Loading...
64-242 - HARMONY GROVE ROAD AT PEABODY CITY LINE - CONSERVATION COMMISSION 64-242 SESD Harmony Grove Demo/ New Building Y 01/29/99 3.''4 b 310 CMR 10. 99 DEP Fite No. 64-242 Form 8 (To be provided by DEP) City/Torn Salem Applicant VEST) Covmionweal th of Massachusetts Certificate of Compliance Massachusetts Wetlands Protection Act, G.L. c. 131, 540 From Salem Conservation Commission Issuing Authority To SESD _50 Fort Ave, Salem M.A 01970. (Name) - (Address) Date of Issuance 9/10/98 This Certificate is issued for work regulated by an Order of Conditions issued to SESD dated 11/9/95 and issued by the Salem Conservation Commission 1. ® It is hereby certified that the work regulated by the above- referenced Order of Conditions has been satisfactorily completed. 2. It is hereby certified that only the following portions of the work regulated by the above-referenced Order of Conditions have been satisfactorily completed: (If the Certificate of Compliance does not include the entire project, specify what portions are included.) 3. It is hereby certified that the work regulated ny the above- referenced Order of Conditions was never commenced. The Order of Conditions has lapsed and is therefore no longer valid. No future work subject to regulation under the Act may be commenced :without filing a new Notice of Intent and receiving a new Order of - Conditions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (Leave Space Blank) Effective 11/10/89 8-1 ( 4. The certificate shall be recorded in the Registry of Deeds or the Land Court for the district in which the d is located. The Order was originally recorded on Decen0er - - 1�9) (date) at the Registry of Deeds gook 13311 page 534 S. ® The following conditions of the Order shall continue: (Set forth any conditions contained in the Final Order, such as maintenance or monitoring, which are to continue for a longer period.) No spill or dis'—hary of petroleum products or other pollutants will will occur th' 1 O .feet of any wetland resource area. Minimal pruning Tissued by and no em v of ny bufferzone or wetland veQitation will occur down gra staked haybale line. Sale Conservatin C fission Signatur s TIJr When issued by the Conservation Commission this Certificate must be signed by a majority of is members. On this lnrh day of September 19 4R before me personally ppeared the above mentioned to me known to be the person described in and who executed the foregoing instrument and acknowledged th�.t. he s execu a as his/her free act and deed. STEPHEN DIBBLE No My Commissionary Pubfio _ F 21= 28&— N Car Public My commission expires ' i/ Salem Conservation Commission Detach an dotted line and submit to the io Issuing Authority Please be advised that the Certificate of Compliance for the project at: File Nunber has been recorded at the Registry of and has been noted in the chain of title of the affected property on 19 ` If recorded land the instrument nurber which identifies this transaction is If registered land the document nurber which identifies this transaction is Signature Applicant 6-2 IRNI MALCOLM PIRNIE, INC. ENVIRONMENTAL ENGINEERS, SCIENTISTS & PLANNERS July 24, 1998 Steven Dibble AUG 17 ,„3 Salem Conservation Commission One Salem Green Sat Salem, Massachusetts 01970 Re: Request for Certificate of Compliance Dear Mr. Dibble: On behalf of the South Essex Sewerage District (SESD) and as required by the Order of Conditions, DEP #64-242, we hereby request a Certificate of Compliance for work completed under Contract 94-4. The project site is located at Harmony Grove Road at the Peabody City Line. This request is made to fulfill the requirements of the Massachusetts Wetlands Protection Act, GL. Chapter 131 Section 40. The work has been performed in accordance with the Order of Conditions issued by the Conservation Commission and the contract plans and specifications. Also, we have included with this submittal one (1) set of record drawings and one (1) copy of Addendum 4 Peabody Record Site Plans for all work performed within the wetlands resources area. A copy of the Order of Conditions has also been included with this submittal. If you should have any questions, please do not hesitate to call at(781) 396-3201. Very truly yours, MALCOLM PIRNIE, INC. jHOF ygs cy PAULA. I/ (��(l BOORD n� CIVIL ti Paul A. Boord, P.E. Na.37392 Vice President G/STV-?�' Enclosures cc: Stanley I. Bornstein, P.E., Director of Public Services Alan F. Taubert, P.E., SESD Mark L. McIntire, Weston& Sampson Engineering, Inc. F:\sesd\C94-4\corzesp\944salem.wd WELLINGTON ONE TEN CABOT ROAD MEDFORD,MA 02155-5141 781-396-3201 fax 781-396-2728 hRp-//www.pirnie.com RECYCLED PAPER WeStOn'QI p Five Centennial Drive L/rSampson Peabody,Massachusetts 01960-7985 E- N G -I N E E R S , I N C . - - Tel:(508)532-1900 Fax:(508)977-0100 - - Environmental Consultants since 1899 'August 23, 1996 Salem Conservation Commission UG 3 1996 One Salem Green 5g� � 1Hflh Salem, Massachusetts 01970 1v L)Qpt• Dear Commissioners: On behalf of the South Essex Sewerage District and as required by the Order of Conditions, DEP #64-242,we hereby notify you of the Contractor's intention to begin work on the project site located , at Harmony Grove Road at the Peabody City Line. For you files,we haveattached the Contractor's official notification that work is scheduled to commence within the next two (2)weeks. The hay bales and silt fence will be in place prior to commencement of any work. They,will be staked and ready for inspection after August 27, 1996. If you have any questions,please do not hesitate to contact either our office at(508)532-1900 or the office of Malcolm Pirme,'Inc., at(617)396-3201. Very truly yours, . WEST N& SAMPSON ENGINEERS,INC. ox, P.E. Em y Project Manager cc: John Fortin, Project Manager, Malcolm Pirie, Inc. F9SMITMVESU FBLEHE\CONCOM.SAL - - Officers: Leo F.Peters Michael J.Hanlon Alan M.Silbovitz Peter M.Smith Francis W.yanuskiewicz Patrick J'.Connelly Paul G.Sutton John D,Jolls Associates: Ronthus B.Fouch,III Kenneth W.Carlson Prasanla%Bhunla Michael J.Sclpione - s INTERSTATE August 21, 1996 Mr. John Fortin Malcolm Pirnie, Inc. Wellington One Ten Cabot Road Medford, MA 02155-5141 Re: SESD Contract 94-4 Upgrade of Remote Pump Stations And Facilities Start of Work Notification Dear Mr. Fortin: In accordance with the Specifications and)four previous request, we hereby notify