Loading...
DERBY STREET - CENTRAL WHARF- CONSERVATION COMMISSION DOA - Ferry Central Wharf/Derby St'�i ity of Salem at N.P.S I 9 I SALEM CONSERVATION COMMISSION D.O.A. SPECIAL CONDITIONS—City of Salem, Salem Ferry ADDRESS: National Park Service—Central Wharf 1. No fuel or chemicals shall be stored on barge. Barge shall have adequate spill kit and be accessible for aggressive containment. No running machinery shall be left unattended. Equipment servicing and overnight equipment storage must be conducted outside the buffer zone. Equipment must be maintained to prevent leakage or discharge of pollutants. 2. Remove all improvements by Dec 1. 1998. `t)UN Cp), ?� Conservation Commission Salem. Massaehusetts 01970 W �y^�A SS�N�y City of Salem Conservation Commission Will hold a public hearing for a Determination of Applicability under the Wetlands Protection Act, Massachusetts General Laws, Chapter 131, Section 40, at the request of the City of Salem. The purpose of the hearing is to discuss the proposed construction of a temporary facility at the National Park Service, Central Wharf, Derby Street, to be used by a high speed ferry providing service between Boston and Salem and other potential destinations. The proposed work includes installation of a gangway and a pile spudded float. This hearing will be held on Thursday, May 28, 1998 at 7:00 p.m. in the second floor conference room at One Salem Green. Mark George Chairman May 20, 1998 Please send bill to: Craig Wheeler City of Salem Public Services Dept One Salem Green Salem, MA 01970 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION x 10.99: continued - - 4. The owners) of the area, if not theerson m an is est, has been given written notification of this request on A �av91 S, 1�y25 - (date) The names) and address(es) of the owner(s): National Park Service 2 New Liberty Street Salem, MA 01970 5. I have filed a complete copy of this request with the appropriate regional fiea t�aasachusetts Department of Environmental Protection l�lav ' 1gf, t1gr (date) DEP Northeast Regional Office DEP Southeast Regional Office 205 A Lowell Street Lakeville Hospital Wilmington MA 01877 Rome los Lakeville, NA 02347 DEP central Regional office DEP western Regional office 75 Grove street - state House west, 4th Floor .Worcester, )4A 01605 436 Dwight street - Springfield, MA 01103 - 6. 1 understand that notification of this request will be placed in a local newspaper at my expense in accordance with Section 10.5(3)(b) 1 of the regulations by the conservation commission and that I, will be billed accordingly. Signature Name Susan S l TTP Address, 286 Congress St. 6th Fl. Tel, (617) 357-7044 Boston, MA 02210 11/20/92 310 CMR - 280.16 310 CMR 10. 99 DEP File No. (To be provided by DEP) Form 2 City/Torn Salem Applicant City of Salem Coamionweal th of Massachusetts Date Request Filed Determination of Applicability Massachusetts Wetlands Protection Act, G.L. c. 131, 540 From Salem Conservation Commission Issuing Authority To Susan St. Pierre N (Name of Person making request) (Name of property owner) Address 286 Congress St. 6th Floor Address 2 Mew T.;herty St_ Boston, MA 02210 Salem, MA 01970 This determination is issued and delivered as follows: ❑ by hand delivery to person making request on (date) ❑ by certified mail, return receipt requested on (date) Pursuant to the authority of G.L. c.131, §40., the Commission has considered your request for a Determination of Applicability 'and its sup- porting documentation, and has made the following determination (check whichever is applicable) : Location: Street Address Central Wharf- Lot harfLot Number: This Determination is positive. 1. ❑ The area described below, which includes all/part of the area described in your request, is an Area Subject to Protection Under the Act. Therefore, any removing, filing, dredging or altering of that area requires the filing of a Notice of Intent. 2. ❑ The work described below, which includes all/part of the work described in your request, is within an Area Subject to Protection Under the Act and will remove, fill, dredge or alter that area. Therefore, said work requires the filing of a Notice of Intent. 2-1 Effective 11/10/89 3 . ❑ The work described below, which includes all/part of the work described in your request, is within the Buffer Zone as defined in the regulations. and will alter an Area Sub3ect to Protection Under the Act. Therefore, said work requires the filing of a Notice of Intent. This Determination is negative: 1. ❑ The area described in your request is not an Area Subject to Protection Under the Act. 2. ❑ The work described in your request is within an Area Subject to Protectiot. Under the Act, but will not remove, fill, dredge, or alter that ares. Therefore, said work does not require the filing of a Notice of Intent. 