64-477 - 23 GLENDALE STREET - CONSERVATION COMMISSION NoT W til-f
OA�a(�
ti� \
� v��coNorrq,� -
�� CITY OF SALEM
44.
CONSERVATION COMMISSION
July 31, 2008
Fred Atkins
Dion's Yacht Yard
23 Glendale Street
Salem, MA 01970
Re: Order of Conditions—DEP#64-477
Dion's Yacht Yard 23 Glendale Street, Salem, Massachusetts
Dear Mr. Atkins:
Enclosed, please find the Order of Conditions for the above referenced project.
Following the 10-day appeal period (as of August 10, 2008), this document and the
attached Special Conditions must be recorded at the Essex County Registry of Deeds (36
Federal Street, Salem, MA). Once recorded, please return a copy of Page 9 of the Order,
which will indicate to the Commission that the document has been recorded.
As indicated in the Order, prior to any work commencing:
1. this Order must be recorded,
2. a sign shall be displayed showing DEP File#64-477 within public view, and
3. contact me at least 48 hours prior to any activity to schedule a pre-construction
meeting to review the Order with your hired contractor.
If you have any further questions, please feel free to contact me 978-619-5685.
Sincerely,
Carey ues
Conservation Agent/Staff Planner
Enclosures
CC: DEP Northeast Regional Office
Massachusetts Department e a
p rtment of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 — Order of Conditions 64-477
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. General Information
Important: Salem
When filling From: t, Conservation Commission
out forms on
the computer, 2. This issuance is for(check one): a. ® Order of Conditions b. ❑ Amended Order of Conditions
use only the
tab key to 3. To: Applicant:
move your
cursor-do not Dion's Boat Yard
use the return a. First Name b.Last Name a Company
key. 23 Glendale Street
d. Mailing Address
'tl Salem MA 01970
e. Cityrrown f. State g.Zip Code
4. Property Owner(if different from applicant):
Fredrick Atkins Trust
a. First Name b. Last Name c.Company
d. Mailing Address
e.Cityrrown f.State
g.Zip Code
5. Project Location:
23 Glendale Street Salem
a.Street Address b.City/Town
33 0646
c.Assessors Map/Plat Number d. Parcel/Lot Number
Latitude and Longitude, if known (note:
electronic filers will click for GIS locator): e.Latitude f.Longitude
6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel):
Essex
a.County b.Certificate(if registered land)
6618 82
c.Book d.Page
Juen 20, 2008 July 24, 2008 July 31 2008
7. Dates: a. Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance
6. Final Approved Plans and Other Documents (attach additional plan or document references as
needed):
Dion's Boat Yard
a.Plan Title
Peter Ogren Peter J. Ogren
b. Prepared By _ c.Signed and Stamped by
June 17, 2008 1"=20'
d. Final Revision Date e.Scale
Notice of Intent Application, Proposed Dock Reconstruction and Marine Railway June 2008
Removal Dion's Boatyard Salem MA g.Date
wpaloro,5.doc• rev.311105
Page 1 of 9
Massachusetts Department of Environmental Protection
- Bureau of Resource Protection - Wetlands DEP File Number.
WPA Form 5 - Order of Conditions 64-477
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings
f. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information provided
in this application and presented at the public hearing, this Commission finds that the areas in which
work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that
apply:
a. . ❑ Public Water Supply b. ® Land Containing Shellfish c. ❑ Prevention of Pollution
d. ❑ Private Water Supply e. ® Fisheries r. ® Protection of Wildlife
Habitat
g. ❑ .Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project, as proposed, is:(check one of the following boxes)
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance standards set
forth in the wetlands regulations. This Commission orders that all work shall be performed in
accordance with the Notice of Intent referenced above, the following General Conditions, and any
other special conditions attached to this Order. To the extent that the followingconditions modify or
Y
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these
conditions shall control.
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the
wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice
of Intent is submitted which provides measures which are adequate to protect these interests, and a
final Order of Conditions is issued. A description of the performance standards which the
proposed work cannot meet is attached to this Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the
effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this
project may not go forward unless and until a revised Notice of Intent is submitted which provides
sufficient information and includes measures which are adequate to protect the Act's interests,and a
final Order of Conditions is issued. A description of the specific information which is lacking and
why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c).
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
3. ❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and
wetland boundary (if available) a.linear feet
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement . Replacement
4. ❑ Bank i-linearfeet b.linearfeet clinear feet d.linear feet
5. ❑ Bordering Vegetated
Wetland a.square feet b.square feet c.square feet d.square feet
6. ❑ Land Under Waterbodies. a.square feet b.square feet c.square feet d.square feet
and Waterways
e.cu.yd dredged f.cu.yd dredged
vvpaforrrr5doc• rev.3/1/05 Page 2 of
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-477
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings (cont.)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
7. ❑ Bordering Land
Subject to Flooding a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h,cubic feet
8. ❑ Isolated Land Subject
to Flooding a.square feet b.square feet
Cubic Feet Flood Storage c.cubic feet d:cubic feet e.cubic feet f.cubic feet
9. ❑ Riverfront area a.total sq.feet b.total sq.feet
Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet
Sq ft between 100-200 ft square feet h.square feet i.square feet
9 q q q j.square feet
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
1o. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
11. ® Land Under the Ocean a.square feet b.square feet
c.cu.yd dredged J.cu.yd dredged
12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below
13. ❑ Coastal Beaches a.square feet b.square feet c.c/y nourishmt. d.c/y nourishmt.
14. ❑ Coastal Dunes a.square feet b.square feet c.cty nourishmt. d.c/y nourishmt
15. ❑ Coastal Banks aa, linear feet b. linear feet
16. ❑ Rocky Intertidal Shores a. u r
sq a e feet b.square feet
17. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet .
18. ❑ Land Under Salt Ponds a.square feet b.square feet
c.cu.yd dredged d.cu.yd dredged
19. ❑ Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
20. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
a.cu.yd dredged b.cu.yd dredged
21. ❑ Land Subject to Coastal.
Storm Flowage a.square feet b.square feet
w aform5.doc• rev.311105 Page 3 of 9
Massachusetts Department of Environmental Protection
1� Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 — Order of Conditions 64-477
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
(only applicable to approved projects)
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory
measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any
injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order
unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. . the time for completion has been extended to a specified date more than three years, but less
than five years, from the date of issuance. If this Order is intended to be valid for more than three
years, the extension date and the special circumstances warranting the extended time period are
set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse,
rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard,
pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing.
7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such
an appeal has been taken, until all proceedings before the Department have been completed.
8. No work shall be undertaken until the Order has become final and then has been recorded in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title
of the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to
be done. In the case of the registered land, the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done. The recording
information shall be submitted to this Conservation Commission on the form at the end of this Order,
which form must be stamped by the Registry of Deeds, prior to the commencement of work.
9. A sign shall be displayed at the site not less then two square feet or more than three square feet in
size bearing the words,
"Massachusetts Department of Environmental Protection" [or, "MA DEP"]
"File Number 64-477 "
wpaform5.Ecc• rev.3/1/05 Page 4 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 — Order of Conditions 64-477
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the
Conservation Commission shall be a party to all agency proceedings and hearings before DEP.
11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of
Compliance (WPA Form 8A)to the Conservation Commission.
12. The work shall conform to the plans and special conditions referenced in this order.
13. Any change to the plans identified in Condition #12 above shall require the applicant to inquire of the
Conservation Commission in writing whether the change is significant enough to require the filing of a
new Notice of Intent.
14. The Agent or members of the Conservation Commission and the Department of Environmental
Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours
to evaluate compliance with the conditions stated in this Order, and may require the submittal of any
data deemed necessary by the Conservation Commission or Department for that evaluation.
15. This Order of Conditions shall apply to any successor in interest or successor in control of the
property subject to this Order and to any contractor or other person performing work conditioned by
this Order.
16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland,
the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden
stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate
of Compliance has been issued by the Conservation Commission.
17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully
stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or
water body. During construction, the applicant or his/her designee shall inspect the erosion controls
on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately
control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission, which reserves the right to require additional erosion and/or damage prevention controls
it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
18. All work associated with this Order is required to comply with the Massachusetts Stormwater Policy
Standards.
