Loading...
64-211 - 18 FREEMAN ROAD - CONSERVATION COMMISSION �1�1- Z\� � 18 M,sn.� i2 .b � .i �,�� -�r�✓�,, Qom-e.c Abe. —���e��� ��, -. ,..:� r 310 CMR 10.99 DFP Me No 64-211 ( (To be provided by DEP) Form 7 Salem APpbCssi Daniel Archibald _ cosmawealth of Xassachusetts EXTENSION PERMIT MA88ACHD8ETT PETLA13D1 PROTECTION ACT G.L. Frons Salem Conservation Commis i Issuing Antb=itp.-- Daniela h;ha;A 48 Nahant Street Wakefield Tot (Name) (Address) The order of conditions(or Extension Permit) issued on 18 Freeman 3, 1993 (date);_- to Daniel Archibald (name) for work at 18 Freeman Road Salem, MA (address) is hereby extended for a period of years(s) from the date it expires. This Extension Permit will expire on February 3 1997 (date► This document shall be recorded in accordance with General condition 8 of the order of conditions. ..... ..... . . . . . . . . . .. . .. . . . . . . . . . . .. . . . .. .. •••• • ..••.•• •• . • (Leave space Blank) ' 7-1 Effective 11/10/89 issued by Salem Conservation Commission J signaturelsl I, J I✓ / 4 J when issued by the conservation commission this Extension Permit must be signed by a majority of its members. _ on this >oe Sof( rh day of 19 before before me personally appeared T�1F hA�l to me known to be -thee. person described in and who executed the foregoing instrument and acknowledged the he/she executed .the same as his/her free act and deed. GC7' rotary Public My commission expires Detach on dotted tiro and uAtait to the Salem Conser^^';^^ �,,,.,,,, odor to commencement of mark. ............................................................... Issuing Authority TO please be advised that the Extension permit to the Order of Condition$ for the project at File Number has been recordom et the Registry Of and has been noted in the chain of title of the affected property in accordance with General Condition O of the orfptrol order of conditions on 19 if recorded land, the instrument saber which identifies this transaction is if registered lend, the docunent rxarber which identifies this Transaction is Applicant Signature 7-2 JOHN R. KEILTY, COUNSELOR AT LAW 40 LOWELL STREET TELEPHONE (508) 531-7900 PEABODY, MA 01960 �qy®y��,ppc�� FACSIMILE (508) 531-2479 RIN Y,e F.' lY'�td 041 -errrra1l� � Hand Delivered December 7, 1995 Conservation Commission City of Salem Two Salem Green Salem, MA 01970 Attn: Beth Debski RE: FREEMAN ROAD - ORDER OF CONDITIONS Dear Ms. Debski: This letter will serve as a formal Request for an Extension of the Order of Conditions, a copy of which is enclosed herewith, for Freeman Road in Salem, Massachusetts. Please be advised that no construction has been commenced. As you are perhaps aware. The approval process was quite cumbersome and time consuming. At the end of the process, my client, Daniel Archibald, began to experience financial difficulties and it is only now that he has been able to address the issue of either sale or development of the lot. Could you kindly place this matter on the agenda for consideration on December 14, 1995. Very truly yours, 0, t. Kei1't �sgyrirl� JRK/emb 310 CHR 10.99 ' l DEP File No. 64-211 (To be provided by DEP) Form 5 citflrmq SALEM Applioat Daniel Archibald coa®onvealth q k , .'u _ '71. �i�y of Xassachuaetta 02/11/93 11:53 Inst 221 Order of Conditions Massachuetts Wetlands Protection Act G.L. c. 131, 540 From Salem Conservation Commission Issuing Authority To Daniel Archibald Same (Name of Applicant) (Name of property owner) Address G8 Nahant St. , 1,7ahefield. - Same _. iudraea This order is issued and delivered as follows: ❑ by hand delivery to applicant or representative on (date). by certified mail, return receipt requested on f4' O(kW 1OR') (date) This project is located at 18 Freeman Road The property is recorded at the Registry of 1'ssex 8459 457 Book Page certificate (if registered) NA The Notice of Intent for this project, was filed on October 22, 1992 (date) The public heaziny was clos_d on December_10i1992 .__ (date) Findings The Commission has reviewed the above-referenced Notice of Intent and plans and has held a public hearing on the project. Based on the information available to the Commission at this time, the Commission has determined that the area on which the proposed work is to be done is significant to the following interests in accordance with the Presumptions of Significance set forth in the regulations for each Area Subject to Protection Under the Act -(check as appropriate): Public water supply Flood Control L.I Land containing sheilfish Private water supply Storm damage prevention L�,JJ Fisheries Ground water supply Prevention of poilution� Protection of Wildlife Habitat Total Filing Fee Submitted $250.00 State Share 112.50 (1/2 fee in excess of $25) City/Town Share S137.50 Total Refund Due f City/Town Portion S State Portion[ (1/2 total) (1/2 total) Effective 11/10/89 5-1 BK 11742 PB 46 Therefore, the Commission hereby finds that the following coroitions are necessary, in accordance with the Performance Standards set forth in the regulations, to protect those interests checked above. The r--- orders that all work shall be performed in accordance with said conditions and _ 4with the Notice of intent referenced above. To the extent that the following - conditions modify or differ from the plane, specifications or other proposals submitted with the Notice of intent, the conditions shall control. General Conditions 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this order. 2. The order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 4. The work authorized Hereunder shall be completed within three years from the date of this order unless either of the following apply: (a) the work is a maintenance dredging project as provided for in the Act; or (b) the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance and both that date and the special circumstances warranting the extended time period are set forth in this Order. 5. This order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the order. 6. Ary f: 11 used in conne_tion with thi•+ project nail be clean fill, contaiTi�ny no trssh, refuse, rubbibh or debris, in.luding Lut not limite� to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts of any of the foregoing. 7. No work shall be undertaken until all administrative appeal periods from this order have elapsed or, if such an appeal has been filed, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Final order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final order shall also be noted on the Land court certificate of Title of the owner of the land upon which the proposed work is to be done. The recording informatin shall be submitted to the Commission on the form at the end of this Order prior to commencement of the work. 9. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection, File Number 64-211 10. where the Department of Environmental Protection is requested to make a determination and to issue a Superseding order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 5_2 BK 11742 PG 47 11. upon completion of the work described herein, the applicant shall forthwith request in writing that a Certificate of Compliance be issued stating that the work has been satisfactorily completed. 