64-365 - MARLBOROUGH ROAD - CONSERVATION COMMISSION _ DEP#64-365-ANRAD Marlborough Road Jh r s 4' J • /±t C a� i i i 0 CITY OF SALEM CONSERVATION COMMISSION April 2, 2007 Paul DiBiase PO Box 780 Lynnfield, Massachusetts 01940 Re: DEP #64-365—Osbome Hills Order of Resource Area Delineation (ORAD)— located off of Marlborough Road, Salem, Massachusetts Dear Mr. DiBiase: Please be advised that the Order of Resource Area Delineation (ORAD) of for the above referenced project will expire on May 13, 2007. If this development project is complete, you do not have submit anything to the Salem Conservation Commission. If this development project has not been completed, than you must submit a written request for an extension of the existing Order of Resource Area Delineation (ORAD) to the Commission at least 30-days prior to the expiration of the order, as required in the Wetland Protection Act. If the project has not been completed and your ORAD expires, you will be required to file a new Abbreviated Notice of Resource Area Delineation (ANRAD) to complete this previously approved project. For your information the ORAD for DEP file #64-376 is set to expire on October 14'2007. If the work is not complete in this area either please request an extension for this project as well at least 30 days prior to the expiration of the order. Please contact me at (978) 619-5685 if you have any questions. Sincerely, uP/1� Carey Duques Conservation Agent/Planner 120 WAS14INGTON STREET, SALEM, MASSACFIuSETTS 01970 • TEL: 978.745.9595 F,vx: 978.740.0404 • WWW.SALEM.COM .' vW�coNnir�A� <PCITY OF SALEM 3s� CONSERVATION COMMISSION May 29, 2007. Paul DiBiase Osborne Hills Realty P.O. Box 780 Lynnfield, MA 01940 Re: Order of Resource Delineation—DEP #64-365 Sub Division off of Marlborough Road Map 9 Lot 1 Dear Mr. DiBiase: Enclosed, please find the Extension Permit for the Order of Resource Delineation for the above referenced project. Following the 10-day appeal period (as of June 8, 2007), this document and the attached Special Conditions must be recorded at the Essex County Registry of Deeds (36 Federal Street, Salem, MA). Once recorded, please return a copy of Page 9 of the Order, which will indicate to the Commission that the document has been recorded. As indicated in the Order, prior to any work commencing: 1. this Order must be recorded, and 2. a sign shall be displayed showing DEP File# 64-365 within public view If you have any further questions, please feel free to contact me 978-619-5685. Sincerely, JAP Carey Duqu Conservation Agent/ Staff Planner Enclosures CC: DEP Northeast Regional Office Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 7 — Extension Permit for Orders of Conditions 64-365 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. General Information Important: When filling out 1• Applicant: forms on the Paul DiBiase, Osborne Hills Realty Trust computer, use Name only the tab key to move P.O. Box 780 your cursor- Mailing Address do not use the Lynnfield MA 01940 return key. city/Town �� , State Zip Code VQI I 2. Property Owner(if different): Name Mailing Address City/Town State Zip Code B. Finding Information The Order of Conditions (or Extension Permit) issued to the applicant or property owner listed above on: May 13, 2004 Date for work at: Land off of Marlborough Road 9 1 Street Address Assessor's Map/Plat Number Parcel/Lot Number recorded at the Registry of Deeds for: Essex So. District 17338 313 County Book Page Certificate(if registered land) is hereby extended until: May 13, 2010 Date This date can be no more than 3 years from the expiration date of the Order of Conditions or the latest extension. Only unexpired Orders of Conditions or Extension may be extended. Date the Order was last extended (if applicable): Date Issued by: Conservation Commission wpafcrM7.dw•rev.7/14/04 Page 1 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 7 — Extension Permit for Orders of Conditions 64-365 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Finding Information (cont.) This Order of ConditiSion must be signed by a majority of the Conservation Commission and a copy sent to th ppli he appropriate DEP Regional Office. Signatures: (J C Notary Acknowledgement Commonwealth of Massachusetts County of Essex On this 12April 2007 Day of Month Year Before me, the undersigned Notary Public, personally appeared K. Cornacchio, D. Pabich,M-84&F, D. Summer, A. Hamilton, K.Glidden, Name of Signer proved to me through satisfactory evidence of identification, which was/were personally known Description of evidence of identification to be the person whose name is signed on the preceding or attached document, and acknowledged to me that he/she signed it voluntarily for its stated purpose. As member of Salem City/Town Conservation Commission NftY Pubic �tOMNammoron 8 / COWNWIl t4 mDti ` Signature of tary Public Care R. u ues Printed Name of Notary Public Place notary seal and/or any stamp above August 16, 2013 My Commission Expires(Date) wpaform7.dm•rev.7/14/04 Page 2 0f 3 J Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 7 — Extension Permit for Orders of Conditions 64-365 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP C. Recording Confirmation The applicant shall record this document in accordance with General Condition 8 of the Order of Conditions (see below), complete the form attached to this Extension Permit, have it stamped by the Registry of Deeds, and return it to the Conservation Commission. Note: General Condition 8 of the Order of Conditions requires the applicant, prior to commencement of work, to record the final Order(or in this case, the Extension Permit for the Order of Conditions) in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, it shall be noted in the Registry's Granter Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, it shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed 'work is done. Detach page 3 of Form 7 and submit it to the Conservation Commission prior to the expiration of the Order of Conditions subject to this Extension Permit. To: Salem Conservation Commission Please be advised that the Extension Permit to the Order of Conditions for the project at: Marlborough Road 64-365 Project Location DEP File Number has been recorded at the Registry of Deeds of: Essex County for: Property Owner and has been noted in the chain of title of the affected property in accordance with General Condition 