64-381 - 103 MARLBOROUGH ROAD - CONSERVATION COMMISSION ►03 Mcr l b(`07� 12oz
G5&0v( 'Fvt& - —i"
C�
�v CITY OF SALEM
CONSERVATION COMMISSION
May 30, 2006
Paul DiBiase
Osborne Hills Realty Trust
P.O Box 780
Lynnfield, Massachusetts 01940
Re: Certificate of Compliance DEP#64-381-103 Marlborough Road, Salem, MA
Dear Mr. DiBiase:
Enclosed, please find the Certificate of Compliance for the above referenced property.
This document must be recorded at the Essex County Registry of Deeds (36 Federal
Street, Salem, MA). Please fill out and return the Recording Information on page 4 of the
Certificate of Compliance, which will indicate to the Salem Conservation Commission
that the document has been recorded.
If you have any further questions please feel free to contact me at (978) 745-9595 x 311.
Sincerely,
F ank Taormi
lanner/Conservation Agent
120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 . TEL: 978.745.9595 FAx: 978.740.0404 . WWW.SALEM.COM
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number.
WPA Form 8B — Certificate of Compliance #64-381
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
forms on the Osborne Hills Realty Trust
computer,use Name
only the tab P
key to move .O Box 780
your cursor- Mailing Address
do not use the Lynnfield Massachusetts 01940
return
—key. Cityrrown State Zip Code
Vuri I 2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to:
Name
rwm
Dated DEP File Number
3. The project site is located at
103 Marlborough Road Salem
Street Address City/rown
MAP 9 LOT 0275
Assessors Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Property Owner(if different)
Essex 23802 268
i County Book Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicants agent, on:
May 24 2006
Date
B. Certification
Check all that apply:
❑ Complete Certification: It is hereby certified that the work regulated by the above-referenced
Order of Conditions has been satisfactorily completed.
® Partial Certification: It is hereby certified that only the following portions of work regulated by the
above-referenced Order of Conditions have been satisfactorily completed.The project areas or work
subject to this partial certification that have been completed and are released from this Order are:
Completion of single-family home driveway, grading and outfall structure
-PWbrm$b.d=•rev.rnwr Peas r a 4
I —
Massachusetts Department of Environmental Protection
Bureau of Resource Protection-Wetlands DEP File Number.
WPA Form 8B — Certificate of Compliance #64-381
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Certification (cont.)
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced
Order of Conditions never commenced.The Order of Conditions has lapsed and is therefore no
longer valid. No future work subject to regulation under the Wetlands Protection Act may
commence without filing a new Notice of Intent and receiving a new Order of Conditions.
❑ Ongoing Conditions: The following conditions of the Order shall continue: (include any
conditions contained in the Final Order, such as maintenance or monitoring, that should continue
for a longer period).
Condition Numbers:
C. Authorization
Issued by:
Salem May 25 2006
Conservation Commission Date of Issuance
This Certificate must be ignad by a majority of the Conservation Commission and a copy sent to the
applicant and a pri a DE al Office(See chment).
Signatures:
.Deronn BC.doc-M.7113104 Pepe 2 of 4
I Y
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number.
WPA Form 8B — Certificate of Compliance #64-361
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
C. Authorization (cont.)
Notary Acknowledgement
Commonwealth of Massachusetts County of Essex
25th May 2006
On ihlS Day Of Month Year
before me, the undersigned Notary Public, personally appeared
Kevin Comacchio Kevin Carr Keith Glidden Joseph Fumari, Michael Blier, David Pabich,
Name of Document Signer
proved to me through satisfactory evidence of identification,which was/were
Personally known
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged
to me that he/she signed it voluntarily for its stated purpose.
As member of Salem Conservation Commission
Cttyrrown
FRANKTAORMINA
WCNotary t ublic
manolmwmveath trf Massachuset6
My Commission Expires
ApMI 27,2012
< j
Sign re of gotary P lic
Frank Taormin
Printed Name of Notary Public
April 27, 2012
My Commission Expires(Date)
Place notary seal and/or any stamp above Signature of Notary Public
,paramftA •rev.MW Pape3of4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number
WPA Form 813 — Certificate of Compliance #64-381
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of
Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
------------------------ ---
To:
Salem
Conservation Commission
Please be advised that the Certificate of Compliance for the project at
103 Marlborough Road f164-381
Project Location DEP File Number
Has been recorded at the Registry of Deeds of.
Essex
County
for.
Property Owner
and has been noted in the chain of title of the affected property on:
Data Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Numbe[.
Signature of Applicant
.P810 nabAx.M.711300 Pepe 4 aro
RECEIVED
BRIAN D. McGRAIL AUG 2 8 2006
ATTORNEY AT LAW DEPT. Of PLANNING&
599 NORTH AVENUE
SUITE 7,2nd FLOOR COMMUNITY DEVELOPMENT
WAKEFIELD,MASSACHUSETTS 01880
FAX: TELEPHONE:
(781)246-1986 (781)246-9999
August 23,2006
Frank Taormina
City of Salem Planning Department
120 Washington Street
Salem,MA 01970
Re: Certificate of Compliance for DEP File#64-381
103 Marlborough Road, Salem, MA
Dear Frank:
Pursuant to our telephone conversation I am enclosing the above-referenced Certificate of
Compliance which requires your signature and stamp on the notary page.
Once signed, please return to me in the enclosed envelope.
Thank you.
Very truly y rs,
Eva Grizzell
Enc.
f
(PARTIAL) CERTIFICATE OF COMPLIANCE PHOTO LOG
DEP#64-381
103 MARLBOROUGH ROAD, SALEM, MASSACHUSETTS
RIITIOIOTN.TN ON S/N/06 m'Fa KTAOxw PurvNpx/HnpgoR Coox Nw
r
Yew of home,driveway,and approved lawn area from Marlborough Road.
s,
View of approved driveway and lawn area(drainage easement runs from end of
driveway directed back to wetlands).
Page 1 of 1
i
� �c h
t Fb.w,x�
_ -. _ - __ ''✓I'i `fl`��-1"",.1111'1
r
1 µ `
Massachusetts Department of Environmental Protection
DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
Important:
When filling out I This
request is beingmadeby: /� 1 j
forms on the
computer, use Name
%/�IODIi1Z� 1�`/�/S ✓( �7l 2Z �f
p
only the tab
key to move !� CJS 70
your cursor- Mailing Add ss n j_/
do not use the ;V1�Te/'
return key. Cityrrown State Zip Code
—IG—I Phone Number
2. This re estis in reference to work regulated by a final Order of Conditions issued to:
'M&
Applicant
Dated DEP File Number
o t he worrkpletion 3. The project site is located at:
authorized in A)3 �6pAp�l M
an Order of reet Address Cityrrovm
Conditions,the
property owner
must request a Assessors p/Plat Number Parcel/Lot Number
Certificate of
Compliance ��
4. The fir l Order of Conditions was recorded at the Registry of Deeds for:
from the issuing 11we
authority stating Property Owner(if different)
that the work ora�� 73�2— —&CF
portion of the
work has been County Book Page
satisfactorily
completed. Certificate(d registered land)
5. This request is for certification that(check one):
❑ the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
e following portions of the work regulated by the above-referenced Order of Conditions have
been s sfactor' rgfnplgted (use additional aper if n cessary).
e a s' &-e
d cnydo-11z� 1,411 tic T. '�'f
��a��e wc�t1 c�icc�`ofjoil o g�".�tsS'n
,
El the above-referenced raOrder of Conditio�fs has laps and is therefore no longer valid, and the
work regulated by it was never started.
wperonnea.a •rev.7113104 Pepe 1 of 2
i
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what d viation, if any, exists from the plans
approved in the Order.
�f
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions(OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office(see Attachment).
v,palorm8e.tlao•rev.
711304 Page 2 ort
Frank Taormina
From: Joe Nerden
Sent: Thursday, December 09, 2004 4:22 PM
To: Frank Taormina
Cc: Bruce Thibodeau
Subject: 103 Marlborough Rd
Frank,
If possible, make the granting of a permanent easement to the City for the drain pipe part of the approval for 103
Marlborough Rd. The details of which to be workedout with the City Engineer and then filed-with-the Registry ofDeeds by
Lheapplicant.
If the_Commission needs details, the'City would like ft a formal easement of at least 20 wide, from Marlborough Rd to the
outfall of the drain pipe for operational and maintenance purposes.f The applicanf,`Mi DiBiase'stiould-be made to b a
t` he cost of-creatingthe-easement-forCity approval and then filing-it as part of the deed for the newly created lot. Paul had
to buy a small lot from someone else and then add it to what he had in order to make the lot buildable.
