Loading...
64-315 - 174 DERBY STREET - CONSERVATION COMMISSION United States Department of the Interior NATIONAL PARK SERVICE Salem Maritime National Historic Site Saugus Iron Works National Historic Site h 3 174 Derby Street Salem,MA 01970 IN REPLY REFER TO: November 20, 2003 —J NOV 2 - 2 93 Mr. Don Cefalo DEPT.r)�p-, & Conservation Agent 'JT City of Salem 120 Washington St. Salem, MA Re: Extension Permit for Order of Conditions, Salem—Salem Maritime NHS DEP # 64—315 Dear Mi. Cefalo: Attached please find the required Recording Information for the Extension Permit as filed with the Essex County Registry of Deeds. Thank you for processing and granting this extension as expeditiously as you have. Sincerely, Collee ruce Project Manager National Park Service Peg �tr�� 0,4.! ci. e d o ra�I I r ee L 11 4,,2! 03 .Tq,,r!c-- 4; Ttj;-.e- Cs-,HEF. 0 4 -,5 12� 61: 22o70-D 55;,N 7 5.00 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands 64-315 WPA Form 7 — Extension Permit for Orders of Conditions Provided by D—EP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. Recording Confirmation (cont.) To: Salem Conservation Commission Please be advised that the Extension Permit to the Order of Conditions for the project at: 174 Derby Street 64-315 Project Location DEP File Number has been recorded at the Registry of Deed of: �-%S P,A T Y County for: NMV Nik G P�'" SW 106 SME, wvil�.17-I M e ir� H S Property Owner and has been noted in the chain of title of the affected property in accordance with General Condition 8 of the original Order of Conditions on: N01VVMe7bf-- 14 , 100* Date Book Page If recorded land the instrument number which identifies this transaction is: Instrument Number If registered land, the document number which identifies this transaction is: Document Number AKIcant signature WPA Form 7 Page 3 of 3 Re�.02100 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands 64-315 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: When filling From: out forms on Salem the computer, Conservation Commission use only the tab key to This issuance if for(check one): move your cursor-do X Order of Conditions not use the return key. F-] Amended Order of Conditions To: Applicant: Property Owner(if different from applicant): U.S. National Park Service/Salem Maritime NHS Same Name Name 174 Derby Street Mailing Address Mailing Address Salem MA 01970 CityfFown State Zip Code City/rown State Zip Code 1. Project Location: 174 Derby Street Salem Street Address City/Town Map 34 Assessors Map/Plat Number Parcel/Lot Number 2. Property recorded at the Registry of Deeds for: Essex �3134 183 County Book Page Certificate(if registered land) 3. Dates: 12/1/00 12/14/00 12114/00 Date Notice of Intent Filed Date Public Hearing Closed Date of Issuance 4. Final Approved Plans and Other Documents (attach additional plan references as needed): Figures 1-9 (Notice of Intent) NA Title Date 5. Final Plans and Documents Signed and Stamped by: NA Name 6. Total Fee: Exempt (from Appendix B:Wetland Fee Transmittal Form) WPA Fo�5 Page 1 of 7 Re,02/00 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands 64-315 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: [] Public Water Supply X Land Containing Shellfish X Prevention of Pollution E] Private Water Supply X Fisheries X Protection of Wildlife Habitat E] Groundwater Supply X Storm Damage Prevention X Flood Control Furthermore,this Commission hereby finds the project,as proposed, is: (check one of the following boxes) Approved subject to: X the following conditions which are necessary, in accordance with the performance standards set forth in the wetiands regulations, to protect those interests checked above. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: F� the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations to protect those interests checked above. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect these interests, and a final Order of Conditions is issued. the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CIVIR 10.05(6)(c). General Conditions (only applicable to approved projects) 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. WPA Fam 5 Page 2 of 7 Re�.02100 Massachusetts Department of Envir o* nmental Protection DEP File Number: Bureau of Resource Protection - Wetlands 64-315 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to this Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or, "MA DER] "File Number 64-315 11 10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before DEP. 11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A)to the Conservation Commission. 12. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. WPA Fam 5 Page 3 of 7 Re�.02100 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands 64-315 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) 15. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any Contractor or other person performing work conditioned by this Order. 16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. Special Conditions (use additional paper, if necessary): See Attached Findings as to municipal bylaw or ordinance Furthermore, the hereby finds (check one that applies): Conservation Commission F-1 that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: Name Municipal Ordinance or Bylaw Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. F-1 that the following additional conditions are necessary to comply with a municipal ordinance or bylaw, specifically: Name Munialpal Ordinance or Bylaw The Commission orders that all work shall be performed in accordance with the said additional conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. WPA Form 5 Page 4 of 7 Re�.02100 Massachusetts Department of Environmental Protection DEP File Number. Bureau of Resource Protection -Wetlands WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) Additional conditions relating to municipal ordinance or bylaw: This Order is valid for three years, unless otherwise specified as a special condition pursuant to General Conditions K from the date of issuance. b4"-w'�0VX vA Vr� Date i This Order must be signed by a majority of the Conservation Commission. The Order must be mailed by cerfified mail(return receipt requested)or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office(see Appendix A) and the property owner(if different from applicant). Signatures: OE! Of Day Month and Year before me personally appeared to,me known to be the person descdbed in and who executed the foregoing instrument and ack d hathe/stWex utedthe a as his/her free act and deed. !Sam My comm4ion Expires This Order is issued to the applicant as follows: E] by hand delivery on Xby certified mail, return receipt requested,on 2\ Date Date WPA F=6 Page 5 d 7 RM.02100 Massachusetts Department of Environmental Protection DEP File Number: lugBureau of Resource Protection - Wetlands . 64-315 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the,Department, with the appropriate filing fee and a completed Appendix E: Request of Departmental Action Fee Transmittal Form, as provided in 310 CIVIR 10.03(7)within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act, (M.G.L. c. 131, § 40)and is inconsistent with the wetlands regulations (310 CIVIR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. D. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on Page 7 of Form 5 shall be submitted to the Conservation Commission listed below. Salem Conservabon Commission WPA Fo"5 Page 6 of 7 Re�.02JO0 DEP File Number: Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands 64-315 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Recording Information (cont.) Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. -----------------------------------I----------------------------------------------- --------------------------------------- To: Salem Conservation Commission Please be advised that the Order of Conditions for the Project at: 174 Derby Street 64-315 Project Location DEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant WPA Fom 5 Page 7 cf 7 Re�.02JO0 -SALEM CONSERVATION COMMISSION SPECIAL CONDITIONS SALEM MARITIME NATIONAL HISTORIC SITE DERBY WHARF , 1. All work shall conforin to the above-referenced Notice of Intent, site plan and supporting documents and those final specifications which shall be filed with the Commission prior to construction. Any change made or intended to be made to the approved plans shall require the applicant to inquire of theCommission in writing whether the change is substantial enough to require the filing of a new Notice of Intent. 2. Members.and agents of the Commission shall have the right to enter and inspeathe premises at all reasonable times to evaluate compliance with the conditions in this Order. The Commission may require the applicant to submit additional data or information necessary for the Commission to conduct that evaluation., 3. Upon completion of the project,the applicant shall submit,with the request for a Certification of Compliance, an affidavit,prepared by a professional engineer or land surveyor registered in the Commonwealth of Massachusetts, stating that the site has been'developed in accordance with the requirements of this Order of Conditiorls,the referenced site-plan and supporting documents. 4. This Order shall apply to every successor in control or successor in interest of the property described int he Notice of Intent and accompanying plans or part thereof. In the event this land or any part thereof changes ownership before or during construction,the current owner shall notify the new owner,by registered mail,of this Order prior to the transfer of ownership and shall forward proof of this notification to the Commission. 5. Additional erosion and sedimentation control measures deemed necessary by the Commission shall be instituted by the applicant. Any siltation caused onto any welland or waterway area shall be promptly reported to the Commission. Such areas shall be restored to the satisfaction of the Commission. 