Loading...
64-266 - 22 KOSCIUSKO STREET - CONSERVATION COMMISSION 2 .64 aaj22 KOSciusk Nal atonsPark Serviervi ce NOI — 'r + E' I 1 n i 310 CMR 10. 99 DEP Pile No. 64-266 Form 8 (To be provided by DEP) City/Torn Salem APplic t NPS Commonwealth of Massachusetts , Certificate of Compliance Massachusetts Wetlands Protection Act, G.L. c. 131, 540 From Salem Conservation Commission Issuing Authority To Nation Park Service 174 n rh* cr rrci (Name) (Address) Date of Issuance 9/24/98 This Certificate is issued for work regulated by an Order of Conditions issued to National Park Serviea _dated June 26, 1997 - and issued by the Commission 1. ❑ It is hereby certified that the work regulated by the above- referenced Order of Conditions has been satisfactorily completed. 2. ❑ It is hereby certified that only the following portions of the work regulated by the above-referenced Order of Conditions have been satisfactorily completed: (If the Certificate of Compliance does. not include the entire project, specify what portions are included.) 3. E] It is hereby certified that the work regulated by the above- referenced Order of Conditions was never commenced. The Order of Conditions has lapsed and is therefore no longer valid. No future _ work subject to regulation under the Act may be commenced without filing a new Notice of Intent and receiving a new Order of Conditions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (Leave Space Blank) Effective 11/10/89 8-1 Registry 4 . The ..e rt ifica2e shall be recorded in the of Deeds or the Land Court f= the district in which the land is located. The Order was originally recorded or. (date) at the Registry of Hook Page 5. ❑ The following conditions of the Order shall continue: (Set forth an), ' conditions c=tained in the Final Order, such as maintenance or monitoring, which are to continue for a longer period. ) Issued by Salem Co e.. tion Co issio Signatur s /f !� When issued by the Conservation Commission this Certificate must be signed by a majority of is members. _ On this 94Lrh day of September 1998 before me personally appeared the ahoy „r;�,.o,I to me known to be the person described in and who executed the foregoing instrument and acknowledged that h s Lecuted/ be his/her free act and SfNENDIBBLE N tory Public MyComutission Expires Nov.12,2004 Nota y Public My commission expires Detach on dotted lire and submit to the ............................................................................................................ To Issuing Authority Please be advised that the Certificate of Compliance for the project at: File Number has been recorded at the Registry of and has been noted in the chain of title of the affected property on , 19 If recorded land the instrument number which identifies this transaction is if registered land the document number which identifies this transaction is Signature Applicant 6-2 t 310 CMR 10.99 DEP File No. 64-266 (To be provided by DEP) Porro 5 City/Town Salem Applicant National Park Service Commonwealth ' of Massachusetts Order of Conditions Massachuetts Wetlands Protection Act G.L. C. 131, 540 From Salem Conservation (`nroro4cc Issuing Authority To National Park 4ni-iri .. (Name of Applicant) (Name of property owner) Address 174 Derby Street, Salem Address caro. This Order is issued and delivered as follows: ® by hand delivery to applicant or representative on June 27, 1997 (date) ❑ by certified mail, return receipt requested on (date). This project is located at 22 Kosciusko The property is recorded at the Registry of Essex Book Page Certificate (if registered) The Notice of Intent for this project was filed on June 19, 1997 (date) The public hearing was closed on June 26. 19.7 (date) Findings The Commission has reviewed the above-referenced Notice of Intent and plans and has held a public hearing on the project: Based on the information available to the Commission at this time, the Commission has determined that the area on which the proposed work is to be done is significant to the following interests in accordance with the Presumptions of Significance set forth in the regulations for each Area Subject to Protection Under the Act (check as appropriate): Public water supply R Flood Control Land containing shellfish Private water supply �.¢ Storm damage prevention Fisheries Ground water supply LX Prevention of pollution Protection of Wildlife Habitat Total Filing Fee Submitted 192 State Share 83.50 (1/2 fee in excess of $25) City/Town Share 108.50 Total Refund Due S City/Town Portion E - State Portion$ (1/2 total) (1/2 total) Effective 11/10/89 5-1 Therefore, the Commi.ss;nn hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the regulations, �c protect those interests checked above. The Commission orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. General Conditions 1. Failure to comply with all conditions stated herein, and with all related statutes and other' regulatory measures, shall be deemed cause to revoke or modify this Order. - 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 4 . The .work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: (a) the work is a maintenance dredging project as provided for in the Act; or (b) the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance and both that date and the special circumstances warranting the extended time period are set forth in this Order. S. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any sill used in connection with this project shall bL clean fill, containing no trash, refuse, rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, .refrigerators, motor vehicles or parts of any of the foregoing. 7% No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Final order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final order shall also be noted on the Land Court certificate of Title of the owner of the land upon which the proposed work is to be done. The recording informatin shall be submitted to the Commission on the form at the end of this Order prior to commencement of the work. 9. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words, ,,Massachusetts Department of Environmental Protection, File Number 64-266 10. Where the Department of Environmental Protection is requested to make a determination and to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceeaings and. hearings before the Department . i 5-2 11. Upon completion of the work described herein, the applicant shall forthwith request in writing that a Certificate of Compliance be issued stating th,-T the work has been satisfactorily completed. 12. The work shall conform to the following plans and special conditions : Plans: Title Dated Signed and Stamped by: On File with: Seawall Rehabilitation 6/97 DIWADKAR Commission Special Conditions (Use additional paper if necessary) See attached Special Conditions (Leave Space Blank) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3A Issued Ey Salem Conservation Commission Si nature (s) _ This Order must be signed b majority of the Conservation Commission. On this 26th day. of June 19 97 before me personally appeared the Above Mentioned to me known to be the person described in and who executed the foregoing instrument and acknowledged that,h/e/she executed the same as his/her free act and deed. 0 11tary Public My commission expires The applicant, the owner, any person agrrieved by this Order, any owner of land abutting the land upon which the proposed work is to be done, or any ten residents of the city or town in which such (and is located, are hereby nctified of their right to request the Department of Environmental Protection to issue a Superseding Order, providing the request is made by certified mail or hand delivery to the Department, with the appropriate filing fee and Fee Transmittal Form as provided in 310 CMR 10.03(7), within ten days from the date of issuance of this determination. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and the applicant. Detach on dotted line and submit to the prior to commencement of work. ............................................................................................................ To Issuing Authority Please be advised that the order of Conditions for the project at File Number has been recorded at the Registry of and has been noted in the chain of title of the affected property in accordance with General Condition 8 on ,19 If recorded lard, the instrument number which identifies this transaction is If registered land, the document number which identifies this transaction is Signature Applicant 5-4A SALEM CONSERVATION COMMISSION SPECIAL CONDITIONS - DEP FILE#64-266 ADDRESS: 22 KOSCIUSKO STREET 1. All work shall conform to the above-referenced Notice of Intent, site plan and supporting documents and those final specifications which shall be filed with the Commission prior to construction. Any change made or intended to be made to the approved plans shall require the applicant to inquire of the Commission in writing whether the change is substantial enough to require the filing of a new Notice of Intent. 2. Members and agents of the Commission shall have the right to enter and inspect the premises at all reasonable times to evaluate compliance with the conditions in this Order. The Commission may require the applicant to submit additional data or information necessary for the Commission to conduct that evaluation. 3. Upon completion of the project, the applicant shall submit, with the request for a Certification of Compliance, an affidavit, prepared by a professional engineer or land surveyor registered in the Commonwealth of Massachusetts, stating that the site has been developed in accordance with the requirements of this Order of Conditions, the referenced site plan and supporting documents. 4. This Order shall apply to every successor in control or successor in interest of the property described int he Notice of Intent and accompanying plans or part thereof. In the event this land or any part thereof changes ownership before or during construction, the current owner shall notify the new owner, by registered mail, of this Order prior to the transfer of ownership and shall forward proof of this notification to the Commission. 5. Additional erosion and sedimentation control measures deemed necessary by the Commission shall be instituted by the applicant. Any siltation caused onto any wetland or waterway area shall be promptly reported to the Commission. Such areas shall be restored to the satisfaction of the Commission. 6. During construction, no debris, fill, or excavated material shall be stockpiled within 100 feet of the high tide line. Any other stockpile location will be protected sufficient to prevent sediment from surface runoff entering wetlands and be located only on the northwesterly corner of the Derby Wharf large lawn area(easterly of the light house path), be kept covered, with material removed weekly. Haybales shall be anchored with stakes and entrenched 4 to 6 inches in depth. Excavated material shall be stockpiled on the upgradient side of the haybale barrier. Haybales shall be inspected daily; those showing signs of deterioration shall be replaced immediately. The haybale barrier shall remain in proper functioning condition until all stockpiling has ceased and material removed. 1 SALEM CONSERVATION COMMISSION SPECIAL CONDITIONS - DEP FILE #64-266 ADDRESS: 22 KOSCIUSKO STREET (continued) 7. Equipment servicing and overnight equipment storage must be conducted outside the buffer zone. Equipment must be maintained to prevent leakage or discharge of pollutants. 