Loading...
64-103 - CLARK STREET - CONSERVATION COMMISSION oa rl i.a. Form 8 - - DECEFde No. 64-103 _ - - (To be provided by DEDE) Commdnwealth City/Town Salem - of Massachusetts _ Applicant Hewitt Construction lug Certificate of Compliance Massachusetts Wetlands Protection Act, G.L. c. 131, §40 From Salem Conservation Commission issuing Authority To Hewitt Construction Co. 18 Verdon Street, Salem (Name) (Address). For work at Clark Date oflssuance This Certificate is issued for work regulated by an Order of Conditions issued to Hewes#t Construction; Co. dated 6-14-84 and issued by the Conservation Comm. 1. U It is hereby certified that the work regulated by the above-referenced Order of Conditions has �. been satisfactorily completed. 2. ❑ It is hereby certified that only the following portions of the work regulated by the above-refer- enced Order of Conditions have been satisfactorily completed:(If the Certificate of Compliance does not include the entire project,specify what portions are included.) 3. 0 It is hereby certified that the work regulated by the above-referenced Order of Conditions was never commenced.The Order of Conditions has lapsed and is therefore no longer valid.No future work subject to regulation under the Act maybe commenced without filing anew.Notice of Intent and receiving a new Order of Conditions. ..................................................................................................................._.....................................-.................. — (Leave Space Blank) C 8-1 4. x This certificate shall be recorded in the Registry of Deeds or the Land Court for the district in which the land is located.The Order was originally recorded on June 22, 1984 (date) �- at the Registry of Essex South Book ,Page #195309 5. O The following conditions of.the Order shall continue:(Set forth any conditions contained in the ' Final Order,such as maintenance or monitoring,which are to continue for a longer period.) Issued by Salem Conservation Commission Signatures) v b When issued by the Conservation Commision this Certificate must be signed by a majority of is members. On this 14 day of February 19 85 before me pe sonally appeared The ahova named to me known to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed the same as his/her free act and deed. 1 9-9-88 i Notary Puhlic �Ay commission expires Detach on dotted line and submit to the Salem Conservation. Commission - io Issuing Authority Please be advised that the Certificate of Compliance for the project at File Number !has been recorded at the Registry of and has-been noted in the chain of title of the affected property on -.19- It 19If recorded land,the instrument number which identifies this transaction is It registered land,the document number which identifies this transaction is f Signature Applicant 8-2 T & M ENGINEERING ASSOCIATES INC. 22 WILLOW AVENUE - SALEM, MASSACHUSETTS 01970- (617) 744-3782 - �:_!VED IiVG DEPT. February 1 , 1985 Salem Conservation Commission 1 Salem Green Salem, MA 019.70 RE: Hewitt Construction Co , Inc ,, Clark Street DEQE File No . 64-103 . Dear Commission Members : I have inspected the above premises in relation to the "Order of Conditions" issued 14 June 1984 by your Commission. Based on this inspection, it is my opinion that all work specified in the "Order" has been completed. It is , therefore, respectfully requested that the Salem Conservation Commission inspect the work accom- plished and, if satisfactory, issue a "Certificate of Compliance . " Respect i ubmitted, Erla. i 'low - L s 31d Jr . o No.11709 OQ � 01P GlSYE�G?` f FSSIONAI-F-�� P7V0®9 i -` CONSERVATION COMMISSION Detach onda�tttlDlirw and submit to the prior to commencement of work To � 'I_ ` � / —Issuing Authority Please be advised that the Order o1 Conditions for the project at C_Xu.A�ite �/iJQ c+-�"'�^ �"�Q�• File Number 3 has been recorded at the Registry of �� � pppQ —r ���yy/`qqq� and has been noted in the chain of tide of the affected property in accordance with General Condition 8 on 79 It recorded land. the instrument number which identifies this transaction is It registered land, a docume nu a which idendf th s section� Signature ADPticant 5-4A ......................................................................................................................... (Leave Space Blank) 5-3A MURPHY, RYAN & ®'KEEFE ATTORNEYS AT LAW, INC. TEN CHESTNUT STREET PEABODY, MASSACHUSETTS 01960 JOHN E. MURPHY OF COUNSEL TIMOTHY J. O'KEEFE (617) 531-1421 JOSEPH CURTIS RYAN JOHN E. MURPHY, JR. JAMES F. RENNICK IN REPLY REFER TO JOHN R. KEILTY FILE NO. THOMAS M. DONOVAN NICHOLAS P. VONTZALIDES November 9 , 1984 Salem Conservation Commission Salem, Massachusetts 01970 RE: Hewitt Construction Co. , Inc. Dear Sirs: Enclosed please find Section 5-4A of the Order of Conditions . If you have any questions, please do not hesitate to contact this office. Thank you. Very truly yours , MURPHY, RYAN & O'KEEFE N R. KEI TYV JRK: Ca Enclosure 9 Form 5 t DEC Fits Pte. 64-103 1 (Tobi provided byGEGE) SALEbS Commonwealth City/Tc,rjn �{f _ of Massachusetts - Hewitt Construction p7 Order of Cp.�nr���Unns 7•,�3Act C. 1121 SALEM CONSERVATION COMMTSSIfiid - - TC Hewitt Construction Company ca-me (Name of Applicant) (NamJ of propc�-:y 0wnet) 18 Verdon Street, Salem Clark Sheet, Salem 'Address-__ _ Address_. _.�� This Order is issued and delivered as follcv-s: CI Eby tta3,d delivery to applicant or representative cn ._._�__.�...___.._.___._.. e �(d:tri} 20, 198= by certified mail,return receipt r2;uesied an June This project is located The property is recorded at the Registry of Essex South Boon Wage_ Certificate(if 46451 Ttte Notice of Intent for this project ss•:5s hied on May 30, 1984 _(date) June 4, 198-,_ The public hearing was closed on,_ Findings Salem Conservation Commission Tho has reviewed the aacva-refersnced tvronc<:of Intent and plans and has held a public hearing on the project. Based on 'he information available to the• comm' ss; �n_ at this tirne, the_Cnz.G*ri s_::in-1 ,_has deter^iir;eud tilat the area on which the proposed work is to be done is significant to the fcilovvir,g interests in accordance wrth the Presumptions of Significance set forth in the regalatlonster each Area Sub ec:t to Protection Under the Act(check as appropriate): ❑ Public water supply r1 Stonn damage proven?ion ),Z Private water supply Prevartion of pctlutior; YM Ground water supply ❑ Land containing shellfish ❑ Flood control ❑ Fisheries 51 95 Therefore, tha_ Con er:,atior. Conm�ssionhereby finds that the following conditions are necessary,in accordance with the `:er4on-nance Standards set forth in the regulations, to protect those inter- ests checked abova.Tha_ Commission orders that all work shall be perform,d in accordance with said conditions and with the Notice of Intent referenced above.To the extent that the lot- lowing conditions modify or differ frorn the plans,specifications or other proposals submitted with the Notice of intent,the conditions shail control. Gond Candlf?ons 1. Failure to comply with all conditions stated herein,and with ail ralated statutes and other r egulatoiy meas- ures,shall ba dNamed cause to revoke or modify this Order. 2. This Order doe3 not grant any preper'Zv rights or wry exclusive privHN es.it does not authorize any injury to prf`r?tE pr cpsi ty or invasion of priv-MA rghtgs. 3. Thi:Or der&—,s not relieve the permit tee or any other person of the ri ce°asrty of complying witch e5 other appli�-tble fedt.ral,state or local statutes,ordinances,by-laws or reguiaiions. 4. The wcrlt SUti rorixed hefaiindz sha!be completed within threa yews from the date of this Order unless either of the foiiowing apply: (a) the work is a.m intenanca dredging project as provided for in the Act;or (b) the time for comp!Peeon has been extended to a specified date more th-an three years, but less than five y ars,from the date of issuance and both that date and the special cfrcurnstance<s warranting the extended time perod are set forth in this Order. 5, This Order rimy use extended by the issuing authority for one ormore period.,s< up to three years each upon app!ir.-.ikon to the iss ling authority at least 3O days prior to the expir ti ii date of the Order. 