6. During construction,no debris,fill,or excavated material shall be stockpiled within 100 feet of the high tide line. Any other stockpile location will be protected sufficient to prevent sediment ftom surface runoff entering wetlands and be located only on the southwesterly comer of the wharf area,be kept covered,with material removed weekly. Haybales shall be anchored with stakes and entrenched 4 to 6 inches in depth. Excavated material shall be stockpiled on the upgradient side of the haybale barrier. Haybales shall be inspected daily;those showing signs of deterioration shall be replaced immediately. The haybale barrier shall remain in proper functioning condition until all stockpiling has ceased and material removed. 7. Equipment servicing and overnight equipment storage must be conducted outside the buffer zone. Equipment must be maintained to prevent leakage or discharge of pollutants. 8. *No spill or discharge of petroleum products or other pollutants will occur within 100 feet of any wetland resource area. 9. Notice shall be given this Comrmission no more than 2 weeks nor less than 2 days prior to the commencement of construction activities. Said notice shall include, in writing,the names(s), address(es),and business and home telephone numbers of the project supervisor(s)responsible for insuring that operations are conducted in compliance with this Order. 10. All disturbed soils shall be immediately and similarly re-vegetated upon completion of. construction activities or shall be mulched until the next growing season. Hydroseeding will be initiated no later than September 15. 11. *Fertilizers used for landscaping and lawn care shall contain a low nitrogen content and be used in moderation. Pesticides and herbicides shall not be used within 100 feet of the resource area. 12. ' A pI.an for landscaping and maintenance of vegetation for the buffer zone shall be developed and submitted for Conservation Commission approval prior to commencement of work. 13. An erosion control subsurface filter fabric shall be installed in a line running from Building I to Building 5 and installed in a vertical position in area between the existing northerly seawall and the proposed building foundations. 14. A full depth silt curtain shall be installed and maintained atietty during construction. 15. All work shall be performed from wharf excluding instaUation of 2 piles for Friendship. 16. The order of Conditions including these Special Conditions shall be posted on site. *ongoing conditions that do not expiri upon co m- pletion of the project or issuance of a Certificate of Compliance. Sd�conc=\wc\dcTbywha United States Department of the Interior q, NATIONAL PARK SERVICE a Salem Maritime National Historic Site Saugus Iron Works National Historic Site h 3 174 Derby Street Salem,MA 01970 IN REPLY REFER TO: R:ECEIVED September 11, 2003 SEP 15 2003 PT PL I G [DSEPT.OF PLANNINPG& COMmu V LO 8. MCKM COMMUNITY D:EV0nDftA E7NT Mr. Don Cefalo City of Salem Conservation Commission Request for Permit Extension DEP File No. qj--�4-- Dear Mr. Cefalo: The National Park Service, Salem Maritime National Historic Site, respectfully requests that the above referenced DEP permit, Order of Conditions issued on December 14, 2000, for construction of a permanent mooring and boarding facility at Derby Wharf to support the vessel Friendship, be extended for one additional year. Within the next thirty days the National Park Service will be issuing a construction contract for the work to begin sometime this fall with a completion date of June 2004. Your consideration in granting this extension is greatly appreciated. If you have any questions, I may be reached at 978-740-1680. Sincerely, /Steven Kesselman Superintendent CITY OF SALEM CONSERVATION COMMISSION October 28, 2003 Steven Kesselman Superintendent National Park Service Salem Maritime National Historic Site 174 Derby Street Salem,MA 01970 Re: Extension Permit for Order of Conditions, Salem—Salem Maritime NHS DEP#64-315 Dear Superintendent Kesselman: Enclosed,please find the original Extension Permit for Order of Conditions for Salem Maritime NHS,DEP#64-315.This Document must be recorded at the Essex County Registry of Deeds before any work can continue. Please fill out and return the Recording Information(Page 3)of the Extension, which will,indicated to the Salem Conservation Commission that the document has been recorded. If you have any further questions or concerns,please feel free to contact me at 1-978-745-9595 x 311. Sincerely, LL Don Cefalo Conservation Agent, City of Salem 120 WASHINGTON' STREET, SALENI, MASSACHUSETTS 01970 TEL: 978.745.9595 FAX: 978.740,0404 WWW.SALENI.COM Massachusetts Department of,Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands 64-315 WPA Form 7 — Extension Permit for Orders of Conditions Provided by EP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: When filling out 1. Applicant: forms on the U.S. National Park Service/Salem Maritime NHS computer,use Name only the tab key to move 174 Derby Street your cursor- Mailing Address do not use the Salem MA MA return key. CityfTown State Zip Code 04---h 2. Property Owner(if different): Same Name Mailing Address City/Town State Zip Code B. Finding Information The Order of Conditions (or Extension Permit)issued to the applicant or property owner listed above on: 12/14/00 Date for work at: 174 Derby Street Map 35 Parcel 0408 Street Address Assessors Map/Plat Number Parcel/Lot Number recorded at the Registry of Deeds for: Essex South 3134 183 County Book Page NA Certificate(if registered land) is hereby extended until: 12/14/06 Date This date can be no more than 3 years from the expiration date of the Order of Conditions or the latest extension. Only unexpired Orders of Conditions or Extension may be extended. Date the Order was last extended (if applicable): NA Date Issued by: Salem Conservation Commission WPA Fom 7 Page 1 of 3 Rev 02100 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands Gq-3j5- WPA Form 7 — Extension Permit for Orders of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Finding Information (cont.) This Order of Conditions Extension must be signed by a majority of the Conservation Commission and a copy sent to the appi ant d t appropriate D ot In a I, t 2P Regional Office (see Appendix A). ,:7nt Signatures: On Of oc-\-ZQ� Month and Year before me personally appeared Lo me known to be the person described in and who executed the foregoing instrument and acknowledged that h as his/her free act and deed. Notary Public My CorAmission Exp�ils- C. Recording Confirmation The applicant shall record this document in accordance with General Condition 8 of the Order of Conditions (see below), complete the form attached to this Extension Permit, have it stamped by the Registry of Deeds, and return it to the Conservation Commission. Note: General Condition 8 of the Order of Conditions requires the applicant, prior to commencement of work, to record the final Order(or in this case, the Extension Permit for the Order of Conditions)in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, it shall be noted in the Registry's Granter Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, it shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. Detach page 3 of Form 7 and submit it to the Conservation Commission prior to the expiration of the Order of Conditions subject to this Extension Permit. WPA F.rm 7 Page 2 of 3 Rev.02/00 L Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands 64-315 WPA Form 7 — Extension Permit for Orders of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. Recording Confirmation (cont.) To: Salem Conservation Commission Please be advised that the Extension Permit to the Order of Conditions for the project at: 174 Derby Street 64-315 Project Location DEP File Number has been recorded at the Registry of Deed of: County for: Property Owner and has been noted in the chain of title of the affected property in accordance with General Condition 8 of the original Order of Conditions on: Date Book Page If recorded land the instrument number which identifies this transaction is: Instrument Number If registered land, the document number which identifies this transaction is: Document Number Applicant Signature WPA Fo�7 Page 3 of 3 Re,,02100 COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL P"1'&iJQ131!D Metropolitan Boston - Northeast 1� i, rl Office 20 P to. 06 ARGEO PAUL CELLUCCI GoVernor SALEM BOB DURAND PLANNING E)rpT Secretary JANE SWIFT Lieutenant Governor LAUREN LISS Commissioner City of Salem and National Park Service MAR 10 2001 c/o Fort Point Associates, Inc. 286 Congress Street, 6" Floor Boston, MA 022 10 Attn: Susan St. Pierre RE: Waterways License Application No. WOO-948 1, License No. 8465 Salem Harbor, Salem, Essex County Dear Sir(s)/Madatn(s): The Department of Environmental Protection has approved the enclosed referenced license authorizing you to perform certain activities pursuant to M.G.L. Chapter 91 and regulations 3 10 CMR'9.00. Any'unauthorized substantial change in use or substantial structural alteration of any structure or fill authorized by this license shall render it void. Pursuant to 3 10 CMR 9.17(l)(a) and 9.17(2), the Licensee may appeal this decision within twenty-one(21) days of the date of license issuance, by submitting a written request, by certified mail, for an adjudicatory hearing. Any notice of claim for an adjudicatory hearing must include the following information: the DEP Waterways Application File Number; the complete name, address and telephone number of the party filing the request; if represented by counsel, the name, address and telephone number of the attorney; a clear statement that a formal adjudicatory hearing is being requested; and a clear and concise statement of the specific objections to the Department's license decision, and the relief sought through the adjudicatory hearing, including, specifically, the changes desired in the final Waterways License. The hearing request, along with a valid check made payable to the Commonwealth of Massachusetts in the amount of one hundred dollars($1 00.00), must be mailed to: Commonwealth of Massachusetts Department of Environmental Protection P.O. Box 4062 Boston, MA 02211 This information is available in alternate format by calling our ADA Coordinator at(617)574�6872. 