Joseph E. Nerden
Asst. DPW Director&
Asst. City Engineer
Department of Public Services
120 Washington Street, 4th Floor
Salem, Massachusetts 01970
tel. 978.745.9595 x321
fax. 978.745.0349
email:jnerden@salem.com
1
Frank Taormina
From: Joe Nerden
Sent: Thursday, December 09, 2004 11:37 AM
To: Frank Taormina
Cc: Bruce Thibodeau
Subject: DiBiase lot& proposed house 103 Marlborough Rd
Frank,
Based on our site visit the other day it appears that no further rip-rap is needed at the end of the storm drain outfall pipe.
There is sufficient stone rip-rap at the end of the pipe now, prior to water reaching the resource area. The Commission
should employ there standard conditions for this project including hay bales, silt fences, erosion control measures, etc .
Joseph E. Nerden
Asst. DPW Director&
Asst. City Engineer
Department of Public Services
120 Washington Street, 4th Floor
Salem, Massachusetts 01970
tel. 978.745.9595 x321
fax. 978.745.0349
email:jnerden@salem.com
1
i �
r
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 — Order of Conditions #64-381
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. General Information IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
Important: SALEM 2004122800673 Bk:23802 P9:268
When filling From: 1.Conservation Commission 12/28/2004 15:18:00 OTHER P9 1/12
out forms on
the computer, 2.This issuance is for(check one): ® Order of Conditions ❑ Amended Order of Conditions
use only the
tab key to 3.To: Applicant:
move your.
cursor-do not Osborne Hills Realty Trust
use the return a. First Name b. Last Name c.Company
key. P.O Box 780
d.Mailing Address
°' Lynnfield MA 01940
e.City/Town L State g.Zip Code
^a^ 4. Property Owner (if different from applicant):
a. First Name b. Last Name c.Company
d.Mailing Address .. '
e.Citylrown - _ f.Stale g.Zip Code
5. Project Location:
103 Marlborough Road Salem
a.Street Address b.City/Town
Map 9 Portion of Lot 1
. .c.Assessors Map/Plat Number - T.Parcel/Lot Number
Latitude and Longitude, if known (note:
electronic filers will click for GIS locator): e.Latitude I. Longitude
s. Property recorded at the Registry of,Deeds for (attach additional information if more than one parcel):
Essex
a.County b.Certificate(if registered land)
1 rf 388 & 10924 313 & 158
c.Book d. Page
7. Dates: November 18, 2004 December 9, 2004 December 9, 2004
a.Date Notice of Intent Filed b.Date Public Hearing Closed c. Date of Issuance
e. Final Approved Plans and Other Documents,(attach additional plan or document references as
needed):
Site Development Permit Plan Salem MA
a. Plan Title
Eastern Land Survey Clayton A. Morin & Christopher-R. Mello
b.Prepared By c.Signed and Stamped by
November 3, 2004 1" =20'
d.Final Revision Date e.Scale
I.Additional Plan or Document Title g. Date
g. Total WPA Fee Paid: $500.00 $247.50 $262.50
a.Total Fee Paid b.State Fee Paid c.Cityfrown Fee Paid
"aform&doc• rev.12/1 /04 Page 1 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
E. Issuance
This Order is valid for three years, unless otherwise specified as a special I q D
condition pursuant to General Conditions#4, from the date of issuance. t. Date of Issuance
Please indicate the number of members who will sign this form:
This Order must be signed by a majority of the Conservation Commission. 2.Number of signers
The Order must be mailed by certified mail (return receipt requested)or hand delivered to the applicant.A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electronically, and the property owner, if different
from applicant.
Signatures: A w A Py
A /
I,. � L '6 V yy—'
AA—
No aAc Acknowledgement
Commonwealth of Massachusetts County of L SS '2�-[
( On this 13 of bece'u+ b z, ZCG
Day Month Year -
Before me, the undersigned Notary Public, C0nScar/a h6,7 Canon ISS icy
personally appeared Name of Document Signer
proved to me through satisfactory evidence of identification,which was/were
I(2�:a7
co
Description of evldenee of iden' pUon �
to be the person whose name is signed on the preceding or attached document, and acknowledged to
me that he/she signed it voluntarily for its stated purpose.
member of SC.,I em Conservation Commission
City/Town
ELLEN BUThEfi<:.
Notary;publir. —
ddmmomealth of'Massachusefts
My Commission Expires
_..November 1,2007 Signature of Notary Public
-
Printed ame of Notary Public
Place notary seal and/or any stamp above 0I1 elm 4 e'r L 2 Do 7
My Commission Expires(Date)
This Order is issued to the applicant as follows:
by hand delivery on ❑ by certified mail,return receipt requested,on
12 JJ /41
Date �— Date
wpalmns.dw• rev.8119/04 .
Pape 7 W 9
f
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions #64-381
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. General Information
Important: SALEM
When filling From: 1.Conservation Commission.
out forms on
the computer, 2. This issuance is for(check one): ® Order of Conditions ❑ Amended Order of Conditions
use only the
tab key to 3. To: Applicant:
move your
cursor- not Osborne Hills Realty Trust
use the ret
urn a. First Name b.Last Name c.Company
key. P.0 Box 780
d.Mailing Address
m Lynnfield MA 01940
e.Cityrrown f.State g.Zip Code
4. Property Owner(if different from applicant):
a.First Name b.Last Name c.Company
d. Mailing Address
e.City/rown f.state
g.Zip Code
5. Project Location:
103 Marlborough Road Salem
a.Street Address b.City/Town
Map 9 Portion of Lot 1
c.Assessors Map/Plat Number d.Parcel/Lot Number
Latitude and Longitude, if known (note:
electronic filers will click for GIS locator): e.Latitude f. Longitude
6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel):
Essex
a.County D.Certificate(if registered land)
17388& 10924 313 & 158
c.Book d.Page
7. Dates: November 18, 2004 December 9, 2004 December 9, 2004
a. Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance
8. Final Approved Plans and Other Documents (attach additional plan or document references as
needed):
Site Development Permit Plan Salem MA
a.Plan Title
Eastern Land Survey Clayton A. Morin &ChristopherR. Mello
b.Prepared By c.Signed and Stamped by
November 3, 2004 1" =20'
d. Final Revision Date e.Scale
f.Additional Plan or Document Title g. Date
g. Total WPA Fee Paid: $500.00 $247.50 $262.50
a.Total Fee Paid b.State Fee Paid c.Citylrown Fee Paid
wpaform5.doc• rev.12JIT04
Page 1 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions #64-381
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings
i. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information provided
in this application and presented at the public hearing, this Commission finds that the areas in which
work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that
apply:
a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution
d. ® Private Water Supply e. ❑ Fisheries f. ® Protection of Wildlife
Habitat
g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project,as proposed, is:(check one of the following boxes)
Approved subject to:
® the following conditions which are necessary in accordance with the performance standards set forth
in the wetlands regulations. This Commission orders that all work shall be performed in accordance
with the Notice of Intent referenced above, the following General Conditions, and any other special
conditions attached to this Order. To the extent that the following conditions modify or differ from the
plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall
control.
Denied because:
❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland
regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is
submitted which provides measures which are adequate to protect these interests, and a final Order of
Conditions is issued. A description of the performance standards which the proposed work cannot
meet is attached to this Order.
❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect
of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may
not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information
and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions
is issued.A description of the specific information which is lacking and why it is necessary is
attached to this Order as per 310 CMR 10.05(6)(c).
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
3. ❑ Bank a.linear feet b.linear feet c.linear feet d.linear feet
4. ® Bordering vegetated 50 50
Wetland a.square feet b.square feet c.square feet d.square feet
5. ❑ Land Under a.square feet b.square feet c.square feet d.square feet
Waterbodies and
Waterways
e.cu.yd dredged f.cu.yd dredged
wpaform5.doc• rev.12/13/04
Page 2 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 — Order of Conditions #64-381
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings (cont.)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
6. ❑ Bordering Land
Subject to Flooding a,square feet b.square feet c.square feet d.square feet
Cubic Feet Flood
Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet
7. ❑ Isolated Land Subject
to Flooding a.square feet b.square feet
Cubic Feet Flood
Storage c.cubic feet dcubic feet e.cubic feet f.cubic feet
8. ❑ Rivertront area a.total sq.feet b.total sq.feet
Sq ft within 100 ft c.square feet d.square feet
Sq It between 100-200 It e.square feet f.square feet
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
s. ❑ Designated Port
Areas Indicate size under Land Under the Ocean, below
10. ❑ Land Under the
Ocean a.square feet b.square feet
c.cu.yd dredged d.cu.yd dredged
11. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below
12. ❑ Coastal Beaches a.square feet b.square feet c.dy nourishmtd.dy nourishmt.
