64-239 - 15 HEMENWAY ROAD - CONSERVATION COMMISSION 15 Hamenway Rd. 64-239
Vim. .
310 -CHR 10.:99 DFP Fik No. 6 / - z 4 7
(To be prodded by DEP)
UForm 5 Gry�o,,,aSA LEM
Assoc .
cosmonvealth �a:'��51a-' 2`
G. `c G 3 i'r�st 4.'i
of Massachusetts
B . 17-2 4 rr �� '
Order of Conditions
Naseachuetts wetlands Protection Act
O.L. C. 131, 540_
From SALEM CONSER TIO �- Issuing Authority
SAME
Tos (Name of property owner)
(Name of Ap uan
AddresalA G^ R a
Address
This order is issued and delivered as follows' {
❑ by hand delivery to applicant or representative on (date)
by certified mail, return receipt requested onma L TQQS (date.)This project is located at Road
The property is recorded at the Registry of F
Book 2 7 Page 2 9 2
certificate (if registered) N/A
The Notice of Intent for this project was filed on April 1S 10.,5 (date)
The public hearing was closed on
Mav 11 1995 _ (date)
Findings
The Commission has reviewed the above referenced Notice of Intent and plans and has
held a public hearing on the project:.. geasd on-ths.information available to the CommiGai on at this � YV
time, the ^ m*�� _ ^n has determined that the area an which the proposed cork is to W'danr=ls
aignif scant to the following interests in accordance with the Presumptions of Significance sat forth in the
-
regulations for each Area Subject to Protest ion Order the Act (check as appropriate):
Public water supply Flood Control lead containing shellfish
Private water supply Strom damage Prevention Fisheries
Ground water supplY Prevention of pollution Protection of Wildlife Habitat
Total Filing Fee Submitted ev.2— State Share 350no
(t/2 fee in excess of $25)
City/Town Share 479 nn -
Total Refund Due S 725 . 00 City/C io/w2n toter S '17S nn stat totem 350 . 00
3'E S
Effective 11/10/89 5-1
ee¢¢F 1-7.=,11-14
'8 -.=,11— r:&'-'
mm' c hereby finds that the following conditions
Therefore, the Co
are necessary, in accordance with the Performance Standards set forth .in the
..ss#en `
regulations, to protect those interests checked above. the ��:
orders that all work shall be performed in accordance with said conditions and
with the Notice of intent referenced above. To the extent that the following
condiLionsCmodify or differ from the plans, specifications or other proposals
isubmittediwith sthe Notice of intent, the conditions shall control.
General Conditions
1. Failure to comply with all conditions stated herein, and with all related
statutes and other regulatory measures, shall be deemed cause to revoke
or modify this Order.
2. The order does. not-grant any property rights or any exclusive
or eiprivileges;
on of
it does not authorize any in
to private property
private rights.
3. This order does not relieve the permittee or any other person of the
necessity of complyingg with all other applicable federal, state or local�m¢ { =-
statutes, ordinances,•by-laws or regulations..
6. The work authorized hereunder shall be completed within three years fromLL
the date of this order unless either of the following apply:
(a) the work is a maintenance dredging project as provided for in the,
Act; or
(b) the time for completion has been extended to a specified date more
than three years, but less than five years, from the date of issuance
and both that date and the special circumstances warranting the
extended time period are set forth in this order.
5. This order may be extended by the issuing authority for one or more
periods of up to three years each upon application to the issuing
authority at least 30 days prior to the expiration date of the order.
6. Any fill used in connection with this project shall be clean fill,
containing no trash, refuse, rubbish or debris, including but notilimited
to lumber, bricks, plaster, wire, lath, paper, cardboard, Pipe,
ashes, refrigerators, motor vehicles or parts of any of the foregoing.
7. No work shall be undertaken until all administrative appeal periods from
this order have elapsed or, if- such an appeal- has. been filed, until„all#s,, '�._
proceedings before the Department have been completed.
8. No work shall be undertaken until the Final order has been recorded
in the Registry of Deeds or the Land court for the district in which
the land is located, within the chain of title of the affected
property. _ in the case of recorded land, the Final order shall also
be noted in the Registry's Grantor Index under the name of the owner
of the land upon which the proposed work is to. be done. In the case
of registered land, the Final order shall also be noted on the Land
court certificate of Title of the owner of the land upon which the
P
work is to bne done;^TThe
on therecording
atnthe endnofshall
this order
submitted to the
prior to commencement of the work.
9. A sign shall be displayed at the site not less than two square feet or
more than three square feet in size bearing the words,
amassachusett64DepVyent of Environmental Protection,
File Number jL�S``//
10. where the Department of Environmental Protection is requested to make a
the determination and to issue a superseding order, �andrhearinge vation
before
commission shall be a party to all agency proceedings
the Department.
5-2
�Le PG 404
11. dpon completion of the work described herein, the applicant shall
forthwith request in writing that a Certificate of compliance be issued
'etating..that.the work has been satisfactorily completed.
12. The work shall conform to the following plans and special conditions: .
Plana:
Title Dated signed and Stamped by: on File with:
Plan AccomDan..innDe��� Usgood Park Neighborhood Association To Rebuild
and maintain the sea wall and boat p nway oad, Salem, MA
Sheet 1 -65, dated—pecem er 10 , 1993 . Prepared by Raymond C Precaay .=_
Professional Surveyors x. F.nnin street , Lynn , MA 01901.
.
m
Salem COnservatioZCromm.
Special Conditions (use additional paper if necessary) { b
See attached Special Conditions dated May 11 , 1995 .
(Leave Space clank). . . . . . . . . . . . . . . . . . . . . . .. ... ..
5-3A
Plans:
Title Dated signed and stained by:
L a _
P ® ledwit�s� '
special conditions (vee additional paper if necessary)
(Leave. Space Blank). . . . . . . . . . . . . . . . . . . . . . . . . . . ...
5-3B
LA%
t V k3 6t
issued by the Department of Environmental Protection ,
Signature
on this
day of 19 r
before me personally appeared to me known to be
the person described in and who executed the foregoing instrument and
acknowledged that he/she executed the same as his/her free act and deed.
Notary Public My commission expires
The applicant. the owner. any person agerisved•by the-supormWinD Order, arty owner of lend abuttfng Lle land t
upon which the proposed.work is to,be done, or any tan persana'Durauent to G.L. c.30A 111011, are-Ir
- nottfled of their right-te-request•on-adjudicatory-hearing pursuant to G.L. c.30A, 1110, providitms
request is made by certified ail or hard delivery to the Department, with the appropriate fllirgcfea armed
Fee transmittal Form as provided in 310 CMR 10.03(7), within ten days from the date of issuance of this `
Superseding order, and is addressed to: Docket Clerk, office of General counsel, Department of Envi woulltat
Protection, one Winter Street, Boston, MA 02105. A cop/ of the request shall at the same time be sant byes., .
certified ail or hard delivery to the Conservation Commission, the applicant, and any other party.. " <=
Proceedings,, C
OfClaim
for
1a01(6) udandt*halt earini shalt
comply
iwith
ng inthe
fo Department's Rules for Adjudicatory
(a) the DEP Wetlands File Number, now of the applicant and address of the project; if represented
(b) the complete neme, ne epr address and telephonumber of the party filing the request, ard,
by counsel, the neme and address of the attorney;
(c) the names and addresses of ell other parties, if kn0m:
(d) a clear and concise statement of (1) the facts which are grounds for the proceedings, (2) the
objections to this Superseding Order, including specifically the manner in which it is alleged to be
inconsistent with the Department's wetlands Regulations (310 CMR 10.00) and does not contribute to the
protection of the interests identified in the Act, and (3) the relief sought through the adjudicatory
hearing, including specifically the changes desired in the Superseding Order;
(e) statement
pthat a copy of
req estsahas been sent totheapplicant, the cons
aservation camiesi'an and
uch
par
Failure to submit all necessary information may result in a dismissal by the Department of the Notice of
Claim for an Adjudicatory Hearing..e and ame^� +i ;
Z W7
Detach an dotted line to the een
prior to cocament of tart
............................................................................
