64-500 - 0 DOVE AVENUE - CONSERVATION COMMISSION ISP #0-560 oOCC'toe szle►�, � '
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands #64-500
WPA Form 5 - Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
SALEM
City/Town
A. General Information
Important: Salem
When filling 1. From: Conservation Commission
out forms
on the z. This issuance is for
computer, (check one): a.®Order of Conditions b.ElAmended Order of Conditions
use only the
tab key to 3. To: Applicant:
move your
cursor-do
not use the a. First Name b.Last Name
return key. City of Salem Engineering Dept
mVQ c.Organization
120 Washington Street
d.Mailing Address
Salem Massachusetts 01970
e.City/rown I.State g.Zip Code
4. Property Owner(if different from applicant):
a. First Name b.Last Name
c.Organization
d.Mailing Address
e.City/rown I.State g.Zip Code
5. Project Location:
0 Dove Avenue Salem
a.Street Address b.City/Town
Map 24 Lot 0218
c.Assessors Map/Plat Number d. Parcel/Lot Number
Latitude and Longitude, if known: 70 d 54" m 6.41'W s 42 d 30" m 35.44'N s
d. Latitude e. Longitude
wpalorm5.dM• rev.IMPage 1 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
` Bureau of Resource Protection - Wetlands #64-500
WPA Form 5 - Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
SALEM
Citylrown
A. General Information (cont.)
6. Property recorded at the Registry of Deeds for(attach additional information if more than
one parcel):
Essex
a.County b.Certificate Number(if registered land)
312 98
c.Book d.Page
July 10, 2010 July 22, 2010 July 22, 2010
7.Dates: a.Date Notice of Intent Filed b.Date Public Hearing Closed c. Date of Issuance
8. Final Approved Plans and Other Documents (attach additional plan or document references
as needed):
Dove Avenue Culverty Rehabilitation Project, Salem, Ma
a.Plan Title
New England Civil Engineering Corp. William M. Ross
b.Prepared By c.Signed and Stamped by
July 2010 1" =40'
d.Final Revision Date e.Scale
f.Additional Plan or Document Title g. Date
B. Findings
t. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information
provided in this application and presented at the public hearing, this Commission finds that
the areas in which work is proposed is significant to the following interests of the Wetlands
Protection Act (the Act). Check all that apply:
a. ® Public Water Supply b. ® Land Containing Shellfish c. ® Prevention of
Pollution
d. ® Private Water Supply e. ® Fisheries I. Wi Protection of
Wildlife
g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance
standards set forth in the wetlands regulations. This Commission orders that all work shall
be performed in accordance with the Notice of Intent referenced above, the following
General Conditions, and any other special conditions attached to this Order. To the extent
that the following conditions modify or differ from the plans, specifications, or other
proposals submitted with the Notice of Intent, these conditions shall control.
wpalom5.dw•_rev.122909 Page 2 of t2
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands #64-500
MassDEP File#
WPA Form 5 - Order of Conditions
(� Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
SALEM
Cityrrown
B. Findings (cont.)
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth
in the wetland regulations. Therefore, work on this project may not go forward unless and
• until a new Notice of Intent is submitted which provides measures which are adequate to
protect the interests of the Act, and a final Order of Conditions is issued. A description of
the performance standards which the proposed work cannot meet is attached to this
Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site, the
work, or the effect of the work on the interests identified in the Wetlands Protection Act.
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides sufficient information and includes measures which are
adequate to protect the Act's interests, and a final Order of Conditions is issued. A
description of the specific information which is lacking and why it is necessary is
attached to this Order as per 310 CMR 10.05(6)(c).
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
3. ❑ Buffer Zone Impacts: Shortest distance between limit of project a.linear feet
disturbance and Bank or Bordering Vegetated Wetland boundary (if
available)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. [JBank - a.linear feet b.linear feet c.linear feet d.linear feet
s. ❑ Bordering
Vegetated Wetland a.square feet b.square feet c.square feet d.square feet
s. ❑ Land Under
Waterbodies and a.square feet b.square feet c.square feet d.square feet
Waterways
e.c/y dredged f.Gy dredged
7. ❑ Bordering Land
Subject to Flooding a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet
e. ❑ Isolated Land
Subject to Flooding a.square feet b.square feet
Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet
wpalorm5.doc• rev.12 23109 Page 3 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Ll Bureau of Resource Protection - Wetlands #64-500
MassDEP File q
WPA Form 5 — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction N
SALEM
City/Town
B. Findings (cont.)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
1,000 1,000
9. ® Riverfront Area a.total sq.feet b.total sq.feet
1,000 1,000
Sq ft within 100 ft - c.square feet d.square feet e.square feet f.square feet
Sq It between 100-
200 It g.square feet h.square feet i.square feet j.square feet
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
1o. ❑ Designated Port Indicate size under Land Under the Ocean, below
Areas
11. ❑ Land Under the
Ocean a.square feet b. square feet
c.c/y dredged d.c/y dredged
12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes
below
13. E] Coastal Beaches cu yd cu yd
a.square feet b.square feet c.nourishment d.nourishment
yd
14. El Coastal Dunes cu yd cu
a.square feet b.square feet c.nourishment d.nourishment
15. 0 Coastal Banks a.linear feet b.linear feet
16. ❑ Rocky Intertidal .
Shores a.square feet b.square feet
17. ElSalt Marshes asquare feet b.square feet c.square feet d.square feet
18. ❑ Land Under Salt
Ponds a.square feet b.square feet
c.c/y dredged d.c/y dredged
1s. F-1 Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
20. ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under
the Ocean, and/or inland Land Under Waterbodies and
Waterways, above
a.c/y dredged b.c/y dredged
21. ❑ Land Subject to
Coastal Storm a.square feet b.square feet
Flowage
wpatorra5.Coc• rev.12/23/09 Page 4 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection Wetlands k64-500
MassDEP File k
WPA Form 5 - Order of Conditions
1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction✓<
SALEM
City/Town
B. Findings (cont.)
22. ❑ Restoration/Enhancement:
a.square feet of BVW b.square feet of salt marsh
23. ❑ Stream Crossing(s):
a.number of new stream crossings b.number of replacement stream crossings
C. General Conditions Under Massachusetts Wetlands Protection Act
The following conditions are only applicable to Approved projects.
1. Failure to comply with all conditions stated herein, and with all related statutes and other
regulatory measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying
with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this
Order unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years,
but less than five years, from the date of issuance. If this Order is intended to be valid
for more than three years, the extension date and the special circumstances warranting
the extended time period are set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three
years each upon application to the issuing authority at least 30 days prior to the expiration
date of the Order.
6. If this Order constitutes an Amended Order of Conditions, this Amended Order of
Conditions does not extend the issuance date of the original Final Order of Conditions and
the Order will expire on 7/22/2013 unless extended in writing by the Department.
7. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash,
refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath,
paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the
foregoing.
8. This Order is not final until all administrative appeal periods from this Order have elapsed,
or if such an appeal has been taken, until all proceedings before the Department have
been completed.
wpaform5.doc• rev.12/2&09 Page 5o112
Massachusetts Department of Environmental Protection Provided by MassDEP:
\ 1 Bureau of Resource Protection - Wetlands 464-500
MassDEP File#
WPA Form 5 — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
SALEM
Citylrown
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
9. No work shall be undertaken until the Order has become final and then has been recorded
in the Registry of Deeds or the Land Court for the district in which the land is located, within
the chain of title of the affected property. In the case of recorded land, the Final Order shall
also be noted in the Registry's Grantor Index under the name of the owner of the land upon
which the proposed work is to be done. In the case of the registered land, the Final Order
shall also be noted on the Land Court Certificate of Title of the owner of the land upon
which the proposed work is done. The recording information shall be submitted to the
Conservation Commission on the form at the end of this Order, which form must be
stamped by the Registry of Deeds, prior to the commencement of work.
10. A sign shall be displayed at the site not less then two square feet or more than three
square feet in size bearing the words,
"Massachusetts Department of Environmental Protection" [or, "MassDEP"]
"File Number #64-500 "
11. Where the Department of Environmental Protection is requested to issue a Superseding
Order, the Conservation Commission shall be a party to all agency proceedings and
hearings before MassDEP.
12. Upon completion of the work described herein, the applicant shall submit a Request for
Certificate of Compliance (WPA Form 8A)to the Conservation Commission.
13. The work shall conform to the plans and special conditions referenced in this order.
14. Any change to the plans identified in Condition #12 above shall require the applicant to
inquire of the Conservation Commission in writing whether the change is significant enough
to require the filing of a new Notice of Intent.
15. The Agent or members of the Conservation Commission and the Department of
Environmental Protection shall have the right to enter and inspect the area subject to this
Order at reasonable hours to evaluate compliance with the conditions stated in this Order,
and may require the submittal of any data deemed necessary by the Conservation
Commission or Department for that evaluation.
16. This Order of Conditions shall apply to any successor in interest or successor in control of
the property subject to this Order and to any contractor or other person performing work
conditioned by this Order.
17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated
Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be
marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall
be maintained until a Certificate of Compliance has been issued by the Conservation
Commission.
npaform5.doc• rev.12123/09 Page 6 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
\ Bureau of Resource Protection - Wetlands #64-500
WPA Form 5 - Order of Conditions MassDEP File#
1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction N
SALEM
City/Town
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have
been fully stabilized with vegetation or other means. At no time shall sediments be
deposited in a wetland or water body. During construction, the applicant or his/her
designee shall inspect the erosion controls on a daily basis and shall remove accumulated
sediments as needed. The applicant shall immediately control any erosion problems that
occur at the site and shall also immediately notify the Conservation Commission, which
reserves the right to require additional erosion and/or damage prevention controls it may
deem necessary. Sedimentation barriers shall serve as the limit of work unless another
limit of work line has been approved by this Order.
NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS
19. The work associated with this Order(the"Project") is(i)❑ is not(2)® subject to the
Massachusetts Stormwater Standards. If the work is subject to the Stormwater
Standards,then the project is subject to the following conditions:
a) All work, including site preparation, land disturbance, construction and redevelopment,
shall be implemented in accordance with the construction period pollution prevention and
erosion and sedimentation control plan and, if applicable, the Stormwater Pollution
Prevention Plan required by the National Pollution Discharge Elimination System
Construction General Permit as required by Stormwater Condition 8. Construction period
erosion, sedimentation and pollution control measures and best management practices
(BMPs) shall remain in place until the site is fully stabilized.
b) No stormwater runoff may be discharged to the post-construction stormwater BMPs
unless and until a Registered Professional Engineer provides a Certification that:
i. all construction period BMPs have been removed or will be removed by a date certain
specified in the Certification. For any construction period BMPs intended to be converted
to post construction operation for stormwater attenuation, recharge, and/or treatment, the
conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that
the BMP has been properly cleaned or prepared for post construction operation, including
removal of all construction period sediment trapped in inlet and outlet control structures;
ii. as-built final construction BMP plans are included, signed and stamped by a Registered
Professional Engineer, certifying the site is fully stabilized;
iii. any illicit discharges to the stormwater management system have been removed, as per
the requirements of Stormwater Standard 10;
iv. all post-construction stormwater BMPs are installed in accordance with the plans
(including all planting plans) approved by the issuing authority, and have been inspected to
ensure that they are not damaged and that they are in proper working condition;
v. any vegetation associated with post-construction BMPs is suitably established to
withstand erosion.
w0aforra5.doe• rev.1212909 Page 7 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands #64510
k
WPA Form 5 - Order of Conditions MassDEP File
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction F
SALEM
City/Town
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
c) The landowner is responsible for BMP maintenance until the issuing authority is
notified that another party has legally assumed responsibility for BMP maintenance. Prior
to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the
responsible party (defined in General Condition 18(e))shall execute and submit to the
issuing authority an Operation and Maintenance Compliance Statement("O&M Statement)
for the Stormwater BMPs identifying the party responsible for implementing the stormwater
BMP Operation and Maintenance Plan ("O&M Plan")and certifying the following: i.)the
O&M Plan is complete and will be implemented upon receipt of the Certificate of
Compliance, and ii.) the future responsible parties shall be notified in writing of their
ongoing legal responsibility to operate and maintain the stormwater management BMPs
and implement the Stormwater Pollution Prevention Plan.
d) Post-construction pollution prevention and source control shall be implemented in
accordance with the long-term pollution prevention plan section of the approved
Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by
the National Pollution Discharge Elimination System Multi-Sector General Permit.
e) Unless and until another parry accepts responsibility, the landowner, or owner of any
drainage easement, assumes responsibility for maintaining each BMP. To overcome this
presumption, the landowner of the property must submit to the issuing authority a legally
binding agreement of record, acceptable to the issuing authority, evidencing that another
entity has accepted responsibility for maintaining the BMP, and that the proposed
responsible parry shall be treated as a permittee for purposes of implementing the
requirements of Conditions 18(f)through 18(k) with respect to that BMP. Any failure of the
proposed responsible party to implement the requirements of Conditions 18(f)through
18(k)with respect to that BMP shall be a violation of the Order of Conditions or Certificate
of Compliance. In the case of stormwater BMPs that are serving more than one lot, the
legally binding agreement shall also identify the lots that will be serviced by the stormwater
BMPs. A plan and easement deed that grants the responsible party access to perform the
required operation and maintenance must be submitted along with the legally binding
agreement.
f) The responsible party shall operate and maintain all stormwater BMPs in accordance
with the design plans, the O&M Plan, and the requirements of the Massachusetts
Stormwater Handbook.
wpalorre5.doc• rev.12123109 Page 8 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands #64-5W
WPA Form 5 - Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
SALEM
City/Town
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
g) The responsible party shall:
1. Maintain an operation and maintenance log for the last three (3) consecutive
calendar years of inspections, repairs, maintenance and/or replacement of the
stormwater management system or any part thereof, and disposal (for disposal the
log shall indicate the type of material and the disposal location);
2. Make the maintenance log available to MassDEP and the Conservation
Commission ("Commission") upon request; and
3. Allow members and agents of the MassDEP and the Commission to enter and
inspect the site to evaluate and ensure that the responsible party is in compliance
with the requirements for each BMP established in the O&M Plan approved by the
issuing authority.
h) All sediment or other contaminants removed from stormwater BMPs shall be disposed
of in accordance with all applicable federal, state, and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04
are prohibited.
j) The stormwater management system approved in the Order of Conditions shall not be
changed without the prior written approval of the issuing authority.
k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site.
Design Credit(as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1,
Low Impact Development Site Design Credits)shall not be altered without the prior written
approval of the issuing authority.
1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld.
Any fencing constructed around stormwater BMPs shall include access gates and shall be
at least six inches above grade to allow for wildlife passage.
Special Conditions (if you need more space for additional conditions, please attach a text
document):
SEE ATTACHED SPECIAL CONDITIONS
wpaformMoc• rev.12@109 Page 9 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands #64-500
WPA Form 5 - Order of Conditions MassDEP File tt
�\ Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction R
SALEM
City/Town
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No
2. The SALEM hereby finds(check one that applies):
Conservation Commission
a. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a
municipal ordinance or bylaw, specifically:
1.Municipal Ordinance or Bylaw 2.Citation
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides measures which are adequate to meet these
standards, and a final Order of Conditions is issued.
b. ❑ that the following additional conditions are necessary to comply with a municipal
ordinance or bylaw:
1.Municipal Ordinance or Bylaw 2.Citation
3. The Commission orders that all work shall be performed in accordance with the following
conditions and with the Notice of Intent referenced above.To the extent that the following
conditions modify or differ from the plans, specifications, or other proposals submitted with
the Notice of Intent, the conditions shall control.
The special conditions relating to municipal ordinance or bylaw are as follows (if you need
more space for additional conditions, attach a text document):
w0aforre5.doe• rev. 1223/09 Page 10 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 064-500
El
WPA Form 5 — Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPTransaction#
SALEM
City?own
E. Signatures
This Order is valid for three years, unless otherwise specified as a special July 22 2010
condition pursuant to General Conditions#4,from the date of issuance. 1. Date of Issuance
Please indicate the number of members who will sign this form.
This Order must be si �nmd
ajority of the Conservation Commission. 2. Number of signersThe Order m mailed by rtfiad mail(return receipt requested),o hand delivered t e applicant.A
copy also st be mailed or delivered at the same time to the ap ropri�te ep rt t of
Environmen Protection ional Office, if not filing electronically,an t props er, if different
from applican
Signatures•
❑ by hand delivery on ❑ by certified mail, return receipt
requested, on
Date Date
F. Appeals
The applicant, the owner,any person aggrieved by this Order, any owner of land abutting the
land subject to this Order, or any ten residents of the city or town in which such land is located,
are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a
Superseding Order of Conditions. The request must be made by certified mail or hand delivery
to the Department, with the appropriate filing fee and a completed Request of Departmental
Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from
the date of issuance of this Order. A copy of the request shall at the same time be sent by
certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is
not the appellant.
Any appellants seeking to appeal the Department's Superseding Order associated with this appeal
will be required to demonstrate prior participation in the review of this project. Previous participation
in the permit proceeding means the submission of written information to the Conservation
Commission prior to the close of the public hearing, requesting a Superseding Order, or
providing written information to the Department prior to issuance of a Superseding Order.
The request shall state clearly and concisely the objections to the Order which is being
appealed and how the Order does not contribute to the protection of the interests identified in
the Massachusetts Wetlands Protection Act(M.G.L. c. 131, §40), and is inconsistent with the
wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal
ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the
Department has no appellate jurisdiction.
vgabrm5.0oc.• rev.121t309 Page 11 or 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands #64-500
WPA Form 5 - Order of Conditions MassDEP File H
1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transactions
SALEM
City[rown
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the
district in which the land is located, within the chain of title of the affected property. In the case
of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the
name of the owner of the land subject to the Order. In the case of registered land, this Order
shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the
Order of Conditions. The recording information on this page shall be submitted to the
Conservation Commission listed below.
Salem
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation
Commission.
-------------------------------------------------------------------------------------------------------------
To:
Salem
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
0 Dove Avenue #64-500
Project Location MassDEP File Number
Has been recorded at the Registry of Deeds of:
Essex
County Book Page
for: Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wpafo m5,dm• rev.12)23109 Page 12 of 12
°cgg Attachment to Order of Conditions # 64-500
= E' Page fof 5
SALEM CONSERVATION COMMISSION
DEP FILE #64-500
0 Dove Avenue (Culvert Replacement)
City of Salem, Massachusetts
ADDITIONAL FINDINGS
Based on the Estimated Habitats of Rare Wildlife and Certified Vernal Pools Map (June 1, 2003) from Natural
Heritage & Endangered Species Program (NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has
been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contains any
vernal pools.
This Order is issued under the Massachusetts Wetlands Protection Act, M.G.L. Chapter 131, Section 40 and the City
of Salem Wetlands Protection Ordinance, Salem Code Chapter 34, Section 34-1 —34-13.
This Order permits the replacement of two corrugated metal pipe culverts, each approximately 5-feet in diameter
which passes under Dover Avenue near the intersection with Jefferson Avenue (0 Dove Avenue). The partially
collapsed existing culverts will be replaced with high density polyethylene HDPE Pipe culverts of approximately
the same diameter as the old metal pipe culverts. This Order permits the alteration of approximately 1,000 square
feet of Riverfront Area (inner riparian zone). Because the exact method of removal and replacement of culverts
cannot be determined until the results of the City's public bidding process is completed,the City Engineer and/or its
hired Contractor MUST Amend this Order of Conditions and discuss the exact method to replace the culverts and
protect the wetland resource areas(refer to Special Condition#43).
GENERAL CONDITIONS
1. This Order of Conditions must be recorded in its entirety(including all 5 pages of Special Conditions)
at the Essex County Registry of Deeds or the Land Court for the district in which the land is located,
after the expiration of the 10-day appeal period and within 30 days of the issuance. A copy of the
recording information must be submitted to the Salem Conservation Commission before any
work approved in this Order commences.
2. Approval of this application does not constitute compliance with any law or regulation other than
M.G.L Chapter 131, Section 40, Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands
Protection Ordinance, Salem Code Chapter 34, Section 34-1 —34-13.
3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No
alteration of wetland resource areas or associated buffer zones,other than that approved in this Order,
shall occur on this property without prior approval from the Commission.
4. Prior to any work commencing on site,a DEP Sign showing DEP File#64-500 must be installed at the
entrance to the site and seen from the public way, but not placed on a living tree.
5. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the
date of the issuance of this Order.
Attachment to Order of Conditions- # 64-500
' Page 2of 5
6. With respect to this Order,the Commission designates the Conservation Agent as its agent with powers
to act on its behalf in administering and enforcing this Order.
7. The Commission or its Agent,officers,or employees shall have the right to enter and inspect the property at
any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131,
Section 40,the Wetlands Regulations 310 CMR 10.00,and shall have the right to require any data or
documentation that it deems necessary for that evaluation.
8. The term "Applicant'as used in this Order of Conditions shall refer to the owner, any successor in
interest or successor in control of the property referenced in the Notice of intent, supporting documents
and this Order of Conditions. The Commission shall be notified in writing within 30 days of all
transfers of title of any portion of the property that takes place prior to issuance of the Certificate of
Compliance.
9. It is the responsibility of the applicant to obtain all other applicable federal, state and local regulatory
permits and approvals associated with this project. These regulatory permits may include but are not
necessarily limited to the following:
(1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816), United States
Army Corps of Engineers.
(2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority
of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00.
(3) Sewer Extension Permit from the DEP Division of Water Pollution Control under MGL. Ch. 2I
ss7 and 314 CMR 7.00. Any Board of Health permit for septic system design for any portion of the
septic system within 100 feet of wetlands shall be submitted to the Commission prior to
construction initiation.