8. *No spill or discharge of petroleum products or other pollutants will occur within 100 feet of any wetland resource area. 9. Notice shall be given this Commission no more than 2 weeks nor less than 2 days prior to the commencement of construction activities. Said notice shall include, in writing, the names(s), address(es), and business and home telephone numbers of the project supervisor(s) responsible for insuring that operations are conducted in compliance with this Order. 10. All disturbed soils shall be immediately and similarly re-vegetated upon completion of construction activities or shall be mulched until the next growing season. 11. The Order of Conditions including these Special Conditions shall be posted on site. *ongoing conditions that do not expire upon completion of the project or issuance of a Certificate of Compliance. sd\concom\ooc\kosciusk U. S. Department the I n t e r f o r National Park Service NEW ENGLAND SYSTEM SUPPORT OFFICE M E M O R A N D U M { September 10, 1998 D5030 �l Mr. Mark George, Chairman Salem Conservation Commission City of Salem Salem, MA 01970 Subject: Seawall Rehabilitation Project located at 23 Kosciusko St., Salem Dear Mr. George: In reference to the above subject, we request the Certification of Compliance for this project. The construction work of the seawall rehabilitation is complete and site has been developed in accordance with the site plans and specifications submitted to your office. All the requirements of the order of conditions issued by your office have also been met. The Project Manager for this project is Mr. Diwadkar who is a professional engineer registered in the Commonwealth of Massachusetts, has stamped and signed this letter per order of condition. If you have any questions concerning the above, please contact Mr. Diwadkar at (617) 223-5054. to Sincerely, N OF M461 BHALCHANORA B. o DIWADKAR m p STRUCTURAL =i 9 Na.28545 O "' Frederick W. Bentley °9oF�/sTEP� e Chief, Engineering and Facility Management j FFss/0 ALENG��` NEW ENGLAND SYSTEM SUPPORT OFFICE — 15 STATE STREET — BOSTON, MA 02109 NORTHEAST CULTURAL RESOURCES CENTER m 400 FOOT OF JOHN STREET — LOWELL, MA 01852 NORTHEAST MUSEUM SERVICES CENTER — BUILDING I, CHARLESTOWN NAVY YARD < CHARLESTOWN, MA 02129 OLMSTED CENTER FOR LANDSCAPE PRESERVATION � 99 WARREN STREET — BROOKLINE, MA 02146 SALEM CONSERVATION COMMISSION SPECIAL CONDITIONS -DEP FILE 464-266 ADDRESS: 22 KOSCIUSKO STREET 1. All work shall conform to the above-referenced Notice of Intent, site plan and supporting documents and those final specifications which shall be filed with the Commission prior to construction. Any change made or intended to be made to the approved plans shall require the applicant to inquire of the Commission in writing whether the change is substantial enough to require the filing of a new Notice of Intent. 2. Members and agents of the Commission shall have the right to enter and inspect the premises at all reasonable times to evaluate compliance with the conditions in this Order. The Commission may require the applicant to submit additional data or information necessary for the Commission to conduct that evaluation. 3. Upon completion of the project, the applicant shall submit, with the request for a Certification of Compliance, an affidavit, prepared by a professional engineer or land surveyor registered in the Commonwealth of Massachusetts, stating that the site has been developed in accordance with the requirements of this Order of Conditions, the referenced site plan and supporting documents. 4. This Order shall apply to every successor in control or successor in interest of the property described int he Notice of Intent and accompanying plans or part thereof. In the event this land or any part thereof changes ownership before or during construction, the current owner shall notify the new owner, by registered mail, of this Order prior to the transfer of ownership and shall forward proof of this notification to the Commission. S. Additional erosion and sedimentation control measures deemed necessary by the Commission shall be instituted by the applicant. Any siltation caused onto any wetland or waterway area shall be promptly reported to the Commission. Such areas shall be restored to the satisfaction of the Commission. 6. During construction, no debris, fill, or excavated material shall be stockpiled within 100 feet of the high tide line. Any other stockpile location will be protected sufficient to prevent sediment from surface runoff entering wetlands and be located only on the northwesterly corner of the Derby Wharf large lawn area (easterly of the light house path), be kept covered, with material removed weekly. Haybales shall be anchored with stakes and entrenched 4 to 6 inches in depth. Excavated material shall be stockpiled on the upgradient side of the haybale barrier. Haybales shall be inspected daily; those showing signs of deterioration shall be replaced immediately. The haybale barrier shall remain in proper functioning condition until all stockpiling has ceased and material removed. 1 SALEM CONSERVATION COMMISSION SPECIAL CONDITIONS - DEP FILE #64-266 ADDRESS: 22 KOSCIUSKO STREET (continued) 7. Equipment servicing and overnight equipment storage must be conducted outside the buffer zone. Equipment must be maintained to prevent leakage or discharge of pollutants. 8. *No spill or discharge of petroleum products or other pollutants will occur within 100 feet of any wetland resource area. 9. Notice shall be given this Commission no more than 2 weeks nor less than 2 days prior to the commencement of construction activities. Said notice shall include, in writing, the names(s), address(es), and business and home telephone numbers of the project supervisor(s) responsible for insuring that operations are conducted in compliance with this Order. 10. All disturbed soils shall be immediately and similarly re-vegetated upon completion of construction activities or shall be mulched until the next growing season. 11. The Order of Conditions including these Special Conditions shall be posted on site. *ongoing conditions that do not expire upon completion of the project or issuance of a Certificate of Compliance. sd\con com\ooc\kosc i usk 2 SALEM CONSERVATION COMMISSION SPECIAL CONDITIONS -DEP FILE#64-266 ADDRESS: 22 KOSCIUSKO STREET 1. All work shall conform to the above-referenced Notice of Intent, site plan and supporting documents and those final specifications which shall be filed with the Commission prior to construction. Any change made or intended to be made to the approved plans shall require the applicant to inquire of the Commission in writing whether the change is substantial enough to require the filing of a new Notice of Intent. 2. Members and agents of the Commission shall have the right to enter and inspect the premises at all reasonable times to evaluate compliance with the conditions in this Order. The Commission may require the applicant to submit additional data or information necessary for the Commission to conduct that evaluation. 3. Upon completion of the project, the applicant shall submit, with the request for a Certification of Compliance, an affidavit, prepared by a professional engineer or land surveyor registered in the Commonwealth of Massachusetts, stating that the site has been developed in accordance with the requirements of this Order of Conditions, the referenced site plan and supporting documents. 4. This Order shall apply to every successor in control or successor in interest of the property described int he Notice of Intent and accompanying plans or part thereof. In the event this land or any part thereof changes ownership before or during construction, the current owner shall notify the new owner, by registered mail, of this Order prior to the transfer of ownership and shall forward proof of this notification to the Commission. 5. Additional erosion and sedimentation control measures deemed necessary by the Commission shall be instituted by the applicant. Any siltation caused onto any wetland or waterway area shall be promptly reported to the Commission. Such areas shall be restored to the satisfaction of the Commission. 6. During construction, no debris, fill, or excavated material shall be stockpiled within 100 feet of the high tide line. Any other stockpile location will be protected sufficient to prevent sediment from surface runoff entering wetlands and be located only on the northwesterly corner of the Derby Wharf large lawn area (easterly of the light house path), be kept covered, with material removed weekly. Haybales shall be anchored with stakes and entrenched 4 to 6 inches in depth. Excavated material shall be stockpiled on the upgradient side of the haybale barrier. Haybales shall be inspected daily; those showing signs of deterioration shall be replaced immediately. The haybale barrier shall remain in proper functioning condition until all stockpiling has ceased and material removed. 1 SALEM CONSERVATION COMMISSION SPECIAL CONDITIONS - DEP FILE#64-266 ADDRESS: 22 KOSCIUSKO STREET (continued) 7. Equipment servicing and overnight equipment storage must be conducted outside the buffer zone. Equipment must be maintained to prevent leakage or discharge of pollutants. 8. *No spill or discharge of petroleum products or other pollutants will occur within 100 feet of any wetland resource area. 9. Notice shall be given this Commission no more than 2 weeks nor less than 2 days prior to the commencement of construction activities. Said notice shall include, in writing, the names(s), address(es), and business and home telephone numbers of the project supervisor(s) responsible for insuring that operations are conducted in compliance with this Order. 10. All disturbed soils shall be immediately and similarly re-vegetated upon completion of construction activities or shall be mulched until the next growing season. 11. The Order of Conditions including these Special Conditions shall be posted on site. *ongoing conditions that do not expire upon completion of the project or issuance of a Certificate of Compliance. sd\concom\ooc\kosciusk 2 SALEM CONSERVATION COMMISSION SPECIAL CONDITIONS - DEP FILE #64-266 ADDRESS: 22 KOSCIUSKO STREET 1. All work shall conform to the above-referenced Notice of Intent, site plan and supporting documents and those final specifications which shall be filed with the Commission prior to construction. Any change made or intended to be made to the approved plans shall require the applicant to inquire of the Commission in writing whether the change is substantial enough to require the filing of a new Notice of Intent. 2. Members and agents of the Commission shall have the right to enter and inspect the premises at all reasonable times to evaluate compliance with the conditions in this Order. The Commission may require the applicant to submit additional data or information necessary for the Commission to conduct that evaluation. 3. Upon completion of the project, the applicant shall submit, with the request for a Certification of Compliance, an affidavit, prepared by a professional engineer or land surveyor registered in the Commonwealth of Massachusetts, stating that the site has been developed in accordance with the requirements of this Order of Conditions, the referenced site plan and supporting documents. 