Loading...
64-490 - FREEDOM HOLLOW - CONSERVATION COMMISSION DEP 64- a�p � . � Plans — - - -- — - STORMWATER REPORT & CALCULATIONS " BRIEF NARRATIVE FOR THE PROPOSED RE-DEVELOPMENT PROJECT: THREE (3) HANDICAP SPACES ARE REQUIRED FOR THIS EXISTING PARKING AREA PER ADA AND BUILDING CODES AS MANDATED BY THE SALEM BUILDING INSPECTOR. AFTER MANY DISCUSSIONS OF THE VARIOUS ALTERNATIVES, THE PROPOSED LAYOUT WAS CHOSEN. THE DESIGN WAS FURTHER ADJUSTED AFTER A SITE WALK AND HEARING WITH THE SALEM CONSERVATION COMMISSION. THE AREA FOR THIS RE-DEVELOPMENT PROJECT IS PARTIALLY LAWN AND PARTIALLY PAVED. THE AREA OF NEW IMPERVIOUS SURFACE IS 1,440 t SF. THE RUNOFF FROM THE PROPOSED PARKING AREA IS DIRECTED VIA A GRASS SWALES TO TWO LANDSCAPED DEPRESSIONS (AREAS A & B) DESIGNED TO CONSERVATIVELY CONTAIN THE FIRST FLUSH (1/2 INCH). IN ADDITION (AS ANOTHER MITIGATIVE MEASURE) TWO MORE LANDSCAPED DEPRESSIONS (C & D) HAVE BEEN PROPOSED TO DETAIN RUNOFF FROM EXISTING PARKING LOTS. LID MEASURES PROPOSED INCLUDE: (1) NO DISTURBANCE OF WETLAND AREAS, (2) MINIMAL WORK WITHIN 25-FEET OF THE FLAGGED WETLAND RESOURCE AREAS, (3) NO DISTURBANCE OF EXISTING TREES AND SHRUBS, (4) USE OF COUNTRY DRAINAGE WITH NO CURBING OR PIPES, (5) GRASS CHANNELS AND LANDSCAPED DEPRESSIONS. \ 1. IN ACCORDANCE WITH DEP STORMWATER STANDARD #1: ALL DISCHARGES SHALL BE TREATED BY PROPOSED LID MEASURES. THE OUTLETS ARE DESIGNED AS LEVEL SPREADERS OVERLAND FLOW THROUGH EXISTING LAWN AND LANDSCAPED AREAS. \ "\ 2. IN ACCORDANCE WITH DEP STORMWATER STANDARD #2: PEAK ATTENUATION IS PROVIDED USING FOUR LANDSCAPED DETENTION DEPRESSIONS TO THE MAXIMUM EXTENT PRACTICABLE. 3. IN ACCORDANCE WITH DEP STORMWATER STANDARD #3: RECHARGE IS PROVIDED USING FOUR LANDSCAPED DETENTION DEPRESSIONS TO THE MAXIMUM EXTENT PRACTICABLE. 4. IN ACCORDANCE WITH DEP STORMWATER STANDARD #4: FOR WATER QUAILITY CONTROL MEASURES, THE LONG-TERM POLLUTION PREVENTION PLAN SHALL INCLUDE THE FOLLOWING: (1) YARD/LANDSCAPING MAINTENANCE AND GOOD HOUSEKEEPING PRACTICES FOR THE ENTIRE PROJECT, (2) STORAGE OF MATERIALS INSIDE THE EXISTING BUILDING AND DISPOSAL (OFF-SITE) OF WASTE PRODUCTS, (3) RESTRICTIONS ON WASHING VEHICLES IN THE EXISTING PARKING LOTS, (4) ROUTINE MAINTENANCE OF THE STORMWATER DEPRESSIONS BY THE LANDSCAPERS (THROUGH THE MANAGEMENT COMPANY) INCLUDING CLEANING AND REMOVING SILT/DEBRIS, (5) SPILL PREVENTION AND RESPONSE PLAN IMPLEMENTED, (6) MINIMAL USE OF NON-ORGANIC FERTILIZERS AND PESTICIDES, (7) SNOW DISPOSAL AND ICE TREATMENT PLAN (SEE BELOW), (8) PET WASTES TO BE CLEANED IMMEDIATELY BY OWNER OF PET, (9) SOLID WASTE REMOVED FROM SITE BY MANAGEMENT COMPANY, (10) REGULAR STREET SWEEPING IMPLEMENTED BY MANAGEMENT COMPANY, (11) MANAGEMENT COMPANY TO INSURE NO ILLICIT DISCHARGES INTO THE STORMWATER MANAGEMENT SYSTEM AND ASSURANCE OF SPILL PREVENTION MEASURES. IN