(4) Design Requirements for Construction in Floodplains under the State Building Code(780 CMR 744.).
10. If there are conflicting conditions within this Order,the stricter condition(s) shall rule.
11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and
surface waters during construction or after completion of the project.
12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods
and boundary during any point in construction, if necessary.
13. The Commission reserves the right to impose additional conditions on portions of this project or this site
to mitigate any actual or potential impacts resulting from the work herein permitted.
14. The work shall conform to the following attached plans and special conditions:
Final Approved Plans
City of Salem, Mass Dove Ave Culvert Rehabilitation Project(Sheets 1- 8)
(Title)
July 21, 2010
(Dated)
William M. Ross(New England Civil Engineering,Corp.)
(Signed and Stamped by)
g 'Attachment to Order of Conditions # 64500
Page 3 o 5
City of Salem Conservation Commission
(On Jlle with)
15. Any proposed changes in the approved plan(s)or any deviation in construction from the approved,
plan(s)shall require the applicant to file a Notice of Project Change with the Commission. The Notice
shall be accompanied by a written inquiry prior to their implementation in the field, as to whether the
change(s) is substantial enough to require filing a new Notice of Intent or a request to correct or amend
this Order of Conditions. A copy of such request shall at the same time be sent to the Department of
Environmental Protection,Northeast Regional Office.
16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has
been issued,the applicant or current landowner shall submit to the Commission a statement signed by the
buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of
the Order of Conditions.
17. Condition Number—as indicated shall continue in force beyond the Certificate of Compliance, in
perpetuity,and shall be referenced to in all future deeds to this property.
PRIOR TO CONSTRUCTION
18. Prior to the commencement of any activity on this site other than activities listed above,there
must be a Pre-Construction Meeting on site between the project supervisor,the contractor responsible
for the work, and the Conservation Agent and/or a member of the Conservation Commission to ensure
that the requirements of the Order of Conditions are understood. The staked erosion control line shall be
adjusted,if necessary,during the pre-construction meeting. Please contact the Conservation Agent at
(978)619-5685 at least forty-eight(48) hours prior to construction to arrange for the Pre-
Construction Meeting.
19. Prior to the Pre-Construction Meeting and commencement of any activity on this site, sedimentation and
erosion control measures must be installed as shown on the approval plan(s)and detail drawings. The
Conservation Agent shall inspect and approve such installation at the Pre-Construction Meeting.
20. No clearing of vegetation, including trees,or.disturbance of soil shall occur prior to the Pre-Construction
Meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the Pre-
Construction Meeting if absolutely necessary in order to install erosion control measures where required.
21. There shall be at least twenty(20) hay bales and wooden stakes stored under cover on the site to be used
for emergency erosion control purposes.
EROSION CONTROL
22. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction,
and shall be maintained during construction in any wetland resource area and/or buffer zones. The
erosion control measures shown on the approval plan(s)and provisions in the Order will be the minimum
standards for this project; the Commission or its Agent may require additional measures.
23. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland
resource areas to prevent sediment from entering wetland resource areas.
a Attachment to Order of Conditions # 64500
Page 4of 5
24. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or
replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed.
25. The area of construction shall remain in a stable condition at the close of each construction day.
26. Any de-watering of trenches or other excavation required during construction shall be conducted so as
to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered
through hay bale sediment traps, silt filter bags or other means approved by the Commission or its
Agent.
27. Within thirty(30)days of completion of construction on any given portion of the project,all disturbed
areas in the completed portion of the site shall be permanently stabilized with rapidly growing
vegetative cover, using sufficient top soil to assure long-term stabilization of disturbed areas.
28. If soils are to be disturbed for longer that two(2) months, a temporary cover of rye or other grass should
be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,
exposed surface shall be stabilized by other appropriate erosion control measures, firmly anchored, to
prevent soils from being washed by rain or flooding.
DURING CONSTRUCTION
29. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all
times when work is in progress.
30. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on
the approved plan(s).
31. All waste products,grubbed stumps,slash;construction materials,etc. shall be deposited at least 100 feet
from wetland resource areas and 200 feet from river.
32. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage
system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be
immediately removed.
33. All exposed sub-soils shall be covered by a minimum of three(3) inches of quality screened loam topsoil
prior to seeding and final stabilization.
34. Immediately following drainage structure installation all inlets shall be protected by silt fence, haybale
barriers and/or silt bags to filter silt from stormwater before it enters the drainage system.
35. There shall be no pumping of water from wetland resource areas.
36. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other
components shall be fixed immediately.
37. During construction,all drainage structures shall be inspected regularly and cleaned as necessary.
38. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance
of enforcement actions by the Conservation Commission including,but not limited to,civil administrative
penalties under M.G.L Chapter 21 A,section 16.
✓S.L�b Attachment to Order of Conditions # 64-500
Page 5of 5
AFTER CONSTRUCTION
39. Upon completion of construction and final soil stabilization, the applicant shall submit the following to
the Conservation Commission to request a Certificate of Compliance(COC):
(1) A Completed Request for a Certificate of Compliance form (WPA Form 8A or other form if
required by the Conservation Commission at the time of request).
(2) A letter from a Registered Professional Engineer certifying compliance of the property with this
Order of Conditions.
(3) An "As-Built' plan signed and stamped by a Registered Professional Engineer or Land Surveyor
showing post-construction conditions within all areas under thejurisdiction of the Massachusetts
Wetlands Protection Act. This plan shall include at a minimum:
(a) All wetland resource area boundaries with associated buffer zones and regulatory setback
areas taken from the plan(s)approved in this Order of Conditions;
(b) Locations and elevations of all stormwater management conveyances, structures and best
management designs, including foundation drains,constructed under this Order within any
wetland resource area or buffer zone;
(c) Distances from any structures constructed under this Order to wetland resource areas-
"structures"include,but are not limited to,all buildings,septic system components,wells,
utility lines,fences,retaining walls,and roads/driveways;
(d) A line delineating the limit of work-"work"includes any filling,excavating and/or
disturbance of soils or vegetation approved under this Order;
40. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds
and a copy of the recording submitted to the Salem Conservation Commission.
41. If the completed work differs from that in the original plans and conditions, the report must specify how
the work differs; at which time the applicant shall first request a modification to the Order. Only upon
review and approval by the Commission, may the applicant request in writing a Certificate of
Compliance as described above.
42. Erosion control devices shall remain in place and properly functioning until all exposed soils have been
stabilized with final vegetative cover and the Commission and/or its Agent has authorized their removal.
ADDITIONAL CONDITIONS
43. Following the public bidding process and selection of installation method, the City and/or its hired
Contractor is required to Amend this Order of Conditions and return the Commission to discuss the
exact method to replace the culverts, so that the Commission can review/approve such method and
attach additional conditions, as necessary, to ensure that the wetland resource areas are being properly
protected.
44. Prior to Amending this Order and prior to any work commencing on site,the City Engineer and/or the
selected Contractor must submit a Revised Work Plan to be reviewed and approved by the Commission.
The Revised Work Plan shall address the following: details of culvert installation method, construction
staging and access, restoration of staging areas, types and locations of erosion control measures used,
de-watering and pumping details.
MAIN,,,
MI'TFII
VOW
1 leccunher 20;0
N7 1 xa SWi
021H
Ro Atme Asm Odsms! KPIVICenlent PLICCI,
I Retluileni-nic
u1sir NI
Us loop 0 to In0s; 11, ITMI The Scion, Couserwation ('owt,-Jsion h"Is$'xpntssul conoent L+Tui ibc
!micro! issocy rula'"Fing irw Candkow crow I two Amway wonsuoson 'sil" , Th3"')i1w.ving An. "vm
AMOSY A NUSIMAY'S PrCom.MLON&I MCCOng with 'Oni D&A, 0c:
• hm kussfIll fujou sign in putlady otuniuva Md Set dQ.. LO b-1-nore OEM,
Ms WCAM30n ha4 ucep sqb'mj-,Iw3 [hai: it spill 0 is o 1 n si
s
;Rojiab)c lxloryl ;'3 jnSUMI�Ioll'r WS i:, dOQ�, WIQt CO'Vtf the ICQfilir,�d ala-
h2vtales jnuqbCit}uhle-matkCd,
1 Aft hig contskulan! trust &�: on i-d! suet=F vVilh Nwbalcts,and
fh �d3--! baare rl'ut iny'LMIC"d or, :LP _ate 01 '* 'w iaj 'Ited ill A)4�
4nnr BMW% ,Fpafl WC any posvonsi o"runtsm
sdowam, Wnuvnioa pkAsv COPUt,11 ZIU: on nkycel! phpne ,iC 918-973-63,3,9or at our Salca) t7EaiCca it
al
Volt A. Tow v
4 A TOU U,0 Mmutgn,
Ccil �:--arp'
U I'tlt 'na< 01-4uCity Uigs"IkIn
Wad Mown py.000sainvi
9R £.' Y3kM M�Ez Z
\ss Baas
zRA --z
3
a4" 9F 4 \pR =A
8,
R
9 4 C
3 / o
2
a
I,
r
L � g
x
F _`$ JEFFERSON A VENUE
. \ !
! & ; §6 !
, � . ,m
\ TomX \ /
) § \
Is08
^ } \
/ \
-
,
Massachusetts Department of Environmental Protection ,M Pr`ovidedbyMassoEP" _
`
Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 - Notice of Intent
\ I Document Transaction Number;
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Salem
City/Town
ImpoWben filling
A. General Information
When filling out
forms on the
computer,use 1. Project Location (Note: electronic filers will click on button to locate project site):
only the tab key
to move your Dove Avenue by Jefferson Avenue Salem 01970
cursor-do not
use the return a.Street Address b.City/Town c.Zip Code
key. Latitude and Longitude: 70°54'6.41"W 42°30'35.44N
d.Latitude e.Longitude
r�
I.Assessors Map/Plat Number g.Parcel/Lot Number
2. Applicant:
David Knowlton
a.First Name b.Last Name
Note: City of Salem (Engineering Department)
Before c.Organization
completing this
form consult 120 Washington Street Fourth Floor
your local d.Street Address
Conservation Salem MA 01970
Commission e.Cityfrown f.State g.Zip Code
regarding any
municipal bylaw (978) 745-9595 (978)745-0349 dknowlton@salem.com
or ordinance. h.Phone Number i.Fax Number I.Email Address
3. Property owner(required if different from applicant): ❑ Check if more than one owner
a.First Name b.Last Name
c.Organization
d.Street Address
e.City/Town I.State g.Zip Code
In.Phone Number i.Fax Number j.Email address
4. Representative (if any):
William Ross
a.First Name b.Last Name
New England Civil Engineering Corp.
