lo N. T S. y t. o hP MIA SE SALEM REAL TY TRUST moo - ELlO DiBIASE & UGO DiBIASE, TRUSTEES LOCUS MAP SCALE.' 1" = loon' D.H.(FD) HELD1125.86" STAKE & _t i N 18 56 52 E �scy 90 TACK (FO) I W AFD T�o�O�/�qT -� AREA CLA/MED BY F[/RNAR/ eoo li�� � 4657' AND L ABEC ED AS �y / ON PIAN Rr OF /N PC AN BOOK g2ESpC CIA "' N h N 2759 45" E o _..._ h v ° }� ^_... .. ✓OSEPy A. (AREA_ � (PLAN & SDA �- _230± Acres) NO FLOW OBSERVED 8��9 327 P�N 'S'NAR/ 2a 78 Q�' SEPTEMBER 1997 _ /00 00 ��ER �� D/BIAS£ CORPORA 770N �.. ••-�..—� 1.0322 ±sF � � APP/ OX/M (NOT/NCL UD/NG tA� —� ��-' / • ` LIMIT OF OBSERVED � �S 662246" E A� ATE ZONE L/NE 27.00' AREA OF STRONG-�� ,-� I ADVERSE 173037' FLOW, SEPTEMBER 7997 d O - — — 2LA/M� �.. I- ��\ • g • 207.62' W Lori / 722.00' 2 61.64' �••�• , 1 O 0 0.� 24,699 fS 1 S 27p6 '4 /.y ,i 64 S 27-0654„ W _ /� O I 0.5670 ±Ac. •• � 15.30p' "•'! 25' x 40' LOT 2 - AN7HONY ✓. & 6z-' - ; 50 Ob • - ° - _ FOO rPRiNT 50,253 f S F n �� 52 bo oo' pQ KARL YNE L. PROPOSED • • `� -(TYPICAL) 1. 1536 ±Ac. \\ I \ OK ,�'- 60.00' \ o IN fURNARI 12'• camsRr _ - � � '_ `'' _ ' � � -� �-� _ / O 64 (PLAN BOOK 242, MARIANNE B. do PLAN 77 _ w' �— ? 66_ — r ,..y,;i �L. / f F o JOSEPH A. fURNARI, /l yy� ,�. ; I" >2 0 _Ec. h tiF �, ARE /o\NTAL,' I - // APPROXiMA TE o 1 (PLAN BOOK 282, PLAN 1) ,0��1� : / \\ 72 p� \ \�b \\ s/OFN 0\E vgTiO P j� 40,887.t 3.F. \ W EDGE OF L A WN JOSEPH A. 721 \ NE f 4y//L y NJ \ Q�e 0.9386 t AC. all IDA A. fURNARI l \ ,� �. 74— ° �\ \ �YFj �% ,_ 0 PLAN BK 3257PL. 47 ? o S= (PLAN BOOK 379, PLAN 70) LAN Ao `y 0 ' ,56 HAROLD H. & \ \ 1 �B o . _ STONE PAVERS - PAULA J ROBERTS F i 55 69' \� o \ oNF , U�FFR 4- PARKING AREA D=04'1123" S 270644" py ` STONE BOUND TO ��` _ _ ` BE SET (5 TOTAL) A/- _ _ LOT E L=23.40' O a 75- -- > ° \ I ! // ° -RETAINING' �v l .� 25, 192 23.98' L ^ 0.5783 ±Ac. O S 36 56 54` W \ \ \ MAINTAIN 5' O � i l - _ a WALL PLAN BK 325 PL.47 « 100.00' » b v 4, VEGETATED LOT 7 Xe- _ i \ I „� o so h - 60.00' ' 14,450 . S.F. ^ WETLAND To 5 PO l S 2234"14"' W R=320.00" 76.60' o s r �� :� ny S9 0.0 LOT 4 a 28,200 ±S F. z z I S 27 4., W 24' WIDE ,h \ ,, m \,' �� Q " Oa A 0.647a fAc. LOT 5 o Z hl0 347,pg' �- 6 OSF� 4N SK325/PL.47 27,794 ±SF. O hI B/TUM/NOUS l + 1. to CONCRETE