13. ❑ Coastal Dunes a.square feet b.square feet c.Gy nourishmtd.c/y nourishmt
14. ❑ Coastal Banks a.linea (feet b.linear feet
15. ❑ Rocky Intertidal
Shores a.square feet b.square feel
16. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet
17. ❑ Land Under Salt
Ponds a.square feet b.square feet
c.cu.yd dredged d.cu.yd dredged
18. ❑ Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
19. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
a.cu.yd dredged b.cu.yd dredged
20. ❑ Land Subject to
Coastal Storm Flowage a.square feet b.square feet
wpaform5.dw• rev.17/13/04 Page 3 of 9
' Massachusetts Department of Environmental Protection
P DEP File Number.
ILI Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions #64-381
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
(only applicable to approved projects)
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory
measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any
injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order
unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years, but less
than five years, from the date of issuance. If this Order is intended to be valid for more than three
years, the extension date and the special circumstances warranting the extended time period are
set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse,
rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard,
pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing.
7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such
an appeal has been taken, until all proceedings before the Department have been completed.
8. No work shall be undertaken until the Order has become final and then has been recorded in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title
of the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to
be done. In the case of the registered land,the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done. The recording
information shall be submitted to this Conservation Commission on the form at the end of this Order,
which form must be stamped by the Registry of Deeds, prior to the commencement of work.
9. A sign shall be displayed at the site not less then two square feet or more than three square feet in
size bearing the words,
"Massachusetts Department of Environmental Protection" [or, "MA DEP"]
"File Number #64-381
wpaform5.d=• rev.17/13104 Page 4 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions #64-381
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the
Conservation Commission shall be a party to all agency proceedings and hearings before DEP.
11. Upon completion of the work described herein,the applicant shall submit a Request for Certificate of
Compliance (WPA Form 8A)to the Conservation Commission.
12. The work shall conform to the plans and special conditions referenced in this order.
13. Any change to the plans identified in Condition #12 above shall require the applicant to inquire of the
Conservation Commission in writing whether the change is significant enough to require the filing of a
new Notice of Intent.
14. The Agent or members of the Conservation Commission and the Department of Environmental
Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours
to evaluate compliance with the conditions stated in this Order, and may require the submittal of any
data deemed necessary by the Conservation Commission or Department for that evaluation.
15. This Order of Conditions shall apply to any successor in interest or successor in control of the
property subject to this Order and to any contractor or other person performing work conditioned by
this Order.
16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland,
the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden
stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate
of Compliance has been issued by the Conservation Commission.
17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully
stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or
water body. During construction, the applicant or his/her designee shall inspect the erosion controls
on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately
control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission,which reserves the right to require additional erosion and/or damage prevention controls
it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
Special Conditions:
If you need more SEE ATTACHED
space for
additional
conditions,
select box to
attach a text
document
wpaform5.do • rev.12/13/04 Page 5 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 5 - Order of Conditions #64-381
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
D. Findings Under Municipal Wetlands Bylaw or Ordinance
t. Furthermore, the hereby finds (check one that applies):
Conservation Commission
z. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal
ordinance or bylaw specifically:
a.Municipal Ordinance or Bylaw b.Citation
Therefore,work on this project may not go forward unless and until a revised Notice of Intent is
submitted which provides measures which are adequate to meet these standards, and a final Order of
Conditions is issued.
3. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or
bylaw:
a.Municipal Ordinance or Bylaw b.Citation
The Commission orders that all work shall be performed in accordance with the following conditions
and with the Notice of Intent referenced above.To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the
conditions shall control.
If you need more
space for c. The special conditions relating to municipal ordinance or bylaw are as follows:
additional
conditions,
select box to
attach a text
document ❑
wpaform5.dw• rev.17/13/06 Page 6 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions LL 381
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
E. Issuance
This Order is valid for three years, unless otherwise specified as a special I a 9 loq
condition pursuant to General Conditions#4, from the date of issuance. 1.Date of Issuance
Please indicate the number of members who will sign this form: 5
This Order must be signed by a majority of the Conservation Commission. 2.Number of signers
The Order must be mailed by certified mail (return receipt requested)or hand delivered to the applicant. A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electronically, and the property owner, if different
from applicant.
Signatures:
No ary Acknowledgement
/ Commonwealth of Massachusetts County of t SS
13 w ec 6p-,- 2-00 4
On this Day of Month Year ,
Before me,the undersigned Notary Public, Co n5 u Va h6,1 Cofwyt i SS iCf1
personally appeared Name of Document signer
proved to me through satisfactory evidence of identification,which was/were
ICeylh Co rlafl: i��--��� -JL��� n'o Ri�i� PI-Z4 Litc/me/ &Y* Lee �liddQr1.
Description of evidence of,den cabbTi on �'
to be the person whose name is signed on the preceding or attached document, and acknowledged to
me that he/she signed it voluntarily for its stated purpose.
As member of 5c,et"
City/rown Conservation Commission
ELLEN UTIEii; '
' Notary;Putilir,
Commonwealth of Massachusetts
My Commission Expires
November 1;2007„ Signature of Notary Public
lrfh ��is f�P r
Printed/Name of Notary Public
Place notary seal and/or any stamp above ^' o it eqn Ate' J, yD o :7
My Commission Expires(Date)
This Order is issued to the applicant as follows:
9 by hand delivery/on ❑ by certified mail,return receipt requested,on
���07
Date
— Date
wpaform5.doc• rev.Bn 9104
Pape 7 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions #64-381
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject
to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of
their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions.
The request must be made by certified mail or hand delivery to the Department,with the appropriate filing
fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR
10.03(7)within ten business days from the date of issuance of this Order.A copy of the request shall at
the same time be sent by certified mail or hand delivery to the Conservation Commission and to the
applicant, if he/she is not the appellant.
The request shall state clearly and concisely the objections to the Order which is being appealed and how
the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands
Protection Act, (M.G.L. c. 131, §40)and is inconsistent with the wetlands regulations (310 CMR 10.00).
To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts
Wetlands Protection Act or regulations, the Department has no appellate jurisdiction.
Section G, Recording Information is available on the following page.
wpafcm5.doc• rev.1211104 Page 8 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 5 - Order of Conditions #64-381
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located, within the chain of title of the affected property. In the case of recorded land, the
Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land
subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court
Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information
on Page 7 of this form shall be submitted to the Conservation Commission listed below.
SALEM
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
To:
SALEM
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
103 Marlborough Road #64-381
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
for:
Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wpa/orm5.dm• rev.12/13/04 Page 9 of 9
Attachment to Order of Conditions DEP#64-381
Page 1 of 1
Salem Conservation Commission
SPECIAL CONDITIONS - DEP FILE #64-381
103 Marlborough Road, Salem, MA
1. The Conservation Agent will be notified 48 hours prior to commencement of construction activities(978-745-
9595 ext.311). Members and agents of the Salem Conservation Commission(Commission)shall have the right
to enter and inspect the premises to evaluate and ensure compliance with the conditions and performance
standards stated in this Order,the Notice of Intent,the referenced plans,the Act,and 310 CMR 10.00,and may
require any information,measurements,photographs,observation and/or materials or may require the submittal
of any data or information deemed necessary by the Commission,agent,or DEP determines that any of the
work is not in compliance with this Order of Conditions. Work shall not resume until the Commission is
satisfied that the work will comply,and has so notified the applicant in writing.
2. Approval of this application does not constitute compliance with any law or regulation other than MGL Chapter
131,Section 40,and Wetlands Regulations 310 CMR 10.00.
3. This Order shall apply to any successor in control or successor in interest of the property described in the Notice
of Intent and accompanying plans. These obligations shall be expressed in covenants in all deeds to succeeding
owners or portions of the property.
4. The form provided at the end of this Order shall be completed and stamped at the Registry of Deeds after the
expiration of the 10-day appeal period and within 30 days of the issuance if no request for appeal has been filed
with the Department of Environmental Protection. This form shall be returned to the Commission within 21
days of recording accordance and prior to commencement of any activities subject to the Order of Conditions.
5. Prior to any work commencing,a sign shall be displayed showing DEP file#64-381,and not placed on a living
tree.
6. The term"Applicant'as used in this Order of Conditions shall refer to the owner,any successor in interest or
successor in control of the property referenced in the Notice of Intent,supporting documents and this Order of
Conditions. The Commission shall be notified in writing within 30 days of all transfers of title of any portion of
the property that takes place prior to issuance of the Certificate of Compliance.