205a Lowell St. Wilmington,MA 01887*Phone (978)661-7600*Fax (978)661-7615*TDD#(978)661-7679 Pnnted on Recycied Po�r License No. 8465 At the same time, a copy of this appeal must be sent to the DEP Waterways Regulation Program, the municipal official of the city or town where the project is located, and any other parties to this proceeding. In addition,this appeal must include a statement that the appropriate copies have been delivered as described herein. Furthermore, this license must be recorded at the referenced County Registry of Deeds with 60 days from the date of license issuance or your license will be revoked. The Registry for your project is: Essex County - Southern District 36 Federal Street Salem,NIA 01970 (978) 741-0200 The work or change in use authorized by this license shall not commence until said license and plans are recorded, the Department has received written notification of the date, book and page number of record, or if the Department receives the enclosed Notification Form to this office. �ncer.ely, am s=Sp(r�ague S S ection Chief W Wet etlands and Waterways Program cc: DEP/Waterways Regulation Program, Boston Salem Conservation Commission, City Hall, Salem, MA 01970 William Whooley, Harbormaster, Winter Island, Salem, MA 0 1970 James A. Sprague, Section Chief Divisioh of Wetlands and Waterways Department of Environmental Protection 205a Lowell Street Wilmington, MA 01887 RE: Waterways Application No. WOO-948 I/License No. 8465 D=Mr. Sprague: This is to notify you that the referenced license was recorded on book number page number(s) Sincerely, LICENSE VOID IF NOT RECORDED WITHIN 60 DAYS OF ISSUANCE TOMMOUlstalth of M1150nottatus No. 8465 Whereas, City of Salem and National Park Service of-- Salem--, in the County of-- Essex -- and Commonwealth aforesaid, has applied to the Department of Environmental Protection for license to—construct and maintain three (3) floats, five (5)platforms and seven (7)ramps ------------------------------------------------ and has submitted plans of the same; and whereas due notice of said application has been given, as required by.law,to the -- Mayor and City Council -- of the -- City -- of Salem; - ---------------------------------------------------------------------------------------------------------- NOW, said Department, having heard all parties desiring to be heard, and having fully considered said application, hereby subject to the approval of the Governor, authorizes and licenses the said City of Salem and National Park Service --, subject to the provisions of the ninety-first chapter of the General Laws, and of all laws which are or may be in force applicable thereto, to—construct and maintain three (3) floats, five (5)platforms and seven(7) ramps ------------------------- -------------------------------------------------------------------------- in and over the waters of— Salem Harbor-- in the -- City -- of-- Salem -- and in accordance with the locations shown and details indicated on the accompanying DEP License Plan No. 8465 (6 Sheets). PRINTED ON RECYCLED PAPER License No. 8465 Page 2 The structures hereby authorized shall be limited to the following use(s): to provide commercial docking and boating access to navigable waters. This license has no term limitation. The existing bulkhead, fill and structures where previously authorized pursuant to Harbor and Lands License No.s 98, 206, and 1938 and DEQE License No. 436 and shall be maintained in accordance with said license conditions. All work authorized herein shall,be completed within five (5) years of the date of license issuance. Said construction period may be extended by the Department for one or more one year periods without public notice,provided that the Applicant submits to the Department,thirty (30) days prior to the expiration of said construction period, a written request to extend the period and provides an adequate justification for said extension. Please see page 3 for additional conditions to this license- ---------------------------- ------ ---------------------------------------------------------------------------------------------------------- Duplicate of said plan,number 8465 is on file in the office of said Department, and original of said plan accompanies this License, and is to be referred to as a part hereof. License No. 8465 Page 3 STANDARD WATERWAYS LICENSE CONDITIONS 1. Acceptance of this Waterways License shall.constitute an agreement by the Licensee to conform with all terms and conditions stated herein. 2. This License is granted upon the express condition that any and all other applicable authorizations necessitated due to the provisions hereof shall be secured by the Licensee RE!E to the commencement of any activity or use authorized pursuant to this License. 3. Any change in use of any substantial structural alteration of any structure of fill authorized herein shall require the issuance by the Department of a new Waterways License in accordance with the provisions and procedures established in Chapter 91 of the Massachuseus General Laws. Any unauthorized substantial change in use or unauthorized substantial structural alteration of my structure of fill authorized herein shall render this Waterways License void. 4. This Waterways License shall be revocable by the Department for noncompliance with the terms and conditions set forth herein. This license may be revoked after the Department has given written notice of the alleged noncompliance to the Licensee and those persons who have filed a written request for such notice with the Department and those persons who have filed a written request for such notice with the Department and afforded them a reasonable opportunity to correct said noncompliance. Failure to correct said noncompliance after the issuance of a written notice by the Department shall render this Waterways License void and the Commonwealth may proceed to remove or cause removal of my structure or fill authorized herein at the expense of the Licensee,its successors and assigns as an unauthorized and unlawful structure and/or fill.. 5. The structure(s)and/or fill authorized herein shall be maintained in good repair and in accordance with the terms and conditions stated herein and the details indicated on the accompanying license plans. 6. Nothing in this Waterways License shall be construed as authorizing encroachment in,on or over property not owned or controlled by the Licensee,except with the written consent of the owner or owners thereof 7. This Waterways License is granted subject to all applicable Federal,State,County,and Municipal laws,ordinances and regulations including but not limited to a valid final Order of Conditions issued pursuant to the Wetlands Protection Act,G.L. Chapter 13 1,s.40. 8. This Waterways License is granted upon the express condition that the use of the structure(s)and/or fill authorized herein shall be in strict conformance with all applicable requirements and authorizations of the DEP,Division of Water Pollution Control. 9, This License authorizes structure(s)and/or fill on: • Private Tidelands. In accordance with the public easement that exists by the law on private tidelands,the licensee shall allow the public to use and to pass freely upon the area of the subject property lying between the high and low water marks,for the purposes of fishing,fowling,navigation,and the natural derivatives thereof • Commonwealth Tidelands. This Licensee shall not restrict the public's right to use and to pass freely,for any purpose,upon lands lying seaward of the low water mark. Said lands are held in trust by the Commonwealth for the benefit of the public. A Great Pond of the Commonwealth. The Licensee shall not restrict the public's rights to use and to pass freely upon lands lying seaward of the high water mark for any lawful purpose. No restriction on the exercise of these public rights shall be imposed unless otherwise expressly provided in this I icense. 10. Unless otherwise expressly provided by this license,the licensee shall not limit the hours of availability of any areas of the subject property designated for public passage,nor place any gates,fences,or other structures on such areas in a manner that would impede or discourage the free flow of pedestrian movement thereon. License No. 8465 Page 4 The amount of tidewater displaced by the work hereby authorized has been ascertained by said Department, and compensation thereof has been made by the said—City of Salem and National Park Service -- by paying into the treasury of the Commonwealth -- two dollars and zero cents ($2.00) -- for each cubic yard so displaced,being the amount hereby assessed by said Department. (.00 cu. yds. = $0.00) Nothing in this License shall be so construed as to impair the legal rights of any person. This License shall be void unless the same and the accompanying plan are recorded within 60 days from the date hereof, in the Registry of Deeds for the County of--Essex ----------------------- IN WITNESS WHEREAS, said Department of Environmental Protection have hereunto set their hands this SIXTEENTH day of MARCH in the year two thousand and one. 42 Department of Commissioner Environmental Protection Section Chief )'THE C*OMMONWE4ALTH OF MASSACHUSETTS This license is approved in consideration of the payment into the treasury of the Commonwealth by the said—City of Salem and National Park Service---------------------------------------------------- the further sum of-- zero dollars and zero cents ($0.00) ------------------------------------------------- the amount determined by the Governor as a just and equitable charge for rights and privileges hereby granted in the land of the Commonwealth BOSTON, Approved by the Governor. Governor DMAD .. ........ LOCUS MAP HAPTER-9-1 OLIN 4m . . ......... ANN NE A4, FEW 1 UM FLOCIV, p ��BOLINIDARY (TW 65;373�3 -CENTRAL WHARF \—SITE LOCATI_ 90' CHANNEL, 8'DEF DERBY WHARF APPROX. CHANNEL LIMITS SALEM HARBOR LOCATION PLAN SCALE: 1"=500' SHEET 1 OF 6 PLAN ACCOMPANYING PETITION OF: �IITY OF SALEM AND NATIONAL PARK SERVICE ro CONSTRUCT TIMBER PLATFORM AND Awwo by Owe=d )OLPHIN, INSTALL NEW FLOATS, GANGWAYS, A'Rm kND MOORING PILES AT 2001 3ALEM HARBOR, SALEM, MASSACHUSETTS 500 0 500 SCALE IN FEET 1"=500' DERBY WHARF 0 MLW .. ...... ...... ......... N554 082.85 E765 4 L34 2 SALEM HARBOR BASIN EL. -13 6 B -41 A--*l 90 FOOT VESSEL 10 MLW,MHW&HTL ALONG P POSED EXISTING STEEL 5 PILE TIMBER BULKHEAD-\ 2� OLPHIN c -5. TO ol )::, t;p :v PROPOSED 20'x4O' FLOAT PROPOSED B 20'x5O' FLO 450'± TO P13 DERBY ST CENTRAL WHARF z- C=3 N554.047.58 C3 ae� PROPOSED E765,287.91 �xl 8' ±150' TO 10'xl8' PILE PICKERING WHARF SUPPORTED TIMBER PLATFORM CD C-5 ol m SITE PLAN SCALE: 1"=60' 0 5 PILE STEEL MOORING TIMBER STAIRS PILES (6 TOTAL) DOLPH] FLT-C FLT-B FLT-A E:RAMP G RAMP F P5 RAMP E P4 0 RAMP A 0 0- P3 RA P RAMP C P2 RAMP e Pi MLW,MHW&HTL ALONG PLATFORM SLOPED Tc MEET EXISTING GR,ADF EXISTINC STEEL BULKHEAD CENTRAL WHARF FLOAT SCHEDULE PLATFORM SCHEDULE RAMP SCHEDULE 0 FLOAT DIMENSIONS(l) FREEBOARD(2) PLATFORM DIMENSIONS(l) FREEBOARD(2) RAMP DIMENSIONS(l) -A 3Ox5 FLT-A 50x2O 48 Pi 156 24 P2 1 Ox4.5 13-8 B 30x3 FLT-B 5Ox2O FLT-C 40x2.O 12 P3 5.75x7.75 108 c 30x3 1005.5 C= 78 D 3OX3 .5a t' P5 _ZZ�AAAA4 E 3OX3 F 24x3 C4 G 120 FLOAT LAYOUT PLAN (1) DIMENSIONS ARE IN FEET. C E: 1"=30' WIDTH SHOWN IS CLEAR WIDTH. SCAL Lq v, (2) FREEBOARD IS IN INCHES 0 ABOVE WATER SURFACE, ITS MIS; PQ C= cm z /-T2y4p' CLEAT rWDETECTABLE 2' TRANSITION 2'. (5 TOTAL) 50 ARNING STRIP PLATE 8- D-SHAPE D-BORE RUBBER ENDER FDE� FLOAT B 24" FB FLOAT A 7P4 P5 8,,, 78 + PILE GUIDE. FBD 0 48" FBD STAIRS FEID > 48" m FBD RAMP E P- RAMP A RAMP F ]p' RAMP D PLATFORM m 108 Pi 14 m FBD P2 L+- L+ RAMP C 1138- 1`13� RAMP B EL. 13.0, TIM BER CURB RAMPS 6" INSIDE 2'-0" CLR., TYP� I�L EDGE OF FLOAT PLATFORM, RAMP ORI EXISTING GRADE MLW,MHW&HTL ALONG STAIR BEARING PLATE EL. 12.0± EXISTING STEEL BULKHEAD CENTRAL WHARF FLOAT DECK PLAN FLOAT A SCALE: 1"=15' 0 TOP OF PLATFORM EL. 13.0± TIMBER PLATFORM GRADED GRAVEL FILL TRANSITION FROM RAMP TO 5 PILE TIMBER DOLPHIN EXISTING STONE WALKWAY 15, 'u� ur A* Mp To KWAY 15' �L APPROXIMATE OUTLINE CENTRAL OF VESSEL WHARF HTL 10.2 TIMBER CURB 1 MHW 9.0 U 3r EXISTING BULKHEAD 31 0, TO REMAIN MLW 0 0 , TIMBER PILE 5 (TYPICAL, 4 TOTAL) 5 BASIN EL. -13.0 =9mww SECTION A-A SCALE: 1"=20' NEW STEEL FLOAT GUIDE PILE (TYPICAL, 2 TOTAL) PLATFORM 2, (138" FB) PLATFORM 4, (78- FB) PROPOSED STEEL FLOAT 22' 20'x5O', 48" FB I APPROXIMATE OUTLINE CENTRAL OF VESSEL WHARF HTL 10.2 MHW 9.0 BASIN jL. -13,0 1 m9mgm SECTION B-B SCALE: 1"-20' nDAAVID UCENSE PLAN NO. Apw4by DWwMmM of EMWOMN PxWjm NAIR 16 Z 0 0 1 20 0 20 SCALE IN FEET 1"=20' SHEET 5 OF 6 lZ TOP OF STEEL PLATFORM 2 PLATFORM 4 PLATFORM 3 PIPE GUIDE PILE EL +20.0 RAMP 8 LATFORM 5 EXIST. GRADE L. 12.0± TIMBER PLATFORM 1 RAMP F -TOP OF CURB EL. 13.0 EL.13.0 OAT 77 N-LW=O_0 EL. -13.0 MINN, SECTION C-C, DURING HIGH TIDE SCALE: 1"=30' TOP OF STEEL PLATFORM 3 PIPE GUIDE PILE EL. +20.0 PLATFORM 2 F . r c� TIMBER PLATFORM 1 PLATFORM 4 FPLATFORM 5 TOP OF CURBI 'ST- GRADE JA E WLA 390 07EL. 12..0± 0 C4L S: I . I z ?0'x50' $TEEL,&Q6L EL, -13.. t CD SECTION C-C. 3: scAPYRING LOW TIDE =30 0 -�ION z Consemdon Comn-i%ion Salem, Massachusetts 01970 ASSA City of Salem Conservation Commission Will hold a public hearing for a Notice of Intent under the Wetlands Protection Act, Massachusetts General Laws, Chapter 13 1, Section 40 and Salem's Ordinance Pertaining to General Wetlands at the request of U.S. National Park Service, 174 Derby Street, Salem, MA. The purpose of the hearing is to discuss the construction of a permanent mooring, docking facility, accessible ramps and a historic warehouse exhibit on the westerly side of Derby Wharf in Salem Harbor at 174 Derby Street. This hearing will be held on Thursday, December 14, 2000 at 7:00 p.m. in the second floor conference room at One Salem Green. Debra A. Hurlburt Chairperson December 7, 2000 Please send bill to: U.S. National Park Service 174 Derby Street Salem, MA 01970 �NT United States Department of the Interior NATIONAL PARK SERVICE 0 Salem Maritime National Historic Site Saugus Iron Works National Historic Site 174 Derby Street Salem,MA 01970 IN REPLY REFER TO: November 28, 2000 Ms. Debra Hurlburt Salem Conservation Commission City Hall One Salem Green Salem, MA 01970 1 Subject: Notice of Intent Certificate of Compliance Salem Maritime National Historic Site Reference: DEP File No. 64-24 Dear Ms. Hurlburt: Attached for the Salem Conservation Commission's consideration are eight copies of a Notice of Intent to construct a mooring and docking facility and accessible ramps on the westerly side of Derby Wharf in Salem Harbor. As requested by Mr. Don Giard, we have also included eight copies of a Certificate of Compliance to close out the Order of Conditions issued on March 13, 1997, for the above referenced project. (see attached correspondence dated 3/ 13/97; 4/29/97; 5/17/2000 and 6/6/2000). The National Park Service originally filed a Notice of Intent for this project in February 1997, DEP File No. 64-24. The project was subsequently delayed due to funding issues and through an oversight, the National Park Service did not request a time extension for the Order of Conditions issued March 13, 1997, which expired earlier this year. The purpose of this Notice of Intent filing is to correct this oversight and obtain a valid Order of Conditions. Attached please find copies of a similar extension request granted by the Army Corps of Engineers on July 3, 2000. The proposed project remains as described in the original Notice of Intent and involves the construction of a permanent mooring and docking facility for the SV Friendship; the installation of accessible ramps to the ship for the visiting public along the westerly side of Derby Wharf; and the construction of warehouse exhibits and site improvements. The project is divided into two phases. The mooring and boarding facility is considered Phase I and is expected to be constructed as one package commencing in the spring of 2001, funding permitting. Proposed activities include the placement of two ramps, gangway systems accessing a steel pile secured float as well as installation of electrical lines to provide shore power to the ship. Phase Il of the proposed project would involve the installation of warehouse exhibits and associated site improvements along Derby Wharf and is not expected to commence before 2005. Phase II work would include the construction of five warehouse exhibit structures; site improvements to the wharf surface; seating and landscaping and the continuation of site utilities to support the exhibit area. To accommodate our funding cycles, we request that the Order of Conditions remain valid for 5 years from issuance. Could your office please schedule the public hearing for this Notice of Intent for your December 14, 2000, meeting. If you have any questions or concerns regarding this matter, please contact either myself or Colleen Bruce at 978-740-1680. Sincerely, /�teven Kesselman Superintendent Enclosures: Notice of Intent cc: DEP / Northeast Regional Office (2 copies certified) Natural Heritage Program (certified) ook c jl Conservation Commission Salern, Massachusetts 01970 '"'ASSACI June 6, 2000 Steve Kesselman National Park Service 174 Derby Street Salem, MA 01970 RE: Request for Permit Extension(DEP File No. 64-264) Dear Mr. Kesselman: The Conservation Commission reviewed your request to extend the Orders of Conditions (DEP File No. 264)issued on March 13, 1997 for construction necessary to build a permanent docking facility at Derby Wharf for the SV Friendship. After reviewing your application,the Conurtission determined that your Orders of Conditions had already expired and that an extension could not be granted. To proceed with this project,you will need to submit a new Notice of Intent application to the Conservation Commission. You are also required to submit a Certificate of Compliance to close out the expired Notice of Intent. I have enclosed a copy of these applications with this letter for your use. If you have any questions or need additional information, please contact me at (978) 745- 9595 ext. 311. Sincerel Don Giard, Senior Planner Cc: Colleen Bruce United States Department of the Interior NATIONAL PARK SERVICE Salem Maritime National Historic Site Saugus Iron Works National Historic Site 174 Derby Street Salem,MA 01970 rN REPLY REFER TO: May 17, 2000 Ms. Debra Hurlburt City of Salem Conservation Commission One Salem Green Salem, MA. 01970 Request for Permit Extension DEP File No. 64-264 Dear Ms. Hurlburt: The National Park Service, Salem Maritime National Historic Site, respectfully requests that the above referenced DEP permit, Order of Conditions issued on March 13, 1997, for construction necessary to build a permanent docking facility at Derby Wharf for the SV Friendship, be extended for an additional three years. WPA Form - 7 Extension Permit for Orders of Condition is attached. Our original plan was to complete the construction of Friendship during 1999 and to construct the permanent mooring piles and access ramps to accommodate the docking facility in late 1999. Issues involved with the construction of the ship have set the time frame for completion bqck to mid - 2001. We are now into the last phase of construction on the vessel and would like to