you that we expect work will commence at the Pump Stations named in the Con-Comm Order of Conditions (Peabody/Salem and Marblehead)within the next two weeks. The hay bales and silt fence will be in place on Tuesday August 27, 1996. There will be an IEC tool trailer dropped at Peabody also on Tuesday. There will be a temporary power drop installed at Peabody by Mass Electric on or about September 5, 1996 and we will begin demolition within a few days of that. The Pre-engineered Building currently is scheduled for delivery during the week of September 23. As soon as we get details on the Odor Control unit and a ship date for the Grinders for the Marblehead site we will initiate work. The environmental controls will be in place on Tuesday August 27, 1996 ready for inspection. Please feel free to call if you have any questions. Very truly yours, Interstate Engineering, Corp. Stephen P. Begom's Project Manager a�SUD 9602TTR mlpim SdD-o► 193 Jefferson Avenue - P.O. Boz 687 • Salem, MA 01970 (508) 744-8883 • Fox (508) 744-1792 SERAFINI, SERAFINI AND DARLING ATTORNEYS AT LAW 63 FEDERAL STREET SALEM, MASSACHUSETTS 01970 Vts('s� �1�,(I ElD JOHN R. SERAFINI. SR. O�I I 1995 TELEPHONE JOHN R. SERAFINI.JR. . re ppy508-7440212 JOHN E. DARLING i;6 w"� J 617-581-2743 ELLEN M.WINKLER (} i#`CF)�1R JOSEPH C. CORRENTI saw" # TELECOPIER 308-741-4683 December 5, 1995 Frederick J. Harney, Jr. , Chairman Salem Conservation Commission One Salem Green Salem, Massachusetts 01970 RE: DEP File No. 64-242 Applicant: South Essex Sewerage District Project Location: Harmony Grove Road at Peabody City Line Salem, Massachusetts Dear Mr. Harney: Please be advised that the Order of Conditions for the above- referenced project was recorded with the Essex South District Registry of Deeds on December 5, 1995 in Book 13311, Page 534. Enclosed for the Commission's file is a certified copy of the Order as recorded. Sincerely, John E. Darling JED:jaf Enclosure rte' 95 10: 6 Inst 123 2 K 13 =) i 9 310 CMR 10.99 DPP FJe No. 64-242 \ (To be provided b/DEP) �. Form 5 SALEM �rr� App®tSouth Essex Sewerage comoavealth District of Xassaobusetts order of Conditions Massachuetts Wetlands Protection Act G.L. c. 131, 540 From SALE!! CONSERVATION CO?MISSION Issuing Authority To South Essex Sewerage District SAME (Name of Applicant) (Name of property owner) Address 50 Fort Avenue, Salem MA Address SAME 01970 This order is issued and delivered as follows: ❑ by hand delivery to applicant or representative on November 14, 1995 (date) ❑ by certified mail, return receipt requested on (date) This project is located at Harmony Grove Road at Peabodv City Line. The property is recorded at the Registry of Essex rnunrN Book 3462 Page 541 Certificate (i£ registered) N/A The Notice of Intent for this project was filed on October 17, 1995 (date) The public heariny was clnssd on October 26,-1995 _, ]date) Findings The rnmm;ec;nn has reviewed the above-referenced Notice of intent aro plans and has held • publi�a �rS%Ml he project. eased on the inforeanon available to chE Commission at this time, the 3 has determined that the area on which the proposed wore is to be done is significant to the following interests in accordance with the Presurotions of Significance set forth in the regulations for each Area Subject to protection under the Act (check as appropriate): Public water supply Flood Control Lard containing shellfish Private water supply Store damage prevention Fisheries Graud water simply prevention of pollution, protection of Wildlife Nabitet $525 $250 Total filing Fee SuAntitted State Shell (1/2 fee In elnCtt3 Of S25) City/Town Share $275 Total Rehstd Due S City/Town portion S State portions (1/2 total) (1/2 total) Effective 11/10/89 5-1 Therefore, the Comm;ca;on hereby finds that the fo:luwing cor.ui ions are necessary, in accordance with the Performance standards set forth in the regulations, to protect those interests checked above. The Commiaaion orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of intent, the conditions shall control. General conditions 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be doemed- cause to revoke or modify this order. 2. The order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this order unless either of the following apply: (a) the work is a maintenance dredging project as provided for in the Act: or (b) the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance and both that date and the special circumstances warranting the extended time period are set forth in this order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the order. o . Ai°y f' '_1 urea in conneat4.on with thi•, oIect _::aLi be cine., fill, costa.--ny no trzsh, _efuse, rub;jish or datciul 4n:ludinq Lut LOL lisitr. to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts of any of the foregoing. 7 . No work shall be undertaken until all administrative appeal periods from this order have elapsed or, if such an appeal has been filed, until all proceedings before the Department have been completed. 8 . No work shall be undertaken until the Final order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. in the case of recorded land, the Final order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final order shall also be noted on the Land Court certificate of Title of the owner of the land upon which the proposed work he Commi be cion e. The an theoformgatnthe endnofhall thisborder submitted to the prior to commencement of the work. 9. A sign shall be displayed at the site not less than two square feet or more than three square feet in size nearing the words, *Massachusetts Department of Environmental Protection, File Number 64-242 10. Where the Department of Environmental Protection is requested to make a determination and to issue a superseding order, the conservation Commission shall bea party to all agency proceedings and hearings before the Department. 5-2 11. Upon completion ct tho work described herein, the applicant shall forthwith request in writing that a certificate of compliance be issued stating that the work has been satisfactorily completed. 