S 475823" EI p ` \\ /50 0� F<< 3B I �20.6381O N I / 423 6g• OR/VE 20 3 40.00' i 1 S fL fAc. O 1 ti� F NG- PLAN BK3251R.47 ESCUTCHEO - 8 • �� \ L O rn j WILTH NAPE 9x5 6 ,0 0 / ,2• WALA/N/NG 8 FENCE t� O^ /N LEAD PL�P/N MAcQLB c ' 46,` \ \ ov\ 1 \ BALES fT P.J g0 MATCH TO l� m STONE 1N O/QOU^U ( -' \ I m EX/STING AT j a z Z rn BOUND v�7 \ - i q ' 6 ��ROPERTY 3Q 00' v J � , (ED-HELD ' -i ` \ / 00 -L INE N 2254'14" E \ \ VEGETATED / Q STALE 1 6R /%2' A Fr/Sr/NG p lK Q PROPOSED O 794 �� DR/VE E D�ELG/NG r ^� ASSESSORS.• MAP 9, A PORTION OF LOT 270 /2" CULVERT _ h O \ — h ZON/NG• R - RES/DENTIAL ONE FAMILY z V = RC - RESIDENTIAL CONSERVATION OUT A 0�\ Jlj S 42'14'16' E ^ (� Q TABLE OF AREAS so �oEJ g'�58 �6s,008 6 68 y�. h Z 2s.00' ^ � o REFERENCES.• PORTION of LOTS WITHIN 4 ����� S 5631 "05" E " DEED BOOK 14446, PAGE 346 (STRONG BROOK R. T.) ZONING DISTRICT R1 • 75.00' DEED BOOK 14787, PAGE 479 (KEVIN O DONNELL) j2j" V m DEED BOOK 14842, PAGE 542 (T.A. CHAUSSE) LOT 1 16,500-± S F PLAN BOOK 325, PLAN 47 LOT 2 30,900 ±SF p 5j74 / ^ W PLAN BOOK 321, PLAN 74 LOT 3 23,600 ±SF. \ ' t PLAN BOOK 319, PLAN 70 LOT 4 19,000 ±S.F. 2 REBARS OR �Q D S 33 24 lv 70000 PLAN BOOK 242, PLAN 71 LOT 5 18,000E S.F. WOODEN STAKES /A s�/`L HOLE PLAN BOOK 282, PLAN 1 LOT 6 15,800E S.F. �Fn ONE a0 OWNERS OF RECORD.' LO AANiNc LAND 12,300± SF INTO GROUND NLD o/v NEJ STRONG BROOK REALTY TRUST (LOTS 1, 2 & 1) OF FURNARI 21,900± SF. -+ ANGLE RRST STAKE (JOSEPH H. GRENIER, TRUSTEE) TOWARDS PRE VIOUSL YIL T.A. CHA USSE (L O IS 5 & 6) LAID BALE DET N. ,.S. S. KEVIN O DONNELL (LOT 4) < ` / �� i STRAW OR r � � � NAY HALE �, A/ DRILL A'1OLE PLAN OF LA ND BUTT rOGETHERS j8' N STONE BOUND ( ) /N �AR�eo 26p APPROVAL UNDER THE SUBO W1SION 84 SALEM, MA I CONTROL LAW NOT REQUIRED ISOMETRIC VIEW Rp�DUGy PROPERTY OF SALEM PLANNING BOARD STRONG BROOK REALTY TRUST ? WACLAV y, 'oy (ANNOTATED TO ACCOMPANY A NOTICE OF INTENT) a CKO 7fREV. NOV. /3, /996 + ALAIn EMBED BALE :#34026 SCALE: 1" = 40' MARCH 20, /998 REV. NOV. l2, 1998 4" DEEP IJII 0 PPP\ ' 0 20 40 8O 160 CROSS SECTION ( I HANCOCK SURVEY ASSOCIATES, INC. HA Y BALE BARR/ER 235 NEWBURY STREET, DANVERS, MASSACHUSETTS 01923 DA TE.• 978 777 — 3050 Nor TO SCALE ) CHECKED BY.• ( 6432 I