4. This Order shall apply to every successor in control or successor in interest of the property described int he Notice of Intent and accompanying plans or part thereof. In the event this land or any part thereof changes ownership before or during construction, the current owner shall notify the new owner, by registered mail, of this Order prior to the transfer of ownership and shall forward proof of this notification to the Commission. i. Additional erosion and sedimentation control measures deemed necessary by the Commission shall be instituted by the applicant. Any siltation caused onto any wetland or waterway area shall be promptly reported to the Commission. Such areas shall be restored to the satisfaction of the Commission. 6. During construction, no debris, fill, or excavated material shall be stockpiled within 100 feet of the high tide line. Any other stockpile location will be protected sufficient to prevent sediment from surface runoff entering wetlands and be located only on the northwesterly corner of the Derby Wharf large lawn area(easterly of the light house path), be kept covered, with material removed weekly. Haybales shall be anchored with stakes and entrenched 4 to 6 inches in depth. Excavated material shall be stockpiled on the upgradient side of the haybale barrier. Haybales shall be inspected daily; those showing signs of deterioration shall be replaced immediately. The haybale barrier shall remain in proper functioning condition until all stockpiling has ceased and material removed. 1 SALEM CONSERVATION COMMISSION SPECIAL CONDITIONS - DEP FILE #64-266 ADDRESS: 22 KOSCIUSKO STREET (continued) 7. Equipment servicing and overnight equipment storage must be conducted outside the buffer zone. Equipment must be maintained to prevent leakage or discharge of pollutants. 8. *No spill or discharge of petroleum products or other pollutants will occur within 100 feet of any wetland resource area. 9. Notice shall be given this Commission no more than 2 weeks nor less than 2 days prior to the commencement of construction activities. Said notice shall include, in writing, the names(s), address(es), and business and home telephone numbers of the project supervisor(s) responsible for insuring that operations are conducted in compliance with this Order. 10. All disturbed soils shall be immediately and similarly re-vegetated upon completion of construction activities or shall be mulched until the next growing season. 11. The Order of Conditions including these Special Conditions shall be posted on site. *ongoing conditions that do not expire upon completion of the project or issuance of a Certificate of Compliance. sd\concom\ooc\kosc I Us k 2 U. S. Department the ( n t erio r 7q � 2 / National Park Service NEW ENGLAND SYSTEM SUPPORT OFFICE M E M O R A N D U M September 10, 1998 D5030 Mr. Mark George, Chairman Salem Conservation Commission City of Salem Salem, MA 01970 Subject: Seawall Rehabilitation Project located at 23 Kosciusko St., Salem Dear Mr. George: In reference to the above subject, we request the Certification of Compliance for this project. The construction work of the seawall rehabilitation is complete and site has been developed in accordance with the site plans and specifications submitted to your office. All the requirements of the order of conditions issued by your office have also been met. The Project Manager for this project is Mr. Diwadkar who is a professional engineer registered in the Commonwealth of Massachusetts, has stamped and signed this letter per order of condition. If you have any questions concerning the above, please contact Mr. Diwadkar at (617) 223-5054. I / Sincerely, P�6 OF r yss9f� _ C eruLCHA 10 °yG�r DIww.rAa N iP STRUCTURAL 9 No.258:6 p "' Frederick W. Bentley °yo Fc/STEa� e Chief, Engineering and Facility Management F�sM aLENG`�� I — NEW ENGLAND SYSTEM SUPPORT OFFICE — 15 STATE STREET — BOSTON, MA,02109 NORTHEAST CULTURAL RESOURCES CENTER — 400 FOOT OF JOHN STREET — LOWELL, MA 01852 NORTHEAST MUSEUM SERVICES CENTER — BUILDING I, CHARLESTOWN NAVY YARD — CHARLESTOWN, MA 02129 OLMSTED CENTER FOR LANDSCAPE PRESERVATION + 99 WARREN STREET — BROOKLINE, MA 02146 SALEM CONSERVATION COMMISSION SPECIAL CONDITIONS -DEP FILE #64-266 ADDRESS: 22 KOSCIUSKO STREET 1. All work shall conform to the above-referenced Notice of Intent, site plan and supporting documents and those final specifications which shall be filed with the Commission prior to construction. Any change made or intended to be made to the approved plans shall require the applicant to inquire of the Commission in writing whether the change is substantial enough to require the filing of a new Notice of Intent. 2. Members and agents of the Commission shall have the right to enter and inspect the premises at all reasonable times to evaluate compliance with the conditions in this Order. The Commission may require the applicant to submit additional data or information necessary for the Commission to conduct that evaluation. 3. Upon completion of the project, the applicant shall submit, with the request for a Certification of Compliance, an affidavit, prepared by a professional engineer or land surveyor registered in the Commonwealth of Massachusetts, stating that the site has been developed in accordance with the requirements of this Order of Conditions, the referenced site plan and supporting documents. 4. This Order shall apply to every successor in control or successor in interest of the property described int he Notice of Intent and accompanying plans or part thereof. In the event this land or any part thereof changes ownership before or during construction, the current owner shall notify the new owner, by registered mail, of this Order prior to the transfer of ownership and shall forward proof of this notification to the Commission. 5. Additional erosion and sedimentation control measures deemed necessary by the Commission shall be instituted by the applicant. Any siltation caused onto any wetland or waterway area shall be promptly reported to the Commission. Such areas shall be restored to the satisfaction of the Commission. 6. During construction, no debris, fill, or excavated material shall be stockpiled within 100 feet of the high tide line. Any other stockpile location will be protected sufficient to prevent sediment from surface runoff entering wetlands and be located only on the northwesterly corner of the Derby Wharf large lawn area (easterly of the light house path), be kept covered, with material removed weekly. Haybales shall be anchored with stakes and entrenched 4 to 6 inches in depth. Excavated material shall be stockpiled on the upgradient side of the haybale barrier. Haybales shall be inspected daily; those showing signs of deterioration shall be replaced immediately. The haybale barrier shall remain in proper functioning condition until all stockpiling has ceased and material removed. 1 SALEM CONSERVATION COMMISSION SPECIAL CONDITIONS -DEP FILE#64-266 ADDRESS: 22 KOSCIUSKO STREET (continued) 7. Equipment servicing and overnight equipment storage must be conducted outside the buffer zone. Equipment must be maintained to prevent leakage or discharge of pollutants. 8. *No spill or discharge of petroleum products or other pollutants will occur within 100 feet of any wetland resource area. 9. Notice shall be given this Commission no more than 2 weeks nor less than 2 days Prior to the commencement of construction activities. Said notice shall include, in writing, the names(s), address(es), and business and home telephone numbers of the project supervisor(s) responsible for insuring that operations are conducted in compliance with this Order. 10. All disturbed soils shall be immediately and similarly re-vegetated upon completion of construction activities or shall be mulched until the next growing season. 11. The Order of Conditions including these Special Conditions shall be posted on site. *ongoing conditions that do not expire upon completion of the project or issuance of a Certificate of Compliance. sd\concom\ooc\kosciusk 2 SALEM CONSERVATION COMMISSION SPECIAL CONDITIONS -DEP FILE #64-266 ADDRESS: 22 KOSCIUSKO STREET 1. All work shall conform to the above-referenced Notice of Intent, site plan and supporting documents and those final specifications which shall be filed with the Commission prior to construction. Any change made or intended to be made to the approved plans shall require the applicant to inquire of the Commission in writing whether the change is substantial enough to require the filing of a new Notice of Intent. 2. Members and agents of the Commission shall have the right to enter and inspect the premises at all reasonable times to evaluate compliance with the conditions in this Order. The Commission may require the applicant to submit additional data or information necessary for the Commission to conduct that evaluation. 3. Upon completion of the project, the applicant shall submit, with the request for a Certification of Compliance, an affidavit, prepared by a professional engineer or land surveyor registered in the Commonwealth of Massachusetts, stating that the site has been developed in accordance with the requirements of this Order of Conditions,the referenced site plan and supporting documents. 4. This Order shall apply to every successor in control or successor in interest of the property described int he Notice of Intent and accompanying plans or part thereof. In the event this land or any part thereof changes ownership before or during construction, the current owner shall notify the new owner, by registered mail, of this Order prior to the transfer of ownership and shall forward proof of this notification to the Commission. 5. Additional erosion and sedimentation control measures deemed necessary by the Commission shall be instituted by the applicant. Any siltation caused onto any wetland or waterway area shall be promptly reported to the Commission. Such areas shall be restored to the satisfaction of the Commission. 6. During construction, no debris, fill, or excavated material shall be stockpiled within 100 feet of the high tide line. Any other stockpile location will be protected sufficient to prevent sediment from surface runoff entering wetlands and be located only on the northwesterly corner of the Derby Wharf large lawn area(easterly of the light house path), be kept covered, with material removed weekly. Haybales shall be anchored with stakes and entrenched 4 to 6 inches in depth. Excavated material shall be stockpiled on the upgradient side of the haybale barrier. Haybales shall be inspected daily; those showing signs of deterioration shall be replaced immediately. The haybale barrier shall remain in proper functioning condition until all stockpiling has ceased and material removed. 1 SALEM CONSERVATION COMMISSION SPECIAL CONDITIONS - DEP FILE #64-266 ADDRESS: 22 KOSCIUSKO STREET (continued) 7. Equipment servicing and overnight equipment storage must be conducted outside the buffer zone. Equipment must be maintained to prevent leakage or discharge of pollutants. 8. *No spill or discharge of petroleum products or other pollutants will occur within 100 feet of any wetland resource area. 9. Notice shall be given this Commission no more than 2 weeks nor less than 2 days prior to the commencement of construction activities. Said notice shall include, in writing,the names(s), address(es), and business and home telephone numbers of the project supervisor(s) responsible for insuring that operations are conducted in compliance with this Order.. 