12. The work shall conform to the following plans and special conditions: Plans: Tiitl1e Dated signed and Stamped by: on File with: SESD Remote Fa clil y Upgrade 10/16/95 Peter M. Smith Conservation Commission Peabody grease and grit chamber Site Plan Special conditions (Use additional paper if necessary) SEE ATTATCHED SPECIAL CONDITIONS (Leave space .Elank) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3A P1 any: Title Dated Signed and Stamped by: on File with: special conditions (ase additional paper if necessary) (Leave Space Blank) . . . . . . . . . . . . . . . . . . . . . . . . 5-38 QV 1 771 i C5 -- CZ79 f 01% i i i 1 1:3 01, Q issued By Salem conservation commission sign re(s) Y-7 - i - This order must be signed by a majority of the conservation Commission. on this 9th day of November 19 95 before me personally appeared the above-mentioned to me known to be the person described in and who executed the foregoing instrument and acknowledged that /she executed the same as his/her frae act and deed. Oaf /6, /99da Naltary Public My commission expires The applicant, the owner, any person agrrieved by this Order, any owner of land abutting the lard upon which the proposed work is to be done, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the Department of Envircrmenta/ protection to issue a Superseding order, providing the request is made by certified mail or hard delivery to the Department, with the appropriate filing fee and Fee Transmittal Form as provided in 310 CMR 10.03(7), within ten days from the date of issuance of this determination. A copy of the request shell at the same time be sent by certified mail or hard delivery to the Conservation Commission and the applicant. Detach on dotted lire and submit to the Commission prior to commencement of work. ...................................................................................................... To Salem Conservation Commission Issuing Authority Harmony Grove Road at Peabody Please be advised that the Order of Conditions for the project atC. File Number 64-242 has been recorded at the Registry of and has been noted in the chain of title of the affected property in accordance with General Condition 8 on 19 If recorded lard, the insstruient rxarber which identifies this transaction is If registered land, the document rsanber which identifies this transaction is signature Applicant 5-4A rssued by the Department of Environmental Protection Signature on this day of 19 , before me personally appeared to me known to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed the same as his/her free act and deed. I Notary public My commission expires The applicant, the owner, any person aggrieved by the superseding order, and owner of land abutting the land upon which the proposed York is to be done, or arty ten persons pursuant to G.L. c.30A 110A, are hereby notified of their right to request an adjudicatory hearing purstont to G.L. c.30A, 110, providing the request is made by certified mail or hard delivery to the Department, with the appropriate filing fee and Fee Transmittal Form as provided in 310 CMR MOW), within ten days from the date of issuance of this _ - Superseding Order, and is addressed to: Docket Clerk, Office of General Counsel, Department of EnvironsnKal Protection, One Winter Street, Boston, MA 021080► A dopy of the request shall at the Same time be sent by certified mail or hand delivery to the Conservation Commission, the applicant, and any other party. A Notice of Claim for an Adjudicatory Nearing shall comply with the Department's Rules for Adjudicatory Proceedings, 310 CMR 1.01(6), and shall contain the following information: (a) the DEP Wetlands File Number, name of the applicant and address of the project; (b) the complete name, address and telephone number of the party filing the request, and, if represented by counsel, the name and address of the attorney; (c) the names and addresses of all other parties, if known; (d) a clear and concise statement of (1) the facts which are grounds for the proceedings, (2) the objections to this Superseding Order, including specifically the manner in which it is alleged to be inconsistent with the Department's Wetlands Regulations (310 CMR 10.00) and does not contribute to the pro(>ctnon of the interests identified in the Act, and (3) the relief sough* through the anjuditatory hearir[, i,.c L,Ahwg see•..fically the _.-angel desired in the Supersedine Ore- (e) a srareceot Gnat a c_cy of the rrqu_st har been sent to the appmicant, the aonser•otion commi"v,n and each other party or represent.itive of suu.n party, if known. Failure to submit all necessary information may result in a dismissal by the Department of the Notice of Claim for an Adjudicatory Nearing. Detach on dotted line rd submit to the prior to commencement of work. ............................................................................................................ To Issuing Authority. Please be advised that the Order of Conditions for the project at File Number has been recorded at the Registry of and has been noted in the chain of title of the affected property in accordance with General Condition 8 on , 19 If recorded land, the instrument number which identifies this transaction is If registered land, the document number which identifies this transaction is Signature Applicant 5-4B EWK 13311 PG 540 SESD - HARMONY GROVE ROAD BUILDING DEMOLITION/REPLACEMENT PROJECT SPECIAL CONDITIONS #64-242 1 . All work shall conform to the above-referenced Notice of Intent (NOI►, site plan and supporting documents and those final specifications which shall be filed with the Commission prior to construction. Any change made or intended to be made to the approved plans shall require the applicant to inquire of the Commission in writing whether the change is substantial enough to require the filing of a new Notice Of Intent (NOI). 2. Members and agents of the Commission shall have the right to enter and inspect the premises at all reasonable times to evaluate compliance with the conditions in this Order. The Commission may require the applicant to submit additional data or information necessary for the Commission to conduct that evaluation. 3. Upon completion-of the project, the applicant shall submit, with the request for a Certification of Compliance, an affidavit, prepared by a professional engineer or land surveyor registered in the Commonwealth of Massachusetts, stating that the site has been developed, in accordance with the requirements of this Order of Conditions, the referenced site plan and supporting documents. 