8. Any fill usad in connection with thiy3 Fro;ect shall be clean fill,eontrtinirig r%.,:rat;;,refuse,r ubbL"In ar du bris,inclucarig but not iimitecl to!umber,bricks,plaster,wire,lata,pater,c3xiboaid,pipe,tires,ache , refrigerators, motor vehicles cr parts of any of the foregoing. T. No work shall be undertaker:until all administrative appeal periods from this Order have elapsed or,if such an appeal has been filed, until all proceedings before the Department have been completed- 8. ompleto-d-8. No work shai]l be undertaken unfit the Final Order has been recorded in the Registry of Dens orthe Land Court for die district in which the land is located,within the chain of title of tree atrz•cted property, in the case of recorded land,the Final Order shall also be noted in the Registry's Gran. cr Index under thra name, . of the o+,mer of the land upon which the proposed,,vcrk is to be done. In the case,of r ggistered irnd, the Final Order shall also be noted on tie Land Court Certificate ofTitle of the c+:vn=r of the land upon whici': the propos :•ri work is to be dorio. The rero,ding iniermation shall be submit.wi to the commission _ on the form at the end of this Order prior to commencement of the work. 8. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words, "Massachuset"ts Department of Environmental Quality Engineering, Fle Number 64-103 10. Where the Department of Environmental Quality Engineering is requested to maka a determination and to issue a Superseding Order, the Conservation Commission shall be a.party to all agency proceedings and hearings before the Depar lment. 1 1 . Upon completion of the vrork described her ain, the applicant shall forthwith request in writing that a Certificate of Compliance be issued stating that the work has been satisiaciorily cocipfeted_ 12. The work shall conform to the following plans and special conditions: 5-2 Plans: Title Dated Signed and Stamped by: On File with: Site Development Plan, Salem, MA. forHewitt Construction May 21, 1984 Erland Townsend,. Jr. conse.Mitei'o�j. comm i u f Special Conditions(Use additional paper R ne s: my) 1. Work shall conform to the above--referenced plans. 2. All debris now located on the property shall be removed _prior to - commencement of work. - - 3. Erosion control measures shall be employed on the site behind :Got 345: Hay bales shall be placed prior to commencement of construction and during construction. Loaming and weeding of the bank shall be done as soon- as possible-. - - ....._...................................:............................................................... .--......-------------------------- -----._.._....._--'---....r_ (leave SCS Blank) - 5-3A Issued ry� SALEM T Conserv'atbn Co:>^.mission signature(s) I i Tn srPrid 'ti m 5t t7.^-..SI[arisSd by a Pftojority of to a C19Y7:.9Natmn CCii'.i:tisslon. 14 June Untrra. - day of . ef36ri�1 V a�y� arecl v._ he at,_� _.els e __� _ _ a_ �,_.to me i-ra v tot e thr3 person de=ibfld in an echo ES>tki';:Lba hc!,-- lS execcutfad thes tx6a;3nis/ilerfraziv`ctwddeed PIotary pztdc // My ccrnmiasirn expiri,�. r 7T.2r appl.�-srY,4P:o ar n .r,awry pses.^.rr e{S�rt' ^end a'.y �9 Ordst,any owns of is Po tm ecna r:r my tsar rssi;nnta of the oiY or trrtnr in,.h-: �s+..Gn lan6 iy Ic�:xl�"s ha;csSY c�di;rtl cf t.1ec ri,.' i to re„^uz�t the C:,pxr'snc-n' of F^'rtrr::rvanL2l Qr:zii4y Er+r,'irerr-:Sg to i::ruv a Sup�:rer3dmry Ox:ar,pm-,xx iag the is rr-<o by cer 7%d mzi cr tr�rd dNivesy fo ttia tendr;s fro.n the det:q of is ui::ee of this crdr_r.F copy cftlt. Uiw4uwztz1's:tlt tra,�wn>tnn .tra serr,.trr ea;�.7ti`ci m2ii a;'hs:rrd Ctii,,wy tc U:xo Gcnsra+.=:z.i��Ci.;r+un::'a:an ar:d iho e_•t,::iranL CCINSERVATION COMMISSION L's2aofr o.�dc3t�iP i:nsv arr9 sarb:ni4 to t?rs ________._.__ __._.__. ._prior to snmrnncvmor,e cS aro. Pi=sse ca advised that lho Order cl CondSons!nrths project at_. _.. _-- -_-_— Fie fiuober-----hez been recccrded ai tare Registry of has been noted in tha chain of title of the affacted property in accerdares with.General C:a,c`-rn 3 cnA__, _,_. 