Issuing Authority.
To
Please be advised that the Order of Conditions for the project-at
FIto Number has been recorded at the Registry of mid
has been noted in the chain of title of th• ope affected prerty in accordance with General Condition 5 on
. 19
If recorded land, the instrument enmber which identifies this transaction is
If registered land, the document comber which Identifies this'transaction is
Applicant
Signsture
5-6B
BK 1-32104 PG .406
issued By SA E co servation -gommia a ion
Signatures
This order must be signed by a majority of the conservation commission.
da of Mev 19 95 , before me
On this �r — y
personally appeared the above named (..,=i s&JQa to me known to be the
cuted the foregoing instrument and acknoarledg
person described in and who exe
x«a
that he/she executed the same as his/her free act and deed. s
x tory Public xy commission expires P
The applicant, the owner, any person agrrieved by this order, any owner of land abutting the lard.upon which
the proposed work is to be done, or any ten residents of the city or tan in which such land is touted, are
hereby notified of their rightto request the Department of Envircreental protection to issue a Superseding
Order, providing the request is made by certified mail or hard detivery to the Department, with the
appropriate filing fee and Fee Transmittal Form as provided in 310 CMR 10.03(7), within ten days from the
date of issuance of this determination. A Copy of the request shell at the same time be sent by certified
nail or hard delivery to the Conservation Commission and the applicant.
pmrior to commencement of work.
Detach an dotted line and submit to the 5a 1 Pm - - - m
........................................................... Issuing Authority
To
please be advised that the Order of Conditions for the project at
File Number has been recorded at the Registry of
has been noted in the chain of title of the affected property in accordance with Genorel Condition 8 an
-x_,19
if recorded land, the instrument nu ber which identifies this transaction is
if registered lard, the document rmnber which identifies this transaction is
Applicant
Signature
5-4A
BK 13204 PG 408
NOTICE OF INTENT
OSGOOD PARK NEIGHBORHOOD ASSOCIATION
15 HEMENWAY ROAD
#64-239
SPECIAL CONDITIONS
MAY 11, 1995
1. All work shall conform to the above-referenced Notice of Intent, site plan and supporting
documents and those final specifications which shall be filed with the Commission prior to
construction. Any change made or intended to be made to the approved plans shall require
the applicant to inquire of the Commission in writing whether the change is substantial
enough to require the filing of a new Notice Of Intent.
2. Members and agents of the Commission shall have the right to enter and inspect the
premises at all reasonable times to evaluate compliance with the conditions in this Order.
The Commission may require the applicant to submit additional data or information
necessary for the Commission to conduct that evaluation.
3. Upon completion of the project, the applicant shall submit, with the request for a
Certification of Compliance, an affidavit, prepared by a professional engineer or land
surveyor registered in the Commonwealth of Massachusetts, stating that the site has been
developed in accordance with the requirements of this Order of Conditions, the referenced
site plan and supporting documents.
4. This Order shall apply to every successor in control or successor in interest of the property
described in the Notice of Intent and accompanying plans or part thereof. In the event this
land or any part thereof changes ownership before or during construction, the current
owner shall notify the new owner, by registered mail, of this Order prior to the transfer of
ownership and shall forward proof of this notification to the Commission.
5. Prior to commencement of construction activity, a haybale barrier shall be placed
downgradient of construction to prevent siltation of the adjacent wetland. Haybales shall
be anchored with stakes and entrenched 4 to 6 inches in depth. Trench material shall be
deposited on the upgradient side of the haybale barrier. Haybales shall be inspected daily;
those showing signs of deterioration shall be replaced immediately. The haybale barrier
shall remain in proper functioning condition until all disturbed areas have been stabilized.
6. Additional erosion and sedimentation control measures deemed necessary by the
Commission shall be instituted by the applicant. Any siltation caused onto any wetland or
waterway area shall be promptly reported to the Commission. Such areas shall be restored
to the satisfaction of the Commission.
7. During construction, no debris, fill, or excavated material shall be stockpiled within 100
feet of designated wetlands. Any other stockpile location will be protected sufficient to
prevent sediment from surface runoff entering wetlands.
BK 17-9204 PG 409
8. Equipment servicing and overnight equipment storage must be conducted outside the buffer
zone. Equipment must be maintained to prevent leakage or discharge of pollutants.
9. * No spill or discharge of petroleum products or other pollutants will occur within 100 feet
of any wetland resource area.
10. Notice shall be given to this Commission no more than 2 weeks nor less than 2 days prior
to the commencement of construction activities. Said notice shall include, in writing, the
name(s), address(es), and business and home telephone numbers of the project supervisor(s)
responsible for insuring that operations are conducted in compliance with this Order.
11. All disturbed soils shall be immediately and similarly re-vegetated upon completion of
construction activities or shall be mulched until the next growing season. Hydroseeding
will be initiated no later than September 15.
12. No float shall be constructed until a design plan for mitigation for the proposed float is
reviewed and approved by the Commission.
* Ongoing conditions that do not expire upon completion of the project or issuance of a
Certificate of Compliance.
jm/bd/osgoodsp.con
So,Lt.*-j Consev-Va+ion C�mrni sS ��n
One- SajeM Cr-ejn
SCS [ e u-sn Oi Q -�o
t' Commonwealth of Massachusetts
Executive Office of Environmental Affairs
Department of
Environmental Protectio9 -4 9F0F�
William F. Weld ,� �1
Governor
Daniel S.Greenbaum
AUG
111993
1 1993 /� 99u.
Commissioner P117 13 J A ,✓
h
Paul LaBrie
11 Hemenway Road
Salem, MA 01970
Re: Waterways Application No. W93-1905
Dear Sir:
The Waterways Regulation Program (WRP) has received your
application requesting Interim Amnesty Approval pursuant to 310
CMR 9 . 10. The WRP has assigned your filing with the referenced
application number. IT IS IMPERATIVE THAT YOU REFER TO THIS
APPLICATION NUMBER WHENEVER YOU SUBMIT OR REQUEST INFORMATION FOR
THIS FILE.
Attached is the WRP' s public notice for this application. You
are required to publish this notice, at your expense, in the
local newspaper (s) having circulation in the area affected by the
proposed activity. This notice must be published no later than
the designated "Notification Date" and for at least one day in
the local newspaper (s) . There is a prescribed public comment
period imposed from the date of publication. You are required to
submit proof of publication to the WRP by sending a copy of the
newspaper notice showing the date of publication or a letter from
the newspaper indicating the date the notice was published.