C.Company
120 Washington Street Suite 202E P.O. Box 3026
d.Street Address
Salem MA 01970
e.City/Town f.State g.Zip Code
(978)741-7401 (978) 741-7402 wmr@engineeringcorporation.com
h.Phone Number i.Fax Number j.Email address
5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form):
a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid
wpaform3.doc•rev. 11/16/09 Page 1 of 8
r
Massachusetts Department of Environmental Protection Provided by MassDEP`:—
Bureau of Resource Protection - Wetlands MassDFP File Number I
WPA Form 3 — Notice of Intent
T
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number]Salem
City/Town
A. General Information (continued)
6. General Project Description:
Replace the two deteriorated corrugated metal culverts that run under Dove Avenue and convey
South River flow. Work will include installation of temporary dewatering "dams' so flow can be
pumped around the construction site, excavation to remove existing culverts and riprap embankments
and installation of new culverts with high density polyethylene pipe and riprap embankments.
7a. Project Type Checklist:
1. ❑ Single Family Home 2. ❑ Residential Subdivision
3. ❑ Limited Project Driveway Crossing 4. ❑ Commercial/Industrial
5. ❑ Dock/Pier 6. ❑ Utilities
7. ❑ Coastal Engineering Structure 8. ❑ Agriculture(e.g., cranberries, forestry)
9. ❑ Transportation 10. ® Other
7b. Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR
10.24 (coastal) or 310 CMR 10.53 (inland)?
1. ❑ Yes ® No If yes, describe which limited project applies to this project:
2.Limited Project
8. Property recorded at the Registry of Deeds for:
Essex
a.County b.Certificate#(if registered land)
312 98
c.Book d.Page Number
B. Buffer Zone & Resource Area Impacts (temporary & permanent)
1. ❑ Buffer Zone Only—Check if the project is located only in the Buffer Zone of a Bordering
Vegetated Wetland, Inland Bank, or Coastal Resource Area.
2. ® Inland Resource Areas (see 310 CMR 10.54-10.58; if not applicable, go to Section B.3,
Coastal Resource Areas).
Check all that apply below. Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including standards
requiring consideration of alternative project design or location.
For all projects
affecting other Resource Area Size of Proposed Alteration Proposed Replacement(if any)
Resource Areas,
please attach a
narrative a. ❑ Bank 1.linear feet 2.linear feet
explaining how b. ® Bordering Vegetated
the resource
area was Wetland 1.square feet 2.square feet
delineated.
c. ❑ Land Under 1.square feet 2.square feet
Waterbodies and
Waterways 3.cubic yards dredged
wpaform3.doc•rev.11/16/09 Page 2 of 8
Massachusetts Department of Environmental Protection Provided by Mi iiDEP—®a 1
Bureau of Resource Protection - Wetlands MassoeP File Number 3
WPA Form 3 - Notice of Intent
Document Transaction Numbers
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 salemmmf___ —
Cityrrown
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont'd)
Resource Area Size of Proposed Alteration Proposed Replacement(if any)
d. ❑ Bordering Land
Subject to Flooding 1.square feet 2.square feet
3.cubic feet of flood storage lost 4.cubic feet replaced
e. ❑ Isolated Land
Subject to Flooding 1.square feet
2.cubic feet of flood storage lost 3.cubic feet replaced
South River
f. ® Rivertront Area 1.Name of Waterway(if available)
2.Width of Rivertront Area (check one):
❑ 25 ft. - Designated Densely Developed Areas only
❑ 100 ft. - New agricultural projects only
® 200 ft. -All other projects
3. Total area of Rivertront Area on the site of the proposed project: square feet
4. Proposed alteration of the Rivertront Area:
a.total square feet b.square feet within 100 ft. c.square feet between 100 ft.and 200 ft.
5. Has an alternatives analysis been done and is it attached to this NOI? ® Yes❑ No
6.Was the lot where the activity is proposed created prior to August 1, 1996? ® Yes❑ No
3. ❑ Coastal Resource Areas: (See 310 CMR 10.25-10.35)
Check all that apply below. Attach narrative and supporting documentation describing how the project
will meet all performance standards for each of the resource areas altered, including standards
requiring consideration of alternative project design or location.
Online Users:
Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any)
document
transaction
number a. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
(provided on
your receipt b. ❑ Land Under the Ocean
page)with all 1.square feet
supplementary
information you 2.cubic yards dredged
submit to the.
Department. c. ❑ Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below
d. ❑ Coastal Beaches 1.square feet 2.cubic yards beach nourishment
e. ❑ Coastal Dunes 1.square feet 2.cubic yards dune nourishment
wpaform3.doc•rev.11/16/09 Page 3 of 8
Massachusetts Department of Environmental Protection Provided by MassbEP.--'`"
Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 - Notice of Intent
Numra
be
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem � "Document Transactionn ss_Y
City/Town
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont'd)
Size of Proposed Alteration Proposed Replacement(if any)
f. ❑ Coastal Banks 1.linear feet
g. ❑ Rocky Intertidal
Shores 1.square feet
h.❑ Salt Marshes 1.square feet 2.sq ft restoration,rehab.,creation
i. ❑ Land Under Salt
Ponds 1.square feet
2,cubic yards dredged
j. ❑ Land Containing
Shellfish 1.square feet
k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
1.cubic yards dredged
I. ❑ Land Subject to
Coastal Storm Flowage 1.square feet
4. ❑ Restoration/Enhancement
If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the
square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional
amount here.
a.square feet of BVW b.square feet of Salt Marsh
5. ❑ Project Involves Stream Crossings
a.number of new stream crossings b.number of replacement stream crossings
C. Other Applicable Standards and Requirements
Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review
1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on
the most recent Estimated Habitat Map-of State-Listed Rare Wetland Wildlife published by the Natural
Heritage and Endangered Species Program (NHESP)?To view habitat maps, see the Massachusetts
Natural Heritage Atlas or go to
h>t>ttp://www.mass.gov/dfwele/dfw/nhesp/regulatory review/priority habitat/online viewer htm.
a. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
April 2009 Version Route 135, North Drive
b.Date of map Westborough, MA 01581
wpaform3.doc•rev. 11/16/09 Page 4 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP" l
Bureau of Resource Protection - Wetlands MassDEPFile Number
WPA Form 3 - Notice of Intent
Document Transaction Numbed;
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem__
City/Tom
C. Other Applicable Standards and Requirements (cont'd)
If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review(321
CMR 10.18). To qualify fora streamlined, 30-day, MESA/Wetlands Protection Act review, please
complete Section C.1.C, and include requested materials with this Notice of Intent(NOI); OR
complete Section C.1.d, if applicable. If MESA supplemental information is not included with the NOI,
by completing Section 1 of this form, the NHESP will require a separate MESA filing which may take
up to 90 days to review(unless noted exceptions in Section 2 apply, see below).
1. c. Submit Supplemental Information for Endangered Species Review*
1. ❑ Percentage/acreage of property to be altered:
(a)within wetland Resource Area
percentage/acreage
(b) outside Resource Area percentage/acreage
2. ❑ Assessor's Map or right-of-way plan of site
3. ❑ Project plans for entire project site, including wetland resource areas and areas outside of
wetlands jurisdiction, showing existing and proposed conditions, existing and proposed
tree/vegetation clearing line, and clearly demarcated limits of work****
(a)❑ Project description (including description of impacts outside of wetland resource area&
buffer zone)
(b) ❑ Photographs representative of the site
(c)❑ MESA filing fee (fee information available at:
http://www.mass,gov/dfwele/dfw/nhesp/regulatory review/mesa/mesa fee schedule htm).
Make check payable to"Commonwealth of Massachusetts- NHESP"and mail to
NHESP at above address
Projects altering 10 or more acres of land, also submit:
(d)❑ Vegetation cover type map of site
(e)❑ Project plans showing Priority& Estimated Habitat boundaries
d. OR Check One of the Following
1.❑ Project is exempt from MESA review.
Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14,
http:l/www.mass.gov/dfwele/dfw/nhesp/regulatory review/mesa/mesa exemptions htm;
the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to
310 CMR 10.37 and 10.59.)
2. ❑ Separate MESA review ongoing. a.NHESP Tracking# b.Date submitted to NHESP
' Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review(see
http://www.mass.gov/dfwele/dfw/nhesp/nhesp.htm, regulatory review tab). Priority Habitat includes habitat for state-listed plants and
strictly upland species not protected by the Wetlands Protection Act.
`* MESA projects may not be segmented (321 CMR 10.16). The applicant must disclose full development plans even if such plans are
not required as part of the Notice of Intent process.
wpaform3.doc•rev.11/16/09 Page 5 of 8
Massachusetts Department of Environmental Protection !Provided tij MassDEP
Bureau of Resource Protection - Wetlands f 4
i MassDEP File Number 4
WPA Form 3 - Notice of Intent 9 --
I - Document Transaction_Number;
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
C. Other Applicable Standards and Requirements (cont'd)
3.❑ Separate MESA review completed.
Include copy of NHESP "no Take" determination or valid Conservation & Management
Permit with approved plan.
2. For coastal projects only, is any portion of the proposed project located below the mean high water
line or in a fish run?
a. ® Not applicable—project is in inland resource area only
b.❑ Yes ❑ No If yes, include proof of mailing or hand delivery of NOI to either:
South Shore-Cohasset to Rhode North Shore-Hull to New Hampshire:
Island, and the Cape&Islands:
Division of Marine Fisheries- Division of Marine Fisheries-
Southeast Marine Fisheries Station North Shore Office
Attn: Environmental Reviewer Attn: Environmental Reviewer
1213 Purchase Street-3rd Floor 30 Emerson Avenue
New Bedford, MA 02740-6694 Gloucester, MA 01930
Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region,
please contact MassDEP's Boston Office. For coastal towns in the Southeast Region, please contact
MassDEP's Southeast Regional Office.
3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
If es, provide name of ACEC see instructions to WPA Form 3 or MassDEP
Online Users: a. ❑ Yes ® NO y P (
Include your Website for ACEC locations). Note: electronic filers click on Website.
document
transaction b.ACEC
number
(provided on 4. Is any portion of the proposed project within an area designated as an Outstanding Resource Water
your receipt (ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00?
page)with all
supplementary a. ❑ Yes ® No
information you
submit to the 5. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Department. Restriction Act(M.G.L. c. 131, §40A)or the Coastal Wetlands Restriction Act (M.G.L. c. 130, § 105)?
a. ❑ Yes ® No
6. Is this project subject to provisions of the MassDEP Stormwater Management Standards?
a. ❑ Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management
Standards per 310 CMR 10.05(6)(k)-(q) and check if:
1.❑ Applying for Low Impact Development(LID) site design credits (as described in
Stormwater Management Handbook Vol. 2, Chapter 3)
2.❑ A portion of the site constitutes redevelopment
3. ❑ Proprietary BMPs are included in the Stormwater Management System.
b. ® No. Check why the project is exempt:
1.❑ Single-family house
wpaform3.doc•rev. 11/16/09 Page 6 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:_
Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 - Notice of Intent
Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Tom
C. Other Applicable Standards and Requirements (cont'd)
2.0 Emergency road repair
3.❑ Small Residential Subdivision (less than or equal to 4 single-family houses or less than or
equal to 4 units in multi-family housing project)with no discharge to Critical Areas.