begin construction of the mooring facility at Derby Wharf. We have requested a similar extension with the Army Corps of Engineers and look forward to working with the Salem Conservation Commission in obtaining the necessary time extension. Thank you for your consideration. If you have any questions, I may be reached at (978) 740- 1680. SinceFe y, c Y' S teve teven Kesselman Superintendent CORTELL ASSOCIATES April 29, 1997 Steven Dibble SALEM CONSIERVATION COMMISSION One Salem Green Salem, MA 01970 re: DEP File No. 64-264, National Park Service Dear Mr. Dibble: We and the National Park Service have reviewed the Order of Conditions and request that the following edits be made: Special Condition 6 In the second sentence, please change "the southwesterly comer of the wharf area" t I o the northern Dart of the site. The area for stockpiling was discussed at the hearing and mi our subsequent conversation as being in the northern part of the site on the lawn area north of the beach. The southwest comer of the site would be on Central Wharf near Pickering Wharf. Special Condition 14 Please edit the condition to more clearly state that "A full depth silt curtain shall be installed and maintained during all work associated with construction of the mooriR facilit V-rl� 6k- X-N" Please feel free to call me if you have any questions. Sincerely, ZN IATES INC. 0 ar Sr. Environmental Scientist cc: Steven Kesselman JASON M.CORTELL AND Environmental Consultants 244 Second Avenue TEL 617/89D-3737 ASSOCIATES INC and Planners Waltham,Massachusetts 02154 FAX 6171890-3430 k SALEM CONSERVATION COMMISSION SPECIAL CONDITIONS SALEM MARITIME NATIONAL HISTORIC SITE DERBY WHARF(3/13/97) 1. All work shall conform to the above-referenced Notice of Intent, site plan and supporting documents and those final specifications which shall be filed with the Commission prior to construction. Any change made or intended to be made to the approved plans shall require the applicant to inquire of the Commission in writing whether the change is substantial enough to require the filing of a new Notice of Intent. 2. Members and agents of the Commission shall have the right to enter and inspect the premises at all reasonable times to evaluate compliance with the conditions in this Order. The Commission may require the applicant to submit additional data or information necessary for the Commission to conduct that evaluation. 3. Upon completion of die project,the applicant shall submit,with the request for a Certification of Compliance, an affidavit,prepared by a professional engineer or land surveyor registered in the Commonwealth of Massachusetts, stating that the site has been-developed in accordance with the requirements of this Order of Conditions,the referenced site-plan and supporting documents. 4. This Order shall apply to every successor in control or successor in interest of the property described int he Notice of Intent and accompanying plans or part thereof. In the event this land or any part thereof changes ownership before or during construction,the current owner shall notify the new owner, by registered mail,of this Order prior to the transfer of ownership and shall forward proof of this notification to the Commission. 5. Additional erosion and sedimentation control measures deemed necessary by the Commission shall be instituted by the applicant. Any siltation caused onto any wetland or waterway area shall be promptly reported to the Commission. Such areas shall be restored to the satisfaction of the Commission. 6. During construction,no debris, fill,or excavated material shall be stockpiled within 100 feet of the high tide line. Any other stockpile location will be protected sufficient to prevent sediment from surface runoff entering wetlands and be located only on the southwesterly comer of the wharf area,be kepf covered,with material removed weekly. Haybales shall be anchored with stakes and entrenched 4 to 6 inches in depth. Excavated material shall be stockpiled on the upgradient side of the haybale barrier. Haybales shall be inspected daily;those showing signs of deterioration shall be replaced immediately. The haybale barrier shall remain in proper functioning condition until all stockpiling has ceased and material removed. 7. Equipment servicing and overnight equipment storage must be conducted outside the buffer zone. Equipment must be maintained to prevent leakage or discharge of pollutants. 8. *No spill or discharge of petroleum products or other pollutants will occur within 100 feet of any wetland resource area. 9. Notice shall be given this Commission no more than 2 weeks nor less than 2 days prior to the commencement of construction activities. Said notice shall include, in writing,the names(s), address(es), and business and home telephone numbers of the project supervisor(s)responsible for insuring that operations are conducted in compliance with this Order. 10. All disturbed soils shall be inumediately and similarly re-vegetated upon completion of construction activities or shall be mulched until the next growing season. Hydroseeding will be initiated no later than September 15. 11. *Fertilizers used for landscaping and lawn care shall contain a low nitrogen content and be used in moderation. Pesticides and herbicides shall not be used within 100 feet of the resource area. 12. ' A plan for landscaping and maintenance of vegetation for the buffer zone shall be developed and submitted for Conservation Commission approval prior to corrunencement of work. 13. An erosion control subsurface filter fabric shall be installed in a line running from Building I to Building 5 and installed in a vertical position in area between the existing northerly seawall and the proposed building foundations. 14. A full depth silt curtain shall be installed and maintained atjetty during construction. 15. All work shall be performed from wharf excluding installation of 2 piles for Friendship. 16. The Order of Conditions including these Special Conditions shall be posted on site. *ongoing conditions that do not expire' upon completion of the project or issuance of a Certificate of Compliance. sftonwm\�kderbywha 310 CMR 10.99 DEP file No. Form 5 (To be provi0ed by DEP) City/Townp Salem, Commonwealth Applicant U.S. National-Park Sei of Massachusetts Order of Conditions Massachuetts Wetlands Protection Act G.L. c. 131, 540 From Salem Conservation Commission —Issuing AUt hority To U.S. National Park Service Same (Name of Applicant) (Name of property owner) Address 174 Derby Street, Salem MAAddress This order is issued and delivered as follows: 13 by hand delivery to applicant or representative on (date) by certified mail, return receipc requested on T7 —(date). This project is located at- 174 Derby Street, Salem, MA The property is recorded at the. Registry of Essex Book Page Certificate (if registered) The Notice of Intent for this project was filed on 2/24/97 (date) The public hearing was closed on March 13, 1997 (date) Findings The Commission has reviewed the above-referenced Notice Intent and plans and has heid,a public hZingson the project. Based on the information available to th:f Commission at this time the Co s ,on — has determined that the area on which the proposed work is to be done is significant to the foLkowing interests in accordance with the Presumptions of Significance set forth in the regulations for each Area Subject to Protection under the Act (check as appropriate): Public water supply Flood Cont a L Land containing shellfish Private water supr Storm dama;e prevention Fisheries Ground water suppL. Prevention of pollution Protection of Wildlife habitat Total Filing Fee Submitted $332.00 State Share $153.50 (1/2 fee in excess of S25) City/Town Share $178-50 Total Refund Due S ity/Town Portion S tote PortionS (1/2 total) (1/2 total) Effective 11/10/89 5-1 Therefore, the Commission hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the regulations, �-.c protect those interests checked above. The F"_-24 orders that all work shall be performed in accordance with satd__'c;n_dTf]%ns and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. General Conditions 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The order does not grant any property rights or any exclusive privileges; it does not authorize any injury. to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: (a) the work is a maintenance dredging project as provided for in the Act; or (b) the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance and both that date and the special circumstances warranting the extended time period are set forth in this' Order. S. This Order may be extended by the issuing authority for one .or more periods of up to three years each upon application to the issuing aut�ority at least 30 days prior to the expiration date of the Order. 6. Any Yill used in connection with this project shall b� clean fill, containing no trash, refuse, rubbish or debris, including but nor, limited to lumber, bricks, plaster, wiie,, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts of any of the foregoing. 7. No work shall be undertaken until all administrative appeal periods from this order have elapsed or, if such an appeal has been filed, until all proceedings before the Department have been completed. B. No work shall be undertaken until the Final order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded lard, the Final Order shall also be noted inthe Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording informatin shall be submitted to the Commission on the form at the end of this Order prior to commencement of the work. 9. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection, * File Number 64-7(Ag 11 10. Where the DeDartment of Environmental Protection is requested to make a determination and to issue a Superseding order. the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 5-2 11. Upon completion of the work described herein, the applicant phall forthwith request in writing that a Certificate of Compliance be issued stating th,%r the work has been satisfactorily completed. 