12. The work shall conform to the following plans and special conditions: Plans: Title Dated signed and stamped by: on File with: Site Plan for Daniel Archibald 3/13/92 Christopher Mello Conservation Cormiission nReplication Methadnt„py in/6/97 Soruner Environmental Tech Conservation Commission TaauyaYeHyaorglaia 11/12/92 Conservation Commission Special Conditions (use additional paper if necessary) SEE ATTACHED CONDITIONS (Leave Space -Blank) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3A r BK 11742 PG 48 Pians: Title Dated Signed and Stamped by: On File with: SEE PLANS ne* V-E� Pte_ special conditions (Use additional paper if necessary) (Leave space Blank) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . 5-38 BK 11742 FIG 4 issued By c,tom Conservation commission sign to e( ) This ord r t S signedy a majority of the conservation commission. on this / day of /11f 1U 1Cr19before me personally appeared -I-& /1 boUo, n)aj e d , to me known to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed the same as hie/her free act and deed. Notary Public My off' s) nexpires The applicant, the owner, any person agrrieved by this Order, any owner of land abutting the land upon which the proposed work is to be done, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the Department of Environmental Protection to issue a Superseding Order, providing the request is made by certified mail or hand delivery to the Department, with the appropriate filing fee and Fee Transmittal Form as provided in 310 CMR 10.03(7), within ten days from the date of issuance of this determination. A copy of the request shall ns at the saw time be sent by certified mail or hand delivery to the Conservation Commission and the applicant. Detach on dotted line and submit to the r,,,,„,.,; prior to commencement of work. ............................................................................................................ To Salem Conservation Commission Issuing Authority Please be advised that the Order of Conditions for the project at 18 Freeman Road File Number 64-211 has been recorded at the Registry of and has been noted in the chain of title of the affected property in accordance with General Condition 8 on ,19 If recorded land, the instrument ranber which identifies this transaction is If registered lanai, the document nanber which identifies this transaction is Signature Applicant 5-4A E K 11742 PG ' 50 ' zssued by the Deparcment of Environmental Protection Signature on this day of 19 , before me personally appeared to me known to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed the same as his/her free act and deed. 1 Notary Public My commission expires The mppl icent, the owner, Any person aggrieved by the Superseding Order, any owner of lard abutting the land upon which the proposed work is to be date, or any ten personis pursuant to G.L. c.30A 1110A, are hereby notified of their right to request an adjudicatory hearing pursuant to G.L. c.30A, 510, providing the request is made by certified mail or hard delivery to the Department, with the appropriate filing fee and - Fee Transmittal Form as provided in 310 CMR 10.03(7), within ten days from the date of issuance of this Superseding Order, and is addressed to: Docket Clerk, Office of General Counsel, Department of Environmental Protection, One Winter Street, Boston, MA 02108. A copy of the request shaLL at the same time be sent by certifi d mail or hand delivery to the Conservation Commission, the applicant, and any other party. A Notice of Claim for an Adjudicatory Hearing shall comply with the Department's Rules for Adjudicatory Proceedings, 310 CMR 1.01(6), and sha(L contain the following information: (a) the DEP Wetlands File Number, name of the applicant and address of the project; (b) the complete name, address and telephone number of the party filing the request, and, if represented by counsel, the name and address of the attorney; (c) the names and addresses of all other parties, if known; (d) a clear and concise statement of (1) the facts which are grounds for the proceedings, (2) the objections to this' Superseding Order, including specifically the manner in which it is alleged to be inconsistent with the Department's Wetlands Regulations '(310 CMR 10.00) and does not contribute to the protactmon of the interests identified in the Act, and (3) the relief sought through the amjudicatory hearir:, i,.coxning sut!,Jficalty the _:angel desired in the Supersedine Ord, (e) a srateneot coat a c_oy of the raqu.st her been sent to the applicant, the ,:onser'aticn commission and each other party or represent.,tive of such party, if known. Failure to submit all necessary information may result in a dismissal by the Department of the Notice of Claim for an Adjudicatory Hearing. Detach an dotted lire and submit to the Prior to commencement of work. ............................................................................................................ To _ Issuing Authority. Please be advised that the Order of Conditions for the project at File Number has been recorded at the Registry of and has been noted in the chain of title of the affected property in accordance with General Condition 8 on 19 If recorded Land, the instrument number which identifies this transaction is If registered land, the document number which identifies this transaction is Signature Applicant 5-4B BK 11742 PG 51 Notice of Intent (64-211) with revised pages 3-5 and 3-6 signed by the applicant September 18, 1992 . Site plan for Daniel -Archibald, Eastern Land Survey Associates, Inc. , dated March 13 , 1992 . Revised July 24, 1992, December 1, 1992 , and December 10, 1992 , and December 11, 1992 . Replication Methodology, Sommer Environmental Technologies, Inc. , dated October 6, 1992 . Drainage Calculations, entitled TR-55, Tabular Hydograph Method, executed November 12 , 1992 . SPECIAL CONDITIONS 1. All work shall conform to the above-referenced Notice of Intent, site plan and supporting documents and those final specifications which shall be filed with the Commission prior to construction. Any change made or intended to be made to the approved plans shall require the applicant to inquire of the Commission in writing whether the change is substantial enough to require the filing of a new Notice of Intent. 2 . *Members and agents of the Commission shall have the right to enter and inspect the premises at all reasonable times to evaluate compliance with the conditions in this Order. The Commission may require the applicant to submit additional data or information necessary for the Commission to conduct that evaluation. 3. Upon completion of this project, the applicant shall submit, with the request for a Certification of Compliance, an affidavit, prepared by a professional engineer or land surveyor duly registered in the Commonwealth of Massachusetts, stating that the site has been developed in accordance with the requirements of this Order of Conditions, the referenced site plan and supporting documents. 4 . This Order shall apply to every successor in control or successor in interest of the property described in the Notice of Intent and accompanying plans or part thereof. In the event this land or any part thereof changes ownership before or during construction, the current owner shall notify the new owner, by registered mail, of this Order prior to the transfer of ownership and shall forward proof of this notification to the Commission. 