Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Emergency Certification Form
Massachusetts Wetlands Protection Act M.G.L. c. 131,§40
A. Emergency Information
Important: Carey Duques Salem Conservation Agent
When filling out Issuance From: Issuing Authority
forms on the 68 Dearborn Street Map 36 Lot 487
computer, use 1. Site Location:
only the tab
key to move 2 Reason for Emergency:
your cursor-
do not use the Deck and patio have collapsed and are in terrible condition. Both pose a threat to the homeowners
return key. and thieir children.
3. Applicant to perform work: John Keenan and Kara McLaughlin
4. Public agency to perform work or public agency ordering the work to be performed:
Salem Conservation Commission
5. Date of Site Visit: Start Date: End Date*:
September 19, 26, & October 2, 2008 October 9, 2008
29, 2008 *no later than 30 days from start date or 60 days in the
case of an Immediate Response Action approved by
DEP to address an oilfhazardous material release.
6. Work to be allowed*:
Demolition of exisitng wooden deck, cinderblock wall, and concrete patio. Three trees located
adjacent to the existing deck and patio will also need to be removed in order to get the demolition
equipment into the back yard.
May not include work beyond that necessary to abate the emergency.
B. Signatures
Certified to be an Emergency by this Issuing Authority.
Siat es:
a W i M� September 29, 2008
Ch i an(or esignee) Date
A copy of this form must be provided to the appropriate DEP Regional Office.
WPA Emergency Cerllfication Paget oft
Rev.11101
Massachusetts Department of Environmental Protection
L,
Bureau of Resource Protection -Wetlands
WPA Emergency Certification Form
Massachusetts Wetlands Protection Act M.G.L. c. 131,§40
C. General Conditions
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory
measures, shall be deemed cause to revoke or modify this Emergency Certification or subject to
enforcement action.
2. This Emergency Certification does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of property rights.
3. This Emergency Certification does not relieve the applicant or any other person of the necessity of
complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. Any work conducted beyond that described above, and any work conducted beyond that necessary to
abate the emergency, shall require the filing of a Notice of Intent.
5. The Agent or members of the Conservation Commission and the Department of Environmental
Protection shall have the right to enter and inspect the area subject to this Emergency Certification at
reasonable hours to evaluate compliance with this Certification, and may require the submittal of any
data deemed necessary by the Conservation Commission or the Department for that evaluation.
6. This Emergency Certification shall apply to any contractor or any other person performing work
authorized under this Certification.
7. No work may be authorized beyond 30 days from the date of this certification without extension by the
Issuing Authority.
D. Special Conditions
Erosion control measures, including silt fence and haybales, shall be installed prior to the start of the
demolition and shall remain in good condition and in place throughout construction activities. A
Request for Determination of Applicability or a Notice of Intent shall be filed with the Salem
Conservation Commission for additional work proposed for the site.
E. Appeals
The Department may, on its own motion or at the request of any person, review: an emergency
certification issued by a conservation commission and any work permitted thereunder; a denial by a
conservation commission of a request for emergency certification; or the failure by a conservation
commission to act within 24 hours of a request for emergency certification. Such review shall not
operate to stay the work permitted by the emergency certification unless the Department specifically so
orders. The Department's review shall be conducted within seven days of: issuance by a conservation
commission of the emergency certification; denial by a conservation commission of the emergency
certification; or failure by a conservation commission to act within 24 hours of a request for emergency
certification. If certification was improperly granted, or the work allowed thereunder is excessive or not
required to protect the health and safety of citizens of the Commonwealth, the Department may revoke
the emergency certification, condition the work permitted thereunder, or take such other action as it
deems appropriate.
WPA Emergency Certification Page 2 of 2
Rev.11101
HP OfflceJet 7410 Log for
Personal Printer/Fax/Copier/Scanner DPCD
978-740.0404
Sep 29 2008 5:27PM
Last Transaction
Date Time Twe Identification Duration Panes Result
Sep 29 5:25PM Fax Sent 919787454110 1:25 3 OK
rGi-,lr,, �.g�•
tet ..*t^1 �`, .. '•lS,tf_ 11'. 'ii e•
1 `pOP.U.T x
t3•Ar �` e
QTY OF SALEM
DEPARTMENT OF PLANNING AND
GOMMUNITYDEVELOPMENT
KINMERLEYDRIscou
MAYOR
120 WASHINGTON STREET♦SALEM,MASSAGTL15EM 01970
LYNN GOONINDuNcAN,AICP TEL:978-619-5685♦FAX:978-740-0404
DimcroR
Fax
To: ScottPatrowicz From: CareyDuques
Fax: 978-745-4110 Date: September 29,2008
Phone:978-836-6400 Pages: 3 including cover
Re: Emergency Certification Form for 68 CC:
Dearborn Street
❑ UrgentOr Review ❑ Please Comment ❑ Please Reply ❑ Per Your Request
sComments:
Scott,
I spoke with John Keenan and explained the activities that are allowed under this emergency certification form as
well as the start date which is Friday October 3. Please review this document and pass it along to him As we discussed
this will be followed by a RDA filed for the work around the pool,which is scheduled for the October 9'hearing. Feel
free to contact me with any questions.
Thanks,
Carey