Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
64-148 - 18 CLARK STREET - CONSERVATION COMMISSION
p ., ..�. t �..� -�--=�--t- .,LT"�_f�.. 4 _ - - -- - -, , --- - -� r J I 310 CNA 10.99 DEP PdeNm 64-148 Form a (ro be provided by DEP) CrdY/1.0.o Sa1em _ Appost Wa,Zteh Abnnhnm Coamoarealth of xassachusetts PARTIAL Certificate of Compliance Kassachusetts Wetlands Protection Act, G.L. c. 131, S{o Salem CovweAvafii,on Comm.i6eion Issuing Authority From To Wa.P.teh Abhal am (A dress - (Name) May 12, 1994 Date of Issuance • This Certificate is issued for work regulated by an order of conditions issued to4)alter Abraham dated July 30 1987 and issued by the Salem 1. 0 It is hereby certified that the work regulated by the above- referenced order of Conditions has been satisfactorily completed. 2. It is hereby certified that only the following portions of the work regulated by the above-referenced order of conditions have been satisfactorily completed: (If the Certificate of compliance does not include the entire project, specify what portions are included.) The filling portion of the Notice of Intent has been completed. The construction of single family residences has' yet to commence, but due to the change tt1,e Buffer Zone from th f•lli and th x iratii of the Orde; off Co ditio Me Commission recommends khat a uest o� � pe lq 3. ❑ It 1s herely eer'}ified that the work regulated by t e a o e ion of epHIM referenced order of conditions was never commenced. The order of be i e conditions has lapsed and is therefore no longer valid. No futursestablisl work subject to regulation under the Act' may be commenced without new Buff, filing a new Notice of intent and receiving a new order of Zone. Conditions. . . ... .. . . . . ... .. .. . . . . .. . . .. . . ... .. ... .. ... .. .. . .. .... ... .. . . . . .... ... (Leave space Blank) Effective 11/10/89 8-1 4. The certificate shall be recorded in the Registry of Deeds or the Land court for the district in which the land is located. The order was originally recorded on (date) at the Registry of Essex , 800k-1 Page 5. ❑ The following conditions of the order shall continue: (set forth any conditions contained in the Final order, such as maintenance or monitoring, which are to continue for a longer period. ) Issued by 3 Signature(s) i When issued by the conservation commission this certificate must be signed by a majority of is members. on this -- 12th day of , 19 94 before me personally appears , to me known to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed the same as hie/her free act and deed. JULY 15, 1999 4-taPibliQcL��� Hy commission expires Detach an dotted line and edit to the ........................................................ To Salem Conservation Comm' -qinn Issuing Authority ptaasa be advised that the certificate of Compliance for the project at: + �_,�-�.�yu cr, � File Number 64-148 has been recorded at the Registry of and has been noted in the chain of title of the affected property on 19 If recorded land the instrument IRA which identifies this transaction is If registered land the document nsaeber which identifies this transaction is Applicant signature 8-2 Form 5 DEOE File No. 64-148 ;' :- (To be provided by DEQE) Commonwealth city/Town Salem - of Massachusetts Applicant Abraham, Order of Conditions Massachusetts Wetlands Protection Act G.L. c. 131 , §40 From SALEM CONSERVATION COMMISSION To Walter Abraham jl l* eh ^pain (Name of Applicant) (Name of property owner) i Address 65 Valley-Street Salem, MA Address 65 Valley Streer , Salem, MA i This Orderis issued and delivered as follows: f'lby hand delivery to applicant or representative on l l'�a� t (date) ❑ by certified mail,return receipt requested on (date) This project is located at 1 l_ The property is recorded at the Registry of Essex Book i6' Page 3862`. =' Certificate(if registered) :31343' June 6;. 