5. Haybales identified on the site plan and discussed in the Sommer document shall be anchored with stakes and entrenched 4 to 6 inches in depth. Trench material shall be deposited on the upgradient side of the haybale barrier. Haybales shall be inspected daily by applicant or his agent; those showing signs of deterioration shall be replaced immediately. The haybale barrier shall remain in proper functioning condition until all disturbed areas have been stabilized. BK 11742 PG c 6. Additional erosion and sedimentation control measures deemed necessary by the Commission shall be instituted by the applicant. Any siltation caused onto any wetland or waterway area shall be promptly reported to the Commission. Such areas shall be restored to the satisfaction of the Commission. 7. During construction, no debris, fill, or excavated material shall be stockpiled within 100 feet of designated wetlands. Any other stockpile location will be protected sufficient to prevent sediment from surface runoff entering wetlands. 8. Equipment servicing must be conducted outside the buffer zone. Equipment must be maintained to prevent leakage or discharge of pollutants. No overnight equipment storage shall occur within 100 feet of the wetland boundary. 9. *No spill or discharge of petroleum products or other pollutants will be allowed into any wetland resource area or land within the buffer zone. 10. *Use of rock salt (sodium chloride) or other toxic de-icing chemicals within the project area is prohibited and any arrangement for snow removal shall so stipulate. None of these agents shall be stored onsite. 11. *The applicant will refrain from depositing snow in such a way as to increase runoff for abutters. 12 . Notice shall be given to this Commission no more than two weeks nor less than 2 days prior to the commencement of site preparation, blasting and of construction activities. Said notice shall include, in writing, the name(s) , address (es) , and business and home telephone numbers of the project supervisor(s) responsible for insuring that operations are conducted in compliance with this Order. 13 . *There shall be minimal pruning and no removal of any buffer zone or wetland vegetation downgradient of the staked haybale line delineated on the site plan. 14 . All disturbed soils shall be immediately and similarly re-vegetated upon completion of construction activities or shall be mulched until the next growing season. 15. *Fertilizers used for landscaping and lawn care shall contain a low nitrogen content and be used in moderation. Pesticides and herbicides shall not be used within 100 feet of the resource area. 16. The applicant will provide the Conservation Commission with a $3, 000 bond to ensure the success of the wetland replication project. The bond will be used by the Commission to hire a consultant to assess whether the performance specifications of the replicated resource area identified in the Sommer Environmental Technologies report have been achieved after two growing seasons. If the Commission's consultant determines the specifications have not been met, the Commission will hire a contractor with the remainder of the bond to re-replicate and/or revegetate. The consultant BK 11742 Ply 53 and the contractor may not be the same entity. 17. * Permanent iron markers exposed visually at least 3 feet above the high water mark shall be installed at flags 10, 9, 8A, 2 , 2A, 1 and lA on the site plan to identify the outline of the resource area. No organic material will be deposited in the resource area. 18 . The deed recorded for lots 630A and 631A will include a description of the precise locations of the seven iron markers identified in special condition #17 and indicate that they are to remain in perpetuity. 19. The applicant will submit a plan for the Commission's approval prior to commencing work that describes steps to assure the free flow of water through the twin 18 inch drain pipes under the driveway. The plan should also include a description of methods to be employed to prohibit small children and animals from entering the pipes. 20. * Any discrepancies between the Notice of Intent and related documents will be resolved in favor of the special conditions. 21. The material in the "stockpile" identified on the site plan will be properly disposed. 22 . During construction of the replication area, a Clerk of the Works identified by the Conservation Commission will be on site, at the applicant's expense. 23 . During the growing season immediately following construction the applicant will plant a minimum of 8 Evergreen trees along the driveway abutting the Erps property. The trees will be evenly spaced, however, the trees will not be placed within 5 feet of either side of the pipe. Any tree that dies within one (1) year of its planting will be similarly replaced. The trees will be properly nourished and maintained to reduce sedimentation to the resource area. 24. In addition to conducting the pre-blast survey required by the City of Salem's Ordinance 12-70, the applicant will instruct his blasting contractor to perform blasting such that changes to bedrock groundwater flow patterns will be minimized. 25. Abutters within 300 feet of the blasting area will be notified by certified mail within 48 hours prior to construction and/or blasting . * Conditions noted by asterisks are ongoing and do not expire upon completion of the project or issuance of a Certificate of Compliance. jm/jm/specond.memo J71 P JOHN R. KEILTY, COUNSELOR AT LAW 40 LOWELL STREET TELEPHONE (508) 531-7900 PEABODY, MA 01960 FACSIMILE (508) 531-2479 RECEIVED NOV 2 5 1992 . Swam November 20, 1992 Salem Conservation Commission 2 Salem Green Salem, MA 01970 Attn: Debra Hurlbert, Planning Assistant RE: DEP #64-211 Dear Ms . Hurlbert: Enclosed please find an Amended Notice of Intent which has been forwarded to the Regional Office of the Department of Environmental Protection. Very truly yours, John/R. KeiTft�, � uire JRK/emb Enclosure 4$LteFF[ • • 5 Y Quick. TR:-55 Version: 4. 04 S/Nz 8 s;1109t:, Pace 1 of TR'-55 TABULAR Hv1?h-:OGt=:t=3r-'k-1 METHOD Type ll % Distribution i24 hr . Duration Storm) ,_::.::er=utedn 11-12-1992 992 1-'a 4`-.'. 42 Watershed File ----.> C:. iFREEMAN . WSD Hydrogr ph File Cg FREEMAN HYD 100 S&rZ .PSdYC. 12JNPFf input Parameters Used to Compute HydrograQh << Q: . ---------------------------------------------------------------------------------- ...n_,ha.t' ea 1-L.....t, t.r T C r i t Precim. r ru-G{ � _ r O LEsCI1CLiGiid_ieb; Fs. - 5; ! lf i ( '_< ri .:. ------------------------------------------ - Travel ras r _iRF from subarea-=_ outfall to composite w. . Loutfall point. Total area = 3. 00 acres or 0. 00469 so. mi Peak discharge =.. 17 cls >>>> Computer Mudifirations of inout Parameters <Y<Q: --------------------------------- -- --- --- ---------------- Input Values RoMer._J iVa:i.u,_:is 1a ._. Subarea Tc ;. ; :_ ?:_. nts,roC:l.-at.;:;r.:i 1a/r; Description I ?r : t n r (hr) (hr) (Yes/Nb)C_t; ME:.c:;+_:aqs._. 1 00 0. 30 0. 00 No Computed .I, ;n < . 1 PACE Z o Z . { I . � O CHART 5 F 2000 h 1 � Mwi _ e O 4 1000 J UMMK A0 OUTLET CULVERT Flpw,MG FULL � 5 800 120 w.w emw wa wa.