7. It is the responsibility of the applicant to procure all other applicable federal,state and local permits and
approvals associated with this project. These permits may include but are not necessarily limited to the
following:
(1) Section 404 of the Federal Water Pollution Control Act(P.L.92-500, 86 stat. 816),U.S.Army Cote of
Engineers.
(2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of sec.
27(5)of Chapter 21 of the Massachusetts General Laws as codified
(3) Flood Plain
(4) Grading Ordinance
8. If there are conflicting conditions within this Order,the stricter condition(s)shall rule.
9. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters
during construction or after completion of the project.
10. The Commission and its Administrator shall have the discretion to modify the erosion/siltation control methods
and boundary during construction if necessary.
11. All work shall be performed in accordance with this Order of Conditions and approved site plans(s). No
alteration of wetland resource areas or associated buffer zone,other than that approved in this Order,shall occur
on this property without prior approval from the Commission.
Attachment to Order of Conditions DEP#64-381
Page 2 of 2
12. If any changes are made in the above-described plan(s)which may or will alter an area subject to protection
under the Wetlands Protection Act,or any changes in activity subject to regulations under G.L.Ch. 131, Section
40,the applicant shall inquire from this Commission in writing,prior to their implementation in the field,
whether the change(s)is significant enough to require the filing of a new Notice of Intent. Any error in the
plans or information submitted by the applicant shall be considered changes and the above procedures shall be
followed. A copy of such request shall at the same time be sent to the Department of Environmental Protection.
13. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has been
issued,the applicant or current landowner shall submit to the Commission a signed statement by the buyer that
he/she is aware of an outstanding Order of Conditions on the property and has received a copy of the Order of
Conditions.
14. Conditions number as indicated shall continue in force beyond the Certificate of Compliance,in
perpetuity,and shall be referred to in all future deeds to this property.
PRIOR TO CONSTRUCTION
15. Prior to commencement of any activity on this site,there shall be a PRECONSTRUCTION MEETING
between the project supervision;the contractor responsible for the work or its administrator to and phone
numbers of all responsible parties shall be registered with the Commission at the pre-construction meeting.
16. Prior to the pre-construction meeting and commencement of any activity on this site, sedimentation and erosion
control barriers shall be installed as shown on the approval plan(s)and detail drawings. The Commssion and/or
its Administrator shall inspect and approve such installation at the pre-construction meeting.
17. Prior to the commencement of any activity on this site,the applicant or current landowner shall submit to the
Commission in writing a construction schedule/sequence of work to complete this project.
18. Prior to any work on site,the proposed limits of work shall be clearly marked with stakes or flags and shall be
confirmed by the Commission or its Administrator. Such markers shall be checked and replaced as necessary
and shall be maintained until all construction is complete. Workers shall be informed that no use of machinery,
storage of machinery or materials,stockpiling of soil or construction activity is to occur beyond this line at
anytime.
19. Prior to commencement of construction on site,the limits of wetland resource areas closest to construction
activity shall be flagged with surveyor's tape and shall remain in place during construction. The limits of areas
to be impacted and the limits of work in the replication area(s)shall be clearly flagged.
20. There shall be_hay bales and wooden staked stored under cover on the site to be used only for emergency
erosion control.
EROSION CONTROL
21. Appropriate erosion control devices shall be in place prior to the beginning of any phases of construction, and
shall be maintained during construction in the wetland areas and buffer zones. The erosion control specification
provided in the Notice of Intent and the erosion control provision in the Order will be the minimum standards
for this project;additional measures may be required by the Commission.
22. All debris,fill and excavated material shall be stockpiled a location far enough away from the wetland resource
areas to prevent sediment from entering wetland resource areas.
Attachment to Order of Conditions DEP 064381
Page 3 of 3
23. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as
necessary. Any accumulated silt adjacent to the barriers shall be removed.
24. The areas of construction shall remain in a stable condition at the close of each construction day.
25. Any de-watering of trenches or other excavations required during construction shall be conducted so as to
prevent siltation of wetland resource areas. All discharges from de-watering activities shall be filtered through
haybale sediment traps,silt filter bags or other means approved by the Commission or its Administrator.
26. Within thirty days of completion of construction on any given portion of the project,all disturbed areas in the
completed portion of the site shall be permanently stabilized with rapidly growing vegetative cover,using
sufficient top soil to assure long-term stabilization of disturbed areas.
27. If soils are to be disturbed for longer than two months,a temporary cover of rye or other grass should be
established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,exposed
surfaces shall be stabilized by other appropriate erosion control measures,firmly anchored,to prevent soils
from being washed by rain or flooding.
DURING CONSTRUCTION
28. A copy of the Order of Conditions, construction plans,and copies of the documents and reports cited in
Condition# 11, shall be on the site upon commencement and during any site work for contractors to view and
adhere to.
29. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as
necessary. Any accumulated silt adjacent to the barriers shall be removed.
30. Only clean fill, free of masonry,stumps,asphalt,and any other kind of waste material shall be used on the site.
31. All waste products,grubbed stumps, slash,construction materials,etc. shall be deposited at least 100 feet from
wetland resource areas and 200 feet from rivers.
32. All filling or removal of waste material from the site shall be done in accordance with the regulations of the
City of Salem Health Department.
33. Cement trucks shall not be washed out in any wetland resource or buffer zone area. Any deposit of cement or
concrete products into a buffer zone or wetland resource area shall be removed by hand.
34. No fuel, oil,or other pollutants shall be stored in any resource area or the buffer zone thereto,unless specified
in this Order of Conditions.
35. There shall be no pumping of water from wetland resource areas.
36. During construction,all drainage structures shall be inspected regularly and cleaned as necessary.
37. The project shall not cause an increase in run-off onto adjacent properties,either during construction or when
completed.
38. The applicant is hereby notified that failure to comply with all requirements herein may result in the issuance of
enforcement actions by the Conservation Commission including,but not limited to,civil administrative
penalties under M.G.L. Chapter 2IA,section 16.
POST CONSTRUCTION
39. All disturbed areas, slopes and proposed landscape areas shall be loamed and seeded or stabilized through the
use of erosion control blankets or other approved means. All disturbed areas will be graded,loamed,and
Attachment to Order of Conditions DEP#64-381
Page 4 of 4
seeded prior to November 1 of each year, if possible. No disturbed areas or stockpiled material will be left
unprotected or without erosion controls during the winter.
40. Upon completion of construction,the applicant or current landowner shall submit the following to the
Commission to request a Certificate of Compliance:
(1) A letter requesting a Certificate including the following information:
a. Name and address of current landowner;
b. Name and address of the individual/trust or other entity to whom the Certificate is to be issued:
c. Street address and lot number for the project;and
d. DEP file number
(2) A letter from a Registered Professional Engineering or Land Surveyor certifying compliance of the
property with this Order of Conditions
(3) An"As-Built"plan signed and stamped by a Registered Professional Engineer showing post-construction
conditions and:
a. As-built elevations of all drainage ways constructed within 100 feet of any wetland resource area;
b. As-built elevations and grades of all filled or altered wetland resource areas,buffer zones and
replicated areas;and
c. Distances to all structures within 100 feet of any wetland resource area.
41. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds.
42. If the completed work differs from that in the original plans and conditions,the report must specify how the
work differs;at which time the applicant shall fust request a modification to the Order. Only upon review and
approval by the Commission,may the applicant request in writing a Certificate of Compliance as described
above.
43. Erosion control devices shall remain in place and properly functioning until all exposed soils have been
stabilized with final vegetative cover and the Commission and/or its Administrator has authorized their
removal.
ADDITIONAL CONDITIONS
44. The location of the hay bale and salutation fencing shown on the approved plans shall be moved back to the
property line to stabilize the entire site. Once installed,the Conservation Agent shall be notified to inspect the
installation.
45. The original location of the erosion control measures,shown on the approved plans, shall delineate the limit of
work associated with this filing and no machinery and material shall be allow beyond that point.
46. The applicant shall create a formal easement for the City of Salem of at least 20 ft. wide from Marlborough
Road to the outfall of the drain pipe for operational and maintenance purposes. The details of such easement
shall be worked out with the City Engineer and the cost of creating the easement and the filing of such easement
at the Registry of Deeds shall be the responsibility of the applicant.