The WRP will concurrently notify the appropriate municipal
officials of the proposed activity for their review and comment.
The WRP cannot complete review and authorization until at least
forty-five (45) days after the municipality has been notified of
this application.
One Winter Street 0 Boston, Massachusetts 02108 • FAX(617)556,1049 9 Telephone(617)292-5500
Should you have any questions with regard to the foregoing, ,
please ,contact me at (617) 292-5695.
Sincerely,
Zonald t�-
Licensing Engineer
Waterways Regulation Program
cc: Salem-Mayor & City Council
Salem-Conservation Comm_i_ssion
Salem Harbor Master
DEP, NE Regional Office, Wetlands Section, #64-30
MEPA Unit
Office of Coastal Zone Management
DEM, Ocean Sanctuaries
Division of Fish & Wildlife
Massachusetts Historical Commission
Division of Marine Fisheries
Abutter
WRP Application File -
DEPARTMENT OF ENVIRONMENTAL PROTECTION
WATERWAYS REGULATION PROGRAM
Notice of Request for Interim Approval pursuant to 310 CMR 9. 10
Waterways Application Number W93-1905
Paul LaBrie
Notification Date: August 27 , 1993
Public notice is hereby given of the application by Paul LaBrie
to maintain a seawall at 11 Hemenway Road in the municipality of
Salem, in and over the waters of Salem Harbor. The Proposed use
of the structure (s) or fill is to provide shoreline stabilization
for the protection of existing structures.
The Department will consider all written comments submitted
within 30 days subsequent to the "Notification Date"" in order to
decide whether to grant Interim. Approval. A public hearing may
be held .upon request by the municipal official . Furthermore, a
municipality, ten citizen group or any aggrieved person that has
submitted written comments may also petition to intervene to '
become a party before the close of the comment period. Failure to
submit such petition will result in the waiver of any right to an
adjudicatory hearing. Further information regarding this
= application may be obtained by contacting the Division at (617)
292-5695. Plans and documents for this application are on file
with the Department for public viewing at the address below.
Written comments should be addressed to: John A. Simpson, Section
Chief, DEP/Waterways Regulation Program, One Winter Street, 8th
Floor, Boston, MA 02108 .
..........................._...
Massachusetts Department of Environmental Protection9 Program Tr"ansmin CI�5�
Bureau of Resource Protection-Waterways ..._ .a..............
:
l/
BRP WW 01 Waterways License or Permit: Non Amnesty
t BRP WW 02 Waterways Amnesty License or Interim Approval
BRP WW 03 Waterways Amendment to License or Permit
General Waterways Application
See
pageIbeton lam on Project Information
page 1
completing
sections A•D of 1. Which permit category are you applying for? 7. Project description:
` this form ❑ BRP WW 01 ❑ BRP WW 03
BRP WW 02(Amnesty)
fix.,_ ...z� . ... _s .� ,..�a.11......_........
.....................................................:...................................................
2. Applicant: -
p ................................................................................................................
Name / ............................_..._.._..._-............_...................................
......._.....
1..I)IK:2!'4105.N...ZJJ. ...........PLl_4.b...........
A4 I/ AOOress s
�G: :...'... �7q 8. Description of existing and proposed use(s):
annp» stye �s , .. ,...4..,L.........: :: .---:----- ...
.. c..S ....:. .Y 3._Fr..............................
i epnonelhome IeorkJ
.5 3) — l GO O.f......... fSJ.D ....0€........................
3. Authorized agent(it any):
....._.........................-.........._......._.................._.........._................
...........................................-...................._........................................
....................:................_................................................-...............
' .......... _ _
.. ............................................................ ................................
AGoress 9. Is this application for an Amnesty Interim Approval?
Yes D No
c;h//oxn awe If"Yes",submit plans Prepared in accordance with
........................................................ Appendix A.
ie/epnone -
4. Property owner: 10. What is the approximate total cost of the project(including
materials 8 labor)
O ,L,4- 13 n-4 - --- __.
Norte Qloiaerelr11 apP/ t) NP..7....... ...4.6" j..c!s.-�3.�.![. ...........................:..
-._---- S� �f�,_
torAb.lsJ .... .- ewcx ---------swomsmrt--- 11. List the name and ccmplete mailing
® g address of each abutter
(attach additional sheets,0 necessary):
Lcaem/srreeraueress) - - CS 0OD i¢/Q.C.lI[lL1G.tt8.QidoD SSoe
----- - --_- y 2 EA v oy ko/}D.,S+)A� /kA 47715
5. Name of the water body: _OAD NA
J4-^ � ddp pp ppTDIc1�0
-1 Jlil�.......... .../.�F.q2.-Of...............................
12. 'I have attached project plans in accordance with the
6. The water body at the project site is: instructions contained in..':
(check 1 or more of both a S b) X Appendix A(for Interim Approval applications)
a. X Tidal ❑ Filled Tidelands ❑ Great Pond Appendix B(tor Permit applications)
❑ River/Stream ❑ Uncertain '
❑ Appendix C(for license applications)
b. ,$1 Natural ❑ Man-Made ❑ Uncertain Appendices A•C begin on page 7 of this Application
Package.
Rev.2193 Page 2 of 8
Massachusetts Department of Environmental Protection
Bureau of Resource Protection— Waterways Program 7ransm tte
_. BRP WW 01 Waterways License or Permit: Non Amnesty
BRP WW 02 Waterways Amnesty License or Interim Approval
BRP WW 03 Waterways Amendment to License or Permit
General Waterways Application
Certification
Please type or
print ctearty,all All applicants,property owners and authorized agents must sign this papa.All future application correspondence may be
inlormaeon signed by the authorized agent alone. - -
" provided on this
form. I//
'I hereby make application for a permit or license to -. z \ ---------.---.--.--.
aulhorize the activities I have described herein.Upon my ApIkanMsignarum c
signature,I agree to allow the duly authorized representatives ...../v.....` ....../f.c.!22......................
of the Massachusetts
nt of Environmental Protection Date
and the
to
enter Massachusetts
upon theprem sCoastal s of thee projecZone t she Management Program
she at reasonable ties � t..............................................__..
for
urpose of inspection, Prorerry
aDDihcatonbs true and at curate to theon best of my knowledge,*in this
eldpe.' ....
(0._smp� p n / , ..��.....................
- ................................................................................................................
Apenrs sgnalum(d appl)C&el
................................................................................................................
ame
Ll Waterways Dredging Addendum
1. Provide a description of the dredging project.
........../Y.ON... -............................................................................................................................................................................
2. What is the purpose of the dredging?
..............................:.......................................................................................................................................................................................................
...
w 3. What is the volume(cubic yards)of material to be dredged?
4. What method will be.used to dredge?
........................................................................................................................................................................................................................................
5. Describe the disposal method that will be used and give the disposal location(include a separate disposal she location map):
........................................................................................................................................................................................................................................