1987 The Notice of Intent for this project was filed on (date) ' , The public hearing was closed on June ,11, '.1987- (date) Findings The Sa l P r roar inn_ _ has reviewed the above-referenced Notice of Intent and plans and has held a public hearing on the project. Based on the information available to the Commission at this time, the Commission . has determined that the area on which the proposed work is to be done is significant to the following interests in accordance with the Presumptions of Significance set forth in the regulations for each Area Subject to Protection Under the Act(check as appropriate): ❑ Public water supply Storm damage prevention ❑ Private water supply ® 'Prevention of pollution ❑ Ground water supply ❑ Land containing shellfish (, ❑ Flood control ❑ Fisheries 1 5-1 i Therefore, the Commission - hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the regulations, to protect those inter- ests checked above. The Commission . orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced above.To the extent that the fol-' C lowing conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. General Conditions 1. Failure to comply with all conditions stated herein,and with all related statutes and other regulatory meas- ures, shall be deemed cause to revoke or modify this Order. 2. This Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: - (a) the work is a maintenance dredging project as provided for in the Act; or (b) the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance and both that date and the special circumstances warranting the extended time period are set forth in this Order. 5. This Order may be extended by the issuing authority for one-or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or de- bris, including but not limited to lumber, bricks,.plaster,wire, lath, paper,cardboard,pipe,tires, ashes, `. refrigerators, motor vehicles or parts of any of the foregoing. 7. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted to the comm;s�; on the form at the end of this Order prior to commencement of the work. 9. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Quality Engineering, File Number X64-1-48 10. Where the Department of Environmental Quality Engineering is requested to make a determination and to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 1 1 . Upon completion of the work described herein, the applicant shall forthwith request in writing that a Certificate of Compliance be issued stating that the work has been satisfactorily completed. 12. The work shall conform to the following plans and special conditions: 5.2 r Plans: Title Dated Signed and Stamped by: On File with: I 'Pioposed work. '- 5/2.1/87; Gulf_of Maine Research Centery INC. Conservation�Commissio Description_ _ , Special Conditions(Use additional paper if necessary) ....................................................................................................................................................................................... (Leave Space Blank) 5.3A Issued By SALEM Conservation Commission i li Signa re(s — X/ This Order must be signed by a majority of the Conservation Commission. On this 1 I day of T 19 27 before me personally appeared above named to me known to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed • the s meas hislher ee act and deed. j� , Notary Public y commissi expires The applicant,the owner,any person aggrieved by this Order,any owner of land abutting the land upon which the proposed work is to be done or any ten residents of the city or town in which such land is located are hereby notified of their right to request the Department of Environmental.duality Engineering to issue a Superseding Order,providing the request is made by certified mail or hand delivery to the Department within ten days from the date of issuance of this Order.A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and the applicant. I Detach on dotted line and submit to the prior to commencement of work. ........................................................................................_........................................................................................................................ To 'Issuing Authority Please be advised that the Order of Conditions for the project a File Number has been recorded at the Registry of and has been noted in the chain of title of the affected property in accordance with General Condition 8 on , 19— If recorded land, the instrument number which identifies this transaction is If registered land,the document number which identifies this transaction is Signature Applicant 5.4A i t 92 Form 4 DEOE File No. `-� - (To be provided by DEOE) Commonwealth DltyiTo%n S'''e-O( // of Massachusetts APPRMt L C '1i dAJ44 ,Vf • I Abbreviated Notice of Intent Massachusetts Wetlands Protection Act, G.L. c. 131, §40 To be used only for projects of minimum impact, as described in the General Instructions for Completing the Notice of Intent. 