JOHN R. KEILTY, COUNSELOR AT LAW
40 LOWELL STREET TELEPHONE (978) 531-7900
PEABODY, MA 01960 FACSIMILE (978) 531-2479
November 18,2004
Conservation Commission
City of Salem RECEIVE
120 Washington Street
Salem, MA 01960 NOV 2 4 2004
Attn: Frank Taormina
DEPT.OF PLANNING&
RF. NOTICE OF INTENT COMMUNITY DEVELOPMENT
103 MAR1,H0R01JGH ROAD,SAI,F.M,MA
Dear Mr Taormina:
Please be advised that I represent Paul DiBiase Trustee of Osborne Hills Realty Trust,
relative to the filling of a Notice of Intent as it applies to the property at 103 Marlborough Road,
Salem Massachusetts.
Submitted herewith are the following instruments:
1. Check in the amount of$137.50 as application fee;
2. 8 copies of the Notice of Intent;
3. 8 copies of the Plan of Land;
4. Certified list of abutter, and notification to abutters will be provided
by Frank Taormina of the Salem Planning Department;
Kindly schedule this matter for hearing at your earliest convenience.
Thank you for your anticipated cooperation.
Very truly yours,
John { 'lty, Esq r
JRK/smw
Enclosures
s
I
Massachusetts Department of Environmental Protection Provided by DEP:
�. Bureau of Resource Protection -Wetlands DEP File Number _—
WPA Form 3 - Notice of intent
Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
- City/Town
A. General Information
1. Project Location (Note: electronic filers will dick on button for GIS locator):
103 Marlborough Road Salem 01970
a.Street Address b.City/Town C.Zip Code
Latitude and Longitude, if Known: 4&3d-36" 7l)55 45
d.Latitude e.Longitude
9 Portion of 1
I.Assessors Map/Plat Number g.Parcel/Lot Number
Important:
When filling out 2. Applicant:
forms on the Osborne Hills Realty Trust
computer, use
only the tab a.First Name b.Last Name c.Company
key to move P. O. Box 780
your cursor- d.Marling Address
do not use the Lynnfield MA 01940
return key. e.City/town f.State g.Zip Code .
781-844-7026
h.Phone Number I.Fax Number j.Email address
3. Property owner(If different from applicant): ® Check if more than one owner
Patricia Britton & Osborne Hills Realty Trust
a.First Name b.Last Name - c.Company
d.Mailing Address
Note:
Before e.City/Town f.State g.Zip Code
completing this
form consult h.Phone Number I.Fax Number j.Email address
your local
Conservation 4. Representative (f any):
Commission
regarding any a.Firm
municipal bylaw Attorney Brian McGrail
or ordinance. b.Contact Person First Name c.Contact Person Last Name
Lakeside Office Park, 599 North Ave.
d.Mailing Address
Wakefield MA 01880
e.City/rown f.State g.Zip Code
781-246.9999 781-246-1986
h.Phone Number i.Fax Number j.Email address
❑ Select if
you want to see 5. Total WPA Fee Paid (from Appendix A.Wetland Fee Transmittal Form):
Wetland Fee $250.00 $112.50 $137.50
Transmittal a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid
Form.
6. General Project Description:
Grading in the Buffer Zone and placement of riprap in resource area, as requested by the City
Engineer.
Massachusetts Department of Environmental Protection Provided by DEP:
1 Bureau of Resource Protection -Wetlands DEP File Number
WPA Form 3 — Notice of Intent
I Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
A. General Information (continued)
7. Project Type Checklist:
a. ® Single Family Home
b. ❑ Residential Subdivision
c. ❑ Limited Project Driveway Crossing
d. ❑ commercial/Industrial
e. ❑ Dock/Pier
f. ® Utilities
g. ❑ Coastal Engineering Structure
h. ❑ Agriculture—cranberries,forestry
i. ❑ Transportation
I. ❑ Other
8. Property recorded at the Registry of Deeds for.
Essex So. District
a.County
17338 and 10924
b.Book
313 158
c.Page Number
d.Cerbricate#(if registered land)
9. Buffer Zone Only
Is the project located only in the Buffer Zone of a bordering vegetated wetland, inland bank, or
coastal bank, coastal beach, coastal dune, or salt marsh?
a. ❑ Yes If yes, skip to Section C.
b. ® No If no, check the resource areas to be affected by this project, directly below.
I
i
Massachusetts Department of Environmental Protection Provided by DEP:
Bureau of Resource Protection -Wetlands DEP File Number
WPA Form 3 - Notice of Intent
\ Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number
Salem
cityrrown
B. Resource Area Effects
1. Inland Resource Areas
Check all that apply below. Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
Online Users:
Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any)
document
transaction a. ❑ Bank 1.linear feet 2.linear feet
number b. ® Bordering vegetated 50 -0-
(provided on Wetland 1.square feet 2.square feet
your receipt
page) with all c. ❑ Land Under
1.square feet 2.square feet
supplementary Watertiodies and
information you Waterways
submit to the 3.cubic yards dredged
Department. d. ❑ Bordering Land
Subject to Flooding 1.square feet 2.square feet
3.cubic feet of flood storage lost 4.cubic feet of flood storage replaced
e. ❑ Isolated Land Subject
to Flooding 1.square feet _
2.cubic feet of flood storage lost 3.cubic feet of flood storage replaced
f. ❑ Riverfront area
1. Name of Waterway(if available):
2.Width of Riverfront Area (check one):
❑ 25 ft.- Designated Densely Developed Areas only
❑ 100 ft. - New agricultural projects only
❑ 200 ft.-All other projects
3. Total area of Riverfront Area on the site of the proposed project:
Square Feet
4. Proposed alteration of the Riverfront Area:
a.Total Square Feel b.Square Feet within 100 ft. c.Square Feet between 100 ft.and 200 ft.
5. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes❑ No
6. Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes❑ No
Massachusetts Department of Environmental Protection Provided by DEP:
� Bureau of Resource Protection -Wetlands DEP rile Number -
' WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number
Salem
Chy/rown
B. Resource Area Effects (continued)
2. Coastal Resource Areas:
Check all that apply below. Attach narrative and supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
Online Users:
Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any)
document
transaction a. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
number
(provided on b. ❑ Land Under the Ocean 1.Square feet
your receipt
page)with all - 2.Cubic yards dredged
supplementary
information you c. Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes
❑
submit to the below
Department. d. ❑ Coastal Beaches 1.Square feet 2.Cubic yards beach nourishment
e. ❑ Coastal Dunes 1.Square feet 2.Cubic
q yards dune nourishment
f. ❑ Coastal Banks 1. Linear feet
g. ❑ Rocky Intertidal Shores 1.square feet
h.❑ Salt Marshes 1.Square feet 2.Sq ft restoration,rehab.,or creation
i. ❑ Land Under Salt Ponds 1.square feet
2.Cubic yards dredged
i ❑ Land Containing
Shellfish 1.Square feet 2.Square feet restoration,rehab.
jc ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
1.Cubic yards dredged
i. ❑ Land Subject to Coastal
Storm Flowage 1.Square feet
3. Limited Project:
Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR
10.24 or 310 CMR 10.53?
a. ❑ Yes ® No If yes, describe which limited project applies to this project:
b.Ltmrted Project
Massachusetts Department of Environmental Protection Provided by DEP:
Bureau of Resource Protection -Wetlands
DEP File Number
WPA Form 3 - Notice of Intent
Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Tom
C. Bordering Vegetated Wetland Delineation Methodology
Check all methods used to delineate the Bordering Vegetated Wetland (BVW) boundary:
Online Users: t. ❑ Final Order of Resource Area Delineation issued by Conservation Commission or DEP
Include your (attached)
ocument
ransaction 2 ❑ DEP BVW Field Data Form (attached)
number
(provided on 3- 0 Final Determination of Applicability issued by Conservation Commission or DEP (attached)
your receipt
page) with all 4. ❑ Other Methods for Determining the BVW Boundary (attach documentation):
supplementary
information you a. ❑ 50% or more wetland indicator plants
ubmit to the
Department. b. ❑ Saturated/inundated conditions exist
c. ❑ Groundwater indicators
d. ❑ Direct observation
For all projects
affecting other e. ❑ Hydric soil indicators
Resource
reas, please f. ❑ Credible evidence of conditions prior to disturbance
ttach a
narrative
explaining how
he resource
eli was D. Other Applicable Standards and Requirements
elineated. Pp � 4
1. Is any portion of the proposed project located in estimated habitat as indicated on the most recent
Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and
Endangered Species Program?
a. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NO[to:
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
Route 135, North Drive
Westborough, MA 01581
2000-2001 Atlas
b.Date of Map
2. For coastal projects only, is any portion of the proposed project located below the mean high water
line or in a fish run?