ACCORDANCE WITH RECHARGE REQUIREMENTS, THE BMP'S HAVE BEEN CONSERVATIVELY SIZED TO CONTAIN THE FIRST FLUSH: 1/2-INCH OF RUNOFF FROM THE HANDICAP PARKING AREA (1,440±SF) WHICH IS T �" APPROXIMATELY 60t CF. THE THREE LANDSCAPED DEPRESSIONS (ADJACENT TO THE ADDITIONAL PAVED SURFACES) WILL CONTAIN 160± CF. 5. IN ACCORDANCE WITH DEP STORMWATER STANDARD #5: THE PROJECT DOES NOT INCLUDE LAND USES WITH HIGHER POTENTIAL POLLUTANT LOADS. °gRCReSr, 6. IN ACCORDANCE WITH DEP STORMWATER STANDARD #6: THE PROJECT IS NOT WITHIN A CRITICAL ENVIRONMENTAL AREA. 7. IN ACCORDANCE WITH DEP STORMWATER STANDARD #7: THE PROJECT IS A RE-DEVELOPMENT PROJECT WHEREBY HANDICAPPED PARKING IS ADDED TO AN EXISTING PARKING LOT. 8. IN ACCORDANCE WITH DEP STORMWATER STANDARD #8: A SHORT-TERM (CONSTRUCTION PERIOD) POLLUTION PREVENTION AND EROSION AND SEDIMENTATION CONTROL PLAN IS BEING IMPLEMENTED. SEE BELOW. \ O 9. IN ACCORDANCE WITH DEP STORMWATER STANDARD #9: A LONG-TERM OPERATION AND MAINTENANCE PLAN IS BEING IMPLEMENTED. SEE STANDARD #4 AND BELOW. 10. IN ACCORDANCE WITH DEP STORMWATER STANDARD #10: ILLICIT DISCHARGES ARE PROHIBITED AND CONTROLLED/PREVENTED BY SECURITY AND THE MANAGEMENT COMPANY: EAST COAST PROPERTIES. SHORT-TERM SEDIMENTATION & EROSION CONTROL MEASURES (DURING CONSTRUCTION) O IN ACCORDANCE WITH DEP STORMWATER MANAGEMENT STANDARD #8 THE FOLLOWING SEDIMENTATION AND EROSION CONTROLS SHALL BE EMPLOYED TO MINIMIZE EROSION (AND TRANSPORT OF SEDIMENT) DOWN-GRADIENT TO WETLAND RESOURCE AREAS DURING THE EARTHWORK AND CONSTRUCTION PHASES OF THE PROJECT: / SITE 1. SILT FENCING: USE A SILT FENCE (DETAIL SHOWN ON THIS PLAN) AT THE DOWN-GRADIENT PROPERTY LINE (INSTALL PER DETAIL). THIS SEMI-PERMEABLE BARRIER MADE OF SYNTHETIC POROUS FABRIC WILL PROVIDE PROTECTION TO MINIMIZE EROSION AND THE RESULTANT SEDIMENTATION TO THE ADJACENT WETLANDS. THE SILT FENCE BARRIER SHALL BE DUG INTO THE GROUND AT LEAST FOUR (4) INCHES AND BE HELD UPRIGHT WITH WOODEN STAKES SPACED TEN (10) FEET APART (MAXIMUM). THE SMALL SPOIL PILE SHALL BE PLACED ON THE UP-GRADIENT SIDE OF THE SILT FENCE. THE WOODEN STAKES (1.5-INCH SQUARE) SHALL BE DRIVEN INTO THE GROUND AT LEAST EIGHT (8) INCHES. THE SILT FENCE SHALL BE FIRMLY HELD TO THE WOODEN STAKE WITH MANY CONSTRUCTION GRADE STAPLES AND STAINLESS STEEL WIRE. THE SILT FENCES AND HAY BALE BARRIERS WILL BE REPLACED AS DETERMINED BY PERIODIC FIELD OO INSPECTIONS. 2. VEGETATIIIIIE §1 6PF §TAPILJ2ATI : STABILIZATION OF OPEN SOIL SURFACES WILL BE IMPLEMENTED WITHIN FOURTEEN (14) D0§ AFTER GRADING OR CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED UNLESS THERE IS SUFFICIENT SNOW COVER TO PROHIBIT IMPLEMENTATION. VEGETATIVE SLOPE STABILIZATION WILL 9E US€B TO MINIMIZE EROSION ON SLOPES OF 3:1 (H:V) OR FLATTER, ANNUAL 9RA5595 (5UGH A5 ANNUAL RYE GRASS) HALL DE USED TO ENSURE RAPID