4. This Order shall apply to every successor in control or successor in interest of the property described in the Notice of Intent and accompanying plans or part thereof. In the event this land or any part thereof changes ownership before or during construction, the current owner shall notify the new owner, by registered mail, of this Order prior to the transfer of ownership and shall forward proof of this notification to the Commission. 5. Prior to commencement of construction activity, a haybale barrier shall be placed down gradient of construction to prevent siltation to the adjacent wetland. Haybales shall be anchored with stakes and entrenched 4 to 6 inches in depth. Trench material shall be deposited on the up gradient side of the haybale barrier. Haybales shall be inspected daily; those showing signs of deterioration shall be replaced immediately. The haybale barrier shall remain in proper functioning condition until all disturbed areas have been stabilized. 6. During construction, no debris, fill, or excavated material shall be stockpiled within 100 feet of designated wetlands. Any other stockpile location will be protected sufficient to prevent sediment from surface runoff entering wetlands. 11 e3 le 7. Equipment servicing and overnight equipment storage must be conducted outside the buffer zone. Equipment must be maintained to prevent leakage or discharge of pollutants. 8. * No spill or discharge of petroleum products or other pollutants will occur within 100 feet of any wetland resource area. 9. Notice shall be given to this Commission no more than 2 weeks nor less than 2 days prior to the commencement of construction activities. Said notice shall include, in writing, the name(s), address(es), and business and home telephone numbers of the project supervisor(s) responsible for insuring that operations are conducted in compliance with this Order. 10. * Minimal pruning and no removal of any buffer zone or wetland vegetation will occur down gradient of the staked haybale line. 11 . All disturbed soils shall be immediately and similarly re-vegetated upon completion of construction activities or shall be mulched until the next growing season. Hydro seeding will be initiated no later than September 15. 12. Clerk of the Works shall review haybales and silt fence prior to start of project to ensure that they are still effective. *ongoing conditions that do not expire upon issuance of a Certificate of Compliance. jm/bd/sesd242.spc r.�� COMMONWEALTH OF MASSACHUSETTS ESSEX REGISTRY OF.DEEDS,SO DIST.SALEM MASS ESSEX SS h�C �- 19 ' A_IT.(.\R��U� COPY OFRECORD: '/1O� � h i �-� 'REGISTER R2€ ' FVE SERAFINI, SERAFINI AND DARLING ATTORNEYS AT LAW OCT 17 W5 63 FEDERAL STREET to p� SALEM, MASSACHUSETTS 01970 Valued ri4i wig wept' JOHN R. SERAFINI. SR. TELEPHONE JOHN R. SERAFINI.JR. 508-744-0212 JOHN E. DARLING 617-58t-2743 ELLEN M. WINKLER TELECOPIER JOSEPH C. CORRENTI 508-741-46 8 3 October 17, 1995 BY HAND DELIVERY Conservation Commission City of Salem One Salem Green Salem, Massachusetts 01970 RE: Notice of Intent Applicant: South Essex Sewerage District Project Location: Building demolition and replacement at Harmony Grove Road at Peabody City Line Salem, Massachusetts Dear Sir or Madam: Enclosed for filing in connection with the above-referenced matter are the following: 1. An original and 8 copies of the Notice of Intent. Each of the copies includes: a. Notice of Intent Form b. Notice of Intent Fee Transmittal Form C. Affidavit of Service d. Copy of Notification to Abutters e. Copy of Abutter List f. Filing Fee Calculation Worksheet g. Site Description Report 2 . Check in the amount of $275. 00 payable to the City of Salem for the filing fee. 3 . Check in the amount of $55. 00 payable to the Salem Evening News for advertising of the hearing notice. Conservation Commission October 17, 1995 Page 2 Please acknowledge receipt of these documents by date stamping the enclosed copy of this letter. If there are any questions concerning this matter, please call the undersigned. Thank you for your assistance. sincerely, John E. Darling JED:jaf Enclosures Salem. Massachusetts 01970 ` yMAtisn�N� r City of Salem R Conservation Commission Will hold a public hearing for a Notice of Intent under the Wetlands Protection Act, Massachusetts General Laws, Chapter 131, Section 40, at the request of the South Essex Sewerage District, 50 Fort Avenue, Salem, MA 01970. The purpose of the hearing is to discuss the effects of a RCRA waste clean-up proposal for the excavation and off-site treatment and disposal of chromium-rich incinerator ash from an underground chamber located on Harmony Grove Road at the Peabody City Line. The proposed work is located within the buffer zone and on land subject to flooding. This hearing will be held on Thursday, October 12, 1995, at 7:00 P.M. in the second floor conference room at One Salem Green. Fred Harney Chairman October 5, 1995 Th s notice posted on "Official Bulletin Board" Cloy Hall Ave., Salem, Mass. on OCT 2 05 at /u, /� /�/Yf in aootrrdww With chap. '30 sec. 23A A 238 of M.G.L. , 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION 10.99: continued nm-1"k No. (1'0 Ix pnonded aY DIT) Form 3 c[Y/ra.r Salem Apptican, South Essex Sewerage District Commonwealth Department of Defense of Massachusetts Vni[ad States Notice of Intent of America Under the Massachusetts Wetlands Protection Act, G.L. c. 131, 540 and Application for a Department of the Army Permit Part I: General Information 1. Location: street Address Harmony Grove Road at Peabody City Tina LotHumber 16-240 Buil Ing DemolLtion/ Demolition of existing building 2. Project: Type R :1 aramen tDe scziption and equipment and installation of new prefabricated building within the Buffer Zone to the North River canal Ana on h, rdoria. land subject to flooding. South 3. Registry: county Essex current Book 9469 b Page 941 certificate (if Registered Land) 4. Applicant South Fsgex gpig rage Dist _t Tel. (508) 744-4550 Address 50 Fort Avenue, Salem, MA 01970 S. Property owner Same Tel.