10. All disturbed soils shall be immediately and similarly re-vegetated upon completion of construction activities or shall be mulched until the next growing season. 11. The Order of Conditions including these Special Conditions shall be posted on site. *ongoing conditions that do not expire upon completion of the project or issuance of a Certificate of Compliance. sd\concom\ooc\kosciusk 2 To Sa 1 am -ta Issuing Authority J Please be advised that the Order of Conditions for the project at 77 x ; ,,s file Nuiber 64-266 has been recorded at the Registry of Deeds Essex County and has been noted in the chain of title of the affected property in accordance with General Condition B on 1;p;. 26 ,79x7 If recorded land, the instrument nuaber which identifies this transaction is S 7 9 If registered land, the document number which identifies this transaction is Signature - .u- -�"' i'us "� /'�-a'`� Applicant United States Department of the Interior ^3 m ± R ° NATIONAL PARK SERVICE Salem Maritime National Historic Site 3 44 Saugus Iron Works National Historic Site 174 Derby Street Salem,MA 01970 _ c" M REPLY REFER TO: Ct. -'k W J October 28, 1997 A^ n plan, <� Dept D5217(SAMA) Salem Salem Conservation Commission Salem City Hall One Salem Green Salem, MA 01970 RE: Seawall Rehabilitation Project, DEP File 464-266 Dear Sir/Madam: This is to notify you that the Seawall Rehabilitation Project at 22 Kosciusko Street is about to proceed. The contractor has been issued a notice to proceed effective November 3, 1997. If you have any questions please do not hesitate to contact me at 740-1680. Sincerely, 0. Steven Kesselman Superintendent COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION METROPOLITAN BOSTON-NORTHEAST REGIONAL OFFICE ` WILLIAM F. WELD TRUDY COXE Govemor ( Rp .p 1�E1`► Secretary ARGEO PAUL CELLUCCI DAVID B. STRUHS Lt. Govemora�8(�'1 �(G�,. Commissioner DEP File # 064-0266 RE: NOTIFICATION OF WETLANDS PROTECTION ACT FILE NUMBER SALEM DATE : 7-9-97 (city/town) The Department of Environmental Protection has received a Notice of Intent filed in accordance with the Wetlands Protection Act (M.G.L. c . 131, §40) : Applicant : U. S NATIONAL PARK SERVICE Owner: SAME Address : 174 DERBY STREET Address : SALEM, MA 01970 Project Location : 174 DERBY STREET IF CHECKED, THE FOLLOWING ITEMS) APPLY TO THIS NOTICE OF INTENT: A. " This project has been assigned the following file Although a file # is being issued, please note the following: ISSUANCE OF A FILE NUMBER INDICATES ONLY COMPLETENESS OF SUBMITTAL, NOT APPROVAL OF APPLICATION B . " No File # will be assigned to this project until the following missing information is sent to this office, to meet the minimum submittal requirements in accordance with the Wetlands Protection Regulations at 310 CMR 10-'.00 : 1 . ( ) _ copy (s) of a completed Notice of Intent (Form 3 or Form 4 of Sect . 10 . 99, whichever is applicable) and a copy of the Fee Transmittal Form, with a copy of the check for the State' s share of the Notice of Intent filing fee . 2 . ( ) _ copy(s) of plans, calculations, and other documentation necessary to completely describe the proposed work and mitigating measures to protect resource areas . 3 . ( ) _ copy (s) of an 834" X 11" section of the USGS map of the area . 4 . ( ) _ copy (s) of plans showing compliance with Title 5 of the State Environmental Code, 310 CMR 15 . 00 . S . ( ) Proof that a copy of your Notice of Intent has been mailed or hand delivered to the Natural Heritage and Endangered Species Program. COMMENTS : .(see page 2 for additional information) 10 Commerce Way 0 Wobu ,Massachusetts 01801 0 FAX (617) 932-7615 0 Telephone (617) 932-7600 9 TDD#(617)932-7679 C. Other Regulatory Jurisdiction 1 . ( ) Application has been forwarded to Waterways Regulatory Program to determine if a Chapter 91 License is required. 2 . ( ) , Applicant is advised to forward a copy of the Notice of Intent to the Corps of Engineers for review (call 1-800-362-4367 for information) . D. 401 Water Quality Certification The project described in your Notice of Intent requires a 401 Water Quality Certification from the Department of Environmental Protection and may require submittal of a 401 application form. See below for further details : 1 . ( ) Based upon the information submitted in and with your Notice of Intent a separate 401 Water Quality Certification application form is not required. The Department of Environmental Protection has reviewed the plans submitted by the applicant and finds that there is reasonable assurance that the project or activity will be conducted in a manner that will not violate the Massachusetts Surface Water Quality Standards, provided that : a) the applicant receives and complies with a Final Order of Conditions from the local conservation commission or the Department; b) the Order of Conditions does not cause the loss of more than 5 , 000 sq. ft . of bordering vegetated wetlands and land under water and/or the dredging of more than 100 cubic yards of land under water; c) any loss of vegetated wetlands has been mitigated with a minimum replication of 1 : 1; and d) the project is not exempt from the M.G. L. c . 131, X40 - the Wetlands Protection Act ; is not part of a subdivision; does not cause the loss of any wetlands designated as Outstanding Resource Waters; and does not cause the loss of any salt marsh. Therefore, provided that the above conditions are satisfied, the Final Order of Conditions will serve as the Water Quality Certification for this project . This does not relieve the applicant of the duty to comply with any other statutes or regulations . , 2 . ( ) Before the activity described in the Notice of Intent can commence, you must obtain a Water Quality Certification from this Regional Office . Please complete the enclosed 401 Water Quality Certification application form and file it with this Regional Office for review. 3 . ( ) Your project involves dredging of greater than 100 cubic yards of material or requires a permit from the Federal Energy Regulatory Commission for work in "waters of the Commonwealth. " Therefore, your proposed project is subject to 314 CMR 9 . 00 and requires a Water Quality Certification. Please complete the enclosed 401 Water Quality Certification application form and file it with the Department of Environmental Protection, Waterways Program, One Winter Street; Boston, MA 02108 . Contact the Division of Waterways Program at 617-292-5655 if you have any questions . For more information please contact :RALPH PERKINS at (617) 932-7600 . CC : Conservation Commission ( ) U.S . Army Corps of Engineers ( ) Owner ( ) Coastal Zone Management ( ) DEP - Water Pollution Control (X) Representative :JASON CORTELL & ASSOC. ( ) DEP- Waterways 244 SECOND AVENUE ( ) Other WALTHAM, MA 02154 w zv" 2 _ _ �i�i�a� ����iA�un�. f CORTELL ASSOCIATES June 17, 1997 Steven Dibble SALEM CONSERVATION COMMISSION One Salem Green Salem, MA 01970 re: National Park Service — Notice of Intent For Tuckers Wharf Seawall Repairs Dear Mr. Dibble: Enclosed is the National Park Service's Notice of Intent for the proposed repairs to the seawall at Tuckers Wharf. If you need any more information or have any questions, please feel free to call me. Otherwise, I will see you at Saturday's site visit. Sincerely, JASPN M. CORTELL and ASSOCIATES INC. Carlton` Y L. No e/s/� Sr. Environmental Scientist cc: Steven Kesselman JASON M. CORTELL AND Environmental Consultants 244 Second Avenue TEL 617/890-3737 ASSOCIATES INC. and Planners .Waltham,Massachusetts 02154 FAX 617/890-3430 31.0 CMR 10.99 Form 3 DEP File No. (To be provided by DEP) City/Town Salem Applicant U.S. National Park Service Notice of Intent Under the Massachusetts Wetlands Protection Act, G.L. c. 131, §40 and Application for a Department of the Army Permit Part I: General Information 1. Location: Street Address 174 Derby Street, Salem, MA Lt Number 2. Project: Type Category 5 Description Repair of failing existing seawall at Tuckers Wharf. This will be conducted in a segLent'al process of removing the failing seawall and driving a sheet steel core until the entire ore has been driven effectively sealing the area from ocean water, Pouring of footings, placement of grade berms, granite block resurfacing of the seawall, and site restoration will follow. 3. Registry: County Essex Current Book &Page Cetficate(it Registered Lard) 4. Applicant U.S. National Park Service Tel. (508) 740-1680 Address 174 Derby Street, Salem. MA 5. Property Owner U.S. National Park Service Tel.-J5D8) 740-1680 Address 174 Derby Street. Salan. MA 6. Representative SASON M. CORTELL and ASSOCIATES INC. Tel. (6171 890-3737 Address 244 Second Avenue, Waltham, MA 02154 7. a. Have the Conservation Commission and the Department's Regional Office each been sent, by certified mail or hand deliver, 2 copies of completed Notice of Intent, with supporting plans and documents? Yes X No_ b. Has the fee been submitted? Yes x No_ c. Total Filing Fee Submitted 5192.00 d. City/Town Share of Filing Fee s108.50 State Share of Filing Fee $83.50 (Sent to Citylrown) (v,of fee in excess of$25, sent to DEP) e. Is a brief statement attached indicating how the applicant calculated the fee? Yes g No_ 8. Have all obtainable permits, variances and approvals required by local by-law been obtained? Yes x No_ Obtained : Applied for: Not Applied For: PP PP Department of the Army Programmatic General Permit No. 1993-01040 No other permits. variances, approvals reauired 9. Is any portion of the site subject to a Wetlands Restriction Order pursuant to G.L. c. 131, §40A or G.L. c. 130,§105? Yes_ No x 10. List all plans and supporting documents submitted with this Notice of Intent. Identifying Number/Letter Title, Date Sheet 1 of 3 Seawall Rehabilitation. Salem Maritime - N.H.S. Sheet 2 of 3 Seawall Rehabilitation. Salem Maritime - N.H.S. Salem, MA. Sheet 3 of 3 Seawall Rehabilitation. Salem Maritime - N.H.S. Salem, MA. 11. Check those resource areas within which work is proposed: (a) x Buffer Zone (b) Inland Bank' Land Subject to Flooding Bordering Vegetated Wetland" _ Bordering _ Land Under Water Body&Waterway' _ Isolated (c) Coastal Land Under the Ocean' _ Designated Port Area' x Coastal Beach' Coastal Dune Barrier Beach' x Coastal Bank Rocky Intertidal Shore' _ Salt Marsh' Land Under Salt Pond' x Land Containing Shellfish' Fish Run' Likely to involve U.S. Army Corps of Engineers concurrent jurisdiction. See General Instructions for Completing Notice of Intent. L 1 12. Is the project within estimated habitat which is indicated on the most recent Estimated Habitat Map of State-Listed Rare Wetlands Wildlife(if any) published by the Natural Heritage and Endangered Species Program? YES [ ] NO [ x] Date printed on the Estimated Habitat Map NO MAP AVAILABLE [ ] (f any) 1997 (1997-1998 Edition) If yes, have you sent a copy of the Notice of Intent to the Natural Heritage and Endangered Species Program via the U.S. Postal Service by certified or priority mail (or otherwise sent it in a manner that guarantees delivery within two days) no later than the date of the filing of this Notice of Intent with the conservation commission and the DEP regional office? YES [ ] NO [ ] If you please attach evidence of timely mailing or other delivery to the Natural Heritage and Endangered Species Program. Part It: Site Description Indicate which of the following information has