1. Location:street Address_/< C/c r-k `f Lot Number & - 2. Project:Type 1-- .- I, 'lep io4 n-1' /"<'.1�9v r��-}rrc-� - _Description G pc\i.e Y'P.(ViL.'ut f7YM:.� -_ 3. Registry: County Fs,ex Current Book Z 8 Page -3 S"<• Certificate(If Registered Land) / ( Z �q `7Yt;-i I(' 4. Applicant: r t'r irz Hsi 71 Fi14 Tel. Address: 5. Property OwnerTel.r� c �r Tel. 7515- S C,0 7 Address: 6. Representative: Tel. Addr 7. Have the Conservation Commission and DEOE Regional Office each been sent, by certified mail or hand delivery, 2 copies of completed Notice of Intent, with supporting plans and documents? Yes ©'� No ❑ 8. Have all obtainable permits,variances and approvals required by local by-law been obtained or applied for?Yes Z No ❑ Obtained: Applied For. 1 Not Applied For. 9. Is any portion of the site subject to a Wetlands Restriction Order pursuant to G.L. c. 131, §40A or G.L. c. 130, §105? Yes ❑ No ❑ 10. List all plans and supporting documents submitted with this Notice of Intent. Identifying Number/Letter Title/Date l- 3 F [7r-- 4-1 93 11. For work proposed within the Buffer Zone(as defined in Part 1,Sections 10.02(2)and 10.04 of the reg- ulations)describe,with reference to supporting plans and calculations where necessary: (a) /The size, shape,type and location of the proposed work. ReWrovZ !"L'.�u,� l�nq�ertc.� and reC'(aCe u.,� C /e.,a.; �, ll (b) Mitigating measures and designs to insure that the proposed work will not alter the resource area which said Buffer Zone borders;or if it will alte?said resource area,the mitigating measures and designs proposed to meet the performance standard established for that resource area in Part II or Part III of these regulations. 12. For work proposed within land Subject to Flooding(as defined in Part III, Section 10.57(2)of the reg- ulations)describe, with reference to supporting plans and calculations where necessary: (a) The size, shape,type and location of the proposed work. X�/fi (b) Mitigating measures and designs proposed to meet the performance standards set forth in Part III, Section 10.57(4) of the regulations. l 4/i I hereby certify under the pains and penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents and supporting data are true and complete, to the best of my knowledge. lL'A.'c'J Signature of Applicant Date Signature of Applicant's Representative Date 4.2 Form 1 DEOE Fie No. _ - Jo be pm,,:eC by OEOE) ` � Salem E - GN/ravn t-x=_' Walter . Ara am c= � � � Ccmmonwealth - of Massachusetts Applicant Request for a Determination of Applicability Massachusetts Wetlands Protection Act, G.L: c. 131, §40 1. I,the undersigned.hereby request that the Salem Conservation Commission make a determination as to whether the area,described below,or work to be performed on said area,also described below,is subject to the jurisdiction of the Wetlands Protection Act,aL c. 131, §40. 2. The area Is described as follows;(Use maps or plans,it necessary,to provide a description and the location of the area subject to this request) #18 Clark Street See-Attached Sheet Site Description 3. The work in said area is described below.(Use additional paper,if necessary,to describe the proposed work.) See Attached Sheet Proposed Work Description t-1 - 79 4. The owner(s)of the area,if not the person making this request, has been given written notification of this request on (date) The name(s)and address(es)of the owner(s): Walter Abraham 65 Valley St. Salem, MA 01970 5. 1 have filed a complete copy of this request with the appropriate regional office of the Massachusetts Department of Environmental Quality Engineering on MAY 91 19 R 7 (date) ,Northeast Southeast t: 5 Commonwealth Lakeville Hospital Woburn,MA 01801 Avenue Lakeville,MA 02346 ` Central Western 75 Grove Street Public Health Center Worcester,MA 01605 University of Massachusetts Amherst, MA 01003 6. 