— Address- 6. el.Address_6. Representative John E. Darling Esq. Tel. (508) 744-0212 Address Serafini, Serafini and Darling, 63 Federal St. , Salem, MA 7. a. Have the conservation commission and the Department's Regional office each been sent, by certified mail or hand deliver, 2 copies of completed Notice of Intent, with supporting plans and documents? Yes ® No ❑ b. Has the fee been submitted? Yes No ❑ C. Total Filing Fee submitted $525 d. CTon Share of Filing Fee $275 State share of Filing Fee $250 (Sent (n of fee in excess of 525, sen[ to DEP) e. Is a brief statement attached indicating how the applicant calculated the fee? ® Yes ❑ No 11/20/92 310 CMR - 280.27 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION 10.99: continued e. Have all obtainable permits, variances and approvals required by local by-lav been obtained? Yea ❑ No ❑ NONE REQUIRED_ Obtained Applied For: Not Applied For: 9. Is any portion of the site subject to a wetlands $estrict'on order pursuant to G.L. C. 131, 540A or G.L. C. 130, 5105? Yes U No f 10. List all plans and supporting documents submitted with this Notice of Intent. Identifying Number/Letter Title, Date Figure 1 Location Plan Attachment F Pertinent Details Attachment G Site Plan 11. Check those resource areas within which work is proposed: (a) -® Buffer zone (b) Inland: ❑ Bank- Land subject to Flooding ❑ Bordering vegetated wetland- RI Bordering ❑ Land Under water Body t waterway- ❑ Isolated (c) Coastal: ❑ Land under the ocean- ❑ Designated Port Area- 0 Coastal Beach- ❑ Coastal Dune ❑ Barrier Beach- ❑ Coastal Bank ❑ Rocky Intertidal Shore- ❑ Salt Harsh- 0 Land under Salt Pond- ❑ Land Containing Shellfish- 0 Fish Run- -Likely to involve U.S. Army corps of Engineers concurrent jurisdiction. See General Instructions for Completing Notice of Intent. 11/20/92 310 C.MR - 280.28 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION 10.99: continued 12. Is the project within estimated habitat which is indicated on the most recent Estimated Habitat Hap of state-Listed Rare wetlands wildlife (if any) published by the Natural Heritage and Endangered species Program? YES ( I NO IX J Date printed on the Estimated Habitat Hap NO HAP AVAILABLE I I (if any) If yes, have you sent a copy of the Notice of Intent to the Natural Heritage and Endangered species Program via the U.S. Postal Service by certified or priority mail (or otherwise sent it in a manner that guarantees delivery within two days) no later than the date of the filing of .this Notice of Intent with the conservation commission and the DEP regional office? YES ( J NO [ J If yes please attach evidence of timely mailing or other delivery to the Natural Heritage and Endangered species Program. Part II: Site Description Indicate which of the following information has been provided (on a plan, in narrative description or calculations) to clearly, completely and accurately describe existing site conditions. Identifying Number/Letter (of plan, narrative or calculations) Natural Features (No Excavation) soils Site Plan Vegetation Site Plan Topography open water bodies(including ponds and lakes) Site Plan Flowing water bodies(including streams and rivers) Public and private surface water and ground water supplies on or within 100 feet of site maximum annual ground water elevations with dates and location of test -- Boundaries of resource areas checked under Part 1, item 11 above -- Other Site Plan Han-made Features: Structures (such as buildings, piers, towers and headwalls) _ Site Plan Drainage and flood control facilities at the site and immediately off the site, including culverts and open channels (with inverts), dams and dikes subsurface sewage disposal systems Underground utilities 11/20/92 310 CMR - 280.29 310 CMR: DEPARTMENT Of ENVIRONMENTAL PROTECTION 10.99: continued Site Plan Roadways and parking areas Site Plan Property boundaries, easements and rights-of-way -- other Part III: work Description - Indicate which of the following information has been provided (on a plan, in narrative description or calculations) to clearly, completely and accurately describe work proposed within each of the resource areas checked in Part I, item 11 above. Identifying Number/Letter (of plan, narrative or calculations) Site Plan Planview and Cross Section of: Siruciures(such as buildings, piers, towers and headwalls) Site Plan. Drainage and flood control facilities, including culverts and open channels(with inverts), dams and dikes Site, Plan _ subsurface sewage disposal systems S underground utilities Not Applicable Filling, dredging and excavating, indicating volume and composition of material Not Applicable Compensatory storage areas, where required in accordance with Part III, Section 10.57(4) of the regulations. Not Applicable wildlife habitat restoration or replication areas -- Other Point Source Discharge No Change - Description of characteristics of discharge from point source (both closed and open channel), when point of discharge falls within resource area checked under Part I, item 11 above, as supported by standard engineering calculations, data and plans, including but not limited to the following: 1. Dethxation of the drainage area contriWtirg to the point of discharge; Not Applicable 2. Pre•ard xst-ch,etopae,X peak ry-off froc the drainage area, at the point of discharge, for at teest the to..... a.d 100•re.r f,ewntcr secret: Attachment "W' , No Change 1. Pre- ud post-development rate of infittration ctntriwtir to the reswrce aro checked Wer Part I, item it aepee; Attachment "C" , No Change 4. Estimated water p tiey characteristics 01 pre- ar,d ,ost-devetcpenc runoff at the point el discharge. Attachment "C" , No Change 11/20/92 310 CMR - 280.30 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION 10.99: continued Part IV: Mitipatitq aw,. s 1. [Ieer1Y, car�pletclY end accuratety descripe. with reference to supporting plans and calwlatioes where rec es[ery: - (a) All measures and desigtu proposed to meet the w rIoraamr standards set forth Wer each resource area specified in Part 11 or Part III of the r,owt.tiar.; or lh) my the presuepti. set forth Wer each reswrce area spccified in Part 11 or Part 111 of the reoulations do not apply. Q coastal Resource Area Type: Identifying number or H Inland letter of support Land Subject to Flooding documents Attachments E & F D coastal Resource Area Type: Identifying number or D inland letter of support - documents 11/20/92 310 CUR - 280.31 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION 10.99: continued ❑ coastal Resource Area Type: Identifying number or ❑ Inland letter of support documents 2. clearly, coopletely and accurately d....ibe, with reference to supporting plans and calculations where necessary: (a) all aw:asures antfdesigns to regulate .,k within the Buffer zox so as to erssure that said work does not alter an area smcified in Pari 1, Section 10.02(1)(.) of these fe,wL.tians: or (b) if work in the Buffer zone will alter such an area, all me.sures end designs proposed to meet the performance suMards esublithed for the adjacent resource area, specified in Part 11 or Part III of these regulatl ones. ❑ coastal Resource Area Type Bordered Identifying number or Inland By 100—Feet Discretionary zone: letter of support All Resources Area Listed Above documents Bank Attachments E & F 11/20/92 310 CMR - 200A2 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION 10.99: continued Part v: Additional Information for a Department of the Army Permit Not Applicable 1. COE Application No. (to be provided by COE) 2. (Name of waterway) 3. Names and addresses of property owners adjoining your property: d. Document other project alternatives (i.e., other locations and/or construction methods, particularly "those that would eliminate the discharge of dredged or fill material into waters or wetlands). 5. 8y' x 11- drawings in planview and cross-section, showing the resource area and the proposed activity within the resource area. Drawings must be to scale and should be clear enough for photocopying. Certification is required from the Division of water Pollution Control before the Federal permit can be issued. Certification may be obtained by contacting the Division of water Pollution Control, 1 winter street, Boston, Massachusetts 02108_ where the activity will take place within the area under the Massachusetts approved Coastal Zone Management Program, the applicant certifies that his proposed activity complies with and will be conducted in a manner that is consistent with the approved program. Information provided will be used in evaluating the application for a permit . and is made a matter of public record through issuance of a public notice. Disclosure of this information is voluntary; however, if necessary information is not provided, the application cannot be processed nor can a permit be issued. I hereby certify under the pains and penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents and supporting data are true and compl to to the est of To knowledge. South Esser S e ag Dis ijPt by its Attornet , signat e f Applicant John ling Date spignature off App 1 cant' epresentat ve Date Weson& Sampson EncjEll Pe«sta �farm cies approved by wOUSACE, 6 May 1982- 1403 100 (TEST) 1 MAY 82 "this document contains a joint Department of the Army and State of hassacnus<tts application for a permit to cht.in permission To perform activities in United States waters. the Office of Management and BW9et(ows) has approved those questions required by the US Army Carps of Engineers. (MB w,naer 0]02-00}6 and expiration date of 30 Septenoer 1983 applies". This statement will be set in b point type. 11/20/92 310 CUR - 280.33 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION - NON-TEXT PACE 11/20/92 310 CMR - 280.34 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION Forms: continued NOTICE OF INTENT FEE TRANSMITTAL FORM DEPARTMENT OF ENVIRONMENTAL PROTECTION DMSION OF WETLANDS AND WATERWAYS NOTICE OF INTENT (NOI) APPLICANT PROPERTY OWNER: Name South Essex Sewerage District Nam South Essex Sewerage District Street 50 Fort Avenue Street 50 Fort Avenue City/Town Salem City/I'own Salem State MA Zip Code 0 19 70 State MA Zip Code 01970 Phone Number: (508) 744-4550 PROJECT LOCATION: Street/Lot Number Harmony Grove Rd./Map 16 Lot 240 City/Town Salem DEP FILE NUMBER (if Available) (NOI) FILING FEE DISPUTED FEE Total NOI Filing Fee: $ 525 Total Disputed Fee: $ State Share of Filing Fee: $ 250 (as determined in Notice of Insufficient Fee letter (t/z of fee in excess of$25.00) from conservation commission) City/Town Share of State Share of Fee: $ Filing Fee: $ 275 (�i of total disputed fee) City/Town Share of Fee: $ (t/r of total disputed fee) INSTRUCTIONS: 1. Send this Fee Transmittal fort and a check or money order, payable to the Commonwealth of Massachusetts, to the DEP Lock Box at: Dept of Environmental Protection Box 4062 Boston, MA 02211 2. Attach a copy of this form to the Notice of Intent submitted to the local Conservation . Commission. 3. Attach a copy of this form and a coot/ of the DEP check to each of the Notice of Intent forms submitted to the DEP regional office. 4/1/94 310 CMR - 440 AFFIDAVIT OF SERVICE I, John E. Darlina, hereby certify under the pains and penalties of perjury that on October 17 , 1995 I mailed, by certified mail, notification to abutters in compliance with the second paragraph of Massachusetts General Laws Chapter 131, Section 40, and the DEP Guide to Abutter Notification dated April 3, 1994, in connection with the following matter: A Notice of Intent filed under the Massachusetts Wetlands Protection Act by South Essex Sewerage District with the Salem Conservation Commission on October 17 , 1995 for the property located at Harmony Grove Road at Peabody City Line. The form of the notification, and a list of the abutters to whom it was given and their addresses, are attached to this Affidavit of Service. /oZI 7/s s� John E. Darling Date Notification to Abutters Under the Massachusetts Wetlands Protection Act In accordance with the second paragraph of Massachusetts General Laws Chapter 131, Section 40, you are hereby notified of the following: Applicant Name: South Essex Sewerage District Address: 50 Fort Avenue, Salem, MA 01970 Telephone: (508) 744-4550 The applicant has filed a Notice of Intent with the Salem Conservation Commission seeking permission to remove, fill, dredge, or alter an Area Subject to Protection under the Wetlands Protection Act (General Laws Chapter 131, Section 40) . Location of Project: Harmony Grove Road at the Peabody City Line Assessors Reference: Map No: 16 Parcel/Lot No. : 240 Property Owner's Name: South Essex Sewerage District Address: 50 Fort Avenue, Salem, MA 01970 Telephone: (508) 744-4550 Description of Proposed Project: Demolition of an existing building and replacement with a prefabricated concrete building located within the 100-foot buffer zone of the North River Canal and on land subject to flooding. The project contains erosion control measures to protect wetland resource areas adjacent to the site. Copies of the Notice of Intent