Rev.y93 Pape 3 of 8 -
TiP�}avf n,�77`,y
3 -
IYf � YtY+ 1 i
l '
Park y<piokero 4A-9 p ,p
NI GN T16
LOCUS MA'p Co& CkJEF /i/2 �/92
S,6-A 6.1/i
x"'44
Hr+K/ CA PI°FF-a
6AWAc4. S A-I
D
R
G
A
� R o
A
kQh
-14 0
.2 SfioRy �h
Wood
/Q5 t 132 'x.
o T-S Si 2 6- 2s /J-0 reg Act 2
PURPOSE: INTERIM APPROVAL Fob
DATUM Mfg. �at+f rrEh '�� 1� / �rttk v 6� �o.9z7 54- 1 1HARZa2
ADJACENT PROPERTY OWNERS: Y
.- - I (%SGODD �AICK/YL1GMBo�CN'oaDA77 AA4j�
nG/ff�7(LJ. �'��R�i Aep 17 To COUNTY OF XJd'/X STATE
G,14'244 ' o,iL,- - �� t APPLICATION BY
- ScJ A, /,1 3D - / SHEET OFZ DATE /ONW 93
I.
LI
�INu/
MaD cIJ�
SECTION A -/�
PURPOSE: INTERIM APPROVAL -P.' LA, StIAWf��- L_
-DATUM 1 SALtM
-_ ADJACENT PROPERTY OWNERS: , I �I Cp\c/j W A`( IN
1 AT
Y Sl}l the MA O I Quo COUNTY OF STATE STATE MA
w
APPLICATION eY
`v
3 SHEET Z OF I DATEA)AW If(
310 CMR 10.99 DEP Fite No.
64-239
Form 7 (To be provided by DEP)
City/Torn Salem
Applicant Osqqod Park N.A_
Comonwealth
of Massachusetts
EXTENSION PERMIT
MASSACHUSETTS WETLANDS PROTECTION ACT
G.L. c. 131, 540
From: Salem Conservation com _ _Issuing Authority
To: Osgood Park Neigh y Asqnc 19 Savoy Road ,.
(Name) (Address)
The order of CondiLons (or Extension Permit) issued on May 11, . 199$ (date)
to same (name) for work. at 15 Hemenway Road
(address) is hereby extended for a period of years (s) from
the date it expires.
This Extension Permit will expire on May 11 1999 (date)
This document shall be recorded in accordance with General Ccidition 8 of the
Order of Conditions.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(Leave Space Blank)
7-1
Effective 11/10/89
Issued by Salem Conservation Commission
Signature(s)
v
When 4�ed he nservation Commission this Extension Permit must be
signed by a majority of its members.
On this 26th day of March 19 98 before me
personally appeared ,.,may: oa. to me known to be the
person descredin h executed the foregoing instrument and acknowledged
that / e xecut h ame as his/her free
MY -atKj -deed.
�iGcc�
�OMMiSSioNov,ov
I S
N a y P blic My commission expires
Detach on dotted lire and submit to the prior to commencement of work.
..............................................................................
To Issuing Authority
Please be advised that the Extension Permit to the Order of Conditions for the project at
File Number has been recorded at the Registry of and
has been noted in the chain of title of the affected property in accordance with General Condition 8 of the
original order of conditions on , 19
If recorded land, the instrument number which identifies this transaction is
If registered land, the document number which identifies this Transaction is
Signature Applicant .
2
NORTH H SHORlE MARINE INC .
Twenty Three Glendale St. Salem, MA 01970 Telephone (508) 745-8062
1XQ/r!A'B Cadnnc�rd
—e' Ver/ C.L. GaAj u— i7 rhe
lsSueaQ �� Os� �o� �l a /z lUej 4 J6, -hou.Q
evrd �i 5 �o�� /"��+,A00 ( end) 4� Q
woo�� ! _ 4I 1/e
e.-r ri.C� /J�" �✓ G...•1 cY -} o<a .
T.]1 � f , h 7 � '
S Y �' rer �; �es � �9 Ivw � C�-r
/ nit G. II� w us
�w � y� v � y�, � ✓ evr�s �e11o41QI,
ehreser �/ OSS �
/ve, A, J6rn
4au�t' �Sfa
0 DREDGING • PILE DRIVING 0 WHARF BUILDING • SEA WALLS
PREPARER DATE
x
EXISTING `W"° LAO k"
CONDITIONS
i;SA L F O
NARBOR
BENCH AlARK. LOU
9 YAP
x Top of southeast corner of concrete NOT TO SCATS
waR at the northeast corner of the Locus.
Eieve10.53 NQVD O
HEMENWAY ROAD SMH
CONCRETEeRIM-11.02'
•
'WALK
GRANITE CURB QB
�e1 y6 APPROX PROP „ UNE ord i
1 \ W
GRASS 7¢
jr°? xeA +iso a�
- ^^� ENTIRE LOCUS 1S WITHIN �qs ; aa!
_ .o GRASS FEMA ZONE V3 (EL 14) p W Bli
�'��no x`p9 xe? TREE e° xs? , TRE ye xe? a
xe DRENCH poi
v° TREE GRASS a v
SLI
BENCHES Pe
BENCHES s? °d LICENSE
� Q
jl.R .. b 2851
a •o s.o •s4
m2 0 BEACH CO�JC e• q. APPROXIMATE
STEPS BEACHa l
HISTRIC MHW
�
STONE MEAN RICH WATER —W
SEA s� m
Rye
S D. P. 2 x v° Ze o
• INTERIM APPROXIMATE ,p qPx �� } � w q.
APPROVAL HISTORIC MHW +•e JLl6iLYIRi
3506 um
S 18' DRAT -q2 HW xo5
4
PIP
NVE0.36' Q R
t 0
4r Af X A R R
PLAN ACCOMPANYING P&TMON OF pwr
0SGOOD PAR% NEIGHBORHOOD AS90CLT10N 0 40 80
TO REBUILD AND MAINTAIN THS i 1 1j
SSA WALAND BOAT RAMP
AT 09GOSGO OD PARS, PREPARED BY: G.K.G.
HZWENWAY'ROAD. SALEM, MASS.
SCALE C-40' DECEMBER 10, 1999
SHEET 1 OF 6
RAYMOND C. PRESSEY, INC. "
PROFESSIONAL SURVEYORS k ENGINEERS
158. BROAD STREET LYNN, MA 01901
989-101 3/13795 10:50 AM
THE REGISTERS OF DEEDS.
PREPARER DATE
1-3
1
i
I
; o +
o .
d
� o
H � ��-+ N
z
PLN ACCOYPAKMG PETCPION Of m
OSGOOD PARS NEIGHBORHOOD ASSO=nW
TO RBBDIIA AND YADTTADI THE
SSA WALL AND BOAT RAMP V.
AT OSGOOD PARS,
HE10II1WAY ROAD, SALSK MASS.
SCALE AS NOTED DZCKIdB= 10, 1995
SHEET 2 OF 6
RAYMOND C. PRESSEY, INC.
PROFESSIONAL SURVEYORS h ENGINEERS
156 BROAD-STREET LYNN, MA 01901
969-10213/113 95 11:00 AM PREPARED BY:- G.K.G:
PREPARER DATE
cn
o �
* g�
O
d
V
7 /L O
z
o
C�
o0
0
' .16
BITUMINOUS WALK
p O W .09
PLAN ACCOMPANYING PETf1TON or
OSGOOD PARK NEIGHBORHOOD AS80CLTION
TO R13UUZ AND MADNTADN TBE
SEA RAIL AND BOAT RAW
AT OSGOOD PAM
ENACMAY ROAD, SALL4 MASS.
SCALE AS NOTED DECEMBER 10, 1996
SHEET 3 OF 6 ` 8.6
RAYMOND C. PRESSEY, INC.
