Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
64-549 - 57 MARLBOROUGH ROAD - CONSERVATION COMMISSION
Os�.w- kf!els cy((/1� REPO ,:'�ON�1T�• a /4 � Aa; CITY OF SALEM ;; 4c CONSERVATION COMMISSION May 16, 2016 Paul DiBiase Osborne Hills Realty Trust PO Box 780 Lynnfield, MA 01940 Re: Extension Permit for Order of Conditions—DEP#64-549—Osborne Hills Subdivision Dear Mr. DiBiase: Enclosed, please find the Extension Permit for the above-referenced Order of Conditions. The attached Extension Permit must be recorded at the South Essex County Registry of Deeds. Once recorded, please return a copy of Page 2 of the Extension Permit, which will indicate to the Commission that the document has been recorded. I If you have any further questions,please feel free to contact me at 978-619-5685. Sincerel Tom Devine Conservation Agent Enclosure CC: DEP Northeast Regional Office Footprint Power Salem Harbor Development LP/Footprint Power Salem Harbor Real Estate LP VqW Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 7 — Extension Permit for Orders of Conditions 64-549 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. General Information Important: When filling out 1. Applicant: forms on the Osborne Hills Realty Trust computer, use Name only the tab p0 Box 780 key to move your cursor- Mailing Address do not use the Lynnfield MA 01940 return key. City/Town Slate Zip Code VQ 2. Property Owner(if different): Name anon Mailing Address City/Town State Zip Code B. Authorization The Order of Conditions (or Extension Permit) issued to the applicant or property owner listed above on: 6/20/2013 Issued by: Salem Date Conservation Commission for work at: 57 Marlborough Road 9 1 Street Address Assessor's Map/Plat Number Parcel/Lot Number recorded at the Registry of Deeds for: South Essex 32990 532 County Book Page Certificate(if registered land) is hereby extended until: pat IT Date the Order was last extended(if applicable) This date can be no more than 3 years from the expiration date of the Order of Conditions or the latest extension. Only unexpired Orders of Conditions or Extension may be extended. This Extension Permit must be signed by a majority of the Conservation Commission and a copy sent to the applicant and the appropriate DEP Regional Office htt ://www.mass. o /eea/a encies/massde /about/contacts/find-the- a de r conal- ffice-for- our-cit -or- town.html . Signatures: �^ Date ' 1n r / i vryaformTdoc•rev.51292014 Page 1 of 2 NOI Status Sheet p� Address: DEP#: Application gyp Date Submitted: �' o3 Contact Name: 1,,Ii0S Phone: Proposed activity: Lh.. 1 L Application Complete LCorrect Fee Received @-Abutters List Requested Received 'E'Legal Ad Sent egal Ad Confirmed �!qnline C'Added to Agenda genda to Applicant -M;zAgent Comments to Commission BEP Comments Hearing Opened: 5/t)jA 3Continued: -- Site Visit: Abutters Notice Confirmed 'Permit Sent to Applicant and DEP ❑ Confirmation of Delivery -4xpiration date added to calendar Z>Added to database 9 Applicant Recorded OoC with Registry Preconstruction Meeting: ❑ Certificate of Compliance Sent to Applicant and DEP ❑ Confirmation of Delivery ❑ Applicant Recorded CoC with Registry Notes: HACON COMMWdministrative\project status sheet\NOI status sheet 2012-12-27.doc Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 7 — Extension Permit for Orders of Conditions 64-549 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP C. Recording Confirmation The applicant shall record this document in accordance with General Condition 8 of the Order of Conditions (see below), complete the form attached to this Extension Permit, have it stamped by the Registry of Deeds, and return it to the Conservation Commission. Note: General Condition 8 of the Order of Conditions requires the applicant, prior to commencement of work, to record the final Order(or in this case, the Extension Permit for the Order of Conditions) in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, it shall be noted in the Registry's Granter Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, it shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. Detach this page and submit it to the Conservation Commission prior to the expiration of the Order of Conditions subject to this Extension Permit. To: Conservation Commission Please be advised that the Extension Permit to the Order of Conditions for the project at: Project Location DEP File Number has been recorded at the Registry of Deeds of: County for: Property Owner and has been noted in the chain of title of the affected property in accordance with General Condition 8 of the original Order of Conditions on: Date Book Page If recorded land the instrument number which identifies this transaction is: Instrument Number If registered land, the document number which identifies this transaction is: Document Number Signature of Applicant wpaform7.dcc•rev.5/29/2014 Page 2 of 2 19 Professional Land Surveyors &Civil Engineers ESSEX SURVEY SERVICE 1958- 1986OSBORN PALMER 1911 - 1970 JAN 1 V, 20 5 BRADFORD&WEED 1885- 1972 DEPT.OF PLANNING& CO?OMUN!TY DEVELOPMENT January 15,2015 Mr. Tom Devine Salem Conservation Commission Salem City Hall Annex 120 Washington Street Salem,MA 01970 RE: F 12795 OSBORNE HILLS SALEM, MA Dear Tom: Please find enclosed two copies of the Phasing Plan for the above referenced subdivision. Sincerely, 7 Christopher R. Mello, PLS President CRM:lc cc: Mr. Paul Dibiase Enclosure 104 LOWELL STREET PEABODY, MASS. 01960 TELEPHONE: 978-531-8121 FAX: 978-531-5920 • • • • • • . 1 1 ' •11 WW Qq �`x' xN � ��iay ' �..> � `a•� _._f f3 �i4 't��it' Y�.I r� _ +lis }1� 1 �0 V7G� f�'I���IY/d1Ir �" *e-ig f , ' 0 � , �u`i':w,.�'. :. .. Z ` a 'n fl.� A.by�.d � "J""".ho3s d e Z✓.. 14, Wz =-�* A•'" W e -•- ass r � � 14 . "'�'�` .r*a a<` -.rte' ^-•+�� ins ' - +�''-.� �' �� W" .a �� JI� ,k,• R�je� �` � ,4 s'�.�Z a �� ��"+•'`{i! a a w•�, *d`..- �r. •t„n tib: acs ', s, 3' ��„ dr.,.`q """R'a j w �. ��v e��� �YFa'd�•�'tr.. 't• `+�`� � �,rv,'��yJ��_'S s'W �y '. � 4 s'�,�`,y AR me. l �d �,�{�,�1y"o,kv { ' - � `•`E 2 ♦ Y+-'�,�+ � p - th'k.w. �rS.. r+ai°:"=F C rc q �`[t'..' • X 4�r `M" +d, X13 �...�"' ." ~` ' ol `� �' J�` � a 3-.•�*'�' {r• o",`„� 'x'1'� '""'ya` r.. �,�r"..r YY..���r��` 1...1;�,��y y{Nk ,. tiik:»y 3ibh�� 4' t{„+ F�i lY'r jVill o- 4 " ,�.+�'�"itK; �'.:.< . tM.w_ <:h'�� 4'tts.#'. t.».��`4.t> .�a.=:7 '12'g5 .q�:.. .�'r, r..Rq"�,wi ,�;:..`.,s�,Y�.1.• UM Agji IP WA �♦ ly Y �.' � 'ems`\ �}xy� ' d^5 a %91 (, x t `{j.,� ±S'ya,��,'lra�'f`�•�&'.�iC" ae-'$ty a}"'.,..+� CITY OF SALEM CONSERVATION COMMISSION January 12, 2015 Illlilllllllllllllilllllllllllllllllllllllllll Paul DiBiase 2015012100285 803811 Pg., 121 Osborne Realty Trust 0112112015 12137 convLi as 113 PO Box 780 Lynnfield, MA 01940 Re: Partial Certificate of Compliance—DEP#64-549—Osborne Hills Subdivision, Phases I & II Dear Mr. DiBiase: Enclosed, please find the Partial Certificate of Compliance for the above referenced project. This Document, including this cover letter, must be recorded at the South Essex County Registry of Deeds. Please fill out and return the Recording Information on page 3 of the Certificate of Compliance,which will indicate to the Salem Conservation Commission that the document has been recorded. This Certificate of Compliance certifies completion of Phases I & II of the above-referenced project in substantial compliance with the Order of Conditions and approved plans. However,per Conditions #44 and#48(4), this Certificate does not certify completion of any wetland alteration or replication until said work is certified in writing by a qualified Wetlands Scientist to be completed in compliance with the Order of Conditions and approved plans. In addition, Conditions #45, #46, and #47 from the Attachment to Order of Conditions, regarding ongoing monitoring of replicated wetlands, remain in effect beyond this Certificate. If you have any further questions please feel free to contact me at (978) 619-5685. Sincerely, Tom Devine Conservation Agent Enclosures v CC: . DEP Northeast Regional Office Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 64-549 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information Important: When filling out 1. This Certificate of Compliance is issued to: forms the computer, use Osborne Hills Realty Trust _--" only the tab key Name to move your PO Box 780 cursor-do not use the return Mailing Address - key. Lynnfield' MA 01940 City/Town State Zip Code 2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to: Osborne Hills Realty Trust renrn Name 6/20/2013 64-549 Dated DEP File Number 3. The project site is located at: 57 Marlborough Road Salem Street Address City/Town 9 1 Assessors Map/Plat Number Parcel/Lot Number the final Order of Condition was recorded at the Registry of Deeds for: Property Owner(if different) South Essex 32990 532 County Book Page Certificate 4. A site inspection was made in the presence of the applicant, or the applicant's agent, on: 1/7/2014 Date B. Certification Check all that apply: ❑ Complete Certification: It is hereby certified that the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ® Partial Certification: It is hereby certified that only the following portions of work regulated by the above-referenced Order of Conditions have been satisfactorily completed.The project areas or work subject to this partial certification that have been completed and are released from this Order are: wpefrm8b.doc•rev.5129114 WPA Fon ae,Cer118cate of compliance•page 1 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 64-549 Massachusetts Wetlands Protect n Act M.G.L. c. 131, §40 Provided by DEP ❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no longer valid. No future work subject to regulation under the Wetlands Protection Act may commence without filing a new Notice of Intent and receiving a new Order of Conditions. Ongoing Conditions: The following conditions of the Order shall continue: (Include any conditions contained in the Final Order, such as maintenance or monitoring, that should continue for a longer period). Condition Nuln�bgr`;: C. Authorization Issue by it Conservation Commission Dat of Issu ce I This Certificate must be signed by a majority of the Conservation Commiss' n a a copy sent to the applicant and appropriate DEP Regional Office e http,//www.mass.gov/eea/agencies/massde /about/contacts/fin -th de - re ional-office-for- our-ci -or.-{own.html). i Signatur� J D. Recording Confirmation The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court for the district in which the land is located. Detach on dotted line and submit to the Conservation`Commission. -- -------------- -------- - - --------- ------------------------ ------------------------------- To: Conservation Commission Please be advised that the Certificate of Compliance for the project at: wpafrmeb.Coc-rev.5/29/14 WPA Forth e6,Cetlirimte of Compliance-Page 2 of 3 ol r COMMONWEALTH OF MASSACHUSETTS ESSEX REGIS RY OF DEEDS S0.DIST.,SALEM.MASS t ESSEX SS TR, 077 REC R 2045 AGE ATTEST: } REGISTER J CITY OF SALEM CONSERVATION COMMISSION January 12,2015 Paul DiBiase Osborne Realty Trust PO Box 780 Lynnfield,MA 01940 Re: Partial Certificate of Compliance—DEP #64-549—Osbome Hills Subdivision, Phases I & II Dear Mr. DiBiase: Enclosed, please find the Partial Certificate of Compliance for the above referenced project. This Document, including this cover letter, must be recorded at the South Essex County Registry of Deeds. Please fill out and return the Recording Information on page 3 of the Certificate of Compliance,which will indicate to the Salem Conservation Commission that the document has been recorded. This Certificate of Compliance certifies completion of Phases I & II of the above-referenced project in substantial compliance with the Order of Conditions and approved plans. However,per Conditions #44 and #48(4), this Certificate does not certify completion of any wetland alteration or replication until said work is certified in writing by a qualified Wetlands Scientist to be completed in compliance with the Order of Conditions and approved plans. In addition, Conditions #45, #46, and #47 from the Attachment to Order of Conditions, regarding ongoing monitoring of replicated wetlands, remain in effect beyond this Certificate. If you have any further questions please feel free to contact me at (978) 619-5685. Sincerely, Tom Devine Conservation Agent Enclosures CC: DEP Northeast Regional Office Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 813 — Certificate of Compliance 64-549 1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information Important: When filling out 1. This Certificate of Compliance is issued to: forms on the computer,use Osborne Hills Realty Trust only the tab key Name to move your PO Box 780 cursor-do not use the return Mailing Address key. Lynnfield MA 01940 Cityfrown State Zip Code 2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued y Osborne Hills Realty Trust Name 6/20/2013 64-549 Dated DEP File Number 3. The project site is located at: 57 Marlborough Road Salem Street Address City/Town 9 1 Assessors Map/Plat Number Parcel/Lot Number the final Order of Condition was recorded at the Registry of Deeds for: Property Owner(if different), South Essex 32990 532 County Book Page - Certificate 4. A site inspection was made in the presence of the applicant, or the applicant's agent, on: 1/7/2014 Date B. Certification Check all that apply: ❑ Complete Certification: It is hereby certified that the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ® Partial Certification: It is hereby certified that only the following portions of work regulated by the above-referenced Order of Conditions have been satisfactorily completed. The project areas or work subject to this partial certification that have been completed and are released from this Order are: wpafrm8odoc•rev.529/14 WPA Form BB,Certificate of Compliance•Page 1 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 64-549 Massachusetts Wetlands Protect n Act M.G.L. c. 13L11, §40 Provided by DEP ❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no longer valid. No future work subject to regulation under the Wetlands Protection Act may commence without filing a new Notice of Intent and receiving a new Order of Conditions. Ongoing Conditions: The following conditions of the Order shall continue: (Include any conditions contained in the Final Order, such as maintenance or monitoring, that should continue for a longer period). Condition Numb r C. Authorization Issue by 5 1 � Conservation Commission Dat of Issu—Ace This Certificate must be signed by a majority of the Conservation Commis n a a copy sent to the applicant and appropriate DEP Regional Office e http://www.mass.gov/eea/agencies/massdep/about(contacts/fin -th de - regional-office-for-your-cit - own.html). Sig natur / D. Recording Confirmation The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court for the district in which the land is located. Detach on dotted line and submit to the Conservation Commission. To: Conservation Commission Please be advised that the Certificate of Compliance for the project at: vgafrm8b,doc•rev.5129/14 WPA Form 89,Cetlifcate of Compliance•Page 2 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 64-549 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Project Location DEP File Number Has been recorded at the Registry of Deeds of: County for: Property Owner and has been noted in the chain of title of the affected property on: Date Book Page If recorded land, the instrument number which identifies this transaction is: If registered land, the document number which identifies this transaction is: Document Number . Signature of Applicant . wpafrm8b.doc•rev.5129114 wPA Foos 88,Certificate of Compliance•Page 3 of 3 • •• •• • '•.•MUM • • •• 1 , • } ���' -.w '� f i. � '�1 •ti�3 }p� I � N �,��,� f 4 .�.hic�.�-'1,:«"v�i'.Re+.r�-¢r" +W wF"�?X a �'� � ��Y'� ' �.4. ,t�i�. �) •:�n �F <� M-� � rr " � s ., ✓. � rr�, t +,gb �s y� � " 3 Y ' Tj A IIIA• Y� M�.,a3 zAe r�.x P h:. ,S w�f +..,3, � ��� � • � v�•H�• " T n� yL Y ' s T:4# x*,K''Az_%��..,w:.. t'• .f't+ r � � Ad:, csw ..�'ik�;"`sw`_.�. ...� ° 4:x.�� chy�� 4° I f VA 111.1 411*1 Vil, JI _ .� � 4'. ' `5 " ^t r 'sa,�r , ,M r + .M.t'c t• 'r Ms€ _.. " .��„`��''� "� �#�' aYi+ ms` s.� `°� i �• 1 .�' �a Ka rTW P� r ��. __ r. L 3z� � � � yr rxs�se�'�a � � .s i _ i d 4F e a Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8A — Request for Certificate of Compliance 64-418 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information Important: When filling out 1. This request is being made by: forms the computer, use Osborne Hills RealtyTrust only the tab Name key to move P. 0. Box 780 your cursor- Mailing Address do not use the Winnfield MA return key. C tyrrown 01940 State Zip Code 781-844-7026 `m Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: Osborne Hills Realty Trust Applicant November 16, 2006 Dated 64-418 Upon completion DEP File Number of the work 3. The project site is located at: authorized inan Off Marlborough Road Orders, Address Street AddSalem Conditions, the Cltyrfown property owner Map 9 Part 1 must request a Assessors Map/Plat Number Parcel/Lot Number Certificate of Compliance 4. The final Order of Conditions was recorded at the Registry of Deeds for: from the issuing authority.stating Property Owner(if different) that the work or portion of the Essex South 25090 31 work has been County Book Page satisfactorily N/A completed. Certificate(if registered land) 5. This request is for certification that(check one): ® the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above-referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). Phase 1 and 2, Lots 14, 6-46 are in substantial compliance ❑ the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. naform9a.dx••rev.5/29114 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8A — Request for Certificate of Compliance64-418 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provide-by DEP A. Project Information (cont.) '6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office(see http://www mass.gov/eea/agencies/massdeplabout/contacts/find the massdeo regional office- for-your-city-or-town html). wpaformea.dx••rev.5a9/14 Page 2 of 2 q 4 g CITY OF SALEM 9� CONSERVATION COMMISSION June 20; 2013 Paul DiBiase PO Box 780 Lynnfield,MA 01940 f Re: Order of Conditions—DEP#64-549 Osborne Hills Subdivision off of Marlborough Road, Salem,Massachusetts P Dear Mr. DiBiase: Enclosed, please find the order of conditions for the above-referenced project. The ; attached amended order must be recorded at the Essex County Registry of Deeds, Shetland Park, 45 Congress Street, Suite 4100, Salem,Massachusetts. Once recorded, please return a copy of Page 12 of the amended order, which will indicate to the Commission that the document has been recorded.. i If you have any further questions, please feel free to contact me 978-619-5685. Sincerely, Tom Devine Conservation Agent/ Staff Planner Enclosures I CC: DEP Northeast Regional Office r 1 I Massachusetts Department of Environmental Protection Provided by MassOEP: Bureau of Resource Protection - Wetlands 64-549 WPA Form 5 — Order of Conditions MassDEPPne# Massachusetts.Wetlands Protection Act M:G.L. c. 131 §40 eDEP Transaction R Salem City/r6wo G. Recording Information Prior to commencement of work,this Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected'property. In the case of recorded land,the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. in the case of registered land,this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions:The recording Information on this page shall be submitted to the Conservation Commission listed.below. ' Salem Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. ----------------------- ------,---------- ........ To ----- ------- To Salem Conservation Commission Please be advised that the Order of Conditions for the Project at: 57 Marlborough Rd: 64-549 Project Location - MassDEP File Number Has been recorded at the Registry of Deeds of: k`crc`'K /- 33F 3,3 . County Book Page for: 1ls a� k'aUc' 17/G�3 �G A/ry rf` T Property Owner and has been noted in the chain of title of the affected property in: yq0 }3 j Book . Page _ :. In accordance with the Order of Conditions issued on: /2.��3 'R6 e O r n Date If recorded land,the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: .Document Number Signature of AppllcanF: wPalorrn5.tloc•rev.05492010 - Page 12 of f2 JO G� illilll�I�Illilllllllllllllilllllllllllil11 % i6$ - 2013120200348 802990 Pg t2.. 12/02/2013 02:25 00NDN Ps 1120 If E:.. Massachusetts Department of Environmental Protection Provided by MassoEP: Bureau of Resource Protection - Wetlands 64-549 WPA Form 5 - Order of Conditions MassDEP Ala4 Massachusetts Wetlands;Protection Act M.G.L. c. 131, §40 eDEPTransaction# Salem City/rown A. General Information Please note: thisbeen rriolliSalem beames t.From: n. n odllled CiOnSOfVat100 CiOmmlSSlon' wth added 2.This issuance for space to a.®Order of Conditions b.Q.Amended Order of Conditions i. accommodate (check One); t the Registry of Deeds 3.To: Applicant: , e' i Requirements Important: a.First Name - b.Last Name When filling Osborne Hills Realty Trust out forms on c.Organization I the PO Box 780 computer, use only the d.Mailing Address tab key to Lynnfield MA 01940 move your e.Chyfrown cursor-do I.State g,Zip Code - tmie 4. Property Owner(if different from applicant):eYy LF I a.First Name b.Last Name c.Orgapization man d.Mailing Address aa.City/town f:State g.Zip Code - - 5. Project Location: 57 Marlborough Rd. Salem a.Street Address - b.City/Town 9 j _ c.Assessors Map/Plat.Number d..Parcel/Lot Number - - Latitude and Longitude, if known: 42d30m27s 70d5Om45s d.Latitude e.Longitude wPelarm6.doc• rev Q&19/2010 - -' page rof 12 Massachusetts Department of Environmental Protection Providea by Mas OL71 Bureau of Resource Protection Wetlands SDEP: WPA Form S — 64-549 (( ®rder of-Conditions MessDEPe--F;l— .g-.` Massachusetts Wetlands Protection Ac tM.G.L: c. 131, §40 eDEP Transact�— A• GeneraF Information (cont.) Salem s. r Property ecorded at Registry of peeds for(attach,additional information if more than one parcel). Property re .Essex South B r] b.Certifi c.Book cate Number(if registered land) 313 7. Dates: 5/9/2013 d.Page a..Date Notice of Intent Fled 6/13/2013 s• Final A b.Date Public Hearin Closed 6/20/2013 Approved Plans and Other Documents (attach additional plan or document references c,Date of Issuance as heeded); See attached a.PlanTitle - _ b..Prepared By c.Signed and Stamped-by d Final Revisicn Date See attached e.scale I Oonal Plan or Document AdtliTitle I. Findings pursuant to the Massachusetts Wetlands Protection Act: Following the.review of the above-referenced Notice of Intent and based on the information Provided in this applicati the on and presented at the public hearing, this Commission finds that, areas in which work is proposed is significant to the fo Protection Act(the Act). Check all that apply.. llowing interests of the Wetlands a. ® Public Water Supply 'b. ❑ Land Containing Shellfish c. 0 Prevention of d. ® Private WaterSuply e, Pollution p _ ® Fisheries f. ® Protection of o• ® Groundwater Supply h. Wildlife Habitat ® Storm Damage Prevention 1. Flood Control 2, This Commission hereby finds the project,as proposed, is: Approved subject to: (check one of the following boxes) a ® the following conditions which are necessary in accordance with the performande standards set forth in the wetlands regulations. This Commission orders that all:work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions;and an that the following conditions modifypr differ from the 1Insspecifications, orother y other special conditions attached to this Order_ 70thextent proposals submitted with the Notice otlntent, these conditions shall oontrol. wPalormb,yc+ rev Oon 9x2010 Page 2W 12 i ' 5 / a T d is F� j i { i I C � COMMIDWAWN OF MASW"USMS �SEX�$�TNYi�g1FfQS�SQIObLr .R(ASS _ A 7WE COPY OF RECORD: 2D /3 SOOK3 d AGE S p�{r7 `� REGISTER /��,CO401Tq„q CITY OF SALEM CONSERVATION COMMISSION SITE VIISIT FORM 77 PROJECT LOCATION: S ✓ D T OF SITE VISIT. PROJECT PROPONENT: o DEP FILE NUMBER: PROPOSED WORK: IN.ATTEND"CE: Commission Members/Agent: Abutters: Erb �c r : Applicant/Property Owner/Representative: ct b ISITE VISITn=g SITE VISIT",DOCUMENTATION:; "�' '' ❑Photos ❑ Site Map ❑Other: QBSERVATIDN$': piped P g _. ,a __. Take into account}relevant tlaspects or features such as: natural or i ed drain a or obvious pollution; topography; existing vegetation; possible alternative sites; signs of wildlife, possible vernal pools, rare species habitat; landmarks; recent or historical disturbances; proximity to other water bodies or drainage areas; adjace t land uses. o ,REGOMMENR,ATION.$. • Professional Land Surveyors &Civil Engineers ESSEX SURVEY SERVICE 1958- 1986 OSBORN PALMER 1911 - 1970 BRADFORD&WEED 1885- 1972 December 18, 2014 Mr. Thomas Devine Salem Conservation Commission Salem City Hall Annex 120 Washington Street Salem,MA 01970 RE: DEP FILE NO. 64-418 F 12795 OSBORNE HILLS SUBDIVISION SALEM,MA Dear Mr. Devine: I have completed the As Built Plans of the Phase 1 and 2 of the above reference subdivision. I find the construction be in substantial compliance with the approved plans, without deviation. Sincerely, Christopher R. Mello,PLS President CRM:lc cc: Mr. Paul Dibiase 104 LOWELL STREET PEABODY, MASS. 01960 TELEPHONE: 978-531-8121 FAX: 978-531-5920 yw'CONDIT� o, CITY OF SALEM \\t`` .g �/, CONSERVATION COMMISSION June 20, 2013 Paul DiBiase PO Box 780 Lynnfield, MA 01940 Re: Order of Conditions—DEP #64-549 Osborne Hills Subdivision off of Marlborough Road, Salem, Massachusetts Dear Mr. DiBiase: Enclosed, please find the order of conditions for the above-referenced project. The attached amended order must be recorded at the Essex County Registry of Deeds, Shetland Park, 45 Congress Street, Suite 4100, Salem, Massachusetts. Once recorded, please return a copy of Page 12 of the amended order, which will indicate to the Commission that the document has been recorded. If you have any further questions, please feel free to contact me 978-619-5685. Sincerely, C � Tom Devine Conservation Agent/ Staff Planner Enclosures CC: DEP Northeast Regional Office Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-549 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town A. General Information Please note: Salem this form has 1. From: been modified Conservation Commission with added 2.This issuance is for space to a. ®Order of Conditions b.❑Amended Order of Conditions accommodate (check one): the Registry , of Deeds 3. To: Applicant: Requirements Important: a. First Name b.Last Name When filling Osborne Hills Realty,Trust out forms on c.Organization the PO BOX 780 computer, use only the d. Mailing Address tab key to Lynnfield MA 01940 move your e.City/Town f.State Zi C cursor-do g P ode not use the 4. Property Owner(if different from applicant): return key. ra a. First Name U.Last Name c.Organization rerun d.Mailing Address e.City/Town f.State g.Zip Code 5. Project Location: 57 Marlborough Rd. Salem a.Street Address b.Cityfrown 9 1 c.Assessors Map/Plat Number d. Parcel/Lot Number Latitude and Longitude, if known: 42d30m27s 70d50m45s d.Latitude e. Longitude wicaform5.doc• rev.05/19R010 Page 1 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-549 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town A. General Information (cont.) e. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel): Essex South a.County b.Certificate Number(if registered land) 17388 313 c.Book d. Page 5/9/2013 6/13/2013 6/20/2013 7. Dates: a.Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance 8. Final Approved Plans and Other Documents (attach additional plan or document references as needed): See attached a. Plan Title b. Prepared By c.Signed and Stamped by d. Final Revision Date e.Scale See attached I.Additional Plan or Document Title g. Date B. Findings f. Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act (the Act). Check all that apply: a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution d. ® Private Water Supply e. ® Fisheries f. ® Protection of Wildlife Habitat g. ® Groundwater Supply h. ® Storm Damage Prevention I. ® Flood Control 2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes) Approved subject to: a. Z the following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. wpalorm&do rev.05/1 92 01 0 Page 2 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-549 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town B. Findings (cont.) Denied because: b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect the interests of the Act, and a final Order of Conditions is issued. A description of the performance standards which the proposed work cannot meet is attached to this Order. c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). 3. ❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and the wetland resource area specified in 310 CMR 10.02(1)(a) a.linear feet Inland Resource Area Impacts: Check all that apply below. (For Approvals Only) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 4. ❑ Bank a.linear feet -37rfeet c.linear feet d. linear feet 5. ® Bordering 4320 4320 9790 9790 Vegetated Wetland a.square feet b.square feet c.square feet d.square feet 6. ❑ Land Under Waterbodies and a.square feet b.square feet c.square feet d.square feet Waterways e.Gy dredged f.c/y dredged 7. ❑ Bordering Land Subject to Flooding a.square feet b.square feet c.square feet d.square feet Cubic Feet Flood Storage e.cubic feet f. cubic feet g.cubic feet h.cubic feet e. ❑ Isolated Land Subject to Flooding a.square feet b.square feet Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet 9. ❑ Riverfront Area total so.feet Sq ft within 100 ft d.sauare feet _ f.sauare feet Sq ft between 100- 200 ft _ _ h.sauare feet i.sauare feet wpaform5.doc- rev.o5ii me 10 Page 3 of 12 Massachusetts Department of Environmental Protection Provided by MassoEP: Bureau of Resource Protection - Wetlands 64-549 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem citylrown B. Findings (cont.) Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only) Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement to. ❑ Designated Port Indicate size under Land Under the Ocean, below Areas 11. ❑ Land Under the Ocean a.square feet b.square feet c.c/y dredged d.c/y dredged tz. El Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 13. ❑ Coastal Beaches cu yd cu yd a.square feel b.square feet c.nourishment d.nourishment cu yd cu yd 14. ❑ Coastal Dunes a.square feet b.square feet c.nourishment d.nourishment 15. ❑ Coastal Banks a.linear feet b.linear feet is. ❑ Rocky Intertidal Shores a.square feet b.square feet 17. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet is. ❑ Land Under Salt Ponds a.square feet b.square feet c.c/y dredged d.c/y dredged 19. ❑ Land Containing Shellfish a.square feet b.square feet c.square feet d.square feet 20. ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above a.c/y dredged b.c/y dredged 21. ❑ Land Subject to Coastal Storm a.square feet b.square feet Flowage wPaform5.dM• rev.051192010 Page 4 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-549 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem citylrown B. Findings (cont.) #22. If the 22 ❑ Restoration/Enhancement project is for the purpose of restoring or square uare feet of BVW enhancing a q b.square feet of salt marsh wetland resource area 23. ® Stream Crossing(s): in addition to 6 total wetland crossings, including but not the square ( 9 r 9 footage that limited to streams) b.number of replacement stream crossings has been entered in C. General Conditions Under Massachusetts Wetlands Protection Act Section 8.5.c (BV or )(salt The following conditions are only applicable to Approved projects. Marsh)above, 1. Failure to comply with all conditions stated herein, and with all related statutes and other please enter the additional regulatory measures, shall be deemed cause to revoke or modify this Order. amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does'not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not extend the issuance date of the original Final Order of Conditions and the Order will expire on 6/20/2016 unless extended in writing by the Department. 7. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 8. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. wpaform5.doc• rev,05/19/2010 Page 5 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-549 WPA Form 5 - Order of Conditions MassDEP File t Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction q Salem Citylrown C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) 9. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done.The recording information shall be submitted to the Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 10. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or, "MassDEP"] "File Number 64-549 " 11. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before MassDEP. 12. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance(WPA Form 8A)to the Conservation Commission. 13. The work shall conform to the plans and special conditions referenced in this order. 14. Any change to the plans identified in Condition #13 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. wpafarm5.doc• rev.0 5/1 91201 0 Page 6 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-549 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem Cily/Town C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) 18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS 19. The work associated with this Order(the "Project") is(t)® is not(2)❑ subject to the Massachusetts Stormwater Standards. If the work is subject to the Stormwater Standards,then the project Is subject to the following conditions: 1. a) All work, including site preparation, land disturbance, construction and redevelopment, shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Construction General Permit as required by Stormwater Condition 8. Construction period erosion, sedimentation and pollution control measures and best management practices (BMPs) shall remain in place until the site is fully stabilized. b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/or treatment, the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures; ii. as-built final construction BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized; iii. any illicit discharges to the stormwater management system have been removed, as per the requirements of Stormwater Standard 10; iv. all post-construction stormwater BMPs are installed in accordance with the plans (including all planting plans)approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetation associated with post-construction BMPs is suitably established to withstand erosion. wpaformS.tlac• rev.05119/2010 Page 7 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-549 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible party(defined in General Condition 18(e)) shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement("O&M Statement)for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan ("O&M Plan") and certifying the following: i.)the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance, and ii.)the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. d) Post-construction pollution prevention and source control shall be implemented in accordance with the long-term pollution prevention plan section of the approved Stormwater Report and, if applicable,the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Multi-Sector General Permit. e) Unless and until another party accepts responsibility,the landowner, or owner of any drainage easement, assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of the property must submit to the issuing authority a legally binding agreement of record, acceptable to the issuing authority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 18(f) through 18(k)with respect to that BMP. Any failure of the proposed responsible party to implement the requirements of Conditions 18(f)through 18(k)with respect to that BMP shall be a violation of the Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans, the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. wpaform5.doc• rev.0 5/19/2010 Page 8 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-549 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) g) The responsible party shall: 1. Maintain an operation and maintenance log for the last three (3) consecutive calendar years of inspections, repairs, maintenance and/or replacement of the stormwater management system or any part thereof, and disposal (for disposal the log shall indicate the type of material and the disposal location); 2. Make the maintenance log available to MassDEP and the Conservation Commission ("Commission") upon request; and 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the 0&M Plan approved by the issuing authority. h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. j) The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit (as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits) shall not be altered without the prior written approval of the issuing authority. 1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions (if you need more space for additional conditions, please attach a text document): See attached wpaform&dm- revAS/19/2010 Page 9 0112 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-549 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. C. 131, §40 eDEPTransaction# Salem Cityfrown D. Findings Under Municipal Wetlands Bylaw or Ordinance 1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No 2. The Salem hereby finds (check one that applies): conservation Commission a. ❑that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw, specifically: i.Municipal Ordinance or Bylaw 2.Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. b. ®that the following additional conditions are necessary to comply with a municipal ordinance or bylaw: c.50 Wetlands Protection and Conservation Ordinance 2.Citation 1.Municipal Ordinance or Bylaw 3. The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent,the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows (if you need more space for additional conditions, attach a text document): See attached Page 10 of 12 wpaform5.dm• rev.05/1912010 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPTr nsaction# E. Signatures Cny/I own IWhen mportant: This Order is valid for three years, unless otherwise specified as a special }..per farms on the condition pursuant to General Conditions#4, from the date of issuance. t.Date of Issuan e computer, use Please indicate the number of members who will sign this form. :lab key This Order must be signed by a majority of the Conservation Commission. 22.Numbe�of Signers your do not Th • Order must be mailed by certified mail(return receipt re a ed)or hand delivered to key.the return - th:_ applicant.A copy must be mailed, hand delivered or file el tIc Ilya same r x tirT.a with the aPP appropriate date MassDEP Regional Office. � ra t lgna I C b_r hand delivery on ❑ by certified mail, return receipt requested,on Date Date ppeals i,.a =pplicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassOEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act(M.G.L. c. 131, §40), and is inconsistent with the wetlands regulations (310 CMR 10,00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. wpa5sigsdoc• rev.021252010 Pagdl e11a. Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-549 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem Citylrown G. Recording Information Prior to commencement of work,this Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on this page shall be submitted to the Conservation Commission listed below. Salem Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. ------------------------------------------------I----------------------------------------------------------- -- To: Salem Conservation Commission Please be advised that the Order of Conditions for the Project at: 57 Marlborough Rd. 64-549 Project Location MassDEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant wpaform5.tloc• rev.05/19/2010 Page 12 of 12 "f Attachment to Order of Conditions # 64-549 e Page Ili of 8 SALEM CONSERVATION COMMISSION Attachment to Order of Conditions DEP FILE #64-549 Osborne Hills / Strongwater Crossing Subdivision City of Salem, Massachusetts June 20, 2013 ADDITIONAL FINDINGS Based on the Estimated Habitats or Rare Wildlife and Certified Vernal Pools Map (October 1, 2008) from Natural Heritage & Endangered Species Program (NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contains any vernal pools. This Order is issued under the Massachusetts Wetlands Protection Act,M.G.L.Chapter 131, Section 40 and the City of Salem Wetlands Protection and Conservation Ordinance, Salem Code Chapter 50. This Order permits the construction of roadways, utility connections, stormwater management facilities, filling of 3,580 square feet of BVW and the replication of 6,340 square feet of BVW for a 129-lot residential cluster subdivision. This Order does not permit the construction of any homes. A total of six jurisdictional wetlands will be crossed using a combination of span bridges and arch culverts. Approximately 93 acres of the total 162-acre project site will be protected as open space with a low impact public accessible trail network designed for passive recreational use. The trail network shall cross jurisdictional wetlands in five(5) locations; three of the five locations will require footbridges. All of the trail crossings have been designed and approved as a Limited Project provision of ATA(3 10 CMR 10.53(3)0)). GENERAL CONDITIONS 1. This Order of Conditions must be recorded in its entirety (all 8 pages) at the Essex County Registry of Deeds or the Land Court for the district in which the land is located, after the expiration of the 10-day appeal period and within 30 days of the issuance. A copy of the recording information must be submitted to the Salem Conservation Commission before any work approved in this Order commences. 2. Approval of this application does not constitute compliance with any law or regulation other than M.G.L Chapter 131, Section 40, Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands Protection Ordinance, Salem Code Chapter 50. 3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No alteration of wetland resource areas or associated buffer zones, other than that approved in this Order, shall occur on this property without prior approval from the Commission. 4. Prior to any work commencing, a sign shall be displayed showing DEP File #64-549, and not placed on a living tree. 5. No work approved in this Order may commence until the ten(10)business day appeal period has lapsed from the date of the issuance of this Order. t t Attachment to Order of Conditions N 64-549 F' Page J of 8 6. With respect to this Order,the Commission designates the Conservation Agent as its agent with powers to act on its behalf in administering and enforcing this Order. 7. The Commission or its Agent,officers,or employees shall have the right to enter and inspect the property at any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131, Section 40,the Wetlands Regulations 310 CMR 10.00, and shall have the right to require any data or documentation that it deems necessary for that evaluation. 8. The term"Applicant'as used in this Order of Conditions shall refer to the owner,any successor in interest or successor in control of the property referenced in the Notice of intent,supporting documents and this Order of Conditions. The Commission shall be notified in writing within 30 days of all transfers of title of any portion of the property that takes place prior to issuance of the Certificate of Compliance. 9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and approvals associated with this project. These permits may include but are not necessarily limited to the following: (1) Section 404 of the Federal Water Pollution Control Act(P.L.92-500, 86 stat. 816),U.S. Army Corps of Engineers. (2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00. (3) Sewer Extension Permit from the DEP Division of Water Pollution Control under G.L.Ch. 21A ss7 and 314 CMR 7.00. Any Board of Health permit for septic system design for any portion of the septic system within 100 feet of wetlands shall be submitted to the Commission prior to construction initiation. (4) Design Requirements for Construction in Floodplains under the State Building Code(780 CMR 744.). 10. If there are conflicting conditions within this Order,the stricter condition(s) shall rule. 11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters during construction or after completion of the project. 12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods and boundary during construction if necessary. 13. The Commission reserves the right to impose additional conditions on portions of this project or this site to mitigate any actual or potential impacts resulting from the work herein permitted. 14. The work shall conform to the following plans and special conditions. Where there is inconsistency among plans below,the most recently revised plan shall stand for the elements of the project which it includes. Final Approved Plans 1.Definitive Subdivision Plans Osborne Hills 2. Stormwater Manaeement Plan 3.Wetland Replication Plan (Title) May 8 2006 November 2005, April 12, 2006(respectively) (Dated) Christopher R. Mello&Clayton A. Morin(Eastern Land Survey Associates, Inc.) Attachment to Order of Conditions# 64-549 � p Page I of 8 L(vr�f. (Signed and Stamped by) City of Salem Conservation Commission (On file with) Revision Plan, Osborn Hills, Salem, Massachusetts,Plan &Profile—Stormwater Facilities, Amanda Way to Open Space C (including"Buffer Zone Restoration Notes"and"Plant List") (Title) September 29 2011 (Dated) Christopher R Mello &Clayton A. Morin(Eastern Land Survey Associates, Inc.) (Signed and Stamped by) City of Salem Conservation Commission (On file with) Site Development Permit Plan located in Salem, Mass. (Title) June 7,2013 (Dated) Christopher R Mello &Clayton A. Morin (Eastern Land Survey Associates, Inc.) (Signed and Stamped by) City of Salem Conservation Commission (On file with) 15. Any proposed changes in the approved plan(s)or any deviation in construction from the approved plan(s)shall require the applicant to file a Notice of Project Change with the Commission. The Notice shall be accompanied by a written inquiry prior to their implementation in the field, as to whether the change(s) is substantial enough to require filing a new Notice of Intent or a request to correct or amend this Order of Conditions. A copy of such request shall at the same time be sent to the Department of Environmental Protection. 16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has been issued,the applicant or current landowner shall submit to the Commission a statement signed by the buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of the Order of Conditions. 17. Condition#52 as indicated shall continue in force beyond the Certificate of Compliance, in perpetuity, and shall be referenced to in all future deeds to this property. 18. Approved wetland resource alteration and replication shall be performed according to the"Alteration and Replication of Vegetated Wetland"conditions of this Order. PRIOR TO CONSTRUCTION Attachment to Order of Conditions N 64-549 e "g Page', of 8 19. Prior to the commencement of any activity on this site,the applicant or current landowner shall designate a qualified representative,who shall inspect and direct the maintenance of all erosion and sedimentation control measures on site and ensure compliance with this Order of Conditions. Contact information for the qualified representative shall be forwarded to the commission. 20. Prior to the commencement of any activity on this site other than activities listed above,there shall be a Pre-Construction Meeting between the project supervisor, the contractor responsible for the work,and a member of the Conservation Commission or its Administrator to ensure that the requirements of the Order of Conditions are understood. The staked erosion control line shall be adjusted, if necessary,during the pre-construction meeting. Please contact the Conservation Commission Agent at(978)745-9595 ext 311 at least forty-eight(48)hours prior to any activity to arrange for the pre-construction meeting. 21. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The Commission and/or its Agent shall inspect and approve such installation at the pre-construction meeting. 22. No clearing of vegetation, including trees,or disturbance of soil shall occur prior to the pre-construction meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre- construction meeting if absolutely necessary in order to place erosion control stakes where required. 23. There shall be an adequate amount of erosion controls under cover on the site to be used only for emergency erosion control. EROSION CONTROL 24. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction, and shall be maintained during construction in the wetland areas and buffer zones. The erosion control specifications provided in the Notice of Intent and the erosion control provision in the Order will be the minimum standards for this project; the Commission may require additional measures. and excavated material shall be stock 25. All debris, fill and a location far enough away from the wetland P resource areas to prevent sediment from entering wetland resource areas. 26. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 27. The area of construction shall remain in a stable condition at the close of each construction day. 28. Any de-watering of trenches or other excavation required during construction shall be conducted so as to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered through hay bale sediment traps, silt filter bags or other means approved by the Commission or its Administrator. 29. Within thirty (30) days of completion of construction on any given portion of the project,all disturbed areas in the completed portion of the site shall be permanently stabilized with rapidly growing vegetative cover, using sufficient top soil to assure long-term stabilization of disturbed areas. 30. If soils are to be disturbed for longer than two(2) months, a temporary cover of rye or other grass should be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth, exposed surface shall be stabilized by other appropriate erosion control measures,firmly anchored, to prevent soils from being washed by rain or flooding. Attachment to Order of Conditions k 64-549 s .'. Page of 8 DURING CONSTRUCTION 31. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all times when work is in progress. 32. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on the approved plan(s). 33. All waste products,grubbed stumps,slash;construction materials,etc. shall be deposited at least 100 feet from,wetland resource areas and 200 feet from rivers. 34. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be immediately removed. 35. All exposed sub-soils shall be covered by a minimum of three(3)inches of quality screened loam topsoil prior to seeding and final stabilization. 36. Immediately following drainage structure installation all inlets shall be protected by silt fence, haybale barriers and/or silt bags to filter silt from stormwater before it enters the drainage system. 37. There shall be no pumping of water from wetland resource areas. 38. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other components shall be fixed immediately. 39. During construction,all drainage structures shall be inspected regularly and cleaned as necessary. 40. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance of enforcement actions by the Conservation Commission including, but not limited to,civil administrative penalties under M.G.L Chapter 21A, section 16. ALTERATION AND REPLICATION OF VEGETATED WETLAND 41. Prior to the Pre-Construction Meeting and commencement of any activity on this site,the applicant or current landowner shall provide the Commission with the name of a qualified"Wetlands Specialist' experienced in wetland replication who shall be present on site to direct and supervise the replication work. 42. Prior to the Pre-Construction Meeting and commencement of any activity on this site,the borders of both the wetland resource area(s)to be altered and the replication area(s)shall be clearly delineated by grade stakes set in place by field survey. 43. Prior to any alteration of wetland resource area, the wetland replication area(s)shall be constructed per the approved wetland replication site plan and wetland replication methodology. The wetland replication area shall be excavated in the location and to the size and elevation indicated on the approved wetland replication site plan. 44. Following construction of the wetland alteration and replication areas and prior to any other work on site, the Wetlands Specialist shall certify in writing to the Commission that all the wetland alteration and replication work has been performed in compliance with the Order of Conditions. 45. If the wetland replication area does not exhibit at least fifty(50%)percent coverage of indigenous wetland indicator species by the end of the first growing season, the applicant shall supplement the plantings with indigenous wetland indicator species obtained via transplantation from adjacent wetland areas or from a nursery specializing in the propagation of wetland plants. „ Attachment to Order of Conditions k 64-549 Page A of 8 46. The Wetland Specialist shall monitor the soil horizons and depths,plant community composition and structure,and hydrology of the wetland replication area. Monitoring inspections shall occur in June and September for two complete growing seasons following completion of construction. Copies of the documentation for each monitoring inspection shall be submitted to the Commission immediately following each inspection Monitoring shall continue beyond that date if the wetland replication area does not exhibit at least seventy-five(75%) percent coverage of indigenous wetland indicator species at the end of the second complete growing season. 47. In the event that the wetland replication area does not meet the Performance Standard for wetland replication as set forth in Section M.55(4)(b)(I-7)of the Massachusetts Wetlands Protection Act p n Contingency Plan in writing to the ' list shall submit a wetland replicatto g Y Regulations,the Wetland Specialist Commission. The Contingency Plan shall describe proposed measures(such as additional plantings and/or regulations.The changes in grading)designed to bring the replication area into compliance with said re g Contingency Plan shall not be implemented until it has been reviewed and approved by the Commission or its Administrator. AFTER CONSTRUCTION 48. Upon completion of construction and final soil stabilization of the entire subdivisions(all ten phases), the applicant shall submit the following to the Conservation Commission to request a Certificate of Compliance(COC): (1) A Completed Request for a Certificate of Compliance form(WPA Form 8A or other form if required by the Conservation Commission at the time of request). (2) A letter from a Registered Professional Engineer certifying compliance of the property with this Order of Conditions. (3) An"As-Built” plan signed and stamped by a Registered Professional Engineer or Land Surveyor showing post-construction conditions within all areas under the jurisdiction of the Massachusetts Wetlands Protection Act. This plan shall include at a minimum: (a) All wetland resource area boundaries with associated buffer zones and regulatory setback areas taken from the plan(s)approved in this Order of Conditions; (b) Locations and elevations of all stormwater management conveyances, structures and best management designs, including foundation drains,constructed under this Order within any wetland resource area or buffer zone; (c) Distances from any structures constructed under this Order to wetland resource areas- "structures" include,but are not limited to,all buildings,septic system components,wells, utility lines,fences, retaining walls,and roadstdriveways; (d) A line delineating the limit of work-"work" includes any filling,excavating and/or disturbance of soils or vegetation approved under this Order; (e) Wetland resource replication areas constructed under this Order. (4) A letter from a qualified Wetlands Specialist certifying compliance with the wetland replication requirements set forth below under Wetland Alteration. 49. When issued, the Certificate of Compliance must be recorded at the Essex County Registry of Deeds and a copy of the recording submitted to the Salem Conservation Commission. 