12. The work shall conform to the following plans and special conditions: Plans; Title Dated Signed and Stamped by: On File with: Consolidsted Application Environmental Ppr�mirs 2/97 Cortell Associates Conservation Commission Environmental Permits Derby Wharf Improvements 9/95 E. Moery Conservation Commission Special Conditions (Use additional paper if necessary) See attached 16 conditions (Leave Space Blank) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . 5-3A Issued E Salem Conservation Commission Sig (s This Order must be signed by a majority of the Conservation Commission. On this — 13th day. of March 19 97 before me :to me known to be the personally appeared the above mentinn6d —1 person described in and who executed the foregoing instrument and acknowledged that he/she executed the same As his/her fra-A act and deed. Notary Public e14 ,Z commiss ,� exr)3�'res The applicant, the owner, any person agrrieved b this order, any owner of land abutting the tend upon which the proposed work is to be done, or any ten residents of the city or town in which such Land is located, are hereby notified of their right to request.the Department of Environmental Protection to issue a Superseding Order, providing the request is made by certified mait or hand delivery to the Department, with the appropriate filing fee arid Fee Transmittal Form as provided in 310 CHR 10.03C?), within ten days from the date of iss�e of this detemination. A copy of the request shatt at the saw time be sent by certified mmit or hand delivery to the Conservation Commission and the applicant. Detach on, dotted tire and submit to the Commission prior to compencement of work. ............................................................................................................ To Issuing Authority Please be advised that the Order of Conditions for the project at File Nuiber has been recorded at the Registry of and has been noted in the chain of title of the affected property in accordance with General Condition 8 on _09 if recorded land, the instrument number which identifies this transaction is If registered land, the document number which identifies this transaction is Signature Applicant- 5-4A DEPARTMENT OF THE ARMY NEW ENGLAND DISTRICT,CORPS OF ENGINEERS 696 VIRGINIA ROAD CONCORD,MASSACHUSETTS 0`1742-2751 REPLY TO ArrENTION OF July 3,2000 Regulatory Branch CENAE-CO-R-200001104 Steven Kessleman National Park Service Salem Maritime National Historic Site Saugus Iron Works National Historic Site 174 Derby street Salem,Massachusetts 01970 Dear Mr. Kessleman: This is to inform you that we have reviewed your application to install mooring piles and an access ramp to accommodate the permanent mooring of the SN Friendship floating exhibit in Salem Harbor in Salem,Massachusetts. This work is described on the enclosed plans entitled "DRAFT-PLANS ACCOMPANYING PETITION U.S.NATIONAL PARK SERVICE TO Construct a Mooring Facility and Historic Period warehouses On Derby Wharf At SALEM HARBOR,"on(14) sheets, and dated"JULY 1997" Based on the information you have provided,we have determined that the proposed activity will have only minimal individual or cumulative environmental impacts. This activity is therefore authorized under the Federal permit known as the Massachusetts Programmatic General Permit(PGP). Your project is located within, or may affect resources within the coastal zone. Therefore, in order for the above determination of eligibility to become the Federal authorization, a Federal consistency concurrence from the Massachusetts Office of Coastal Zone Management(MCZM) is required. However,MCZM has already determined that no further Federal Consistency Review is required. You must perform the activity authorized herein in compliance with all the terms and conditions of the PGP. Enclosed is a copy of the PGP. Please review it carefully to familiarize yourself with its contents. You are responsible for complying with all of the PGP requirements; therefore,you should be certain that whoever does the work fully understands all of the conditions. You may wish to discuss the conditions of this authorization with your contractor to ensure the contractor can accomplish the work in a manner that conforms to all requirements. Please note that this determination does not constitute an authorization to proceed until all other applicable state and local permits are obtained. Performing work not specifically authorized by this permit, starting work without obtaining other applicable State and local approvals, or failing to comply with the permit conditions may subject you to the enforcement provisions of our regulations. Condition 33 of the PGP (page 12)provides one year for completion of work that has commenced prior to the expiration of this PGP on January 11,2005. You will need to apply for reauthorization for any work within Corps jurisdiction that is not completed by January 11,2006. Please complete and return the enclosed Work Start Notification Form to this office no later than two weeks before the anticipated starting date to allow us to inspect the project if necessary. -2- The Corps of Engineers has implement6d an administrative appeals process for jurisdictional determinations. If you are interested in appealing the jurisdictional determination for this project; or if you would like any additional information pertaining to the appeals process, please contact Crystal Gardner, of my staff, at 978-318-8332. Sincerely, /'karen Kirk Adams Chief, Permits&Enforcement Section Enclosures Regulatory Branch Copies Furnished: Mr. John McCulloch,U.S. EPA, Region 1, 1 Congress Street, Suite 11 00-Mail Code CWQ Boston,MA 02114-2023 Mr. Eric Hutchins,National Marine Fisheries Service, One Blackburn Drive, Gloucester, Massachusetts 01930-2298 Mr. Phil Morrison,U.S. Fish and Wildlife Service,22 Bridge Street,Unit#1, Concord, New Hampshire 03301-4901 Ms. Jane Mead, CoastaLZone Management, 100 Cambridge Street,20th Floor,Boston, Massachusetts 02202 November 28, 2000 Notice of Intent National Park Service Attachment I Project Description The Derby Wharf mooring and boarding facility will provide accessible boarding ramps to the SV Friendship for all visitors to Derby Wharf. Friendship is a working reproduction of a 1797 Salem East India Merchantman is under construction in Salem at Central Wharf. She is 108 ft. LOD with 171 ft. sparred length. Her beam is 29 ft. and she draws 11 1/2 ft. at her full load of approximately 350 tons. Friendship's main mast will rise 110 feet above the deck and she will carry roughly 9,000 square feet of sail (17,000 with stunsails and staysails set) and is complete with 17 miles of rigging. She has auxiliary power and is equipped with all Coast Guard required tanks, piping, alarms etc. She will be certified by the United States Coast Guard as a small passenger vessel carrying 149 passengers on day trips into partially protected (coastwise) waters. She will be certified as a sailing school vessel capable of carrying 49 students and instructors on domestic ocean voyages. The construction associated with SV Friendship mooring and boarding structures will take place in the tidal area between Derby and Central wharves as well as on land. The fore and aft steel fender piles (30 inches in diameter), used to secure the 87-ft. long prefabricated steel float will be driven into the bottom of the berthing area. The anchoring steel piles and concrete deadmen, boarding aprons, stairs and ramps will be constructed on the wharf and extend from Derby Wharf to the float. The proposed construction which is the subject of this application includes information previously submitted under DEP File No. 64-264 which outlined and described the installation of a permanent mooring facility as described above and for the future construction of the period warehouse exhibit on Derby Wharf. The SV Friendship is scheduled for completion by the summer of 2001 and requires a permanent berth with accessible ramps for the visiting public. Funding is currently only available for the construction of the permanent mooring and boarding facility, Phase 1. Funding for the improvements to Derby Wharf, Phase II, including warehouse exhibit buildings and related site development may be available before 2005. Activities within State Wetland Resource Areas Attached Figure 3 indicates resources within the general area of the proposed construction. The activities proposed under Phase I occur within the state wetland resource areas, Land Under Ocean; Coastal Bank and Land Subject to Coastal Storm Flowage (LSCSF), as discussed below: Land Under Ocean The mooring and boarding facility will be installed adjacent to Derby Wharf in water depths of approximately 13-feet (MLW=O). 10 sf of Land Under Ocean will be directly affected by the installation of two 30-inch diameter steel piles. In addition, a 5 ft. x 87 ft., steel float will be installed indirectly affecting the Land Under Ocean. Coastal Bank Approximately 30 linear feet of Coastal Bank (granite/concrete seawall) will be affected by the installation of four steel piling anchors and deadmen into the existing seawall. Buffer Zone and LSCSF Activities within the Buffer Zone and Land Subject to Coastal Storm Flowage include: * Installation of (2) 4'-6" x 15 aluminum gangways with 640 sq. ft. of timber ramps and stair. Minor regrading will also occur to provide an approach for the ramps. * (2) concrete deadmen with 4 steel piling anchors to support the 30 inch diameter steel piles will be installed through and inboard of the granite and concrete bulkhead of Derby Wharf * Utilities installed will require excavation for trenches and backfilling. * Future Warehouse Exhibits will require excavation for foundations and ramping. Best M�nagement Practices Pile driving may occur from barge mounted or land-based equipment or both. During construction any debris that enters the water will be removed immediately. Silt fencing and straw bales will surround the excavation zone. All areas will be hydroseeded immediately after construction is complete. Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 3 - Notice of Intent Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town Important: When filling out 1. Applicant: forms on the U.S. National Park Service Salem Maritime NHS computer, use only the tab Name iDmafl Address(if�applicable) key to move 174 Derby Street your cursor- Mailing Address do not use the Salem MA 01970 return key. State Zip Code 978-740-1685 Phone Fax Tumber(if-applicable) 2. Representative (if any): Firm Note: Conte A Name E-Mail Address(if applicable) Before completing this Mailing Address form consult your local Conservation City/Town State Zip Code Commission regarding any Phone Number Fax Number(if applicable) municipal bylaw or ordinance. 3. Property Owner(if different from applicant): (same) Name Mailing City/Town State Zip Code 4. Total Fee: exempt (from Appendix B:Welland Fee Transmittal Form) 5. Project Location: 174 Derby St. Salem Street Address City/Town 34 Assessors Map/Plat Number Parcel/Lot Number 6. Registry of Deeds: Essex 3134 183 County Book Page Certificate(if Registered Land) WPA Form 3 Re,02/OD Page I of B Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 3 - Notice of Intent Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town A. General Information (cont.) 7. Summary of Project Impacts: a. Is any work being proposed in the Buffer Zone? Yes If yes, how many square feet? 9640 ( includes t mber access ramps; exhibit footprints) E] No b. List the impacts of proposed activities on each wetiand resource areas (temporary and permanent impacts, prior to restoration and mitigation): Resource Area Sizo of Impac (e.g., sq. ft.) Land Under Ocean 10sq.ft. (2 -30inchpiles) Land Under Ocean 435 sq.ft. (I- 5x87 ft. float) Land Under Ocean 135 sq. ft. (two 4'-6"x 15 ft. ramps) Land Subject to Coastal Storm Flowage 640 sq. ft. (timber ramps) Land Subject to Coastal Storm Flowage 9000 sq. ft. (warehouse exhibits) B. Project Description 1. General Project Description: Phase I involves the installation of a permanent mooring and boarding facility at the Derby Wharf Site for docking of and access to the SV Friendship, including steel fender piles, boarding platforms and ramps. Phase 11 will include the construction of period warehouse exhibits with enclosed and ghosted frames; site improvements along Derby Wharf and associated site utilities. 2. Plan and/or Map References: Plan Sheets 4-9, 1996; Attachment 1, dated November 28, 2000; Attachment 2, Performance Standards, dated November 28, 2000; Figure 1 - 3; Date WPA F.rm 3 Rev 02/00 Nge 2 of 8 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 3 .- Notice of Intent Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town 1. a. Check the applicable resource areas if work is to be conducted in an associated Buffer Zone: Inland Resource Areas Coastal Resource Areas n inland Bank E] Coastal Beach Barrier Beach E] Bordering Vegetated Welland (BVW) E] Rocky Intertidal Shore F-1 Coastal Dune E] Salt Marsh Coastal Bank b. Complete for all proposed activities located, in whole or in part, in Wetland Resource Area(s). Inland Resource Areas: Bordering Vegetated Wetlands: Bordering Land Subject to Flooding: n/a n/a Square Feet altered Volume of Flood Storage Lost(cubic feet) n/a n/a Square Feet replaced Volume of Flood Storage Compensation(cubic feet) Land Under Water Bodies: Isolated Land Subject to Flooding: n/a n/a Square Feet altered Volume of Flood 9torage Lost(cubic feet) none n/a Cubic Yards dredged Volume of Flood Storage Compensation(cubic feet) Bank: n/a Linear Feet altered Coastal Resource Areas: Coastal Dune: Land Under Salt Pond: n/a n/a Square Feet altered Square Feet altered n/a n/a Cubic Yards/Volume removed Cubic Yards dredged Salt Marsh: Rocky Interticial Zone: n/a n/a Square Feet altered Square Feet altered Coastal Bank: Designated Port Area: n/a n/a Linear Feet altered Square Feet altered WPA Fom 3 Re�.02MO P.ge 3 of 8 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 3 - Notice of Intent Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town C. Activities Subject to Regulations (cont.) Fish Run: Land Containing Shellfish: n/a n/a Linear Feet altered Square Feet altered Land Subject to Coastal Storm Flowage: Beach: 9640 n/a Square Feet altered Square Feet altered Land Under Ocean: 580 sq. ft. (includes two piles, float and gangways) Square Feet altered n/a Cubic Yards dredged Riverfront Area: a. Name of Waterway (if available): n/a b. Width of Riverfront Area (check one): 25 ft. - Designated Densely Developed Areas only 100 ft. - New agricultural projects only 200 ft. -All other projects c. Describe how the Mean Annual High-Water Line was determined: n/a d. Distance of proposed activity closest to the Mean Annual High-Water line: Feet e. Total area of Riverfront Area on the site of the proposed project: Square Feet f. Proposed alteration of the Riverfront Area: Total Square Feet Square Feet within 100 ft. Square Feet between 100 ft.and 200 ft, WPA Fo,.3 Page 4 ef 8 Re�.02/00 Massachusetts Department of Environmental Protection DEP File Number: UBureau of Resource Protection - Wetlands WPA Form 3 - Notice of Intent Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 lf Town 2. Check all methods used to delineate the Bordering Vegetated Wetfand (BVW) boundary: El Final Order of Resource Area Delineation issued by Conservation Commission or DEP (attached) DEP BVW Field Data Form (attached) E] Final Determination of Applicability issued by Conservation Commission (attached) E] Other Methods for Determining the BVW boundary (attach documentation): E] 50% or more wetland indicator plants E] Saturated/inundated conditions exist E] Groundwater indicators F-1 Direct observation 0 Hydric soil indicators D Credible evidence of conditions prior to disturbance. 3. a. Is any portion of the proposed project located in estimated habitat as indicated on the most recent Estimated Habitat Map of State-Listed Rare Weiland Wildlife published by the Natural Heritage and Endangered Species Program? Yes If yes, include proof of mailing or hand delivery of NOI to : Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife Route 135, North Drive Westborough, MA 01581 No 2000-2001 Date of Map b. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? Yes If yes, provide name of ACEC (see Appendix D for ACEC locations): No c. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act(M.G.L. c. 131, §40A) or the Coastal Wetlands Restriction Act(M.G.L. c. 130, § 105)? Yes No WPA Fo.3 Page 5 of 8 Re�.02/00 Massachusetts Department of Environmental Protection DEP File Number: uBureau of Resource Protection - Wetlands WPA Form 3 - Notice of Intent -Provided by-DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 ,p Town 1. Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CIVIR 10.24 or 310 CMR 10.53? E] Yes If yes, describe which limited project applies to this project: No 2. Is any activity within any Resource Area or Buffer Zone exempt from performance standards of the wetlands regulations, 310 CMR 10.00. Yes If yes, describe which exemption applies to this project: Z No 3 a. Is the project located in the Riverfront Area? 0 Yes If yes, indicate the proposed project purpose: E] Single Family House Industrial Development E] Residential Subdivision E] Commercial Development 0 Transportation 0 Other(describe) b. Was the lot where the activity is proposed created prior to August 1, 1996? E Yes F-1 No 4. a. Describe how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location.Attach narrative and supporting documentation. (-5c-e b. Is this project exempt from the DEP Stormwater Policy? Yes If yes, explain why the project is exempt: Z No If no, stormwater management measures are required.Applicants are encouraged to complete Appendix C: Stormwater Management Form and submit it with this form. WPA Form 3 Page 6 of 8 Re,02100 November 28, 2000 Notice of Intent National Park Service Attachment 2 D. Performance Standards 4a. Describe how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Phase I Mooring and Boarding Facilit : Attached Figure 3 shows the wetland resource area. The proposed project activities which affect Land Under Ocean are piles and pile anchors to support a mooring float, for access to and from the SV Friendship. Ramps and gangways extending to the mooring float from Derby Wharf will affect Land Subject to Coastal Storm Flowage. Impacts to the Coastal Bank, which is identified as the granite/concrete bulkhead, under this proposal include the installation of steel tiebacks and concrete deadmen. There will be minimum disturbance to marine life during construction. Sedimentation and erosion controls will be in place and during pile jetting a full depth silt curtain will be employed. During construction of accessible ramps and platforms to the ship, sedimentation control measures will be in place. No adverse impacts result. Phase II Warehouse Exhibits: Work within the buffer zone which extends from the bulkhead wall inland 100 feet is primarily associated with construction of the warehouse exhibits and regrading of the grassed areas and pathways along Derby Street. Work proposed also includes the installation of utilities along Derby Wharf to support the exhibits. Clean granular fill will be used in the grading and the area will be quickly mulched and hydroseeded. During construction, all efforts will be made to temporarily or permanently cover exposed material to limit erosion and/or dust. Hay bales and/or silt fencing will be in place at all times. Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 3 - Notice of Intent Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town E. Additional Information Applicants must include the following with this Notice of Intent(NOI): • USGS or other map of the area (along with a narrative description, if necessary), containing sufficient information for the Conservation Commission and the Department to locate the site. • Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Weiland (BVW)replication area or other mitigating measure) relative to the boundaries of each affected resource area. • Other material identifying and explaining the determination of resource area boundaries shown on plans (e.g., a DEP BVW Field Data Form). • List the titles and final revision dates for all plans and other materials submitted with this NOI. F. Fees The fees for work proposed under each Notice of Intent must be calculated and submitted to the Conservation Commission and the Department (see Instructions and Appendix B. Weiland Fee Transmittal Form). No fee shall be assessed for projects of the federal government, the Department, or cities and towns of the Commonwealth. Applicants must submit the following information (in additi on to pages 1 and 2 of Appendix B)to confirm fee payment: Check Number Check date Payer name on check Applicant name(if different from payor) G. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, §40. Notice must be made in writing by hand delivery or certified mail (return receip equested 11 abutters within 100 feet of the property line of the project location. :X=& //—:3 �rature of Applicant Date Signature of Property Owner(if different) Date Signature of Representative(if any) Date WPA Fo.3 Page 7 of 8 Re�02100 Massachusetts Department of Environmental Protection DEP File Number: uBureau of Resource Protection - Wetlands WPA Form 3 - Notice of Intent Provlded—by—DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 ,p Town G. Signatures and Submittal Requirements (cont.) For Conservation Commission: Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents; two copies of pages 1 and 2 of Appendix B; and the city/town fee payment must be sent to the Conservation Commission by certified mail or hand delivery. For DEP: Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents; two copies of pages 1 and 2 of Appendix B; and a copy of the state fee payment must be sent to the DEP Regional Office (see Appendix A) by certified mail or hand delivery. Other: If the applicant has checked the"yes" box in any part of Section C, Item 3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. WPA For.3 Page 8 of 6 Rm.02100 ------------- -- Haste Shoal rnwood :0 ---------- -'V LW L; 'Grefit Haste S' Island U Ce el Roc�' r( 540, 70 53' 14" x 42 12-f -1121- In wt Pig edi g Rock TH wallmart Rocks SALEM MARITIME S-0 Ledge C, Endeauom NATIONAL HISTORIC ITE utman Outer point --am an i Endiravom I a;nf offiber nt l!pa&hs 4int *11LN7 ht F0190f ev "S' f A" j: po S,4� Wmer Ong ove 4,4R�OR .SZ� 1, .. -4 v p I N4Point'. fry, 6-75/and r— Jacks.Ror PROJECT LOCUS MAP SOURCE:USGS Salem,MA Topographic Quadtangle(1986 SALEM MARITIME SCALE FIGURE Co L NATIONAL HISTORIC SITE ASS91ARTELS 15,ZN NATIONAL PARK SERVICE 0. 1042' 2083' SALEM, MASSACHUSETTS 51 gnll RICO ............ 9--Af ., F aEK)UPMARY EN WH.Al 10 SITE LOCATI M—.3 as CHANNEL, 8'DEPTH DERBY WHARF PPROX. CHANNEL LIMITS SALEM HARBOR LOCATION PLAN Rx MAN OR M�U,� ......... I lwi4 WIMN MMIq'i % .,m BEACH -F— Sul ding 5 Building I Building 2 : Bullaft, 3 : i Building 4: L D L-7.1-:1-J L--.--..J on I 111 11 11 --------- Derby Wharf Frlbndphip etches Wharf SITE PLAN SOURCE:Naflonal Park Service(1996) SALEM MARITIME SCALE Atop! RGURE CORTELL (tA NATIONAL HISTORIC SITE NATIONAL PARK SERVICE SALEM,MASSACHUSETTS StoneDustPath Derby Wharf 18" Bollard is" Bollard Timber Pi Ramp AFT Apron Timber Pile FWD Apron 20,5 -- ---- 114 T r 4- SfV Friendship 9.2w SECTION AUXILIARY MOORING POINTS SOURCE:National Park Service(1996) SALEM MARITIME SCALE FIGURE COATELL NATIONAL HISTORIC SITE kSSOCIATES NATIONAL PARK SERVICE SALEM, MASSACHUSETTS r7 20.5 Derby Wharf T T �T T T SIV Friendship meal SECTION AT FENDER SOURCE:National P"Service(1996) SALEM MARITIME SCALE C FIGURE CORTRLL NATIONAL HISTORIC SITE io ASSOCIATFS NATIONAL PARK SERVICE SALEM, MASSACHUSETTS Deadman Detail —7 ------- -- Plan View- Forward Piling Plan View-Aft Pillog WN m 9& A. jEqQN MON @) Concrete Pad PILING ANCHORS LAYOUT AND DETAILS SOURCE:National Park Service(1996) SALEM MARITIME SCALE FIGURE C W AgMATLELS NATIONAL HISTORIC SITE *7 NATIONAL PARK SERVICE ,�C,,,dsp SALEM, MASSACHUSETTS 37 R ftww� 7 2'-j 12r' _31 10 1/f Rope-> IV 1:8 40 Derby Wharf 6. SfV Friendship RAMPS SOURCE:Naflonal Park Service(1996) SALEM MARITIME SCALE FIGURE CORTELL NATIONAL HISTORIC SITE ASSOCIATFS NATIONAL PARK SERVICE SALEM, MASSACHUSE17S Receptacle Outlet XL Ju Concrete T-T Pad AWE: Shorepow or Outlet war Cord ago-. IBM Hydrant i1c "N SN Friendship C3 UTILITIES SOURCE:National Park ServIce(1996) M4 SALEM MARITIME SCALE FIGURE CORTELL NATIONAL HISTORIC SITE ASSOCIATES NATIONAL PARK SERVICE SALEM, MASSACHUSETTS United States Department of the Interior NATIONAL PARK SERVICE Salem Maritime National Historic Site Saugus Iron Works National Historic Site 174 Derby Street Salem,MA 01970 IN REPLY REFER TO: November 29, 2000 Dear Neighbor: 'nis is to notify you that the National Park Service has filed a Notice of Intent with the Salem Conservation Commission to re-issue a previously approved Order of Conditions that expired due to a lapse in time. The work approved under that Order of Conditions involved improvements to Derby Wharf, including the installation of boarding ramps and a float system for the Ffiendship, construction of "warehouse" exhibit structures, and minor site improvements, including the installation of utilities. No change to the work as originally approved is being proposed. Please call the Conservation Commission at 978-745-9595 for the date, time, and location of the hearing on this matter. If you have any questions, please feel free to call me or Colleen Bruce, at 978-740-1680. Sincerely, /Steven Kesselman Superintendent CERTIFIED ABUTTERS LIST WR�� Nall QRS T 7, 4044bikEw qi�jw t)m— 1 & 50� P LOT SUFF PROPERTY ADDRESS ASSESSED OWNER MAILING ADDRESS v PIT un I'M .�rzg,Z � XTPIJ&4�Pk '30�Mffilgil '211 '5--Z 'm gg W OEM-, ma-m Way ME 5 0324 WILLIAMS SALR"M' MA 01970 0027 HER BERT STREET RAYMOND CEARLES E 54 SOUTH TERRACE m%-er - 0 y C/O SALEM MARITIME HIST111C III, SALEM VIA 01970 5 0401 801 0020 XOSCIUSK0 STREET U20 CROMWELL ANNE COLE 20 F,0SCILSVO STREET TINECT7 w-�-H"M-- 5 5 0403 SALEM MA 01970 0014 KosciusKo STREET CASK.LINI JAMES E 54 RABBIT RD M=: qp ffilm, 0 ill NEMIROUSKY YULIA SALEM MA 01970 5 0406 1006 XOSCIUSX0 STREET KROM RICITABD 0 6 KOSCIUSNO ST 5 wt ��p2p! �n,AWN- 04- L NM Ew ow �WN-49 A%5!m wo ROCHETT J HILARY TR EREAD MA 01945 4 0408 802 0098 WrIARF STREET LAB PICKFRING WliARF PEAT.Tv TRUST 190 PLEASANT ST ROCNETT J UTLLARY TR MARBLEhEAD MA 01945 4 0408 805 0100CWHARF STREET UA3 BRUCE BETHANY A 100C W�IARF ST UA3 ROCKETT J %ILARY TR MARBLEIEAD MA 01945 C�JIEF A SSE SSOR g Mw W! i s N CERTIFIED ABHTTERS LIST P LOT SUFF PROPERTY ADDRESS ASSESSED OWNER MAILING ADDRESS HEINZ MARIE A BRONX NEW YORK 10461 4 0408 810 0102DWIIARF STREET UIA8 M1JRPf.Y EARYN HICKS 102D WKARF STREET UA8 SALEM MA 01970 4 0408 813 0199BDERBY STREET DF2 MCCUE FAMILY REALTY TRUST 35 CONGRESS ST t1,B4TARBAR w-'4 mdZ ALSTEAD Nil 03602 4 0408 816 0066 WHARF STREET UIJA PICNERING WIARF REALTY TRUST 190 PLEASANT ST MAN mrswom SALEM MA 01970 4 0408 819 0064BWHARP STREET UJ2 OLIVERIO ROBERT R JR 64B WITARF STREET 102 CF,EVOOR MARY A ��N"�"­FL 328`35 4 0408 822 0070AWHARF STREET DJ5 STONE BARBARA A 70A WKARF ST ARBETT..A BLDG UJ5 SALEM MA 01970 4 0408 825 0074BWI,'ARF STREET UJ8 ISAACSON BARBARA D 65 CLIFTON AVE W-M P, T-":k 430 05, "06NO)NOMMMUN, XMill", M �T -AA; 4" gg ;-l"ll" A yam-__ ROCEETT I HILLARY TR MARBLEHEAD MA 01945 C.111EF ASSESSOR IRS 10- &��OR �K CERTIFIED ABUTTERS LIST LOT SUFF PROPERTY ADDRESS ASSESSED OWNER MAILING ADDRESS vgg RG:� P ow A C/() KALIS ROBERT ATTY FOR CANNER G SALEM, MA 01970 1 0408 830 COBOBWFiARF STREET I,x2 WHARF STREET REALTY TRUST 190 PLEASANT ST SALEM MA 01970 4 0408 833 0080EWHARF STREET UX5 WHARF STREET REALTY TRUST 190 PLEASANT ST E,�f- On 8 BE L Ec ROCKETT J HILARY TR KARBLEREAD MA 01945 1 0408 836 0088 WHARF STREET RIB PICKERING WHARF REALTY TRUST 190 PLEASANT ST t lie 1- MP MEW Mr MARBLEREAD MA 01945-3536 1 0408 839 0084CW�IARF STREET RL3 WHARF STREET REALTY TRUST 190 PLEASANT ST ifff,mv Tp ROCKETT J HILARY TR MARBLEHEAD MA 01945 4 0408 842 0086BWHARF STREET UL6 KELLEY MICHAEL J 86B WHARF STREET VL6 ROCNETT HILARY J TR MARBLEHEAD MA 01945 4 0408 845 0090AWHARF STREET UL9 RDBLE.R KIM ANN �)OA WHARF ST 111.9 I ; -tit. -�4 ;7� NW,5 WILE DONALD C SALEM MA 01970 JEF A SE R�Z2 -57177777, 1-77=7 t-17,�51711.1� WE EMU CERTIFIED ABUTTERS LIST LOT SUFF PROPERTY ADDRESS ASSESSED OMER MAILING ADDRESS -pm,ak"OO ROCKETT J 111LARY TR MARBLEHEAD MA 01945 0408 850 00923WHARF STREET UL14 WUARF STREET REALTY TRUST 190 PLEASANT STREET ts, 317140=0 ROCRETT J klLARY TR MARBLEREAD MA 01945 0408 853 0061AWI!ARF STREET Di3l YOUNG P. PAUL 61A WFARF ST UBl 0408 856 006!BWIIARF STREET U.B4 PRIVATEER REALTY TRUST qALEM MA 01970 P 0 BOX 208 8 j�g%g :p 0408 859 0065DWI--ARF STREET T,37 MIDDLETOWN, CT 06457-1744 JOHNSON �ATIILEEN R 65D WFARF qT SALEM MA 01970 0408 862 0201 DERBY STREET UCA PICNERING WHARF REALTY TRUST 190 P�,EASA�T ST R k 14 EA ROCJ=T J �.TLLARY TR MARBLEKEAD MA 01945 0408 865 0,069 WKARF STREET URA PICKERING WAARF REALTY TRUST 190 PLEASANT ST RA TAROZZI PAULINE J SPRINGFIELD MA 01118 -MM-, LOT SUFF PROPERTY ADDRESS ASSESSED OWNER MAILING ADDRESS 0408 870 0062 WHARF STREET UGA SALEK MA 01970 PICEERING WHARF REALTY TBHST 190 PLEASANT ST AjtA&!'�ZM A,Mi AR My 07"�ml 0408 873 ROCKETT J HILARY TR MARBLEHEAD MA 01945 0073 WHARF STREET UDA PICX.ERING WHARF REALTY TRIIST 190 PLEASANT ST ------T--�m 1 MEN ......... 4..,;AI C�HTBF ASSESSOR