3 . [3 The work described in your request is within the Buffer Zone, as defined in the regulations, but will not alter an Area Subject to Protection Under the Act. Therefore, said work does not require the filing of a Notice of Intent. See attached conditions 4. ❑ The area described in your request is Subject to Protection Under the Act, but since the work described therein meets the requirements for the following exemption, as specified in the Act and the regulations, no Notice of Intent is required: Issued by Salem / Conservation Commission Signature (s) r This Determination must be signed by a majority of the Conservation Commission. On this .28th day of May 19 98 before me personally appeared ttze -r ,7, mentioned to me known to be the person described in, and who executed, the foregoing instrument, and ackn1&dgd hat / he executed the same as his/her free act and deed. STEPHEN DIBBLE Notary Public NN CDmmleeinn ExV:s Nov l2,=4 Not lic My Commission Expires This Determination does not relieve the applicant from complying with all other applicable federal, state or .local statutes, ordinances, by-laws or regulations. This Determination shall be valid for three years from the date of issuance. The applicant, the owner, any person aggrieved by this Determination, any owner of land abutting the land upon which the proposed work is to be done, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the Department of Environmental Protection to issue a Superseding Determination of Applicability, providing the request is made by certified mail or hand delivery to the Department, with the appropriate filing fee and Fee Transmittal Formas provided in 310 CMR 10.03(7) within ten days from the date of issuance of this Determination. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and the applicant. 2-2A 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION lift Forms RF� ,", � ° � MAY 18 i�� Salem rslann..,,l t t. D@ 1%Na (ro W PM"&A by DEF) roam 1 dnfrm Salem .. APPa City of Salem Commomrealth - - -- . of Massachusetts 'Request for a Determination of Applicability Massachusetts Wetlands protection Act, G.L c. 131, §40 1.- 1, the undersigned, hereby request that the Salem Conservation Commission make a determination as to whether the area, described below, or work tobe performed on said area, also described below, is subjectto the jurisdiction of the Wetlands Protection Act, G.L. c. 131,. 540. - - 2. The area is described as follows.. (use maps or plans, if necessary, to provide a description and the lacation of the area subject to this request.) Location: street Address Central Wharf Lot number: - "r See attached Locus Map 3. The work in said area is described below. (use additional paper, i1 necessary, to describe the proposed work.) The project invloves a Ferry Demonstration Project at Central Wharf. The proposed work is temporary and involves the installation of a gangway and a pile spudded float system along the easterly edge of Central Wharf (see attached plan) . A high-speed ferry, approximately 90 linear feet, 18 foot beam and 5 foot draft, will be operating at the site. Ferry service will be provided between Boston and Salem- and other potential destinations. Once the demonstration is completed, all of the facilities provided for the docking of vessels will be removed. 11/20/92 310 CMR -280.15 feF Sent 8y: FORT POINT ASSOCIATES; 6173579135 ; May-20-98 5:21PM; Page 21/21 Plans are currently being prepared by Nucci Vine Associates and consist of the following: CENTRAL WHARF SITE Sheet 1 of 3 Vicinity Map Sheet 2 of 3 Proposed Plan View Sheet 3 of 3 Section View of Proposed Gangway and Float System s Sent By: FORT POINT ASSOCIATES; 6173579135 ; May-20-98 5:21PM; Page 20/21 BLOCK#25 Other Approvals or Denials AGENCY TYPE ID DATE DATE APPROVAL NUMBER APPLIED APPROVED Salem Request for May 16, 1998 pending Conservation Determination of Commission Policability Salem Section I OA N/A May 26, 1998 pending Harbormaster Harbormaster Perms Sent By: FORT POINT ASSOCIATES; 6173579135 ; May-20-98 5:20PM; Page 19121 ATTA CHMENTI APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT BLOCK#17 Directions to the Site Take 1-95/Route 128 North. Take the exit towards Lowell Street/West Peabody; keep left at the fork in the ramp. Merge onto Andover Street/ Route 114 East. Andover Street becomes Central Street. Tum left onto Tremont Street. Tum left onto School Street- Tum right onto North Street/Route 114 which becomes Summer Street/ Route 114. Tum left onto Norman Street/Route 114, which will first become New Derby Street/ Route 114 and then Derby Street/ Route 1A. Tum left onto Hawthorne Boulevard/Route IA. Tum right onto Essex Street and right again onto Tumor Street. Then tum left onto Derby Street and right onto Blaney Street. Central Wharf is located on the right, across from the Customs House. BLOCK#18 Project Descrlption The ferry demonstration project will pick up and deliver passengers between Boston. Salem and other potential