8 of the original Order of Conditions on: Date Book Page If recorded land the instrument number which identifies this transaction is: Instrument Number If registered land,the document number which identifies this transaction is: Document Number Signature of Applicant w afcrmTdo •rev.7/14/04 Page 3 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP Regional Addresses Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Mail transmittal forms and DEP payments,payable to: Commonwealth of Massachusetts Department of Environmental Protection Box 4062 Boston, MA 02211 DEP Western Region Adams Colrain Hampden Monroe Pittsfield Tynngham 436 Dwight Street Agawam Conway Hancock Montague Planfiald Wales Alford Cummngton Hadfield Monterey Richmond Were Suite 402 Amherst Dalton Hawley Montgomery Rowe Warwick Springfield,MA 01103 Ashfield Deadieid Heath Monson Russett Washington Phone:413-784-1100 Seckel Easthampton Hinsdale Mount Washington Sandisfield Wencell Belchertown East Longmeadow Holland New Ashford Savoy Westfield Fax:413-784-1149 Bemerdston Egremont Holyoke New Malborough Sheffield Westhampton Sandford Erving Huntington New Salem Shelburne West Springfield Bnmiefd Flonda Lanesborough North Adams Shutesbury West Stockbridge Buckland Gill Lee Northampton Southampton Whately Chademont Goshen Lenox Northrield South Hadley Wilbraham Cheshire Granby Leveren Orange Southwick Williamsburg Chester Granville Leyden Otis Springfield Williamstown Chesterfield Great Barrington Longmeadow Polder Stockbridge Windsor Chicopee Greenfield Ludlow Pelham Sunderland Worthington Clarksburg Hadley Middlefield Peru Tolland DEP Central Region Acton Chariton Hopkinton Millbury Rutland Uxbridge 627 Main Street Ashbumham Clinton Hubbardston Minviue Shidey Warren Ashby Douglas Hudson New8rantree Shrewsbury Webster Worcester, MA 01605 Athol Dudley Holliston Northborough Southborough Westborough Phone:508-792-7650 Auburn Dunstable Lancaster Nonhbldge Southbridge West Boylston Fax:508-792-7621 Ayer East Brookfield Leicester North Brookfield Spencer West Brookfield Barre Fitchburg Leominster Oakham Sterling Westford TDD:508-767-2788 Bellingham Gardner Littleton Oxford Stow Westminster Bertin Grafton Lunenburg Pardon Sturbridge Winchendon Blackstone Groton Malborough Pepperell Sutton Worcester Bolton Harvard Maynard Petersham Templeton Boatorough Hardwick Madway Phillipston Townsend Boylston Holder Mardon Princeton Tyngsborough Brookfield Hopedale Whom Rcyalston Upton DEP Southeast Region Abington Dartmouth Freetown Manapoisen Provincetown Tisoury 20 Riverside Drive Acushnet Dennis Gay Head Middleborough Raynham Truro Attleboro Dighton Gosnold Nantucket Rehoboth Wareham Lakeville, MA 02347 Avon Ouxbury Halifax New Bedford Rochester Wellfleet Phone:508-946-2700 Barnstable Eastham Hanover North Anleborough Rockland West Bridgewater Fax:508-947-6557 Berkley East Bridgewater Hanson Norton Sandwich Westport Bourne Easton Harwich Norwell Scituate West Tsbury TDD:508-946-2795 Brewster Edgartown Kingston Oak Bluffs Seekonk Whitman Bldgewater Farhaven Lakeville Orleans Sharon Wrentham Brockton Fall River Mansfield Pembroke Somerset Yamputh Carver Fanwuth Malan Plainvile Stoughton Chatham Foxborough Marshfield Plymouth Swansea Chilmark Franikin Mashpee Plympton Taunton DEP Northeast Region Amesbury Chelmsford Hingham Merrimac Quincy Wakefield 1 Winter Street Andover Chelsea Holbrook Methuen Randolph Walpole Arlington Corsi Hull Middleton Reatling Waltham Boston, MA 02108 Ashland Concord Ipswich Minis Revere Watertown Phone:617-654-6500 Bedford Danvers Lawrence Milton Rockport Wayland Fax: 617-556-1049 Belmont Dedham Laxinglon Nahant Rowley Wellesley Beverly Dover Lincoln Natick Salem Wenham TDD:617-654-6868 silence Dracut Lowell Needham Salisbury Wast Newbury Boston Essex Lynn Newbury Saugus Weston Boxford Everett Lynnfield Newburyport Sherbom Westwood Braintree Framingham Maiden Newton Somerville Weymouth Brookline Georgetown Manchester-By-The-Sea Norfolk Stoneham Wilmington Burlington Glaucaster Marblehead North Andover Sudbury Winchester Cambridge Groveland Medfield North Reading Swampscott Winthrop Conlon Hamilton Medford Norwood Tewksbury Woburn Carlisle Haverhill Melrose Peabody Topsheld wpalormZdx•DEP Addresses•rev.5129/07 Page t of 1 j 04/0 /2007 10:26 7813340111 DIBIASECOMP PAGE 01 Dieffiase P.U.Bm 780 Buss (781)934-9899 L"nfieI4 MA 019W Fm (781)3340111 FAX Date: 4/9/07 Attn: Carey Duques Fax #: 978-7404)404 RE: DEP#64-365 extension request for OB14RT Pages: 2 (including cover) Good Morning Carey, Please find attached a copy of our letter to Chairman Cornacchio for your records. Thank you, Lori Colameta DiBitase Corporation e 04/W/2007 10:26 7813340111 DIBIASECOMP PAGE 02 OSBORNE HILLS REALTY TRUST April 9,2007 Mr. Kevin Cornacchio,Chairman Salem Conservation Commission 120 Washington Street,3rd floor Salem,MA 01970 RE: DEI'#64-365 -Order of Resource Area Delineation(ORAD) Osborne dills Sub-division Salem, MA Dear Mr.Chairman, The above referenced(ORAD) for our project off Marlborough Rd in Salem is due to expire on May 13,2007. This development project is not yet complete. Therefore,we respectfully request an extension of time to complete the work authorized by the above referenced Order of Resource Area Delineation(ORAD)DEP File#64-365 for a period of three years,until May 13,2010. Thank you in advance for your cooperation in thus matter. Yours truly, Paul DiBiast41.40 Osborne Hills Realty Trust,Trustee PD/lc Cc via fax: Attorney Brian McGril Cc via fax: Carey Duques,Conservation Agent P.O.Box 980 Ly;;4WJ,MA 01940 P.781-334-9899 F.781-334-0111 www.ditriasehomes.com info49dibiaw1wmes.coat pv CITY OF SALEM CONSERVATION COMMISSION April 2, 2007 Paul DiBiase PO Box 780 Lynnfield, Massachusetts 01940 Re: DEP#64-365—Osborne Hills Order of Resource Area DelineationORAD — located off of Marlborough Road, Salem, Massachusetts ( ) Dear Mr. DiBiase: Please be advised that the Order of Resource Area Delineation (ORAD) of for the above referenced project will expire on May 13, 2007. If this development project is complete, you do not have submit anything to the Salem Conservation Commission. If this development project has not been completed, than you must submit a written request for an extension of the existing Order of Resource Area Delineation (ORAD) to the Commission at least 30-days prior to the expiration of the order, as required in the Wetland Protection