50. If the completed work differs from that in the original plans and conditions, the report must specify how the work differs; at which time the applicant shall first request a modification to the Order. Only upon v- - , Attachment to Order of Conditions N 64-549 a Page of 8 review and approval by the Commission, may the applicant request in writing a Certificate of Compliance as described above. 51. Erosion control devices shall remain in place and properly functioning until all exposed soils have been stabilized with final vegetative cover and the Conservation Commission and/or its Administrator has authorized their removal. PERPETUAL CONDITIONS 52. All drainage structures/detention basins shall be maintained as outlined in the approved Stormwater Management Plan(dated November 2005), and shall be the responsibility of the applicant/property owner. The City may take responsibility for maintenance of any said structures upon acceptance for the subdivision's roadways. ADDITIONAL CONDITIONS 53. The approved erosion control measures shall also delineate the limit of work line,except in approved wetland filling and replication areas. .54 Any dewatering activities on the project site in which water will be released to wetland resource areas shall make use of a settling basin or similar device to remove sediment before water is discharged. 55. Upon the completion of Phases One and Two of the Osborne Hills Subdivision Phasing Plan, the applicant shall Reggr� - :Iartial Certificate of Compliance and submit the required documentation as outline,: .bier Construction Section of this Order. The Commission or its Agent shall inspect the site to determine compliance with Phase One and Two approved pp d hems. The a not commence with an t applicant shall y other work until a Partial arttal Certificate of Compliance has been issued. have been satisfactorilycompleted the applicant, If items P pp cant shall submit Phase Three,Four and Five items outlined in the approved "'n ;ridual Phase P - re construction Conference Document for review and approval. At the Commis.' iiscretion, it can Amend the Order of Conditions to issue additional conditions it feels is necu, ,,.ry for Phase Three, Four,and Five of the.project. No work shall commence on site until the Commi ,ion has reviewed/approved the next Phase Items.and issued a Notice to Proceed or issued an Amended Order of Conditions for Phases Three, Four, and Five. Phases Six, Seven, Eight, Nine, and Ten each stand alone as separate phases and work cannot proceed in any of the phases until the required documentation as outlined above in the After Construction Section of this Order has been submitted for the previous phase, the Commission or its Agent has inspected the site and determined compliance with the approved items for the phase,a partial certificate of Compliance has been issued for the previous phase, and an "Individual Phase Pre-construction Conference Document" has been submitted for review and approval by the Commission or its Agent. 56. The Osborne Hills Drive and Amanda Way culverts and associated wetlands alteration and replication, as shown on Site Development Permit Plan Located in Salem, Mass., dated June 7, 2013, shall be completed as part of Phase Two. 57. The silt fence on sheet of the above-referenced plan,Site Development Permit Plan located in Salem, Mass., dated 6/7/13, shall be entrenched 6", rather than 3"as shown on plan. 58. Wetland markers shall be posted in locations in which roadways or trails are likely to bring foot traffic near natural or replicated wetlands. Type, location, and number of markers shall be proposed by the applicant's wetlands scientist and reviewed and approved by the Conservation Agent. Attachment to Order of Conditions N 64-549 Page j of 8 59. The long-term inspection and maintenance of culverts required to be completed twice annually per Amendment No. 1, Operation and Maintenance Plan dated May 2013, shall be conducted in May and November. The bullet stating"Inspect culvert bottom and clean if a clear height of less than 3—8 inches is observed" is clarified to state "less than 3"to 8". 60. Boardwalk materials must be approved by the Conservation Agent prior to boardwalk construction. 61. For all wetlands alteration associated with construction of culverts shown in Site Development Permit Plan located in Salem, Mass. (617113), a ratio of 1.5:1 wetlands replication to wetlands alteration must be achieved within two growing seasons. AMENDMENT NO. 1 OPERATION AND MAINTENANCE PLAN PROPOSED STORMWATER MANAGEMENT FACILITIES STRONGWATER CROSSING (OSBORNE HILLS) SALEM, MASSACHUSETTS MAY, 2013 E. Box Culverts 1. During Construction a. Inspect box culverts quarterly • Ensure that no scour or movement of rip rap at the inlet and outlet of the culvert has occurred • Remove any buildup of sediment debris or brush at the inlet and outlet ends of the culvert • Inspect trash grates to ensure that they are secured in place • Inspect culvert bottom and clean if a clear height of less than 3 — 8 inches is observed. 2. Long Term _ P ' a. Perform above inspection and maintenance activities at least twice annually. CITY OF SALEM CONSERVATION COMMISSION CONFIRMATION OF HAND DELIVERY Document: Osborne Hills Order of Conditions, DEP #64-549 Recipient: Signature• Date: I I TABLE A RESOURCE AREA IMPACTS OSBORNE HILLS SUBDIVISION, SALEM,MA JUNE 2013 Location Proposed Proposed 2013 Proposed 2013 Proposed Alteration(SF) Replication(SF) Alteration of BVW Replication Amanda Way 0 + 90 to 1 + 35 320 950 1,700 6,340 Diandra Drive 1 + 76 to 2 + 18 320 800 320 800 Osborne Hill Drive 14+ 88 to 15 + 54 510 1,000 1,340 See Amanda Way Replication Area (6,340 sf) Strongwater Drive I + 60 to 2 + 20 320 750 320 750 Strongwater Drive 10+26 to 12+ 06 640 1,900 640 1,900 Osborne Hill Drive I + 85 to 2 + 50 1,470(not BV W) Included 0 0 in above Not Req ILSF TOTALS: 3,580 5,400 4,320 9,790 TABLE A RESOURCE AREA IMPACTS OSBORNE HILLS SUBDIVISION SALEM, MA TABLE A—2004 NOI TABLE A—PROPOSED Location Proposed Proposed 2013 Proposed 2013 Proposed Alteration(SF) Replication(SF) Alteration ofBVW(SF) Replication(SF) Amanda Way 0+ 90 to 1 + 35 320 950 1,750 4,000* Diandra Drive 1 + 76 to 2 + 18 320 800 320 800 Osborne Hill Drive 14 + 88 to 15 + 54 510 1,000 1,680 4,000* Strongwater Drive 1 + 60 to 2 + 20 320 750 320 750 Strongwater Drive 10+ 26 to 12+ 06 640 1,900 640 1,900 Osborne Hill Drive 1 + 85 to 2 + 50 1,470 (not BVW) Included 0 0 in above Not Req ILSF TOTALS: 3,580 5,400 4,710 11,450 3/ �D *As distributed over 3 replication areas �� Tom Devine From: Gregory M. St. Louis <gregstlouis@gmail.com> Sent: Wednesday, April 24, 2013 4:01 PM To: Tom Devine Subject: Strongwater Crossing Good Afternoon Tom, A couple comments on Strong Water Crossing which you may want to relay to the applicant if appropriate: Replication Area C is bounded by a proposed pedestrian path to the northwest. Is this a raised crossing that requires drains to the existing stonewall? Additionally it appears there may be some shallow to bedrock inthis area as well as a 6 foot grade change over its length. Confirmation or alternative areas may be warranted. Confirm replication areas to be hydro-logically connected. Verify that 4' x 8' is an interior dimension on the box culverts. Hows does the Replication Area A effect the development of Lot 15? Will the interior culvert bed remain in its natural state or will it be reconstructed? The existing grade of the Osborne Street Crossing appears to rise above the footing, reducing the capacity of the culvert by up-to 50%. Please verify. Provide details of culvert inlet and outlet at retaining walls to ensure the walls is not undermined. Erosion control detail should be revised to depict "STRAW" bales, not hay-bales, if necessary. Depth of trenched siltation fence should be 6-inches. Thank you, Gregory M. St. Louis, PE Salem Conservation Commission Member t AFFIDAVIT OF SERVICE City of Salem provision M.G.L., Chapter 39, Section 23D. (For a City Councilor, Board, or Commission Member, to sign upon listening to the audio of a missed meeting and examining all evidence.) Per the City of Salem provision M.G.L., Chapter 39 Section 23D, I, �`�w� hereby certify under the pains and penalties of perjury that I have examined all evidence pertaining to Osborne Hills Subdivision Notice of Intent, DEP #64-549 which was distributed at the single missed session on 5/23/13 , which evidence included an audio recording of the missed session. This certification was submitted prior to the undersigned's participation in a vote on the matter and shall become part of the record of the hearing. Name: Date: (0 Board or Co Sion: Salem Conservation Commission m Massachusetts Department of Environmental Protection Provided by MessDEP: Bureau of Resource Protection -Wetlands MassDEP File Number WPA Form 3 - Notice of Intent `' Massachusetts Wetlands Protection Act M.G.L. c. 131, 40 DocumentTransaction Number § Salem cityrrown Important: When filling out A. General Information forms on the computer,use 1. Project Location (Note: electronic filers will click on button to locate project site): only the tab key to move your Amanda Way-Osborne Hill Drive Salem 01970 cursor-donot use the return a.Street Address b.City/Town c.Zip Code key' Latitude and Longitude: 42-30-27 70-5045 d.Latitude e.Longitude � 9 1 f.Assessors Map/Plat Number g.Parcel/Lot Number 2. Applicant: a.First Name b.Last Name Note: Osborne Hills Realty Trust Before c.Organization completing this P.O. Box 780 form consult your local d.Street Address Conservation Lynnfield MA 01940 Commission e.Cityrrown f.State g.Zip Code regarding any 781_844_7026 municipal bylaw or ordinance. h.Phone Number i.Fax Number j.Email Address 3. Property owner(required if different from applicant): ❑ Check if more than one owner a.First Name b.Last Name c.Organization d.Street Address - e.City/Town f.State g.Zip Code h.Phone Number i.Fax Number j.Email address 4. Representative(if any): Attorney John R. Keilty a.First Name b.Last Name c.Company 40 Lowell Street d.Street Address Peabody' MA' 01960 e.Cityrrown f.State g.Zip Code 978-531-7900 h.Phone Number i.Fax Number j.Email address 5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form): 1,000.00 487.50 512.50 a.Total Fee Paid b.State Fee Paid a City/Town Fee Paid wpaform3.doc•rev.1/3/2013 Page 1 of 8 Massachusetts Department of Environmental Protection Prov idedbyMassDEP: Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 3 - Notice of Intent D . Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 'Salem city/rown A. General Information (continued) 6. General Project Description: Construction of two culverts 7a. Project Type Checklist: 1. ❑ Single Family Home 2. ® Residential Subdivision 3. ❑ Limited Project Driveway Crossing 4. ❑ Commercial/Industrial 5. ❑ Dock/Pier 6. ❑ Utilities 7. ❑ Coastal Engineering Structure 8. ❑ Agriculture (e.g., cranberries,forestry) 9. ❑ Transportation 10. ❑ Other 7b. Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 (coastal)or 310 CMR 10.53 (inland)? 1. ❑ Yes ® No If yes, describe which limited project applies to this project: 2.Limited Project 8. Property recorded at the Registry of Deeds for Essex South N/A a.County b.Certificate#(if registered land) 17388 313 c.Book d.Page Number B. Buffer Zone & Resource Area Impacts (temporary & permanent) 1. ® Buffer Zone Only—Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland, Inland Bank, or Coastal Resource Area. 2. ❑ Inland Resource Areas (see 310 CMR 10.54-10.58; if not applicable, go to Section B.3, Coastal Resource Areas). Check all that apply below. Attach narrative and any supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. For all projects affecting other Resource Area Size of Proposed Alteration Proposed Replacement(if any) Resource Areas, please attach a narrative a. ❑ Bank 1.linear feet 2.linear feet explaining how the resource b. ® Bordering Vegetated 3,430 sq ft 8,000 sq ft area was Wetland 1.square feet 2.square feet delineated. c. ❑ Land Under 1.square feet 2.square feet Waterbodies and Waterways 3.cubic yards dredged wpaform3.doc•rev. 1/3/2013 Page 2 of 8 Massachusetts Department of Environmental Protection Providedby MassDEP: Bureau Of Resource Protection - Wetlands MassDEP File Number WPA Form 3 - Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Saiem dity/Town B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont'd) Resource Area Size of Proposed Alteration Proposed Replacement(if any) d. ❑ Bordering Land Subject to Flooding 1.square feet 2.square feet 3.cubic feet of flood storage lost 4.cubic feet replaced e. ❑ Isolated Land Subject to Flooding 1.square feet 2.cubic feet of flood storage lost 3.cubic feet replaced f. ❑ Riverfront Area 1.Name of Waterway(if available) 2.Width of Riverfront Area(check one): ❑ 25 ft. - Designated Densely Developed Areas only ❑ 100 ft. -New agricultural projects only ❑ 200 ft. -All other projects 3.Total area of Riverfront Area on the site of the proposed project: square feet 4. Proposed alteration of the Riverfront Area: a.total square feet b.square feet within 100 ft. c.square feet between 100 ft.and 200 ft. 5. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes❑ No s.Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes❑ No 3. ❑ Coastal Resource Areas: (See 310 CMR 10.25-10.35) Check all that apply below. Attach narrative and supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online Users: Include your Resource Area Size of Proposed Alteration Proposed Replacement (if any) document transaction number a. F-1Designated Port Areas Indicate size under Land Under the Ocean, below (provided on your receipt b. ❑ Land Under the Ocean 1.s uare feet page)with all q _supplementary information you 2.cubic yards dredged submit to the Department. c. ❑ Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below d. ❑ Coastal Beaches 1.s quare feet 2.cubic yards beach nourishment e. ❑ Coastal Dunes 1.square feet 2.cubic yards dune nourishment, wpaform3.doc•rev. 1/3/2013 Page 3 of 8 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands ,,MassDEP File Number, ., 1 WPA Form 3 - Notice of Intent _ Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number Salem Cityrrown B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont'd) Size of Proposed Alteration Proposed Replacement(if any) f. ❑ Coastal Banks 1.linear feet g. ❑ Rocky Intertidal Shores - 1.square feet h.❑ Salt Marshes 1.square feet 2.sq ft restoration,rehab.,creation L ❑ Land Under Salt Ponds 1.square feet 2.cubic yards dredged j. ❑ Land Containing Shellfish 1.square feet k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above 1.cubic yards dredged I. ❑ Land Subject to Coastal Storm Flowage 1.square feet 4. ❑ Restoration/Enhancement If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional amount here. a.square feet of BVW b.square feet of Salt Marsh 5. ❑ Project Involves Stream Crossings a.number of new stream crossings b.number of replacement stream crossings C. Other Applicable Standards and Requirements Streamlined Massachusetts Endangered Species ActlWetlands Protection Act Review 1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and Endangered Species Program (NHESP)?To view habitat maps, see the Massachusetts Natural Heritage Atlas or go to http://www.mass.gov/dfwele/dfw/nhesp/regulatory review/priority habitat/online viewer.htm. a. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife 2006 100 Hartwell Street, Suite 230 b.Date of map West Boylston, MA 01583 wpaform3Aoc•rev. 1/3/2013 - Page 4 of 8 Massachusetts Department of Environmental Protection Provided by MassoEP: . Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 3 - Notice of Intent Ll Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem Cityrrown C. Other Applicable Standards and Requirements (corl If yes, the project is also subject to Massachusetts Endangered Species Act(MESA) review(321 CMR 10.18). To qualify for a streamlined, 30-day, MESANVetlands Protection Act review, please complete Section CA.C, and include requested materials with this Notice of Intent (NOI); OR complete Section C.1.d, if applicable. If MESA supplemental information is not included with the NOI, by completing Section 1 of this form, the NHESP will require a separate MESA riling which may take up to 90 days to review(unless noted exceptions in Section 2 apply, see below). 1. c. Submit Supplemental Information for Endangered Species Review' 1. ❑ Percentage/acreage of property to be altered: (a)within wetland Resource Area percentage/acreage (b)outside Resource Area percentage/acreage 2. ❑ Assessor's Map or right-of-way plan of site 3. ❑ Project plans for entire project site, including wetland resource areas and areas outside of wetlands jurisdiction, showing existing and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work**" (a)❑ Project description (including description of impacts outside of wetland resource area& bufferzone) (b) ❑ Photographs representative of the site (c)❑ MESA filing fee (fee information available at: http://www.mass.gov/dfwele/dfw/nhesplregulatory review/mesa/mesa fee schedule.htm). Make check payable to"Commonwealth of Massachusetts- NHESP" and may to NHESP at above address Projects altering 10 or more acres of land, also submit., (d)❑ Vegetation cover type map of site (e)❑ Project plans showing Priority& Estimated Habitat boundaries d. OR Check One of the Following 1.❑ Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14, http://www.mass.gov/dfwele/dfw/nhesp/regulatorV review/mesa/mesa exemptions.htm; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.) 2.❑ Separate MESA review ongoing. a.NHESP Tracldng# b.Date submitted to NHESP `Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review(see http://www.mass.gov/dfwele/dfw/nhesp/nhesp.htm, regulatory review tab). Priority Habitat includes habitat for state-listed plants and strictly upland species not protected by the Wetlands Protection Act. "MESA projects may not be segmented (321 CMR 10.16).The applicant must disclose full development plans even if such plans are not required as part of the Notice of Intent process. wpaformIcloc•rev. 1/3/2013 Page 5 of 8 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands '/�,p/� Q MassDEP File Number , PA Form J — Notice of Intent Document Transaction Number LA Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 saiem' CWTown C. Other Applicable Standards and Requirements (cont'd) 3.❑ Separate MESA review completed. Include copy of NHESP"no Take" determination or valid Conservation &Management Permit with approved plan. 2. For coastal projects only, is any portion of the proposed project located below the mean high water line or in a fish run? a. ❑ Not applicable—project is in inland resource area only b.❑ Yes ❑ No If yes, include proof of mailing or hand delivery of NOI to either: South Shore-Cohasset to Rhode North Shore- Hull to New Hampshire: Island, and the Cape& Islands: Division of Marine Fisheries- Division of Marine Fisheries- Southeast Marine Fisheries Station North Shore Office Attn: Environmental Reviewer Attn: Environmental Reviewer 1213 Purchase Street-3rd Floor 30 Emerson Avenue New Bedford, MA 02740-6694 Gloucester, MA 01930 Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office. For coastal towns in the Southeast Region, please contact MassDEP's Southeast Regional Office. 