D. Additional Information
Applicants must include the following with this Notice of Intent(NOI). See instructions for details.
Online Users: Attach the document transaction number(provided on your receipt page)for any of the
following information you submit to the Department.
1. ® USGS or other map of the area(along with a narrative description, if necessary) containing
sufficient information for the Conservation Commission and the Department to locate the site.
(Electronic filers may omit this item.)
2. ® Plans identifying the location of proposed activities(including activities proposed to serve as a
Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to
the boundaries of each affected resource area.
3. ® Identify the method for BVW and other resource area boundary delineations (MassDEP BVW
Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.),
and attach documentation of the methodology.
4. ® List the titles and dates for all plans and other materials submitted with this NOI.
Dove Ave. Culvert Rehabilitation Project
a.Plan Title
Rachel McCarter William Ross
b.Prepared By c.Signed and Stamped by
7/09/2010 1"=40'
d.Final Revision Date e.Scale
Dove Ave. Culvert July 2010
f.Additional Plan or Document Title g.Date
5. ❑ If there is more than one property owner, please attach a list of these property owners not
listed on this form.
6.❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
a. ❑ Attach NOI Wetland Fee Transmittal Form
9. ❑ Attach Stormwater Report, if needed.
wpaform3.doc•rev. 11/16/09 Page 7 of 8
i
Massachusetts Department of Environmental Protection Provided by MassDEP:
�,` Bureau of Resource Protection -Wetlands
MassDEP He Number
WPA Form 3 - Notice of Intent
Document Transaction Number
LEIMassachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
cityrrown
E. Fees
1. ® Fee Exempt: No filing fee shall be assessed for projects of any city, town, county. or district of
the Commonwealth, federally recognized Indian tribe housing authority, municipal housing
authority, or the Massachusetts Bay Transportation Authority.
Applicants must submit the following information(in addition to pages 1 and 2 of the N01 Wetland Fee
Transmittal Form) to confirm fee payment:
2.Municipal Check Number 3.Check date
4.State Check Number 5.Check date
6.Payor name on check:First Name 7.Payor name on check:Last Name
F. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans,
documents, and supporting data are true and complete to the best of my knowledge. I understand that
the Conservation Commission will place notification of this Notice in a local newspaper at the expense of
the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the
requirements of M.G.L. c. 131, §40. Notice must be made by Certificate of Mailing or in writing by hand
delivery or certified mail (return receipt requested)to all abutters within 100 feet of the property line of the
pr catio
1. tuneo�l�- -- -- 2.Date J
3.signature of Property Owner(if different)-_7 4.Date
5.Signature of Representative(if any) 6.Date
For Conservation Commission:
Two copies of the completed Notice of Intent(Form 3),including supporting plans and documents,two
copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the Conservation
Commission by certified mail or hand delivery.
For MassDEP:
One copy of the completed Notice of Intent(Form 3), including supporting plans and documents, one
copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP
Regional Office(see Instructions) by certified mail or hand delivery.
Other:
If the applicant has checked the"yes" box in any part of Section C, Item 3, above, refer to that section
and the Instructions for additional submittal requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a
timely manner may result in dismissal of the Notice of Intent.
wpafonn3.doc•rev. 11/16109 Page 8 of 8
NEW ENGLAND CIVIL ENGINEERING CORP.
120 WASHINGTON STREET,SUITE 202E,P.O.BOX 3026,SALEM,MA 01970
PH:978.741.7401-FAX:978.741.7402-W W W.ENGINEERINGCORPORATION.COM
a
r J
Project Summary
The South River passes under Dove Avenue near the intersection with Jefferson Street through two
corrugated metal pipe (CMP) culverts, each approximately 5-feet in diameter. Over the past two months
a sinkhole has developed in the median between the West and East bound lanes of Dove Avenue. The
City retained a consultant to complete internal inspections of the CMP culverts and they identified
extensive corrosion along both sides of the pipe. In the approximate location of the sinkhole,the CMP
is corroded completely and soil is being drawn into the culvert by passing water, creating the sinkhole
above.
The project will include replacement of the existing culverts with new high density polyethylene HDPE
pipes of approximately the same diameter as the existing CMP culverts. The project will be advertised
for construction with two options:
Option 1: Excavate and remove existing corroded CMP culverts and install new HDPE culverts at the
same line and grade. Work will include excavation and replacement of riprap embankments at both
ends of the culverts, support of existing utilities, installation of new culverts and backfill, and paving
and surface restoration.
Option 2: Clean debris from existing CMP culverts and install new HDPE culverts (of slightly smaller
diameter) inside existing culverts, pumping concrete mortar"grout'to fill the void between the new and
existing culverts, repair of riprap embankments at both ends of the culverts, and paving and surface
restoration.
The method of construction to be selected by the City Engineering Department will depend on the
results of the public advertisement for construction bids and the funds available for construction.
Notification to Abutters
All abutters located within 100 feet of the proposed work location will receive a notification of the
proposed project in writing through Certified Mail, Return Receipt Requested in accordance with the
MassDEP policy. (A copy of the letter and list of the abutters is attached)
Forms and Fees
This is a municipal project and all fees are waived by the Commonwealth of Massachusetts and the City
of Salem.
Existing Wetland Resource Areas
In accordance with City of Salem GIS layers prepared, the the Mass GIS 2009 hydrographic layers, the
proposed project area is located adjacent to and within the buffer zone of a Bordering Vegetated
Wetland resource. The resource area will not be permanently altered during the construction of this
project. The project will also not alter the impervious surface run-off patterns.
WATER RESOURCES - BURIED INFRASTRUCTURE-PUBLIC WORKS - CONSTRUCTION ADMINISTRATION - LAND DEVELOPMENT
There is no portion of the project within the boundaries of Rare and Endangered Species Habitat
according to the Massachusetts department of Fisheries & Wildlife (Mass GIS, Edition 13, October
2008). A copy of the filing does not need to be forwarded to the NHESP for review.
The entire project area is located within the 200-foot buffer zone of a riverfront area (the South River).
Stormwater Management
The project will not increase the impervious surface at the site. All necessary construction related
sedimentation controls are incorporated into the project and sedimentation or erosion from the site
during earthwork.
Prior to any earth at the site, sedimentation barriers (staked mulch sock, silt fence, and floatables booms)
will be placed upstream and downstream of the proposed construction. The sedimentation barriers will
remain in place during the entire extent of the project work.
Heavy equipment will not be allowed to enter any wetland resource area. The entire project will be
completed within the road layout limits within City property road and easement lines.
Alternatives Analysis
An alternative analysis was developed and two options were identified to replace or repair the corroded
CMP culverts. As described in more detail above, the alternatives include:
Option 1: Remove and replace the corroded culverts with new HDPE culverts.
Option 2: Rehabilitate existing culverts by installation of new HPDE culverts within the existing CMP
culverts through a construction technique called "sliplining".
Not replacing or rehabilitating the corroded culverts was not a viable alternative.
NEW ENGLAND CIVIL ENGINEERING CORP.
• - Page 2 of 2
"1e� 4 .. :�.x."_ A2 `� �f • x.:l"� C}�� � - " �Igo- 6= �.� .
A� i R�� S � � �. , � L_ � t � 1 ' FSY� ��y'a�*�.k`✓�•e ws
14
RAR
1A e114 li U
I �;..T� Y<s ,� ,.�.� +� w' � t"t~�, ' tT..� �,� 7r., •.. ., ,•tea ' `� >
I
] CP
Proposed Work Limitin
Cap
+ t
Ut.r
4 I
1ilr .
_`mss X
Sinkhole
•
/. � . T w • ate.__-�
r
Utlr ,U1.•( ^'
J
tJ.0 Ulr( I fir... UI--
MW - l •fit 4'' .y .r 1 ({�,O F "- v• q p jpf z FIL
r Ulu ?! ]
m
r^
Or
City of Salem, Massachusetts
th M ^�
■ caBasin A Drainage Inlet pd valve —Voider Main Dove Avenue Culvert s,,
0 Manhole ® Drainage Outlet } Hydrant —Hydrant Lateral 1
Marsh Drainage Pipeline N2ter Nety rk Junctions—Mar Service Lateral Peet
Print Date:July 9,2010 0 20 1 inch=40 feet 80
CITY OF SALEM, MASSACHUSETTS
DOVE AVE CULVERT REHABILITATION PROJECT
JULY 2010
74,
va
16,
DRAWING INDEX:
N
b k ,. " 1 G-1: GENERAL NS
y feu.r VL TV'F4u w" ° x+$ DNOTES
EXISTINGCONDITIONS-PIANWM
D-2: EXISTING CONDITIONS-CROSS SECTIONS
D3: EXISTING CONDITIONS-PROFILE VIEW
D-0A: PROPOSED WORK-OPTION 1
D-4R: PROPOSED WORK-OPTION2
D-S: DETAILS
D-6: DETAILS
Ile
rs a
PROJECT LOCATION-
LOCUS
OCATION LOCUS MAP (NO SCALE) CONS
��5
d, HOfiV,
NEW ENGLAND CIVIL ENGINEERING CORP.
120 Washington Street 2 ~ Q
Suite#202E
Salem,MA 01970 ttQ
r y (978)741-7401 ss�!4ALE
(978)741-7402(fax)-
GENERAL NOTES:
1. NL CONTOURS TAE BIBm ON CM OF SALEM DES U!ER5 AND REFER M MIIO LL DEODETC VERIMIL GTUM IB.ME COMPIROR SIMIL MNMAN T RMY PAVEMENT FOR A MINIMUM OF ONE YEAR EXCEPT F
OCTOBER. 122S.CONCERNS AND SPOT EIEVMGS ME NOT TO BE USED FIXE CONSTRUCTION AN . PROPOSED TEMPORARY PAYMNEW 5 PLACED LATER OCTOBER IST,MEN R SIMV BE MNMNNED FOR ONE YEAR MFIi
DRMN INVERTS BASED ON A ED DATUM AND TEMPORMY BENCH MMI((ELF/. 1511 SET ON RIM OF EXISTING TEMPORAO PATHV WHEREVER EypTTNO PAW
CEM6URBED DURING
ING ANS RUC�IION�PL10ES ON ME
ow NUN CULYEN.
2. PRIOR TO EXCAVATION.ME CONCWLTdt SIMM EIELO"FHIrY ME Y My SEWER 012 STORM DRNN FUNCTION 19. PEAMMENT PAVEMENT SHAL BE PLACED ItETIAEEN APRIL 15TH AND DECEMBER 1ST OF EACH QN.M W
OF ALL EXSTINO SFRRCES. .