Act. If the project has not been completed and your ORAD expires, you will be required to file a new Abbreviated Notice of Resource Area Delineation (ANRAD) to complete this previously approved project. For your information the ORAD for DEP file #64-376 is set to expire on October 14, 2007. If the work is not complete in this area either please request an extension for this project as well at least 30 days prior to the expiration of the order. Please contact me at (978) 619-5685 if you have any questions. Sincerely, ^ / Carey Duques Conservation Agent/Planner 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 . TEL: 978.745.9595 FAx: 978.740.0404 ♦ WWW.SALEM.COM OSBORNE HILLS REALTY TRUST April 9, 2007 RECEIVED Mr. Kevin Cornacchio,Chairman APR. 12007 Salem Conservation Commission DEPT.OF PLANNING& 120 Washington Street, 3rd floor COMMUNITY DEVELOPMENT Salem, MA 01970 RE: DEP#64-365 - Order of Resource Area Delineation(ORAD) Osborne Hills Sub-division Salem, MA Dear Mr. Chairman; The above referenced (ORAD) for our project off Marlborough Rd in Salem is due to expire on May 13,2007. This development project is not yet complete. Therefore,we respectfully request an extension of time to complete the work authorized by the above referenced Order of Resource Area Delineation(ORAD) DEP File # 64-365 for a period of three years,until May 13, 2010. Thank you in advance for your cooperation in this matter. Yours truly, Paul DiBias4 Osborne Hills Realty Trust, Trustee PD/lc Cc via fax: Attorney Brian MCGril Cc via fax: Carey Duques,Conservation Agent P.O. Box 780 Lynnfield,MA 01940 P.781-334-9899 F.781-334-0111 www.dibiasehomes.com info@dibiasehomes.com 200 P02 RPR 08 104 11:06 Wetlands & _ Land Management, Inc. i April 7,2004 Mr.non Cefalo Salem Conservation Commission 120 Washington Street Salem,MA 01970 RE: Wetland Delinastion Review of Property offBaroelona Avcmre Dear Mr. Cefelo and Conservation Commission Members: At your request,Wetlands&Land Management, Inc. has completed our review of the f wetland resource delineation at a portion of the property off%rcelons Avenue in Salem. The wetland resource delineation occurred on portions of property appareWy totaling over 236 acres. The wetland resource delineation review was hinted to lands easterly of Strongwater Brook, which traverses through the easterly third of the subject property. I reviewed the wetland boundary depicted on plans entitled"Resource Area Delineation Plan located in Salem, Masa."by Eastern land Survey Associates,Inc. dated December 8, 2003. Wetlands were delineated by Rimmer Environmental Consulting in October to December 2003. I visited the site onril 6 2004 with a AP representative ofRirnmrer Environmental Consulting. Wetlands on the site were reviewed using delineation methodology established in the Wetlands Protection Act and the Department of Environmemal Protection"Delineating Bordering Vegetated Wetlands Handbook"dated 1995, and the US Army Corps of Engineers Manual (1987). These regulations and methodology incorporate the evaluation of hydric soils, predominance of wetland vegetation and wetland hydrology to evaluate the upper limit of vegetated wetlands. With the area having just experienced a significant rain evert in the recent days,I can say, I probably j saw the site in the most advantsgeous conditions to assess the extent of wetland resource areas. After reviewing the flags in the field, l agreed with the location of most of the wetland OW. The steeply sloping topography on much of the study area sharply confined the 500 Maple Street,Danvers,Massachusetts 01923 Tel 978-777-0004 •Fax 97R-777-6363 T 200 P03 RPR 08 134 11:09 Omit of wetlands. In a few locations, my opinion Of the wetland boundary differed. WOOVIRy OPWM differed with respect to gag location orresourcel.aM characterization, the ttew flag tooation was adjusted in the field and in most areas,measured with respect to the OW tlag location. Some additional field survey is necessary to locate a newly delineated H series Raga. The Commission should require an updated plan from the applicant reflecting ttre revised wetland boundary,. The following summarizes the changes made in the field after reviewing the wetland boundary. f • In the field,I noted shallow surfltce water flow and scouring in the vicinity,of Rag t Al-1 on Lot 7. Following this flow path upstream or up elope, I observed areas in.tlte virgttity aftlre King and O'Leary properties offRavenoa and Barcelona Avenues tbet I characterized as a bordering vegetated wetland adjacent to the observed Row Oak The source of hydrology appears to be a combination of overland and groundwater flow Svm the adjacent watered possibly augmented by road drainage ftom the acyaOInt strata. I With the presence of the wetland Siege and the presence of hydric soils in these �f areas,l characterized this Row path as an kmmmam ah earn now path within or down gradient of a bordering vegetated watland. in the field,Rimmer EtMronnieiital Coftdting added new fop HI to H7 ovnt%g up slope on the southerly side oftivs system. New flags HS to H17 trended back down dope on the northerly side oftlle system. Flag Hl connects to AI-2. Fleg H17 connects to Ai. A lWfoot buffs l mne'woWd extend from this system. • In the W we agrand eed to move Rag AS 13 feet u sl relocated A8 to p ° eliminate flag A7 exiathrg A6. • MhII ate flags A9 and AI O. Connect the ncew A8 to Al 1. • In the field, Rags A26 to A34 were not found. Using the plans to recreate the wetland boundary in the field, I am comfortable with the extern and trend of the wetland boundary in this location. The Omit of wetlands along the B series was strongly cotntrolled by the limit of a E, madctato to steep slope. I did not adjust any flags on the 13 series. The C,D and F-aeries wetisnds were located wltMn steep aided topographic swales or SAN within the landscape. In the field,the limit Of wedwWs along the D series was F strcogly controlled by the limit Of strep slopes on both sides of the wetland boundary. I j did not adjust any flags on the D cies. �r i. 2 I . L# 200 PO4 PPR 08 104 11:10 + I noted that sur&ce water was flowing out of the down wadia►t or northerly terminus oftW&wedw4 within a Allow erosion dmm d wilft the adjaca t gravel path; stud, ' outletdng into the C wetland system. The plans should be amended to skew aA-itffermittft stream ahamo11.5 feet wide,betweta flags D24 and C2,centered wilMn the adjacent gravel path. The addition of this intermittent stream channel and associated bank resource area win add additional batt zone to the area easterly of the Gravel path • Add;a similar dirrhertaoa intermittent stream flow path between flag C 1 and 861, • I rated a flowing surface water eom ecdion between the C and E series. The plan skbuld be adjusted to connect flag C7 to EIS and connect CS to E19. • 066 E sores, we added a new flag El-1, located 44 fed up gradient of Hag E40. Comuect the existing El to El-I to E40 and extend the buffer zoos accordingly. • Mr m E37 five fed up slope. • Move E3610 fhb up slope a Move E35 15 feet up slope. 