1 understand that notification of this request will be placed in a local newspaper at my expense in accor- dance with Section 10.05(3)(b) 1 of the regulatIons by the Conservation Commission and that I will be billed accordingly. Y Walter. . Abraham signature Name Name 65. Valley St . , Salem; MA 01970 Tel 745-5807 Address - 12 SITE DESCRIPTION The site which is currently undeveloped is located at 18 Clark Street in Salem, Massachusetts (Figure 1) . The 9, 975 s.f. lot is situated on the southern side of Clark Street. A single family home abuts the property to the west, and the property is abutted to the east by an undeveloped lot (20 Clark Street) (Figure 2) . The property is located between the 110-120 foot elevation contours of the U.S.G.S. Lynn Quadrangle. The site and the abutting properties appear to have been filled some time ago. At the rear of the site the property drops off steeply to an area of red maple swamp which can be classified as Bordering Vegetated Wetland. The Gulf of Maine Research Center Inc. of Salem, Massachusetts was retained to identify the Wetland Resource Areas on the site. The dominant wetland plant species noted in the area included red maple (Acer rubrum) , sweet pepperbush (Clethra alnifolia) jewelweed (Impatiens capensis) , sensitive fern (Onoclea sensibilis) and skunk cabbage (Symplocarpus foetidus) . There is only a small portion of this resource area on the property, the greater portion of the wetland being located on lot 125 and, to a lesser extent on lot 115. Because Bordering Vegetated Wetlands exist at the rear of the property, approximately half of the lot is located within the 100 foot discretionary Buffer Zone. PROPOSED WORK DESCRIPTION The applicant proposes to construct a single family house on the property, within the 100 foot Buffer Zone. No work is proposed within the wetland resource area itself, however, a pile of metal refuse material is located at the southwest corner of the property, which the applicant proposes to remove and replace with clean fill. Care would be taken to ensure that this fill would not encroach upon the nearby Wetland Resource Area. Staked haybales would be placed at the base of the slope to prevent eroded material from entering the Bordering Vegetated Wetland. The slope will be stabilized with mulch and maintained until revegetation takes place. The slope will be seeded with-Redtop (Agrostis alba) , a fast starting, sod-forming ,grass widely used in the Northeast for slope stabilization. At no time, either in the replacement of the metal refuse material, or in the construction of the house will the proposed work encroach upon the Wetland Resource Area located on the property. Because no work is proposed within the Resource Area, and staked haybales will prevent work in the Buffer Zone from impacting the wetland, it is respectively requested that the Salem Conservation Commission issue a Negative Determination for the project as proposed. oon �, �� ���`'a'%''�' � ��n�" ��•� o ��\��t� ,�� /tic+.Zta:� .% .,` 5.//. �, '"+i4.1r �et`•!1.`ri►e �.a� � \ s\'�'� ����1'Ji�i1��6 go lk OVA Mt (� w FOU � p( .��\�l y, 'cr ' ��F v�\�vu. �• Cpl\ !��<�U -� niu VF4 Rpm 7' tell • r . r URT • •LAND SURVEYS -DEVELOPMENTS LOT SUWV�URV<Y! REGISTERED LAND SURVEYOR REGISTERED CIVIL ENGINEER / CONSUlTINO GO7/Zr PARSpOCNS ANO F�AIAq INC. elul Enginarm and-uturyvza 593-7927 480 LINCOLN AVENUE SAUGUS, MASS CHUSETTS �T,Z 99�.rr.FE ti a lri�r N ri /Zt l2t oFIGURE 2 Luro18 CLARK STREET a T • -0.00 N ZOO' �I��✓��� />U/7� Of SMAn" abAjWtt IAM SO614 1• 7�'I/ATiRt• ® :T, e, o o INC W/Rml MCI lhi its M 4M IEEE MEN MW ARM ��� 1 �e`iccklirrPreCa��remikaczin.PrcCaL�Gica�cl� �ir�ireeerliec� S. RUSSELL SYLVA 5 Tjacyunaiuc pc��Clz1c�Piuce Cornm4esioner 935-2160 WE: June 10. 1987 2 W: Salem ASSIGNED FILE NO: 64-148 { The Divisicn of Wetlands is in receipt of an application filed under M.G.L. Chapter 131, Section 40, the application is in the name of: APPLICANT: Walter Abraham OWNER OF LAND: Same 65 Vallev St. , 1 Hi�. MA 02043 CJ A(1- -PROJECT LOCATION: 18 Gh"reh St. LOT: 116 { a PROTECT REVIEW y ( ) The application is incomplete. No file number will be assigned until material. checked below is submitted to this Office: 2 ( ) Notice of Intent ( ) Plans ( ) Project requires the filing of a z Form 3 (Notice of Intent) rather than Form 4 (Abbreviated Notice of Intent) ( ) Locus WATERWAYS REVIEW ( ) Project may require a Chapter 91 License-Project has been referred to ( Waterways. ( X) Preliminary review indicates that the project does not require a Chapter 91 License. However, should further review indicate that the project may require a Chapter 91 License, the Department reserves the right to refer the project to Waterways at that time. ISSUANCE OF A FILE NUMBER INDICATES ONLY COMPLErENESS OF FILING SUBMITTED, NOT APPROVAL OF THE APPLICATION. Very trul you , Sabin M. Lord, Jr. , 'i Deputy Regional Environmental Engineer cc: Conservation Commission, Town Hall. Salem. MA 01971 i ,SON coy r z C.onservati 21 Commissim F� 4� Salem. Massachusetts 01970 ��,yq ssncNv