3. ME EXISTENCE.SPIE IEIGTGN,ORIENTATION.AND OESCRIPTCN OF URNIIES ARE FRDM ME BERT AVALABIE 20.ML RIMS AND INVERTS ME SHOWN TO WIMIN WE TENTH OF A FOOT(PLUS OR MINUS 0.1).TINY ME
COS INE INFORM0IMN,BUT ARE MPROIKI ONLY.ME CONTRACTOR SNUE WOFf ME LOCKPOM OF.ALL BASED ON ME BEST AMIABLE INFORMATION AND STEL BE ABRSTED BY ME READINT ENGINEER AS
UNDERGROMD UTOMFS BEFORE EXCAVATING REWIREX
4. UNES FDR SERVICE&POLICE AND FINE AWRY BOXES STREET UGHTS.TRNFIC SIGNNS AND OVpwGD 21.CONTRACTOR SHALL MMITMN EDGE OF ROADWAY DRNMGE PATIFRMS INC-uIMB REPLACEMENT OF PAVED
POWER.TELEPHONE MID CABLE IEILVLSKIN L NES ME NDT SHOWN ON THE PIANS.ME APMOPRMTE MIM AND UNPAVED STALES BUTS.AND CURBS.
COMIMIES OR NR1MMtOFS RRL BE COMULTED FOR LOGTIOS OF ME ABOVE 22. OREFSION AMID CONTROL OF EXISTING SW RMY.EIGSDMO STORY SEWER.AND SOUTH RIVER STREW
5. ME COMIWROR SNML PREMARK ME EXCAVATION MEA IN RHINE PAW PRIOR TO CAWNC ME ENG SALE ROWS AND DEWATERMO ME ME REBPONS®UTI OF ME CONIRACTdR. ME ]WENDED
CURER(TEL. ND.1-05 ax;- E�,ME CORACTOR SHNL CONTACT ME DKI SNE CEWER At LFASP MREE WMODS MR DIVERSION AND WL AND DEATFFING SHAEL BE SUBYRIFTI
D M E Bell FOR RENEW
BUSINESS DAYS PRIOR M MY IXfAVAWN. NTW IDDmON.NOORWON SILML ALSO BE GAAEN TO ML AFFECTED AND A PROAL L
PRIVATE MID/OR PUBUC UTwTl6 TO PERMIT STREET WRING OF THEIR CODS 23. CONTRM7DR TO SUPPORT.W ONK REPLACE,OR REPAIR NL UTH.rTES ETXCUIITfNED WRING
B. ALL EXISTING MANHOLE fRAlO$AMID CORS AMID BATCH BASIN fRM6 HID CRL6 RELATES BUT NOT
IXGVATION]CLUING.BUT NOT UMRED M WATER.DRMN, EEC .T HONE.AND LGHRNG.
REUSED SHLLL NTDIE PROPERTY OF ME OWNER MD SHAL BE OEINFRE BY ME COMULTOR TOA -
LOGICN DESIGNATED BY ME OWNER.
). TEST PIR SH&L BE EXCAVATED AT TICSE LDQVhOM INDICATED ON ME ORM OGS AND WHERE ORDERED OR
APPROVED BY ME ONMER,ALL TEST W FXGVATCM WE TO DETERMINE ME LDGMXS OF EXISTING MMES
OR STRUCTURES SHML BE PERFORMED IN N MICE OF CONSTRUCIIDN OPEIUTIOS SO TWT ANY REQUIRED
CHMG6 IN AUGMENT AW OR OWE OF ME PROPOSED WORK OR MRM LOGTGI6 MAY BE dIERY]ED.
ALL DECGGNS TAATNE MUTT CWUECIS MD REDGTION NTWIFdMEHR WILL BE WE WY ME RESEWT
ENGINEER.AT THOSE =0015 WHEIRE EXPWRATORY TEST PIIS ARE REOMED W DEENMwE ME LOCATION OF
EXIMNG UEITFS.ME CWTRALTOR SMALL PREMMK ME EXGVAMN MFA IN WEIR PRIOR M GW MNG THE OG
SNE COMB(TEL ND.i-000-DG-SAE)AT LEAST 72 HOURS PRIOR TO EXCAVATION OF ME TEST PIIS.
0. WHERE UTILITY RELOOOION S REQUIRED.ME CONTRACTOR SHAL NONY ME AFFECTED UDNY COMPANY AT
LEAST 30 DAYS IN A ANA OF COSTRUOCN MID SHIEL COORDIWTE ME PROPOSED WAX WITH ME ML1TY yOmtl
RELOCATION.
B. L HOTS OF SERVICE CONNECTIONS TAE TO BE DETERMINED DURING CONSTRUCRON.IN CONSULTATION WITH ParetM
PROPERTY OWNER.M.AND RESADOIF ENGINEER. Drain Pipeline
10.ME COMR/CIOR SNAL VERIFY COSTING WNDMONS INFOPoMTION AND REPORT ANT DISCREPANCIES BETWEEN Eactri Pipeline
ME PLMS AND ME ACI WL CONo1TIO1S TO ME OSNER MR TO BEGINNING WORK. Water PpeMe
11.ML EROSION AND SEDIMENT CONTROL RNC6 SHML BE NSTNIED AND APPROVED W ME ENGINEER PRIOR .. .' Stream Limits
M ME COMMENCEMENT OF NNSTRUCRON. DEVICES S INCWDE AT A MINIMUM GEOTEXhIE(SILT SOCK)w Up Of Pavement
AL CATCH BWIS MO A BWRFR COI OF SILT FENCE WY BAES OR MACH SOCK AROUND PROJECT Guartlrail
UYIIS. ALL COXSTMLTICN DEWATERING WATER MIDST BE TRGTED WAIT A SEDIMEMATGN TNM PRIOR TO '—
DISCHARGE UPSWEIW OF OMER EROSION AND SE N IENTAMN WMROL DEVICES PRIOR M EXGVATGN.
Contour Linea
12 ME COMPACTOR SIAL PROTECT ALL TRnVEIED WAYS AND PEDEV1TwW WAYS FROM COSTRUCMN DEBRIS AT -
AEL TIMES.
— —SetlimelMaObn Borrie]
13.MES DISTURBED WRING COISTRUmCN SHML BE RESTORED BY ME CONTI 11 M MER ETHANAL El SWeealk
CONDITION AT THE COMPACTORS EID
14.ME LOMRICTOR SIDISPOSE OF AEL DEMIX M IMTFAVIS,RUESSH.EXCAVATE WTEL MS
YD DEBRIWeWetlandWL
UNI-ESS ORIFRA'SE NOTED,IN/OCOROQNLE WITH ALL LGGAL.STATED AND FEDERAL REWTREMEWS WANG Drain Manhole
JURSOCICN.ME COWRACTOt SHWL BE RESPONSIBLE FOR OBFMBNG AND PANTIa FOR ALL REWIRED DnOMEML ® peehlt Mbnhote
PERM AND FEES.
® Telephone MonhoM
15.ADL TREE EEPROPECRONPROMO M THIS S EEE. BE IN PltLf PRIOR M COYY6CING EXGVAICX TORI(.SFE SPECIAL G d Catch Basin
N016 FOR THEE PROIFCICN MS SHEET.
.� Tran Pole
18.TIRES M T MOR M BR BE TAGGED BY 111E CONTRIVER AND MPAO/ES BY ME ENONFFR AHID THE Tnnamis5ion Pale
iOVrtN MBORST PRIOR M MER REMWAL
IT.A MKIMUM 10-FEET HOR20NTAL OR 18-INCH VERFQk SPMOCN SHALL BE W ITNNED BETWEEN WATER T. OF Mapes
AND SEVER(SMRMY OR STORM) MUMS.WHERE MS CN0101`BE MAW]FD.CONCRETE ENCASEMENT OF ME B Water Gate
SEER MAN SHNL BE UIBIIED. RIPmP
Traffic Signal Q
8 Hydrant R
Pat Anal
CIN OF SALEM MLS T New England Civil
rao)Kt
DOVE AVE.CULVERT REHABILITATION by by _ Engineering, Corp. G-1
a.n
GENERAL NOTES .aw by w,nR No D]vWtion DIN . t"'A SALEM,MASSACHUSERS
e nExSONS
N
j a
TRANSMISSION POLE
'PARCEL---------
i
BOUNDRY
CULVERT
- GRANITE CURB
�._� ...I . . C4ryCETE �9
' •"� ':.,. SIDEWALK -.....\ i FI-OW 3--48'
GUARDWilL, . �-" - . � � f CNLVERTS
rz.� 'b UNE '��� •. s
c / a
SINKHOLE '-
�..�
h1EDiAN
(MULCHED)-- r "
----...,
VE AVE
4RANrr
CURB
_
o
_ 4
.
SES M4
. . . . . . . . . . . . .
. \\
` l
. . ./ 4\,03 -i RIPRAP
.
• - _ -
WETLAND AREA
I , ,OF r
J
v.
. _SCALE: .1" = 40"
Feet
r
T 20 40 80 i // #192 JEFFERSON AVE
ZONAL
CITY OF SALEM New England Civil
Grope, aLvett
DOVE AVE CULVERT REHABILITATION W by ""'" Engineering, Corp. D-1
by w
EXISTING CONDITIONS-PLAN VIEW W c� wxa xw D u om. t SALEM,MASSACHUSETTS
TOP OF SLOPE
GRASS AREA
],-
RIPRAP IN 1 IN 2
s•.• f
Rx I L Lps•
_ SECTION A-A
` DOVE AVE CULVERT INLET STRUCTURES
TOP OF SLOPE
GRASS AREA pmpmae sNpmx ppw "°"`"°'"
s, xpprt oesmm ro cxaDl nFaes mia¢,ns
Irr Onrol mm
xqm pn.N e,•x.leY .v w.nan m./_ S m�ia'��' ��.wiwnt�mon
5• A f
2'r m•mw m as
. .. papa mOn
OUT 2 ❑UT i INIFRO�I s,•x.nv
RIPRAP "
• . � �;. � . TE pRHAl3�F!&6ENR®AM TE F9IWECIM1E Oi SINMIG.T TS p111E1 pl WMRIRFNI FID YID NE'.IHJ VSIRF/ll
s7• NOf
ru• �3b .
rs• L R o
SECTION B-B C
DOVE AVE CULVERT OUTLET STRUCTURES
sSYp�yAIE
pin! Aem
CITY OF SALEM New England Civil
DOVE AVE CULVERT REHABILITATION Lb
i
Engineering, Corp. D-2
E%ISTING CONDITIONS-CROSS SECTIONS W' ' � SALEM,MASSACHUSETTS
RFNLCNS
m
� xww
� I
�V - -- ------------
'MPAUtlWIE YIFR IENL � I 1
" � t
�•�mavczlylrtT��uror �
� n
�tNOF
0+60 p+:-0 i+00. S+Sti
SECTION C-C h`
HORIZ.1"=40'
VERT.1"=4'
'NO :WATER L MEASURED IN FlEW ON MM12010 AT 1WPM
tllmt
R
CITY OF SALEM New England Civil
vmp
DOVE AVE CULVERT REHABILIFATION ee by
by Engineering, Corp. D-3
EXISITNG CONDITIONS-PROFILE VIEW sxw I, INI N. Ou>b1Nn. [kft J SALEM,MASSACHUSETTS
e RExsaNs
ooc
xx
v O�RN
6 -
i F
L . . f i p P
NONE
DMH
DOVE AVE
o------------ ATER
\✓ -,_ a i" ER
NE`
..
r
WETLAND AREA �� W J tHOF
og,
. - - - - s
SCALE: f" _ 40" -
del #192 JEFFERSON AVE , AL
0 20 40 - - - 80 -
i
awn w
CIN OF SALEM
MLi Ro
New England Civil
DOVE AVE CULVERT REHABILITATION ny y WMR_ Engineering, Corp. D 4
PROPOSED WORK-OPTION I etlietl by .1 N. °ai�°o °°�° �"' SALEM,MASSACHUSETTS
e mmsaxs
- - a
�OF
0
/ co•
GjR
EN \ Yom.- m� FLO - ! t
_ \ i
\•,, '-^---.....__ � — .-., \`�r �o / ,!- ,/i O/POWER
ELEC7PIC
+
HO
EtCP�� i.0.