0 1334 WAS not found Using the plana to retreats the wedoW boundary in the field, I atri.apmfortable with the adatt Aird trend of the wetland boundary in this location. • Effibihate.B25 and Connect E24 to E26. I I made no a*Mmtg to the F series flags. t' At the 0 series.I noted that surface water was slowly flowing into and through a narrow, Citcavated channel at the down Wmn end of the pool. The surface water flow ended i �p:'" y�along this channel. Rimmer Envirdo nerttal Consufting placoed new .. to delineate this outlet cd+annal. B C'AWW ifrom this Y virtue of this excavated outlet wetland,it the appears cheractafzAtioti oftkis wetland system changes f7liutlt niit'jun8dicti0nal isolated we3land m. 'Ctonel'fro JurhstU rdering vegetated wetland. A ootrespondmg bufSer zone should be added to the plan. I traversed the remainmg areas on the eastmly aide of Stmagwater Brook and I did not aft aay'Additional wetlands on the study portion of the ift Thereareobviously at d*"etbuld boundaries on the opposite aide of the Wongwater Brook systerr and ; tm CouMWsaon should issue their wetand determination specific to those flags shown on the revised plan. I�. NeAtmerfimArea Thie section of Strongwater Brook hag already been evahuted to ascertain the presence of tn+grfiopt area. The property directly adjacent,downstream of this ata has been ev pied fur Averfxont anew during the course of a superieft Order of Conditions i nick on"a previous filing. I recall that the Department Superseding Order of Conditions x; 200 POS PPR 08 104 11:16 deteiadnation found the brook to be perennial begkming at a point downstream of what I local eves a bridge or stream crosWag on the now of former Fummi property. weed Qn thin pest detertrurtation, I concluded this section of Su%Vvater Brook up gradiW of that point on the Furnad property is iatwmttem. Rorie SpWes and CertoW Vemmal Poo[t The Natural Heritage AtlEA July,2003 indicates there is no estimated habitat of rare wetldods wildlife or certified pools on the protect site. E Thank you for the opportunity to Swint you on tbis m9tter. I will attend the April 8,2004 mcctiogto discuss my findings. Please call me if you have additional questions regarding the above. sioeerelY, I. Wetlands&Land Management,Inc, WHOM 1. Manuoil Wedand Scientist a r i 4 Wetlands & ,► Land Management, Inc. April 7, 2004 Mr. Don Cefalo Salem Conservation Commission 120 Washington Street Salem, MA 01970 RE: Wetland Delineation Review of Property off Barcelona Avenue Dear Mr. Ceftlo and Conservation Commission Members: Pursuant to the last Conservation Commission meeting on April 8, 2004, I returned to the field to meet with Mary Rimmer of Rimmer Environmental Consultants on April 15, 2004. At the site inspection, we viewed two areas where I had previously commented on the wetland boundary. Regarding the G series wetland, we observed the area again and I believe we are in concurrence about the existence and direction of surface water flow in the historically excavated channel. It appears that the channel was dug some time ago as evidenced by the profuse and uniform shrub growth within and adjacent to the channel. The plans should be amended to show the new flags recently placed in the field. This area would now be characterized as bordering vegetated wetland and would have a 100-foot buffer zone around this area. We looked at the upper reach of the E system again as well. The site visit was conducted a day after another major rain event. Examining the area of the new flag E1-1, (from my previous correspondence), we noted shallow concentrated surface water flow tightly confined in a channelized flow pattern within a portion of the area I had suggested would be vegetated wetland resource area. Soil probes immediately beyond the limits of this channelized flow revealed inconclusive soil matrix colors. Observing the hydrology and surface water conditions in the wettest conditions, I concurred with Ms. Rimmer that a portion of the area that I originally characterized as vegetated wetland is better characterized as intermittent stream, with that portion of the intermittent stream being up gradient of the bordering vegetated wetlands. Accordingly, I 500 Maple Street, Danvers, Massachusetts 01923 Tel 978-777-0004 • Fax 978-777-6363 relocated flag El-1 to a new location 24 feet up gradient of flag E40. Connect the existing El to the new El-1 to existing E40. We did not view any other locations at this site visit and my comments from the previous letter would stand. Thank you for the opportunity to assist you on this matter. Please call me if you have additional questions regarding the above. Sincerely, Wetlands&Land Management, Inc. Lid)-9 1)1"'&2 William J. Manuell Wetland Scientist 2 Professional Land Surveyors&Civil Engineers ESSEX SURVEY SERVICE 1958- 1986 OSBORN PALMER 1911 - 1970 April 26, 2004 BRADFORD&WEED 1885- 1972 nud��jtl.nVa� Mr. Kevin Cornacchio, Chairman APR 2 8 1004 Salem Conservation Commission 120 Washington St., 3rd Floor Salem, MA. 01970 RE: F12795 OSBORNE HILLS SALEM, MA. Dear Mr. Chairman: Please find attached ten sets of the Resource Area Delineation Plan. These plans have been revised to reflect the changes by your consultant, Wetlands and Land Management, Inc. I will be in attendance at your May 13, 2004 meeting should any questions arise. Sincerely, Christopher R. Mello, P.L.S. President CRM:alb Enclosure CC: Mr. Paul DiBiase Attorney Brian McGrail • 104 LOWELL STREET PEABODY, MASS, 01960 TELEPHONE: 978-531-8121 TELECOPIER: 978-531-5920 E-MAIL: elsai@prodigy.net 153 P01 - MAR 10 W 16:29 Wedilods & Land Mansatment, Ince FAX TRANSMMUL CQVER PAGE I Tot Don Cefaio FrM-. Bill Manuell 1 Co.Ware:. Salem CC Date: March 10, 2004 tf 1 I?as#: 979 04 7f LM FlieS =A ' Total number 