destinations. A high-speed (25 to 35 knot) ferry approximately 90 linear feet, 18 foot beam and 5 foot draft,will be operating at the site. Project activities will include the installation of a gangway and float system anchored by spud piles, below the high tide line. Gangway and Float System The proposed work is temporary and involves the installation of a gangway and float system. Refer to Sheets 2 and 3 of 3 for the plan and elevation view of proposed project elements. The 6 foot wide by 50 foot long aluminum gangway will be anchored to the an existing landing which will be modified to ac comdate the new gangway. The gangway will connect to a 100 foot long by 20 foot wide steel float. The float will be bottom anchored within Salem Harbor below the high tide line by a series of steel pipe spud piles side of the float system. The installation of the float system will be performed by barge mounted equipment. BLOCK#18 Proposed Project Purpose The City of Salem, in coordination with the Massachusetts Executive Office of Transportation, will provide a demonstration ferry providing passenger delivery services between Boston, Salem and other potential destinations. The installation of the float and gangway system is expected to occur over a one week period in late June, with the temporary ferry service providing services between July and October. 1998. Once the demonstration project is completed, all of the facilities provided for the docking of vessels will be removed. v a i pt W, � � '� t* .�2.,� r. �f F a � �lT F L#t � f w`�z�k, i • 'f .+s � x 1 • � C ww o rc C v a. v r v -q F � G 1 r' ,,t tmll V. F {, A w F� ✓ t,,r. �3 €}' v,�b^.�4 1, .: .?. . m. 11 LOCUS PLAN FORT POINT ASSOCIATES, INC. 286,Congress Street nth Floor Boston, Massachusetts 02210 617/357-7044 " FAX 617/357-9135 May 14, 1998 Mr. Mark George, Chair Salem Conservation Commission c/o Steve Dibble City Hall One Salem Green Salem, MA 01970 „ SUBJECT: Request for Determination of Applicability Ferry Demonstration Project at Central Wharf Dear Mr. Dibble: Attached for Conservation Commission consideration is a Request for Determination of Applicability for the above referenced project. As you know, the City is currently pursuing . approvals to undertake a ferry demonstration project at the Blaney Street site adjacent to the Hawthorne Cove Manna. As a back up to this plan, the City is also seeking approvals for the Central Wharf site adjacent to Derby Wharf owned by the National Park Service. The proposed work is temporary and involves the installation of a gangway and a pile spudded float system along the northeasterly side of Central Wharf(see attached plan). Because the work does not alter any resource areas,we request the.Conservation Commission to issue a negative Determination of Applicability for the proposed work. " The demonstration project is being undertaken by the City of Salem in coordination with the Massachusetts Executive Office of Transportation and Construction for a temporary time period, between June and October of this year. A high-speed(25 to 35 knot) ferry approximately.90 linear feet, 18 foot beam and 5 foot draft,will be operating at the site,picking up and delivering passengers between Boston, Salem and other.potential destinations. Once the demonstration project is completed, all of the facilities provided for the docking of vessels shall be removed. If you should have any questions or concerns regarding this matter,please contact me at 617-357-7044. Sincerely, Susan St.Pierre Project Manager enclosures: Request for Determination of Applicability cc: DEP, Northeast Regional Office (2 copies) National Park.Service (1 copy) w w oaaoc� aao�aa May 15,1998 253 Low serer Salon�+ �p�, Smie 232 Mr. Stephen Dibble, Administrator Newbwa port Salem Conservation Commission One Salem Green Salem, MA 01970 Massachuseus RE: Ferry Demonstration Project 01950 Central Wharf Site Salem,MA DEP No. 064-278 Dear Mr. Dibble: Attached herewith are two (2) copies of Figure 2--Site Plan for the above-referenced project. This'Figure should be added to the Request for Determination filing for the Central Wharf site,as prepared by Fort Point Associates. Please contact me if you have any questions or need any additional information. Very truly yours, CI VINE ASSOCIATES, INC. David B.Vine,P.E. Project Manager Attachments cc: Craig Wheeler-City of Salem Susan St. Pierre-Fort Point Associates 504-1\conco=2.doc (978)465-1428 Fax (978)465-2640 DERBY WHARF 0 0 2 4 8 v zO G BASIN EL -13 10 y 12 2 O \ MARINE RAILWAY - - FRIENDSHIP MODIFY EXISTING LANDING NEW GANGWAY NEW 20'x100' FLOAT CENTRAL WHARF G� 2 5� SITE PLAN 50 0 50 SCALE IN FEET FIGUREL DERBY WHARF 0 0 2 4 6 8 Ge BASIN EL -13 10 12 0 MARINE RAILWAY FRIENDSHIP ............ . ..... ...... ... ............. .. ... ...... MODIFY NEW GANGWAY EXISTING LANDING CENTRAL WHARF NEW 20'x100' FLOAT ^o JhoJ lb SITE PLAN 50 0 50 SCALE IV �FEET FIGURE 2-,