GERMINATION AND PRODUCTION OF ROOTMASS. PERMANENT STABILIZATION WILL BE COMPLETED WITH PLANTING OF PERENNIAL GRASSES OR LEGUMES. ESTABLISHMENT OF TEMPORARY AND PERMANENT VEGETATIVE COVER MAYBE ESTABLISHED BY HYDRO SEEDING OR SODDING. A SUITABLE LOAM TOPSOIL, GOOD SEEDBED PREPARATION, AND ADEQUATE LIME, FERTILIZER AND WATER WILL BE PROVIDED FOR EFFECTIVE ESTABLISHMENT OF THESE O VEGETATIVE STABILIZATION METHODS. A LIGHT (POROUS) SPREAD OF HAY MULCH WILL ALSO BE USED AFTER PERMANENT SEEDING TO PROTECT SOIL FROM IMPACT OF FALLING RAIN AND TO INCREASE THE CAPACITY OF THE SOIL TO ABSORB WATER. 3. PRIOR TO CONSTRUCTION: PRIOR TO THE PRE-CONSTRUCTION SITE WALK WITH THE SALEM CONSERVATION COMMISSION AND/OR IT'S AGENT), THE SITE CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING EACH CONTROL DESCRIBED IN THIS PLAN. IN ACCORDANCE WITH THE NPDES REGULATIONS, THE SITE CONTRACTOR MUST SIGN A COPY OF A CERTIFICATION TO VERIFY THE EROSION CONTROL PLAN AND PERMIT REGULATIONS ARE UNDERSTOOD AND SUBMIT IT PefOOa � r FOR APPROVAL TO THE SALEM CONSERVATION COMMISSION AGENT AT THE PRE-CONSTRUCTION CONFERENCE. EROSION CONTROLS SHALL BE IN-PLACE PRIOR TO THE PRE-CONSTRUCTION CONFERENCE. ALSO A DETAILED CONSTRUCTION SEQUENCE SCHEDULE OF SITEWORK SHALL BE DISCUSSED IN DETAIL AT THE PRE-CONSTRUCTION CONFERENCE. 4. CONSTRUCTION SEQUENCE: THE CONSTRUCTION SEQUENCE OF STEWORK WILL COMMENCE AFTER ALL PERMITS ARE IN HAND AND A PRE-CONSTRUCTION CONFERENCE WITH THE SALEM CONSERVATION COMMISSION (AND/OR IT'S AGENT) HAS BEEN COMPLETED. AFTER EROSION CONTROL MEASURES HAVE BEEN INSPECTED AND APPROVED BY THE SALEM CONSERVATION COMMISSION (AND/OR IT'S AGENT), EARTHWORK WILL BEGIN TO MOVE EXISTING SOIL MATERIAL AND Re O HOLLOW COMPACT IN ACCORDANCE WITH MHD SPECIFICATIONS. ONCE THE ROUGH GRADES HAVE BEEN SET FOR THE PAVED AREAS AND ADJACENT LAWNS, THE UTILITIES CAN BE PLACED. THEN FINAL GRADING, THEN PAVEMENT, THEN LOAM AND SEED ALL DISTURBED AREAS WITH HYDROSEED. r� fOO i a 5. MAINTENANCE OF EROSION CONTROLS: THE SITE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING EACH CONTROL DESCRIBED IN THIS PLAN. DURING CONSTRUCTION, THE ON-SITE CONTRACTOR WILL INSPECT ALL SEDIMENT AND EROSION CONTROL STRUCTURES WEEKLY AND AFTER EACH RAINFALL EVENT. RECORDS OF INSPECTIONS WILL BE PREPARED AND MAINTAINED ON-SITE BY THE SITE CONTRACTOR. SILT SHALL BE REMOVED FROM WITHIN THE LANDSCAPED DI IDENTIFICATION. SEDIMENT THAT IS COLLECTED SHALL BE PROPERLY DISPOSED OF OFF-SITE. SPOIL PILES SHALL BE COVERED WITH TARPS AND SURROUNDED BY STAKED HAY BALES. THE SALEM CONSERVATION COMMISSION SHALL APPROVE THE STABILIZED EARTH PRIOR TO THE REMOVAL OF EROSION C o DEPRESSIONS IF GREATER THAN TWO (2) INCHES DEEP, OR AS NEEDED. DAMAGED OR DETERIORATED EROSION CONTROL DEVICES WILL BE REPAIRED IMMEDIATELY AFTER IDE CONTROLS. LONG-TERM