6 pages including toyer page 2 i Regarding: DiBiase i NotwCbmments: The original is in the mail. Beware,ground frost could delay when 1 can get out and do a proper vartt"tcadon. It's getting batter but some areas, I still can't anger. PLEASE CALL IF YOU DO NOT RECEIVE ALL PAGES THANK YOU 5W M"Std.Dsavm,MA 01926 Telephone�978-777.0004 Fax—978-777.6363 154 P01 MAR 10 104 16:31 1 . Wetlands & Land Management, Inc. March 9, 2004 Don Cefalo Salem Conservation Commission 120 Washington Street Salem, MA 01970 RE: Request for quote on Professional Services Wetland Delineation Review DiBiase Project off Marlborough Street Dear Mr. CAW Wetlands&Land Management, Inc. can provide wetland delineation review services for the DiBiase project off Marlborough Road as requested. I anticipate reviewing , approximately 5500 linear feet of wetland delineation boundary for conformance with. DEP and Federal methodologies, and preparation of a summary letter report. The cost-for these services is$750.00. In addition, I can attend public hearings as necessary. The cost to attend each meeting and/or site walk beyond the initial review will be$250,00 per meeting or site walk. Thank you for the opportunity to provide this cost estimate. I can proceed within one week of notice to proceed. SIncerely, Wetlands&Land Management,Inc. s. William I Manuell . Professional Wetland Scientist 500 Maple Street, Danvers,Massachusetts 01923 Tel 978-777-0004 Fax 978-777-5363 CITY OF SALEM n CONSERVATION COMMISSION Memorandum To: Denise McClure From: Don Cefalo Date: 3/22/04 Re: Proposals for ANRAD Review Marlborough Road Cc: The following are the three proposals for the review of the 5,500 linear feet of wetland delineation off Marlborough Road for Osborne Realty Trust(Paul Dibiase): 1. The BSC Group, Inc. - $1,600.00 2. Hancock Associates- $1, 600.00 3. Wetlands&Land Management, Inc. - $1,000.00 Recommendation: After review of the above three proposals, I recommend that the Conservation Commission award the peer review to Wetlands&Land Management Inc. (Bill Manuell). Bill is the same person who was chosen to do the peer review for the wetlands line for the Steadman ANRAD so the Commission is confident with his work. It so happens that Rimmer Associates (Mary Rimmer) did both the initial wetlands delineation for both the Steadman project and now the project proposed off Marlborough Road and Bill is quite familiar with her work. I also look at the cost factor of the three companies and Bill's was the lowest out of the three. The cost included field review of the delineated wetlands, a report of findings and attendance to one public hearing to answer any question for the Commission. Any additional hearings would be $250.00 per meeting. In addition,David Padich at the request of Kevin Comacchio stopped by Thursday March 18th to review the proposals. He agreed with my recommendation and would forward his decision to Kevin. After speaking with Kevin on Saturday,March 20°i at a non-related site visit, he informed me that he was satisfied with both David's and myself recommendation and to more forward to acquire the services of Wetlands and Land Management Inc. 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 ♦TEL: 978.745.9595 FAx: 978.740.0404 ♦ WWW.SALEM.COM ......... Wetlands & == Land Management, Inc. th March 9, 2004 I Don Cefalo !' Salem Conservation Commission 120 Washington Street Salem, MA 01970 RE: Request for quote on Professional Services—Wetland Delineation Review DiBiase Project off Marlborough Street Dear Mr. Cefalo: Wetlands& Land Management, Inc. can provide wetland delineation review services for the DiBiase project off Marlborough Road as requested. I anticipate reviewing approximately 5500 linear feet of wetland delineation boundary for conformance with DEP and Federal methodologies, and preparation of a summary letter report. The cost for these services is $750.00. In addition, I can attend public hearings as necessary. The cost to attend each meeting and/or site walk beyond the initial review will be $250.00 per meeting or site walk. Thank you for the opportunity to provide this cost estimate. I can proceed within one week of notice,to proceed. Sincerely, Wetlands &Land Management, Inc. LJ,)_ 9 M �. William J. Manuell Professional Wetland Scientist 500 Maple Street, Danvers, Massachusetts 01923 Tel 978-777-0004 • Fax 978-777-6363 .m•mwr. "'��� °��ea�o�i� DEPARTMENT OF PUBLIC SERVICES 50 FARM AVENUE PEABODY, MASSACHUSETTS 01960-5493 CITY ENGINEER TELEPHONE(978) 536-0600• FAX (978) 535-3754 WATER SUPPLY MUNICIPAL GARAGE SANITARY SEWERS SOLID WASTE STREETS &DRAINAGE MEMO TO: Salem Planning Board FROM: Richard M. Carnevale, Director ht-( 3/2-7hq SUBJECT: Osborne Height Subdivision—off of Marlborough Road Salem & Peabody, MA DATE: March 29, 2004 CC: Mayor Michael Bonfanti Mayor Usovicz Peabody City Council Salem City Council Peabody Planning Board Salem Conservation Commission Peabody Conservation Commission DPS-Bruce Thibodeau DPS-Mike Fowler Community Development-Jean Delios/Joe Viola File As you are aware plans for the development of the DiBiase property in both Salem and Peabody have been submitted to the Salem Planning Board and Conservation Commission, as well as the Peabody City Council over the last 2 months. The proposed projects will present a number of traffic, zoning, planning, utility and drainage issues to review. The Peabody and Salem administrations are currently closely working together to keep both parties apprised of the situation. As the data, plans, etc.,come before the respective City boards and departments, we should copy each respective department or board in each City to ensure that we receive all information regarding this project. Bruce Thibodeau, Salem DPS Director, and I are meeting on March 31"to discuss these projects. These proposed projects fall in the Strongwater Brook watershed which currently has significant flooding issues. A number of studies have been done both by City engineers and contracted engineers (see attached), and I request that drainage mitigation be a part of any discussions on these projects. Storms in 1996, 1998 and 2001 have caused repetitive flood damage losses to numerous homes downstream of the proposed projects (see photographs). I look forward to working cooperatively with the City of Salem on this issue. Please contact me at (978)536-7126 or richard.camevale@peabody-ma.gov if you have questions. Ss mc:Osbome Neiglu SuMvision FLOOD PLAIN MANAGEMENT SERVICES PROGRAM STRONGWATER BROOK FLOODING STUDY PEABODY, MASSACHUSETTS 4 October 2003 1 1 I � 1 US Army Corps of Engineers New England District v T City of Peabody Peabody Square. Flood Control Study April 2003 0 a �r r I i C n r i f i i i 1 I D raft 7 �'Tyy✓tom.: ti. > i� � �,�� �h� +Y f � '•fit � - � '� _k tr +',YbL .z'���`.,�e(y..iz5r��.