�.wa,eenww ww ey .6 600 108 8 300 96 M.0;—!i 1.0 400 B4 / 300 72 66 / E 200 60 (F'.(. w 2 01, LL LLti 54 / 2 Uf D•�8 / lw 48 •u0 00 i / F• W 100 /? 42 /,• OO Sp° �'y .4 0 rY U 80%o Z '� _ 4 60 50 F 33 / App �Op 6 W 30 F 40 Q hop r' O 6 a 27 i P 30 O .a F10 20 2� 8 120 0 Is 8 �S6 Z — 16 " 2C. P1pES 12 OE JF1-11 .1 M) eY. 5 � P = ) 1 C 4 F S �ZPJ2 = 5. 5 C HEAD FOR CONCRETE PIPE CULVERTS FLOWING FULL SUNEGU D pU C nAM .IAN_ *63 n = 0.01" 185 ia��mon Ufrar C" BM Park H 0- 4 weli v Endico H St \�v i�i Bowdi ---Ob pi Fr e tu n., ark. i Wa te� Tl 4 4 ll"u 'Sch! ;> Salem c" IWI LL) So St VN Golf Course Hsi,,,,, H LA N Q PARK /'44 X N Pj A"f, A4 I MILE Primary 6000 7000 FEET I hard su 1 K11OMFTFP \ 1 `:'ssr� _ �\�����1� e\ /�� �7��j.,b`„� 1' %1�,�Q��II�•+71E� .' ♦, ► ._ L -- 4 ` -mmadW 6c gfi Wi pp ,6w raw 6w milli �.�OW =�1 Im �i A1C it/�s�ie��������ii������ MW - Im1�� -.Lw • �TcF R. 19 c 7 HIM rd, Pill WN 310 CMR 10.99 I, Form 3DEP FN No. Commonwealth (T20 De pOY�W DEP) . of Massachusetts- Gty,Tow Salem Daniel Archibald Agivicant Notice of Intent- Under the Massachusetts Wetlands Protection Act, G.L. c:131, §40 and Application for a Department of the Army Permit Part I:General Information 1. Location: Street Address Freeman Road, Salem, Massachusetts Lot Number631A�A Residential 2. Project:Type Construction Description Construction of an extension of roadway providing turnaround potential and residential structure (32 x 26) within -------Buffer Zone-of-inlandresource_ area. 8459 8 Page 457 3. Registry:County Essex Current Bool Certificate(If Registered Land) Not Applicable Tel. (617) 246-3670 4. Applicant Daniel Archibald 48 Nahant Street, Wakefield, MA 01880 Address Tel. (617) 246-3670 5. Property Owner Daniel Archibald Address 48 Nahant Street, Wakefield, MA 01880 6. Representative John R. Keilty, Esquire Tel (508) 531-7900 Address 40 Lowell Street, Peabody, MA 01960 7. a. Have the Conservation Commission and the Department's Regional Office each been sent, by certified mail or hand delivery, 2 copies of completed Notice of Intent,with supporting plans and documents? Yes [0 No =_ b. Has the fee been submitted? 2 Yes C No c. Total Fling Fee Submitted $250.00 $112.50 d. Citylfown Share of Fling Fee $137.50 State Share of Filing Fee (sent to City/1 own) ('h of fee in excess of$25. sent to DEP) e. Is a brief statement attached indicating how the applicant calculated the fee? �u Yes ❑ No Effective 11110189 8. Have all obtainable permits,variances and approvals required by local by-law been obtained? Yes ❑ No 13 Obtained: Applied For: Not Applied For: Extension of Roadway Building Permit Sewer Connection 9. Is any portion of the site subject to a Wetlands Restriction Order pursuant to G.L.c. 131, §40A or G.L. c. 130. §105? Yes C No K 10. List all plans and supporting documents submitted with this Notice of Intent. Identifying Number/Letter Title, Date A Site Development Plan of Land located in Salem, MA, prepared by Eastern Land Survey Associates, Inc. for Daniel Archibald dated March 13, 1992, revised July 24, 1992. B Locus Plan. 1 1.Check those'resource areas within which work is proposed: (a)x—x Buffer Zone (b) Inland: 12 Bank' Land Subject to Flooding, :Kx Bordering Vegetated Wetland' C Bordering xa Land Under Water Body 8 Waterway' El Isolated (c)Coastal: C Land Under the Ocean' ❑ _Designated Port Area' C Coastal Beach' ❑ Coastal Dune Barrier Beach C Coastal Bank Rocky Intertidal ShoreC Salt Marsh' Land Under Salt Pond' Land Containing Shellfish' C Fish Run' Likely to involve U.S.Army Corps of Engineers concurrent jurisdiction. See General Instructions for Completing Notice of Intent. 3-2 12. Is the wetland resource area to be altered by the proposed work located on the most recent Estimated Habitat Map(if any)of-rare, "state-listed"--vertebrate and invertebrate animal species occurrences provided to the conservation commission by the Natural Heritage and Endangered Species Program? YES [ ] NO [x] Date printed on the Estimated Habitat Map issued NO MAP AVAILABLE [ ] (if any) October, 1987 If yes, have you completed an Appendix A and a Notice of Intent and filed them, along with supporting documentation with the Natural Heritage and Endangered Species Program by certified mail or hand delivery,so that the Program shall have received Appendix A prior to the filing of this Notice of Intent? YES [ ] NO [ ] 3-3 1 Part If:Site Description Indicate whichof-the following-information has been provided (on a plan,in narrative description or calcula- tions)to clearly;completely and accurately describe existing site conditions; Identifying Number/Letter (of plan, narrative or calculations) Natural Features: Soils A Vegetation A Topography A Open water bodies(including ponds and lakes) A Flowing water bodies(including streams and rivers) A Public and private surface water and ground water supplies on or within 100 feet of site Maximum annual ground water elevations with dates and location of test A Boundaries of resource areas checked under Part I, item 11 above Other Man-made Features: - - -- — - A-------Structures-(such-as buildings;piers,-towers and headwalls)-- A Drainage and flood control facilities at the site and immediately off the site, including culverts and open channels (with inverts),dams and dikes A Subsurface sewage disposal systems A Underground utilities A Roadways and parking areas A Property boundaries, easements and rights-of-way Other Part III:Work Description Indicate which of the following information has been provided(on a plan, in narrative description or calcula- tions)to clearly.completely and accurately describe work proposed within each of the resource areas checked in Part 1. item 11 above. Identifying Number/Letter (of plan, narrative or calculations) Planview and Cross Section of: A Structures(such as buildings, piers,towers and headwalls) A Drainage and flood control facilities, including culverts and open channels(with inverts). dams and dikes A Subsurface sewage disposal systems&underground utilities A Filling,dredging and excavating, indicating volume and composition of material Compensatory storage areas, where required in accordance with Part III, Section 10:57 (4)of the regulations Wildlife habitat restoration or replication areas A Other 10.57 (4)(a) bordering land subject to flooding. Point Source Discharge Description of characteristics of discharge from point source(both closed and open channel),when point of discharge falls within resource area checked under Part I,item 11 above,as supported by standard engineering calculations,data and plans,including but not limited to the following: 3.4 AMMENDED PAGE 5 1. Delineation of the drainage area contributing to the point of discharge: Y Pre•and post-development peak run-off horn the drainage aria.-at the point of discharge;for at least the.- 10-year and 190-year frequency storm: -3.