PROFESSIONAL SURVEYORS & ENGINEERS
156 BROAD STREET LYNN, MA 01901
969-103 13/13/95 11:45 AM PREPARED BY. G.K.C.
PROPOSED e• THICK PROPOSED 12' THICX
PROPOSED CONDITIONS
:,.
CONCRETE BOAT RAMP REINFORCED CONCRETE WALL
WOODEN RAILING ON (5000 psi CONCRETE) (5000 psi CONCRETE)
BOTH SIDES OF THE GRASS GRADED
WOODEN WALKWAY TO MEET THE .
30• BACK EDGEZgf
OF RAMP
W ty
p < 25. 1 T 30'
W []
O PROPOSED GANGWAY
O 0 PROPOSE
Ln
3I ILR11�+4.4 PILED 2.30LWO
1 Ifffi.�0.0 BEACH ,
O W
IEI.w--4.4
CL
W W z
a 0
SECTION X A x
SCALE 1" = 10' HORIZONTAL _id n
1" = 100'' VERTICAL d a n
• o io zo so � ar
Ua
U. n
0� z m
� o-o
o kw o m �_
0 �OwwWPMi
m
b
V tl
N Q
� � a
�--� �
N I--• 8 p
` f---i
CONCRETE WALL
1 6CONCRETE WALK
WITH WIRE MESH
(Jl (J1 O I PITCH 1/6" PER FOOT
N Z p A
H
N
E8 a o
l..lJ s -
PLAN ACCOHPANMG PETITION OF F +
OSGOOD PARK NEIGHBORHOOD ASSOCIATION
TO REBUILD AND MAINTAIN THE c a
SSA WAEL AND BOAT RAMP
AT OSGOOD PAIM
H1130MAY ROAD. SALEM. MASS.
SCALE AS NOTA DECO®ER 10, 1999 �� $
SHEET 5 OF 6 f $ a
RAYMOND C. PRESSEY, INC. F S•
PROFESSIONAL SURVEYORS h ENGINEERS
156 BROAD STREET LYNN, MA 01901
988-105 3 13 95 12:05 PM PREPARED BY: C.K.G.
THE REGISTERS OF DEEDS.
PREPARER DATE
GRASS < z
PROPOSED CONCRETE WALK
PROPOSED CONCRETE SEA WALL '^
co
I I N
O
z tJZ
II U
BEACH ;
CL:
vi
W o P OKI w
MH '
II IH PROPOSED
o :Z • CONCRETE
o :o;: BOAT RAMP
h z 3: pL1SI1
SEAL
g :
4 O .
m MUD
BEACH 3 '.'.' FLATS
y O
0Fn
i •: z�
:
�?
.3
S A L E M N
q.
PLAN ACCOUPANMG PSl'1'lION OF
OSGOOD PARE NIIG13BOlMOOD ASSOCIATION o' 9
TO REBVDA AND YAINTADF TRX
SRA WALL AND BOAT RAMP J WOOD PILE
AT OSGOOD PAR&
E33UNWAY ROAD, 9ALKIL MASS. O
SCALE Y-10' D=CM(BKR 10, 1909
SHEET 6 OF 6
RAYMOND C. PRESSEY, INC. pgr
PROFESSIONAL SURVEYORS & ENGINEERS p 0 10 20
156 BROAD STREET - LYNN, MA 01901 , , , , Iii „ I 1 I
969-1068 3/13/95 3:15 PM PREPARED SY: C.K.G.
I
Cp��
Salem. Massachusetts 01970
r><r o�T
HASsn C17-�iK' Alf-N.,-FgQ
of;r.�Cl
City of Salem
Conservation Commission
Will hold a public hearing for a Notice of Intent under the Wetlands Protection Act,
Massachusetts General Laws, Chapter 131, Section 40, at the request of the Osgood Park
Neighborhood Association, 19 Savoy Road, Salem,MA 01970. The purpose of the hearing is to
discuss the effects of a proposal for the reconstruction of a seawall and boat ramp and the
construction of a pier, gangway and float at 15 Hemenway Road. The proposed work is located
within the Buffer Zone and the Coastal Resource Area.
This hearing will be held on Thursday, April 27, 1995 at 7:00 p.m. in the second floor
conference room at One Salem Green. YrIed
Harne'y%!��/�
Chairman
April 20, 1995
This notice posted on "Officials Bulletin Board"
CFty Rall Ave., Salem, Mass. on APD � 9
23A j 23C '-1"
in accordance 0fi 3t3 Sic.
1 .G.L. /� �
Commonwealthof Massachusetts
Executive Office of Environmental Affairs �+
Crr�
Department of $ 19
Environmental Protectionlmerrr sn:
Metro Boston/Northeast Regional Office "°n,r,
'%pt,
William F. Weld
Governor - -
Trudy S.Coxe - -
secretary,B.Struh
David B. truhs DEP File # 064-0239
- -
Commissioner -
RE: NOTIFICATION OF WETLANDS_ PROTECTION ACT FILE NUMBER SALEM
DATE: 8-31-95 (city/town)
The Department of Environmental Protection has received a Notice of Intent filed
' in. accordance- with the Wetlands Protection-Act (M.G. L; c . 131, §40) : , _
Applicant :OSGOOD PK NEIGHBORHOOD ASSOC. Owner: SAME
Address : 19 SAVOY RD Address :
SALEM, MA 01970
Project Location: 15- HEMENWAY RD.
IF CHECKED, THE FOLLOWING ITEM(S) APPLY TO THIS NOTICE OF INTENT:
A. " This project has been assigned the following file
Although a file # is being issued, please note the following:
ISSUANCE OF_A- 'FILE NUMBER INDICATES ONLY COMPLETENESS OF SUBMITTAL, NOT
APPROVAL OF APPLICATION - - -`
No File# will be assigned to this project until the following missing
information is sent to this office, to meet the minimum submittal requirements
in accordance with the Wetlands Protection Regulations at 310 CMR 10 . 00 :
ccpy (s) of a completed Notice of Intent (Form 3 or Form 4 of
Sect . 10 . 99 , whichever is applicable) and a cODy of the Fee
Transmittal, Form, with a copy of the check for the State' s share of
the Notice of Intent filing fee .
copy (si Of plans, calculations, and other documentation necessary
to completely describe the proposed work and mitigating measures to
protect resource areas, .
3 . ( ) copy (s) of an 834" X 11 section of the USGS map of the area.
4. ( . ) copy (s) of plans showing compliance with Title 5 of the State
Environmental Code, 310 CMR 15 . 00 .
5 . ( ) Proof that a copy of your Notice of Intent has been mailed or hand
delivered to the Natural Heritage and Endangered Species Program.
COMMENTS :
--" -- -- - ---- -- ------ ------ ---(see-page-2.-for additional information)
10 Commerce Way 9 Woburn, Massachusetts 01801 0 FAX(617) 932-7615 '• Telephone (617)932-7600
C.�_ Other Regulatory Jurisdiction
1 . ( ) Application has been forwarded to Waterways Regulatory Program to
determine if a Chapter 91 License is required.
2 .. . ( ) Applicant is advised to forward a copy of the Notice of Intent to the
Corps of. Engineers for review (call 1-800-362-4367 for information) .