Special Conditions:
If you need more
space for
additional
conditions,
select box to
attach a text
document
wpaform5,dcc• rev.3/1105 Page 5 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-477
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
D. Findings Under Municipal Wetlands Bylaw or Ordinance
f. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No
2. The hereby finds (check one that applies):
Conservation Commission
3. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal
ordinance or bylaw specifically:
a.Municipal Ordinance or Bylaw In.Citation
Therefore, work on this project may not go forward unless and until a revised Notice of Intent is
submitted which provides measures which are adequate to meet these standards, and a final Order of
Conditions is issued.
4. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or
bylaw:
a.Municipal Ordinance or Bylaw b.Citation
The Commission orders that all work shall be performed in accordance with the following conditions
and with the Notice of Intent referenced above. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the
conditions shall control.
If you need more
space for c. The special conditions relating to municipal ordinance or bylaw are as follows:
additional The special conditions attached to this Order of Conditions relate to both the City of Salem's local
conditions,
select box to ordinance and the Massachusetts Wetlands Protection Act.
attach a text
document ® -
vvpatorm5.doc• rev.311105 Page 6 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
i ,
WPA Form 5 - Order of Conditions 64-477
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
E. Issuance
This Order is valid for three years, unless otherwise specified as a special 31 r Z00$
condition pursuant to General Conditions #4, from the date of issuance. 1.Date f Issuce
Please indicate the number of members who will sign this form: f y 5
This Order must be signed by a majority of the Conservation Commission. 2. Number of Sifiners
The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electronically, and the property owner, if different
from applicant.
Signatures: 0
,J
11 r
Notary Acknowledgement
Commonwealth of Massachusetts County of Essex
On this 24 of July 2008
Day Month Year `
Before me, the undersigned Notary Public, K. Cornacchio, M. Blier, D. Pabich, R. Christie 0-411
personally appeared Name of Document Signer Ail
proved to me through satisfactory evidence of identification, which was/were
personally known
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged to
me that he/she signed it voluntarily for its stated purpose.
As member of Salem Conservation Commission
Citylrown.
IL CAREY R.
Mp DLKKU
tAUQW
013
Signature o Notary Public
Carey R. Duques
Printed Name of NotaryPublic
August 16 2013
Place notary seal and/or any stamp above My Commission Expires(Date)
This Order is issued to the applicant as follows:
❑ by hand delivery on by certified mail, return receipt requested,on
UL, 3( zXS
Date Date —I
wpaform5.dm, rev.11/05 Page 7 of
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 — Order of Conditions 64-477
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject
to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of
their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions.
The request must be made by certified mail or hand delivery to the Department, with the appropriate filing
fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR
10.03(7)within ten business days from the date of issuance of this Order. A copy of the request shall at
the same time be sent by certified mail or hand delivery to the Conservation Commission and to the
applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding
Order associated with this appeal will be required to demonstrate prior participation in the review of this project.
Previous participation in the permit proceeding means the submission of written information to the
Conservation Commission prior to the close of the public hearing, requesting a Superseding Order or
Determination, or providing written information to the Department prior to issuance of a Superseding Order
or Determination.
The request shall state clearly and concisely the objections to the Order which is being appealed and how
the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands
Protection Act, (M.G.L. c. 131, § 40) and is inconsistent with the wetlands regulations (310 CMR 10.00).
To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts
Wetlands Protection Act or regulations, the Department has no appellate jurisdiction.
Section G, Recording Information is available on the following page.
wpaform5 Goc• rev.311105 Page 8 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 — Order of Conditions 64-477
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located, within the chain of title of the affected property. In the case of recorded land, the
Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land
subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court
Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information
on Page 7 of this form shall be submitted to the Conservation Commission listed below.
Salem
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
---------------------------------------------------------- ------ -----------------------------------------------------
To:
Salem
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
23 Glendale Street 64-477
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
for:
Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number -
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wpaform5 doc• rev.3)1105 Page 9 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 Order of Conditions 64-477
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
E. Issuance
This Order is valid for three years, unless otherwise specified as a special July 30, 2008
condition pursuant to General Conditions #4, from the date of issuance. t. Date of Issuance
Please indicate the number of members who will sign this form: five (5)
This Order must be signed by a majority of the Conservation Commission. 2. Number of Signers
The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electronically, and the property owner, if different
from applicant.
Signatures:
Notary Acknowledgement
Commonwealth of Massachusetts County of Essex
On this 24 of July 2008
Day Month Year
Before me, the undersigned Notary Public, K. Cornacchio, M. Blier, D. Pabich, A. Hamilton,
personally appeared R. Christie
proved to me through satisfactory evidence of identification, which was/were
personally known
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged to
me that he/she signed it voluntarily for its stated purpose.
As member of Salem Conservation Commission
City/Town
Signature of Notary Public
Carey R. Duques
Printed Name of Notary Public
Place notary seal and/or any stamp above August 16 2013
My Commission Expires(Date)
This Order is issued to the applicant as follows:
❑ by hand delivery on ❑ by certified mail, return receipt requested, on
Date Date
wpaform5.4oc• rev.3/1/05 Page 7 of 9
_ Attachment to Order of Conditions # 64-477
Page lof 6
SALEM CONSERVATION COMMISSION
DEP FILE #64-477
Dion's Yacht Yard
23 Glendale Street
City of Salem,Massachusetts
ADDITIONAL FINDINGS
Based on the Estimated Habitats or Rare Wildlife and Certified Vemal Pools Map (June 1, 2003) from Natural
Heritage & Endangered Species Program (NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has
been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contains any
vemal pools.
This Order is issued under the Massachusetts Wetlands Protection Act,M.G.L. Chapter 131, Section 40 and the City
of Salem Wetlands Protection Ordinance, Salem Code Chapter 34, Section 34-1 —34-13.
This Order permits the removal of a 86 foot long wooden walkway that currently extends between the existing pier
and floating dock and replacement of this walkway with two new 45-foot long floating dock sections which will be
connected to the pier via a new ramp. The existing floating dock will be retained and connected to the new dock
sections and associated wood piles will be removed or replaced as necessary. The Commission approved the
replacement of these pilings so long as they are replaced in kind. The new structure is to be placed in the same
location as the existing structure.
The second component of this project is the removal of the old marine railway. Existing marine rail and support
structures shall be removed with as little disturbance as possible. The Commission voted that this project met the
performance standards based on fulfilling the following conditions; spill kits shall be on site throughout the duration
of the project, pilings and debris from the marine railway and pier shall be properly disposed off site, and if any
changes are made to the work scope the applicant and/or property owner shall notify the Conservation Commission
or the Conservation Agent.
GENERAL CONDITIONS
1. This Order of Conditions must be recorded in its entirety(all 6 pages)at the Essex County Registry of
Deeds or the Land Court for the district in which the land is located, after the expiration of the 10-day
appeal period and within 30 days of the issuance. A copy of the recording information must be
submitted to the Salem Conservation Commission before any work approved in this Order
commences.
2. Approval of this application does not constitute compliance with any law or regulation other than
M.G.L Chapter 131, Section 40, Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands
Protection Ordinance, Salem Code Chapter 34, Section 34-1 —34-13.
3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No
alteration of wetland resource areas or associated buffer zones, other than that approved in this Order,
shall occur on this property without prior approval from the Commission.
Attachment to Order of Conditions # 64-477
Page 2of 6
4. Prior to any work commencing, a sign shall be displayed showing DEP File#64-477, and not placed on
a living tree.
5. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the
date of the issuance of this Order.
6. With respect to this Order, the Commission designates the Conservation Agent as its agent with powers
to act on its behalf in administering and enforcing this Order.
7. The Commission or its Agent, officers,or employees shall have the right to enter and inspect the property at
any time for compliance with the conditions of this Order, the Wetlands Protection Act MGL Chapter 131,
Section 40, the Wetlands Regulations 310 CMR 10.00, and shall have the right to require any data or
documentation that it deems necessary for that evaluation.