�'u�"t�z •k;. �,� �" r''+�.,Y--srV. �f _. ', ;', _. ' R' �F . J ten♦ .i 1 > .` `G' tr � _ -_ I,rrwallrtr El I ±� CDMCAMP DRESSER & McKEE INC. environmental engineers,scientists, One Center%azo planners,6 management consultants Boston,Massechusette 02106 617 742-5151 November 29, 1988 Mr. John Seites, Engineering Manager City of Peabody Department of Public Services Berry Street Peabody, MA 01960 RE: Memorandum on Phase I and Phase II Findings Peabody Square Flood Study Dear Mr. Seites: This letter memorandum reports on the findings of the analyses performed to date on the Peabody Square Flood Study. In particular, the purpose of this memorandum is to summarize the detention basin analysis, and provide screening level cost estimates associated with various flood control measures. This memorandum is the final deliverable for Phases I and II of this project. Attached to this summary are the following support documents: e Memorandum on Potential Detention Pond Sites, dated September 28, 1988; e Memorandum on Project Approach and Design Criteria, dated October 4, 1988; e Data Collection Memorandum of October 17, 1988; and e Memorandum on Hydrologic Findings, including detention pond analysis dated November 29, 1988. These documents are included for your convenience and review. Project Objectives The flood study for Peabody Square is being conducted in multiple phases. Phase I and II, which are now completed, are the data collection and hydrologic analyses portions of the overall study. Phase III and IV, which we are ready to begin as soon as we receive authorization to proceed, encompass the hydraulic analyses and cost estimating tasks. i I, QJ71rnLI!of �`�� / COSH Tp�G SGG, BGC, Zoa6 Cosi � nde-K 22L JULY 1979 Zorn cos� s3/H^�� _ � 341;C, ��3 COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF PUBLIC WORKS �d .Y* SALEM- PE DY CONNECTOR HT UKAWLICo Kt: VL p, �} �f l HOWARD NEEDLES TAMNIEN & BERGENDOFF I / Report to DEPARTMENT OF PUBLIC WORKS OF MASSACHUSETTS upon FLOOD CONTROL AT PEABODY June 29, 1956 Metcalf& • • M ^ a � !is .." !:._ •� a— � _ '✓•ley a*!"'– '. i - � _ rI � ' ,�,..a.' G �V .:J:•. 1 MM � e"T-Arqpjom TI. i�aIJ� ' ' a `� {✓fNs'.� j 41. Wit pal ' �'-yam- �. •r►p.... '��. t�� C� �'t '.AZT � r� 44" $'T; �. I Irk j . . I +f y) ```.j z� •'�r!I�i. ,.�•.�y�• l ?~ Yr•• IiF_� • �bF� � 1'�a II�fY��..�Y t _ �T 5` .. f 1. �.� - ► y�pr.+'.! ) i � a = - �,y...c • • .� �. .� to . or • _ I P _ ff utII, x cl, JI �y.,v4 rt zWTrs - ,.,� 6t° �. .')fy i ��1• I f�i t� .E 4• cn •i' ' 4�'r' ' _ 1 rs _ �s�^I• "IT —lose. I r �£ 1 s I LN Q �� �• _ \'`,` .ice _ \. ` 1 f { y ✓f�� � � i�l yy.',.�ftt F�°�� e � t �ZL I. ` .. �_ i, c 1- ' !. �, .3:i z i $ r}�•" �S RRR�y���"' 1 i�...•' F�.."y'+�q�� . iiIIIII•_. _ _. .. r - �.R;i aa.'�1��"^^'1� Yi L" i" .f� n ;. - "' E''.M���'A �y a '�'�0.�a •• j' li,s•� f:•:s _ :._ � �---�.. _ � �. _.... � i� s��..+.��..�4,1.n. ,F`'4-., �..:'�.,.g•,r /, rt �l•J` ���J�Y�/i f�'/ �� --- f � ^w. .1_.+.ten....-�__. - ,.,• Ah N`� -S•Y i..R.n.! j., 'F >M ���..�,yy �.\_ —,7C. iu ...: --:- : --+.r�..�_,,, --�. �_.-, k wfi w. 7a�x"r : �fµr�+x. ® ae•r qi s v. Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number: WPA"Form 4A — Abbreviated Notice of Resource Area Delineation Salem Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. General Information Important: When filling out 1. Applicant: forms on the Osborne Hills Realty Trust computer, use Name E-Mail Address(if applicable) only the tab key to move P. O. Box 780 your cursor- Mailing Address do not use the Lynnfield MA 01940 return key. City/Tom State Zip Code 781-844-7026 Phone Number Fax Number(if applicable) 2. Representative (if any): Firm Attorney Brian McGrail Contact Name E-Mail Address(if applicable) 333 North Ave. Mailing Address Wakefield MA 01880 Cityrrown State Zip Code 781-246-9999 Phone Number Fax Number(if applicable) 3. Property Owner(if different from applicant): Same Name Mailing Address City/Town State Zip Code 4. Total Fee: $1,000.00 (from Appendix B:Wetland Fee Transmittal Form) 5. Project Location: Marlborough Road Salem Street Address Ctty/Town 9 1 Assessors Map/Plat Number Parcel/Lot Number 6. Registry of Deeds: Essex So. District 17338 313 County Book Page Certificate(if Registered Land) Massachusetts Department of Environmental Protection i Bureau of Resource Protection -Wetlands ' DEP File Number: WPA Form 4A —Abbreviated Notice of Resource Area Delineation Salem Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Area(s) Delineated 1. Bordering Vegetated Wetland (BVW): 5500 LF Unear Feet of Boundary Delineated 2. Check all methods used to delineate the Bordering Vegetated Wetland (BVW) boundary: ® DEP BVW Field Data Form (attached) ❑ Other Methods for Determining the BVW boundary (attach documentation): ❑ 50% or more wetland indicator plants ❑ Saturatedlnundated conditions exist ❑ Groundwater indicators ❑ Direct observation ❑ Hydric soil indicators ❑ Credible evidence of conditions prior to disturbance. 3. Indicate if any other resource area(s) are delineated: Resource Area (s): Isolated Land Subject to Flooding C. Additional Information Include the following with this Abbreviated Notice of Resource Area Delineation: a.) USGS or other map of the area (along wfth a narrative description, if necessary), containing sufficient information for the Conservation Commission and the Department to locate the site. b.) Plans identifying the boundaries of the Bordering Vegetated Wetlands(BVW) (and other resource areas, if applicable). c.) Other material identifying and explaining the determination of resource area boundaries shown on plans(e.g., a DEP BVW Field Data Form). d.) List the titles and final revision dates for all plans and other materials submitted with this Abbreviated Notice of Resource Area Delineation. j i i r Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number: WPA Form 4A — Abbreviated Notice of Resource Area Delineation Salem Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Providedby DEP D. Fees The fee for work proposed under each Abbreviated Notice of Resource Area Delineation must be calculated and submitted to the Conservation Commission and the Department (see Instructions and Appendix B:Wetland Fee Transmittal Form). E. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Abbreviated Notice of Resource Area Delineation and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40. Notice must be made in writing by hand delivery or certified mail fretum r i re nested)to all abutters within 100 feet of the property line of the project location. i aur pp s/cant �Q Date Signature of Property Owner if different) Date Sig u o epresenta6 aIf any) Date For Conservation Commission: Two copies of the completed Abbreviated Notice of Resource Delineation (WPA Form 4A), including supporting plans and documents;two copies of pages 1 and 2 of Appendix B; and the city/town fee payment must be sent to the Conservation Commission by certified mail or hand delivery. For DEP: Two copies of the completed Abbreviated Notice of Resource Delineation (WPA Form 4A), including supporting plans and documents;two copies of pages 1 and 2 of Appendix B; and a copy of the state fee payment must be sent to the DEP Regional Office (see Appendix A) by certified mail or hand delivery. The DEP copies must be sent at the same time as the application submission to the Conservation Commission. Failure by the applicant to send copies in a timely manner may result in dismissal of the Abbreviated Notice of Resource Area Delineation. lMassMassachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands achusetts WPA Appendix B - Wetland Fee Transmittal Form Wetlands Protection Act M.G.L. c. 131, §40 Important: when filling out A. Applicant Information forms on the computer, use 1. Applicant: only the tab key to move Osbome Hills Realty Trust your cursor- Name do not use the P. O. Box 780 return key. Mailing Address ;fry Lynnfield MA 01940 Cfty/rown State Zip Code 781-844-7026 Phone Number Aa n 2. Property Owner(if different): Same Name Mailing Address Cdyrrown State Zip Code Phone Number 3. Project Location: Marlborough Road Salem Street Address City/Town B. Fees To calculate filing fees, refer Abbreviated Notice of Resource Area Delineation (Form 4A): to the category fee list and The fee is calculated as follows (check applicable project type): examples in Section D of this form. ❑ single family house project X$1.00= (feet of BVV1) Total fee(not to exceed$100) ❑ all other projects X$1.00= $1,000.00 (feet of 8VV1� Total fee(not to exceed$1,000) State share of filling fee:$ 487.50 (112 of total fee less$12.50) Cityrrown share of filling fee:$ 512.50 (12 of total fee plus$12.50) wpafonn4a. e •Appendix B.w 1224103 Page i of 6 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands l.\ WPA Appendix B — Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Fees (cont.) Abbreviated Notice of Intent(Form 4)or Notice of Intent(Form 3): The fee should be calculated using the following six-step process and worksheet: Step 1/Type of Activity: Describe each type of activity (see Section D for a list of activities)that will occur in wetland resource area and buffer zone. Step 2/Number of Activities: Identify the number of each type of actively. Step 3/Individual Activity Fee: Identify each activity fee from the six project categories in Section D. Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2)times the fee per category (identified in Step 3)to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in addition to another Resource Area or the Buffer Zone,the fee per activity should be multiplied by 1.5 and then added to the subtotal amount. Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4. Step 6/Fee Payments:To calculate the state share of the fee,divide the total fee in half and subtract $12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50. Step 1/Type of Activity Step 2/Number Step 3/Individual Step 4/Subtotal of Activities Activity Fee Activity Fee Step 5rrotal Project Fee: Step 6/Fee Payments: Total Project Fee: (Total fee from Step 5) State share of filing fee: (12 total fee less$1256) City/Town share of filling fee: (12total fee plus$12.50) wpafama -ApWe e•rev.1212403 Page 2 of 6 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Appendix B - Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Important: A. Applicant Information When filling out pp forms on the computer, use 1. Applicant: only the tab key to move Osborne Hills Realty Trust your cursor- Name do not use the P. O. Box 780 return key. Mailing Address Lynnfield MA 01940 Cdyfrown State Zip Code 781-844-7026 Phone Number 2. Property Owner(if different): Same Name Mailing Address City/Town State Zip Code Phone Number 3. Project Location: Marlborough Road Salem Street Address Cityrrown B. Fees To calculate filing fees, refer Abbreviated Notice of Resource Area Delineation (Form 4A): to the category fee list and The fee is calculated as follows (Check applicable project type): examples in Section D of this form. ❑ single family house project X$1.00= (feet of BVVV) Total fee(not to exceed$100) ❑ all other projects X$1.00= $1,000.00 (feet of BVVv) Total fee(not to exceed$1,000) State share of filling fee:$ 487.50 (1/2 of total fee less$12.50) Cityrrown share of filling fee:$ 512.50 (12 of total fee plus$12.50) wpafomMa dw•Appenfu B-rev.1124103 Page 1 W 6 I� JOHN R. KEILTY, ESQUIRE DATE NvolcE AMOUNT 3 53 179 = Counselor at Law 40 LOWELL STREET PEABODY, MASSACHUSETTS 01960 - N0- 10066 PAMOUNT — DOLLARS DATE TO THE ORDER OF GROSSAMT. DESCRIPTION I NET.AMOUNT - - / 90 Eastern Bank -Lynn, MA Au Ini SIGNATU 111010066R■ 1:0113017981: 60 00453 n■ JOHN R. KEILTY, ESQUIRE GATE INVOICE AMOUNT 53_179 Counselor at Law 113 40 LOW ELL STREET PEABODY, MASSACHUSETTS 01960 N2 10065 PAMOUNT DOLLARS DATE TO THE ORDER OFOSSAMT. DESCRIPT ON NET AMOUNT e„�.1�&_ �[U Eastern Ba71I( -Lynn, MA HUflIZEG SI ATUFE 11101006 511• 1:0113017981: 60 00!. 