MINUTES OF MEETING June 11 , 1987 The Salem Conservation Commission met at One Salem Green, second floor conference room on Thursday, June 11 , 1987. Present were Phil Moran, Fred Harney, Martha Hogan, Harry Takis, and Conservation Advisor Rebecca Curran. Mr. Moran called the meeting to order at 7 :30 p.m. 18 CLARK STREET - PUBLIC HEARING Mr. Moran read the notice of the public hearing to the Commission. Mr. Walter Abraham was present to request an Order of Conditions for 18 Clark Street for the construction of a single family house. The foundation will be located within the 100 foot buffer zone, but there will be no construction in the wetland. Mr. Abraham proposes to remove debris from the wetland and replace it with sod-forming grass . The Commission inspected the lot last week on a site visit and were well aware of the proposed work. Mr. Takis made a motion to close the public hearing and Ms. Hogan second :=he motion, all were in favor. Abraham requested thac the hearing be continued for lot 20 on Clark Street. Mr. Takis made a motion to continue the hearing and Ms. Hogan second the motion. All were in favor. Mr. Takis motioned that an Order of Conditions be granted on 18 Clark Street as proposed on The Gulf of Maine Research work description. Ms. Hogan second the motion. The Commission was unaminously in favor. PARLEE STREET - DISCUSSION Concerned residents of Crowdis Street were present to discuss the construction on Parlee Street and the blasting on Crowdis Street. Mr. Ted Michaud of 39 Crowdis Street presented pictures of the area to the Commission and questioned the status and future plans of Mr. Richard Malone, owner of the property. "els. Curran responded that the Commission was aware of the situation and that Mr. rialone was issued an Order of Conditions to remove the debris. Mr. Robert Redican of 42 Crowdis Street was present and informed the Commission that he has been observing the construction closely and that no debris has been removed. Mr. Moran then concluded that the Commission will monitor the situation closely. LAND COU RTSURVEYS SUBDIVISIONS REGISTERED LAND SURVEYOR REGISTERED CIVIL ENGINEER LOTSURVEYS MORTGAGESURVEYS CONSULTING PARSONS AND FAIA, INC. 60 LEWIS STREET LYNN, MASSACHUSETTS 01902 593-7927 April 25 , 1994 Salem Conservation Commission City Hall Salem, MA 01970 Re : File #64-W4- 148 C' fkA Lots 115 & 116 Clark Street Salem, MA Commission Members , I have made a visual inspection of the above referenced site . In my opinion the site was substantially constructed in conformance with the Proposed Site Plan dated June 12 , 1987 . There is one exception, the fill to the rear of the proposed dwellings was placed higher than proposed . If you have any questions please contact my office . S e s a ' a Parsons and-, iia Inc . ZHUFM DHARLM DANIEL ZG FALA 'n 8091�'' y 4�Bt8TEa� Q QaO SURVO �OQN C 't Conservation k.,dommtssioxi Salem. Massachusetts 01970 � W MINUTES OF MEETING May 28, 1987 The Salem Conservation Commission met at One Salem Green, second floor conference room on Thursday, May 28, 1987. Present were Paul Geoghegan, Harry Takis, John Doyle, Martha Hogan, Rebecca Curran and the Commission's newest member Robert Crowley. Paul Geoghegan called the meeting to order at 7:40 p.m. 18 CLARK STREET - DETERMINATION OF APPLICABILITY Mr. Walter Abraham was present to discuss his proposed plans-for his property and has submitted a report by The Gulf of Maine Research to the Commission. The applicant proposes to construct a single family house on the property, within the 100 foot Buffer Zone. No work will be done in the wetland. Mr. Abraham stated that he will be removing debris including metal materials and replacing it with _a a aa2- grass for slope stabilization. Mr. Geoghegan concluded that Mr. Abraham would have to submit a Notice of Intent for the next meeting. The Commission requested that Mr. Abraham detail the proposed diagram which should include elevation, surrounding wetland and a scale for the next meeting. 20 CLARK STREET - DETERMINATION OF APPLICABILITY Mr.. Abraham also proposes to construct a house on lot 20 within the 100 foot discretionary Buffer Zone. His proposals include the filling in of 500 square feet of Bordering Wetland in order to maximize the use of the property. Ms. Curran quoted from the Wetlands Protection Act (10.55 4C) "the said portion has a surface area less than five hundred .