(yLINE -
W
yI DO
__. AV
• • • • . 10 -{ '\
WATER �
i
.�.�0�
.
r
WETLAND AREA r f I i �N06'M� -
-
. . . • • . • . • _
1 /
SCALE: f" _- 40'
/ Al .,
#192 JEFFERSON AVE
0 20 40 . 80
ONnI �'•W 9iM
CITY OF SALEM mrwrm
aL� New England Civil
DOVE AVE CULVERT REHABILITATION b^1 Engineering, Corp. D-4B
by
PROPOSED WORK-OPTION 2 u, wne xw o.c yea oar. , SALEM,MASSACHUSETTS
e nensaxs
q,.« IM]IVd g Art
4G Y.tlt _ OMC NO IXtVILT
>. leo[«imtYim Gtm°elm IIIc �tic rae: tau oW mm t+.�sl
L �
r aura memo-�u oo ncm § R:a m e-y ne wa o°otl°Ra$o`����� 'S ..•.-� r aur¢
t t, awnt Fanrmx
DRAINAGE CULVERT DETNL ]]n mw�J � sua wN nwaUoe O+� ......................... xw wmm Wt m
v N eeU as Grz waa Dena m am
TYPICAL CHNN UNK FENCE UNPAVED ROAD CROSS SECTION
T
IbIIi
N]X VpII9 y 1. NL ialn a\IaVL W Y M Crm
rva un muzrz i �am m i ma�vr°dMiu mlu aao ro]i mL tw.
NN nrNva
TN M.TY11C amlf
Y BMvt m�(RK)
rMp aNQ
D391K MVFIrt lmIW PMOEX!
' •V IDN[IG GRN BA91 W1p-�
66 YS aeMm AB�
ilm
, YE[YL
l�L RILVN® R FSI.116611�� tIBbWL WlEial
N05N11md f WlFlal
W9 a IXfilYlll
FaW141Np1aRM1 yN611 M Gal GRN
50 el D DUAL ,F yT �M MPO el gpeA�M M DETAI
wsw CATCH BASIN SEDIMENTATION BARRIER
aew.s rerem y,O
.r-Orem R. F a reern aawII(wl
Rol aw a]rJ errs(DN
nN� v4 1� GIDeR Fle9mR
e.mxnnm«m F6]]Il rN]eao m em Id'2«NUN W«(>]ma«
FGWJ ro N9IO.ID n an n aGl{W1m mieumNR memUl OreN Rm]m
III
vNo- ry ma A.¢ m
D s rnNu ro s es emFr mtMNORnx Nm a rra eGwr a v
r xr.
v ream m a ama ro swm wa FONFn
_. _ ♦w arm awe w sri eeir ur a Frmam a aw a exGi mr.uoens� nM�nma NRma
A
aa®x.Nw ateF®aF "`
res ew eam aNWa,warn r¢wn mxNeurnarNR Fmlwo awr uena
�m eon v rNm a&A N n M e «Uma sw®M mrlc ar II]F®a
YwFar neY Nm aFaeR. PERMANENT PAVEMENT DETAL
r m r ].•tial m«asmm a v urn earn waw sero Nar wawa a W FNe
w IOJ wE Was Fv mot
1111
n mwsr timer m II tmvsm w w u oeouoa m Rmmt
mU ta'N'm "'� m � M WRmciaR Rna Nwtw owes rramR F«w Nwen a m om
0.tlY1RCln W M]na nO1pRE(IIT°�N.YL UM MWN AJR ro f 1a6R0I MWflR 6 RMID Mm aCICaA 1.Rp R 9na n
e !)TM]lal wL 4R m a M Ia1LiB 1LN.
rill 11�1911 Ell
Raw
3g M COXIrYa uCA.1lOR a OIIOI aN.9V.Y.9d1 aWL Z R/®EIRGI Ml 16 ra tEmBFN 1 n Gal
A . 'TA, " >M aaeaeROR vNa G.aR FY aRlma«,.»„mammy m.aw
ie Uo�" PNa I�yxmmrt awe a mam ro om®a.M awe aru s]].aNnm,
r4L11 R/®W.VL JfN4 GO RInVOrt IY'Tdf 0.00 M na taIILM
A tlN1V.CIG EMYL WG b61rO IgVNY waS.Vp FSIM ROIEA
EL
& SEDIMEMAT
mNFau =
o.t y
CITY OF SALEM %) New England Civil
Np
DOVE AVE.CULVERT REHABILITATION a by Engineering, Corp. D-5
DETAILS w.a by w 0. Nr oaapum Dots At y"a SALEM,MASSACHUSETTS
b REN9M5
ifR mR �s�O A LMmv ovu a .G vn�P[O�vCm�c .
r�d
RMI.'Im AOtQ ,Y v ON9
WE COD BERN vnr
N�rDRa E> w ro W.yJ
,troy W..N
4A
nsvnrt s,W
maa Olv r) ry v rtv
UIILRV QROSSI�NG OELAIL SECIrDN N-A
y
I �.ivlOOy
�tY vwa r Rm mrz 0.+M
von xo Naru M
xn n nwn Y/O tJ w 3.Y ae¢
®nr aovfm Rf111NINOIIS CONCRETE CURB
wma
rvn Nmol —7]
qo,Y.w J Y L
m K .rNW ML Kon RrJJ EIAN
on-anm<mm r w arrxyv <Ecnou r-c .
D�
D
t.areas wrmnrcu ,ARw mra � •�, .,�
Isrw rR O �r�
�IarRri a AA _ .,
TRENCH DVEfmL0.YEJOR VIDES rwaorxo •••
of
P�
CONCRETE EUCASENEM DUAL
CON N'TC WITH<_EWFR DMN DEAL rvm
rm m rrL
�M OF
0
DSI
CITY OF SALEM mrozno
i" New England Civil
DOVE AVE.CULVERT REHABILITATION by by _ Engineering, Corp. D-6
DETAILS by wma xy o DOLa v-- �'� SALEM,MASSACHUSETTS
CITY OF SALEM, MASSACHUSETTS
DOVE AVENUE BY JEFFERSON AVENUE
� S � �v� r��`LL .„17✓0'BV,y,�w'vv�r,A 4 �' r 7"4 ,r� ap+�j`7 vf' < �� it � I�i7 k�l �
��'N 44 �:� .� a... ,CE' 1✓� �� 5`�� e�p� �''���,�,{l� � ,� �r , ���Iti Tom'
`��isy�,��,`"�y
t� ( � i�n I p<,�ryt•..y����'�a. R 1'. � i '3 0 p U I ¶ '
Culvert outlet with view upstream. Sinkhole located on Culvert outlet Riprap embankment
Dove Ave. median directly above culvert. (Sinkhole is
covered with metal plate.)
lr
r 1
S
9 - 5
Culvert inlet Riprap embankment
NEW ENGLAND CIVIL ENGINEERING CORP.
120 WASHINGTON STREET,SUITE 202E,P.O.BOX 3026,SALEM,MA 01970
PH:978.741.7401-FAX:978.741.7402—WWW.ENGINEERINGOORPORATION.COM Pagel oft
CITY OF SALEM,MASSACHUSETTS
DOVE AVENUE BY JEFFERSON AVENUE
Y
q
,
Corrugated Metal Culvert corroding, detach- Deformed corrugated metal culvert wall.
ing and breaking apart.
y t,�
N
M1
Sinkhole covered by metal plate. Curb and Sinkhole without metal plate. Hole leads to
pavement are eroding. void in culvert.
NEW ENGLAND CIVIL ENGINEERING CORP.
120 WASHINGTON STREET,SUITE 202E,P.O.BOX 3026,SALEM,MA 01970
PH:978.741.7401-FAX:978.741.7402-WWW.ENGINEERINGGORPORATION.00M peg¢2 of 2
July 2010
Notification to Abutters Under the Massachusetts Wetlands Protection Act
In accordance with the second paragraph of Massachusetts General Laws Chapter 131,Section 40,you are hereby
notified of the following: -
A. The name of the applicant is The City of Salem,Engineering Department.
B. The applicant has filed a Notice of Intent with the Conservation Commission for the municipality of The
City of Salem,Massachusetts.
C. The activity proposed is located on Dove Avenue near its intersection with Jefferson Avenue.
D. A brief description of the proposed activity:
The two existing corrugated metal culverts that convey the South River under Dove Avenue are corroded
and need to be replaced. The replacement culverts will be two high density polyethylene culverts of the
same hydraulic capacity. The work will include excavation,removal and installation of culverts,backfill
with gravel,paving and restoration of disturbed areas.
E. Copies of the Notice of Intent may be examined at:
Planning Department,3`d Floor, 120 Washington Street in Salem,MA.
Office hours:
Monday-Wednesday: 8:00 AM-4:00 PM
Thursday: 8:00 AM- 7:00 PM
Friday: 8:00 AM- 12:00 PM
F. Copies of the Notice of Intent may be obtained from the Representative of the Applicant:
New England Civil Engineering Corp.
120 Washington Street Suite 4202E
Salem Massachusetts 01970
(978)741-7401
G. This project will be discussed at the Conservation Commission meeting on:
Thursday,July 22,2010 at 6:00 PM in the 3`d Floor Conference room of the City Hall Annex, 120
Washington Street, Salem,MA
Changes regarding the date,time,and place of the Public Hearing may be obtained by calling
(978)619-5685 between the hours of 9:00 AM and Noon,Monday through Friday.
NOTES:
1. Notice of the Public Hearing,including its date,time and place will be published one week prior to the
meeting date in the Salem News.
2. Notice of the Public Hearing,its date,time and place will be posted at City Hall not less than forty-eight
(48)hours in advance and will be available at http://www.salem.com/Pages/SalemMA ConComm/index.
3. You may also contact the nearest Department of Environmental Protection Regional Office for more
information concerning this application or the Wetlands Protection Act. To phone the DEP Northeast
Regional office call(978)664-3200.