INSPECTION, OPERATION & MAINTENANCE REQUIREMENTS (POST- CONSTRUCTION) o c �j THE PROPOSED STORMWATER MANAGEMENT DESIGN RELIES HEAVILY UPON THE THOROUGH AND PROPER IMPLEMENTATION OF THE FOLLOWING POST-CONSTRUCTION OPERATION AND MAINTENANCE PLAN (IN ACCORDANCE WITH DEP STORMWATER MANAGEMENT STANDARDS #4 AND #9). THE FOLLOWING OPERATION & MAINTENANCE PLAN IS TRANSFERRED TO EACH SUCCESSIVE PROPERTY OWNER (TO RUN WITH THE DEED). THE MAINTENANCE OF THE PROPERTY IS THE RESPONSIBILITY OF EAST COAST PROPERTIES, CYNDY ANSELMO, 441 HIGHLAND AVENUE, SALEM, MA 01970. PHONE NUMBER: 978-741-2003. 6`�> THE OWNER OF THE PROPERTY (THROUGH THE MANAGEMENT COMPANY) SHALL PERFORM REGULAR MAINTENANCE ON THE SITE AND ALL STORMWATER CONTROLS: INCLUDING: (1) QUARTERLY PAVEMENT SWEEPING (AT THE END OF EACH SEASON), (2) QUARTERLY TRASH REMOVAL FROM THE PREMISES, (3) REGULAR AND PROPER DISPOSAL OF TRASH OFF-SITE FROM DUMPSTER AND TRASH BARRELS, (4) MONTHLY INSPECTION OF AREA AROUND DUMPSTER AND TRASH D-ri DISPOSAL, (5) QUARTERLY CLEANING OF ALL CATCH BASINS AND DRAIN MANHOLES. PROPERLY DISPOSING SILT, SEDIMENT AND DEBRIS OFF-SITE BY A SITE MAINTENANCE CONTRACTOR WITH A VACUUM TRUCK (TO OCCUR LATE FALL AND EARLY SPRING), (6) QUARTERLY CLEANING OF FOUR LANDSCAPED SWALES AND DEPRESSION AREAS. x`f cE � ... �/ �/ - - I - - _ - tl/ I .. -#A20 0 1e=bz LOCUS PLAN FROM LOCUS zoo SALEM GIS SCALE IC SCALE: 1"= 200' 96- E pP RE-GRADE FOR SLIGHT DEPRESSION TO CAPTURE STORMWATER. INSTALL " eqe i % SITE PLAN NOTES ROSA RUGOSA 13 SHRUBS - - ,�_' / AS PART OF CONSTRUCTION THE SITE CONTRACTOR MAY WANT TO MAKE FIELD ADJUSTMENT BASED ON ACTUAL FIELD CIRCUMSTANCES (AND/OR TO RECTIFY - .v- �+' - �' - ''� -"' - = � bb9 (2-3' HIGH) °es ,4°,d :99t°%ea°" ys � °,b:�a(Cell Y S C C cs b cco q95 ece` ANY DESIGN DISCREPANCIES IN ORDER TO COMPLY WITH LOCAL/STATE BUILDING CODES, MHD SPECIFICATIONS AND ABOVE MENTIONED REQUIREMENTS FOR ° CONSTRUCTION). PRIOR TO THE CONTRACTOR MAKING THE FIELD CHANGE, THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE DESIGN ENGINEER (SCOTT _ - _ - °e PATROWICZ, P.E.) FOR AU DEVIATIONS TO THIS PLAN. THE DESIGN ENGINEER SHALL INSPECT THE SITE AND THEN DISCUSS THE ANTICIPATED CHANGE WITH - - - \ ; \ , ` THE CITY (TOWN) ENGINEERING DEPT/DPW PRIOR TO THE CONTRACTOR MAKING THE FIELD CHANGE. THE CITY MAY CONSERVATION COMMISSION AND/OR DPW APPROVALS PRIOR TO THE CONTRACTOR MAKING THE FIELD CHANGE. IF THE CONTRACTOR MAKES THE FIELD CHANGE WITHOUT PRIOR APPROVAL FROM THE DESIGN ENGINEER, THEN THE CERTIFICATION ON THE SITE PLANS BY THE DESIGN ENGINEER IS AUTOMATICALLY NULL AND VOID. PLAN IS INTENDED ONLY TO OBTAIN ENGINEERING DEPARTMENT UTILITY APPROVALS FOR THE CONSTRUCTION OF THE PROPOSED IMPROVEMENTS SHOWN -- - - ON THIS PLAN. THE ACTUAL CONSTRUCTION PERMIT FOR SAID UTILITIES SHALL BE ISSUED TO THE SITE CONTRACTOR (CITY LICENSED DRAIN LAYER). OTHER \ #A19 r 4 \ \ CQSJ'e + \ yy3s oezz' aO^as UTILITY LINES NOT PROPOSED AS SHOWN ON THIS PLAN, REQUIRE THEIR OWN SEPARATE APPROVALS. THE SITE UTILITIES CONTRACTOR SHALL COORDINATE DIRECTLY WITH THE CITY DPW AND/OR CITY ENGINEERING DEPT. FOR INSPECTIONAL SERVICES. THE SITE CONTRACTOR SHALL COORDINATE WILL EACH RESPECTIVE CITY DEPT. FOR REQUIRED APPROVALS AND PERFORM REQUIRED TESTING PER CITY SPECIFICATIONS FOR THE USE OF EACH PROPOSED UTILITY ON-LINE. - - - - - o° PRIOR TO WORKING (ON-SITE AND/OR INSIDE THE ROAD RIGHT OF WAY), THE SITE CONTRACTOR SHALL OBTAIN NECESSARY PERMITS TO PERFORM SUCH -#A18 WORK. THE SITE CONTRACTOR SHALL CONTACT DIG-SAFE ® 1-888-344-7233 AND/OR THE RESPECTIVE UTILITY COMPANY PRIOR TO COMMENCING ANY TOTAL SPACES (INCLUDING LOSS � a �'` i UTILITY OR EXCAVATION WORK. -� - - - °_" / „ �4 OF 3 EXISTING SPACES, ALSO PARKING LOT PAVEMENT e 6 e 0 INCLUDING THE GAIN OF 3 NEW es° ANY EXISTING PAVEMENT SHALL BE REMOVED FROM SITE AND PROPERLY DISPOSED OF IN ACCORDANCE WITH CITY REGULATIONS. HANDICAP SPACES) 59 #A17 °' � \ e%¢9 � ° THE PROPOSED PAVEMENT CROSS SECTION FOR THE PARKING LOT AND DRIVEWAYS SHALL CONSIST OF 1.5-INCH (MINIMUM) BITUMINOUS CONCRETE (TYPE - � - - 1-A) WEARING COURSE ON TOP OF 2.5-INCHES (MINIMUM) BITUMINOUS CONCRETE (TYPE I-A) BINDER COURSE ON TOP OF 12-INCHES OF ROAD GRAVEL \\ SUTABLBASE DENSELY E SUBSOIL RASED GRAVEL: MHD SPECFED BY MHDIAND CITY SPECIFICATIONS. OVER 2-INCHES DIAMETER COMPACTED IN TWO LIFTS MINIMUM TO 95%) ON TOP OF 9=%5 ►-] - - REMOVE EXISTING ASPHALT, esa _ °� ` SIDEWALK \'re \ a2 'r9pc` v�6 e9 exc - A16 (�j,r \ GRADE FOR SLIGHT NEW SIDEWALKS SHALL BE CONSTRUCTED AS SHOWN ON THIS SITE PLAN. THE SIDEWALK SHALL BE SLOPED PER THE GRADING PLAN WITH A MAXIMUM CROSS - -y� - - - #A14 x�° rr �9`" DEPRESSION TO CAPTURE 15 ` SLOE OF 1%. - STORMWATER. INSTALL ROSA RUGOSA 18 SHRUBS ee ` � THE CROSS SECTION FOR NEW CONCRETE SIDEWALK SHALL CONSIST OF 4" THICK FORMED (POURED IN PLACE) PORTLAND CONCRETE CEMENT WITH 6"x 6" - - - - - - - - - - - - - 8 R-' \ c"µ x° o"p0`J o°c e" m°J` WWM ON TOP OF 10-INCHES OF ROAD GRAVEL BASE (DENSELY GRADED GRAVEL: MHD M1.03.0 TYPE C, NO STONES OVER 2-INCHES COMPACTED TO 95%) ON _ #A15 p a y (2-3 HIGH) R= �I er" e ba <S TOP OF A SUITABLE SUBBASE MATERIAL. PLACE JOINT FILLER AT INTERFACE WITH BUILDING AND INTERFACE WITH CURBING. PLACE A SCORE LINE 5-FEET ON CENTER, PLACE EXPANSION JOINTS WTH JOINT FILLER EVERY 30-FEET ON CENTER. `.v_ W w _ - 200.87+ C 9� MATCH NEW SIDEWALK TO EXISTING SIDEWALK WITH NO BUMP OR DIP. SAW CUT EXISTING SIDEWALK FOR CLEAN EDGE. - RE-GRADE FOR SLIGHT I `'o est"°" °�� HANDICAP RAMPS SHALL BE INSTALLED PER THE MOST RECENT ARCHITECTURAL BARRIER BOARD REQUIREMENTS AND SPECIFICATIONS. HANDICAP RAMPS ►,r p ;«E DEPRESSION TO CAPTURE -�- - -y C � � °b sv P SHALL BE A MINIMUM WIDTH OF 48-INCHES AND SHALL NOT HAVE ANY SLOPE EXCEEDING 8% WITH HANDRAILS (OR 5% WITHOUT HANDRAILS). SPECIAL STORMWATER. INSTALL +199.0 I „��J` ;:'; °.