8. The term"Applicant'as used in this Order of Conditions shall refer to the owner, any successor in
interest or successor in control of the property referenced in the Notice of intent, supporting documents
and this Order of Conditions. The Commission shall be notified in writing within 30 days of all
transfers of title of any portion of the property that takes place prior to issuance of the Certificate of
Compliance.
9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and
approvals associated with this project. These permits may include but are not necessarily limited to the
following:
(1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816); U.S. Army
Corps of Engineers.
(2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority
of sec. 27(5) of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00.
(3) Sewer Extension Permit from the DEP Division of Water Pollution Control under G. L. Ch. 21A ss7
and 314 CMR 7.00. Any Board of Health permit for septic system design for any portion of the
septic system within 100 feet of wetlands shall be submitted to the Commission prior to
construction initiation.
(4) Design Requirements for Construction in Floodplains under the State Building Code(780 CMR
744.).
10. If there are conflicting conditions within this Order, the stricter condition(s) shall rule.
11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and
surface waters during construction or after completion of the project.
12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods
and boundary during construction if necessary.
13. The Commission reserves the right to impose additional conditions on portions of this project or this site
to mitigate any actual or potential impacts resulting from the work herein permitted.
14. The work shall conform to the following attached plans and special conditions:
Attachment to Order of Conditions N 64-477
Page Sof 6
Final Approved Plans
Dion's Boat Yard
(Title)
June 17, 2008
(Dated)
Peter J. Ogren
(Signed and Stamped by)
City of Salem Conservation Commission
(On file with)
15. Any proposed changes in the approved plan(s)or any deviation in construction from the approved
plan(s) shall require the applicant to file a Notice of Project Change with the Commission. The Notice
shall be accompanied by a written inquiry prior to their implementation in the field, as to whether the
change(s) is substantial enough to require filing a new Notice of Intent or a request to correct or amend
this Order of Conditions. A copy of such request shall at the same time be sent to the Department of
Environmental Protection.
16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has
been issued,the applicant or current landowner shall submit to the Commission a statement signed by the
buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of
the Order of Conditions.
17. Condition Number_as indicated shall continue in force beyond the Certificate of Compliance,in
perpetuity, and shall be referenced to in all future deeds to this property.
PRIOR TO CONSTRUCTION
18. Prior to the commencement of any activity on this site other than activities listed above, there
shall be a Pre-Construction Meeting between the project supervisor, the contractor responsible for the
work, and a member of the Conservation Commission or its Administrator to ensure that the
requirements of the Order of Conditions are understood. The staked erosion control line shall be
adjusted, if necessary, during the pre-construction meeting. Please contact the Conservation Commission
Agent at(978) 745-9595 ext 311 at least forty-eight (48)hours prior to any activity to arrange for the
pre-construction meeting.
19. Prior to the pre-construction meeting and commencement of any activity on this site, sedimentation and
erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The
Commission and/or its Administrator shall inspect and approve such installation at the pre-construction
meeting.
20. No clearing of vegetation, including trees, or disturbance of soil shall occur prior to the pre-construction
meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre-
construction meeting if absolutely necessary in order to place erosion control stakes where required.
Attachment to Order of Conditions N 64-477
Page 4of 6
21. There shall be twenty (20)hay bales and wooden stakes under cover on the site to be used only for
emergency erosion control.
EROSION CONTROL
22. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction,
and shall be maintained during construction in the wetland areas and buffer zones. The erosion control
specifications provided in the Notice of Intent and the erosion control provision in the Order will be the
minimum standards for this project; the Commission may require additional measures.
23. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland
resource areas to prevent sediment from entering wetland resource areas.
24. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or
replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed.
25. The area of construction shall remain in a stable condition at the close of each construction day.
26. Any de-watering of trenches or other excavation required during construction shall be conducted so as
to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered
through hay bale sediment traps, silt filter bags or other means approved by the Commission or its
Administrator.
27. Within thirty (30)days of completion of construction on any given portion of the project, all disturbed
areas in the completed portion of the site shall be permanently stabilized with rapidly growing
vegetative cover, using sufficient top soil to assure long-term stabilization of disturbed areas.
28. If soils are to be disturbed for longer that two (2)months, a temporary cover of rye or other grass should
be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,
exposed surface shall be stabilized by other appropriate erosion control measures, firmly anchored, to
prevent soils from being washed by rain or flooding.
DURING CONSTRUCTION
29. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all
times when work is in progress.
30. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on
the approved plan(s).
31. All waste products,grubbed stumps,slash; construction materials, etc. shall be deposited at least 100 feet
from wetland resource areas and 200 feet from river.
32. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage
system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be
immediately removed.
33. All exposed sub-soils shall be covered by a minimum of three(3)inches of quality screened loam topsoil
prior to seeding and final stabilization.
34. Immediately following drainage structure installation all inlets shall be protected by silt fence,haybale
barriers and/or silt bags to filter silt from stormwater before it enters the drainage system.
35. There shall be no pumping of water from wetland resource areas.
Attachment to Order of Conditions H 64-477
Page 5of 6
36. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other
components shall be fixed immediately.
37. During construction, all drainage structures shall be inspected regularly and cleaned as necessary.
38. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance
of enforcement actions by the Conservation Commission including, but not limited to, civil administrative
penalties under M.G.L Chapter 21 A, section 16.
AFTER CONSTRUCTION
39. Upon completion of construction and final soil stabilization, the applicant shall submit the following to
the Conservation Commission to request a Certificate of Compliance(COC):
(1) A Completed Request for a Certificate of Compliance form(WPA Form 8A or other form if
required by the Conservation Commission at the time of request).
(2) A letter from a Registered Professional Engineer certifying compliance of the property with this
Order of Conditions.
(3) An "As-Built" plan signed and stamped by a Registered Professional Engineer or Land Surveyor
showing post-construction conditions within all areas under the jurisdiction of the Massachusetts
Wetlands Protection Act. This plan shall include at a minimum:
(a) All wetland resource area boundaries with associated buffer zones and regulatory setback
areas taken from the plan(s)approved in this Order of Conditions;
(b) Locations and elevations of all stormwater management conveyances, structures and best
management designs, including foundation drains,constructed under this Order within any
wetland resource area or buffer zone;
(c) Distances from any structures constructed under this Order to wetland resource areas-
"structuies"include,but are not limited to,all buildings,septic system components,wells,
utility lines,fences,retaining walls,and roads/driveways;
(d) A line delineating the limit of work-"work"includes any filling,excavating and/or
disturbance of soils or vegetation approved under this Order;
40. When issued, the Certificate of Compliance must be recorded at the Essex County Registry of Deeds
and a copy of the recording submitted to the Salem Conservation Commission.
41. If the completed work differs from that in the original plans and conditions, the report must specify how
the work differs; at which time the applicant shall first request a modification to the Order. Only upon
review and approval by the Commission, may the applicant request in writing a Certificate of
Compliance as described above.
42. Erosion control devices shall remain in place and properly functioning until all exposed soils have been
stabilized with final vegetative cover and the Conservation Commission and/or its Administrator has
authorized their removal.
ADDITIONAL CONDITIONS
43. The pilings shall be replaced in kind.
44. Spill kits shall be on site throughout the duration of the project
Attachment to Order of Conditions # 64-477
Page 6of 6
45. Pilings and debris from the marine railway and pier shall be properly disposed off site
46. Prior to making changes to the work scope the applicant and/or property owner shall notify and receive
approval from the Conservation Commission or the Conservation Agent.
rs
Y
AMP
T `ryq
p l Y 34 .
is
�y
lip
1.
'�:a , Imo •+ A
d 'II
FFF
iin-
_: .. g fi �
w
}
r y
�R•�is•�ne7v
h
All
f �
T
a
a
n,
a '
z
11RJ• �..: .. .R i 4a �r � i
1 1� ya h }'�� f.M y •�x A a �. }
a{
a a ai t, },Fa rj
Y .�k s'� s� ,•xa.
•x r� •i +
4 .p•� 'i.•ala.
OP
VIA
• r
_ t
• i i
r e
t � •".� d r •a to ..yam' a�k.•
a
a f�
z
f I �
k '
ZI
Ar
F
Ift
toga
AI i
x xQ
zr
--••� . a
{
r i R z a
a
W VVV 4 '
x 4 � _ �• SSjj a yi
i' 3' }1111 FFFF t ,
yf t
x'1
k*
y 4 1
i iyyyl� 1
1 .