- Pre-and post-development rate of infiltrati6tii'tontcibuting io'the resource area checkedunder Part 1.item 11 above: 4. Estimated water quality characteristics of pre-and post-development run-off at the point of discharge. Part IV:Mitigating Measures 1. Clearly.completely and accurately describe.with reference to supporting plans and calculations where necessary: (a) All measures and designs proposed to meet the performance standards set forth under each re- source area specified in Part II or Part III of the regulations:or (b) why the presumptions set forth under each resource area specified in Part 11 or Part III of the regula. tions do not apply. Coastal Resource Area TyGe: Identifying number or letter B +^lend Bordering Vegetated Wetland o+w000rtdocuments Installation of haybales and area to be replicated A Alteration of 150 square feet of Bordering Vegetated A Wetland. Replication of 150 square feet of Bordering Vegetated A Wetland. 'Coastal Resource Area Type: Identifying number or tetter $ Inland 10. 54 Bank of su000rt documents This project proposes to construct a driveway with a culvert across an intermittent stream including an installation of a culvert pipe. A The current bank and stream bed consist of an excavated ditch. This .proposed crossing will not alter the carrying capacity of the channel and the present condition does not provide habitat . 35 AMMENDED PAGE 6 Coaster Resource Mee Type: _ identifying number or letter S "and 10. 56' LAND UNDER WATER BODIES ofs0pportdoeuments The installation of a culvert pipe for. the driveway will not alter the water carrying capacity of the stream. Water quality will A not be effected. The'inte'imitanE stream does not support a fishery or wildlife habitat . 2. Clearly,completely and accurately describe.with reference to supporting plans and calculations where necessary: - - - ---- - — —(a)--all-measures.and"d@signs.to-regulate work within the BufferZone so as to ensure that said work does not alter an area specified in Part I,Section 10.02(1)(a)of these regulations;or (b) if work in the Buffer Zone will alter such an area,all measures and designs proposed to meet the performance standards established for.the adjacent resource area specified in Part II or Part Moll these regulations. M Coastal Resource Area Type Bordered By I00•foot Discretionary Zone: tdentarong number or tetter Q Intend Bordering Vegetated Wetland of support documents Erosion and sedimentation control by haybale barrier A 318 t• 7 Pert V:Additional Information for a Department of the Army Permit 1. COE Application No. - 2. - Ito be provided by COE) (Name of waterway) 3. Names and addresses of property owners adjoining your property: . 4. Document other project alternatives(i.e., other locations and/or construction methods, particularly those that would eliminate the discharge of dredged or fill material into waters or wetlands). 5. 81/2" x 11" drawings in planview and cross-section, showing the resource area and the proposed activ- ity within the resource area. Drawings must be to scale and should be clear enough for photocopying. Certification is required from the Division of.Water Pollution Control before.the Federal permit can be issued.Certification may be obtained by contacting the Division of Water Pollution Control,l Winter Street, Boston, Massachusetts 02108. Where the activity will take place within the area under the Massachusetts approved Coastal Zone Management Program,the applicant certifies that his proposed activity complies with and will be conducted in a manner that is consistent with the approved program. Information provided will be used in evaluating the application for a permit and is made a matter of public record through issuance of a public notice.Disclosure of this information isvoluntary,however,if necessary information is not provided,the application cannot be processed nor can a permit be issued. I hereby certify under the pains and penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents and supporting data are true and complete,to the best of my knowledge. Signature ofApplc Date Amended: 11/20/92 IgnatureofA licant'sRepresenta Date Amended: 11/20/92 FORM "Eurpuon to ENG Form 4346 =pprored by XQUSACE. 6 May 1982- N NED V 100 (TEST) 1 MA 1 82 TSi. doaum ant cont.tn. . joint Depem rteet of the Army =od St= ate of Me...thea t. epplabn . o for a permit to obtain permunoo to perform aen.itio in United Stetee .aur=. The Office of M....em<et and Budget ZOMBI bu .pp...ed thou Que.t,00.r.,.ir,d by the US Army Carp. of Enpne.... OMB Number, 0702.0036 and ..prwoo date of 30 September 1983 apple. Thu =utemeot will be .et m 6 pomt type - 3-7 t SOMMER ENVIRONMENTAL TECHNOLOGIES INC. 65 NEW SALEM STREET WAKEFIELD, MASSACHUSETTS 01880 TELEPHONE (617) 246-5360 REPLICATION METHODOLOGY Daniel Archibald October 6, 1992 Freeman Road, Salem, MA I. - Haybale Location and Installation A single, continuous row of staked haybales shall be installed along the border of the wetlands as indicated on the Plan (Site Development Plan of Land, Revised July 24 , 1992 , By Eastern Land Survey) . This row shall extend the length of the wetland as indicated in order to provide erosion and sedimentation control as recommended in "Erosion & Sedimentation Control guidelines, DEQE, 1983 . 11 Haybales furnished shall be twice looped with wire or other cordage resistant to rot . Haybales shall be set in an excavated trench 611 deep, oriented with the wire loops parallel to the surface contour, tightly butted to adjacent bales, and staked with two 211x211x31 stakes or sections of Irebar' spaced equally in the bale and driven solidly into the underlying material. No spoil from the excavation of the trench shall be placed or stockpiled in the adjacent wetlands (see plan) . NOTE: Additional haybailing required by the Commission during the project duration shall also be provided and installed in accordance with the previous paragraph. II. - Excavation of Replication Areas All trees, topsoil, and subsoil shall be excavated from the replacement areas to a uniform rough grade at an elevation 6" below the proposed final grade. All excavated materials shall be removed from the work area via the upland (northerly) side of the wetland work area. No heavy equipment shall pass the line of staked haybales during this work. The contractor shall take all necessary measures to protect unremoved trees and shrubs against damage from machinery and from excavated materials. Through the operation of a backhoe, "Grade-All" , or other equipment with boomed remote excavation capability, sub-soil in thereplication area shall be removed such that the final grade of the excavated soils shall be lowered to provide a slope from approximately elevation 99 to elevation 98 . All excavation accomplished under this section shall be performed in a such manner that no heavy equipment shall enter onto the final grade, that is, excavation to final grade shall commence in the easterly section of the removed area and progress evenly westward. During excavation of the crossing, the organic soils should be collected and stockpiled for use in the restoration area. Once the restoration site is prepared, the organic material from the crossing shall be deposited within the area. III. - Revegetation of Replicated Wetland It is fully expected that opportunistic and indigenous wetland plants will revegetate the Replicated Wetlands. The organic soils placed in the wetlands should contain ample rootstock, seed and spore material to provide for regeneration SOMMER ENVIRONMENTAL TECHNOLOGIES, INC. required by 310 CMR 10. 