�Ro` ATTENTION TO DETAIL IS REQUIRED IN CONSTRUCTING HANDICAP RAMPS. IF RAMPS ARE NOT CONSTRUCTED MEETING ADA REQUIREMENTS, THEY ARE DEEMED -- - - ROSA RUGOSA 8 SHRUBS eb ('� 20�� `I +199 5 \ % " %:% °°` UNACCEPTABLE AND SHALL BE THE RESPONSIBILITY OF THE SITE CONTRACTOR TO REPAIR OR REINSTALL. �- - - - - ,u - -.y - -�_ 2-3 HIGH •../ ( ) \ °9 °eoo;%� Y �`` %��""°� �a�J� PARKING STRIPING G ,z 'Y x - ._. - - - - - - - ,_ I � THE SIZE OF A HANDICAP SPACE SHALL BE PER ARCHITECTURAL BARRIER BOARD SPECIFICATIONS 8-FEET x 18-FEET WITH A 8-FOOT STRIP NEXT TO THE SPACE DESIGNATED NO PARKING (VAN ACCESS). ALL STRIPING SHALL BE 4-INCH REFLECTORIZED WHITE PAINT. 201'3 / °e A HANDICAP SIGN (R7-8) SHALL BE MOUNTED ON A METAL POST PER MASS. HIGHWAY DEPT. SPECIFICATIONS FOR EACH HANDICAP SPACE. Ej ° z, RIP RAP IP RAP SHALL MHD RIP RAP). RIP L BE USED OPES EXCEED STON LL NOT GH RE °e ca ?P0 -202- -i ' THANA00HBLS EACH. RIPORAPLSHALLTBETPLACED ON1A(6-INCHRCRUSHED STONEEBEDR(MHD M2.01?4) ONUTOPDOF MRAFI FABRICE(140NAOR EQUIVALENT),EN)0 ON TOP OF SHAPED/GRADED/COMPACTED SUITABLE FILL SMH R!M 4.51 cc / A /INVzn(A) 19 6 e tzlNI - // '\\� MVz ( -798.41 \ l s \.. NV"ut(C -1 .31 v�� I N � � � \ STRUC11JRAL FILL (SUB-BASE) UNDER PARKING (PAVED AREAS %°s,% � /� `` I •G,_ / THIS SUB-BASE MATERIAL SHALL OCCUR UNDERNEATH THE 12-INCH GRAVEL ROAD BASE. THIS SUB-BASE MATERIAL SHALL BE MHD M2.01.7 (DENSE GRADED 0_ 1 1 ice/ i - `\ \+-eae- `A 2030 p- e ` , I ! REMOVE EXISTING ASPHALT, CRUSHED STONE FOR SUB-BASE) AND COMPACTED IN 6-INCH LIFTS TO 957. PRIOR TO INSTALLATION OF THIS STRUCTURAL FILL UNDER PARKING, ALL BORDERING VEGETATED ' '\ „ � r! REGRADE FOR HANDICAP UNSUITABLE MATERIAL SHALL BE REMOVED, AND A GEOTEXTILE FABRIC SHALL BE PLACED UPON VIRGIN/COMPACTED/SUITABLE GROUND. FINAL SPECIFICATIONS WETLANDS 5. \\\ \ R=10' b° 2a' e` a %ppJ \ ACCESS DRIVE BY OTHERS (NAMELY A REGISTERED GEOTECHNICAL ENGINEER). PLDE ASSUMES NO RESPONSIBILITY FOR MATERIALS OR CONSTRUCTION UNDERNEATH THE N #Al2 \>,� %�s' / ' \\\. los' % . `^� / / \ PARKING. / \ � ` (TOTAL ) 3 OLENGTH 1 OD LFL I' \ ` ` ` / °g Q4\ NEW PAVED HANDICAP DRIVE AND PARKING AREA / o� \ � - °"` / ?O R=22 \,, \ (12" COMPACTED GRAVEL 95%, 2"TYPE lA BIT.CONC. BINDER, 2"TYPE lA BIT.CONC. TOP 15' +_0-9.7 \ 05.!J �? i/ \ COURSE). CONTRACTOR TO INSURE SUB-BASE IS g #Alj �--- _ R=e' / 'i gS� � ' SUITABLE (NO ORGANICS, NO DEBRIS). w ADJUST THE MANHOLE COVER TO MEET FINISHED GRADE _ Jai\ %° AV AS REQUIRED. DETERMINE INVERTS OF EXISTING SEWER SMALL CONCRETE ti z ti iz O eo / /' o°I° LINE AND INSURE PROPER COVER OVER PIPE. INSTALL RETAINING WALL (POURED IN PLACE) 11 x \\ �� BOLLARDS FOR PROTECTION OF