3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? Online Users: a. ❑ Yes ® No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP Include your Website for ACEC locations). Note: electronic filers click on Website. document transaction b.ACEC number (provided on 4. Is any portion of the proposed project within an area designated as an Outstanding Resource Water your receipt (ORW)as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00? page)with all supplementary a. ❑ Yes ® No information you submit to the 5. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Department, Restriction Act (M.G.L. c. 131, §40A) or the Coastal Wetlands Restriction Act(M.G.L. c. 130, § 105)? a. ❑ Yes ® No 6. Is this project subject to provisions of the MassDEP Stormwater Management Standards? a. ® Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR 10.05(6)(k)-(q)and check if: 1.❑ Applying for Low Impact Development (LID)site design credits (as described in Stormwater Management Handbook Vol.2, Chapter 3) 2.❑ A portion of the site constitutes redevelopment 3.❑ Proprietary BMPs are included in the Stormwater Management System. b.❑ No. Check why the project is exempt: 1.❑ Single-family house wpaform3.doc•rev. 1/3/2013 Page 6 of 8 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands Mas aDEP File Number WPA Form 3 - Notice of Intent Document Transaction NumberLl : Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem Cityrrown C. Other Applicable Standards and Requirements (cont'd) 2.❑ Emergency road repair 3.❑ Small Residential Subdivision(less than or equal to 4 single-family houses or less than or equal to 4 units in multi-family housing project)with no discharge to Critical Areas. D. Additional Information Applicants must include the following with this Notice of Intent (NOI). See instructions for details. Online Users:Attach the document transaction number(provided on your receipt page)for any of the following information you submit to the Department. 1.® USGS or other map of the area (along with a narrative description, if necessary)containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) 2. ® Plans identifying the location of proposed activities(including activities proposed to serve as a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure)relative to the boundaries of each affected resource area. 3. ❑ Identify the method for BVW and other resource area boundary delineations(MassDEP BVW Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology. See ORAD a. ❑ List the titles and dates for all plans and other materials submitted with this NOI. Site Development Permit Plan a.Plan Title Eastern Land Survey Associates, Inc. Christopher R. Mello, PLS b.Prepared By Clayton A. Morin, PE March 25, 2013 V,=20' d.Final Revision Date e.Scale f.Additional Plan or Document Title g.Date 5. ❑ If there is more than one property owner, please attach a list of these property owners not listed on this form. s.❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. 7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. s. ® Attach NO1 Wetland Fee Transmittal Form s. ❑ Attach Stormwater Report, if needed. wpaform3.doc•rev. 1/3/2013 Page 7 of 8 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands MassDEP File.Number WPA Form 3 - Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem City/Town E. Fees 1. ❑ Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form)to confirm fee payment: 018082 May 7, 2013 2.Municipal Check Number 3.Check date 018081 . May 7, 2013 4.State Check Number 5.Check date John R. Keilty, Esq. 6.Payor name on check:First Name 7.Payor name on check:Last Name F. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, §40. Notice must be made by Certificate of Mailing or in writing by hand delive ified mail (return receipt requested)to all abutters within 100 feet of the property line of the prof t locati M)6et4'Tl .Sign of Applicant 2.Date 3.tnature of Pr perty ent) 4.Date C—SigMalureof Re ive(if an 6.Da For Conservation Commission: Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents, two copies of the NO[Wetland Fee Transmittal Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery. For MassDEP: One copy of the completed Notice of Intent(Form 3), including supporting plans and documents, one copy of the NO]Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP Regional Office(see Instructions) by certified mail or hand delivery. Other: If the applicant has checked the"yes" box in any part of Section C, Item 3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. I I wpaform3.doc•rev. 1/3/2013 Page 8 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Important: A. Applicant Information When filling out forms on the 1. Location of Project: computer,use only the tab key Amanda Way-Osborne Hill Drive Salem to move your a.Street Address b.Ctty/Town cursor-do not use the return key,.. c.Check number d.Fee amount „�I I 2. Applicant Mailing Address: a.First Name b.Last Name Osborne Hills Realty Trust c.Organization P. O. Box 780 Lynnfield MA 01940 e.City/Town f.State g.Zip Code 781-844-7026 h.Phone Number i. Fax Number j.Email Address 3. Property Owner(if different): a.First Name b.Last Name c.Organization d.Mailing Address e.City/Town f.State g.Zip Code h.Phone Number I.Fax Number j.Email Address To calculate B. Fees filing fees,refer - to the category fee list and Fee should be calculated using the following process-&worksheet. Please see Instructions before examples in the filling out worksheet. instructions for filling out WPA Step lrrype of Activity: Describe each type of activity that will occur in wetland resource area and buffer zone. Form 3(Notice of Intent). Step 2/Number of Activities: Identify the number of each type of activity. Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions. Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2)times the fee per category (identified in Step 3)to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be multiplied by 1.5 and then added to the subtotal amount. Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4. Step 6/Fee Payments:To calculate the state share of the fee, divide the total fee in half and subtract$12.50.To calculate the city/town share of the fee, divide the total fee in half and add$12.50. noHeetl.dw•Welland Fee Tmnsmiaal Form-rev.10/17111 Page 1 of 2 l Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Fees (continued) Step 1/Type of Activity Step 2/Number Step Step 4/Subtotal Activity of Activities 3/Individual Fee Activity Fee Category 2G 2 500.00 1,000 Step 5/Total Project Fee: 1,000.00 Step 6/Fee Payments: Total Project Fee: 1,000.00 a.Total Fee from Step 5 State share of filing Fee: 487.50 b.1/2 Total Fee less$12.50 City/Town share of filling Fee: 512.50 c.12 Total Fee plus$72.50 C. Submittal Requirements a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to the Commonwealth of Massachusetts. Department of Environmental Protection Box 4062 Boston, MA 02211 b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and the city/town fee payment. To MassDEP Regional Office(see Instructions): Send a copy of the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these electronically.) noifeeH.doo•Wetland Fee Tmnsmi l Form•rev.10117/11 Page 2 of 2 DATE INVOICE AMOUNT 53-179 JOHN R.KEIL TY,ESQUIRE 1-13 Counselor at Law 0 40 LOWELL STREET _ 018081 PEABODY, MASSACHUSETTS 01960 PAMOUNT l - DOLLARS D TEJ TO THE ORDER OF bKUSbAMI. DESCRIPTIO NET AMOUNT - fi Eastern B-mk -Lynn, MA A ¢Eos1G iu3E 4 11.01808111' 1:0113017981: 60 004 891I' 3 JOHN R.KEILTY,ESQUIRE DATE INVOICE AMOUNT 113 53_179 Counselor at Law 40 LOWELL STREET O� 8082 PEABODY, MASSACHUSETTS 01960 8 PAMOUNT �C�' -- f5U[LARS PDATF .TO THE ORDER OE GROSS AMT. I DESCRIPTION . •-NEDAMOUNT. Eastern&-mk -Lynn, MA i R)ZEDsis FIE 11'0 1808 211' 1:0 1130 1 7981: 60 004 S 389R• i i h IlUb pe. I'M Professional Land Surveyors&Civil.Engineers ESSEX SURVEY SERVICE 1958- 1986 OSBORN PALMER 1911 - 1970 BRADFORD&WEED 1885- 1972 May 6, 2013 Salem Conservation Commission Salem City Hall Annex 120 Washington Street Salem,MA 01970 RE: F 12795 DEP FILE NO. 64-418 OSBORNE HILLS SUBDIVISION SALEM, MA Dear Commissioners: On behalf of Osborne Hills Realty Trust it is requested that the Salem Conservation Commission modify the existing Order of Conditions for the referenced subdivision to allow for the construction of reinforced precast concrete, open bottom, box culverts at Station 1+20 Amanda Way and Station 15+25 Osborne Hill Drive in lieu of the Bebo Arch Systems which were originally proposed and permitted to cross existing wetland resource areas. The wetland alternation impacts as were originally proposed in 2004 and as are now proposed, for the entire subdivision, are summarized in Table A, which accompanies this letter. Details of the proposed crossings and replication areas are depicted on the accompanying Site Development Permit Plan, dated March 25, 2013. The Amanda Way crossing is to be accomplished with a 4 foot high by 8 foot wide by 74 foot long open box culvert, set on precast concrete footing sections. The resultant wetland alteration of 1750 square feet (including the 592 square feet of area within the culvert)will be replicated by 4000 square feet within replication area C to be located west of Amanda Drive and Osborne Hill Drive. The culvert will exhibit an openness ratio of 0.43, which is in excess of the openness ratio of 0.25 required by the Massachusetts Stream Crossing Standards. 104 LOWELL STREET PEABODY, MASS. 01960 TELEPHONE: 978-531-8121 FAX: 978-531-5920 Page 2 May 6,2013 The Osborne Hill Drive crossing will be accomplished with a 4 foot high by 8 foot wide by 94 foot long open bottom culvert, constructed in the same manner as the Amanda Way crossing. The resultant wetland alteration of 1680 square feet, including the 752 square feet of area within the culvert, will be replicated by 4000 square feet of new resource area, as follows: Replication Area A: 850 square feet Replication Area B: 750 square feet Replication Area C: 2400 square feet An openness ration of 0.34 will result. Cross sections of the proposed culvert crossings as well as the Wetland Replication Plan which accompanied the original Notice of Intent are shown on Sheet 2 of the Plan. The original Order of Conditions which was issued in 2006, is recorded in Book 25909, Page 312. Please feel free to direct any questions to the undersigned. S7�?& Christopher R. Mello,PLS President CRM:lc Ba�4or�1 �+and ��poo� Q��o�tl�4o� �©oo Professional Land Surveyors&Civil Engineers ESSEX SURVEY SERVICE 1958- 1986 ' OSBORN PALMER 1911 - 1970 ` BRADFORD&WEED 1885- 1972 APR i 1 26 t :OMMLWTY DEVELOPMENN' March 26, 2013 Mr. Paul DiBiase P.O. Box 780 Lynnfield,MA 01940 RE: F 12795 STRONGWATER CROSSING SALEM,MA Dear Paul: Please find enclosed a copy of the Plans and correspondence for your review. Sincerely, Christopher R. Mello, PLS President CRM:lc Enclosures 104 LOWELL STREET PEABODY, MASS. 01960 TELEPHONE: 978-531-8121 FAX: 978-531-5920 Professional Land Surveyors & Civil Engineers ESSEX SURVEY SERVICE 1958- 1986 OSBORN PALMER 1911 - 1970 BRADFORD&WEED 1885- 1972 March 26, 2013 Salem Conservation Commission Salem City Hall Annex 120 Washington Street Salem,MA 01970 RE: F 12795 DEP FIL NO. 64-418 OSBORNE HILLS SUBDIVISION SALEM, MA Dear Commissioners: On behalf of Osborne Hills Realty Trust it is requested that the Salem Conservation Commission modify the existing Order of Conditions for the referenced subdivision to allow for the construction of reinforced precast concrete, open bottom,box culverts at Station 1+20 Amanda Way and Station 15+25 Osborne Hill Drive in lieu of the Bebo Arch Systems which were originally proposed and permitted to cross existing wetland resource areas. The wetland alteration impacts as were originally proposed in 2004 and as are now proposed, for the entire subdivision, are summarized in Table A, which accompanies this letter. Details of the proposed crossings and replication areas are depicted on the accompanying Site Development Permit Plan, dated March 25, 2013. The Amanda Way crossing is to be accomplished with a 4 foot high by 8 foot wide by 74 foot long open box culvert, set on precast concrete footing sections. The resultant wetland alteration of 1750 square feet (including the 592 square feet of area within the culvert)will be replicated by 4000 square feet within replication area C to be located west of Amanda Drive and Osborne Hill Drive. The culvert will exhibit an openness ratio of 0.43, which is in excess of the openness ratio of 0.25 required by the Massachusetts Stream Crossing Standards. The 104 LOWELL STREET PEABODY, MASS. 01960 TELEPHONE: 978-531-8121 FAX: 978-531-5920 Page 2 March 26, 2013 The Osborne Hill Drive crossing will be accomplished with a 4 foot high by 8 foot wide by 94 foot long open bottom culvert, constructed in the same manner as the Amanda Way crossing. The resultant wetland alteration of 1680 square feet(including the square feet of area within the culvert, will be replicated by 4000 square feet of new resource area, as follows: Replication Area A: 850 square feet Replication Area B: 750 square feet Replication Area C: 2400 square feet An openness ration of 0.34 will result. Cross sections of the proposed culvert crossings as well as the Wetland Replication Plan which accompanied the original Notice of Intent are shown on Sheet 2 of the Plan. The original Order of Conditions which was issued in 2006, is recorded in Book 25909, Page 312. Please feel free to direct any questions to the undersigned. Sincerely, /� vl AS Chris er R. Mello, PL President CRM:lc Ba�Qo�il �aad3oQoo� D��oc�t��4o� ��oo �11NIIlllllllillll{If11111fl�IIli11111111� : 2997109400347 9k;27234 Pg;873 i 10/0412007 12;50.00 OTHER P9.112 DECLARATION OF RESTRICTIVECOVENANT THIS DECLARATION OF RESTRICTIVE COVENANT ('Declaration') is;made this l day of Qc4-4eA,- 2007 by Paul DiBiase, Trustee of Osborne Hills Realty Trust uld/t dated July 7,2007 and recorded of Essex South Registry of Deeds at Book 16455, Page 100 ("Declarant"). WITNESSETH: WHEREAS,Declarant,is the owner in fee simple of those certain parcels of land located at Marlborough Road,Essex County,Massachusetts,with the buildings and improvements situated thereon,being shown as lots 1-131 on a subdivision plan entitled, "Definitive Subdivision Plan Osborne Hills Salem Massachusetts,"dated September 28,2004 and with a final revision date of May 8,2006,prepared by Eastern Land Survey Associates, Inc. and recorded with Essex South County Registry of Deeds in Plan Book 402,Plan 79(collectively, the"Property"); and WHEREAS,under theprovisionsof 314 CMR 4.04(3),adopted by the Department of Environmental Protection,a duly constituted agency established under the laws of the Commonwealth of Massachusetts("DEP"),Declarant is exempt from having to.obtain individual water quality certifications for the Property if Declarant imposes upon said Property a restrictive covenant limiting the amount of fill to less than 5,000 square feet cumulatively of bordering and isolated vegetated wetlands and land under water("Wetlands")for the single and complete project associated with development of the Property,where the discharge of dredged or fill' material is not to an Outstanding Resource Water; and WHEREAS, Dectarant desires to be exempt from having to obtain such individual water quality certifications for the Property; i NOW,THEREFORE.Declarant hereby voluntarily declares and imposes upon the Property,and any portion thereof,the following restrictive covenant for the benefit of Declarant- and his/her/its successors in interest to the Property and any portion thereof. " 1. Purpose. It shall be the intent and purpose of this Restrictive Covenant, pursuant to the provisions of 314'CMR 9.04(3), to restrict the cumulative total area of a discharge of dredged or fill material into Wetlands that may take place within the Property to less than 5,000 square feet, as set forth specifically in the Final Order of Conditions for the work within the Property that is subject to DEP File#064-0418 and issued pursuant to 310 CMR 10.00; 2. Binding Effect. The restrictive covenant and provisions herein set:forth shall run with the Property,and any portion thereof,and Shull inure to the benefit of and be binding upon Declarant and any other patty having an 'interestin the Property,or any portion thereof,or claiming to have an interest with respect to the Property; or any portion thereof, as tenants, invitees,licensees or otherwise, .and all of the respective heirs, successors, grantees, mortgagees, assigns, agents, contractors,subcontractors and employees of the foregoing. l -- u - a 3. Restrictive Covenant. Any and all discharges of dredged or fill material into Wetlands IQ situated within the Property shall not exceed a cumulative total of 2,100 square feet in area as set' forth in the Final Order of Conditions issued for the work within the Property that is subject to t4 DEP File#064-0418. Said 2,110 square foot limit of Wetlands fill may be apportioned among the respective lots comprising the Property but such apportionments shall not exceed the cumulative total of 2,110 square feet in area. The aforesaid restrictive covenant is hereby imposed pursuant to 314 CMR 9.04(3). ix 4. Enforceability. So long as Declarant or his/her/its successors in interest shall retain record title to any of the Property,Declarant and such successors in interest shall have the sole 6 authority and right to,and shall enforce the restrictive covenant herein set forth. Any person having the right to enforce the provisions hereof shall have the right to bring proceedings in law or in equity against any party or parties violating or attempting to violate the terms of this . 4j Declaration,to enjoin them from so doing,and to cause any such violation to be remedied,after providing written notice to such party or parties and all mortgagees of record. 