55 (4) (b) (6) . The remaining surface of the newly created replacement wetland shall be sown by hand with seed of Reed Canary Grass (Phalaris arundinacea) , Bluejoint (Calamaarostis canadensis) , a Fowl Meadow grass (Glviceria sp. ) or acceptable substitute. This seed shall be raked into the upper 1/4" of the replaced soil by hand and mulched with hay. IV. - Maintenance of Planted Wetland. Vegetation Following planting and seeding of the replicated vegetated wetland, the area shall be inspected on a weekly basis and shall receive any necessary maintenance accomplished including, but not limited to, maintenance of erosion control haybales, weeding and pruning of planted vegetation, and removal of any invasive Phraamites or any other so-called 'undesirable ' species. V. - Replacement of Planted Wetland Vegetation The contractor shall replace all plant materials which have not shown satisfactory evidence of growth following one growing season, 50% healthy foliage shall be assumed satisfactory evidence of growth. All dead or unsatisfactory plants shall be removed and replaced. Replacement planting shall conform to the provisions of these specifications. VI. - Reporting The applicant will arrange for the monitoring of the compensatory wetland area for two full growing seasons. The wetland plant species are expected to cover 50% of the surface of the created wetland areas after the first growing season and at least 75% of the surface areas by the end of the second season. SOMMER ENVIRONMENTAL TECHNOLOGIES, INC. If sufficient wetland vegetation should fall to remain and regenerate within the wetland area to the prescribed quantities within the first two growing seasons , the applicant will subsidize the existing vegetation with additional plantings indigenous to the area. archibal.rep SOMMER ENVIRONMENTAL TECHNOLOGIES, INC. 2821bTal 18md Professional Land Surveyors & Civil Engineers ESSEX SURVEY SERVICE. 1958 - 1986 OSBORN PALMER 1911 - 1970 BRADFORD & WEED 1885 - 1972 December 18, 1992 Ms. Betsy Horne, Chairperson Salem Conservation Commission City of Salem One Salem Green Salem, MA 01970 RE: F 8873 Freeman Road Salem, MA Dear Madam Chairperson: Please find enclosed several copies of the above referenced Site Development Plan with the alterations requested at your last meeting. It is my understanding that this will facilitate the issuance of an Order of Conditions. Thank you for your consideration in this matter. If you have any questions or comments, please do not hesitate to contact me. Sincerely, Christopher R. Mello P.L.S. President enc. cc Dept. of Environmental Protection Daniel Archibald Paul Sommer Atty. John R. Keilty 40 LOWELL STREET PEABODY, MASS. 01960 (508)531-8121 FAX: (508) 531-5920 — mom g Pla,_ Cil,•b S J -�-tll_Wit%\ UJ�4k Sur�e c mAelvae 11 FCn w. -, � � J _ - lir __ __- _ . _ _ ___ _ -l_ . -_ _. _ _ _ --: i �-- - - -_ -- - 'i ii Ste-- - � ego L� fid,-� L rd i J - -- _ i I F ;' i • i l !� it I I i i I ' F i ill If ' i i i f i�' �', �'� ,.I SII t i I ;� i I i I� i II I, �II I' itit � ' ..'�%ON Cpy z Conservatim (,ommiSSim Salem. Massachusetts 01970 Af.4 SSAC� - CITY OF SALEM CONSERVATION COMMISSION NOTICE OF PUBLIC HEARING On Thursday, October 22, 1992 at 7 :00 p.m. the Salem Conservation Commission will hold a public hearing for a Notice of Intent under the Wetlands Protection Act, M.G.L. Chapter 131, Section 40 at the request of Daniel Archibald. The proposed work involves the construction of an extension of a roadway within buffer zone of inland resource area at 18 Freeman Road, Assessors Map 14 Lot 279 . The hearing will be held at One Salem Green, Second Floor Conference Room. l c Chair October 9, 1992 jm\dh\concomph.not This notice Posted ura ci�r.i�ial Bulletin Hfyi" ±qty Hall Ave . . Salem. Mass . ori Ocit 1 43k • tt 10,57 A//J in accordance with Chap. a the Acta of 1958 JOHN R. KEILTY, COUNSELOR AT LAW 40 LOWELL STREET TELEPHONE (508) 531-7900 PEABODY, MA 01960 FACSIMILE (508) 531-2479 November 12, 1992 Conservation Commission City of Salem One Essex Green Salem, MA 01970 Attn: Debra L. Hurlbert, Planning Assistant RE: DEP #64-211 Dear Ms . Hurlbert: Through you to the Commission, I am in recent receipt of a transmittal from the Department of Environmental Protection, a copy of which I am enclosing herewith. In response to this inquiry from the Department, we are suggesting the amendments to the originally filed Notice of Intent to Pages 5 and 6, copies of those amendments are submitted herewith. Further copies will be forwarded to the DEP following discussion of this project at your meeting of November 12 , 1992 . Very truly yours, vhn Cei �' E ire JRK/emb Enclosure ' Comrnonvscllh of tVjcssOChuSeitS Executive Office of Environmental Afiei;s De,sarfinenk of al - Ersae'at�menf��. [srafecfF= J\/ietro Boston/Noriheast'Regionol Office William F.%Weld - Gommer Daniel S.Greenbaum.:.. .• ... . `.1 r,.r - - - - C•nm6siener - - - This project has beersassigned. the following 'file 64=211 a Dt.TE: November 6, 1992 t-; •RE:: NOTIFICATION- OF FILE NUMBER NETLANDS/_ - SAI EM (city/town) The Departmentisin receipt of..the'-- following application filed in accordance 1!ith the wetlad ns Protection Act (M.G.L. Ch. f131. s. 40) APPLICP.IdT: - Daniel Archibald OWNER: ' ,. : . ADDRESS : 48 Nahant Street ADDRESS : . Wakefield:, MA < 01.880 _ OJECT LOCATION: Freemen Road Salem MA 631A & 630A .'_triough a file s being issued,` please note the .following: will intermitteDt stream bank be altered? will.. be assigned to this- _bio act until t e' _.._or,-,ation is sent to thJs o`fi _ h following missing ='e ACL' Ce �-O COmAle—e -,the tfihi'n4 3n accordance 'viitl7 ( ) Notice of Tlntent _ - _ .. . ( . ) Title 5 ? ( ) Locus MaA -- ;. ( ) Fee transmit < Plans ��al worm .. ( ) FSpendia Documentation ( ) , Plans ( } Application has en forwarded` "t- o Waterways 'Licensing Program to determine if a Chapter 91 License is ree_uired. 2 - ( ) APMlicant i . < _ _ S ddVi11.d O �.0�'Ward� a CODy._ Of-the:_NOtiCe of Intent to the Corps of Engine,='rs`:`ior Sec: SO4-review (Call 1-^000-362-4367 urther information) . . for page 2 for additional r - �r._o rat_on) 1 'r} 10 Commerce Way • }Woburn, Idassachusers o1601 '• FAX(617);35-6393 • Telephone (617) 9352160 , t "5.7 ... 4 r 7 lo 3 . ( ) The project described Jin - our-Atice."of' Intent• requires a 401 Water Quality Certifica' ti` on . from the;;DEP.. See below for further information: 4 . ( ) Before the activity described in the Notice of Intent 'can comnence, you must obtain a Water Quality Certification (WQC) from this Regional Office. Please complete and file ,the .enclosed application torn c•:ithrtHis Regional Offices for review. " 5 . ( ) Your ,project- involve s:"dredging of' greater'than 100 cubic yards of material,,, or requires: a permit from the Federal Energy Regulatory Commission for work in "waters of the Commonwealth" . Therefore, your proposed project is subject to 314 CMR- 9 ..00 and :requi_es a Water Quality Certification:: :;,Please: Coirplete and file. the enclosed application form withi_the =DEP%-'Division of Vater Pollution Control , One Winter Street, Boston, MA 02108. You nay: contact the Division of Water Pollution Control.,a't`v1617-292-5655 if you have any questions. 