49.._.. If recorded lac:d^, :he instrument nmnber which ident.fies this trap ac'.On If registered land. th,e document number which idonMies this transacticxr in 5.4A �I S6 Form 3 OECE File No. (To be provided by 0ECE) upCommonwealth K ayrsoym of Massachusetts Applicant A,_ Y curtrwc t J Notice of Intent Under the Massachusetts Wetlands Protection Act, G.L c. 131, §40 and Application for a Department of the Army Permit Pert 1:General Information 1. Location:Street Address Lot Number 344 345 2. Project:Type Description CouereucTtoJ o� tWo S�yGLE mew "OWE u iUCS 1 I i 3. Registry:County_F--;=, x �_o- Current Book &Paget Certificate(If Registered Land) Ag. b 1 4. Applicant Co 1CY2JCT10 1 C o lut Tel. 9 4'4—A'la Address VErZ oou Qsf azct'( ��� 5. Property Owner Tel. Address 6. Representative E c 'u6 l oe'ace�4? Tel. Address 22 \441 LA ) &IL SID r' 7. Have the Conservation Commission and the DEQE Regional Office each been sent,by certified mail or hand delivery, 2 copies of completed Notice of Intent,with supporting plans and documents? -Yes- No 0 3.1 ✓ ' S7 8. Have all obtainable permits,variances and approvals required by local by-law been obtained? Yes ❑ No 0 Obtained: Applied For. Not Applied For. _�N Q- SUP,O\V\510�1�C7wr� W6'1�UD'� �EC.1 rpt Y�¢.m 17 9. Is any portion of the site subject to a Wetlands Restriction Order pursuant to G.L.c. 131, §40A or G.L. c. 130, §105? Yea ❑ No k 10. Ust all plans and supporting documents submitted with this Notice of Intent. Identifying Number/Letter ' Title,Date S\TF vEUopr„s-u-( P'xr L) 11.Check those resource areas within which work is proposed: (a)X Buffer Zone (b)Inland: ❑ Bank* Land Subject to Flooding, ❑ Bordering Vegetated Wetland' ❑ Bordering ❑ Land Under Water Body 8 Waterway* ❑ Isolated (c)Coastal: ❑ Land Under the Ocean* ❑ 1 Designated Port Area- ❑ Coastal Beach• ❑ Coastal Dune ❑ Barrier Beach ❑ Coastal Bank ❑ Rocky Intertidal Shore' ❑ Salt Marsh ❑ Land Under Salt Pond' ❑ Land Containing Shellfish ❑ Fish Run Likely to involve U.S. Army Corps of Engineers concurrent jurisdiction.See General Instructions for Completing Notice of Intent. 3-2 SS Pert 11:Site Description Indicate which of the following information has been provided (on a plan,in narrative description or calcula- dons)to clearly,completely and accurately describe existing site conditions.. Identifying Number/Letter (of plan,narrative or calculations) Natural Features: Sots Vegetation A Topography N0' Open water bodies(including ponds and lakes) U01� Flowing water bodies(including streams and rivers)' u0 T� Public and private surface water and ground water supplies on or within 100 feet of site A Maximum annual ground water elevapons with.dates and location of test Boundaries of resource areas checked under Part 1,item 11 above Other Man-made Features: A Structures(such as buildings,piers,towers and headwalls) �O Drainage and flood control facilities at the site and immediately off the site,including culverts and open channels (with inverts),dams and dikes +00 Q-r= Subsurface sewage disposal systems A Underground utilities A Roadways and parking areas Pc Property boundaries,easements and rights-of-way Other Part III:Work Description Indicate which of the following information has been provided(on a plan,in narrative description or calcula- tions)to clearly, completely and accurately describe work proposed within each of the resource areas checked in Part I,item 11 above. Identifying Number/Letter (of plan, narrative or calculations) Planview and Cross Section oh A Structures(such as buildings,piers,towers and headwalls) two Drainage and flood control facilities,including culverts and open channels(with inverts), dams and dikes R Subsurface sewage disposal systems&underground utilities R Filling,dredging and excavating,indicating volume and composition of material ocgr6 Compensatory storage areas,where required in accordance with Part 111,Section 10:57 (4)of the regulations Other Point Source Discharge 00 ai= Description of characteristics of discharge from point source(both closed and open channel),when point of discharge falls within resource area checked under Part I, item 11 above,as supported by standard engineering calculations, data and plans, including but not limited to the following: 3-3 89 1. Delineation of the drainage area contributing to the point of discharge; 2. Pre-and past-development peak run-off from the drainage area,at the point of discharge,for at least the 10-year and 100-Year frequency storm; 3. Pre-and post-development rate of infiltration contributing to the resource area checked under Part 1,item 11 above; 4. Estimated water quality characteristics of pre-and post-development run-off at the point of discharge. Part IV:Mitigating Measures 1. Clearly,completely and accurately