may be examined at the offices of the Applicant (above) between 10: 00 a.m. and 4 : 00 p.m. Monday through Friday. Copies of the Notice of Intent may be obtained by calling the applicant's representative noted below. Applicant's Representatives: John E. Darling, Esq. , Serafini, Serafini and Darling Address: 63 Federal Street, Salem, MA 01970 Telephone: (508) 744-0212 Peter M. Smith, Weston & Sampson Engineers, Inc. Address: Five Centennial Drive, Peabody, MA 01960 Telephone: (508) 532-1900 NOTE: Notice of Public Hearing, including date, time, and place will appear in the Salem Evening News at least 5 days in advance of the meeting and will be posted in the City Hall not less than 48 hours in advance of the meeting. NOTE: You may also contact the Salem Conservation Commission at (508) 745-9595 or the nearest Department of Environmental Protection (DEP) Regional Office for more information about this application or the Wetlands Protection Act. To contact the DEP Northeast Regional Office, call (617) 932-7600. SALEM Augustine J. Merlina, Trustee Map: 16 A & A Howley Street Trust Lot: 241 78 East Mountain Avenue Revere, Massachusetts 02151 Theo Wagner, Trustee Harmony Grove Corp. Map: 16 30 Grove Street Lot: 242 Salem, Massachusetts 01970 City of Peabody Planning Board City Hall Peabody, Massachusetts 01960 Margaret Buckley Map: 16 Michael J. Harrington Lot: 374 19R Howley Street Peabody, Massachusetts 01960 PEABODY M.M. Buckley & Win. Say. I, Inc. Map: 86 19R Howley Street Lot: 130 Peabody, Massachusetts 01960 Win Sav I, Inc. Map: 86 25 Bartlett Road Lot: 134 Winthrop, Massachusetts 02152 Augustine J. Merlina, Trustee Map: 86 27 Howley Street Lot: 135 Peabody, Massachusetts 01960 B & M Railroad MBTA Guilford Trans. Ind. , Inc. High Street N. Billerica, Massachusetts 01862 City of Salem Planning Board One Salem Green Salem, Massachusetts 01970 �'r N :0 � w It .. t (�-. //, r.Willem � Ceym I •� 1J/// � o� • it 111 1/iJ! �l g js. m�•F' 4 _ � �• � e. a r..; ,. `51 J.�, tiff�,r �' •• p,�Y/ ��. _ �� / �-� �' � s .. �of I - j�t<` `x '. PPing on\ I�.i,`;•" i r / IfLours6�� \ Seffe � , �� `` � � �. ��;, -� w� F n �� / /� ��I`� mw'ootl a . �(ta ��X•"1��\�/�_ n j NTE HA E .`� ,� �� ra ,.. •� � \ I \; H'e I I, ( 1\ _, � lI� Pa � .. \ �C�a' _ ` • �`> x lam'A� ��'I � �U - � ✓-� PROJECT AREA r r r- 171 N =. /'/1: _ • � ��� 1; r '.\ \ e _� i — �\ II 1107 �Pt� �t edlia �' - I l i � ..•• i Ct . \ T � I sr J/e.. � 1 - \.PYA u '_;.;` f�,.- t I))) �a •Sfe, /. `l e ✓�'//iQ ::� C �. .-� � 1/�.� � ■ f III IJ~ I I IA iF s .y IIGURI 1. - LOCATION PLAN pla 9ro nd Q �ord ATTACHMENT "A" PROJECT DESCRIPTION The South Essex Sewerage District plans to upgrade the Peabody grease and grit chamber in Peabody, Massachusetts. The project includes the demolition of the existing above ground structure as well as the demolition of and modifications to existing equipment in the below ground-structure. The project also includes the installation of a new, smaller,prefabricated building and a hatch on the existing concrete walk next to the building. No excavation is required. F MITI U EKE ESD A.WPI ATTACHMENT "B" CALCULATION OF FILING FEE P:�MIIHU¢I ESU B WPI - NOI Filing Fee Calculation Worksheet Adapted from 310 CMR 10.03(c)(1-5) Category 1 $55 per activity No. $ F. Construction of each crossing for a driveway associated with an unattached SFH, reviewable A. Any work on a single family residential lot under 310 CMR 10.53(3)(e). including: (addition, deck, garage, pool, shed, or driveway (see Cat. 2F));Construction of single G. Any point source discharge. family house(SFH); Construction of a dock,pier, or other coastal engineering structure. H. Control of nuisance vegetation, other than on a single family lot, by removal, herbicide treatment B. Site preparation of SFH lot (removal of or other means, reviewable under 310 CMR vegetation, excavation, grading) where actual 10.53(4). construction is not proposed under the NOI. 1. Raising or lowering of surface water levels for C. Control of nuisance vegetation by removal, flood control or any other purpose. herbicides, etc. from a resource area, on each single family lot, pursuant to 310 CMR 10.53(4) J. Any other activity not described in Categories 1, 3, 4, &5. D. Resource improvement pursuant to 310 CMR 10.53(4) other than removal of aquatic nuisance K. The exploration for public water supply wells or vegetation, as allowed under said section. well fields derived from groundwater, reviewable under 310 CMR 10.53(3)(0). E. Construction,repair, replacement or upgrading of a subsurface septic system or any part of such a _ _ TOTAL Category 2 Activities system. Category $525 per activity F. Activities associated with installation of a monitoring well, other than construction of an _ _ A. Site preparation, for any development other than access roadway thereto. a SFH, including removal of vegetation, excavation, &grading where actual construction G. New agricultural or aquacultural projects. is not proposed under this NOI. TOTAL Category 1 Activities B. Construction of each building for any commercial, -L- $525 industrial,institutional or apartment/condo/town- Category 22$250 per activity house type of development, any part of which is in a buffer zone or resource area. Associated A. Each new single family house Including site activities: site preparation, retention/detention preparation, retention/detention basins, utilities, basin construction, septic systems, parking lots, septic system, roadway/driveway other than those utilities, point source discharges, package pursuant to 310 CMR 10.53(3)(e). Other activities sewerage treatment plants, roadways/driveways not subject to additional fees if reviewed under a not subject to 310 CMR 10.53(3)(e) shall not be Single NOI. subject to additional fees if said activities are reviewed under a single NOI. B. Parking lot of any size C. Construction of each roadway/driveway not •C. Placement of sand for purposes of beach reviewable under 310 CMR 10.53(3)(e) and not nourishment. associated with the construction of a SFH. D. Any projects reviewable under 310 CMR D. Any activity associated with the clean up of 10.24(7)(a-c). hazardous waste, except as noted in category 4. E. Any activities reviewable under 310 CMR E. The development, construction, expansion, 10.53(3)(d) and 310 CMR 10.53(3)(f-1), except maintenance, operation, or replacement