6 . ( g) The Department ofEnvi±onmentaT -Protection has reviewed the plans submitted bNi the applicant and finds that'�'there is 'reasonable assurance that the project or activity will be conducted in a manner whichwill not violate Ma ­ 11ssachusetts water, quality standards, provided that: ± Vic. a) the anplicant' receives and comalies with a Final Order of Conditions from the local conservation commission or the Department,.-and" b) the Order of_ Conditions does not cause the loss of ^Ore than 5 , 000sq_ ft ... bordering- vegetated wetlands and land under _ . .. - water; and c) the project: is subject to 310 .CB'h 10. 00 (i. e. ,. not exempt from the- 'MA- Wetlands' -, ect on"Act_'-.,c..i3i § 40) , is not Dart of a subdivision ; '`arid does -not cause the loss of any wetlands of Outstanding Resource T4aters, , or any salt harsh: . .. Therefore,; provided :.tn`at she above conditions; are satisfied, this w_i:lh-serve%ras =t] eT±'ate-r Quality Ceti fication for this project. This Certification does not relieve the applicant_ of he duty t0 comply._with--anv- other 'statutes or regulations. __SSUANCE OF A FILE NUMBER INDICATES ONLY._COMPLETENESS OF FILING SUBMI-iTTED, NOT APPROVAL . OF APPLICATION., - Please contact the following NERO . Wetland Staff person assigned to this file ':ith any questions relat ve* to` this letter: Heidi Davis cc: Conservation Commission ( ) U. S . Rrmv Corps of Engineers, Reg .Branch.: . ( ) Coastal Zone Management ( ) Board of Health Bruilcing inspector ( X) Repres=entative DEP -. WPC, Boston . r Cornrnorw� ci'h of N °^��LI��^ SS�.0 I _�IIs I ' LY,e_Ullve OfflCe Of �nVl(OnfTl f;iClnffCCS DeRar{mant of GQi �ggcL.. O0Q` a r 3 Ernarartmeritaf, Pra{ec�i0 2T i ! ro 5cs or/f lcl hecsi Regionol Office V"i liam F. Weld Q\ Go.nnor - Daniel S. Greenbaum CieConmisione: This Project has beenassigned the following file = 64-211 =_D: November 6, 1992 RE: NOTI7ICATION OF PILE NU?°SER V,-ETL>__NDS/ CAI FM (city/town) The Dehe-Weent is Dr receipt Of the f011Owing aPSlication filed in accordanc2 ands ctection Pct (M.G. L. Ch. 131 s. 40) : _?PL_ICxNT: Daniel Archibald OWNER• ADDRESS : 48 Nahant Street ADDRESS : Wakefield, MA 01880 PROJECT LOCATION: Fraaman Road, Salem MA 631A & 630A e - _s being issued, please note the following will intermittent stream bank be altered? o file = will bei asS_gne.. LO t_'?iS PrOj2Ct Lntil the f01lOi.;in^ On 1S SEnt t0 LP_15 Off i Ce �0 CC.uPl ete Lne I11S51ng -' l i 71g n accordance 'r.'1t_'1 ACL : ( ) Notice of -, ntent ( ) LOCUS ma-0 lens ( ) 'ee Lran.saittal fOrSl Plans ( ) Application has been forwarded or c �O S4aLe:w+aVS ?' Censi nQ PrO;�ra'1 t0 O'e.-ei"Il'ne 1- a Cha-) 1 License is r ecuired. advised Lo =Crward a copy of the 2votice Of Intent to the Corps of E gineers f qr Sec . _- O: _review (Call -000- 52-6367 f0- .. u=hc_ _n_ormati On) see Page .2 -O'- 'add'_L1' :ral < f __ 1 10 Comme,•ce Way • Woburn, Rtassachusetts 01801 0 F:.X(6;7) c85_Eoc3 • Telephone (617) 935-2160 The pr`oject described in your Notice of Intent requires a 401 Water ;. Qual,ity °Certification from the DEP. See below for further �'infor;�laticn : Before the activity described in the Notice of Intent can commence, you e�nust obtain a 1'�ater Quality CertificatiGn (WQC) from this REciOnal Office. Please COmblete and file theEi:Cl05ed apDllCatiOn form with this Regional Office for review. 5 . ( ) Your project involves dredging of greater than 100 cubic vards of marlerlal, or recuires a permit from the Federal Energy ^eaulatory Commission for work in °v.eters Of the Comm-onwealth° . Therefore, vour proposed DroleCt is subject t0 31-^ C!-,R. 9 . 00 and --acrlir C's a 1'7atcr Quality Certification. Please complete and file the enclosed application for=m with the DEP/ Division Of Water Pollution Control , One Winter Street, Boston, 1,Lk 02108 . You nay contact the Division of Water Pollution Control at 617-292-5655 if you have any questions. 6 . ( X) The Department of Environmental Protection has reviewed the plans submitted by the applicant and finds that there is reasonable a55L'ra.^.Ce that the ^ur oJect or activity Hill be COnduczed in a ruanner wnich will not violate Xassachusetts water Quality standards, Provided that: a) the applicant receives and Complies Lith a Anal Order of Conditions frOm the local Conservation CO?mission Or the Department ; and b) Ine Order Of Conditions does not cause the loss Of nGre than 5 , 000 sq. ft. of bordering vegetated we-lands and land under Water; and C) the project: is sl'bjec- to 310 Cl.:R 10 . 00 (i . e. , not exem_D from the ?,=k Wetlands Protection AC-G. - C. 131,g 40) 1 is not Dart Of a su'bdivisicn , and does not cause the loss of any wetlands of Outstanding Resource Waters, Or any sal`. `:arsh. Therefore, provided that the above Conditions are satisfied this will- serve as the Water Quality Certification for this Project. This Certifica-..ion does not relieve the applicant o_ the duty to COruD I'd with anv other statutes or regulations. _SSUP.NCE OF A :LTE NUMBER IND=CATES ONLY COMPLETENESS OF FILING SLTBL7mm 0 NOT APPROVAL OF APPLICATION. J _-Ease Contact the following NERC Wetland Staff person assigned to this Y:'- Lh anv Ouestlons relative to this letter' Heidi Davis CC : Conservation Commission - ( ) U. S . iIv '...Orbs O: ng neer DE .. -- - -s g Branch._ (. ) .CoastalLone Managemen-- ( ) BO and G. -.ea- __'1 _ - . ( X) ( ) `nild_ng Snspectcr Representative ( ) DEP - iiPC , Boston � • r r , 1 7 — ( r � C�L'��µ� �*`aU'� _ FNS;�d�y�i':K' b^ "'f '� _ ,r,. i �N`��' � "`, "�- d n �. �' _ MVti 4:� �' v�- 11�Q1�•IF:��j��(.�'t.-ax /. ice+ `� ;4,.'s ', t tO� t`� 1 �t i !�. ��rr•.7'S�1�V ..�� ; r AFib: k � " i' `t� Q� .�.��7 �J � 5' �� ;t �. i'�i' \ • \ J � 1 / • .y � r � \- �'� � ,. � � t��`� � , ,fit �• , � •�.. � l� � ��«, �' ` f. +a S y �,;, � 1 J �J , � .. � w« ' - ,c�^ � - , / � • 4c,; : #A� � . AMP, If V4V < L s 1 �r • r � a � �;. , ',�f ,,r1 �y" _ _ r� ' I� (\�Li v �.. (r�,I(,�j..r. ./ z���.1. J c'�R .. aN'e�,rc�-�:�� — t.^fig ry " .: _ _ _ _ .; \ ,` y t , ,�..�� ,/ T i i S�� / / . � !r'7! �., r ' /� e r .� yam- �l�t" ��f� � f� �i �y ���5�'i���P a, ��� __ � �� ,�/ yr,..�-.tai' ��y� ��i �ii- �.., frit- �" Y,/y LN' Y' _ I. _ � � , r . .� J i � � _ r.� �/ .`; G�' ,.. �.:� i f= , / .. � � K � � Nr t . GENERAL NOTES sf 1) THIS PLAN IS THE RESULT OF AN ON THE GROUND FIELD v"` Z PROPOSED PAVED DRIVEWAY SURVEY AND PUBLIC AND PRI VA TE PLANS. LOCUS �o P ITCH \� 2) UTILITIES SHOWN ARE BASED UPON FIELD SURVEY AND RECORD PLANS AND ARE NO T NECESSARIL Y INDICA Tl VE OF —_ FL. 100 _— -_ - ---_--_ A+Fr UNDERGROUND CONDITIONS. �eY o9` I au- D TW IN EXISTING GROUND 1yv,y 18" RCP CL . V 3) THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING AND I FRANK N. CLARK - I EXISTING DITCH-' DETERMINING THE LOCATION, SIZE AND ELEVATION OF ALL EXISTING UTILITIES, SHOWN OR NOT SHOWN ON THESE PLANS, 0`y",� SECTION B - B PRIOR TO ANY CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED -- , — / IN WRITING OF ANY UTILITIES FOUND INTERFERING WITH THE — - -- -- �" 5 PROPOSED CONSTRUCTION AND APPROPRIATE REMEDIAL ACTION LOCUS MAP JAMES SKAL IOT/S — �/ EXISTING GRADE BEFORE PROCEEDING WITH THE WORK. E 3^ 'o PROPOSED PAVING GRADE AT STOCKPILE 0 7 ' 57 - AT FREEMAN ROAD -7 4) THIS PLAN IS BASED ON THE REFERENCED PLANS, DEEDS E S 33 99 .97 ice , PROPOSED AND THE RE-SUL TS OF A FIELD SURVEY AS OF THIS OA TE. ASSESSORS MAP 14 LOT 279 a — REPLICATION AREA NO CERTIFICATION IS INTENDED AS TO PROPERTY TITLE MATO BE TER I LOT 631A 8 630A S OR AS TO THE EXISTENCE OF UNWRITTEN OR UNRECORDED ° EXISTING REMOVED " i - \ - i EL. 100_ RESOURCE AREA EASEMENTS LO / AREA 19 , 430' SF. -- ✓� 0� m . SECTION A - A HAYBALE DETAIL HORIZONTAL I '= 40' SCALE ' VERTICAL 1 "= 4' s 1 i i'i , 100 FT. BUFFER ZONE . (, � 8 s R R0p00SED 13! INV. 95.85 e[oolwa DCT.U( TREE TO REMAIN AND ALLp0' I PIPE N .a t1.4WA (i° ° /v EFFORTS TO PROMOTE DRAIN GROWTH TO BE ATTEMPTED. IRON PIPE 8 1 TO BE SETAl 10 I ; ,1 • LO1Nb baLC)IUC{O Gx(gNiWP VJ± "'tl' rn ` ' to RESO�CE AR� � 1 FT. _ y d ;GE cc N ED NSE GLEN & BARBARA ERPS a s nrn!.