describe,with reference to supporting plans and calculations where necessary: (a) Ali measures and designs proposed to meet the performance standards set forth under each re- source area specified In Part II or Part III of the regulations;or . (b) why the presumptions set forth under each resource area specified In Part II or Part III of the regula- tions do not apply. ❑ Coastal Resource Area Type: - Identifying number or I~ ❑ - inland of support documents ❑ Coastal Resource Area Type: Identifying number or letter ❑ Inland of support documents 3.4 90 O Coastal Resource Area Type: Identllying number or letter ,13 wand of support documents 2. Clearty,completely and accurately describe,with reference to supporting plans and calculations where necessary: (a) allmeasures and designs to regulate work within the Buffer Zone so as to insure that'said work does not-alter an area specified in Part I,Section 10.02(1)(a)of these regulations;or (b) If work in the Buffer Zone will after such an eret?i,all measures and designs proposed to meet the performance standards established for the adjacent resource area specified In Part II or Pert III of these regulations. Cosaw( Resource Area Ty m\Bordered By 100-Foot ohaMr etloy Zone:.� Idendfymtg number or letter lnknd y�.G1=t A't 60 W F�r✓amu D. of support documents 2E6S2A.D11J� AilD C'PrJ�-r�VC'(ltlr,J Or QP-t11'�360 �WE��-Ua16 �' ou 1—i s 3A.4 x�ufl 31a5 . EeAs:o,.� eoinaroi s�,�. PR�CYICED QY 'TLArQ--. LIY.'11'T OF vjMW—' UW 11- 00 LON �r�� rnp—lt:,rz,lp�s -To C3� VY11.tZE-o - LA . _.__ 3.5 91 Part V:Additional Information for a Department of the Army Permit 1. COE Application No. 2. (to be provided by COE) (Name of waterway) 3. Names and addresses of property owners adjoining your property: 4. Document other project alternatives(i.e.,other locations and/or construction methods,particularly those that would eliminate the discharge of dredged or fill material into waters or wetlands). S. 8'/a" x 11' drawings in planview and cross-section,showing the resource area and the proposed activ- ity within the resource area.Drawings must be to scale and should be clear enough for photocopying. Certification is rewired from the Division of Water RAition Controlbefore the Federat permit can be issued Certification may be obtained by corltactirg the Division of Water PoCuoon,Contra l Winter Street Boston, Massacnueetts 02108. Where the activity will'take place within the area under the MassachLeetis approved Coastal Zone Management Program the applicant certifies that his proposed activity cornp5es with and will be conducted in a manner that is consistent with the approved program . .. Information prwded will:be used in evaluating the appkation for a permit and is made a matter of public. record through ssuance of a public notice. Dwlosure of this information is vokmtary. however f necessary information is not provided. the application cannot be processed nor can a permit be issued. I hereby car under the pains d penalties of perjury that the foregoing Notice of Intent and accompanying plans,docu ants and suppo ng data are true and complete,to the best of my knowledge. Signature licant Date Signature of Applicant's Representative Date FORM "Exception to ENG Form 4148 approved by HQUSACE. 8 May 1982•. NED 100 'TEST). 'Thi. mrm 1 MAY I)2 his docuent contains • joint Department o!the Ay and Stab of MuuehosetL application (or a permit to obtain permission to Perform activities in United Slate. oaten.The Office of Management and Budget (OMB) has approved those nuution. renewed by the US Army Corp. of Enginser.. OMB Number 0702.0018 and ,:Diction data of 10 September 1981 applies". This statement will be .et in 8 point type. 3-8 �%ON Co` f Conservatim CGS' ' IVI7l Salem. Massa chlisctts 01970 e,Ass��```5 ' May 1 , 1986 Mr. Mrs. John Wilkins 24 Clark Street Salem, MA. 01970 Dear Mr. Mrs. Wilkins: Pursuant to our discussion at last Thursday' s Conservation Commission meeting, we are writing to confirm our agreement regarding the placement of fill behind your home within the wetland area. 1 . All inappropr'iate fill material such as bituminous shall be removed. -. 2. The slope shall be stabilized as best as possible without incurring financial hardship. 