D.-( 401 Water Quality Certification
The project described in your Notice of Intent requires a 401 Water
Quality Certification from the Department of Environmental Protection and may
require submittal of a 401 application form. See below for further details :
Based upon the information submitted in and with your Notice of
Intent a separate 401 Water Quality Certification application form is
not required. The Department of Environmental - Protection has -
reviewed the plans submitted by the applicant and finds that there is
reasonable assurance that the project or activity will be conducted
in a manner that will not violate the Massachusetts Surface Water
Quality Standards, provided that :.
a) the applicant receives and complies with. a Final= Order of
Conditions from the local conservation commission or the
Department ;
b) the Order of Conditions does not cause the loss of more than
5 , 000 sq. ft . of bordering vegetated we and land under
water and/or the dredging of more than 100 cubic yards of land
under water;
c) - any loss of vegetated wetlands has been mitigated with a minimum
replication of 1 : 1 ; and
d) the project is not exempt from the M.G. L. c . 131 , §40 - the
Wetlands Protection Act ; is not part of a subdivision; does not
cause the loss of any wetlands designated as Outstanding
Resource Waters; and does not cause the loss of any salt marsh.-
Therefore, provided that the above conditions are satisfied, the
Final Order of Conditions will serve as the Water Quality
Certification for this project . This does not relieve the applicant
--------of ._the-duty__to_comply_..with_any-.,-other--statutes-or_._regulat ions. ---
2 . ( ) Before the activity described in the Notice of Intent can commence,
you must obtain a Water Quality Certification from this Regional
Office . Blease complete the enclosed 401 Water Quality Certification
application form and file it with this Regional Office for review.
3 . ( ) Your project involves dredging of greater than 100 cubic yards of
material or requires a permit from the Federal Energy Regulatory
Commission for work in "waters of the Commonwealth. " Therefore, your
proposed project is subject to 314 CMR 9 . 00 and requires a Water
Quality Certification. Please complete the enclosed 401 water
Quality Certification application form and file it with the
Department of Environmental Protection, Waterways Program, One Winter
Street, Boston, MA 02106 , Contact the Division of Waterways Program
at 617-292-5655 if you have any questions . .
For more information please contact :WAYNE LOZZI
at (617) 932-7600 .
CC : Conservation Commission ( ) U. S . Army Corps of Engineers
( ) Owner ( ) Coastal Zone Management
( ) DEP - Water Pollution Control (X) Representative : PHI'LIP PELLETIER
( ). DEP - Waterways 23 SAVOY ROAD
( ) Other : SALEM, MA 01970
2
OSGOOD PARK
NEIGHBORHOOD ASSOCIATION
April 30, 1995
Conservation Commission
One Salem Green
Salem, Massachusetts 01970
Dear Sir or Madam:
It is requested that the Osgood Park Neighborhood Association application to
"Reconstruct the Seawall and Boat Ramp and Construct a Pier, Gangway and Float" be
continued to the next regularly scheduled meeting of the Commission.
Thank you.
Sincerely yours,
Philip C. Pelletier
Agent for Osgood Park Neighborhood Association
22 Savoy Road
Salem, Massachusetts 01970
h
14 ,
4' 310 "CHR 10.99
DPl File Tln �-�
()b be F by DM
Fora 3
ci:ygown
ePpost
Casonvealth pa a tof
of Xassachusatts pada,:
�Stes
Notion of Intent of baa
Under the
Massachusetts Wetlands Protection hat, G.L. C. 131, 54Q: •;-
Application for a Dspaataiat of the 71rag^PerIIt
Part is General Iaiormation -+cs
__. .._
1. Locations street Address FemenwaV a - / Roac
Lot Number- -
2. Project: TypePeconstruct Description Reconstruction of -
Seawall ane a.oat Ram; . Construction of Pier , Gangway
3. Registry: county Fcaox current Book 2573 s Page ?o?
certificate (if Registered Land) .
4. Applicant OSGOOD PARK NEIGHBORHOOD ASSOC . Tel. 08-745-gin?9
Address ; 9 SAVOY —D .-,---SA ,,N--A �-- , '7 '-- -- — —
. RFM, .0 �
5. Property Owner 0S(=nnT) PAPu NRTrPTinPPnnT) aCSnr •Tel.�na enc nn^g,
Address 19 SAVOY RD . , SALEM - MA 01970
6. Representative MR , PUTT,TP PFT,T,F'PTF.R Tel.`n8_70,1_0771
Address ?3 SAyny RD . . SAT,FM . P4A n197n - - -
7. a. Have the Conservation Commission and the Department's Regional Office each
been sent, by certified mail or hand deliver, 2 copies of completed Notice of
Intent, with supporting plans and documents?
yes ❑ No
b. Has the fee been submitted? Yes ❑ No Q
c. Total Filing Fee Submitted 725
d. city/Town share of Filing Fee 975 state Share of Filing Fee Imn
(sent to City/Torn) ('h of fee in excess of.S25, sent to DEP)
e. is a brief statement attached indicating how the applicant calculated the
fee? ❑ Yes )aJ No -
3-1
Effective 11/20/92 x, t� x
i s T� a
8. Have all obtainable perrictt vaziancee and approvals required by local by-law.
been cbtaineYes ❑ No 'c1
obtained Applied ror: Not Applied For:
DEP WATERWAYS LICENSE
RUIT DING PMLL
-- °.
------------
9. is any portion of The site subject to a Wetlands strlc ypn order pussoa�
to G.L. c. 131, S40A or G.L. C. 130, 51057 Yes L1
documents submit
ted with this Notices r mN;
supporting ,.
10. List all plans and suppo 9
intent.
Identifying Title, Date
Number/Letter
969-101 "PLAN ACCOMPANY N , FT ^' T
r REBUILD
PARK TION TO
F ORHOOD ASSOCIATION a� _1
. ARK N
EIC._B
,09 _02
969-103 AND MAINTAIN THE SEA WALL AND BOAT RAMP
969-1 OSB AT OSGOOD PARK"
969-105 ----- --
969-106B
11. Check those resource
areas within
which work is proposed:
(a) 0 Buffer Zone
(b) Inland:
❑ Land subject to Flooding
Bank-
Bordering vegetated Wetland* ❑ Bordering
❑ Land under water Body s Waterway' ❑ Isolated
(c) coastal:
❑ Land Under the ocean- C3 Designated Port Area*
P9 coastal Beach* ❑ coastal Dune
C3 coastal sank
❑ Barrier Beach*
❑ Rocky Intertidal shore* C3 salt Marsh-
C1
containing Shellfish*
C3 Land Under salt Pond*
❑ Fish Run*
*Likely to involve U.S. Army corps of Engineers concurrent jurisdiction.
See General Instructions for completing Notice of Intent.
3-2
r 12. ly the urojeJt within soi.imated habitat which is indicated on the most
recent Estimated Habitat' map of state-Listed Aare wetlands wildlife (if any)
Y published by the Natural Heritage and Endangered species Program?
YES [ ] No. [X j Date printed an the Estimated Habitat map
NO MAP AVAILABLE ( ] (if any)
If yes, have you sent a copy of the Notice of Intent to the Natural Heritage
and Endangered species Program via the U.S.. Postal Servica-by of��ad,or.
priority mail (or otherwise sent it in a manner that guarantees-Wifvery
withia:uvo,.days), m later_than the-data,-of-.the-filing_of this.- of-__
Intent with-the conservation. commission and the DEP regional-69
YES [ ] NO,.. [ 1
if yes please attach evidence of timely mailing or other delivery to the
Natural Heritage and Endangered species Program.