3 ro.T� i
op
ss
r
# c
4
r
ffi i d4 .14 .
'fig, gg
o,«-All. �,
-d
u^
f
w.,
. P
h 1
f
'"etC a
ki
S
0
i
Project File: SAL-0065
' Dion's Boatyard
#23 Glendale Street FI
Salem, MA 01970 Y't � ��'®
' JUN 2 0 2008
' DEPT. OF PLANIAG&
GOft4MOM!TY DEVELO?MEW
1
Notice of Intent
Application
Proposed Dock Reconstruction
and Marine Railway Removal
Dion's Boatyard
Salem, MA
June 2008
603 Salem Street
Wakefield, MA 01880
Tel: (781) 246-2800 Nantucket, VIA 0#2554
_— Fax: (781) 246-7596 Tel: (508) 228-7909
' Hayes Engineering,Inc.
1
Massachusetts Department of Environmental Protection Provided by MassDEP:
' Bureau of Resource Protection - Wetlands MassOEP File Number
WPA Form 3 - Notice of Intent
Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
/tub -SAL-S" VOV- tc-A-alas Pewrr�Tw---L �2b
'mp°"a"`
When filling out A. General Information
' forms on the
computer,use
only the tab key 1. Project Location (Note: electronic filers will click on button to locate project site):
to move your Dion's Boat Yard, Glendale Street Salem
cur' use the
ret not a. Street Address b.Cit frown c.Zi Code
use the return y P
key' Latitude and Longitude:
d. Latitude e.Longitude
' m 33 0646
f.Assessors Map/Plat Number g. Parcel/Lot Number
2. Applicant:
a. First Name b. Last Name
Note: Dion's Boat Yard
' Before c.Organization
completing this 23 Glendale Street
form consult
your local d.Street Address
' Conservation Salem MA 01970
Commission e.CityfTown f.State g.Zip Code
regarding any
municipal bylaw (978) 274-0844
or ordinance. h.Phone Number i. Fax Number j.Email Address
3. Property owner(required if different from applicant): ❑ Check if more than one owner
' a.First Name b.Last Name
Fredrick Atkins Trust
c.Organization
' d.Street Address
e.Cityrrown f.State g.Zip Code
' h. Phone Number i. Fax Number j.Email address
t4. Representative (if any):
a. First Name b. Last Name
' Hayes Engineering Inc.
c.Company
603 Salem Street
d.Street Address
' Wakefield MA 01880
e.City/Town f.State g.Zip Code
(781)246-2800 (781)246-7596
' h.Phone Number i. Fax Number j. Email address
5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form):
' $916.00 $445.50 $470.50
a.Total Fee Paid b.State Fee Paid c.Cityrrown Fee Paid
' wpaform3.doc•rev.02/21/08 Page 1 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:
' Bureau of Resource Protection - Wetlands
MassDEP File Number
WPA Form 3 - Notice of Intent Document Transaction Number
' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City town
A. General Information (continued)
6. General Project Description:
The applicant proposes to reconstruct a dock and remove a marine railway as shown on the
' accompanying plan and as described in the attached 'Project Narrative".
7a. Project Type Checklist:
1. ❑ Single Family Home 2. ❑ Residential Subdivision
' 3. ❑ Limited Project Driveway Crossing 4. ❑ Commercial/Industrial
' 5. ® Dock/Pier 6. ❑ Utilities
7. ❑ Coastal Engineering Structure 8. ❑ Agriculture (e.g., cranberries, forestry)
' 9. ❑ Transportation 10. ❑ Other
7b. Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR
10.24 (coastal) or 310 CMR 10.53 (inland)?
1. ❑ Yes ® No If yes, describe which limited project applies to this project:
' 2.Limited Project
8. Property recorded at the Registry of Deeds for:
' Essex south
a.County b.Certificate#(if registered land)
c. Book d.Page Number
' B. Buffer Zone & Resource Area Impacts (temporary & permanent)
1. ❑ Buffer Zone Only—Check if the project is located only in the Buffer Zone of a Bordering
Vegetated Wetland, Inland Bank, or Coastal Resource Area.
2. ❑ Inland Resource Areas (see 310 CMR 10.54-10.58, if not applicable, go to Section B.3,
Coastal Resource Areas).
' Check all that apply below. Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including standards
requiring consideration of alternative project design or location.
' For all projects
affecting other Resource Area Size of Proposed Alteration Proposed Replacement(if any)
Resource Areas,
please attach a
' narrative a. Ll Bank 1. linear feet 2.linear feet
explaining how b. ❑ Bordering Vegetated
the resource
area was Wetland 1.square feet 2.square feet
' delineated.
c. ❑ Land Under 1.linear feet 2. linear feet
Waterbodies and
Waterways 3.cubic yards dredged
' wpaform3.doc•rev.02/21/08 Page 2 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:
' Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 - Notice of Intent
Document Transaction Number
' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
Cityrrown
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (corl
' Resource Area Size of Proposed Alteration Proposed Replacement(if any)
' d. ❑ Bordering Land
Subject to Flooding 1.square feet 2.square feet
3.cubic feet of Flood storage lost 4.cubic feet replaced
' e. ❑ Isolated Land
Subject to Flooding 1.square feet
' 2.cubic feet of flood storage lost 3.cubic feet replaced
f. ❑ Riverfront Area 1. Name of Waterway(if available)
' 2. Width of Riverfront Area (check one):
❑ 25 ft. - Designated Densely Developed Areas only
' ❑ 100 ft. - New agricultural projects only
❑ 200 ft. -All other projects
' 3. Total area of Riverfront Area on the site of the proposed project: square feet
' 4. Proposed alteration of the Riverfront Area:
a.total square feet b.square feet within 100 ft, c.square feet between 100 ft.and 200 ft.
' 5. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes❑ No
6.Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes❑ No
' 3. ® Coastal Resource Areas: (See 310 CMR 10.25-10.35)
Check all that apply below. Attach narrative and supporting documentation describing how the project
will meet all performance standards for each of the resource areas altered, including standards
requiring consideration of alternative project design or location.
' Online Users:
Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any)
document
transaction
number a. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
(provided on
your receipt b. ® Land Under the Ocean 1
page)with all .square feet
supplementary
information you 2.cubic yards dredged
submit to the
Department. c. ❑ Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below
' d. ❑ Coastal Beaches 1.square feet 2.cubic yards beach nourishment
e. ❑ Coastal Dunes 1.square feet 2.cubic yards dune nourishment
' wpaform3.doc•rev.02/21/08 Page 3 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:
' Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 - Notice of Intent
Document Transaction Number
' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
cityrrown
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont'd)
Size of Proposed Alteration Proposed ReDlacement(if any)
' f. ❑ Coastal Banks insignificant disturbances
due to removal of marine
g. ❑ Rocky Intertidal railway.
Shores 1.square feet
' h. ❑ Salt Marshes 1.square feet 2.sq ft restoration,rehab.,creation
i. ❑ Land Under Salt
' Ponds 1.square feet
2.cubic yards dredged
I. ❑ Land Containing
' Shellfish 1.square feet
k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
' above
1.cubic yards dredged
I. ❑ Land Subject to
Coastal Storm Flowage 1.square feet
4. ❑ Restoration/Enhancement
' If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the
square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional
amount here.
' a.square feet of BVW b.square feet of Salt Marsh
C. Other Applicable Standards and Requirements
Ili ' Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review
1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on
the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural
Heritage and Endangered Species Program (NHESP)?To view habitat maps, see the Massachusetts
Natural Heritage Atlas or go to htto://www.mass.gov/dfwele/dfwinhesp/nhregmai).htm.
' a. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
' 2006 Route 135, North Drive
b.Date of map Westborough, MA 01581
If yes, the project is also subject to Massachusetts Endangered Species Act(MESA) review(321
' CMR 10.18). To qualify for a streamlined, 30-day, MESA/Wetlands Protection Act review, please
complete Section CA.C, and include requested materials with this Notice of Intent (NOI); OR
complete Section CAA, if applicable. If MESA supplemental information is not included with the NOI,
' by completing Section 1 of this form, the NHESP will require a separate MESA filing which may take
up to 90 days to review(unless noted exceptions in Section 2 apply, see below).