(500) square feet, therefore the issuing authority may issue an Order of Conditions permitting work in bordering vegetated wetland." The Commission requested of Mr. Abraham that when submitting the Notice of Intent that the diagram be well detailed and that lot 18 & 20 be combined as one project. Mr. Geoghegan suggested a site visit so the Commission would be fully prepared when Mr. Abraham returned with the Notice of Intent. Mr. Takis made a motion of Positive Determination for lot 18 & 20 and Ms. Hogan second the motion. It was unaminously in favor. 3 McKINLEY ROAD - DISCUSSION Ms. Curran stated that the abutters of Forest River were not present, but she had been informed by the neighbors that there was a pile of junk in the area. Mr. Geoghegan suggested that Ms. Curran call the Department of Public Works and request assistance in the removal, for it is Conservation owned land. LAND COURT SURVEYS .DEVQ'OPMENTS REOIPTEREOIAND PURVEYOR LOT SURVRYS iiEOISTERED CIVILENOINEER / CONSULTING CAr/Zr PARSONS AND FAIA, INC. "Ut �it9inecu and csuwtyou 593-7927 480 LINCOLN AVENUE SAUGUS. MASS CHUSETTS surf r ti /Z� lZt FIGURE 2 Ov>Fu4q 18 CLARK STREET 7— a t°v Zoo, T J"of IIIAll"4 M1YCC GUA m iOPiP O/�� 4• t Cl SITE DESCRIPTION The site which is currently undeveloped is located at 18 Clark Street in Salem, Massachusetts (Figure 1) . The 9 ,975 s.f. lot is situated on the southern side of Clark Street. A single family home abuts the property to the west, and the property is abutted to the east by an undeveloped lot ( 20 Clark Street) (Figure 2) . The property is located between the 110-120 foot elevation contours of the U.S.G.S. Lynn Quadrangle. The site and the abutting properties appear to have been filled some time ago. At the rear of the site the property drops off steeply to an area of red maple swamp which can be classified as Bordering Vegetated Wetland. The Gulf of Maine Research Center Inc. of Salem, Massachusetts was retained to identify the Wetland Resource Areas on the site. The dominant wetland plant species noted in the area included red maple (Acer rubrum) , sweet pepperbush (Clethra alnifolia) jewelweed (Impatiens capensis) , sensitive fern (Onoclea sensibilis) and skunk cabbage (Symplocarpus foetidus) . There is only a small portion of this resource area on the property, the greater portion of the wetland being located on lot 125 and, to a lesser extent on lot 115. Because Bordering Vegetated Wetlands exist at the rear of the property, approximately half of the lot is located within the 100 foot discretionary Buffer Zone. PROPOSED WORK DESCRIPTION The applicant proposes to construct a single family house on the property, within the 100 foot Buffer Zone. No work is proposed within the wetland resource area itself, however, a pile of metal refuse material is located at the southwest corner of the property, which the applicant proposes to remove and replace with clean fill. Care would be taken to ensure that this fill would not encroach upon the nearby Wetland Resource Area. Staked haybales would be placed at the base of the slope to prevent eroded material from entering the Bordering Vegetated Wetland. The slope will be stabilized with mulch and maintained until revegetation takes place: The slope will be seeded with Redtop (Agrostis alba) , a fast starting, sod-forming grass widely used in the Northeast for slope stabilization. At no time, either in the replacement of the metal refuse material, or in the construction of the house will the proposed work encroach upon the Wetland Resource Area located on the property. Because no work is proposed within the Resource Area, and staked haybales will prevent work in the Buffer Zone from impacting the wetland, it is respectively requested that the Salem Conservation Commission issue a Negative Determination for the project as proposed. i 'd .d 13o .00 130 G ryLyCr,'ieA v j C 110.00 {'20-oma © LOT 115 LOT 116 11 ,020 S.F 9 ,975 S •, e• I /A O / a "GCS ✓ N I d � �aJc = �Io.o 11'0 00 ti \ A SCALES- I "=20' HOR7 . a 1 4' i � \ �� SECTION A - VERT. S. _ EM CONSERVATION COMMISSION APPROVAL J,,, LL / ` - ---- �i veJ �a7` ele 5ei n' \ .� ,tii;L ol�� � %, � \ \ w 3 ��3 / \�� / �� � .2X.f�!^, v /c o,l Gid �t- .+1 •so � DAU-II 7. TE . r,7 4p PROPOSED SITE PLAN `jZ , 41 «.f' /f / ena� u`J ' SALEM MASSACHUSETTS SCAL1- 1 _ �O JUNE 12 ; 1987 ,dced� PARSONS AND FAIA INC. c �c� - //� .� at �/o•� area �1 lad��agCJ LINCOLN ,\- '. iti�� �x fi SAgUGUS NWS /ZCLARK STREETz 'vJ : ^e� �ad.