been provided (on a plan, in narrative description or calculations)to clearly and accurately describe existing site conditions. Identifying Number/Letter (of plan, narrative or calculations) Natural Features: Attach. A Soils Attach. A Vegetation Attach. A Topography NA Open water bodies (including ponds and lakes) M Flowing water bodies(including streams and rivers) rm Public and private surface water and ground water supplies on or within 100 feet of site rm Maximum annual ground water elevations with dates and location of test Fig. 2 of 3 Boundaries of resource areas checked under Part I, Item II above Attach. A Other Man-made Features: Attach. A Structures(such as buildings, piers,towers and headwalls) Attach. A Drainage and flood control facilities at the site and immediately off the site, including culverts and open channels (with inverts), dams and dikes Attach. A Subsurface sewage disposal systems Attach. A Underground utilities Fig. i of 3 Roadways and parking areas Fig. 2 of 3 Property boundaries, easements and rights-of-way Other Part III: Work Description Indicate which of the following information has been provided (on a plan, in narrative description or calculations)to clearly, completely and accurately describe work proposed within each of the resource areas checked in Part I, item II above. Identifying Number/Letter (of plan, narrative See narrative below or calculations) Planview and Cross Section of: Fig. 2 and 3 of 3 Structures(such as buildings, piers,towers and headwalls) - NA Drainage and flood control facilities, including culverts and open channels (with inverts), dams and dikes NA Subsurface sewage disposal systems & underground utilities Fig. 2 and 3 of 3 Filling,dredging and excavating, indicating volume and composition of material NA Compensatory storage areas, where required in accordance with Part ill, 10.57(4)of the regulations. NA Wildlife habitat restoration or replication areas Other Point Source Discharce NA Description of characteristics of discharge from point source (both closed and open channel), when point of discharge falls within resource area checked under Part I, Item II above, as supported by standard engineering calculations, data and plans, including but not limited to the following: 1. Delineation of the drainage area contributing to the point of discharge; 2. Pre-and Post-development peak run-off from the drainage area, at the point of discharge, for at least the 10-year and 100-year frequency storm; 3. Pre-and post-development rate of infiltration contributing to the resource area checked under Part I, item 11 above; 4. Estimated water quality characteristics or pre-and post-development run-off at the point of discharge. Work Description This will be conducted in a sequential process of removing the failing seawall and driving a sheet steel core until the entire core has been driven, effectively sealing the area from ocean water. Pouring of footings, placement of grade beams, granite block resurfacing of the seawall, and site restoration to follow. Part IV: Mitigating Measures 1. Clearly, completely and accurately describe,with reference to supporting plans and calculations where necessary: (a) All measures and designs proposed to meet the performance standards set forth under each resource area specified in Part II or Part III of the regulations; or (b) why the presumptions set forth under each resource area specified in Part II or Part III of the regufations do not apply. _ Coastal Resource Area Type: Identifying number or letter of support Inland Land Under the Ocean documents ' g Coastal Resource Area Type: Identifying number or letter of support Inland Coastal Beach documents The seawall repairs will result in a localized impact to the Attachment A coastal beach within approximately 20 feet of the front of the Sheet 2 of 3 seawall, as well as the higher beach area west of Tuckers Wharf and south of the grass lawn along Derby Street. The impact in front of the seawall is unavoidable because it is necessary to demolish and remove the existing seawall footing and to construct the new footing and granite facing. Attachment A describes environmental features of the work area. A temporary access ramp is proposed between the lawn and the top of the upper beach area to Tuckers Wharf. This ramp is proposed in order to limit the impacts to the only shade tree on the site as well as to provide the contractor better access and to limit local disturbance due to very limited access from _ Kosciusko Street. Mitigation will consist of upland erosion controls including the covering of exposed excavated land with a geotextile - fabric to minimize the exposure of bare soil to water, as well as the installation of a silt curtain on the coastal beach. These erosion and turbidity controls are intended to limit the spread as much as possible to adjacent marine areas. 10.99: continued Xt Coastal Resource Area Type: Identifying number or letter of support Inland Land Containing Shellfish documents The proposed seawall repairs could impact land containing Sheet 2 of 3 shellfish within the immediate area of the Tuckers.wharf seawall. Although signs of shellfish have not.been observed in this area, it is presumed that soft-shelled clams and other shellfish inhabit this area. Mitigation will consist of upland erosion controls including _ the covering of exposed excavated land with a geotextile fabric to minimize the exposure of bare soil to water, as well as the installation of a silt curtain on the coastal beach. These erosion and turbidity controls are intended to limit the spread as much as possible to adjacent marine areas. 2. Clearly, completely and accurately describe,with reference to supporting plans and calculations where necessary: (a) all measures and designs to regulate work within the Buffer Zone so as to ensure that said work does not alter an area specified in Part 1, Section 10.02(1)(a) of these.regulations; or (b) if work in the Buffer Zone will alter such an area, all measures and designs proposed to meet the performance standards establishes for the adjacent resource area, specified in Part II or Part III of these regulations. Coastal Resource Area Type Bordered By 100-Feet Discretionary Zone: Identifying number or letter of support Inland documents 10.99: continued ZC Coastal Resource Area Type: Identifying number or letter of support Inland Coastal Sank documents The coastal bank that will be impacted by this construction is Figure 2 of 3 the Tuckers Wharf seawall itself. Except for scattered fronds of rockweed on the footing, the seawall is not vegetated. It is not possible to mitigate impacts to thiscoastal bank because due to its unsafe condition, it must be replaced. 2. Clearly, completely and accurately describe, with reference to supporting plans and calculations . where necessary: (a) all measures and designs to regulate work within the Buffer Zone so as to ensure that said work does not alter an area specified in Part I, Section 10.02(1)(a)of these regulations; or (b) if work in the Buffer Zone will alter such an area, all measures and designs proposed to meet the performance standards establishes for the adjacent resource area, specified in Part II or Part III of these regulations. Ll Coastal Resource Area Type Bordered By 100-Feet Discretionary Zone: Identifying number or letter of support Inland Suffer Zone documents A buffer zone is associated with both the coastal bank and the Figure 2 of 3 coastal beach. Work within the buffer zone is primarily associated with reconstruction of the failing seawall and construction of the temporary access ramp from Derby Street. Clean granular fill will be used in the construction grading and the area will be quickly mulched and hydroseeded. During construction, all efforts will be made to temporarily or permanently cover exposed material to limit erosion and/or dust. Part V: Additional Information for a Department of the Army Permit 1. COE Application No. 1993-01040 2. Salam Harbor (to be provided by COE) (Name of Waterway) 3. Names and addresses of property owners adjoining your property: See list of abutters on following pages. 4. Document other project alternatives (i.e., other locations and/or construction methods, particularly those that would eliminate the discharge of dredged or fill material into waters or wetlands). 5. 8_" x 11" drawings in planview and cross-section, showing the resource area and the proposed activity within the resource area. Drawings must be to scale and should clear enough for photocopying. Certification is required from the Division of Water Pollution Control before the Federal Permit can be issued, Certification may be obtained by contacting the Division of Water Pollution Control, 1 Winter Street, Boston, Massachusetts, 02108. Where the activity will take place within the area under the Massachusetts approved Coastal Zone Management Program, the applicant certifies that his proposed activity complies with and will be conducted in a manner that is consistent with the approved program. Information provided will be used in evaluating the application for a permit and is made a matter of public record through issuance of a public notice. Disclosure of this information is voluntary; however, if necessary information is not provided,the application cannot be processed nor can a permit be issued. I hereby certify under the pains and penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents and supporting data are true and complete, to the best of my knowledge. Signature of Applicant Date Signature of Applicant's R resentative Date FORM (TEST) "Exception to ENG Form 4345 approved by HOUSACE, 6 May 1982" NED ll�hL n®® (y yip y y "This document contains a joint Department of the Army and state of Massachusetts application for I MAY Ol¢sL a permit to obtain permission to perform activities in the United States waters. The Office of lL l`�lllil ll OG Management and Budget (OMB) has approved those questions required by the US Army Corps of Engineers. OMB Number 072-0036.and expiration date of 30 September 1983 applies". This statement will be set in 6 point type. Wetlands Filing Fee Calculation Worksheet For Notices of Intent Filed under the Massachusetts Wetlands Protection Act(G.L. Ch. 131, Sec. 40)` CATEGORY f $55 Per Activity $ # S # a. Existing House/Residential Lot(addition,deck, c. Each Roadway/Driveway Crossing (if not — garage,pool,shed or driveway) reviewable under 10.53(3c) or associated with b. Site Preparation(each Single Family House(SFH) SFH) lot; removal of vegetation, excavation grading d. Hazardous Waste Cleanup(except as in Cat 4) — — where house construction is not proposed under TOTAL CATEGORY 3 ACTIVITIES –a– same Noll c. Control of Nuisance Vegetation (removal, herbi- _ CATEGORY 4 $725 Per Activity tides,etc.; per lot under 10.53(4)) a. Each Roadway/Driveway Crossing (under — d. Resource Area Improvement(under 10.53(4);other 10.53(3e)associated with commercial,industrial, than removal of aquatic nuisance vegetation) institutionaldevelopment or residential subdivi- e. Septic System(or any part thereof; construction. sion construction) replacement,upgrade) b. Flood Control Structures (construction, repair, — f. Monitoring Wells (installation activities except. maintenance) access mad) c. Landfills (public & private); creation. mainte- g. New Agricultural or Aquacullural Projects nance,operation TOTAL CATEGORY 1 ACTIVITIES - –0– d. Sand.and Gravel Operations (creation, mainte- nance,operation) CATEGORY 2 $250 Per Activity e. . Railroad Lines(new or extensions of existing). — — a. Construction of Each New SFH (including site f. Bridges(construction.reconstruction,expansion, — preparation, retention/detention basins, utilities, maintenance;except for a SFH Lot) septic systems, roadway/driveway except under 10.53(3e);under single NOl) g. Alteration of Resource Area toDivert Water(asso- . crated with hazardous waste cleanup,non-exempt b. Parking Lot(my size) mosquito control projects,other purpose not iden. c. Beach Nourishment(placemen of sand) • tified elsewhere in this schedule) d. Coastal Activities(pursuantto 10.24(7a-c)(includ- h. Dredging Activities in Water Bodies(except asso- — ing electric generating facilities, public utilities, ciated with new dock,pier or other structure) limited projects e.g.:repair/maintenance of exist- i. Package Sewage Treatment Plant (construction: — ing piers,buildings,culverts) discharge from) e. Limited Project Activities(in I0.53(d and f-1);per TOTAL CATEGORY 4 ACTIVITIES –0– footprint) . I. Each Driveway Crossing (associated with aSFH — CATEGORY 5 $2 per Linear Foot pursuant to 10.53(3e)) Minimum$50. Maximum$1,000. - g. Any Point Source Discharge a. Docks, Piers, Revetments,-Dikes or Other Engi- neering Structures (constmetion, reconstruction, - h- Control of Nuisance Vegetation(under 1053(4); repair,or replacement;coastal or inland;including except on a SFH Lot) placement of rip-rap or other material) L Raising or Lowering Surface Water Levels TOTAL CATEGORY 5 ACTIVITIES 5142_. - ...9y-,if j- Any Other Activity not described in Cat.t.3.4&5 TOTAL CATEGORY 2 ACTIVITIES _p_ TOTAL FILING FEE 0-192 "- CATEGORY 3 $525 Per Activity - (Sum of Totals in Categories 1-5) a. Site Preparation for Development (except SFH ; including removal of vegetation,excavation&grad- Person Calculating Fee Schedule Carlton L. Noyes ing when actual construction not proposed under Cortell & Assoc. 244 Second Avenue same NOI) - Address b. ConstructionofEachBuildingwithinCommercial, Waltham, MA 02154 Industrial, Institutional, or Apartment/Condo/ Telephone 90-3737 8 Townhouse Development(including: site prepara- tion. retention/detention basins, septic systems, Signat Dat 9� parking lots,utilities,pointsouree discharges,pack- s Categories as in 310 CMR 10.03(7)(c);Fees as in 801 CMR 4.02 age sewage treatment plants,roadways/driveways- except under 10.53(3e)if under single NO[) Prepared by the Massachusetts Association of Conservation Commissions. Revised 1211193. • IIr _ `, � f • ° _ nt ,ate�Q��� ��►t �'�' �,► -� ' WA fir ,', • M�,��, � 4 aim,, �l �,E •�`� �i�aF; y zm j RI UN �®/ ��`il 111�8�.ciL� .waa u• Q I'�sAi��mr V l �,1� Y �� "W -VICKery7g Po �y.®�� Via' � V��� ���g��•>.� ���'Tr*, d'����/j Ir♦ + ��ir,1�.f, � �,. r�� Id\ ► R.SJf�.'.Ia A`•.l• ���:}�►1•. �' .�� lam_ }!.ic-'fir [T • ATTACHMENT A - NATURAL FEATURES Soils In order to determine the underlying soil and rock conditions along the proposed seawall repair, six borings were conducted in May, 1997. The boring location plan and logs are attached. The soils under Tuckers wharf consist of general fill which is underlaid by organic silt. Hard yellow clay and till are found under the silt. Vegetation/Wildlife The upland area is a grass lawn with one maple shade tree. The beach south of Tuckers Wharf contains filamentous algae; scattered rockweed (Fucus sp.), barnacles (Balanus sp.), mud snails (Nassarius trivitattus), periwinkles (Littorina littorea), and various marine worms. Signs of shellfish have not been observed in this immediate area, but are presumed to be present. The higher beach area west of Tuckers Wharf is in the wave zone and is composed of pebbles and sand, is well washed by waves at high tide and is dry at low tide. No signs of marine life have been observed. Topography The topography of Tuckers Wharf is a flat grassed upland area, a vertical seawall to the south with a gentle sloping beach, and a vertical to sloping seawall along the west also with a gentle sloping beach. Topographical plan is attached. Flowing Water Bodies The Tuckers Wharf area is part of Salem Harbor, an area classified as SB by the Massachusetts Department of Environmental Protection. There are no public or private water supplies within 100 feet of the site. Groundwater under Tuckers Wharf will most likely fluctuate with the tide. There are no underground utilities on Tuckers Wharf. Telephone and electric service is provide along the east side of the Wharf which is one of the access limitations, and public water supply, sewage collection and storm drainage is provided under Kosciusko Street. i FIGURE 2 !-015TING WALL �- 5EAC11 AREA—� 1 i Z c A ; v { = i iItJG 5A,WAU. - E09TING PENCE Y ri k a EXISTING ��'''�-� ; MACH AREA PS PROFEMY LINE-} c } LEGEND 111113 LOCAnON OP 13OREHOLPS PERPORMm 3Y 111 CARRAEE CORP. 9ETWEI•N MAY 29, 1997 AND JUNE 2, 1997 fOR MuPt1AIL A"^SOCIATFS, INC. 1 PRIVATE PROPERTY �... I rl 1 i n v O c Y n c c . � s4renr wsaeoneens Y.1G5UPfAGt pR19R41101!RIN 1pl DAMMANN.H64DRIE 4 Ak0lErYr,NC. QmessfiPma - m . � x aeia, s:rtr MrPNNL AS50Ct4T®,INC. mea�no<nrx..eau C.TE I. (n. W k" IN.��.w :'rCMNO Scee'IMM 6'1!h C C JULY- 0-01 IIVIY IU-4U IY f11L Ifll\I\ JL.IIVV - IVI(f IfVVll LLJ JLVV 1 V CARR-DEE CORP. .INDEX STREET P.O. BOX 67 MEDFORD, MA 02155-0001 Telephone (617) 391-4500 SgPiAIL ASSOCIATES, INC. 1 30 NORPOLK ST. , CAMSRIDGE.MA Date May. 30. , 997- Joh No. 97113 ) .tion TUCKER'S WHARF, FRONT STREET, SALEM. MA _ Scale 1" = 3' BORING I Ground Surface 16 8¢1,- FROM 010" TO 2'0" 20 RECOVERED 20" 5 I 7 I� i F I L L I I 2 S#'2, FROM 5'0" TO 7'0" 3 RECOVERED 20" I 2 2 SAND, GRAVEL, BRICK, I 12 S#3, FROM 10.0" TO 12/0" SOME ORGANIC SILT 5 RECOVERED 20- 10 7 15'0" 4 S#4, FROM 15'0" TO 17'0" 5 RECOVERED 15" ORGANIC SILT, 4 4 SOME SHELLS 19'6" - -- - - - - - - - -- - - - CONTINUED ON SHEET NUMBER 2 w Sheet 1 of 2 JUIK .7-.71 !lulu 10.41 IVHIL rnhh onvu rnn 11U. Cl l ccJ ULUU r. u0 CARR-DEE CORP. .INDEN STREET P.O. BOX 67 MEDFORD, MA 02155-0001 Telephone (617) 391-4500 •-I�r L ASSOCIATES INC 30 NORFOLK ST C . MSRIDGEMA Date May-__30__1591 Job No- 97113 ition TUCKER'S WHARF FRONT STREETpSALEM MA Scale 1" = 3' BORING 1 19'6" - - - - - - - - - - - - - -- - -, - - - ORGANIC SILT, 3 S#5, FROM 20'0" TO 22'0" SOME 4 RECOVERED 18" SHELLS 3 1 4 i 23'0" 1 I " HARD YELLOW 14 S#6, FROM 25'0" TO 2710" 16 RECOVERED 14" CLAY 17 18 27 '6•' VERY DENSE FINE SILTY SAND, [ 47 S$7, FROM 30'0" TO 3210" SOME GAVEL 27 RECOVERED 24" 24 32.0,E WATER LEVEL 7.0" (TIDE) , 10:30AM SIZE OF CASING NW, DEPTH 20'0" DRILLER: STEPHEN DESIMONE, INSPECTOR: PAUL WADSWORTH DATE STARTED & COMFLETt0: 5-29-97 i ample$ have been visually classified by Driller. unless otherwise specified, water levels noted were observed at completion rings• and do not necessarily represent permanent ground water levels. - Figures in right hand column indicate number of blows red to drive Two-inch split Sampler 6 inches using 140 Ib. weight falling 30 Inches(+/-). Figures in column to left ated) indicate number of blows to drive easing one foot, using 300 Ib. weight felling 24 inch*$(+/-). Sheet 2 of 2 JUN- S-S/ MON IU:4( NAIL t'AKK 6EKVU t•AX NO. b1 ( 2G3 5L6U t. UH CARR-DBE. CORP. .INDEX STREET P.O. SOX 67 MEDFORD, MA 02155-0001 Telephone (617) 391-4500 HAIL ASSOC A S INC 30 NORFOLKST. CAME SDGE MA Data May. 30, 1997 Job No. 97113 ,tion TUCKER'S WHARF FRONT ST8EET4 SALEM _tA Scale 1" 3' BORING B-2 • i Ground Surface 15 S#1, FROM 0'0" TO 2 '0" 10 RECOVERED 4" I 7 i 5 i I F I L L 4 02, .FROM 5'0" TO 7 '0" 2 RECOVERED 18" 2 4 SAND, GRAVEL, ORGANIC i 4 S#3, FROM 10'0" TO 12.0" SILT, TRACE OF BRICK 4 RECOVERED all I 3 5 I. i 15'0" 4 594, FROM 15'0" m0 1710" 3 RECOVERED 20" 4 3 ORGANIC SILT 19.6" - - - - - .- - - - - - - - - - - - - - CONTINUED ON SHEET NUMBER 2 Sheet 1 of 2 JUN-. 8-J( NUN lU:48 NAIL YHKK.6EKVC YHIS NU. bit L'LJ bZbU - -- CARR-DEE CORP. LINDEN STREET P.O. BOX 67 MEDFORD, MA 02155-0001 Telephone (617) 391-4500 MCEHAIb ASSOCIATES. INC. . 30 .NORFOLK ST. , CAMBRIDGE MA Date May. 30, 1997 Job NO. 97113 nation TUCKER'S WHARF FRONT STREET SALEM MA Scale 1" = 3' BORING B-2 - - - - - - - _ _ 2 S#5, FROM 20'0^ TO 22 '0" ORGANIC SILT 2 RECOVERED 24•• 2 2 23'0" • HARD YELLOW CLAY 14 S,#6, FROM 25 '0^ TO 27 '0" ' 20 RECOVERED 14" 18 27'0" VERY DENSE FINE SILTY SAND, GRAVEL 55 S#7, FROM 30'0° TO 3210" 30 RECOVERED 12" 26 32'0" WATER LEVEL 7 '0" (TIDE), 2:30 PM - SIZE OF CASING NW, DEPTH 2010" DRILLERz STEPHEN DESIMONE, INSPECTOR: PAUL WADSWORTH DATE STARTED & COMPLETED: 5-29-97 eples have been visually classified by Driller. Unless otherwise specified, water levels noted were observed at completion Inge, and do not necessarily represent permanent ground-water levels. Figures in right hand column indicate number of blows ad to drive Two-Inch Split Sampler 6 Inches using 140 (b, weight felling 30 inches(./-). Figures in column to left Aad) Indicate nunbor of blows to drive casing one foot, using 300 lb. weight falling 24 Inches(+/•). _a n JUN- y-W NUN lU:48 NHTL hHKK 6ENVU hflA NU. till GLJ bZbU Y. 11 CARR-DEE CORP. i LINDEN STREET P.O. SOX 67 MEDFORD, MA 02155-0001 Telephone (617) 391-4500 MOPNAIL ASSOCIATES, INC 30 NORFOLK ST CAHHRIDGE MA Date May. 30, 1997 Job No. 97113 ation TUCKER'S WRARF FRONT STREET SALEM MA Scale 1" - 3' BORING B-3 Ground Surface 3 S¢`1, FROM 010" TO 2'0" 1 RECOVERED 6" 2 3 F_I- L L 7 S#2, FROM S'0'• TO 7'0" 5 RECOVERED 5" 3 2 SAND, GRAVEL, - 17 S$3, FROM 10'0" TO 12'0" LOAM & WOOD 11 -RECOVERED 8" 5 14 1510" - 6 S94, FROM 15'0" TO 17'0" 2 RECOVERED 1S" ORGANIC SILT, 2 2 SOME SHELLS 20'0" CONTINUED ON SHEET NUMBER 2 Sheet l of 2 dUPI- d-dl Ilult )u-4d ItnIL rnnn Dcnvu rnA nu. U7 i cc,) ocuU 1 . 1c CARR-DEE CORP. 37 LINDEN STREET P.O. BOX 67 MEDFORD, MA 021SS-0001 Telephone (617) 391-4500 Po McPHAIL ASSOOIATES, INC, , 30 NORFOLK ST. , CAMBRIDGE,MA Date May. 30, 1997 Job No. 97113 _ Location TUCKER'S WHARF, FRONT STREET, SALEM, MA Scale 1" - 3' BORING B-3 2010" 15 S#5, FROM 20'0" TO 22'0" HARD 16 RECOVERED WI BLUE--YELLOW 17 - CLAY 18 24'0" VERY STIFF YELLOW 9 S06, FROM 25'0" TO 27 '0" CLAY 10 RECOVERED 12" 14 15 28'0" VERY DENSE FINE & MEDIUM SAND, SOME GRAVEL, TRACE OF CLAY, INORGANIC SILT ` 22 S#7, FROM 30'0" TO 32 '0" 38 RECOVERED 18" 32 32'0" WATER LEVEL 1110" (TIDE) , (TIDE) , 10130 AM SIZE OF CASING NW, DEPTH 20'0" DRILLER: STEPHEN DESIMONE, INSPECTOR: PAUL WADSWORTH - DATE STARTED & COMPLETED: 5-30-91 samplas have been visually classified by Griller. Unless otherwise specified, water levels noted, were observed at completion 6erings, and do not necessarily represent permanent ground water levels. Figures in right hand column indicate number of blows wired to drive Two-inch Split Sampler 6 inches using 140 lb. weight falling 30 Inches(+/-), Figures in coluan to left toted) indicate number of blows to drive casing one foot, using 300 lb. weight falling 24 Inches(+/-). JUN7 U-SI I1U11 IU-40 11HIL rnrtn ocmv , rNA nU. U i I cca UcuU � , w CARR-DER CORP. LINDEN STREET P.O. BOX 67 MEDFORD, MA 02155-0001 Telephone (617) 391-4500 1IcPHAIL ASSOCIATESg INC. . 30 NORFOLK ST. , CAMBRDGE,MA _Date May. 30, 1997 Job No. 97113 kation "TUCKER'S WHARF`FRONT STREET, SALEM, MA .. Scale I" = 3' BORING B-4 Ground Surface 26 S#1, FROM 0'0" TO 1'0" 90 RECOVERED 6" F I L L 6 S02, FROM S '0" TO 7'0" - 4 RECOVERED 24" 4 3 SAND, GRAVEL, BRICK, 4 S#3, FROM 10'0" TO 12'0" CONCRETE, ORG.SILT,WOOD 2 RECOVERED 10" 3 2 15'0" 2 Sfr4, FROM 15'0" TO 17 '0" 2 RECOVERED 24" 2 2 ORGANIC SILT 2 S#5, FROM 20'0" TO 21 '0" 21 '0" 2 RECOVERED 12" CONTINUED ON SHEET NUMBER 2 Sheet 1 of 2 JUK- d-di 11UV IU;bU NHIL rMK& btKVU PHA nu. Ul ( lwcj SLOu r. lq yiUPIQiYr4'?7'S� �A'ih�ga - c•• 1.