�r !ranatt . b L M jLA-ZII AT TE TCE.O-A a m°[T[E C ,.. NO In A Fa'nM Z RESOURCE AREA FLAGGING `� 4 \ LOT 629 1 w Vlnest TiN Y A91,G E:A�Y6Ai 4,t. BY PAUL SOMMER r a« Ib E A IL."I" VI lw I,<,E, OSEO T l +) I It 11K11 ME IM II AL. OP PROPOSED EDGE OF d1R I VE ,. T, M X"M (� .x) � n a„ (ILIO W ))MLa QR RESOURCE AREA TO �K.a a 2 ' FROM PROPERTY �a;E w`; ;T` QE"T�':2 ;�„ER. ST'! UK U BE REPLICATED 15 SF. ` ' L I NE �, Imo\ EPS�M�N� 1 S Eun be r ,W M `a .Ib DDEIA vonu wrt M u n ro eus. " S � - a Incx s)vw na a w"iws. ao PROPOSED .000 2 RALPH F. SALVO STAKED HAYBALES LT 632 '�' ' 1 zI ' —i / 0b AREA TO BE REPLICATED 150' SF. \00 - ICLco I 3 �,•. M \ / o 101 \\ 'o • - ,offF, 47.Bo II U) / 1 01 3 *° /00 i"i' lol.p I O O / - - �. CL 1 STOCK PILE TO BE REMOVES 100. 00 f� N 20° 18 '40' W — -- J �:.— _ s BENCHMARK 99so I ROPOSED SMH ._ - FIRE HYDRANT 'm� / , I RIM 100.2' INV.94 S — Boll under L in 'Darling ' -� I ° � ELEV. 102,.80 FBE f4N O D W - - - I - - - - — f/ SITE DEVELOPMENT BLOWOF • - 199.So PROPOSED 2 b � o� .,,D -� ' ' " PLAN OF LAND F IC!. � LOCA TED IN s SEEMORE ' �/ SALEM , MASS . PREPARED BY PROPOSED "T" SHAPED EASTERN LAND SURVEY ASSOCIATES, INC. �• " PAPER TURNAROUND CHRISTOPHER R. MELL O, PLS STREET " CONSTRUCTED WITH BITUMINOUS CONCRETE 40 LOWELL ST. PEABODY MA. 01960 PAVEMENT (508) 531 -812 L E G E N D SCALE: 1 " = 20' MARCH 13, 1992 • SMH PROPOSED SEWER MANHOLE o SMH EXISTING SEWER MANHOLE ZONING DISTRICT R- 1 PREPARED FOR REV. JULY 192 • DMH PROPOSED DRAIN MANHOLE o DMH EXISTING DRAIN MANHOLE RV. DEC . 1 I , 1 1992 ■ CB PROPOSED CATCH BASIN ❑ CB EXISTING CATCH BASIN LOT AREA 10, 000 SF . DANIEL A R C H I B A L D r HYD PROPOSED HYDRANT D" HYD YARD 15 FT.HYD EXISTING HYDRANT SIDE YARD 10 FT. •• WG PROPOSED WATER GATE >.d WG EXISTING WATER GATE REAR YARD 30 FTPHOTO REPRODUCTION OF THE ABOVE SEAL IS . L 100 PROPOSED CONTOUR — — 100 — EXISTING CONTOUR INDICATIVE OF UNAUTHORIZED REPRODUCTION LOT WIDTH 100 FT. OF THIS PLAN AND IS TO BE CONSIDERED A UTILITY POLE COPYRIGHT INFRINGEMENT AND/OR FRAUD. r- - ----- -- '----- 100X0 PROPOSED SPOT GRADE 100.00 PO GRADE ENFORCEMENT AUTHORITY SHALL NOT ACCEPT PROPOSED RETAINING RETAINING WALL PHOTO REPRODUCTION FOR ANY PURPOSE. WALL o0000000o STONE WALL BITUMINOUS CURB o 10 20 ao sc sr ^�'�T^ PROPOSED HAYBALES —X _ x _ FENCE F 8873 N i • IML J �a• GENERAL NOTES Sf. 1) THIS PLAN IS THE RESULT OF AN ON THE GROUND FIELD va PROPOSED PAVED DRIVEWAY Z ,'" SURVEY AND PUBLIC AND PRIVATE PLANS. J LOruSe o PITCH or� _.� t� 2) UTILITIES SHOWN ARE BASED UPON FIELD SURVEY AND ----_ _ ___ RECORD PLANS AND ARE NOT NECESSARIL Y INDICA TI VE OF EL . 100 ____ __- - - --- - -- - 'Arpl- � , -- UNDERGROUND CONDITIONS. 0 �o PROPOSED TWIN I � q� 9r EXISTING GROUND �'� 18" RCP CL. V 3) THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING AND FRANK N. CLARK I EXISTING DITCH DETERMINING THE L OCA TION, SIZE AND ELEVATION OF ALL EXISTING UTILITIES, I N PRIOR ANY CONSTRUCTION. �HE ENGINEER SHALL BE NO SECTION ON B B NOTIFIED - IN WR/TING OF ANY UTILITIES FOUND INTERFERING WITH TH THE /3v — - LOCUS MAP .y"� r/AMES SKAL /OTIS PROPOSED CONSTRUCTION AND APPROPRIATE REMEDIAL ACTION EXISTING GRADE BEFORE PROCEEDING WITH THE WORK. 57" E 3 4- " PROPOSED PAVING GRADE AT STOCKPILE ✓ AT FREEMAN ROAD 4 THIS PLAN IS BASED ON THE REFERENCED PLANS, DEEDS ASSESSORS MAP 14 LOT 279 S PROPOSED AND THE RESULTS OF A FIELD SURVEY AS OF THIS DATE. I�' ' 9g '97 ,�, � - '� �� �, _--_______---�--- ---- - (10 _ � `, , � ,— REPLICATION AREA - - MATERIAL NO CERTIFICATION IS INTENDED AS TO PROPERTY TITLE LOT 63/,4 E4 630A «� TO BE - EXISTING OR AS TO THE EXISTENCE OF UNWRITTEN OR UNRECORDED -/-/ ' ,,` REMOVED ' EL. 100 RESOURCE AREA _ EASEMENTS. Ni - •� `---=-- -- - 1 - ---- - ��0 AREA 19 , 430` SF. cn SECTION ON A - A -,_4 91 - c f HORIZONTAL 1 '= 40 ' HAYBALE DETAIL SCALE' VERTICAL 1 4 ' Olib 0g a G�P_t PROPOSED T- . 100 FT. BUFFER ZONE r ` ` oma. LP0 J' 8 RIM 101 .7! 1NV. 95.85 BEDOINa DETA4 TREE TO REMAIN AND ALL I 00 DRAIN PIPE q,EVIPI4,LYCEALE EFFORTS TO PROMOTE - LRON PIPE c� V�' $' °' I PROPOSED GROWTH TO BE ATTEMPTED. LLy TO BE SET -- ., 100.4 M 0 0) ` 65'- / A/' 5 .� �i 2, 'axnu wgcuucco.x wxiaq O p I FT . � _• v0 OURCEARE , 100 Of ...,.iiEE6 nc i(°.;:.>..., N EDGE OF RESu it 4`, :;�: . ..°Nx>CAYC,,.,,: ngh - — -, •. (- ♦NDNow Na DET41L CON GLEN 8 BARBARA ERPS mart,N a IFI.Tl�n z - RESOURCE AREA FLAGGING \ 4 LOT 629 ° BY PAUL SOIvMER q „�;,yam AT�,9: DI M AN.V Ix. .;N —� 1 ENr tv-E B.W.eE DhZEp.IN M,WIL A nlxou.a (Y) ito s AIJ num m 'IE-BIw IIra Ax rEAIZIN(Iy, �, PROPOSED EDGE OF O I VE. �. E Ii ,,a„ as , Ix i.E Mn :VLA w..� PROP RESOURCE AREA TO " ` 2 ' FROM PROPERT'(I n n<,�, I,. FIRST 11A,E I„,,,, n,u,E°Iwo M W I0.AY U11 6 AT Av A ( •^•'-9._ M 6':.E: ICfi:Tl[q. $I.:._.: nVjL.F ✓ PS�MEN� BE REPLICATED 15 SF. �=i L I NE w:� �n N„„ M . V. {It`3[RIQ1 7Ky 16 (q[(1j)n NQ>UAIq VDL n Sty-Iy Y•'tE HV9(L..3 .a C l0 1 - 5 ENn nNu u q➢V�NCI nn n.4 sxn�"EIq usuwli.s AS KIT ucc. N w Incl ncul no-a ou lwn, °D PROPOSED 6000'° `�� 9q,S 2 RALPH F. SALVO STAKED HAYBALES--- 1 ' ' j ' L T 632 '0 ZI i 00 AREA TO BE REPLICATED ' tp1.0 -� 150i SF. 00 Q) o 101 \00 Lij 00 i I 1 , U)l 01 I J I ? y STOCK PILE TO BE REMOVED O I. 1100 0. 100. 00 0 N 20918140" W - ) BENCHMARK ROPOSED SMH co I FIRE HYDRANT -� I RIM 100.21 INV, I S— - � Bolt under L in 'Darling ' -_� E-E1v_f N ii�O p 1 ELEV. 102.80 199.80 PROPOSED 2"_ - - w - - - - - - SITE DEVELOPMENT BLOWOFF — -- - — PLAN OF LAND LOCA TED /N SEEMORE '. 13 � SALEM , MASS . 00. S T . `II n ' ✓L I PREPARED BY \PROPOSED "T" SHAPED EASTERN LAND SURVEY ASSOCIATES, INC. PAPER TURNAROUND STREET " CONSTRUCTED WITH CHRISTOPHER R. MELLO, PLS BITUMINOUS CONCRETE PAVEMENT 40 LOWELL ST. PEABODY, MA. 01960 L E G E N D (508) 531 -8121 SCALE: 1 " = 20' MARCH 13, 1992 • SMH PROPOSED SEWER MANHOLE o SMH EXISTING SEWER MANHOLE ZONING DISTRICT R-1 PREPARED FOR REV. JULY 247 1992 • DMH PROPOSED DRAIN MANHOLE o DMH EXISTING DRAIN MANHOLE REV. DEC . 1 , 1992 ■ CB PROPOSED CATCH BASIN 0 CB EXISTING CATCH BASIN LOT AREA 10, 000 sF. DANIEL A R C H I� B IA L >q<HYD PROPOSED HYDRANT HYD EXISTING HYDRANT FRONT YARD 15 FT. WG PROPOSED WATER GATE WG EXISTING WATER GATE SIDE YARD 10 FT. PHOTO REPRODUCTION OF THE ABOVE SEAL IS PROPOSED CONTOUR — — 100 — EXISTING CONTOUR REAR YARD 30 FT, 100 PROPOSED SPOT GRADE 100.00 EXISTING SPOT GRADE LOT WIDTH 100 FT. OF INDICATIVE THIS PLAN ANDI SOTOZBED CONSIDEEREDIOA 100X0 -0- UTILITY POLE COPYRIGHT INFRINGEMENT AND/OR FRAUD. PROPOSED RETAINING RETAINING WALL ENFORCEMENT AUTHORITY SHALL NOT ACCEPT PHOTO REPRODUCTION FOR ANY PURPOSE. WALL o0000000o STONE WALL BITUMINOUS CURB i) 20 40 6 —x — x — c A PROPOSED HAYBALES FENCE E 8873