MANHOLE. GRAPHIC SCALE m I 0 - EXISTING / o� / n � mos °G"J` oe I I e 1I zo +o #A9 ° LIGHTPOLE TO �z 1 0°1° // a %Q=°r '-SNIP OFF A SMALL PORTION OF THE 3 - #At i i�� R� \ o EXISTING RET.WALL / EMAIN / i �' / Q� / e' INSTALL CONCRETE CAP OVER EXISTING SEWER PIPE WITH INSULATION ( IN FEET PLANS NOT FOR CONSTRUCTION, PLANS FOR PERMITTING PURPOSES ONLY I 0 I R S E ) o - - -- �y / / �� " .200 s" `oma (CONTRACTOR TO INSURE FOR H-20 LOADING) LENGTH=20LF 1 inch = 10 ft. 10OLF SILK' FENCE EROSION / o CONTROL (LIMIT OF WORK) - SEE DETAIL NEW CONCRETE SIDEWALK (4'WIDE) o _ J t, %Jl DEMOLISH EXISTING CONCRETE #A8(9 , \I �� SIDEWALK IN THIS AREA ,\ j ,, ' -SNIP OFF A CORNER OPERATION & MAINTENANCE PLAN Ch -A `, (RECONSTRUCT) A SMALL PORTION 1 6/11/09 REVISED PER COMMENTS FROM SALEM CC AND MASSDEP `° % ` " SNOW MANAGEMENT & ICE TREATMENT - _ - - ` 206.2 %rsJ OF THE EXISTING RIPRAP SLOPED /r/�, WALL TO CREATE A ROUND N0. DATE DESCRIPTION LU - - - _ I Izo%,, V %`0%y eS J % �` 1. PER DEP'S STORMWATER STANDARDS UNDER SOURCE CONTROLS AND POLLUTION PREVENTION IN ACCORDANCE WITH STORMWATER CORNER FOR THE TURN-OUT d = _ - - _ /. STANDARD #9, THE OWNER SHALL IMPLEMENT THE FOLLOWING SNOW REMOVAL PLAN. PROPER MANAGEMENT OF SNOW AND SNOW #A7 °° / i I i _ MELT, REMOVAL AND USE OF DE-ICING COMPOUNDS CAN MINIMIZE THE MAJOR RUNOFF AND POLLUTANT LOADING IMPACTS TO T'IE CO - k - _ / ' �' PAINTED STRIPES FOR PEDESTRIAN WALKWAY ADJACENT WETLAND AREAS. SITE PLAN Iq OU - #A5® / °" vv 2. USE OF DE-ICING COMPOUNDS: THE OWNER SHALL USE ONLY ALTERNATIVE DE-ICING COMPOUNDS SUCH AS CALCIUM CHLORIDE - - G s - 9 , b / 0 l \ 0 - y - - y- 71 f{A6 / / ���p"` •� XL (CaCl2) AND CALCIUM MAGNESIUM ACETATE (CMA) AND ANY NON-SODIUM BASED DEP APPROVED DE-ICING COMPOUND ALLOWED FOR STORMWATER �� ��� REPORT LU - - - - - - / / SV J` pw" III ADJUST THE HANDHOLD (MANHOLE COVER) TO MEET 1.5" SQ. WOOD POST 10' TO 4' O.C. OR MINIMAL USAGE. SANDING IS TO BE USED. SODIUM CHLORIDE AND ROCK SALT SHALL NOT TO BE USED. THE OWNER SHALL - _�- _ _ - '� - / / / / FINISHED GRADE AS REQUIRED. INSURE PROPER STEEL REBAR POSTS SET 10' APART INSTALL THE APPROPRIATE STREET SIGNAGE AT THE ENTRANCE OF THE PROJECT SITE AND WITHIN THE PROPERTY TO REFLECT THIS 2 - - - - _ - _ - / / COVER OVER WIRES WRAP ATTACHMENT- PROHIBITION (LOCATIONS OF SIGNAGE PER SALEM CONSERVATION COMMISSION SPECIFICATIONS THE SIGN SHALL READ: ROCK SALT for a UNDESTURBED DISTANCE ) U) _ _ _ _ / / CORD AROUND _ - PROHIBITED FOR THE PROTECTION OF THE WETLANDS. THE SIGNS SHALL BE MAINTAINED BY THE PROPERTY OWNER TO ENSURE POST TWICE (SEE PLAN) '/ ' es"J NEW CONCRETE SIDEWALK THEIR CONTINUED FUNCTION. THE OWNER SHALL REDUCE THE USE OF DE-ICING COMPOUNDS ON LESS USED PARKING AREAS. K % � FINISHED a� (4 WIDE) MAX.4� GRADE i DOWN GRADIENT PROPOSED HANDICAP O - #A4 � / / / %; 5' TO 10' - THE PARKING