❑ Yes❑ No If yes, include proof of mailing or hand delivery of NOI to:
Massachusetts Division of Marine Fisheries
251 Causeway Street,Suite 400
Boston, MA 02114
® Not applicable—project is in inland resource area only
Massachusetts Department of Environmental Protection Provided by DEP:
1, Bureau of Resource Protection - Wetlands DEP File Number – —
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G-L. c. 131, §40 Document Transaction Number
Salem
cayrrom
D. Other Applicable Standards and Requirements (continued)
3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
a. ❑ Yes ® No If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP
Website for ACEC locations). Note: electronic filers click on Website.
b.ACEC
Online Users: 4. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Include your Restriction Act(M.G.L.c. 131,§40A) orthe Coastal Wetlands Restriction Act (M.G.L. c. 130, § 105)?
document
transaction a. ❑ Yes ® No
number
(provided on
your receipt 5. Is any activity within any Resource Area or Buffer Zone exempt from performance standards of the
page)with all wetlands regulations, 310 CMR 10.00.
supplementary
information you a. ❑ Yes ® No If yes, describe which exemption applies to this project:
submit to the
Department. b.Exemption
6. Is this project subject to the DEP Stormwater Policy? a. ® Yes ❑ No
b. If yes, stormwater management measures are required.Applicants should complete Appendix B:
Stormwater Management Form and submit it with this form.
c. If no, explain why the project is exempt:
E. Additional Information
Applicants must include the following with this Notice of Intent(NOI). See instructions for details.
Online Users: Attach the document transaction number(provided on your receipt page)for any of
the following information you submit to the Department.
1. ❑ USGS or other map of the area (along with a narrative description, if necessary) containing
sufficient information for the Conservation Commission and the Department to locate the site.
(Electronic filers may omit this item.)
z. ❑ Plans identifying the location of proposed activities (including activities proposed to serve as
a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to
the boundaries of each affected resource area.
Massachusetts Department of Environmental Protection Provided by DEP:
}.; Bureau of Resource Protection - Wetlands DEP File Number
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 SalemntTransactlon Number
alem
cityrrom
E. Additional Information (continued)
3. ❑ Other material identifying and explaining the determination of resource area boundaries
shown on plans (e.g., a DEP BVW Field Data Form).
Online Users:
Include your 4. ❑ List the titles and dates for all plans and other materials submitted with this NOI.
document 5. ❑ If there is more than one property owner, please attach a list of these property owners not
transaction listed on this form.
number
(provided on 6. ❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
your receipt
page)with all 7 ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
supplementary
information you 6. ❑ Attach Appendix A, see next page.
submit to the
Department. s. ❑ Attach Appendix B,if needed.
F. Fees
The fees for work proposed under each Notice of Intent must be calculated and submitted to the
Conservation Commission and the Department(see Instructions and Appendix B.Wetland Fee
Transmittal Form).
No fee shall be assessed for projects of the federal government,the Department, or cities and towns
of the Commonwealth.
Applicants must submit the following information (in addition to pages 1 and 2 of Appendix B)to
confine fee payment:
1.Municipal Cheek Number 2.Check date '
3.State Check N L 4.Check date
5.Payor name on check:First Name 6.Payor name on check:La ame
Massachusetts Department of Environmental Protection Provided by DEP:
Bureau of Resource Protection - Wetlands DEP File Number - —
WPA Form 3 - Notice of Intent
Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
cayirown
G. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying
plans, documents, and supporting data are true and complete to the best of my knowledge. I understand
that the Conservation Commission will place notification of this Notice in a local newspaper at the
expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the
requirements of M.G.L. c. 131, § 40. Notice must be made in writing by hand delivery or certified mail
(return rep6quested) to all abutters within 100 feet of the property line of the project location.
Signature of Applicant Date
Signature of erty Owner(if differe t) _ Date
Si ure o presen arf any) Date
For Conservation Commission:
Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents;two
copies of pages 1 and 2 of Appendix B; and the cityttown fee payment must be sent to the Conservation
Commission by certified mail or hand delivery.
For DEP:
One copy of the completed Notice of Intent(Form 3), including supporting plans and documents; one
copy of pages 1 and 2 of Appendix B; and a copy of the state fee payment must be sent to the DEP
Regional Office (see Instructions) by certified mail or hand delivery. (E-filers may submit these
electronically.)
Other.
If the applicant has checked the"yes"box in any part of Section D, Item 3, above, refer to that section
and the Instructions for additional submittal requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely
manner may result in dismissal of the Notice of Intent.
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands
ELI�
WPA Appendix A — Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act.M.G.L. c. 131, §40
Important: A. Applicant Information
When filling out
forms on the 1. Applicant:
computer, use
only the tab Osborne Hills Realty Trust
key to move a.First Name b.Last Name c.Company
your cursor- P. O. Box 780
do not use the d.Mailing Address
retum key. Lynnfield MA. 01940
Y-, `�� e. own
781-841-844-7026 f.State g.Zip Code
h.Phone Number
2. Property Owner(if different):
Patricia Britton & Osborne Hills Realty Trust
a.First Name b. Last Name c.Company
d.Mailing Address
e.City/Town f.State g.Zip Code
h.Phone Numher
3. Project Location:
103 Marlborough Road Salem
a.Street Address
b.City/Town
To calculate B. Fees
filing fees, refer
to the category Notice of Intent(Form 3)or Abbreviated Notice of Intent(Form 4):
fee list and
examples in The fee should be calculated using the following six-step Section D of 9 g p process and worksheet. Please see
this form. Instructions before filling out worksheet
Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and
bufferzone.
Step 2/Number of Activities: Identify the number of each type of activity.
Step 3/individual Activity Fee: Identify each activity fee from the six project categories listed in the
instructions.
Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2)times the fee per
category Identified in Step 3)to reach a subtotal fee amount. Note: If any of these activities are in a
Riverfront Area in addition to another Resource Area or the Buffer Zone,the fee per activity should be
multiplied by 1.5 and then added to the subtotal amount.
Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4.
Step 6/Fee Payments: To calculate the state share of the fee,divide the total fee in half and subtract
$12.50. To calculate the city/town share of the fee, divide the total fee in half and add$12.50.
Massachusetts Department of Environmental Protection
T �
Bureau of Resource Protection - Wetlands
WPA Appendix A — Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Fees (continued)
Step 1/Type of Activity Step 2/Number Step Step 4/Subtotal Activity
of Activities 3/Individual Fee
Activity Fee
1 Category 2a 1 $250.00 $250.00
Step 5frotal Project Fee: $250.00
Step 6/Fee Payments:
Total Project Fee: $250.00
a.Total fee from Step 5
State share of filing fee: $112.50
b.1/2 total fee less$12.50
City/Town share of filling fee: $137.50
c.1f2 total fee plus$12.50
Abbreviated Notice of Resource Area Delineation (Form 4A):
The fee is calculated as follows (check applicable project type):
1. ❑ single family
house project a.feet of BVW x$1.00= b.Total fee not to exceed$1,000
2. ❑ all other
projects a.feet of BVW x$1.00= b.Total fee not to exceed$1,000
State share of filing fee: 3.1/1 of total fee less$12.50
City/rown share of filing fee: 4.112 of total fee plus$12.50
JOHN R. KEILTY, ESQUIRE °ATE NVOICE AMOUNT
53-179
Counselor at Law 1133
40 LOWELL STREET -
PEABODY, MASSACHUSETTS 01960 N° 1 1 0 5 9
PAMOUNT
.. ...DATE_._ TO THE ORDER OF '--�OLLARS
GROSSAMT DESCflIPTI .NET AMOUNT
Eastern Bank -Lynn. MA
i
- A THOHI OSIGNATUHE
II.01105911• 1:011301798•: 60 0045 9u•
JOHN R. KEILTY, ESQUIRE DnrE NVOICE AMDUNT
Counselor at Law. 53-179
40 LOWELL STREET 113
PEABODY, MASSACHUSETTS 01960
N° 11058
PAMOUNT
..- DATE TO THE ORDER OF + �Q GROSSAMT DOLLARS
DESCRI.TION NET AMOUNT
M.,,. d
�✓Eastern Bank -Lynn, MA . , -
-._ ._..i
"•011058"• 1:0. 11300981: 60 0045
Massachusetts Department of Environmental Protection
�. Bureau of Resource Protection -Wetlands
WPA Appendix B - Stormwater Management Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. Property Information
Important:
When filling out 1. The proposed project is:
forms on the
computer, use a. New development ® Yes ❑ No
only the tab
key to move b. Redevelopment ❑ Yes No
your cursor- ®
do not use the (If yes, distinguish redevelopment components from
return key. c. Combination ❑ Yes ® No new development components on plans).
n
11 2. Stormwater runoff to be treated for water quality is based on the following calculations:
a. ❑ 1 inch of runoff x total impervious area of post-development site for discharge to critical areas
(Outstanding Resource Waters, recharge areas of public water supplies, shellfish growing areas,
swimming beaches, cold water fisheries),
Note: b. ® 0.5 inches of runoff total impervious area of post-development site for other resource areas.