Part rx a. site Deseripioet.t. wi�:
nEJi�.:--,�a- �d'<�t,���sa�Indicv�ch of t a following information bhs bean provided (on d
narrative description or calculations) to clearly, completely and accasately:
desci:%M* * "tinq,site'-conditions:-^
3X_ .2
identifying
Number/Letter
(of plan, narrative
or calculations)
Natural Features
soils
vegetation
969-1O1 _ Topography
open water bodies(including ponds and lakes)
NA Flowing water bodies(including streams and rivers) ._
_
NA Public and-private-surface-vater and ground water supplies-
on or within 100 feet of site
Maximum annual ground water elevations with dates and
location of test
969-101 Boundaries of resource areas checked under Part 1, item 11
above
other
Nan-made Features:
969-101 structures (such as buildings, piers, towers and
headwalls)
969-101. Drainage and flood control facilities at the site and
immediately off the site, including culverts and open
channels (with inverts) , dams and dikes
NA subsurface sewage disposal systems
underground utilities
969-101 Roadways and parking areas
969-101 Prvp;rty houncr_ries. nas"aanto and rights-of-:ray
other
Part lilt Mork Description
Indicate which of-the following information has been provided (on a plan-,. in- --
narrative description or calculations) to clearly, completely and accurately
describe work proposed within each of the resource areas checked in Part 1,
item 11 above.
Identifying
Number/Utter
(of plan, narrative
or calculations) _ , -
Planv+ew -
969-104B structures such as buildings, piers, towers and he =
NA Drainige and flood control facilities, including culvertc>i ;
and open channels(with inverts), dams and dikes-
j.
NA
subsurface sewage disposal systems s underground utilities
NA Filling, dredging and excavating, indicating volume and
composition of material
NA compensatory storage areas, where required in accordance
with Part. III, section 10.57(4) of the regulations.
NA wildlife habitat restorariou or rep.icaticn areas
Other
Point source Diseharce
NA Description of characteristics of discharge from point
source (both closed and open channel) , when point of
discharge falls within resource area checked under Part 1,
item 11 above, as supported by standard engineering
calculations, data and plans, including but not limited to
the following:
1. Delinestian of the drainage area contributing to the point of discharge;
2. Pre-am post-development peak run-off from the drainage area, at the point of discharge, for at least
the 10-year and 100-year frequency storm;
}, pre- and post-develooment rate of infiltration contributing to the resource area checked under part t,
item 11 above;
4. Estimated rater quality characteristics of pre- and post-development run-off at the point of
discharge.
3-4
part 1y: Mitigative Measures
i. Clea.':v. i..olate(y �r,d arcurs-ely descriNe, with reference to supporting plans and calculations where
necessary:
(a) All anuures and designs prepoaad to awt the parlor•nee standards set forth under each
resmree area specified in part 11 or part III of the-regulations; or -- -
(b) Why the presumptions set forth under each resource area specified in part 11 or part-l(1 of-the—
regulation do not apply.
c
coastal Resource Area Typet Identifying no `
❑ Inland letter of supper
COASTAL BEACH documents
969-;.06B
HAY BALES SILTATION FENCING TO BE
INSTALLED PRIOR TO CONSTRUCTION.
MOST WORK IS ABOVE N.U .W. AND NOT
SUBJECT TO TIDAL ACTION .
.. ...AYH
Coastal Resource Area Type: Identifying nuaber or
❑ Inland letter of support
.LAND CONTAINING SHELLFISH documents — - -- -
0
HAY BALES AND SILTATION FENCING TO BE
INSTALLED PRIOR TO CONSTRUCTION ,
3-5
❑ Coastal Resource Area Type: -lentifyinq number or
❑ Inland letter of support
documents
--m; -
Z, Clearly, completely and accurately describe, with reference to supporting piens and calculatiarm Where"
necessary:
(a) ell measures and designs to regulate work within the Buffer Zone so as to ensure that said work
does.not alter an area specified in Part 1, Section )0.02(1)(a) of these regulatiam; or
(b) if work in the Buffer Zone will alter such an area, all measures vd designs proposed to seat
•he performance standaros =st.;nlishea for ttc cdjacenr resource area, specnflea ir. Part It o^
Part 111 of these regulations. -
❑ Coastal Resource Area Type Bordered identifying number or"
❑ Inland By 100-Feat Discretionary Zone: letter of Support
documents
3-6
Part v: Additional information for a Department of the Army permit
s 1. c0E Application No.
(to be provided by COE)
2. SALEM HARBOR
(Name of waterway)
3. Names and addresses of property owners adjoining your property:
PATRICIA A. ane PAUL J . LABRIE 11 HEMENS4AY RD .
BRUCE J . ane JBANNETTE McLAUGHLIN 1.7 HEMENNTAY RD .
4. Document other project alternatives (i.e., other locations and/or
construction methods, particularly those that would eliminate the=
discharge of dredged or fill material into waters or wetlands) ..
5. 8ho x 11" drawings in planview and cross-section, showing the resource` :
area and the proposed "activity within the resource area. Drawings must be
to scale and should be clear enough for photocopying. -
certification is required from the Division of Water Pollution control before
the Federal permit can be issued. certification may be obtained by contacting
the Division of Water Pollution control, 1 Winter. 5treet, Boston,
Massachusetts 02108.
Where the activity will take place within the area under the Massachusetts
approved coastal zone Management Program, the applicant certifies that his
proposed activity complies with and will be conducted in a manner that is
=onsistent with the approved progr_m.
information provided will be used in evaluating the application for a permit
and is made a matter of public record through issuance of a public notice.
Disclosure of this information is voluntary; however, if necessary infamaticw�
is not provided, the application cannot be processed nor can a permit be.
issued.
I hereby certify under the pains and penalties of perjury that the foregoing
Notice of Intent and accompanying plans, documents and supporting data are
true- and complete, to a best of my knowledge.
At TERRENCE MELVILLE
signature of Applicant Date
i`/ �i PHILIP PELLETIER
signs ure of Applicant's Representative OatA
FORM "Exception to ENG Form 4345 approved by NOUSACE, b May 198211
NED 100 (TEST)
1 MAY 82 "This document contains a joint Department of the Army and State of
Massachusetts application for a permit to obtain permission to perform
activities in united States waters. The Office of Management and
8udget(OM8) has approved those questionsrequired by the US Army Corps of
Engineers. CNB Nutter 0702-0036 and expirstim data of 30 September 1983
appO esa. This statement will be set in 6 point type..
3-7
r ,
F
THIS PLAN CONFORMS TO THE
RULES - AND REGULATIONS :.OF
THE REGISTERS OF DEEDS:'`
PREPARER DATE
I-
rornrc
EXISTING --' AW
CONDITIONSus
�`�`
SA L EA/
.HARBOR
BENCH =1IfARK.