SALE
\ DOVE AV UE
EROSION C TR�L N
SFT 1 OF
f
APPROX EXI NV ER
ELEVA JO �T
Q
PRO.PSTR W WATTLE/ } 9S ON
CON I XUL�RIF.R�SE� O E 8) COFFERDAM E
�� FOR STAGINC. ORviv1A I )
ST 'GES S(MENTATION �GON7ROL S STEM AREA-(-S1 E DE'
LOCATION SUBJECT TO CHAS G� UE TO EXISTING FIELD 01 ION STRAW R�
00
"PONTR� _ OL BARB ERTLE ,EROSION r
oP
F -
-� � o�
/ , A
T
ER
` PR's V
PHA�ET— -� � _ � -,. . . • AL GNMENT ( ,YP�
ELECTRIC/TELEPHONE LINE —�
PROP SILTSACK
E
72
E{)I M E-N TA TJ ON TR_- PS
8 V.ATER
-- r
JP RASE-III
APPROX P OPERTY LINE TY
P)
P)
\
PROP ST AW WATTLE EROSION - - -
CONT L BAR E NOTE 8)
` - - - STAGE 2 SE IMENTATON ONTROL SY T M AREA (SEE DET IL)\
ONSTR C I N NOTE / - _ ` - - `WETLAND•AREA - [LOCATIOKI_SUBJECT 0 RANGE DUE 0 EXISTING FIELD C NDIT NS]
—ALL WORK-ASSOCIATED HEREWITH SHA F\ORMjTO/ 0 DEh R OF CONDITIO S SE OR IN DEP FIL / #64-500 AND A ADDITIONAL FINDINGS ATTACHED TO SAID ORDER BY - - STRA T � OSI N
THE CITY-OF—SALEM C6 SER-VA RON-GOMMiSSIbN AS MENUED. - `
2-BASE INFO�RM�ON IS BASED ON CITY OF��SA\L � CiiS��LAYE�RSVAS SHOWN IN THE ROJE,GT�CUMENT, PREPARED Y-NEW ENGLAND CIVIL�ENGINEERING CORPORATION. - - `
ONTROL BARRIER SE NO E 8�
REFER TO SHEET 2 OF 2 FO SION AND SEDIMEN ATIDN CONTROL DETAIL . - _ _ - - COFFERDAM (SEE NOTE 4
SEQUENCE OF CULVERT REPLACEMENT IS AS FOLLOWS: � � ` - - - � FOR STAGING INFORMATION)
TRAFFIC MANAGEMENT STAGE 1: - ` ` • - -
PHASE � - - - LEG\E
INS�AL�RDAMS AND DEWATERING WELL (AS EXCAVATI ) TO SUPPORT WO ON WESTERN ULVERT `AND`DIVERT SOUTH-RIVER FLOW INTO EASTERN `CULVERT ONLY„ ` ` - - 1#192 JEFFERSON AVE V
�
REMOVE AND REPLACE NORTHERN PORTION OF WESTERN LVERT AND BACK�FILT _
PfiA\SR&R PHASE i COFFERDAMS AND IN TALL DEWATERIN (AS-EXCAVATING) TO SUPPORT WOR ON EASTERN CULVERT AND DIVERT`S6UTH RIVER_ FLOW INTO WESTERN CULVERT ONLY. - I ® - DEWATERIN SU PPI.
REMOVE AND \ EPLACE NORTHERI�`JPORT10N OF EA RN CULVERT AND BACKFILL - -
REMOVE DEWA ERING WELL AND COMPLETE SURF CE RESTORATION AS POSSIBLE ON NORTH SIDE OF ROADWAY WITHIN AND, ADJACENT TO TRAFFIC MAINAGEMENT STAGE - l/ { - SEDT ENTATION CONTROL YSTE AREA
1 WORK AREA - - - - _ - "
FFI ANAGEMENT TAGE 2: - - - - _
. - - � � w - _ . - _ � - • SILTS GK SEDIMENT 10 TRA
A (INSTAL\ COFFERDAMS AND DE ATER G WELL (AS EXCAVATING) TO SUPPORT WORK ON EASTERN CULVERT`AND DIVERTSOUTH- RIVER FLOW INTO WESTERN- CULVERT ONLY. - III= - STIA WATTLE EROSION CONfR L BARRIER
EtvTOLE LAND REPLACE SOUTH N ORTION OF EASTERN CULVERT AND BACKFILL - - - PPROX EXI T ATER
I � - COFF DAMS LIMIT
&R PH S COFFERDAMS D INSTALL (AS EXCAVATING) DEWATERING WELL TO SUPPORT WORK N WESTERN `CULVERT qND DIVERT SO VEf?`FILOW MTO EASTERN CULVERT`ONLY. - - - ELEVA I _ _ I EXIST - EXI TI G
REMM� REPLACE SO HERN PORTION OF WESTERN CULVERT AND BACKFILL • - -
�� �T �I
REMOVE�� �ARl G W& AND COMPLETE SURFACE RESTORATION AS POSSIBLE ON SOUTH SIDE OF ADWAY WITHIN, AND ADJACE T TO TRAFFIC MA GEMENT•STAGE - - ` - - PROP - PR P ED
\Q TEMP - TEMIP RAR
REMO FI�ED\WO AREA AND COMPLETE FINAL�SURFACE RESTORATION. . ` - - - - - F�i&R - REf O � AND R SET
t T - RE1 AI
5. ATCH SIN IM TAT10 TR PS SHALL BE SED IN A EAS WHERE MATERIALS ARE TO BE STOCKPILED WAY FROM-WE?LAND AREA . - _ i
�EWATERIN 1N L ��E INSTALLED AS NEEDED -WITHIN THE WORK AREA TO COMPLETE THE WORK. - REM - REIJIO
11*'\G
ONTR-ACTOR AL \U1 112E t ENCH\BOXES AT VARING SIZES DURING EXCAVATION FOR EARTH SUPPORT. - ` - '
8. `cbNTRACTOR HALL
R MOVEND REINSTALL STRAW NI TTLE AS NECESSARY TO COMPLETE THE REQUIRED WOR - - - AP( ROX - AP I R IM' TE
0 Y0 30 60 -�
SCALE I.N- FEET- • ` ` . - -
C: \TEMP\Salem\10765.01-DOVE AVE-EROSION.dwg
SALEM
DOVE AVENUE
EROSION CONTROL DETAILS
SHEET 2 OF 2
RIVER
aura.-aaam(,rA
12"-36" DIA. PERFORATED
CORRUGATED METAL OR
12"-18" PVC PIPE 1 ' : . . . .. . . :. : •• : '.'.'.'.'. .
t WnRK AREA awr ',._• : : ; ;. . ,
\`T \
EXISTING GROUND SIDE SLOPE (VARIES)
�: ::: ; �•: :,: : :.it •aawn+.efaq
'..
STANDPIPE WRAPPED IN ��/ "I,; /��
1/2 INCH HARDWARE CLOTH .,.� `�� ;
k
AND GEOTEXTILE CLASS E �/ 0`, ° $T
1. 6p
u
AKE DETAIL , '
io �\�/ xo awe E SOIL ..
O° O
SLOPE DETAIL
12"
"y/�\%///�:�/y/%:/i�/i�✓��� CLEAN GRAVEL OR co�EaoA" awawr
AASHTO M-43 #57 sEc lo" i
AGGREGATE FILL
1
Notes
k � fia
1. SUPERSACKS SHALL BE PLACED AS TIGHTLY AS POSSIBLE
AGAINST ONE ANOTHER TO PREVENT WATER INTRUSION.
STAKE DETAIL
2. 50 LB SANDBAGS SHALL BE USED AS NEEDED TO PREVENT 5E0T1ON "EW
WATER INTRUSION INTO WORK AREA. p
Notes: 3. SUPERSACKS SHALL BE FILLED WITH SAND AS NEEDED
DEPENDING ON WATER LEVEL.
1. PIT DIMENSIONS AND DEPTH WILL VARY BASED ON FIELD
CONDITIONS.
Straw Wattle Erosion Control Barrier Detail 11/10
Dewatering Sump Pit 3/07 Cofferdam Detail 11/10 N.T.S. Source: VHS
N.T.S. Source: VHS LD-692—rev
N.T.S. Source: VHS
FIELD VARIABLE
STAKES
(2 PER BALE)
p
-
:ic: ;< ■ . • : • .- CATCH BASIN GRATE
BALED HAY BAG REMOVAR ° n
DIRTBAG
OR STRAW ■ xx
SILTSACK
f ° pe O °
m
FILTER
FABRIC a
.:i
.- . ...
Lj
l
Plan View
Plan View
CATCH BASIN 1"x1"x3' WOOD STAKE, CATCH BASIN GRATE
GRATE
_sµ
SILTSACK o �'. . '.. p a p i
FILTER
FABRIC FLOW F�pW
FLOWFLOW \T\ �y\ \� STAKED HAY BALES 20P RE BALE STAKES,
8" (MIN. 4" EMBEDMENT PUMP DISCHARGE HOSE
(MIN.) EXPANSION RESTRAINT DIRTBAG Plan View
SEWN IN SPOUT
a.
Section View STAKED HAY BALES
r Section View ( —PUMP DISCHARGE HOSE
Notes:
Notes:
1. INSTALL SILTSACK IN ALL CATCH BASINS WHERE INDICATED ON
1. ENCLOSE STRUCTURE WITH HAYBALES PRIOR TO PLACEMENT OF THE PLANS BEFORE COMMENCING WORK.
STOCKPILED MATERIAL. MAINTAIN UNTIL ALL STOCKPILED MATERIAL 2. GRATE TO BE PLACED OVER SILTSACK.
HAS BEEN REMOVED FROM AREA OR AS DIRECTED BY THE ENGINEER..
IF GRATE IS AGAINST EXISTING CURB THEN HAY BALES ARE TO 3. SILTSACK SHALL BE INSPECTED PERIODICALLY AND AFTER ALL Cross-Section
2.
IBE F
AROUND THREE SIDES OF GRATE ONLY. STORM EVENTS AND CLEANING OR REPLACEMENT SHALL BE
PERFORMED PROMPTLY AS NEEDED. MAINTAIN UNTIL UPSTREAM
3. GRATE TO BE PLACED OVER FILTER FABRIC. AREAS HAVE BEEN PERMANENTLY STABILIZED Notes:
4. BALES SHALL BE INSPECTED PERIODICALLY AND AFTER ALL 1. NUMBER OF BALES MAY VARY DEPENDING ON SIZE OF DIRTBAG USED.
STORM EVENTS AND REPAIR OR REPLACEMENT SHALL BE
PERFORMED PROMPTLY AS NEEDED.
Siltsack Sediment Trap 6/03 Sedimentation Control System 6/03
Catch Basin Sediment Trap 6/03 N.T.S. Source: VHB LD-674 N.T.S. Source: VHB LD-690
N.T.S. Source: VHB LD-673
i
C: \TEMP\Sa1em\10765.01_DET.dwg