3. Loaming and seeding may take place to help stabilize the slope, but hay bales should be placed at the toe of the slope to prevent wash out of any fill into the wetland. 4. There shall be no placement of fill beyond the present line. The Commission understands your disappointment in not being able to fill any further than what presently exists. We have attempted to reach an equitable compromise by allowing the fill that is presently there to remain. By statute, no more than 500 sq. ft. of area may be filled without providing a compensating area within the same wetland. This type of activity would be prohibitively expensive: Your cooperation in working with the Commission on this issue is very much appreciated. Please feel free to contact our Staff person, Dale Yale at 744-4580 if you need further assistance. Again, the Commission appreciates your cooperation in addressing this matter. Very tru yours, Philip D. Moran U Chairman ()N CO.t, y i C9nse vai m s •owl Salem. Massachusetts 01970 c yASS�N April 2, 1986 Mr. and Mrs. John Wilkins 24 Clark Street Salem, MA 01970 Dear Mr. and Mrs. Wilkins: Pursuant to our telephone conversation earlier today, I have placed your name on next Thursday' s (April 10) agenda so you and the Conservation Commission can discuss your proposal to level and fill a portion of your property adjacent to a wetland area. °I appreciate your cooperation in suspending your fill operation until the matter can be discussed. The Commission is interested in resolving these matters in an amicable fashion. If there are any questions you may have, please feel free to. contact me at 744-4580. I look forward to seeing you at 7:30 p.m. on April 10 at One Salem Green, second floor. Si erely, yours, Dale E. Yale Staff Advisor to Conservation Commission Re: 24 Clark Street--dumping I <j, - Q 7 7 Fall, 1985--Site visit with Paul Niman, Director of Public Services who had received a request from owner to take City fill (leaves, street sweepings) for landfill purposes. It was observed the area was within a wetland (land donated to Conservation Commission by builder of abutting homes) and any filling must be done with Commission approval only. Mr. Niman told owner that no City fill would be brought to site. April, 1986--Two telephone calls from concerned neighbors that large amounts of fill and trash were being dumped in wetland area. Site visit confirmed this was taking place. April 2, 1986--Telephone call to Mrs. John Wilkins, 24 Clark Street, who confirmed they had hired the trucks to bring in fill. I asked her to stop dumping immediately and contact me again for proper procedure to follow. Follow-up letter attached. T ,a to tmi P..•'3 j BAY STATE SURVEYING SERVICE 1NC. 234 CABOT ST , 81-MER.LY, NIA! ` LOC;TION ' ; To t li�l �T �1,` i i srC CPl1 af4111 t i d SC. : E : I" FT. DOTE = �'Cd'h..�'�dl�.�'i� i hereby certify Vat I have examined the premise; and that to 1 C6r n r. 1 y7 r. building (s) shown on this plan are located on th :jund a . !i �tEEERi=IVC=. = Ela i .t.✓_-.x::. 1.�...a .... ........... shown and that they conformed to the zoning ',a t ,s or the C. E y - --------------: � '1i"�t— �-1-- --- when cona;r,;c'ed. ' NOTE : This is a Mortgage Inspec±ion survey and not I The building (s) are not located in the special ;'ood hazard I an in trum ani survey, there'rwa this plot plan is for II zone , as defined by H ;.D . - roriyaG n .dectlon purposes only, I ~' J J N Ct / r c li _� Fr � .F J 4 vt�^. � a i ffS `o rnL S 1 n, 'A . 1 1[ i � 1 it ter/ i i LOT t ;fit 65- LOT O r - � i I 1 1 I 1 y , f15 7H1:3 : t ?Lr'f IS BAr 13iSF1ES, SN?,,'BS, rENi C ES I �/� i_ii`TS DO SIO I INECE;7;•ARILT 6 ., 310 CMR: DEPARTMENT OF ENVIRONMENTAL QUALITY 1,NOINCERING '�,�•— 10.99: Forms _ Form 1 Form t OEOE Fix W.�) (Ta D��by OEOE) Commonwealth - Oryrtow+ ' . of Masmohuxds A� ' Request for a Determination of Applicability Massachusetts Wetlands Protection Act, G.L c.131, §40 1, i,the undersigned,hereby request that the .Conservation Commission make a determination aafo whether the area,described below,or wont to be performed on said area,also described below,is subject to the jurisdiction of the Wetlands Protection Act,CL c 131,540. 2 The area is described as follows.