of public for those subject to 310 CMR 10.03(7)(c)4.b.. _ water supply wells or well fields derived from Where more than one activity is proposed within groundwater, reviewable under 310 CMR and identical footprint, only one fee shall be 10.53(3)(o). payable. TOTAL Category 3 Activities 1 $525. TOTAL Category 4 Activities Category dd$725 per activity Category 5 $2 per linear foot; total fee not be less than$50 nor more than$1000. A. Construction of each crossing for a limited project _ access roadway or driveway reviewable under A. Construction, reconstruction, repair, or 310CMR 10.53(3)(e) associated with a replacement of docks,piers, revetments, dikes or commercial, industrial, or institutional other engineering structures on coastal or inland development or with any residential construction resource areas,including the placement of rip-rap other than that related to an unattached single or other material on coastal or inland resource family house. areas. B. Construction, modification or repair of a flood TOTAL Category 5 Activities control structure. TOTAL FILING FEE CALCULATED _ $525 C. Creation,operation, maintenance or expansion of a public or private landfill. Calculated by: Emily H Cnz,2 F D. Creation,operation, maintenance or expansion of _ _ Address: a public or private sand/gravel operation. Weston&Sampson Engineers, Inc. 5 Centennial Drive E. Construction of new railroad lines or extensions _ _ Peabody, MA 01960 of existing lines. Telephone Number: (508)532-1900 F. Construction, reconstruction, expansion, or Signatu maintenance of any bridge, except to gain access �,lfl to a SFH lot. Date: Dctoher 16 1995 G. Any alteration of a resource area(s) to divert water for the clean up of a hazardous waste site, for non-exempt mosquito control projects, or for any other purpose not expressly identified elsewhere in this fee schedule. H. Any activities, including the construction of structures, associated with a dredging operation - conducted on land under a water body, waterway, or the ocean. If the dredging is directly associated with the construction of a new dock, pier or other structure identified in Category 5, only the Category 5 fee shall apply. 1. Construction of, or the discharge from, a package sewage treatment plant. J. Airport vegetation removal projects reviewable under 310 CMR 10.24(7)(c)5 and 10.53(3)(n). K. Landfill closure projects reviewable under 310 CMR 10.24(7)(c)4 and 10.53(3)(p). L. Any activities, including the construction of _ structures, associated with the assessment, monitoring, containment, mitigation, and remediation of, or other response to, a release or threat of release of oil and/or hazardous material reviewable under 310 CMR 10.24(7)(c)6 or 310 CMR 10.53(3)(q). ATTACHMENT "C" Part III: Work Description Point Source Discharge The discharge into the North River Canal currently consists of runoff from the area surrounding the Peabody grease and grit chamber, as shown on the attached site plan. There will be no change in pre-and post-development peak runoff due to the project. The runoff calculations for this drainage area are shown on Attachment "D". 3. There will be no change in pre-and post-development rate of infiltration contributing to the land subject to flooding. 4. There will be no change of estimated water quality characteristics of pre- and post- development runoff at the point of discharge. B:MSD C.WPI ATTACHMENT "D" PEAK RUNOFF CALCULATIONS Peabody grease and grit chamber Site drainage area There is no change between the pre-and post-development peak run-off conditions. The foundation slab for the existing building is not being removed. The new, prefabricated building is being installed on the existing slab. Therefore, there is no change in the impervious area. A, area(acres) C,runoff coefficient urban areas 0.368 0.60 asphalt roads& driveways 0.424 0.90 foundation slab area 0.155 0.90 total site drainage area 0.947 Peak Peak Rainfall Runoff Storm Storm intensity Q Volume Volume FrequencyFrcquency Duration (in/hr) (cfs) (co (co 10 year 1 hr 1.84 1.365 6,325 4,914 2 hr 1.15 0.853 7,906 6,142 3 hr 0.87 0.645 8,972 6,970 4 hr 0.70 0.519 9,625 7,477 6 hr 0.53 0.393 10,931 8,492 12 hr 0.32 0.237 13,200 10,254 24 hr 0.21 0.156 17,325 13 459 100 year 1 hr 2.80 2.077 9,625 7,477 2 hr 1.68 1.246 11,550 8,973 3 hr 1.68 1.246 17,325 13,459 4 hr 1.01 0.749 13,888 10,788 6 hr 0.76 0.564 15,675 12,177 12 hr 0.45 0.334 . 18,563 14,420 24 hr 0.29 0.215 23,925 18,586 rdwki N OF Afq y PETER tib F � .q No 29402 Q FcS/ONAL FNG ATTACHMENT "E" MITIGATING MEASURES Land subject to flooding may be temporarily disturbed in the area of the Peabody grease and grit chamber. Construction operations adjacent to wetlands are planned. There is no excavation planned for this area. The contractor will not be allowed to store waste materials in the area. Equipment refueling will be prohibited within wetland areas during construction. Siltation in wetlands areas during construction will be controlled by the use of temporary hay bales and silt fences inside the existing fence line. The hay bales and silt fences will be in place until all construction activities are completed. F:\SMITM K\SESD EWPI ATTACHMENT "F" PERTINENT CONSTRUCTION DETAILS BVESD FWPI BALED HAY U 03 } OR STRAW BALES TO BUTT CC o� ¢ I TOGETHER o h- — _ 2"X2"X3' STAKES } TWO EACH BALE r4. ' 6 j ' NO. OF BALES ( Irl•l( ( Ld 0 AND SPACING r o z v 0� w VARIABLE l i r I � r z 0 _ � Q. r O r FLOW il 2-X2-X3' STAKES rl ` 1 if TWO EACH BALE f r L i m �SWALE r r i i' PLAN PLAN Q EMBANKMENT SLOPE Ld EMBANKMENT SLOPE a og'± Ld 4GROUN OVERLAP EDGESEXISTING GROUNDEXISTING SECTION SECTION '- NOTE: TO BE USED 1N NOTE: TO BE USED IN ' LOCATIONS WHERE THE LOCATIONS WHERE THE ' w EXISTING GROUND EXISTING GROUND Q SLOPES IN TOWARD SLOPES AWAY FROM m THE TOE OF SLOPE Q THE TOE OF SLOPE U HAY BALES DETAIL N.T.S. WESTON & SAMPSON CAUL) FILL No. (SYS. \DIR.\FILE) APPROVED BY TRC 3\CIVIL\SILTFENC REV. 1 DATE A 5-31-90 B I C I D ' 2"x2" OAK POSTS APPROVED BY TRC rB SUPPORT NETTING q� SUPPORT NETTING SIGNED pgTE SEDIMENT CONTROL FABRIC SEDIMENT CONTROL) B FABRIC DIRECTION OF FLOW 2"± SECTION A—A —SUPPORT NETTING POST COUPLER SEDIMENT CONTROL INTERMEDIATE POST co FABRIC N DIRECTION OF FLOW A A BACKFILL R COD g BACKFILL � N g' + o gp pCl QGO B S SECTION B-B ELEVATION SILT FENCE DETAIL O N.T.S. z _ _ ATTACHMENT "G" SITE PLAN