' wpaform3.doc•rev.02/21/08 Page 4 of 8
1 �
Massachusetts Department of Environmental Protection Provided by MassDEP:
' Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 - Notice of Intent
Document Transaction Number
' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
C. Other Applicable Standards and Requirements (cont'd)
1. c. Submit Supplemental Information for Endangered Species Review
' 1. ❑ Percentage/acreage of property to be altered:
(a)within wetland Resource Area
percentage/acreage
(b) outside Resource Area
percentage/acreage
2. ❑ Assessor's Map or right-of-way plan of site
3. ❑ Project plans for entire project site, including wetland resource areas and areas outside of
wetlands jurisdiction, showing existing and proposed conditions, existing and proposed
' tree/vegetation clearing line, and clearly demarcated limits of work**
(a)❑ Project description (including description of impacts outside of wetland resource area &
bufferzone)
' (b) ❑ Photographs representative of the site
(c)❑ MESA filing fee (fee information available at:
http://www.mass.gov/dfwele/dfw/nhesD/nhenvmesa.htm)
Make check payable to"Natural Heritage & Endangered Species Fund" and mail to
NHESP at above address
' Projects altering 10 or more acres of land, also submit.
(d)❑ Vegetation cover type map of site
' (e)❑ Project plans showing Priority& Estimated Habitat boundaries
d. OR Check One of the Following
' 1. ❑ Project is exempt from MESA review.
Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14,
htto://www.mass.gov/dfwele/dfw/nhesD/nhenvexemptions.htm; the NOI must still be sent to
t NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.)
2.❑ Separate MESA review ongoing.
' a. NHESP Tracking Number b.Date submitted to NHESP
3. ❑ Separate MESA review completed.
' Include copy of NHESP"no Take" determination or valid Conservation & Management
Permit with approved plan.
* Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP
review(see www.nhesn.org regulatory review tab). Priority Habitat includes habitat for state-
listed plants and strictly upland species not protected by the Wetlands Protection Act.
' ** MESA projects may not be segmented(321 CMR 10.16).The applicant must disclose full development plans
even if such plans are not required as part of the Notice of Intent process.
' wpaform3.doc•rev.02/21/08 Page 5 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:
' Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 - Notice of Intent
Document Transaction Number
' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
Cityrrown
C. Other Applicable Standards and Requirements (cont'd)
' 2. For coastal projects only, is any portion of the proposed project located below the mean high water
line or in a fish run?
' a. ❑ Not applicable—project is in inland resource area only
b.® Yes ❑ No If yes, include proof of mailing or hand delivery of NOI to either:
' South Shore-Cohasset to Rhode North Shore- Hull to New Hampshire:
Island, and the Cape& Islands:
Division of Marine Fisheries-
Division of Marine Fisheries- North Shore Office
' Southeast Marine Fisheries Station Attn: Environmental Reviewer
Attn: Environmental Reviewer 30 Emerson Avenue
838 South Rodney French Blvd. Gloucester, MA 01930
New Bedford, MA 02744
' Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region,
please contact MassDEP's Boston Office. For coastal towns in the Southeast Region, please contact
' MassDEP's Southeast Regional Office.
3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
Online users: a. ❑ Yes ® No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP
Include your Website for ACEC locations). Note: electronic filers click on Website.
document
' transaction
number b.ACEC
(provided on 4. Is any portion of the proposed project within an area designated as an Outstanding Resource Water
your receipt (ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00?
page)with all
' supplementary a. ❑ Yes ® No
information you
submit to the 5. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Department. Restriction Act(M.G.L. c. 131, §40A) or the Coastal Wetlands Restriction Act(M.G.L. c. 130, § 105)?
a. ❑ Yes ® No
6. Is this project subject to provisions of the MassDEP Stormwater Management Standards?
a. ❑ Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management
Standards per 310 CMR 10.05(6)(k)-(q) and check if:
I. ❑ Applying for Low Impact Development(LID)site design credits (as described in
Stormwater Management Handbook Vol. 2, Chapter 3)
2.❑ A portion of the site constitutes redevelopment
3.❑ Proprietary BMPs are included in the Stormwater Management System.
b. ❑ No. Check why the project is exempt:
1. ❑ Single-family house
' 2. ❑ Emergency road repair
3.❑ Small Residential Subdivision (less than or equal to 4 single-family houses or less than or
equal to 4 units in multi-family housing project)with no discharge to Critical Areas.
' wpaform3.doc•rev.02/21/08 Page 6 of 8
1
Massachusetts Department of Environmental Protection Provided by MassDEP:
1 Bureau of Resource Protection -Wetlands MassDEP File Number
WPA Form 3 - Notice of Intent
Document Transaction Number
1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
D. Additional Information
1 Applicants must include the following with this Notice of Intent(NOI). See instructions for details.
Online Users: Attach the document transaction number(provided on your receipt page) for any of the
1 following information you submit to the Department.
1. ® USGS or other map of the area(along with a narrative description, if necessary) containing
1 sufficient information for the Conservation Commission and the Department to locate the site.
(Electronic filers may omit this item.)
2. 0 Plans identifying the location of proposed activities(including activities proposed to serve as a
1 Bordering Vegetated Wetland [BV" replication area or other mitigating measure) relative to
the boundaries of each affected resource area.
1 3. ❑ Identify the method for BVW and other resource area boundary delineations(MassDEP BVW
Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.),
and attach documentation of the methodology.
1 4. 0 List the titles and dates for all plans and other materials submitted with this NOI.
Refer to attached "List of Plans and Documents".
a.Plan Title
1 Hayes Engineering Inc. PeterJ. Ogren
b.Prepared By c.Signed and Stamped by
1 d. Final Revision Date e.Scale
f.Additional Plan or Document Title g. Dale
1 5. ❑ If there is more than one property owner, please attach a list of these property owners not
listed on this form.
6. ❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
1 7. 0 Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
1 6. ® Attach NOI Wetland Fee Transmittal Form
g. ❑ Attach Stormwater Report, if needed.
1 E. Fees
1. ❑ Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of
the Commonwealth, federally recognized Indian tribe housing authority, municipal housing
1 authority, or the Massachusetts Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee
1 Transmittal Form) to confirm fee payment:3& «� ax�o2,
2. Municipal Check Number 3.Check date
4. State Check Number 5.Check date
`
6.Payor name on check: First Name 7. Payor name on check:Last Name
1 wpafonn3.doc•rev.02/21108 Page 7 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:
' Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 - Notice of Intent Document Transaction Number
' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
F. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans,
documents, and supporting data are true and complete to the best of my knowledge. I understand that
the Conservation Commission will place notification of this Notice in a local newspaper at the expense of
' the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the
' requirements of M.G.L. c. 131, § 40. Notice must be made by Certificate of Mailing or in writing by hand
delivery or certified mail (return receipt requested) to all abutters within 100 feet of the property line of the
project location.
' 1.Si na ure of App scant 2. Dat
3.Si a��yL o��Pro e O er if differan 4. Date
5.SignaEp of Representative(if any) U . Date
For Conservation Commission:
' Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents,
two copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the �.
Conservation Commission by certified mail or hand delivery.
For MassDEP:
' One copy of the completed Notice of Intent(Form 3), including supporting plans and documents, one
copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP
Regional Office(see Instructions) by certified mail or hand delivery.
' Other:
If the applicant has checked the "yes' box in any part of Section C, Item 3, above, refer to that section
and the Instructions for additional submittal requirements.
' The original and copies must be sent simultaneously. Failure by the applicant to send copies in a
timely manner may result in dismissal of the Notice of Intent.