5. Severabilitv. If any court or other tribunal determines that any provision of this : instrument is invalid or unenforceable,such provision shall be deemed to have been modified 't automatically to conform to the requirements for validity and enforceability as determined by m such court or tribunal.In the event the provision invalidated is of such anature that it cannot be so modified,the provision shall be deemed deleted from this instrument as though ithad never" been included herein. In either case,the remaining provisions of this instrument shall remain in x full force and effect. ra 6. IneMooration into Deeds Mortgages Leases and Instruments of Transfer. Declarant hereby agrees to incorporate this Declaration, in full or by reference, into all deeds, easements, mortgages, leases, licenses, occupancy agreements or any other instrument of transfer by which ° an interest in and/or a right to use the Property,or any portion thereof,is conveyed. x, f4 7. Term. The restrictive covenant and provisions herein set forth shall run with the Property,or any portion thereof,for a period of thirty(30)years from the date of recordation and/or registration,before which time said restrictive covenant and said provisions maybe } extended as provided by law. g 8. Recordation/Registration Declarant shall record and/or register this Declaration with the appropriate Registry of Deeds and/or Land Registration office within thirty(30) days of its date tr of execution and shall submit a certified Registry copy of the same to the appropriate regional office of DEP,within fourteen(14)'days of its date of recordation and/or registration; t r3 9. Amendment and Release. In the event this Declaration is amended and/or released, such amendment and/or release to become effective upon its recordation and/or registration with the r appropriate Registry of Deeds and/or Land Registration Office, a certified Registry copy of such ' amendment and/or release shall be submitted to the appropriate regional office of'DEP by qy Declarant within fourteen(14)days of the date of recordation and/or registration. a ,qt 5 5't 2 Ex, WITNESS the execution hereof under seal this day of be �e 4^ ,2007. Osborne Hills Realty Trust;by, /auliase,Trustee COMMONWEALTH OF MASSACHUSETTS 114 ,2007 SS ° j On this day, before me, the undersigned notary public,personally appeared Paul DiBiase, Trustee, proved to me through satisfactory ,_evidence of identification, which were k'P J�+<( Ytxdwto f'u to be the person whose name is signed on theproceed' document,and acknowledged to me that he signed it voluntarily for its stated purpose. Notary Public / /J Hz KGs a f My Commission Expires: 323/{2 - \O4\\NQg:\4�ts11*�/ �o�'�,� .. Q.*ORIF F r k� !3 3 k% it a h: I rt X F , ilu. .y Tom Devine From: Howard, Mike <mhoward@epsilonassociates.com> Sent: Thursday, May 09, 2013 8:38 AM To: jill.provencal@slate.ma.us Cc: Tom Devine; Merrill, Pamela (DEP) (pamela.merrill@state.ma.us); kevin.r.kotelly@usace.army.mil; Paul DiBiase (info@dibiasehomes.com); Paul DiBiase (pauldibiase21 @comcast.net) Subject: DEP File No. 064-0418, Osborne Hills Subdivision Attachments: DEP Restrictive Covenant0001.pdf Hi Jill, As we discussed last week I am providing this email as a follow up to our phone conversation and the email train below; 1. As requested by the Department, the Applicant (Paul DiBiase)will file a new Notice of Intent with the Salem Conservation Commission requesting an Order of Conditions that authorizes modified BVW access road crossing designs in two locations. As proposed, the total BVW alteration would increase from --2,100 s.f. to --3,850 s.f. 1 have confirmed through discussions with the Applicant that neither one of these crossings involves work in the ORW referenced in prior MEPA filings. Additional information describing proposed work will be included in the new Notice of Intent filing to be reviewed by the Commission. 2. Upon receipt of a Final Order of Conditions, and in lieu of an Individual 401 WOC, in accordance with 314 CMR 9.04(3)the Applicant will place a deed restriction on the property providing notice to subsequent purchasers limiting the amount of BVW fill for the single and complete project to less than 5,000 square feet (3,850 square feet of BVW fill). The Applicant will use the same covenant l deed restriction document that was previously reviewed and approved by the Department in 2006. The only change would be the increase in BVW fill from 2,100 s.f. to 3,850 s.f. and references to the new Final Order of Conditions. A copy of the previously approved covenant is attached to this email. I have asked my Client (Paul DiBiase—copied on this email) to have his attorney forward a final copy of the new covenant for your files as soon as it is ready and upon receipt of the referenced Final Order of Conditions. 3. 1 have spoken directly with the MEPA office (Rick Bourre, Assistant Director)and confirmed that additional MEPA review is not required for this proposed plan change. I will forward you a separate email on this topic for your files. 4 Lastly, the Client will provide the Corps with a Work Start Notification Form before conducting work in wetlands i waters of the U.S. The work will be performed under CAT I of the General Permit for Massachusetts in accordance with the special conditions referenced therein. If you require any additional information please do not hesitate to contact me at the number below or shoot me an emai!. As always, thank you for your assistance and guidance on this matter.We appreciate it. Thanks. Mike Michael Howard, PWS, CWS Principal& Mgr. Ecological Sciences Epsilon Associates, Inc. 3 Clock irr wer Pia;..:, Suitt; 25-0 Maynard, fa5s7 ? 978,4<1.1524.7 Epsivon: F,78.897.7100 mhowardre�.apsilonassociates.com hit?JS;(tti;.SG'r.COrY;1�4}5ilOnfi55C�C wwiA'.eUSiOna3SOCi8tU'S.GOtt1 1 ...._...... From: Provencal, Jill (DEP) [mailto iill.provencal(&state.ma.us] Sent: Tuesday, April 30, 2013 6:39 AM To: Tom Devine; Eastern Land Survey Cc: Merrill, Pamela (DEP); Kotelly, Kevin R NAE Subject: RE: DEP File No. 064-0418, Osborne Hills Subdivision Hi All, I was informed by MEPA that the submittal of a Notice of Project Change will be required to be filed with MEPA for these changes to the project. Thanks. Jill ........... From: Tom Devine [mailto:tdevine@Salem.com] Sent: Monday, April 29, 2013 8:32 AM To: Provencal, Jill (DEP); Eastern Land Survey Cc: Merrill, Pamela (DEP); Kotelly, Kevin R NAE Subject: RE: DEP File No. 064-0418, Osborne Hills Subdivision Jill, Thank'you for taking the time to review this submittal. i am forwarding to the applicant and the commission. Best, Tom Tom Devine, Conservation Agent/Staff Planner City of Salem Department of Planning & Community Development 120 Washington St„ 3rd Floor I Salem, MA 01970 (V)97B-619-5682I (F) 978-740-0404 tdevineAsalem.com I salem.com From: Provencal, Jill (DEP) [mailto 'illi provencalCalstate.ma.us] Sent: Monday, April 29, 2013 8:10 AM To: Tom Devine; Eastern Land Survey Cc: Merrill, Pamela (DEP); Kotelly, Kevin R NAE Subject: DEP File No. 064-0418, Osborne Hills Subdivision Hi, MassDEP received a copy of a request from the applicant to "modify" the existing Order of Conditions,for the above referenced project, in order to allow for the installation of open bottom, box culverts instead of the previously approved Bebo Arch systems at Amanda Way and Osborne Hill Drive. The proposed changes would alter an additional 1750 square feet of BVW in addition to the previously allowed alteration of approximately 2100 square feet of BVW. MassDEP has several concerns with this request. No provisions are provided in the Regulations which allow for the issuing authority to "modify" an OOC or SOC. Any proposed changes must be reviewed by the Commission in order to determine if the changes are allowable under an Amended CDC or require the filing of a new Notice of Intent. Under MassDEP Policy 85-4 "Relatively minor changes which result in the same or decreased impact on the interests protected by the Act are appropriate for amendments." Since it appears that the applicant is asking to increase impacts to BVW, it is MassDEP's opinion that the new proposal does not qualify for an Amended DOC. 2 t The applicant was also notified through MassDEP comments on the Notice of Intent and as provided through the MEPA process that the project was required to obtain either a 401 WQC or submit for review and approval a deed restriction. To date, MassDEP has not received an application for a 401 WQC or a copy of a draft deed restriction. On March 29, 2007, MEPA issued a Certificate on the Final EIR for this project. Since additional wetland impacts are now being proposed, the applicant is required to contact MEPA in order to obtain an opinion as to whether the filing of a Notice of Project Change (NPC) is necessary. If you have any questions concerning these comments please contact me at 978-694-3250. Thank you. Jill Jill Provencal MassDEP-NERO Wetlands Program 978-694-3250 (w) jit provencal(rilstate.ma.us Wetland Helpline 978-694-3405 3 Paul DiBiase From: Tom Devine ltdevine@Salem.coml Sent: Wednesday, April 24, 2013 4:02 PM To: DiBiase Corporation (pauldibiase2l@comcast.net) Subject: FW: Strongwater Crossing Paul, One of the Conservation Commissioners drafted questions and comments ahead of tomorrow's meeting. See below. Best, Tom Tom Devine, Conservation Agent/Staff Planner City of Salem Department of Planning & Community Development 120 Washington St., 3rd Floor I Salem, MA 01670 (V) 978-619-56821 (F)978-740-0404 tdevine(a)salem.com I salem.com From: Gregory M. St. Louis Sent: Wednesday, April 24, 2013 4:01 PM To: Tom Devine Subject: Strongwater Crossing Good Afternoon Tom, A couple comments on Strong Water Crossing which you may want to relay to the applicant if appropriate: Replication Area C is bounded by a proposed pedestrian path to the northwest. Is this a raised crossing that requires drains to the existing stonewall? Additionally it appears there may be some shallow to bedrock in this area as well as a 6 foot grade change over its length. Confirmation or alternative areas may be warranted. Confirm replication areas to be hydro-logically connected. Verify that 4' x 8' is an interior dimension on the box culverts. Hows does the Replication Area A effect the development of Lot 15? Will the interior culvert bed remain in its natural state or will it be reconstructed? The existing grade of the Osborne Street Crossing appears to rise above the footing, reducing the capacity of the culvert by up-to 50%. Please verify. Provide details of culvert inlet and outlet at retaining walls to ensure the walls is not undermined. Erosion control detail should be revised to depict "STRAW" bales, not hay-bales, if necessary. Depth of trenched siltation fence should be 6-inches. Thank you, Gregory M. St. Louis, PE Salem Conservation Commission Member t JOHN R. KEILTY, Counselor At Law Telephone (978) 531-7900 40 Lowell Street Facsimile (978) 531-2479 Peabody, MA 01960 E-Mail KeiltyLaw@verizon.net April 25, 2013 Via Email Conservation Commission City of Salem 120 Washington Street Salem, MA 01970 Attn: Tom Devine Re: DEP File No. 64-418 Dear Mr. Devine: Through you to the Conservation Commission of the City of Salem, I am attempting to address an issue that has come to our attention. I represent Paul DiBiase and Osborne Hills Realty Trust with respect to the filing of an Amendment to an Order of Conditions being DEP File No. 64-418. I have been made aware that a certain abutter has raised the question of whether or not the notice given to abutters by certified mail is in compliance with the regulations set forth in 310 CMR 10.00. My Affidavit states that notice was given on April 18, 2013 which is one week prior to tonight's hearing. The time stamp arranged by my office is April 18, 2013 and the post office stamped receipt is April 19, 2013. The issue of whether or not compliance with the notice requirements has been provided is within the determination of the Conservation Commission. In the event that the Conservation Commission feels that the April 19, 2013 is non-compliant, then my client would respectfully agree to a continuance of this matter until the next regularly scheduled meeting of the Conservation Commission which is May 9, 2013. If that is the desire of the Conservation Commission, then this office would mail via regular mail notices to each of the abutters on the list of the continuance date. Very truly yours, 7okn R: Keilty John R. Keilty, Esquire JRK/emb TABLE A RESOURCE AREA IMPACTS OSBORNE HILLS SUBDIVISION SALEM, MA TABLE A—2004 NOI TABLE A—PROPOSED Location Proposed Proposed 2013 Proposed 2013 Proposed Alteration(SF) Replication(SF) Alteration of BVW Replication Amanda Way 0+ 90 to I + 35 320 950 1,700 4,000 Diandra Drive 1 + 76 to 2 + 18 320 800 320 800 Osborne Hill Drive 14 + 88 to 15 + 54 510 1,000 1,340 4,000 Strongwater Drive 1 + 60 to 2 + 20 320 750 320 750 Strongwater Drive 10 + 26 to 12+ 06 640 1,900 640 1,900 Osborne Hill Drive 1 + 85 to 2 + 50 1,470 (not BVW) Included 0 0 in above Not Req ILSF TOTALS: 3,580 5,400 4,320 11,450 a 1 CORP 0 P II 018,PSE eabady q — owmwM�r "vo AGN or arY Lw - - - --- --- -- - -- -- ----- ---- - -- - -- - -- - --- ------ --- -- - --- - --- - -- - --- ---- -- ---- ----- ------ --- ------ <o O P E N `or `ter 0 v rJ < r Salelllm SPACE OPEN SPACE C m \ a <or FI t �'� `ter ,� <or� SHEET 6 t7 l '� SHEET 1$ o V `or `or •- INC'' � trL L > a `ter SHEET 20 ( S H E E 21 J!> � FIR F�R15 <orPHA 9 �`� / <o' b PHASE 6 \ 110 r� � '`►. C/Ty nor �� � � �• \ OF L lob 1� 4g D y g ` C TEMPORARY I CALDESAC( TYP <o \ .� PARCEL �, OPEN r `ori `or ( �o\ ?$0 Fr f S P C E F SHE= 4 0 '✓ ',s -`"�lyr r — OPEN SPACE C PHA 10 K WJY ` PHA _ / j 139 orr OAR / — �34f ,: , <q* torn ao► a y1♦ FROST <ai '•' <or',' 'o <Q $ rA' <or' `or `or <o\ I P N A 5 t39j p or s uo► for } A '•� 'mob ',. \ X16 Z05 o, PHASEt re, e• h < �► Yt DRIVE `or \ °��.� QNps� a 5 N HEET 4 IL {� `or 'w \ �,v ' R, 2° let <�r �, r SHEET 13 SHEET 10 ° SHEET i fl '©' `ter `ter r'q, 4' �' � ° p SHEET 7 ;, c q C Atfx� -OltSHEET16 �.% <ar E E T \ 2) 5 a E �* y o, tor„ Or P SE I (S H E E T 2 3) SHEET 9 <' . ► <o oPE sp ° q �or,Q f?4 for* forte lip .r SHEET 18 40), LOT n E I c 0 p f i 110' l U Y ° torr tortorr <or <or for♦ <orJqC <o`(4iy q T ♦ E/V(LANoi pl) Qfor ', CO.10 SEE CONDITION 16F OF THE PLANNING BOARD DECISION AS TO LOT 5 �. \ VFW ENC YqR for„r •� 1p �1' <aj� or CHANELLE s ockz/ e�' o �p f pLEARY O P orOr t q�ENT� -1 PHASING PLAN s 9 C ' OY \ 12_ E N S p to or,So j$ Q MESS/N� SHEET 3 *44,* ;° Qr ��d '° Z �' q ° f p EscHAUPs SHEET 12 DEFINITIVE SUBDIVISION PLAN 1'qusr SHEET 8 A SHEET 17 �e� OSS DRNE HILLS o� SALEM , MASSACHUSETTS SHEETS 3-11 ARE LOTTING PLANS KEY SHEET {341 SHEETS 12-20 ARE TOPOGRAPHIC PLANS �. � FM RlE�lRY UK owy {ssI �� SHEETS 21 -23 SHOW OPEN SPACE DESCRIPTIONS AND TOPOGRAPHY 09MlMiE OALS REALTY MW rFosltirn Land y Ilarot+., Ina DEMOTES PLAN & PROFILE SHEET NUMBERS SHEETS 24-39 ARE PLAN & PROFILES P!? am M Qrktwhw R. Me% P.L.& L wool" AMM Qpow W Lowobkm ofm f978) POINTE CHERYL La , CLERK OF THE CITY OF SALEM, MASS. APPROVED UNDER THE SUBDIVISION CONTROL LAMS jou 1140"Y CERIWY THAT THIS PLAN CONFORMS I, SALEM PLANNMfG BOARD sw r , TO TMS RULES AND REGULATKONS OF THE HEREBY CEPTIFY THAT THE NOTICE OF APPROVAL OF THIS PLAN �yG REGIS'11EilS OF DIM OF THE C IOMMONWEALTH BY THE SALEM PLANNING BOARD HAS BEEN RECEIVED AND RECORDED AT THIS OFFICE AND NO APPEAL WAS RECEIVEDOF illii!IIl!IACI*J9EM �" a DURING THE NEXT TWENTY DAY'S AFTER SUCH RECEIPT AND RECORDING OF SAID NOTICE. , OAA' �'+►a snrr� it F1 Z?Sts J1, 20M 3. AO 81 2006 z11EfT 2 OF 48 DATE A kv*9 I 11 100 WOOD BRIDGE 76 jos 88 72 / 1, 72 74 iso v i7886 / 15" RC 84 K / 1=82.74 W A a1 v \ 8274 STONEDUST ' 90 76 1733 — _ '"'• 78 EDGE WA1ER EL. 70.4 \ W° �, I I i / / / /g O/� STACKED STONE O P E N S P A C E F I I �/ \. w (TYPICAL)" - FOR REGIS TRY USE ONLY �,.4 i RETAINING WALL � � / / / � �\ a o W � OUTLET CONTROL STRUCTURE / HEREBY CERTIFY THIS PLAN ' J 1 AREA 3,2701 SF. I I � r��.� a CONC. R=e8.46 CONFORMS TO THE RULES AND REPLICATION i I / / / y I STONE o 2' ORIFICE 86.60 � aeDREGULATIONS OF THE REG/STERE �, �� I /� sl �� OF DEEDS OF THE COMMON— ' 78 76 74 �a s 72 70.7 70, IE70.8 74 / a 3 ��� rn WEAL T MA CHUS TTS. �7�9 a ,..3 72 l� �� I a� �� DoT 16 RETAINING WALL — INTERLOCKING CONCRETE BLOCKS �a � ��� -7 84 82 / s 86 pp j 94. \ Iti`r ` �� 12" RC -- � •�' \ 1=87.90 90 88 � J — / 92 94 f- HILL w W os :3 RNE . A/rA (2 ND o?' d A WA Y H L NOTES 1=74.1 1. SUBDIVISION PLAN BOOK 402 PLAN 79 2. THE HOUSES SHOWN ON THIS PLAN ARE DRAWN TO SHOW UTILITY LOCATIONS ONLY; THE LOCATION RELATIVE TO PROPERTY LINES MAY DIFFER. 3. SEWER AND WATER SERVICE STUBS PLOTTED FROM DATA PROVIDED BY OTHERS, OR FIELD SURVEY. 4. HOUSES AND SERVICE PEDESTALS SHOWN ARE CONNECTED 3Y UNDERGROUND WIRES OF ELECTRIC, TELEPHONE FIRE ALARM AND CABLE TELEVISION. \ 8 12" FLARED END 5. PROFILE OF WATER MAIN ASSUMES INSTALLATION AT 5' DEPTH,7 1=79.36 EXCEPT WHERE FIELD DATA EXISTS. STONE �_ c 80 RIPRAP go O I HEREBY CERTIFY THAT THE STONE BOUNDS _ ARE SET AS SHOWN. J DMH �ry 8q / CERTIFY THAT THE PROPERTY LINES SHOWN ARE EARTH BERM , G> / � OUTLET CONTROL STRUCTURE THE LINES DIVIDING EXISTING OWNERSHIP, AND THE -'Y— R=84.10 4" ORIFICE 80.34 LINES OF STREETS AND WAYS SHOWN ARE THOSE -- — r OF PUBLIC OR PRIVATE STREETS OR WAYS ALREADY B" ORIFICES 81.83 (2) 1 D OUTLET 12" RC I=80.17 ESTABLISHED AND NO NEW LINES FOR DIVISION OF Cey'Is EXISTING OWNERSHIP OR FOR NEW WAYS ARE SHOWN. I� II 86 // GIS T STMFN-TA S < FACILIT`( I I I I MANAGEMEN I { CHRISTOPHER R. MELLO PLS 12" FLARED END 1=84.00 \ C OSBORNE HILLS — AMANDA WAY 12" RC 5=0.05 � � -- � � ' DMH ` ; - -� STORMWATER MANAGEMENT FACILITIES R=94.40 I=90.61 eg AS BUILT I=84.9 DROP / �" .6 OPEN SPACE c '� PLAN OF LAND / / gory LOCATED IN LOT 19 DMH / SALEM , MASS . R=98.28 1=91.66 1=91.56 PREPARED 8Y 1-7 ' EASTERN LAND SURVEY ASSOCIATES, INC. 5'0 02 CHRISTOPHER R. MEL L 0, PLS 104 LOWELL ST. PEABODY, MA. 01960 EpSEl0l ' (978) 531 - 8121 ,�,� LOT T 20 , SCALE: 1 St = 20 SEPTEMBER 11 , 2014 12 RC � i 0 10 20 40 60 80 F- 1 2795 SHEET 4A _71W1 Q N LU I- LLJ li LI HEREBY CERTIFY THIS PLAN 2 CONFORMS TO THE RULES AND �i REGULATIONS OF THE REGISTER OF DEEDS OF THE COMMON— WEAL TN OF MASSACHUSETTS. LOT 31 LOT 30 SPACE LOT 29 LOT 28 i z �� B EXISTING o o I O No 7 STACKED BOULDER DWELLING N NO 8 No. 6 (TYPICAL) 8 No. 4 RETAINING WALLS No. 2 11 J V \ I I �gXO S Z I 104.11 112. 104.14 LOT 27 +� W ss�� I FOR REGISTRY USE ONL Y \ o n C F 0 z on aw NOTE: CURB OPENINGS 2sF� 0 E T. i ` D BUILT WITH 2 FT. E. T. E. .T. + wsc 0 13 A5O - - - - _ ROUNDINGS (TYPICAL) p 0 p 0 I 2 \ l ARM_ �w \��. ° o I T PULL 8 Qs� ' Oo C) 2CQ 0 —�---- smnuaPrat SFw sm e WG S=0.017 o \ Fq� tiF 6 w BA D 7+0 6+0 5+0 4�0 3+0 " q ? W- W- 9 ° GAS DD *so R=125.80 0 p 0 �H ?'AO GQr C.T. I 1-113.79 HYDRANT C . TRANS. E 8 SPINDLE w� v LOT 7 NO 9 I r z NO' 7 I ELEV. 121.22 No. 5 _Y Na. 3 k I I � WI D No. 1 I T LOT 6 I a ( LOT 4 `� LOT 2 D Q4 w LOT 3 I m 1 - - - - - rn o I LOT 1 I STORMWATER o,, qy MANAGEMENT �� !y s II I FACILITY ' 1 �D \ ° S 0 N I L- - - - - - J CC \ �" Swoo v FS 18^ RC OPEN SPACE- 0 D W4 1=126.02 A Ry G O RIPRAP R�'rl "'A'FC SIGN NEW ENGLAND POWER COMPANY 4 �, TRA�N POLE AL O IsiA/b�� SIGTRAF. SIG. ``L`(��l 703E PED �2 Sc. �f B• �� Rc 120 E � °�'c s sic. 8• Q ' O CONTROL NTRL PIANEL >' RC CRAIN S. `r inCki QCD � Ir1 • N LLO O �` N e J R ix R K R R — Z— {—p —p (p N m ti CC�tfQ m�? ftO p aN ¢ c�¢ c•v� —� o l CERTIFY THAT 711E PROPERTY LINES SHOWN ARE 1 1 O CD THE LINES DIVIDING EXIS77NG OWNERSHIP, AND THE LINES OF STREETS AND WAYS SHOWN ARE THOSE 9• OF PUBLIC OR PRIVATE STREETS OR WAYS ALREADY p ESTABLISHED AND NO NEW LINES FOR DIVISION OF EXISTING OWNERSHIP OR FOR NEW WAYS ARE SHOWN. IL W cFNreR 8 N • o n min OVC DRA INS /S�g10 m N Q C(06 ai cu N n= al CHRISTOPHER R. MELLO PLS N N N R "� I STORMWATER o 100 in cr MANAGEMENT FACILI• IT 9+0 8+0 7+0 1 v E N 0 R. PVC SEWER O_ 12" RC DRAIN S=0.006 „ ui — g N ern S,D OSBORNE HILLS OSBORNE HILL DRIVE 0 SMH SEWER MANHOLE a�i w o I$$ 022 I Q STATION 0+0 TO 9+0 O DMH DRAIN MANHOLE -- R ; u R S • PVC AS BUILT In CATCH BASIN ov HYDRANT D3 u PLAN OF LAND o WG WATER GATE O N CD - a 000 E C T UTILITY SERVICE PEDESTAL N - - 0WSO WATER SHUTOFF 90 ,n v "� d• "� ,SLOCA TED IN , cr N ¢R - GW UTILITY POLE SALEM , MASS . — uc — UNDERGROUND WIRES RETAINING WALL No 000000000 STONE WALL $ $ PREPARED BY " GRANITE CURB - - STREET TREE EASTERN LAND SURVEY ASSOCIATES, INC. N 1. SUBDIVISION PLAN BOOKO402 PLAN 79 J W ° CHRISTOPHER R. MELLO, PLS 2. THE HOUSES SHOWN ON THIS PLAN ARE DRAWN TO SHOW � in N 104 LOWELL ST. PEABODY, MA. 01960 UTILITY LOCATIONS ONLY; THE LOCATION RELATIVE TO — c" o oco 531 -8121 PROPERTY LINES MAY DIFFER. o co a nj a O0 cn 978 0 c6 3. SEWER AND WATER SERVICE STUBS PLOTTED FROM DATA 80 N N — O m rn O � SCALE: 1 " = 40' SEPTEMBER 11 , 2014 PROVIDED BY OTHERS, OR FIELD SURVEY. 