This November
2000 version of
the Stormwater--
Management B. Stormwater Management Standards
Form supersedes
earlier versions DEP's Stormwater Management
including those 9 Policy(March 1997) incudes nine standards that are listed on the
contained in following pages. Check the appropriate boxes for each standard and provide documentation and
DEP's additional information when applicable.
Stommrater
Handbooks. Standard#1: Untreated stormwater
a. ® The project is designed so that new stormwater point discharges do not discharge untreated
stormwater into, or cause erosion to, wetlands and waters.
Standard#2: Post-development peak discharges rates
a. ❑ Not applicable—project site contains waters subject to tidal action.
Post-development peak discharge does not exceed pre-development rates on the site at the point of
discharge or downgradient property boundary for the 2-yr, 10-yr, and 100-yr,24-hr stone.
b. ❑ Without stormwater controls
c. ® With stormwater controls designed for the 2-yr, and 10-yr storm, 24-hr storm.
d. ® The project as designed will not increase off-site flooding impacts from the 100-yr, 24-hr storm.
Wo Oma. -n wD-.w.ring Pani of
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands
WPA Appendix B - Stormwater Management Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Stormwater Management Standards (cont.)
Standard#3: Recharge to groundwater
Amount of impervious area 1070
pe (sq.ft.)to be infiltrated: a.square feet
Volume to be recharged is based on:
b. ❑ The following Natural Resources Conservation Service hydrologic soils groups (e.g. A, B. C,
D, or UA) or any combination of groups:
100 B
1.%of impervious area 2.Hydrologic soil group 3.%of impervious area 4.Hydrologic soil group
5.%of impervious area 6.Hydrologic soil group T%of impervious area 8.Hydrologic soil group
c. ❑ Site specific pre-development conditions: 1.Recharge rate 2.Volume
d. Describe how the calculations were determined:
e. List each BMP or nonstructural measure used to meet Standard#3 (e.g.dry well, infiltration trench).
Infiltration Chamber Bed
Does the annual groundwater recharge for the post-development site approximate the annual
recharge from existing site conditions?
f. ® Yes ❑ No
Standard#4: 80% TSS Removal
a. ® The proposed Stormwater management system will remove 80% of the post-development
site's average annual Total Suspended Solids(TSS) load.
b. Identify the BMP's proposed for the project and describe how the 80% TSS removal will be
achieved.
Non Structural (lawn)
Wmfam3.Coc-MmMuc D-Wv 1111004 Pace 2 d5
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands
WPA Appendix B - Stormwater Management Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Stormwater Management Standards (cont.)
c. If the project is redevelopment, explain how much TSS will be removed and briefly explain why 80%
removal cannot be achieved.
Standard#5: Higher potential pollutant loads
See Stormwater
Policy Handbook Does the project site contain land uses with higher potential pollutant loads
Vol. I, page 1-23,
for land uses of a. ❑ Yes ® No b. If yes, describe land uses:
high pollutant
loading(see
Instructions).
c. Identify the BMPs selected to treat stormwater runoff. If infiltration measures are proposed,
describe the pretreatment. (Note: If the area of higher potential pollutant loading is upgradient of a
critical area, infiltration is not allowed.)
Standard#6: Protection of critical areas
See Stomwater Will the project discharge to or affect a critical area?
Policy Handbook
Vol. I, page 1-25,
for critical areas a. ❑ Yes ® No b. If yes, describe areas:
(see
Instructions).
c. Identify the BMPs selected for stormwater discharges in these areas and describe how BMPs meet
restrictions listed on pages 1-27 and 1-28 of the Stormwater Policy Handbook—Vol. I:
wvat m .A -Aoomy&D-rev.1111000 Pane 3 of
Massachusetts Department of Environmental Protection
T Bureau of Resource Protection -Wetlands
WPA Appendix B - Stormwater Management Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Stormwater Management Standards (cont.)
Note:
components of Standard#7: Redevelopment projects
redevelopment
projects which Is the proposed activity a redevelopment project?
plan to develop
previously a. ❑ Yes ® No b. If yes,the following stormwater management standards have been met:
undeveloped
areas do not fall
under the scope
of Standard 7.
c.The following stormwater standards have not been met for the following reasons:
d. ❑ The proposed project will reduce the annual pollutant load on the site with new or improved
stormwater control
Standard#8: Erosion/sediment control
a. ® Erosion and sediment controls are incorporated into the project design to prevent erosion,
control sediments, and stabilize exposed soils during construction or land disturbance.
Standard#9:Operation/maintenance plan
a. ® An operation and maintenance plan for the post-development stormwater controls have been
developed.The plan includes ownership of the stormwater BMPs, parties responsible for operation
and maintenance, schedule for inspection and maintenance, routine and long-term maintenance
responsibilities, and provision for appropriate access and maintenance easements extending from a
public right-of-way to the stormwater controls.
Operation and Maintenance Plan 103 Marlborough Road November 2004
b.PlanrrrUe
c.Date
Salem, MA.
d.PlaNTille e.Date
woafomildw•ADDwWw D-m 1IM004 Pane 4 of
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Appendix B - Stormwater Management Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. Submittal Requirements
Online Users: DEP recommends that applicants submit this form, as well as, supporting documentation and plans,
Include your with the Notice of Intent to provide stormwater management information for Commission review
document consistent with the wetland regulations (310 CMR 10.05 (6)(b)) and DEP's Stormwater Management
transaction Policy(March 1997). If a particular stormwater management standard cannot be met, information
number should be provided to demonstrate how equivalent water quality and water quantity protection will be
(provided on provided. DEP encourages engineers to use this form to certify that the project meets the stormwater
your receipt management standards as well as acceptable engineering standards. For more information, consult
page)with all the Stormwater Management Policy.
supplementary
information you
submit to the
Department. D. Signatures
Applicant Name Date
Signature
Representative Cif any) Date
Signature
Woalo .A -Ao ixD-rov.11110 C Pace 5of5
STORMWATER MANAGEMENT FACILITIES
OPERATION AND MAINTENANCE PLAN
103 MARLBOROUGH ROAD
SALEM, MASSACHUSETTS
NOVEMBER 2004
A. Roof Recharse Chambers
The recharge chambers shall be inspected following each major storm(more than
one inch of rainfall in 24 hours)but at least four times annually. Water levels in
the observation wells should be recorded at the beginning, 24 hours and 48 hours
following a major storm. The water level should not exceed six inches at 48
hours after the end of the storm. Operation and maintenance of the recharge
chambers shall be the responsibility of the individual homeowner.
The party responsible for Operation and Maintenance of the Stormwater Management
Facilities is:
Paul DiBiase, Trustee
Osborne Hills Realty Trust
P. 0. Box 780
Lynnfield, MA 01940
Tel: 781-844-7026
or his heirs and assigns.
1
\ C 1
�,ff
•I
I � s
s s -
C8 I
{� p,
�'• : � ,I •. � i rv��;��11\� � f`� f �v. ♦ � �f �Gq'Cwrte \� `.+� - I
tom` t ` 7
30, 341 143
KILOMETERS 1 .5 0 7 ]
ES 1 5 0 t I
Locus 'i`�AP I
� I
[,WY�gln Ir-i���..Ea,0w�sans.Inc
\ GENERAL NOTES
\ 1) THIS PLAN /S THE RESULT OF AN ON THE GROUND FIELD
ocvs
SURVEY AND PUBLIC AND PRIVATE PLANS.