1
1
' wpaform3.doc•rev.02/21/08 Page 8 of 8
f
HAYES ENGINEERING, INC. 603 SALEM STREET
' CIVIL ENGINEERING& �J WAKEFIELD,MA 01880
LAND SURVEYORS __.._ __ (781)246-2800
HAYEB ENpINEEFINUr
1 yam.
ra" '+r` 'r Y/
Long Poinr t
hd r W
x h
SITEr
/
Pckeog
pp i if
Gr
`I t QY 4
ytime o � �, cNr r-ti
R�_�LLt y� I k� coon �§ 4_ 'a�a 5 .,.i r q F� :•-1�i-f
non .t ..%•rlsX ., ./�., RZ
' UNITED STATES GEOLOGICAL SURVEY MAP LOCUS MAP N
MASSGIS MARBLEHEAD QUADRANGLES DION'S BOAT YARD, GLENDALE ST. T
SCALE: 1:25,000 (metric contours) SALEM, MASSACHUSETTS
1
it
1
1U.S. Postal Service,,,
ru CERTIFIED MAIL,,, RECEIPTq (DOMestic Mail Only,No Insurance Coverage pro,ided)a
Cc
OFFICIAL U
Cc
' Ln
Certlflea Fee _ <O
' �mRuedM (ErMemRgircl 1��
O
M (ER1`d`1W etl of Requlree)
Ir
.? Totel •�_ Q
9 SA`
a gJivfaion of Marine Fisheries
' MM North Shore Office
o Attn: Environmental Reviewer
M1 Por 30 Emerson Avenue
' W4 Gloucester, MA 01930 — -
t
1
' Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands
' NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Important: A. Applicant Information
When filling out
' fors on the 1, Applicant:
computer,use
only the tab key
to move your a. First Name
' cursor-do not It. Last Name
use the return Dion's Boat Yard
key. c.Organization
23 Glendale Street
nd l Mailing Address
Salem MA 01970
e.City/Town f.State
g.Zip Code
(978)274-0844
h.Phone Number i.Fax Number I.Email Address
2. Property Owner(if different):
' a.First Name b.Last Name
' c.Organization
d.Mailing Address
' e.Citylfown f.State g.Zip Code
h.Phone Number i.Fax Number j.Email Address
' 3. Project Location:
Dion's Boatyard Glendale Street Salem
' To calculate a.Street Address b.Cityrrown
filing fees,refer B. Fees
to the category
fee list and The fee should be calculated using the following six-step process and worksheet. Please see
examples in the Instructions before' fillip out worksheet.instructions for g
filling out WPA Ste 1/Type of Activit Describe each type of activity that will occur in wetland resource area and
For 3(Notice of pY� Yp tY
' Intent). buffer zone.
Step 2/Number of Activities: Identify the number of each type of activity.
' Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the
instructions.
' Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2)times the fee per
category(identified in Step 3)to reach a subtotal fee amount. Note: If any of these activities are in a
Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be
multiplied by 1.5 and then added to the subtotal amount.
Step 6/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4.
Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract
$12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50.
' WWorm&doc•Wetland Fee Transmittal For•rev.2121108 Page 1 of 2
' Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Fees (continued)
' Step 11Type of Activity Step 2/Number Step Step 4/Subtotal Activity
of Activities 3/individual Fee
Activity Fee
' Dock reconstruction (Category 5.) 1 $4 x104 I.f. _ $416.00
Railway removal (Category 2.j.) 1 $500.00 $500.00
' Step 5/Total Project Fee: $916.00
Step 6/Fee Payments:
' Total Project Fee: $916.00
a.Total Fee from Step 5
State share of filing Fee: $445.50
' b.1/2 Total Fee less$12.50
City/Town share of filling Fee: $470.50
c.1/2 Total Fee plus$12.50
' C. Submittal Requirements
a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to
the Commonwealth of Massachusetts.
' Department of Environmental Protection
Box 4062
Boston,MA 02211
' b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent;a copy of
this form;and the city/town fee payment.
' To MassDEP Regional Office(see Instructions):Send a copy of the Notice of Intent or Abbreviated Notice of
Intent;a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these
electronically.)
' WrafoPn3.doo•Wetland Fee Transmittal Foon•rev.2121108 Page 2 of 2
m '`s +sys " „lal a z 4"i } 4 SALEM FIVE CENTS :13009,
�' S } 'j ,}+� .Otp
SAVINGS BANK
h tuj "i4P; y + tier •P$" Yf3..
SALEM,MA 01970
FRED`J.DI011T
yacht y8rd Inc.' 53.7055/2113
,� 5/7/2008
1 Twenty-three Glendale Street Salem,MA 01970
vet .:
A-ORDER oFE ' Commonwealth of Massachusetts i $ "445.50
Four Hundred Forty-Five and 50/100*"" ""*"""'""""""""'"""""""„""'..'.""" ".""" ., ..,.4..*.60LLARS IJ
Commonwealth of Massachusetts
� f`a1Eh:10
11001300911• -e: 2L1, 3705581: 89 2 10 12 54u'
pqr t t• +'� :> iii s� � N n'xr ' '� 4y° _
a a1s13010
SALEM FIVE CENTS
? SAVINGS BANK
'a ' SALEM,MA 01970
Utz FRED J`
ION 53.7055 2113
yacLt pard INC -
5/7/2008
`.�'"r' = Twenty-three Glendale Street Salem,MA 01970
at a h
`4 PAY T.O THE C1 of Salem ”' *'470.50
M-ORDER OF
c,
Four Hundred Seventy and 50/100"`~'"""��""�"k���""#��"""•e.."�"����""fe�"��"....e..."**~*�""";�"�DOLLARS 8
City of Salem
Salem City Clerk
z 93 Washington Street
P
Salem MA 01970
< MENTO v— `--
Permits
u-0L30LOu■ 1: 211, 3705581: 8921012SLeV
1
' AFFIDAVIT OF SERVICE
Under the Massachusetts Wetlands Protection Act
' (to be submitted to the Massachusetts Department of
Environmental Protection and the Conservation Commission
when filing a Notice of Intent)
I, `: 'Z; , hereby certify under the pains
and penalties of perjury that on (�\ \ 9ye% I gave notification to
abutters in compliance with the second paragraph of Massachusetts General Laws,
' Chapter 131, Section 40, and the DEP Guide to Abutter Notification dated April 8,
1994, in connection with the following matter: Dock reconstruction and marine railway
removal.
A Notice of Intent filed under the Massachusetts Wetlands Protection Act by
' Dion's Boatyard with the Salem Conservation Commission on for
property located at Dion's Boatyard on Glendale Street.
III ' The form of the notification, and a list of the abutters to whom it was given and
' their addresses are attached to this Affidavit of Service.
Name Date
1 .;0�1�51)1T,q p f
k�
1 = CITY OF SALEM
CONSERVATION COMMISSION
1
1 MEMORANDUM
1 TO: Assessor's Office
FROM: Carey Duques, Conservation Agent/Planner
DATE: June 12,2008
RE: Certified Abutters List
1
The Salem Conservation Commission is requesting a certified abutters list for the properties located
1 on 23 Glendale Street (Map 33—Lot 0646).
1 Attached is the 100 foot abutters list produced from the City's GIS program. Please Certify this
list and return to:
1 CareyDuques
The Planning Department
1
Thank you for your attention to this matter. If you have any questions, please contact me at
1 extension 5682.
APPROVED
Autho izd igr%ture
1
1
1
1
' Notification to Abutters and City Agencies Under the
' Massachusetts Wetlands Protection Act
And
City of Salem Wetlands Protection Ordinance
' In accordance with the second paragraph of Massachusetts General Laws Chapter 131,
Section 40, you are hereby notified of the following.
A. A Notice of Intent application has been filed with the Salem Conservation Commission
' seeking permission to work within an Area Subject to Protection Under the Wetlands
Protection Act (General Laws Chapter 131, Section 40) and Salem Wetlands protection
Ordinance.
' B. The name of the applicant is: Dion's Boatyard.
' C. The address of the lot where the activity is proposed: Dion's Boatyard on Glendale
Street (Map 33, Lot 646).
' D. The activity proposed on the site: Dock reconstruction and marine railway removal.
E. Copies of the Notice of Intent may be examined/obtained at:
' Haves Engineering, Inc., 603 Salem Street, Wakefield, MA, 01880 between the hours
of 8 a.m. and 4:30 p.m. on the following days of the week: Monday through Thursday
by appointment only. For more information, call: (781) 246 —2800
' Check one: This is the _ applicant, X representative, or other (please
specify).