LOCUS IAP
T, `"af,
southeast coerrnof concrete NOT TO SCAM
r tuctiZ Qt the '!LO?theQSt CO?"?'Le1' df the Zoc-us. O
EZev=10.53 NGVD
HEMENWAY ROAD SMH
CONCRETE
*RIM-11.02' i
WALK ._(GRASS GRANITE CURE �t8
.54
i
F1 AF'PROX PROPERTY UNE
GRASSv oc i
k°R ♦1o.0 Z �IL
� t
N z k .... '�°A ENTIRE LOCUS .IS WITHIN �Q J 3 a a
z GRASS FEMA ZONE V3 (EL _14) a Ez!I •-o ° o
Not
TREE a �i NTREE ed o'��' X zBENCH { v
e
EE ;
GRASS rZ
v a Y. . BENCHES BENCHES d u2851 E
V z� 9.70 ,J MING S .1 9.64
ttaa�l a.o ,
m o �� BEACH CO1C d� �. APPROXIMATE
STEPS HIST�RIC -MHW
BEACH
H
`
STONE : EAN HIGH WATER "'W
o
0
SEE D.E.P. 21 :: 1� y �, 4.8 �q
ApVAPPROXIMATE ybk 1.9
R AL HISTORIC _MHW o
3506
0.4
H
1 it DRAT 'Q? W k ,
PIPE eL
INV=0.36' g
0
X A R 8
PIAN ACCOMPANYING PETITION OF FEET
OSGOOD PARK NEIGHBORHOOD ASSOCIATION 0 40 80
TO REBUIIM AND MAINTAIN
SFA WALL AND BOAT RAS'
AT.03GOOD PARK; PREPARED BY: G.K.G.
SAY ROAD, -SAM.' MASS.
SCALE 1"=40' . DECEIMER 10,- 1999
SHEET -1 OF 6
RAYMOND C.'. PRESSEY, INC.-
PROFESSIONAL
NC.
PROFESSIONAL SURVEYORS & ENGINEERS ..
156 BROAD STREET LYNN.' MA 01901
i969-1011 3/13/95 .10:50 -A7M
EXISTING CONDITIONS
Y
C9
ID
C1
Ww
= LA.; �
F- p W a-
Oy ( 1--
3
Z a
1- W j
O W
CONCRETE
p ? WO STAIRS GRASS o0
0w �
V W 3�=+4.4 BEACH
Z 0 N TIN RUMINOUS SEA WALL
zw
Q W w MM,=O.0(NGVD)
N W W MLW=-4.4
3: :3 S
co
O �
N
WO)SECTION B B ,
ED 00 O
,r
SCALE 1 = 10 HORIZONTAL m C3 Z
Z
� r1» _ 10' VERTICAL om A
0C
in N
� Mg 0 N0 10 20 30 O w a
uH E.W.EAz .4
a Opd o c�o�
OA CS r7 0 n
dO �C
u
m o
NOE d m (n so.
i
C7 -
PROPOSED CONDITIONS PROPOSED a' THICK PROPOSED Ir THICK
CONCRETE BOAT RAMP REINFORCED CONCRETE WALL
WOODEN RAILING ON (5000 psi CONCRETE) '(5000 psi CONCRETE)
BOTH SIDES OF THE GRASS GRADED
W WOODEN WALKWAY TO MEET THE w
30, BACK EDGE %a-
1-- o W OF RAMP
Z w Q 25, 8' 17' 30• 59a
0
m o PROPOSED GANGffmffi WAY fill
.DD
0 0 PROPOSEDFLOAT W000 WOOD 8-00
ZO w � 3. MTN- 4,4 PILE 2.30 PILE
v W
BEACH ?.,.0
MSL-0.0 GVD
� aW
a- En ix Q 3ILW--4.4
(A -w W
N
SECTION A - A EraEA Z r
''�.q 0
00
0 •2T
SCALE 1" = 10 HORIZONTALm NZ
ff f u 0 �
1 = 10 VERTICAL 2
�� e m q
0 � j
T0 D5W
0 10 20 , 30 a to a
0a Oe o ooh m
L7W�C0 W OWm O'
aoE• a v�
in Cal m
rn
I
EXISTING CONDITIONS
O
W � ,
O
=1a.
t—
0 . LLJ
�o.
oZW Q
D ' .
foo
8rwM1No
� O RU�!]NOUT. BfTUMINOUS BOAT RAMP
GRASS,
IA- M
8
W to U"—+4.4 RAMP
UwW
o �--
�I�3I�0.0(NGVD)
a. w Q MLN--4.4
cn J w W
0) to
.r
- s -A
W 0)
ECTION �+a Z r
O
O W
SCALE 1 - 10 HORIZONTAL �� Q
.. » �
1 = 10 VERTICAL
nE1 W Q WNW in
0 10 20 30 �, . �
za
tiZ •-
DA4 0e og M
p� o
�0 LO'3d N 0 N
� �ch o in O
0 CD
04 0
�a W
PROPOSED CONDITIONS Y
.rte:
Simrlar dimensions of theexisting concrete
stairs should be used to build a new set W
of concrete stairs.
0y � f- 3 3� a
P Z W Q PROPOSED NEW REINFORCED
0 W CONCRETE SEA WALL v UJ-10
n (5000 psi CONCRETE) Z •-
Ono o
c� 'Ec EL s.00
W GRASS GRADED TO MEET THE BACK EDGE OF WALK
O ,
t� %0 2*
Z z 40 PVC DRAIN :. 6" CRUSHED STONE
20 ON CENTERS
a. W /5 EPDXY COATED RE—ROD
W a U"—+4.4 24" GRID & r OF COVER
t/1 J LIJ W
3: M H CONCRETE FOOTING c
6' CRUSHED STONE CbN
� o
0.0(IJ(;VD) EXCAVATE TO -SOUD BEARING MATERIAL AS
DIRECTED DY THE CONSTRUCTION ENGINEER o
�qo .
1mW=-4.4
z
ao � =o� 0
' ' SECTION B - B
o �
SCALE 5' HORIZONTAL �W
�� ao o co ,a ..
1 5' VERTICAL 0 Aa x
ua � oQFEET o10>-
o z v mc� 0
0 10 15 ��o W-:ohm '-
a.oH e 8 cn ;�a•- to
THIS PLAN CONFORMS TO THE
RULES AND REGULATIONS OF
THE REGISTERS OF DEEDS.
PREPARER DATE
t
GRASS Q z
PROPOSED CONCRETE WALK _ --
PROPOSED CONCRETE. SEA
WALL
N
Lu
z .ZZ
U W
BEACH z
` o c�
v z a
H W xx� c
a W W
pO RI
0 CI MFiV`I
HIGH WATER ; PROPOSED
♦• r w w d
CONCRETE
o :o•: BOAT RAMP ,
EXIS i1
SEA
i
M w -
BEACH 3
MUD
z, FIATS i
c� 3
o�
0�6
3
N 0;
PLAN ACCOMPANYING T, ON OF
OSGOOD PARK NEIGHBORHOOD ASSOCIATION
TO REBUIW AND MAINTAIN THE •o: 4
SEA WALL A PARK.
RAMP
A3 �• WOOD PILES
i SAY ROAD, SALEM. MASS.
SCALE 1"=10' DECEMBER 10, 1999 O.
SHEET 6 OF 6 ROP •p: c
RAYMOND C. PRESSEY, INC.
PROFESSIONAL SURVEYORS & ENGINEERS
f0 0 10 20
E
-156 BROAD STREET LYNN, MA 01901
969-1068 3 13/95 3:15 PMI rPREPARED BY: G.K.G.
f