5 D• RIMMER ENVIRONMENTAL CONSULTING 21 Pine Island Road Newbury, MA 01951 Tel 978-463-9226 Fax 978-463-8716 0 WETLAND RESOURCE AREA DESCRIPTIONS Marlborough Road Salem,MA December 23,2003 INTRODUCTION . The following is a summary of wetland site investigations conducted by Rimmer Environmental Consulting(REC)within property located off of Marlborough Road and Barcelona Road in Salem,Massachusetts. The purpose of these investigations was to determine the extent and location of wetland resources subject to jurisdiction under the Massachusetts Wetlands Protection Act(MGH Ch. 131 s. 40) and the City of Salem Wetlands Ordinance within and immediately adjacent to the project site. METHODS The limits of jurisdictional wetland resources were delineated by Rimmer Environmental Consulting on October 29 and December 3, 2003. Wetlands were identified with numbered sequence of flags in accordance with the procedures established within the Massachusetts Wetlands Protection Act Regulations (3 10 CMR 10.00) and the Department of Environmental Protection—Delineating Bordering Vegetated Wetlands Handbook(1995), as well as the City of Salem Wetlands Ordinance. Wetland vegetative criteria as well as evidence of wetland hydrology, including hydric soils were used to delineate the wetland boundary. WETLAND RESOURCES The following wetland systems are present at the site: . i A-Series(AI-A43):Bordering Vegetated Wetland This wetland system consists of a large freshwater marsh which flows north into Strongwater Brook. The plant community dominated by purple loosestrife (Lythrum salicaria) as well as a variety of grasses, sedges and forbs, including soft rush (Juncus effusus),New England aster(Aster novae-angliae) and reed canary grass (Phalaris arundinacea). The boundary is well defined by topographic features, including bedrock outcrops. B-Series(BI-B95): Bordering Vegetated Wetland The B-series is separated from the A-series by a trail;however a culvert connects the two systems hydrologically. The B-series is primarily a forested wetland consisting of red maple (Acer rubrum),northern arrow-wood(Viburnum recognition),pussy willow(Salix Eastern land Survey Associates, Inc. Re: Marlborough Street—Salem,MA Page 2 of 3 discolor) and highbush blueberry(Vaccinium corymbosum). The northernmost portions of the B-series also contain a freshwater marsh containing purple loosestrife and broad- leaf cattail (Typha latifolia). Much of the boundary is well defined by slope and a clear change in vegetation from the upland to the wetland. The dominant vegetation in the adjacent upland includes black cherry (Prunus serotina),white ash (Fraxinus arnericana) and poplar(Populus deltoides) in the overstory, and black cherry and privet(Ligustrum sp.) in the understory. C-Series(CI-C]2): Bordering Vegetated Wetland This series delineates a small depression located south of the trail separating the B-series from the C-series. It appears to receive runoff from the northern portion of the trail,as well as the E-series to the south.This wetland contained water stained leaves and other evidence of sustained flooding. The wetland contains a few mature red maple, as well as scattered winterberry holly(Ilex verticillata),northern arrow-wood and highbush blueberry in the understory. Royal fern (Osmunda regalis) and sensitive fern(Onoclea sensibilis)were noted in the herbaceous stratum. The adjacent upland contained evidence of historic filling and was s v egetated with non-native species, especially Norway maple (Acer platanoides). D-Series(DI-D47): Bordering Vegetated Wetland/Inland Bank This series delineates a narrow bordering vegetated wetland associated with an intermittent channel that enters the site from the electric easement to the south. There was some standing water within the channel at the time of observation,but no flow. The channel and banks as well as the narrow fringe of vegetated wetland within the cleared easement consist largely of common reed (Phragmites australis). Within the treeline in the northern portion of this wetland system is a forested/scrub shrub wetland containing species similar to the B-series, including a red maple overstory,with an understory of winterberry,northern arrow-wood and cinnamon fem(Osn:unda cinnamomea). The adjacent upland rises steeply and is mostly open field and meadow in the easement and a mixed oak(Quercus spp.) and black cherry(Prunus serotina)forest. E-Series(EI-E40): Bordering Vegetated Wedand/Inland Bank This series occurs to the south of the D-series,and is connected to the C-series by overland flow. Much of this system has.been altered by historic filling. There is a faint channel that meanders between piles of fill and boulders that appears to overtop into the C-series. There was no flow at the time of observation. The vegetation includes red maple and crabapple (Prunus sp.) in the overstory with European buckthorn (Rhamnus frangula), highbush blueberry and winterberry in the understory. Bristly blackberry (Rubus hispidus)was noted as the dominant groundcover in much of this wetland system. F-Series(FI-F9): Bordering Vegetated Wetland This wetland is located along the southern property boundary and includes a swale and vegetated wetland extending into the site from a larger off-site pond and marsh system. The portion of the wetland on the site includes a narrow fringe of wooded swamp and a wet meadow dominated by purple loosestrife. RIMMER ENVIRONMENTAL CONSULTING Eastern land Survey Associates, Inc. Re: Marlborough Street—Salem,MA Page 3 of 3 G-Series(GI-G7):Non-Jurisdictional Isolated Vegetated Wetland This wetland is a small, isolated depression located in the southeastern portion of the site, near Marlborough Road..It contains quaking aspen(Populus tremuloides)in the overstory and pussy willow,highbush blueberry,northern arrow-wood, and steeplebush (Spiraea tomentosa)in the understory. The presence of water-stained leaves indicates periodic ponding within this wetland. Due to its small size and lack of a connection to another wetland or waterway,this wetland is not jurisdictional under the Massachusetts Wetlands Protection Act. OTHER RESOURCES There are no certified vernal pools, estimated habitat of rare wetlands wildlife, or priority habitats of rare species within the project area, as determined by reference to the Massachusetts Natural Heritage and Endangered Species program,Natural Heritage Atlas (I Ith edition). SUMMARY Any proposed construction or activity at the site within the 100-foot Buffer Zone to Bordering Vegetated Wetland will be subject to review by the Salem Conservation Commission under the Massachusetts Wetlands Protection Act RIMMER ENVIRONMENTAL CONSULTING Park -41VF� /�Sicp cu, N 0 Ce I : 4 Gott Course 4'- 'E5,— 'OF7 F nwood Hie Pa �iotf cou,sC Q,,tr��lob "A Z, covrse och 57' 30" 340 341 nD;54,'a342 55, 343 KILOMETERS 1 .5 O 1 2 MILES 0 Copyright(C)1996,Earthvisiom,Inc.