F. Information regarding the data, time and place of the public hearing may be obtained
from: The Salem Conservation Commission (office hours vary)
Check one: This is the _ applicant, _ representative, or _ other (please
' specify).
' *NOTE: Notice of the public hearing, including its date, time and place, will be published
at least five (5) days in advance in a newspaper with general circulation in Salem.
' *NOTE: Notice of the public hearing, including its date, time and place, will be posted in
the City or Town Hall not less than forty-eight (48) hours in advance.
' NOTE: You also may contact your local Conservation Commission or the nearest
Department of Environmental Protection Regional Office for more information about this
application or the Wetlands Protection Act. To contact the DEP, call:
' `Northeast Region- Wilmington: 978-694-3200
1
' 33_0644_0 33_0748_0 330630_801
AMODEO ROBERT C FREDERICK 1 ATKINS TRUST WILLOW AVENUE REALTY TRUST
15 GLENDALE ST 23 GLENDALE ST 22 WILLOW AVE
' SALEM,MA 01970 SALEM,MA 01970 SALEM,MA 01970
' 33_0647_0 33_0749_0 33_0630_802
RYAN GERALDC FREDERICK I ATKINS TRUST HOOVER LAURETTEL
18 GLENDALE ST 23 GLENDALE ST 22 WILLOW AVENUE 42
SALEM,MA 01970 SALEM,MA 01970 SALEM,MA 01970
33_0645_0 33_0663_0 33_0630_803
' KERWIN JOSEPH F BEAUREGARD JEAN B HOOVER LAURETTE L
21 GLENDALE ST 4 OCEAN AVE 22 WILLOW AVE U2
SALEM,MA 01970 SALEM,MA 01970 SALEM,MA 01970
' 33_0646_0 33_0662_0 33_06220
FREDERICK 1 ATKINS TRUST JOHNSON MARVIN MCMAH_ON THOMAS V IR
23 GLENDALE STREET 8 OCEAN AVE 23 WILLOW AVE
SALEM,MA 01970 SALEM,MA 01970 SALEM,MA 01970
' 33_0747_801 33_0633_801 33_0750_0
HANNIG TODD J DEVOE DAVID I FREDERICK 1 ATKINS TRUST
24 GLENDALE STREET 16 WILLOW AVE UNIT l 23 GLENDALE STREET
SALEM,MA 01970 SALEM,MA 01970 SALEM,MA 01970
33_0747_802 33_0633_802
' SMITH PATRICK E SNOW KATHLEEN A
24 GLENDALE STREET UNIT 2 16 WILLOW AVE U2
SALEM,MA 01970 SALEM,MA 01970
33_0747_803 33_0633_803
WEDBERG KYLE DUNKWATER JULIA C
24 GLENDALE STREET U3 16 WILLOW AVE UNIT 3
' SALEM,MA 01970 SALEM,MA 01970
33_0661_0 33_06320
DELANEY DENISE MOORS_ROBERT
' IOOCEANAVE 18 WILLOW AVE
SALEM,MA 01970 SALEM,MA 01970
33_0660_0 33_0631_0
' PATRIE BELUAH L MCBOURNIE ROBERT W
P O BOX 514 20 WILLOW AVE
KINGSTON,NH 03848 SALEM,MA 01970
' 33_0659_0 33_0621_0
LIMA DAVID WH,LIAMS DAVID
' 16 OCEAN AVENUE 21 WILLOW AVE
SALEM,MA 01970 SALEM,MA 01970
NOTICE OF INTENT
PROJECT DESCRIPTION
DION'S BOAT YARD
' SALEM, MASSACHUSETTS
June 17, 2008
LIST OF PLANS AND DOCUMENTS
' Identifvino Number/ Letter Title / Date
PLAN Plan to Accompany Notice of Intent in Salem, Mass.,, Dion's Boat
Yard; Hayes Engineering, Inc.; June 17, 2008 (1 sheet).
' A Project Narrative, Dion's Boatyard, Salem, MA; April 29, 2008
1
' PROJECT NARRATIVE
DION'S BOATYARD
SALEM, MASSACHUSETTS
April 29, 2008
Existing Conditions
' The subject locus is a commercial boatyard containing various buildings, a crane and a pier
with connected dock structures (walkways, ramps and floating dock) which are supported by
' wooden piles and. An old marine railway connected to the pier is located next to the dock
structures. Resource areas within the locus consist of Coastal Bank (defined by topography and
face of pier sheet piling (per DEP Coastal Bank Policy), Land Under Ocean/ Nearshore Area
' (defined as the area between mean low water and 80 feet seaward), and Land Subject to
Coastal Storm Flowage (FEMA Zone A4 at elevation 11' and Zone V3 at elevation 14'). Existing
and proposed site features and buffer zone boundaries are shown on the attached Hayes
t Engineering, Inc. plan titled," Plan to Accompany Notice of Intent in Salem, Mass, Dion's
Boatyard."
Pr000sed Conditions
Work proposed in this application will occur on the dock, pile, and railway structures, most of
' which are located below mean low water and thus within the Land under Ocean /Nearshore
area resource area. Temporary disturbances may occur on the pier within Coastal Bank and
Land Subject to Coastal Storm Flowage (L.S.C.S.F). resource areas. Since most work will
' occur within the footprint of existing structures or within existing areas of disturbance, the
project should have an insignificant impact upon the resource areas.
' Dock Reconstruction
This task consists of removing the 86-foot long wooden walkway extending between the pier
and floating dock and replacing it with two new 45-foot long floating dock sections which will be
connected to the pier via a new ramp. The existing floating dock will be retained and connected
to the new dock sections and associated wood piles will be removed or replaced as necessary.
New structures will be situated in the same general location as the existing structures.
Marine Railway Removal
1 Existing marine rail and support structures will be removed with as little disturbance as possible.
Regulations
tThese activities are subject to performance standards contained in the Massachusetts
Wetlands Protection Act Regulations and the Salem Wetland Protection Ordinance. These
standards and how the project will meet them are outlined below.
' 1
I
' Project Narrative, Dion's Boatyard, Salem, MA
' April 29, 2008
Wetlands Protection Act (310 CMR 10.00 et. all
Coastal Bank—310 CMR10.30
' The extent of the coastal bank resource area is represented by the top of the sheet pilling wall
along the pier, and generally at the top of the railway at the pier. This resource area will only be
temporarily disturbed during the rail removal process. .A review of the Natural Heritage &
Endangered Species Program Atlas (2006 edition) revealed that the project is not within any
' estimated habitat of rare or endangered species or priority habitat, and thus the project will not
have any adverse effect on such species.
' Best practical measures have been used in the design of the structure to ensure the coastal
bank's storm damage prevention role will be preserved. Refer to the attached plan for repair
details.
Land Under Ocean / Nearshore Area
' Minor and temporary disturbances to this resource area may occur within this resource area.
However, no permanent occupation of this resource area below the mean low water line will be
required to accommodate pile replacement and removal activities. The total number of piles will
be reduced and existing or replaced piles will be used for the new floats.
1
Salem Wetlands Protection Ordinance
' Float installation activities associated with the project are proposed within wetland resource
areas jurisdictional under the Salem Wetlands Protection Ordinance. As noted in the discussion
' above, project activities will only have a temporary effect on the buffer zone and resource areas
regulated under the Ordinance.
1
1 �
1
1
' 2
I
v CITY OF SALEM
i CONSERVATION COMMISSION
%TTF VISIT FARM
PROJECT LOCATION: n dw" cif V DAT OF SITE VISIT Z Z01g
PROJECT PROPONENTAjT DEP FILE NUMBER: G
PROPOSED WORK: QAY' AJQ Q ci,4" WMwif,t, MI..5o-U : ( f ta." l i-a
It I
IN ATTENDANCE:
Com iss'o eer / gent: - Abutters:
Jsouc
Applicant/Property Owner/Representative:
SITE VISIT PURPOSE _ ..
❑Request for Determination ❑Abbreviated Notice of Resource Area Delineation 'ONotice of Intent
❑Certificate of Compliance ❑Enforcement/Violation Emergency Informal
P g Y
�AREAS'bF]URISDICTION:. .� ..�.n � r ..