4. HOUSES AND SERVICE PEDESTALS SHOWN ARE CONNECTED 6+0 5+0 4+0 3+0 2+0 1 +0 0+0 BY UNDERGROUND WIRES OF ELECTRIC, TELEPHONE A:3J FIRE ALARM AND CABLE TELEVISION. PROFILE: SCALE, 1" = 40'HORIZONTAL OSBORNE HILL DRIVE 1 = 4 VERTICALF 1 2795 0 20 40 ao 120 Iso SHEET 1 OF 4 Q � OPEN SPACE � I HEREBY CERTIFY THIS PLAN SEE RETAINING WALLB �� CONFORMS TO THE RULES AND INTERLOCKING REGULATIONS OF THE REGISTERS SHEET 3 CONCRETE BLOCKS OF DEEDS OF THE COMMON— WEA L OMMON— WEAL TH OF MA SSA C,HUSETTS. R /STACKEDLOT 34 �� C C 0 o f BOULDER WALL LOT 36 LOT 35 o STORM- NIL / 3 WATER tJo `' I ''� o FOR REGISTRY USE ONLY MANAGEMENTI All FACILITY Daa No. 18 No• 14 x LHo 16 (10) 48* HDPEI I PIPES wso O <• ��� v oar, D orW S 0 owe D sae 12+0 D10+ C 6+0 11+0 Z Z�v „c —W 3- —w— E. W— ,,,soL E G E N D � C1 Z STREETUCHT (TIPICAL) '�� o SMH SEWER MANHOLE wso O COx-7 w \ O J N O DMH DRAIN MANHOLE o 07 ® CATCH BASIN N a rn No. 23 LOT 11 osa HYDRANT � > No. 25 EXISTING [T2]1 o WG WATER GATE No. 27 DWELLING °° ° E C T UTILITY SERVICE PEDESTAL owso WATER SHUTOFF Z n0 - (TYPICAL) �W UNIDERGROUND WIRES 2�� � LOT 12 U LOT 14 LOT 13 ?� 130 RETAINING WALL U) C1 �� LOT 15 CX:) 000 STONE WALL � pZ � � GRANITE CURB �s STREET TREE o C� C U ( rn z C ON rn R T r�u�i '0 rri NOTES 1. SUBDIVISION PLAN BOOK 402 PLAN 79 \ v co rn 2. THE HOUSES SHOWN ON THIS PLAN ARE DRAWN TO SHOW ") 8 M) UTILITY LOCATIONS ONLY; THE LOCATION RELATIVE TO n - o D° PROPERTY LINES MAY DIFFER. o 3. SEWER AND WATER SERVICE STUBS PLOTTED FROM DATA - _ 120 PROVIDED BY OTHERS, OR FIELD SURVEY. 4. HOUSES AND SERVICE PEDESTALS SHOWN ARE CONNECTED BY UNDERGROUND WIRES OF ELECTRIC, TELEPHONE H N FIRE ALARM AND CABLE TELEVISION. 41 p g• vo Q � S � O N CL r m � O � � 10Rp,N o ui N 0 Cf°� Ih ON- N N K 110 / CERTIFY THAT THE PROPERTY LINES SHOWN ARE , 7NE LINES D/VlD/NG EX/S77NG OWNERSHIP, AND THE LINES OF STREETS AND WAYS SHOWN ARE THOSE � OF PUBLIC OR PRIVATE STREETS OR WAYS ALREADY ESTABLISHED AND NO NEW LINES FOR D/VISION OF cr 1c)v U.m EXISTING OWNERSHIP OR FOR NEW WAYS ARE SHOWN. O J x Z. 0 Z— ON u- -- C1 Nst mM / 2m Q Z m Z x U_ 00 N 00 • x — m a1 5 in D] ♦ — N U 0)0) U N D —� V• 11 -cr 50o to cr0: �N • �� P i ul r%1 \2 INC O¢ / CHRISTOPHER R. MELLO PLS / 100 5`0 J� M oN OSBORNE HILLS — OSBORNE HILL DRIVE �N 77 77 STATION 9+0 TO 14+50 m (D AS BUILT � PLAN OF LAND I2' RC DRAIN IF g '� s a 50.014 �2 0� p o • 07 m ¢ N S•o• 9 0 L OCA TED IN II -_• g�p.013 11 +0 10+0 9+0 SALEM , MASS . 8• PVC SSR PREPARED BY ILJIEASTERN LAND SURVEY ASSOCIATES, INC. � inti _ CHRISTOPHER R. MEL L 0, PLS 104 LOWELL ST. PEABODY, MA. 01960 a�p M `O (978) 531 -8121 00 !0 Off O N 8 M m � N 1 80 SCALE: 1 " = 40' SEPTEMBER 11 , 2014 15+0 14+0 13+0 12+0 PROFILE: SCALE 1" = 40' HORIZONTAL OSBORNE HILL DRIVE A339 1 = 4 VERTICAL F 12795 0 20 0o eo 120 Ise SHEET 2 OF 4 d OPEN SPACE C TO STORMWATER STACKED MANAGEMENT FACILITY BOULDER WALL FY R=94.40 I HEREBY CERTIFY THIS PLAN i=90.61 Pp CONFORMS TO THE RULES AND <'O 1p J 12• RC REGULATIONS OF THE REGISTERS R D LOT 16 LOT 17 �0 S=0.02 / OF DEEDS OF THE COMMON- LOT 18 / WEALTH OF MASSACHUSETTS. o b= ' EXISTING q�06j� DWELLING m N >I; (TYPICAL) No. 16 — < Z ')0 r�m'I£ No 22 No. 20 No. 18 E F Jm� �� O Cj 0 STREETLIGHT C. TRANS. NOTE; CU S p A I (TYPICAL) ° pT. ,� �HNINGS ge ILT FOR REGISTRY USE ONL Y 2 p E N RE1P1N1N OCKVNG �T°mU/CDI LGS O 1t4 J-E BLOCKS p - ) / s, CONCRE c we 2+0 W 3+0 W 4+ Aw W_ W� 1+0 r _ {— -+ S - - O 3 4 l� m FS- S FS- - 6' CLDI FORCE SEWER - DMH 40 O seP�pF _ p SO 05 0+0 ' j° 91 Z --AD4H GAS S E. E. .T. E.c T. o N ( 14+0 0 h ROpOWP o � 5r1oN a—D �� r No. 17 do s L E G E N D GON PANEL o { I N o. 21 N o. 19 IS ex > 8� A s O SMH SEWER MANHOLE o _n n r> m MH E HYD. SPINDLE I m m m D A l Amo RETAINING WALL D n O D DRAIN MANHOLE ELEV. g8,12 _ m IN ® CATCH BASIN p ❑o HYDRANT 3 L O T 40 oi^�J'oy0� -� o WG WATER GATE I W o < m � CONCRETE BLOCKS Z LOT 37 LOT 38 LOT 39 do ILL f + Z r p�t'� Z N 0WSO WATER SHUTOFF OPEN E I �� �Z�9Z N ECT UTILITY SERVICE PEDESTAL g <'Q \ o UTILITY POLE 03-�30 B 000 'o UGW UNDERGROUND WIRES RETAINING WALL �! o0000000o STONE WALL IL.,yJ7 \ GRANITE CURB o \ STREET TREE SEE ° SHEET O 0 j NOTES 1. SUBDIVISION PLAN BOOK 402 PLAN 79 N �Cn�� 2. THE HOUSES SHOWN ON THIS PLAN ARE DRAWN TO SHOW UTILITY LOCATIONS ONLY; THE LOCATION RELATIVE TO PROPERTY LINES MAY DIFFER. 3. SEWER AND WATER SERVICE STUBS PLOTTED FROM DATA 110 PROVIDED BY OTHERS, OR FIELD SURVEY. 4. HOUSES AND SERVICE PEDESTALS SHOWN ARE CONNECTED BY UNDERGROUND WIRES OF ELECTRIC, TELEPHONE FIRE ALARM AND CABLE TELEVISION. C6 of (I o)r4) ��" I 7 m aam U- J (O n J W(0 Z (b m " Z " N z O m o m 'n p ¢3x N S S (' o M rn " C 0RA1N 1 00 _j� (� 6 12 R 5,0.032 1 CERTIFY THAT THE PROPERTY LINES SHOWN ARE THE LINES DIVIDING EXISTING OWNERSHIP, AND THE LINES OF STREETS AND WAYS SHOWN ARE THOSE OF PUBLIC OR PRIVATE STREETS OR WAYS ALREADY 12• RC DRAIN ESTABLISHED AND NO NEW LINES FOR DIVISION OF SEWER EXISTING OWNERSHIP OR FOR NEW WAYS ARE SHOWN. 50.009 8� PSCO 010 FARCE SE,�R Bpv5a0•p3 6' CLOS ONA CHRISTOPHER R. MELLO PLS 0 SOO• 9 O �2'Rc RP1 12 R � 8PVC SERE rn 8' PVC SEWER S=0.011 4 OSBORNE HILLS - AMANDA WAY adm STATION 0+0 TO 6+0 Wil - U. -1m - AS BUILT c5j~ 0 m W o PLAN OF LAND 0 8O � cr LOCATED IN Er SALEM , MASS . 0 PREPARED BY M m N EASTERN LAND SURVEY ASSOCIATES, INC. Z M CHRISTOPHER R. MEL L 0, PLS N Q Ln 0 0) 8 104 LOWELL ST. PEABODY, MA. 01960 O K ..... t(00 0O N " M 0: r r` w ao rn n ° N ui (978) 531 -8121 M m 4 (o of o 0 70 aj CD -�I - °' °' °' _ SCALE: 1 " = 40' SEPTEMBER 11 , 2014 0+0 1 +0 2+0 3+0 4+0 5+0 6+0 Ll PROFILE: SCALE 1" = 40' HORIZONTAL AMANDA WAY 1 = 4 VERTICAL F 1 2795 0 20 40 80 120 160 SHEET 3 OF 4 I HEREBY CERT/FY THIS PLAN CONFORMS TO 77-IE RULES AND LOT 27 LOT 22 LOT 23 LOT 24 LOT 25 LOT 26 REGULATIONS OF THE REGISTERS OF DEEDS OF THE COMMON- 2o WEALTH OF MASSACHUSETTS. <�44 Amlg�^ G � No. 8 No. 6 No. 4 No. 2 _— No. 12 No. 10 �� \ �\ HYDRANT C.T. TRANS. w°5o E. ,r• SPJN ��L OSB y SPINDLE STREETLIGHT (TYPICAL) 119c, ❑ ❑ ��F �P E.C.a• ELEV. 109.32 ❑ FOR REGISTRY USE ONLY WGAct �� lr 'Si ao ° W — — w — Qm O SmH GAS° — _ _- SNM "'I s SNIT Iv'h Vj —7++0 __ 8+u FS- -9+0�� !� C O,o� FS- - 6 C/ T — FS- - " CLDI FORCE SEWER SMH 6 pyH ` 6 L S °wso wso ❑ ❑ \ Fys� EC.T. J, gOR�1E 1R�51 // d+ No. 11 �Y o�7 x� �5 EXISTING No. 9 No. 7 No. 5 0 RPL / DWELLING No. 3 \ �� L E G E N D (TYPICAL) S o TS �•, Pm O SMH SEWER MANHOLE 0 DMH DRAIN MANHOLE Sti FF LOT 42LOT 43 LOT 44 LOT 45 LOT \ `X0 AaJ CON ® HYDRANTASIN F 1 LO 46 \�� Rd• Do WG WATER GATE ti (0 clOO E C T UTILITY SERVICE PEDESTAL ° D opo owso WATER SHUTOFF M STOP & s Pia 10 -0- UTILITY POLE STREET 45 �/ — UGW -- UNDERGROUND WIRES SIGNS D tixo - - RETAINING WALL 41A. 00cDcDCl 0 STONE WALL // �r o cEPSo� �( � GRANITE CURB STREET TREE Ftil NOTES 1. SUBDIVISION PLAN BOOK 402 PLAN 79 � 2. THE HOUSES SHOWN ON THIS PLAN ARE DRAWN TO SHOW UTILITY LOCATIONS ONLY; THE LOCATION RELATIVE TO PROPERTY LINES MAY DIFFER. O 3. SEWER AND WATER SERVICE STUBS PLOTTED FROM DATA 120 PROVIDED BY OTHERS, OR FIELD SURVEY. 4. HOUSES AND SERVICE PEDESTALS SHOWN ARE CONNECTED BY UNDERGROUND WIRES OF ELECTRIC, TELEPHONE FIRE ALARM AND CABLE TELEVISION. r rn � rn N— CL N (V O OD I`_ X00 X00 7H) -- 88 it o , -ii CD v - I II -10— 11 II Zi r QiCD m n n I UI � � D u') n u 110 + If °IL- s= �� ul - � � - - Q II -, LL - l CERTIFY THAT THE PROPERTY LINES SHOWN ARE - THE LINES DIVIDING EXIS77NG OWNERSHIP, AND THE $z3% LINES OF STREETS AND WAYS SHOWN ARE THOSE OF PUBLIC OR PRIVATE STREETS OR WAYS ALREADY ESTABLISHED AND NO NEW LINES FOR DIVISION OF EXISTING OWNERSHIP OR FOR NEW WAYS ARE SHOWN. s CLD! FORCE SEWER Ell'12' RC DRAIN 12R� 8' PVC SEWER S 00.010 S'o•ols CHRISTOPHER R. MELLO PLS 0RP1N 8' PVC S 12' RC n n EWE S=0.010 - - - - 8' PVC SEWS S=0.009 8, pVC SEAR 00 N N o OSBORNE HILLS — AMANDA WAY cr o 8 a STATION 6+0 TO 72+67.21 11 N If m = Q) U o n N II AS BUILT Im ' o "WN o 0 1 LL C6 L0 PLAN OF LAND 0 CID °' - - I � LOCA TED IN Qn -- — -- - - -- - - SALEM , MASS . QD PREPARED BY ,cn EASTERN LAND SURVEY ASSOCIATES, INC. CHRISTOPHER R. MEL L 0, PLS 0) 0 104 LOWELL ST. PEABODY, MA. 01960 q o 06 (978) 531 -8121 80 -- lo I _ - Imo- -- -- --- 1-0 SCALE: 1 " = 40' SEPTEMBER 11 , 2014 6+0 7+0 8+0 9+0 10+0 11 +0 12+0 PROFILE: SCALE 1 " = 40' HORIZONTAL AMANDA WAY 1 = 4 VERTICALF 1 2795 0 20 40 80 120 160 SHEET 4 OF 4 GENERAL NOTES //� 68 LOCUS IS SHOWN ON SUBDIVISION PLAN OF LAND /� -66 / BY EASTERN LAND SURVEY ASSOCS. PLAN BOOK 402 1) THIS PLAN IS THE RESULT ON THE GROUND FIELD / / /� l.__ SURVEY AND PUBLIC AND PRIVATE PLANS. ` / 64 PLAN 79 2) UTILITIES SHOWN ARE BASED UPON FIELD SURVEY AND D // ASSESSORS MAP 9 PARCEL 1 RECORD PLANS AND ARE NOT NECESSARILY Y INDICATIVE OF Z /// J20 / RECORD OWNER: OSBORNE HILLS REALTY TRUST UNDERGROUND CONDITIONS. DEED REFERENCE: BOOK 17338 PAGE 313 3) THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING AND 70 DETERMINING THE LOCATION, SIZE AND ELEVATION OF ALLm' l a EXISTING UTILITIES, SHOWN OR NOT SHOWN ON THESE PLANS, \ r12 / / 69oseo4�F o Q STA PRIOR TO ANY CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED �— �>• 1 /� I // // vQ;vs (� 0 �aQ� IN WRI77NG OF ANY UTILITIES FOUND INTERFERING WITH THE IV PROPOSED CONSTRUCTION AND APPROPRIATE REMEDIAL ACTION J73 Jt / G BEFORE PROCEEDING WITH THE WORK. 4 4) THIS PLAN IS BASED ON THE REFERENCED PLANS, DEEDS J15 i / J76 AND THE RESULTS OF A FIELD SURVEY AS OF THIS DATE. NO CERTIFICAT70N /S INTENDED AS TO PROPERTY TITLE - � / �/ LOCUS MAP OR AS TO THE EXISTENCE OF UNWRITTEN OR UNRECORDED i EASEMENTS. r 5) RESOURCE AREA DELINEATED BY RIMMER ENVIRONMENTAL 1 % 86 \ \ 866 � ' C I T Y CONSULTING, OCTOBER 29 - DEC. 76, 2003 \ U I \ \ _ - � \865 O F P E A B O D Y 1, \ 10 1\ 1 3L� \ 00 �a �6 B5�\\\ \ R E S \ 867 62 854 RCE \ \\ �� A 6S/ \ \�\ �� � � 6s -- - \ \\ _ A \ \ 853 r ' \`\ \` \\ \\ \ \ 68 \ X 690 10 862 / C� \ A, - 7 �rZQ116 � � ! \ \ \ \ � � - B57 /856 658 Q jB61 � � --- - � ;g,V � - B59 Bhp - �Q �� ------------- - \ \ 855 _ —_�� - -- -- PROPOSED _R�ZQn \ \ / I \ TRAIL _ �� _ -� � _- PROPOSED BOARDW�IC ----` \ __ -----� _ --- TO SPAN STrs) ( • -- - 7°'� �� c" FOe \ `J \ \ --------,\---- ____---- BA RIEC72Cf2 � \ � `'� `v =� -___-_ - - -- - -- - - -- -- -- --- - # _ _ ___- _ /'� II / / / / _ _ _ _ -. o , �. �.8L E G E N D 0 /TT� B REP ICATIO C 1 21 a � � / / _ \_ \ SMH PROPOSED SEWER MANHOLE L I I 54 U � / \ ■ ,DMH PROPOSED DRAIN MANHOLE D26 INV = PROPO ED LT BAItin1E ( 340f��� I \R PREP / I / / / / \ 82 ■ PROPOSED CATCH BASIN � o5 0 79- _ -� / ' / C3 / i / ti o W \ PROPOSED WATER GATE 0 (tPROPOSED H17JRANT ?S � j�A�N I o Q — — 100 — EXISTING CONTOUR PROPOSED\RETAINING 'WALLWV� o "� - - - \ �J p \ER I PROPOSED FENCE �� \ / / �- CJ1 �. \ J� B FF \ 1 ' �r D ��— / / \ \ h J o2 y¢ 100.00 EXISTING SPOT GRADE L00 F� N PRY \ \ I / 21 - \ - r / c / \ 4 A x 88 i m0 OZONE 6�\ o\ \ I �_tl—�'�� / / D ���/ - • — • ' / / I x�� 71.1 \\ / / \ O \\ /� o000000�0o STONE RETAINING WALL c m� \ I / / / " / r r---- ---• n / 86 CURB - \ \ / / • _ —tet— PROPO�ED'GUARD,RIGL \ \ \\ `/ \\ O —x— x— FENCE \ —T / ?0 - - - -1 \ \ 96 / i _ I / 92 RESOURCE AREA BOUNDARY / O \ 13+6'9 30 P I I 9q D \ 8 ' ULVER/1 i / i \ \ ROPOSED I l o 6 0 A 10 P— Nl a, BY 8' BOX \ _ _ _ S lj ' S\\��a+ S =0+0 \ — 95 7 a �pNG VEI T 1 I\ / / \ \ RESOURCE AREA BOUNDARY FLAG PROP��D � -� — - - — �- — 74. BOX CUL CS W •' \ \ / \� \ g4' LANG / ' — \ R'E +0 Il P ED \ / \ 9p 100x0 PROPOSED CONTOUR r I \ �QURCE DRI \ t5+�� �\ r� _ - - 15+0 — �al1RCE AREA��(LTERA�ON , W PROPOSED SPOT GRADE • 1 � � I I / , i oP _ AREA I @7- I I M I WADER /. D \ ry TEST PIT �L TERA TI ON E / SaORI� +o s / SMH 9 D7� , — _ X6804 SF �\ N 1 I _— M" _ \\ J� r HIL � �U � .� ; o o�� o DM" =�r7\5of SF _I �_ w o, s \ \ / \ I, - L� \ I loa / \ � 1 /_ 1 % %' —y-• �- I \ l I I I I I S SSI \I SITE DEVELOPMENT PERMIT PLAN ° �- I I i loz \i / / / // I I % \! r \ —' . - 73' Cgl� jP I t I I I 1 g3.76l %� - J ROPO \ \ \ \ ROFIOSED OUq R Ill I I 0�0 LOCA TED IN 104 I I RD F�AI� - \ ` "7 � DIS �� \ � I / �ED FENCE -�_ � �� � S �(o pR0 �GUA _ — / 7 /;/ / // PROPOSED RETAI ING C7 "C8 0 - 1 WAL ,, , � ' ' , , M NQq� F SALEM , MASS . POSED \ 6q // / / + . I / o° - � PREPARED BY' a0 I -iNV = 74 / W Qi /wat� Io�� / ,�' l Q/ r I EASTERN LAND SURVEY ASSOCIATES, INC. ES D R PIN N� / r I I I o v \\ /? \ h0 E18/ / -k O pRO� 1 / / ( I/ 1\' PROPOSED LT BARRIE - \ i N i \ pR0 0 - �Et / ti 2 / / / / 1 / �O D7> /gI 41gVOSED 0 �>1 / 9 �I p l I CHRISTOPHER R. MELLO, PLS I 1 \ N �. / Q I / / v I l I I ( I 1 /' _ - / �' �u c) I ; 4%` V \ S AGeMFNTOR11wq // I E7��� ,cby / 104 LOWELL ST. PEABODY MA. 01960 \ / 1 /mss \ 3 v \ \ V F r I I I / ' o ; \ / m/ \ \ D SHEeI, ACICIry R / t \ �i / 2 a I I I / I I 03. I X0,6 o a I \ / / a \\ \ e�IN�r e 4o I \ I I /978 531 -8121 j 3 e I V S(/e F QpP // 1 4z\- 0 \ E76� E20 �� I I 1 I 1 I i 1 l - ' 2 a I o \ k� 1 0 \ \ \ JIVjS ROV / \ \ 1 I 1 1 c �, \ / \ \ \ \ IONP ed / � \ t I I I I I \ o SCALE: 1 = 20 MARCH 25, 2013 k, LOT 15 / �, ° ; \ \ \\ \� , � �N�' �� ka \\� 1E I I I I I \\ 1 PREPARED FOR // �33� ' ' \\ \ \\ �/� �iIr i I I I STIIVG \ \ \\ \, E1$ � OSBORNE HILLS REALTY TRUST oo �� °� �� \\ \ \ \\ \� \\ v E22� I I I \ �, 0 10 20 40 60 80 REVISED MAY 29, 2013 BOX CULVERT NOTES 1\\J \ / QE23 / 11 I I 1\�OT 37 \ P 1 16i I�✓v t REV. JUNE 7, 2013 LOT 36 G r J I. A RIPRAP PAD 10' WIDE AND 4 FEET LONG SHALL BE CONSTRUCTED �/ E13 / / 1, / I I I \\ '��l✓jl�� � AT THE INLET AND OUTLET OF EACH BOX CULVERT. RIPRAP SHALL - V Y HAVE A MINIMUM WEIGHT OF 100 LBS. PER STONE \\ / \ I 2, A TRASH RACK HAVING AN 81" BY 8" MESH SHALL BE INSTALLED AT EACH END OF THE BOX CULVERTS. THE RACK SHALL BE CONSTRUCTED op �a �E24OF WELDED STEEL PADLOCKED SHUT EXOCDEPT WHEN BEING INSPECTED OR CLEANED. FBARS, MOUNTED ON HINGES AND BEN Sp'�cE �� cb� �o \\ F 12795 B � SHEET 1 OF 3 CROSS SECTION — 15+25 LONGITUDINAL SECTION STATION 15+25 OSBORNE HILL DRIVE OSBORNE HILL DRIVE ROAD PROPSOSED RETAINING WALLS SHALL BE CONSTRUCTED OF suRFAc�_ __ STACKED BOULDERS OR SEGMENTAL RETAINING WALL UNITS IN ACCORDANCE WITH ASTM C1372. ALL WALLS DETAIL 'ROP. GUARD RAIL (Typ) 1-ROP 4 FENCE (Typ) - - e" WATER FOUR OR MORE FEET IN HEIGHT SHALL BE DESIGNED BY A MASSACHUSETTS REGISTERED PROFESSIONAL ENGINEER, EROSION CONTROL SILT FENCE SEWER PERMITTED IN ACCORDANCE WITH THE REQUIREMENTS OF 2•x2"x4'-6" WOODEN POSTS PROPOSED AT 8' O.C. (MAX) 00 WATER RETAINING THE SALEM, MASSACHUSETTS BUILDING INSPECTOR AND WALL (Typ) 4' HIGH x 8' WIDE f� e SEWER 0 PRECAST CONC. CONSTRUCTED BY A CONTRACTOR EXPERIENCED IN THE MIRAFI No. 100 SEDIMENT OPEN BOTTOM PARTICULAR TYPE OF WALL CONSTRUCTION. IF PRECAST CONTROL FABRIC OR EQUIV. EXIST. GRAPE CULVERT SEGMENTAL RETAINING WALL UNITS ARE UTILIZED, THE EXISTING — — FLO4DIRECTnION t— .I 74.50 PROPOSED CULVERT S = 0.047 GRADE PRECAST.CONC WALL SHALL BE CONSTRUCTED IN ACCORDANCE WITH THEf-- _ 1 - 71.00 FOOTING UNIT MANUFACTURER'S SPECIFICATIONS. EXISTING GROUND OPENNESS RATIO = 4' x 6' 1 94' = 0.34 3' ENTRENCHMENT 4' 6' _ -_ I I II = 1111 II11 = II I I = UNDISTURBED SUBGRADE CROSS SECTION — 1 +20 MOUND O = 1111 = 1111 LONGITUDINAL SECTION STATION 1 + 20 AMANDA WAY AMANDA WAY S EOFMOU a PIT 4 J O P. PROP. 4FENCE (Typ) ROAD SURFACE PROP. GUARD RAIL (Typ) 8" WATER PROPOSED SEWER � 0 RETAINING - 0" --. e" SEWER - EXISTING GRADE 8" WATER WALL (Typ) 'I 4' HIGH x 8' WIDE 6-18" MOUND PROPOSED SURFACE _ ea.eo — PROVDESMOO EXISTING PRECAST CONC. HEIGHT Of ORGANIC MATERIA. GRADE OPEN BOTTOM 30' MAX. — — — — — _ _ = AT G1LVErtr NveRr— CULVERT VERIICAL DIFFERENCE t PROPOSED CULVERT 5 = 0.0425 — — I=79.80 6-12" PIT / r: L; DEPTH i PRECAST CONC. -- - FOOTING OPENNESS RATIO = 4' x e' 174" = 0.43 — TOTAL HORIZONTAL DISTANCE --- WILL VARY FROM 10-20', BASED ON THE DISCRETION OF THE WETLAND SCIENTIST. HORIZONTAL LENGTHS OF MOUNDS AND PITS HALL NOT ALWAYS BE EQUAL. !' PIT AND MOUND MICROTOPOGRAPHY DETAIL __ I NOT TO SCA'_F I i N.T.S. SITE DEVELOPMENT PERMIT PLAN LOCATED IN SALEM , MASS . PREPARED BY EASTERN LAND SURVEY ASSOCIATES, INC. CHRISTOPHER R. MELL 0, PLS — — SLOW RELEASE ROOTBALL 104 LOWELL ST. PEABODY, MA. 01960 EXISTING WETLAND EXCAVATE EXISTING UPLAND OSMOCOTE FERTILIZER AS WETLANDS REPLICATION AREA TO GRADES AS SHOWN ON APPROVED BY THE WETLAND (978) 531 -8121 PLANS AND CROSS-SECTIONS EDGE OF WETLAND PER CONSTRUCTION NOTES SPECIALIST BACKFILLED WITH WET-LAND SOIL MARCH 25, 2013 (TYP.) �PIT AND MOUND MICRO-GRADING IN EXISTING GRADE PLANT FLUSH PREPARED FOR SUBGRADE THROUGHOUT ENTIRE INSTALL SILT FENCE REPLK A I INSTALL PROPOSED N AREA AND WOODY INSTALL . SILT FENCE OSBORNE HILLS REALTY TRUST 1 FEET DOWN GRADIENT PLANTINGS PER DEBRIS (10X) AS DIRECTED BY THE ( - _ OF WETLAND FLAGS AT PLANTING SCHEDULE ' WETLAND SPECIALIST PER DETAILS AND WL .�.�r/ / NOTES. A & PLANTING NOTES WETLAND CONSTRUCTION ,..... ...., � / �f�at�/ REPLICATION SITE EXISTING WETLANDS / >�:::: :::7 / / DO NOT DISTURB \ �� \\ `:::::•` •••••::: CHISEL REVISED MAY 29, 2013 PLOWED REVISED JUNE 7, 2013 PROPOSED GRADE SUBGRADE INSTALL 12' WETLAND SOILS ROCKS AND BOULDERS UNCOVERED PER SPECIFICATION SCARIFY BOTTOM DURING EXCAVATION MAY BE LEFT IN OF PIT TO 6' MIN. 2X ROOT BALL PLACE PROVIDED THEY DO NOT SIGNIFICANTLY DECREASE THE INSTALL NEW ENGLAND PLANTABLE AREA OF THE REPLICATION WETLAND SEED MIX PER SITE. SPECIFICATION WETLAND REPLICATION TYPICAL SECTION SHRUB RPLANTING DETAIL F• 12795 N.T.S. SHEET 2 OF 3 the enclosed detail and spaced approximately 10 to 20-feet habitat features for wildlife. This material shall be the plan view. The cross-section views shall depict the Wetland Replication Area Construction Notes: 6. Existing wetland soils from the wetland fill locations are on-center. Roughly 50 percent of the surface area of the distributed to cover roughly 10 percent of the replication 20. All plants shall be planted in transported top soil not suitable for re-use in the replication area. constructed wetland sub-grade, final grade, predicted high p that is thoroughly watered and tamped as back filling 1. It is recommended that the work described herein occur Accordingly, replication site shall be mounds and 50 percent shall be area's substrate surface. This material shall be of progresses. Raise and replant any plant which settles more g y, approximately 1.