�' CI'�f/rsti� $Prtxs;aue.-,• _ _ _ ,rwc,:on .•e•es" • CARR-DEE CORP. LINDEN STREET P.O. BOX 67 MEDFORD, MA 02155-0001 Telephone (617) 391-4500 HgPHAIL ASSOCIATES,- INC..,_ 30 NORFOLK STS CAMHRDGE,MA pate May. 30, 1997 Job No. 97113 _ :ation TUCKER'S WHARF, FRONT STREET SALEM MA Scale 1" = 3' BORING B-4 21'0" STIFF 4 S:i'5A, FROM 21'0" TO 22'0" BLUE—YELLOW ,5 RECOVERED 12" CLAY 23'0" VERY STIFF BLUE-YELLOW 9 $16, FROM 25 '0" TO 27.0" 15 RECOVERED 12" CLAY 15 14 29'0" ._..� VEY DENSE FINE & " MEDIUM SILTY SAND 20 8$71 FROM 30.0" TO 32'0" & GRAVEL 29 RECOVERED 20" 31 32'0" WATER LEVEL 9'0" (TIDE) , 2:30 PM SIZE OF AUGERS 3-3/4" I.D. , DEPTH 5 '0" SIZE OF CASING NW, DEPTH 20'0" DRILLER: STEPHEN DESIMONE DATE STARTED & COMPLETED: 5-30-97 NOTE: AUGERED THROUGH CONCRETE FROM 1'0" TO 5'0". imples have been visually classified by Driller. Unless otherwise specified, water levels noted were observed at completion 'Ings, and do not necessarily represent permanent ground water levels, Figures In right hand column indicate mobor of blows 'ed to drive Two•Inch Split sampler 6 inches using 140 lb. weight falling 30 inches(./•). Figures in column to left :tod) indicate number of blows to drive casing one foot, using 300 lb. weight falling 24 inches(./•). Shoaf- of JU!V- .7-UI IIUN IU-01 IVHIL rHMN OtKVU CnA nU, Ul l CCO UCUU r. 1U CARR-DEE CORP. 7 LINDEN STREET P.O. BOX 67 MEDFORD, MA 02155-0001 Telephone (617) 391-4500 Job NO- p p IL CAMBRIDGE M 97113 Ocation TUCKER S WHARF fiRONT STREET SALEM MA __ Scale 1" = 3' BORxNG B-5 Ground Surface 5 S#l, FROM 0'0" TO 2 '0" 6 RECOVERED 12" 4 3 F I L L 8 S12, FROM 5'0" TO 7 '0" 7 RECOVERED 14" - 6 3 SAND, GRAVEL & 28 S,#3, FROM 1010" TO 1210^ LOAM 8 RECOVERED 4" S 8 14'6" 2 504, FROM 15 '0" TO 17 '0" ORGANIC SILT, 2 RECOVERED 18" 2 SOME 2 SHELLS 19' 6" - - - " - - - - - - - - - - - - - - - - CONTINUED ON SHEET NUMBER 2 . Sheet 1 of 2 JUN- 8-V MON lU:bl NAIL t'AKK SERK MX NO. til ( 223 b26U F. 16 ._ .. t rtKi 7(,.�i.i'. �'?•aY,^.1•d r .r•��;vw.,.:;.r. . rr:*- CARR-DEE CORP. 17 LINDEN STREET P.O. BOX 67 MEDFORD, MA 02155-0001 Telephone (617) 391-4500 t0 MCPHAIL ASSOCIATE6—INC. , 30 NORFOLK ST CAMBRIDCE,MA Date Jun. 3, 1997 Job No. 97113 ,*cation TUCKER'S WHARF, FRONT STREET SALEM MA Scale 1" = 3' BORING B-5 19 6" — -- - — — — — — — — — — — — - - - ORGANIC SILT, l S#5, FROM 20'0 TO 22'0° SOME 1 RECOVERED 24" SHELLS 2 22'0" 2 HARD BLUE–YELLOW 14 S#6, FROM 25 '0" TO 27 '0" 19 RECOVERED 16" - 26 CLAY 30 28-6- VERY DENSE FINE SAND, SOME GRAVEL, .LITTLE INORGANIC SILT, TRACE 40 S#7, FROM 30.0" TO 3210" CLAY - 44 RECOVERED 24" 51 32'0" WATER LEVEL 710" (TIDE) , 10:30AM SIZE OF CASING NW, DEPTH 20'0" DRILLER: STEPHEN DESIMONE DATE STARTED & COMPLETED: 6-2-97 samples have been visually classified by Driller. Unless otherwise specified, water levels noted were observed at completion borings, and do not necessurily represent permanent ground water levels. figures in right hand colunn indicate number of blows mired to drive Two-inch Split Sampler 6 inches using 140 lb. weight falling 30 inches(+/-). Figures in column to left noted) indicate number of blows to drive.casing one foot, using 300 lb. weight falling 24 inches(+/.). JUN- d-yl NUN IU;OL IYNIL rHKK JCKVU rHA IVU. oil CrJ DCOU r. II t.e"au3ROYlek • CARR-DEE CORP- 17 LINDEN STREET P.O. BOX 67 MEDFORD, MA 02155-0001 Telephone (617) 391-4500 Co cPH IL hSSOCIATES, INC. 3Q NORFOLK ST. , CAMBR I IPGF,_MDate Jun. 3• 1997 Job NO. 97113 vacation TUCKER S WHARF. FRONT STREET, SALEM MA Scale 1" = 3 BORING B-6 Ground Surface 12 S#l, FROM 010" 30 2 '0" 10 RECOVERED 18" 5 6 F I L L 6 592, FROM 5'0" TO 7 '0" 4 RECOVERED 18 SAND, GRAVEL, LOAM, 3 2 ORGAINC SILT 10 S03, FROM 1010" TO 12 -0- a RECOVERED 20" 10 10 14'0" ORGANIC SILT, 6 504, FROM 15'0" TO 17 '0" $ RECOVERED 16" SOME 4 2 SHELLS - - - - - - - - - - - - - - - - - - - CONTINUED ON SHEET NUMBER 2 Sheet. 1 of 2 JUN- 9-91 MON IU:b? NAIL FRA SERVO hAX NO. 611 213 bLbU N. 18 ' CARR-DEE CORP. '. LINDEN STREET P.O. BOX 67 MEDFORD, MA 02155-0001 Telephone (617) 391-4500 e iPHAIL ASSOCIATES, INC. , 30 NORFOLK K ST CAMBRIDGE MA Date Jan. 31 1997 Job No. 97113 ,cation TUCKER'S WHARF, FRONT STREET SALEM MA Scale '1" 3' BORING B-6 19'6" — — — — -- — — — — — — — — — — ORGANIC SILT, 2 S#5, FROM 20'0" TO 22 '0" SOME 2 RECOVERED 24" SHELLS 2 2 22 '6" HARD BLUE—YELLOW 14 Sr-6, FROM 25 '0" TO 27'0'- CLAY 7'0"CLAY 20 RECOVERED 18" 2S 28 - VERY DENSE FINE BAND & GRAVEL, SOME INORGANIC - SILT, TRACE OF CLAY 54 S07, FROM 30'0" TO 32'0" 48 RECOVERED 24'- 50 4"50 32'0" 67 WATER LEVEL 12'0" (TIDE) , 2:DopM) SIZE OF CASING NW, DEPTH 20'O" DRILLER: STEPHEN DESIMONE DATE STARTED & COMPLETED: 6-2-97 ample: have been visually classified by Driller. unless otherwise specified, water levels noted were observed at completion rings, and do not necessarily represent permanent ground water levels. Figures in right hand column indicate number of blows red to'drive Two-Inch Split Sampler 6 inches using 140 Ib. weight fatting 30 inches(+/-). figures in column to left geed) indicate number of blows to drive casing one foot, using 309 It. weight fatting 24 inches(+/.), Sheet 2 of 2 ATTACHEMENVT B LIST OF ABUTTERS Charles E. Raymond Pickering Wharf Realty Trust 27 Herbert Street J. Hillary Rockett, Trustee Salem, MA 01970 190 Pleasant Street Marblehead, MA 01945 W. David Crosby 40 Prince Street Lee Realty Corporation Beverly Farms, MA 01915 128 Maple Street Danvers, MA 01923 Helen K. Mysliwy Irving Mysliwy Michael G. Jones 11 Hodges Court 8 Auburn Court #3 Salem, MA 019700 Brookline, MA 02146-6331 Association for Relief of Douglas L. Garber Aged and Destitute Women Leslie A. Garber 180 Derby Street 3 Peterson Road Salem, MA 01970 Peabody, MA 01960 Anne Cole Cromwell Christopher J. Ritz 20 Kosciusko Street Suzanne Johnson Salem, MA 01970 316 West 9th Street Charlotte, NC 28202-1780 Tina Ross P.O. Box 1262 James R. Murray, Jr. Stowe, VT 05672-1262 Ann G. Murray 1443 Woodscreek Circle Jay C. Chapin Crystal Lake, IL 60014-1978 16 Kosciusko Street Salem, MA 01970 Wharf Street Nominee Trust Zaher Bdiwi, Trustee James E. Casellini P.O. Box 425 144 Rabbit Road Danvers, MA 01923 Salisbury, MA 01952 George D. Heinz Genevieve Rybicki Marie A. Heinz 12 Kosciusko Street 2886 Middletown Road Salem, MA 01970 Bronx, NY 10461 Roger S. Tardiff Karyn T. Hicks Dorothy L. Tardiff 102D Wharf Street UAB c/o Regina A. Rakoc Salem, MA 01970 2 Felt Street Salem, MA 01970 Anne E. Hutchins Jeffrey C. Richards Richard H. Krom 6 Evergreen Drive Margaret M. Kmm Beverly, MA 01915-4706 6 Kosciusko Street Salem, MA 01970 McCue Family Realty Trust David S. McCue, Trustee Andrew W. Pasquina 199B Derby Street U-172 Paul M. Nathan Salem, MA 01970 159 Derby Street Salem, MA 01970 Barbara M. Hall 195A Derby Street U3 Salem, MA 01970 ATTACH12AENT B LIST OF ABUTTERS Lindley S. Hanson Kathleen J. Hunt Star Route 1 80C Wharf Street U-K3 Box 216 Salem, MA 01970 Alstead, NH 03602 Gerold Mussmann Kathleen M. Barnes 80D Wharf Street U4 64A Wharf Street U-51 Gentoo Building Salem, MA 01970 Salem, MA 01970 Robert R. Oliverio, Jr. J. Robert Wells, Jr. 64B Wharf Street UJ2 Cecily A. Wells Salem, MA 01970 20 Fox Run Middleton, MA 01949 Stuart K. Bowling Sallie D. Bowling Gary J. Dionne 68A Wahrf Street U-J3 80F Wharf Street UK6 Salem, MA 01970 Salem, MA 01970 Thomas C. Chevoor Kevin V. Coan Mary A. Chevoor 84 Wharf Street UL1 68 B Wharf Street UJ4 Salem, MA 01970 Salem, MA 01970 Brian R. Jerome Barbara A. Stone 84B Wharf Street UL2 Earl J. Pizzarelli Salem, MA 01970 70A Wharf Street Arbella Building UJ5 Diane M. Bourgeois Salem, MA 01970 84 C Whars Street UL3 Salem, MA 01970 John S. Harrington 70B Wharf Street Joseph L. Jones, IV Salem, MA 01970 Betsy D. Jones 55 Tozer Road Robert J. Bishop Beverly, MA 01915-5513 Joan Bishop 18 North Hill Drive Roland F. Levesque Lynnfield, MA 01864 Lorraine L. Levesque 86A Wharf Street Phyllis E. Perkins Salem, MA 01970 28 Raven Lane Gloucester, MA 01930 Michael J. Kelley 86B Wharf Street UL6 Galo P. Emerson, Jr. Salem, MA 01970 Sally A. Emerson c/o Robert Kalis Cynthia L. Cronkhite Attorney for Cann C. Cronkhite 133 Washington Street D. Cronkhite Salem, MA 01970 86C Wharf Street UL7 Salem, MA 01970 Paul A. Phillips 80B Wharf Street UK2 Salem, MA 01970 ATTACHIDAENT B LIST OF ABUTTERS Marie P. Vaillancourt John C. Hystedt' c/o Jones Company 61 Wharf Street 55 Tozer Road Privateer Building Beverly, MA 01915 Salem, MA 01970 Kim Ann Rubler Mark J. Bonney 90A Wharf Street UL9 49 Orchard Hill Lane Salem, MA 01970 Middletown, CT 06457-1744 Sandra Bebchick Kathleen R. Johnson 90B Wharf Street U-L10 65D Wharf Street Salem, MA 01970 Salem, MA 01970 Ellen C. Wile Claire M. Hinman 11 Church Street U401 92C Wharf Street Salem, MA 01970 Salem, MA 01970 Scott K. Derderian Rose Mary Newell 90D Wharf Street 65F Wharf Street UB9 Grand Trunk Building Salem, MA 01970 Salem, MA 01970 Pickering Wharf Nominee Trust Clarke Jacobs Realty Trust Shirley Ginsberg Donald J. Clarke josep Gibbons Segal Jacobs 210 Essex Street P.O. Box 677 Salem, MA 01970 Salem, MA 01970 Judith A. Finochio Douglas P. Glasson 71A Wharf Street UE1 Patricia E. Moody Salem, MA 01970 25 Beverly Avenue Marblehead, MA 01945 Gerald P. Tarozzi Pauline J. Tarozzi Claire M. Hinman 71B Wharf Street 92C Wharf Street Salem, MA 01970 Salem, MA 01970 John H. Ramsden Toni-Ann Pike 67A Wharf Street 1292 Falling Leaf Lane Square Rigger Las Vegas, NV 89122 Salem, MA 01970 Robert L. Wilson 65A Wharf Street Salem, MA 01970 David R. Hubbell Constance N. Hubbell 65B Wharf Street Privateer Building Salem, MA 01970 William Gerald Hendricks, Jr. 61B Wharf Street Privateer Building Salem, MA 01970 JASON M.CORTELL AND ASSOCIATES INC. AFFIDAVrr OF SERVICE Under the Massachusetts Wetlands Protection Act (to be submitted to the Massachusetts Department of Environmental Protection and the Conservation Commission when filing a Notice of Intent) I, Carlton L. Noyes, hereby certify under the pains and penalties of perjury that on June 16, 1997, 1 gave notification to abutters in compliance with the second paragraph of Massachusetts General Laws Chapter 131, Section 40, and the DEP Guide to Abutter Notification dated April 8, 1994, in connection with the following matter: Notice of Intent filed under the Massachusetts Wetlands Protection Act by National Park Service with the Salem Conversation Commission on June 16. 1997 for property located at 174 Derby Street. The form of the notification, and a list of the abutters to whom it was given and their addresses, are attached to this Affidavit of Service. 