AREA AND ADJACENT WALKWAYS SHALL CONTINUALLY BE MAINTAINED DURING WINTER WITH DE-ICING COMPOUNDS AND - \� \ MARAFI FABRIC#A4- WETLAND RESOURCE SAND, SO THAT ICE DOES NOT FORM (MAKING THE PAVEMENT AND WALKWAYS SLIPPERY). PLDE IS NOT RESPONSIBLE FOR 7A �, G, 0°� J a #A3 / / / g ' !;' g ��°s� --- EXISTING CONCRETE SIDEWALK TO REMAIN //�� AREA PERSONAL INJURY DUE TO LACK OF MAINTENANCE OR FOR PERSONAL INJURY FOR PEDESTRIANS NOT USING THE DESIGNATED PARKING AREA z w C / ����� SPOIL (STRIPED) WALKWAY. - / � a t b e _ _ a� / / i P`O" i�%/�������� ' z 3. STORAGE OF DE-ICING COMPOUNDS: THE OWNER SHALL STORE COMPOUNDS INSIDE THE EXISTING BUILDING (IN THE i �.� MAINTENANCE AREA), FULLY CONTAINED, LOCKED AND ENCLOSED. THE STORAGE AREA SHALL BE PROTECTED FROM WATER AND t `J �� # 50 Freedom Hollow BURY FABRIC 8" MIN. - I WIND EROSION AND TRANSPORT. pts 1 E o 0 ob p%o p IN GROUND. DO NOT t} Salem Massachusetts L) A2 s %b5 � '�sMH RIM=207.02 PUT SPOIL ON WETLAND 4. SNOW REMOVAL AND SNOW STORAGE: PLOWED SNOW ON THE SITE SHALL BE PLACED ON PERVIOUS SURFACES WHENEVER o _ # �/ ��i INV=199.67 °pF w SIDE OF FENCE POSSIBLE TO ALLOW SLOW INFILTRATION TO OCCUR. PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF COMPLIANCE FOR THE Date: April 30, 2009 e iJ PROPOSED PROJECT, THE OWNER SHALL INSTALL DURABLE POSTS WITH SIGNS IDENTIFYING THE DESIGNATED AREAS AND MARKED 2 NOTE: CONTRACTOR TO INSTALL TEMPORARY SILT FENCE EROSION CONTROL (LIMIT OF WORK) PLDE#08-28 Scale: 1" = 10' Sheet 1 of 1 AS SHOWN ABOVE AND HAVE IT INSPECTED BY THE CONSERVATION COMMISSION PRIOR TO ANY SNOW STORAGE AREA. THE SIGNS SHALL BE MAINTAINED BY THE PROPERTY OWNER TO ENSURE THEIR CONTINUED FUNCTION. EXCAVATION OR EARTH REMOVAL ON-SITE. -`C - / SHOULD THE AMOUNT OF SNOW ON SITE EXCEED THE DESIGNATED SNOW STORAGE AREA'S CAPACITY AND BE PROPOSED IBR Prepared for: East Coast Properties CC - �I -THE CONTRACTOR MAY NEED NOTE: CONTRACTOR IS RESPONSIBLE FOR INSURING EROSION CONTROL IS PROPERLY C O 400 Highland > - y TO RE-WIRE LIGHT POSTS MAINTAINED AT ALL TIME IN ACCORDANCE WITH THE ORDER OF CONDITIONS (WETLANDS PERMIT) REMOVAL FROM THE SITE, THEN IT SHALL BE DISPOSED OF IN ACCORDANCE WITH THE DEP'S BUREAU OF RESOURCE PROTECTION'S Avenue, Suite 11, Salem, MA 01970 o / JJ AND IN GOOD OPERATING CONDITION. EROSION UNDER SILT FENCE IS STRICTLY PROHIBITED. SNOW DISPOSAL GUIDELINES. PATROWICZ DEPENDING ON WHERE (DEPTH) THE BURIED ELECTRICAL WIRES EXIST SILT FENCE DETAIL SNOW IS PROHIBITED FROM BEING TRANSPORTED ON THE PROPERTY FROM OFF-SITE. LAND DEVELOPMENT ENGINEERING #Af 14 Brown Street, Salem, MA 01970 5. SURVIVING CONDITIONS: THE ABOVE FOUR CONDITIONS SHALL SURVIVE THE EXPIRATION OF THE ORDER OF CONDITIONS, AND �c .' SHALL BE INCLUDED AS CONTINUING CONDITIONS IN PERPETUITY ON THE CERTIFICATE OF COMPLIANCE. (978) 836-6400 ca v, O E U O U