-inches of an evenly mixed and low ground water elevations (or perched ground water under the supervision of a qualified Wetlands Specialist organic/mineral soil ("wetland soil") shall be imported to pits. Rocks and boulders uncovered during the excavation varying stages of decay and shall be randomly placed to conditions as the case may be) , and/or other indicators of than 2 inches after planting and watering. (WS) . the site from an off-site source and placed within the may be left_ in_ place- _upon approval from_- WS Provided provide habitat features, _ Ai Jl1feCSed by She WS. These surface or ground water hydrology including direct replication area bringing grades to the final desired that they do not significantly decrease the plantable area materials shall not include species identified on the U.S. observations and soil characteristics. Locations of cross- 21. Fertilizer for woody plants shall be slow release and 2. Project Surveyors working for the Site Contractor shall re- elevations. The Site Contractor shall provide the WS with of the mitigation area. These rocks and boulders shall be Army Corps of Engineers invasive species list. Freshly cut suitable for release under saturated soil conditions. establish and re-label wetland flags as per permit drawings written documentation identifying the supplier and location sections should ro indicated on the plan view. The aas-pproval placed in such a way as to provide crevices and cavities logs shall not be the primary source for this feature, but Prior to planting the nursery provider shall provide the WS around the perimeter of the wetland replication area. of the source material . Soil consistency shall be loose to built shall be provided to the WS for review and approval with a written recommendation and specification describing suitable far use by wildlife. may be used if approved by the supervising WS. Fallen logs P 9 Project Surveyors shall also stake out the limits of the friable and texture should be loam to sandy loam. The within 30 days of completing construction of the the proposed fertilizer based on site specific conditions proposed wetland replication area. The stakes shall remain organic material used for mixing shall be well or partiallyshall be varying sizes and in varying degrees of re P P P 9. Prior to planting, the WS shall inspect the final-grades of plication area for inclusion with the report. and the proposed plant species. in place until wetland vegetation has become fully decomposed. Clean leaf compost is the preferred soil decomposition. the replication area to ensure that the proper hydrology replication established. This work shall occur before construction of amendment to achieve these standards though other materials 15. At least 75% of the surface area of the re p 22. Plants shall not be bound with wire or rope at any the replication area commences. may be used if approved b the WS. Note that "clean" has been established. Any adjustments to final elevations 13. If the site is excavated to the sub grade in the fall area shall be established with native wetland plant species Y PP Y time so as damage the bark or break branches. Plants refers both to a negligible amount (<I%) of physical shall be made under the direction of the WS in consultation and delay is inevitable, consideration shall be given to within two (2) growing seasons after all the planting is shall be handled from the bottom of the ball only. 3. Trenched siltation fence shall be installed along the contaminants such as plastic and to the lack of chemical with project engineers and the site contractor. stabilizing the site for winter with annual rye and complete (as per 310 CMR 10. 55) . existing wetland boundary approximately 12-inches down- contaminants that might pose a hazard to plants or animals. conducting final grading in the spring. gradient from the re-established wetland flags in the Mineral materials shall be 10. The WS shall identify on behalf of the Site Contractor 23. Planting operations shall be performed during periods g 9 predominantly in the sandy loam Y 16. The erosion control barriers shall be disassembled and within the planting season when weather and soil conditions adjacent wetland. Installing erosion controls in this to loam sand texture range (as defined b USDA Textural specific locations in the wetland replication area where 14. Within 30 calendar days following planting of the y g y P properly disposed of by the site contractor after the are suitable as determined by the supervising WS. This is manner will allow the site contractor to properly tie-in Soil Classification System or Soil Science Society of each individual plant species specified herein are to be replication area, the WS shall certify in writing to the replication area is deemed stable by the Conservation typically between April 15 and June 15 and September 15 proposed contours to the adjacent wetland contours without American Glossary of Soil Science Terms) , with minimal installed based on hydrology, topography, soil conditions Conservation Commission that the area has been constructed Commission. Sediment collected by these devises shall be through November I.S. Plants shall not be installed in undermining the trenched silt fence. The interface / tie- quantities of graven or rock. A minimum organic carbon and other relevant features that will contribute to the in substantial compliance with the referenced permits and removed and disposed of in a manner that prevents erosion topsoil that is in a muddy or frozen condition. The Site in between the replication area and adjacent wetland shall content of 12% (21 percent organic matter) on a dry weight record drawin and transport to a waterway or wetland. Contractor shall be be natural using gentle slopes. basis for soils shall be used in the wetland replication survival of the plantings (conceptual locations are drawings. Such certification shall be accompanied responsible for re-setting any plants depicted herein) . To the extent practicable the woody by a written report and an as-built plan prepared by the that become dislodged or uprooted as a result of frost 4. The Site Contractor or the WS shall provide the area. The Site Contractor shall provide written P Other Miscellaneous Wetland Replication Area Planting Notes: heaves or other environmental factors duringthe first two P shall be installed on the to and sides of the Project Surveyors. The report shall include representative Conservation Commission with at least 48 hours advance certification from the supplier ca the wetland soil to the plantings p growing seasons. notice (via email or phone) to provide an opportunity for WS confirming that this specification has been met. The constructed mounds above the constructed pits. The WS site photographs depicting each phase of replication area 17. The WS may propose plant substitutions relative to inspections duringeach of the following replication area analysis and written certification shall be provided to the shall oversee the plantingwork to ensure conformance with construction, relevant WS field notes and inspection species, size and quantities if there is limited g P WS prior to placing the wetland soil in the replication 24. Set all plants plumb and straight. Locate plant in construction milestones: (1) prior to commencement of P 9 p cation this specification. Plantings shall be clustered and reports, a discussion of hydrologic conditions, wetland availability of plant stock at the time of planting. All the center of the planting pit. excavation; (2) when the replication area has been area. randomly spaced to simulate natural growth patterns and soil certification, number and types of plants installed in plant material shall be purchased from a New England nursery and guaranteed by the landscaper to be in vigorous excavated to sub-grade; (3) when the replication area has where appropriate structural context with other plantings the replication area and receipts from the plant nursery, 25. The wetland seed mix shall be sown according to the been graded to final elevations with micro-topography; and 7• Wetland soil shall be deposited in the replication area in growing condition. g can be maintained. Container-grown shrubs are referred. and a discussion of any field modifications deemed manufacturer's recommendations and specifications. (4) during planting and placement of coarse woody debris a manner that minimizes travel and subsequent compaction of g p (see below) . the newly placed soil . Should soils be compacted, they Mulch balled and burlapped or container-grown shrubs in an necessary by the WS to obtain the desired hydrology and 18. Insofar as it is practicable, plant material shall be shall be loosened b a method such as rototillin approximately 3-foot diameter circle approximately 2-inches scrub-shrub wetland environment. Project surveyors shall 26. Due to unpredictability of short term local hydrologic y g, pp y pp y planted on the day of delivery. In the event this is not conditions and the need for additional care to establish 5. The replication area shall be grubbed and initially deep; mulch bare-root woody plantings in an approximately prepare the final as-built drawing signed and stamped by a practicable, the Site Contractor shall protect and water new plantings the Site Contractor shall irrigate the excavated to a depth approximately 12-inches below the 8. Micro-topography ("pits and mounds") shall be established 18-inch diameter circle approximately 2-inches dee The Registered Professional Land Surveyor of the Commonwealth stock not planted in consultation with the WS and nursery. as necessary during the first growing season PP Y P• plantings, Y 9 9 9 P1 shall n remain n 1 d for longer than a 3 da within the wetland soil using continuous rough grading (see use of mulch around woody plantings is strongly depicting ants s a ofu p ante g y planting. final design grade elevations depicted on the referenced g g y encouraged. final contours (n-foot contour intervals with after lantin detail) . The micro-topography work shall occur under the representative spot elevations in plan view and a minimum period after delivery to the site. Any plants not drawings to allow for placement of wetland topsoil . The WS installed during this 3 day period may be rejected by the direct supervision of the WS. The trough of a 11. The replication area side slopes shall be stabilized of two section views of the replication area) and the Wetland Seed Mix Specification's (or approved equivalent) for shall inspect the sub-grade of the replication area to WS. depression/pit shall be continuous with the crest of a with the slope seed mix specified herein. limits of the grading. The final as-built shall include a Wed Replication Site ensure that proper hydrology has been established; any mound, which shall be continuous with the trough of the surface area calculation confirming that sufficient surface 19. Quality and size of plants, spread of roots, and size adjustments to final sub-grade elevations shall be made next depression/pit. The entire wetland replication area 12. Logs, branches, and other natural debris shall be area has been provided The New England Wetmix (Wetland Seed Mix) contains a wide under the direction of the WS at the time of construction. (excluding side slopes) , as per the of balls shall be in accordance with ANSI 260 (REV.1980) variety shall be sculpted using the pit-and-mound method. The placed in the replication area to provide beneficial permit. Locations of cross-sections should be indicated on "American Standard for Nursery Stock" as published by the of native seeds that are suitable for most wetland P restoration sites that are not permanently flooded. All species width of the mounds shall be constructed in accordance with American Association of Nurserymen, Inc. TEST PIT 2 are best suited to moist ground as found in most wet meadows, adjacent to commercial and residential projects. Application Depth Matrix Color Soil Redoxieorphic Features/Remarks TEST PIT 4 scrub shrub, or forested wetland restoration areas. The wetland Rate - 1 LB/1,750 sq. ft. Overland Replication Area Test Pit Data Onchas) Texture Plantino schedule tar netland Replication site seeds i n this mix can be sown by hand, with a hand-held _ C. Nene species wee Sin Chastity °+te w+a c'ier soil ad..+�W+< Frta sn�.rks SPECIES (Type) : Virginia Wild Rye, (Elymus vi rginicus) , Little Indicator r.) r+"�ii1 T"t a spreader, or hydro-seeded. Lightly rake to insure good seed-to- Gravels and cobbles are located throughout each horizon for each 0-3 Very dark Gravelly status soil contact. Seeding can take place on frozen soil , as the Bluestem, (Schizachy n um scopan um) , Big Bluestem, (Andropogon - -- - erardii) , Creeping-Red Fescue; (Festuea- rubra),- Switch-Grass, test pit. Soil is mapped by MRCS as Chatfield Hollis Rock gray 10YR sandy loam Uky_pd � ,,� _ „o,___ � 3_._ __ _- _ au err- +aytil�- -freezing- and thawing- weather--of-late fal-l 'and late winter will --g Outcrop Complex. Soil test pits conform to mapped soil series. 3/1 aurthern were. grayish 15.nd work the seed into the soil . If spring conditions are drier (Panicum vi rgatum) , Partridge Pea, (Chamaecrista fasciculate) , Soils are generally derived from glacial till derived fromni. ten- as brown IoyR than usual watering may be required. If sowing during the summer Deer Tongue, (Panicum clandestinum) , Indian Grass, (Sorghastrum y g 3 20 Brown Gravelly Slightly coarser sand than Red granite bedrock. 10YR 4/3 sand loam previous horizon • r Aro^'^+ +iro is tea f i I+ 312 r s months supplemental watering will likely be required until nutans) Ox Eye Sunflower, (Heliopsis helianthoides), Common vt ss park Gravelly bev;apace of groundwater germination. A light mulch of clean, weed free straw is Milkweed, (Asclepias syriaca), Spotted Joe Pye Weed, (Eupatorium 20-31 Yellowish Gravelly wnbrberrr Il e, verti<iilrt. Fadi = -LI v yeitoatsn coarse sand recommended. Application Rate - 1 LB/2,500 sq. ft. maculatum) , Grass Leaved Goldenrod, (Euthamia graminifolia) , TEST PIT 1 brown sand loam w °:a v.<cin,- z - I brown IoyR Depth Matrix Color soil Redoxieorphle Features/Remarks Y muewr s. w F'�' rpt D 1414 Blue Vervain, (Verbena hastata), New England Aster, (Aster IOYR S/6 � _ tm"k M (inches) Texture SPECIES (Typ.) : Fox Sedge, (Carex vulpinoidea) , Lurid Sedge, novae-angliae) , Early Goldenrod, (Solidago juncea) . 31-39 Light olive Gravelly Active redox features: 10% dark (I) sPlantchen for an-6,400 based on -Io-toot on-cencc planting (Carex lurida), Blunt Broom Sedge, (Carex scoparia) , Sensitive brown sandy loam yellowish brown IOYR 4/4 soft scants for al be l set. wetland replication arm. 0-12 Dark gray Gravelly 25% strong brown 7.5VR 4/6, this 2.5Y 5 3 masses. This horizon is moist. (z) Plants malt be located throughout replication b tl m site and Fern, (Onoclea sensibilis) , Blue Vervain, (Verbena hastata) , Hop IOYR 4/1 loam redox is a relic of previous y adjacent upland buffs, zone ra y.recces by t6 based on Sedge, (Carex lu ulina Green Bulrush, p 39-44 Light olive Gravelly Active redox features: 10% dark hydrologic conditions, topography, soil conditions and g p ) , (Scirpus atrovirens) , I Ihydrology, likely a translocated brown I sandy loam yellowish brown lOVR 4/4 Omer relevant feature: that will contribute to the brp.., 7.syB I sandy loam Nodding Bur Marigold, (Bidens cer-nua) , Bristly Sedge, (Carex A horizon survival of the plantings. See Wetland Repli:ation Area 4/5 i comosa) , Fringed Sedge, (Carex crinita) , American Mannagrass, (Glyceria grandis) , Wool Grass, (Scirpus cyperinus) , Soft Rush, 12-36 Light olive (, Gravelly 25% strong brown 7.SYR 4/6, this I2.SY 5/3 concentrations and S% gray 10YR - Construction Notes for additional specifications. 14B Bedrock Bedrock Bedrock refusal 5/1 depletions soft masses. This (]uncus effusus) , Spotted Joe Pye Weed, (Eupatorium maculatum) , I brown sandy loam redox is a relic of previous horizon is saturated. Seasonal Boneset, (Eupatorium perfoliatum) , Mud Plantain, (Alisma i 1, 2.SY S/3 j Ihydrology, likely a translocated high groundwater estimated at -39 subcordatum) , New England Aster, (Aster novae-angliae) , horizon _ inches. Rattlesnake Grass. (Glyceria canadensis) , Purplestem aster 36-39 Very dark Gravelly Likely buried A horizon 44-50 Olive gray Coarse sand Groundwater is located in this (Aster puniceus), Soft Stem Bulrush, (Scirpus validus) , Blueflag gray IOYR loam 2.5Y 5/2 horizon, standing water in the (Iris versicolor) , Swamp Milkweed, (Asclepias incarnata) , Monkey 3/1 pit is pooled at 48 inches. Flower, (Mimulus ringens) . 39-46 Dark Gravelly Saturated at approximately 42 Bedrock is located at 98 grayish loam inches within this horizon inches*** The Site Contractor or Landscaper shall submit Certification of brown Compliance for the wetland seed mix to the WS. A manufacturer's 2.5Y 4/2 __- Certificate of Compliance to the specification shall be - TEST PIT 3 submitted by the manufacturer with each shipment of seed. These 46-55 Olive gray Gravelly Active redox features: 15% certificates shall include the guaranteed percentages ed purity, SY 5/2 clay loam yellowish brown IOYR S/4 Depth- Matrix Color Soil Redoxieorphic Features/Remarks concentrations and 10% light (inches) Texture weed content and germination of the seed and also the net weight olive brown 2.5Y 5/3 depletions and date shipped. No seed may be sown until the Contractor or Landscaper has submitted certificates to the WS. soft masses. Seasonal high 0-3 Very dark Gravelly --groundwater estimated at -46"• gray 10YR sandy loam New England Conservation/Wildlife Mix' (or approved equivalent) 55-59 Olive gray Coarse sand Groundwater is located in this 3/ for Wetland Replication Area Side Slopes & Adiacent Upland 5Y 5/2 - horizon, standing water in the 3-16 Yellowish Gravelly Buffer Zone pit is pooled at 58 inches brown sandy loam 10YR 5/4 The New England Conservation/Wildlife Mixm provides a permanent 16-26 Brown Gravelly cover of grasses, wildflowers, and legumes. For both good 10YR 5/6 sand loam erosion control and wildlife habitat value. The mix is designed 26-48 Strop Gravell - SITE DEVELOPMENT PER MIT PLAN to be a no maintenance seeding, and is appropriate for cut and fill slopes, detention basin side slopes, and disturbed areas L OCA TED IN SALEM , MASS . PREPARED BY EASTERN LAND SURVEY ASSOCIATES, INC. CHRISTOPHER R. MEL L 0, PLS 104 LOWELL ST. PEABODY, MA. 01960 A PROPOSED (978) 531 -8121 a a RETTAINING WALL JUNE 7, 2013 y J o a PREPARED FOR EXISTING EXISTING PROPOSED 3 WETLANDS ON WETLANDS EXISTING REPLICATION =l z EXISTING O S B O R N E HILLS REALTY TRUST P R O P O S E D R E P L I C A T I O N A R E A WETLANDS Q O -- t - - - -� t0 q - AREA WETLANDS _ o (D A Ir SILT FENCEU) SILT FENCE p `_1 B SILT FENCE B ii w F 12795 SHEET 3 OF 3 SECTION VIEW B-B SECTION VIEW A-A