4 1G 27 Name Dat Notification to Abutters Under the Massachusetts Wetlands Protection Act in accordance with the second paragraph of Massachusetts General Laws chapter 131, section 40, you are hereby notified of the following. . A. The name of the applicant is U.S. National Park Service B. The applicant has filed a Notice of Intent with the conservation Commission for the municipality of Salem seeking permission to remove, fill, dredge or alter an Area subject to Protec- tion Under the Wetlands Protection Act (General Laws Chapter 131, section 40)_ C. The address of the lot where the activity is proposed is 174 Derbv Street, Salem D. Copies of the Notice of Intent may be examined at Office of the Salem Conservation Commission _ between the hours of 9:00 amend 4: 30om on the following days of the week: Monday - Friday For more information, call: check one: This is the applicant ❑, representative ❑, or other ❑ (specify) : E. copies of the Notice of Intent may be obtained from either (check one) the applicant ❑, or the applicant's representative B, by calling this telephone number ( 617 ) 890- 3737 between the hours of 9,00am and 5.00pm on the following days of the week: Monday _- Friday _ F. information regarding the date, time, and place of the public hearing may be obtained from the Salem ConservationCommission by calling this telephone number ( ) - between the hours of g„IIp�m and 4:30pm on the following days of the week: Monday - Friday Check one: This is the applicant ❑, representative ❑, or other ❑x (specify) : Salem Conservation Commission NOTE: Notice of the public hearing, including its date, time, and place, will be published at least five (5) days in advance in the Salem Evening News (ramie of newspaper) NOTE: Notice of the public hearing, including its date, tine, and place, will be posted in the City or Town gall not less than forty-eight (48) hours in advance. NOTE: You also say contact your local Conservation Coamission or the nearest Depart- ment of Environmental Protection Regional Office for more information about this application or the Wetlands Protection Act. To contact DEP, call: central Region: 508-792-7650 Northeast Region: 617-935-2160 Southeast Region: 508-946-2800 Western Region: 413-784-1100 COWELL ASSOCIATES JASON M. LAND ASSOCIATESES INC.INC. 244 Second Avenue Waltham,Massachusetts 02154 TO: Sieve Dibble RE' NOI For Tucker's Wharf Repairs SALEM CONSERVATION COMMISSION 'i- Salem Green Salem, MA 01970 WE ARE SENDING YOU THE FOLLOWING ❑ Reports ❑ Drawings ❑ Information ❑ Samples ❑ Letters ❑ Other QUANTITY DESCRIPTION 8 Sets of design plans 8 Copies of NOT Fee Transmittal Form and copies of checks - G BY: Carlton L. Noyes DATE: Ju 19, 1997 VIA: ❑ FIRST CLASS ❑ EXPRESS MAIL ❑ MESSENGER ❑ AI SS ❑ HAND DELIVERY COPIES TO: 95019 w . ' 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION Forms: continued NOTICE OF INTENT FEE TRANSMITTAL FORM DEPARTMENT OF ENVIRONMENTAL PROTECTION DMSION OF WETLANDS AND WATERWAYS. NOTICE OF INTENT(NOI)APPLICANT PROPERTY OWNER: Name U.S. National Park Service Name Same 174 Derby Street ' Street Street City/TownSalem City/Town State MA Zip Code 01970 State Zip Code Phone Number. 508 740-1680 PROJECT LOCATION: Street/Lot Number 174 Derby Street City/Town g I PM DEP FILE NUMBER(if Available) (NOD FILING FEE DISPUTED FEE Total NOI Filing Fee: $ : 10Total Disputed Fee: $ State Share of Filing Fee: $ 83. 50 (as determined in Notice of Insufficient Fee letter ()A of fee in excess of$25.00) from conservation commission) City/Town Share of State Share of Fee: $ Filing Fee: $ 108.50 (y,of total disputed fee) City/Town Share of Fee: $ ('A of total disputed fee) INSTRUCTIONS: 1. Send this Fee Transmittal form and a check or money order,payable to the Commonwealth of Massachusetts, to the DEP Lock Box at: Dept. of Environmental Protection Box 4062 Boston, MA 02211 2. Attach a cony of this form to the Notice of Intent submitted to the local Conservation Commission. 3. Attach a copy of this form and a copy of the DEP check to each of the Notice of intent forms submitted to the DEP regional office. 4/1/'94 310 CMR-440 JASON M. CORTELL EXPLANATION AMOUNT 5-39/110 AND ASSOCIATES INC. 519 7 NA SECOND AVENUE p -I WALTHAM, MA 021541 OUNT re� 0 l DOLLARSI CHECK 1T TO THE ORDER OF DESCRIPTION CHECK AMOUNT NUMBER �g 7 owuAVKk, e�' massa' 51?71 $ 83 BANK OF BOSTON THE NATIONALI WKOF BOSTON AUTHORIZED SIGNATURE 118005197114 1:011000390,: S02 36411118 JASON M. CORTELL EXPLANATION AMOUNT 5-39/110 AND ASSOCIATES INC. 5195 244 SECOND AVENUE WALTHAM, MA 02154 SUNT _D he N � , , i SOf I0 - DOLLARS I CHECK CHECK AMOUNT TO THE ORDER OF DESCRIPTION NUMBER f9y Is-l9 S BANK OF BOSTON " AUTHORIZED SIGNATURE THE FRSTNAl10NA18ANKOF BOSION .... . .. 8400 5 19 511■ ,:0 1 1000 390,: 502 30, 108 �i Capon Commission Salem. Massachusetts 01970 W V ASSPrN 0 City of Salem Conservation Commission Will hold a public hearing for a Notice of Intent under the Wetlands Protection Act, Massachusetts General Laws, Chapter 131, Section 40, at the request of the U.S. National Park Service, 174 Derby Street, Salem, MA. The purpose of the hearing is to discuss the effects of the proposed seawall reconstruction at 22 Kosciusko Street(Tuckers Wharf) and ramp work on the Derby Wharf beach/lawn area. This hearing will be held on Thursday, June 26, 1997 at 7:00 p.m. in the second floor conference room at One Salem Green. Fred Harney Chairman June 19, 1997 Please send bill to: U.S. National Park Service 174 Derby Street Salem, Ma 01970 01,-..nd:m62697 City of Salem Conservation Commission Will hold a public hearing for a Notice of Intent under the Wetlands Protection Act, Massachusetts General Laws, Chapter 131, Section 40, at the request of the U.S. National Park Service, 174 Derby Street, Salem, MA. The purpose of the hearing is to discuss the effects of the proposed seawall reconstruction at 22 Kosciusko Street (Tuckers Wharf) and ramp work on the Derby Wharf beach/lawn area. This hearing will be held on Thursday, June 26, 1997 at 7:00 p.m. in the second floor conference room at One Salem Green. Fred Harney Chairman June 19, 1997 Please send bill to: U.S. National Park Service 174 Derby Street Salem, Ma 01970 m\nnnmm�a:m62697 WALL C:OLLAPSETUOCC-AQ CGIZAI:)E " _ 5'0 (Ey 16T.) S 5T0 {� —7 , , . THICK NEWALL — � � � - OL LL 3-0 2-0 _ ,��-: COLLAPSED 2 O"SQUARE WALL COLUMN A5 L �� PHA T / / 61DEWALK w CONCRETE , ^ I 5TON1 r' f-� •Z-9• LOCK WALL L���� SEAWALL - 4 LONG J/� W(TH -� SCOUR i` r� C41ZOUT % 1 ASPHALT PAVEp PARKINC.I LOT \\ / i 40'-0! CONCRETE N `JOIE LAWN . 1 2'- 9" SLOGIC ti,G p4: i 3IIFi RAIL NCP+IPE (6H. 5) 4 LONC, �Fel o • o GRANITE __ r % 3 a GrADE PL I/4"x G"X �"(A-36} CURB PiZOPERTY MUD LWE r. 0 5,0" 6RAIOTE STOJE CAP LINE r. - (EL VARIES) 2•-Oy o 9.C. A �1 \4- . ,r 4" •- �- . a. _ 1 x v =(/ 10,4t /;•�-�!('. In z// n . . / 1 C -� ' gip^, . . r � V .�•: .• [� •e- Q,,. � - D' � - .. Flo • NPS, P120PERTY ; c Q G N 4 n . i LINE 4 SELECT STUD VVE-LDED n - T12EE BACKFILL 7o zlt[t T PALE , LEXIST) ENTiR� SEAWAt�L 'TO BE kEt=1C,vl_i (TY P) �b y: 124(TYl') - WOODEN �A-A - EXI6TING CONDITION r-a #4 ( 12" 2-0 BOARD i I FENCE FILTER FABRIC cry ( ( s Gyp) ",• —~ C12U5HED STONE SEALANT 2 CLEAIZ _' 3/4" TO I " SIZE CRL15HED STONE COVER r' AfJCNOR EACH C�U125E 80fJD BREAKEiZ FINES ' 4a� 12 �', {TYP) DETAIL �,H-3 -T_'T • i #5 ILO�� 'I/2 To 3/4 (TYP .' YY" FLAW ( EXISTINCI) _ a• , , �EL VARl6� I'Q TO a0- SCALE ; 1/8"= ILO° 8 CONTRACTION JOJWT EXPANSION JOINT 3"CLEA{2 COVER ` ,� u��''/ -•'t, r. — STAGGEKJOIW [6 , 1 " I I-0 M.L.W=OIO I3 „ EACiNCj (N` W) CJ-AVIIFEQED - 2-0 1'� NYLO;J LINE(TYP) COUCRE T F ARRI55E� I 200 LBS ANCHnR(TYP.) 'PETAIti11NCn _ a WALL(NE1N ) , ^ COPAPACTED A SND CONTAINiaVfa �Ni .1_L. F15H }JEOPi2ENE FLEXIBLE w L t lEOT'RENE D ` _; GIRANLILAR BASE t iZUBBER SEAL 1 - " i"t.EX1aLE -� ,F EC:AST Cow PETE Tu uITY p e BEAM ON CIPADE 56 0 RuBBFR SEALANT IS" TF(ICK STONE � i CONTrwL • -= _ ,. � 3`-4%tux 2' x 8' LC�.(`T`r`?) WALLCEXIST) I� r'1 CLIRTAIPJ I�CtIu1tY C,ON! kOL TILLER ll GOA~, I`AL 6A N1 SEAWALL(NEW) I ® 7�a SEALED VEKTI(AL JOINTS 2'O"6QUAIZE 1NALL „ —• /-.T EXPANSIOFJ JOINT. -- COLUMtJ (EXIST ASPHALT -- 3'CTYP) EXPANS{ON —BETHLEI BETHLEHEM PZ35 GCS T EXT I LE � � " SIDEWALK JOINT 2 ( EXIST) t 20'-O j M1LETH PILE WITH 15 CONTRAGTIOf,i II EPDXY COATINC.I 'GROUT JOINT( TYI'. ) I OLt_++.0 4 6TEEL FIFE 1 COVER SLOPE• I 1N MUS LINE ASPHALT PAVED Q BY GEOTEXTIL>r I ( YR) 3PLACES PARKING, 10T I SL PE 1 .60" (EX 6T) HAY SALE 4 61LT FENCE 0 ® � 40-0 11 GRANITES � QQ C ASTAL �8iy�lr I CUtZ$ (r-// A BAtJfK le:-r(?OL 14.9„ , (EXIST } r\s l I j L A VV N 50" I } \ ! I EM r'OI'.),R.Y / (aRAVF I. 60" 20 <,HiEET PILES AQD (NEW ) 15- RCX•K y RAiv1P r' �). PP�PF�TY I_IIJF I R ILS 22.64" _ O'4 I:ZADE RADE l� ,A B B 5H_3 ELR,60(EX15T) ELIO.S(EX15T) -�(AJOG-DEN f�O,- D N. T 5. FENCE (EX►5T.) NORMAL REVERSE DESIGNED: SUB SHEET NO. TITLE OF SHEET DRAWING NO. ' 'DI WADIcAR 37 3 �♦ 814015 C - 1T/e � DRAWN: tEAWALL REHABILITATION , EI5ELE PKG. I , _ TECH. REVIEW: N0. .SHEET Sc-ALE ; /g - I —v SALEM MARITIME-N, H.S. k PILES INITERLOCKtNG DETAIL, PWOODBURY SALEM MA. 0 DATE: OF ' — '.: �r1.t.tdEn•nT nLi�I fFFRE:8T6-100 , . '' �PL %4x6x (0 PL /41x6`xe" T- 7t3 V-AWP- WLT �„ l O y4110 ,. LC-j• GRANITE STOVE CAP + + X, 2" EMBEDMrNT OR EQUAL SILT 1=ENCE . o RAI LINCI 5( IPPOR T DETAIL A HAY BALE 2�o� 5(�UAR'E WAIL � _ Gf - � o COL UMN (Exls� ) __._ _- _-___-_-._r.-_. 56 0 18 THICK STONE GRANITE WALL(EX16T, ) STONE CAP qu 15u TSA2 x)-,x STEEL WOOD P06T 0 2 x 2° WooDEN STAKE ASPHALT �ED 5 SLK --- � c�H.2) #5(TYP) i�LAN VIEW -- --- #312" WOOD POST u u #5ra 9" 7' 0. C, 2 x2 x3 STAKE6 4 � 12" - SILT FENCE n1 —�(2) PER BALE _ _ ASPHALT PAYED I ( HAY HER -PARKINCa LOT(EX15I') 6�`X 6".TRENCH - - �' D 2`-Q" MIN ( TYP) --� ±7W 4 NELSON H 4 L 4. - r d' WITH BACKFILL 3-d MAX HEADED D I IN PLACE• U C AW ITE NP AtJt NOR CONCRETE NATIVE ;SOIL—/ ( EXIST )—� EPERTY 5/8'to - G 9/1(0"LCt � (TYR) } LAWN j 2"CLFA2 COVER SHEET F - F PILE 5H 2 0.�_v TREE _. - (EXIST) 7"(TYR) E2O:� ION CONTROL PBARRIER 5" MAX. 3/"pMIN E �-- LENCtTH VARIES PLAN (NEW) METAL HAND ANCHOR LOCATION PLAN 67AiNLE55 PLA N 6TEEL STRAP 21¢ 6TD PIPE (TYP) a'- 0" RAILING N , T, 5. (TYP) ANCHOk (TYP) 1 EL 10.50 TOP OF 1 CT''Y p) I/4 WALL M .TCH - TYP DETAI A 4 It EXISTING CIZAOE 4 - 1 I 2° � . — 2, o"(TYP 't (TYP) I i o I -- �- 1 I �BAR I � ELP 3 NEW EL9-3o `)TAINLE65 STEEL " (TOP OF WALL) i_6 ` T,—) x 5/I� Y �2�- 3/4 TYP) 12 2 i � IL 2I,5TD: PIPE ( ❑ .., ANCHOR STRAP DETAIL (TYP) (TYP) 6p THICK CIRANITE i BOT TOM COURSE RAI L PARALLEL TO STONG CAP TOP OF WALL.(TYP) SHEET PILE I �� 3.. G,RAN► tE 5T01.it\I,T, S, q-0' O ___' S6 O° I STAINLEgs " i 5 EL DOWEL07 O.C. E L 500 r .•, 'FRU AST C�JeANIT E I „ CONCRETE (EX15T) STONE FACINC.t at BEAM ON GRADE r BOTTOM l� 3-O (MAX,) COURSE OF EL2.00 CP-ANITE JTOME ' (TYP) EL' 1,30 (TYP•) J 00 I \ EL 0 _ , T _ It SUB SHEET N0. DESIGNED: TITLE OF SHEET DRAWING NO. PRECAST DIWADkAR 373 f DRAWN: EHABICoN"ETE SEAWALL RLITATION a 814 05D - D (SH-2) 2 BEAr� PKG.EISELE SALEM MARITIME MR-5, SHEET Y - HORIZON TECH. REVIEW: O. VERTICAL : %I = 1 _01 P,1 . > A ,.. �, N SALEM MA. 8�0'' WOODBURY F3 (TYP) DATE: G/q3 OF 3 T II K&E 18 1157 11-01 MC W62- - r Lawrence Lowel I Gloucester I SALEM MARITIME I NATIONAL HISTORIC SITE Marblehead Ii Concord ynn . I f MASSACHUSETTS Winthrop BA Y BOSTON SCALE OF MILES 0 5 1.0 Wellesley QUINC Dedh Hingham Weymouth . Scituate LOCATION MAP rr, oo �, SEAWALL REHABILITATION o SALEM MARITIME NATIONAL HISTORIC SITE0�� a o �. �.ago SALEM ,, MASSACHUSETTS o` :_J _ �:� D� SEAWALL REHABILITATION 1 Qr%� _CENTRAL \ \1� SALEM MARITIME N.H.S. �Q . ,WHARF `\ � � � CIDD❑ St(' I,��l���a'� �o aaaQo son' O' CICIE! � 161J 1 1�wn®ea SITE LOCATION I i DESIGNED: TITLE OF DRAWING DRAWING NO. STEM= KE55ELMAN CONSTRUCTION DiZAW I NG SSEAWALL REHABI LITATIOI�I 373 W �IVVA Q W DRAWN: LOCATION WITHIN PARK 81405 SUPERINTENDENT / DATE UNITED STATES 6EAWAL.1_ //i J 1 NAME OF PARK cDEPARTMENT OF THE INTERIOR EI�ELE NO f / SHEET o >s t-.., y TECH. REVIEW: ar DAT;E NATIONAL PARK SERVICE �JALEM MARITIME N.HS, M _SUPERINTENDENT NotzTHEAST REC4ION P. W00'DBUW-Y NEW ENCILAND 5YJTEM `JUPPOPT OFFICE DATE: 6 REGION COUNTY STATE N.E. ESSEX MA. OF -L— I I