(00
2) UTILITIES SHOWN ARE BASED UPON FIELD SURVEY AND PROPOSED
RECORD PLANS AND ARE NOT NECESSARIL Y INDICA TI VE OF STONE R I PRAP
UNDERGROUND CONDI PONS. Pe 375 PL 26 `
�� AJc PPS � 4a ad,l \RESO(i
3) THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING AND
DETERMINING THE LOCATION, SIZE AND ELEVATION OF ALL SRF 08y
s'" �` 60
EX/STING UTILITIES, SHOWN OR NOT SHOWN ON THESE PLANS, `
PR/OR TO ANY CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED OSBORNE HILLS �e °, 1 6� � ' 164 7522w sae
IN WRITING OF ANY UTILITIES FOUND INTERFERING WITH THE REALTY TRUST FES INV 68.79 �� qRr Nos by
PROPOSED CONSTRUCTION AND APPROPRIATE REMEDIAL ACTION � 1_c , -Z 163.60
LOCUS MAP BEFORE PROCEEDING WITH THE WORK. ,L Q e`367 '
4) THIS PLAN /S BASED ON THE REFERENCED PLANS, DEEDS —
AND THE RESULTS OF A FIELD SURVEY AS OF THIS DATE
NO CERTIFICATION /S INTENDED AS TO PROPERTY TITLE - --- - --_ ,z
OR AS TO THE EXISTENCE OF UNWRITTEN OR UNRECORDED PROPOSED I ,' OSBORNE HILLS
EASEMENTS \ 20 FT. WIDE — —
UTILITY EASEMENT , >y REAL TY TRUST
5) RESOURCE AREA DELINEATED BY R/MMER ENVIRONMENTAL 4
CONSULTING, SEE NOTICE OF RESOURCE AREA DELINEATION �� 'Q� ��' 'o as �� LOT 2
LOT AREA t 8
26,724± SF. I i
l �s `° X80
FLS '>>
PROPOSED X31 9x
'SILT BARRIER r� \ �" �
EX/S77N
-02'7 4-W C1 \ /'1' 80.4 E gpUNDARY
v� BECK _ �o�l ( DMN \BUFFER ZON _ ez
ao W
o –
y To Peabody
OSE - b
?•
159.50 5p 0 T –aa _ S_ -
E
N
PA TR/CIA BRI TTON �S /
ti
a0 B tix r Ld AZO / SMH WA
7-ER
SEWER 9 BASELINE
— O
BASELINE STATIONS IN METERS
SNC7NN ON 2002 MASS. R 1 GHM AY PLAN
SIP-
ROOF RECHARGE BED
DETAIL: No Scale �dP�elbe .
MIN. 1 INSPECTION PORT (�0 Jp�O�S �� Ro
PLAN TO FINISH GRADE �0
4 - STORMTECH SC-310 CHAMBERS 4" PVC TO DOWNSPOUTS J ��
N AN 6' BY 30' STONE LINED (TYPICAL)
l�U r
SECTION EXCAVATION ZONING DISTRICT.- R1
�-- GEOTE}:TILE FABRIC
4" LOAM AND SEED (MIN.) , LINED EXCAVATION ASSESSORS MAP 9 PARCEL 8 & PART PCL. 1
is" MIN 7 RECORD OWNER PCL. 8. PATRICIA BRITTON
TO 96"MAX 4' INLET STORMTECH SC-3101 CHAMBERS DEED REFERENCE: BOOK 10924 PAGE 158
2- SITE DEVELOPMENT PERMIT PLAN
N 1 . RECORD OWNER PCL. 1: OSBORNE HILLS REALTY TRUST UTILITY CONNECTIONS SHALL BE INSTALLED
6 DEED REFERENCE: BOOK 17338 PAGE 313 IN ACCORDANCE WITH REQUIREMENTS OF I ^ OCAT��
CITY OF SALEM PUBLIC WORKS.
SAL E I `/� MASS .
2' Min. 1 1/2" TO 3• WASHED STONE
-- EST S.H.W.T. 7
DETAIL
PREPARED BY
L E G E N D EROSION CONTROL SILT FENCE EASTERN LAND SURVEY ASSOCIATES, INC.
2"x2•x4'-6• WOODEN POSTS ►►..V��.
AT B' O.C. (MAX) ► �ZHOFMgs�
0 TMH EXISTING TELEPHONE MANHOLE 10p PROPOSED CONTOUR :a:aqOwrm9' CHRISTOPHER R. MELLO PLS
100X0
o SMH EXISTING SEWER MANHOLE PROPOSED SPOT GRADE ;a OMC�NA ►
MIRAFI No. 100 SEDIMENT �� ►
o DMH EXISTING DRAIN MANHOLE CONTROL FABRICc
ZONING DISTRICT R1 CIVIL
® EXISTING CATCH BASIN N : ` �""" �., 104 LOWELL ST. PEABODY, MA. 01960
No.30369
EXISTING HYDRANT HAY BALES ONE FAMILY RESIDENTIAL �-, 9F �° �¢• '
EXISTING WATER GATE FLOW DIRECTION ►"�SS�CNA EN��• g It p
— 100 EXISTING CONTOUR LOT AREA 15,000 SF. o " A It
(97$) 531 -8121
�o MELLO SCALE. 1 " = 20' NOVEMBER 3 2004
100.00 EXISTING SPOT GRADE EXISTING GROUND " N°.ai3v o ,
LOT WIDTH 100 FT. �F
¢ UTILITY POLEFRONT YARD 15 FT.
PREPARED FOR
LIGHT ON POST
SIDE YARD 10 FT. —
RETAINING WALL
STONE WALL REAR YARD 30 FT. OSBORNE HILLS REALTY TRUST'-
000000000
CURB PHOTO REPRODUCTION OF THE ABOVE SEAL IS
—x — x — FENCE _ _ INDICATIVE OF UNAUTHORIZED REPRODUCTION
RESOURCE AREA BOUNDARY — IIII —_ IN OF THIS PLAN AND IS TO BE CONSIDERED A
0
RESOURCE AREA BOUNDARY FLAG II I I = II I I - COPYRIGHT INFRINGEMENT AND/OR FRAUD.A10 _ — UNDISTURBED SUBGRADE ENFORCEMENT AUTHORITY SHALL NOT ACCEPT 1. Fr pr
II — I I II PHOTO REPRODUCTION FOR ANY PURPOSE.
F 12795
-t \
6 p
30' RC FES 6T6
a.. INV 68.79 ; _p L OCV$ �d
'� � RIPRAP — - -
;�
�� 6v a s4<
bg ' bit 'a:7'S -T�''),�4 N0915'22�N — oUrOPR1 — 62
P 0 69 > �i
OSBORNE HILLS \yam „ n �, 163.60' ' cE PRE ./ A aJ P,f e Qa o0.
REAL TY TRUST �( _ 37" RESCUR _ 6c roN �hlo� y�P
I 6g
\ irk
l VGo fap 115TA AVE
LOCUS MAP
�pMN BOULDER OSBORNE HILLS
REALTY TRUST
/ PROPOSED RETAININ
20 FT. WIDE L E G E N D
UTILITY EASEMENT — o LOT 2
-,,.,I WALL �� e 0 SMH EXISTING SEWER MANHOLE
0 DMH EXISTING DRAIN MANHOLE
LOT AREA I, ® EXISTING CATCH BASIN
EXISTING HYDRANT
26,724± SF. I %0- EXISTING WATER GATE
/ 9�FFFR _ -- -- 100 — EXISTING CONTOUR
/13 / 100.00 EXISTING SPOT GRADE
�q N\ 90u, V0 �. �- UTILITY POLE
6 ' I o kISnN� RETAINING WALL
\ � 4ti
�CIlNG c�00000�-goo STONE WALL
CURB
—X X —_ FENCE
S1j0274Q1135 ;
MN GK
s3.,
'�y .�A• �15t�N �0� ' 1 To Peabody
17. �� Z
GE � es
TA a8 1
PA TRICIA BRI TTON �u / s
563%°
b
0� \ '"s
�BITj2 - 8stii
CERTIFICATE OF COMPLIANCE
AS BUILT
5 �� ,. , a� g0 J� PLAN OF LAND
\4po �� ,. % LOCATED IN
�aP�. �7b SALEM , MASS .
i�
�XA���� PREPARED B r'
g0 lJ� EASTERN LAND SURVEY ASSOCIATES, INC.
0 CHRISTOPHER R. MEL L 0 PLS
4C�G
CHRISTOPHER N104 LOWELL ST. PEABODY, MA. 01960
R. (978) 531 -8121
$I s MELLO
No.31317 p
\\�1$1
C'IST0" SCALE: 1 " = 20' MARCH 9, 2006
ASSESSORS MAP 9
PREPARED FOR
ABOVE SEAL
ZONING DISTRICT R1 RESIDENTIAL NDIICAOTIVEPOF UNAUOTHORIZEDEREPR DUCTIONS OSBORNE HILLS REALTY TRUST
OF THIS PLAN AND IS TO BE CONSIDERED A
LOCUS IS SHOWN ON A PLAN BY EASTERN LAND COPYRIGHT INFRINGEMENT AND/OR FRAUD. A '54
SURVEY ASSOCIATES, INC. DATED NOVEMBER 2, 2004 ENFORCEMENT AUTHORITY SHALL NOT ACCEPT
PHOTO REPRODUCTION FOR ANY PURPOSE. 0 10 2C 4 f ' F 12795
I I ful 1 1