INLAND RESOURCE AREAS COASTAL RESOURCE AREAS
❑Bank ❑ Land Subject to CoastalLand Under the Ocean
Storm Flowage
❑Bordering Vegetated Wetland
❑ Designated Port Area ❑Coastal Beach
❑Land Subject to Flooding
❑ Coastal Dune ❑Barrier Beach
❑Land Under Water Bodies or Waterway
Nance: ❑ Coastal Bank ❑Rocky Intertidal Shore
❑Riverfront Area ❑ Salt Marsh ❑ Land Under Salt Pond
❑Vernal Pools ❑ Land Containing ❑Anadromous/Cata-
Shellfish dromous Fish Run
❑ Bordering Vegetated Wetland in Coastal Area
120 WASHING'[ON S'rneeT, SAt.eM, iv1ASSAa i USEMS 01970 .Tei,: 978.745.9595 FAX: 978.740.0404 . www.3.v.r:NTXOM
.r
J
BUFFER ZONE (within 100-feet)
❑Water Body ❑ Bordering Vegetated Wetland ❑ Bank ❑ Coastal Beach ❑Coastal Dune
INTERESTS PROTECTED:
❑Protection of Water Supply ❑ Protection of Groundwater Supply ❑Flood Control
❑Storm Damage Prevention ❑ Prevention of Pollution ❑Protection of Fisheries
❑ Protection of Wildlife Habitat ❑Protection of Land Containing Shellfish
Is this an exempt project: If so,why?
Are resource area boundaries delineated correctly? If not,explain.
SITE VISr -DOCUMENTATION:
❑Photos ❑ Site Map ❑Other:
OBSERVATIONS. a _z , ,; ..
Take into account relevant aspects or features such as: natural or piped drainage or obvious pollution;
topography; existing vegetation; possible alternative sites; signs of wildlife, possible vernal pools, rare species
habitat; landmarks; recent or historical disturbances; proximity to other water bodies or drainage areas;
adjacent land uses. \
V4 see e4u�
t� , �,, t �- a1 Q�✓ � r
u.
z ("
Rvl�- �;14a `b
RECOMMENDATIONS:.
o
SALEM j .
HARBOR °
WOOD
t��o'LP GAN" LOCUS , PILE °
nYP)
�y� a� Pte• D .` o�
o •,MHw
LOCUS MAP •�
SCALE: 1:10,000
EXISTING
81JI NG ZONE V3 (EL. = 14)
• \
BUILDING NG
9.5 t WOOD
10.5 PILE PROPOSED NEW ELECTRIC TO-
t 11><' 10 EXIST. (m'•) RUN ALONG NEW FLOATS
EXISTING 1 6 WATER
\_ WOOD
1 ® EXISTING WOOD
,7 0,3 10.6 1 PILE
BUILDING '/s/to.o t25 $TING SEA WALL t o (T1P)� PILE TO BE REMOVED PROPOSED
I = 11.7 9. g
100 �. . 17 2 10 4 t0.7 ,0 r. 9 03 10. . 2.T a 0.1 I�5 (M.) 45•x8.p'�K ATING PROPOSED
14(fFrER 2 p IVE �•., /^ 11.2 10.7 EX/S"T 10.0 'O Y 7-. ' .9 5' ,ELECTRIC x t0. x 45'x8.5�C FLOATING
EXISTING 10.2 ,o.3x
CRANE BU/LD/NG WOOD
= ss
S T 0 0 .
N
/ RAMP PR
OP: t
i GANG ..
to.o _
� •.,e a EXISTING
3
8.5 x
40
WIDE( E FLOA
TIN
_ G D
OCKS (TO REMAIN)
10.1 ,0.0� � ' 9.8 , S•T O N' .'. , : • . . 9 B /"'O ,_„•.f..z..,.• t .4 aEXIST. Q
a USE EXIST. WOOD PILES -j
TO SECURE / RAMP TO ` O O O O
o E : . . • . �° to.3 oto.
t t z PROP. FLOATING DOCK MSL WOOD
tt 12.2 (PROP. PILES IF NECESSAI PILE (TYP) BE REMOVED G (IYPPOLE -10 O
10.0 10.5 .0� 1 2.7 EXIST. PIER TO
i ^-- 5 t 0 EXIST• OLD MARINE R.R. BE REMOVED
ONCRE7E t o.D_ ^ ^-•' 9 8 / 1 . . •ucvr'Pot£• t
10.5 METAL 1 W/£[£&7F/C I .dTO BE REMOVED
10.5 10.4
WASH PAD\ t0 5 .9 0 LANDING .8 •10.4 '10.5 • ',l. (n'?J.10.4 • .1• ..• g ! ) 2.3
1 PIa9.41 ®9.4� STfM6 SEA WgE
i WOOD 1.1 10.7 1.9 9.6 103 t
-10 -
10. ,0.51 10.5 gip) EXISTING 8.5' WIDE FLOATING DOCK
10.0
1ttnn0.6 1.1
�` 10.5 12. i 13.2 .10 YS.(S4
ZONE A4 (EL.= 11 ) ---- ,0 --
6.1
�'�� 9 1 1o.a 8.5' WIDE FLOATING DOCK 5.3
CB ' 41 10.4 RAMP
AMP
SHAPED
R-7.98
EX I BU/LU/NG
-•-�_ NG BRAIN
9.
3NZONE V3 (EL. = 14)
FREDERICK J.
.., TKN
S TR , tNOFMss
c
WEET
W
123 GLENDALE
o y
/ • - // . 8.8 'LLO AVE STR < PETER J.
// -- 33 0750 OGREN
#33604
Woks'
gg
WILLOW AVE �OFessKri'oP
O NVE $(
o zo i � REALTY
UREr
0 3 - TR.
/ a o �o s o 3 LAUROVE L Ls
/• / W 3 y HOOVER
/ ohm o� 9z2wliow SALEM ��� t9,1��
` „ 33 o6ao H A R B O R ,Q /�r/� ¢ /�
EXISTING & sot-eG3 / IG / C o /"1 ci �i Ompany
BUILDING
ROBERT C,. 3
#15 CLEND
AMODEOua /A,/ tic
/�
STREET x�o I r o ti V Of Intent i/ /
33 0644 N.P"in /�oFREDERICK J. 5AZC I�W IWASSo
GLENDALE STREET ATKINS TRUST
STREET #23 GLENDALE
R STREET Hayes Engineering, Inc. Telephone.- 781.246.2800
�a 33 0646 Civ// Engineers & Land Surveyors Facsimile.- 781.246.7596
.. o a
Toon J 603 So%m Street wFVFv hoyeseng.com
PATRICK•Et,S ANlTH
!'24 DSEEtR�G Wakefie/d, MA 01880
N CIO STREET
so 0' so'
° Scae1 = 204 ✓une 17, 2008
NOTES:
1.) PERIMETER INFORMATION SHOWN HAS BEEN COMPILED FROM SITE DETAIL PLAN ^I �'`
PREPARED FOR FEDERICK J. ATKINS TRUST BY T & M ENGINEERING ASSOCIATES oo Bom
z o ` zaN o D I O i V ' J BOAT YARD
36 ORCHARD CIRCLE SWAMPSCOTT, MASS. UPDATED THRU 03/09/1993. _� p: 3EDERICK �, OWNER: FEDERICK J . ATKINS TRUST
z j
ATKINS S TRUST
d 2.) THE EXISTING DOCK SYSTEM AND FLOAT FEATURES SHOWN WERE LOCATED BY cw � S4 GLENDALE
HAYES ENGINERING INC., DATED DECEMBER 13, 2007. OCEAN �' M 3'3 o74s #23 GLENDALE STREET
3.) DATUM IS N.V.G.D. AVE ASSESSORS MAP 33 PARCEL 646
p FREDERICK J.
p ATKINS TRUST
,; 4.) THE ZONE A4 (EL.=11) & ZONE V3 (EL.=14) WERE TAKEN FROM CITY OF SALEM, MASS . `�""��.�� #23 GLENDALE DEED REF. BK. 6618 PG. 82
5 F.I.R.M. COMUNITY PANEL # 250102 0005. EFF. DATE AUGUST 5, 1985. 3STREET 47
J
Q
u Z