(Use maps or plans,H necessary,to provide a description and the location of the area subject to this request) 3 1/5 i(o) Ilo S s F a 9 3. The work in said area is described below,(Use additional paper,if necessary,to describe the proposed work) 7� p �[ce a 5 t•1 6/30/x3 Vol. 12 - 222.1 310 CMR: DEPARTMENT OF ENVIRONMENTAL QUALITY ENGINEERING - 10.99: continued Form 1: continued 4. The owner(s)of the area,A not the person makkfnp this request,has been given written notification of this I. requeston�3'ta--Q / 5_ /4 .(date) The name(s)and address(es)of the owner(s): up,( t�. Gtr u /iii �✓� S. f have(Med a complete copy of this recuest with the appropriate regional office of the Massachusetts Depiu-tment of Environmental CuaSty,Engineering on 'date) Northeast Southeast 323 New Boston Street lakeville Hospital Woburn,MA 01801 Lakeville,MA 02348 Central Western 75 Gmve Street Public Health Centel \`=' Worcester,MA 61605 University,of Massachusetts Amherst,MA 01003 6. 1 understand that notification of Iris request will be placed in a local newspaper at my expense in accor. dance with Section 10.05(3)(b)1 of the regulabocs by the Conservation Commission and that I will be billed accomingly. g Gly/�ti{? lU Tel 777 .vVV✓�'lam' " "!L 12 6/30/83 \ Vol. 12 - 222.2 m— �� .��. �� �'C_z'iecrtlt.r�,. �/`�,/,�C,C,of �ltriJ rrr r�r7,rrac�iLa(� c�"T�T•►�, EG 1 ) X r 1Y�✓/-r GJJf IJ( /�(�/J PI rI•IL/I1141e ..(AII//`✓ �(//IIOIAY.!?"( J %�,))r fLlnrJtY.�''�n�rrlY %lnlfrl/�rJJ '�i� JI J S. RUSSELL SYLVh ��iu %fr/r fr'r .Yl+!'ter! �.iiJ fig/r n�Jnd' ✓4� pommrsvoner WATERWAYS LICENSE APPLICATION N0. 86W-179 �6` 26jo DATE October 20, 1986 �i� �b� Dear Applicant: The Department has received your application requesting authorization to perform certain activities in state waterways pursuant to G.L. Chapter 91, Waterways Licensing. The Waterways Regulation Section has assioned your, filing with the above-indicated application number. It is imperative that you .refer to this application number whenever, you submit or request information for this file. Attached is the Department's public notice for this application. You are required to publish this notice, at your expense, in the local newspaper having circulation in the area aT�d by this application pursuant to G.L c.91,s.18. This notice must be published for at least one day in the local newspaper and there is a thirty (30) day comment period imposed from the date of publication. You are required to submit proof of publication to the Department by sending a copy of this notice showing the date of publication or a letter from the newspaper indicating the date that this notice was published. The Department will concurrently notify the local Government and local conservation commission of the proposed activity for their review and comment. Please be advised, however, that the Department cannot begin licensing review and authorization until at least forty-five (45) days after the municipality has be n0t,7, this application pursuant to G.L.c.91 ,s.18. In general , the Department will not begin licensing review and autho7jzation for this application until the following information has been submitted to'the file: - Proof of publication of the public notice - Expiration of the statutory 45 day notice period Receipt of a valid final Order of Conditions pursuant to the Wetlands Protection Act livable to - Receipt of the Municipal Zoning Certification (app tidal areas only) i , applicable) = Receipt .of a DEQE Yater Quality Certification ( ` - Completion of MEPA review (if applicable) Complete and accurate license application and plans = Should you have any questions with retard to the Foregoing, lease do P not hesitate to contact the Waterways Regulation Section at 292-5695. Sincerely, hart s r-- ' Charl6s J. �o�a e, er Se Cti On.�tl-V-f V DEPARTMENT OF ENVIRONMENTAL QUALITY ENGINEERING Division of Wetlands and Waterways Regulation Waterways Regulation Section PUBLIC NOTICE WATERWAYS LICENSE APPLICATION NO . 86W-179 Public notice is hereby given pursuant to G. L. Chapter 91 , s . 18 of the application of McNeil and Associates. Inc. in the municipality of Westwood for authorization to maintain the existing filled area including landscaping and a public walkway to enhance public access to the waterfront at property located at Essex Street in the municipality of Salem in and over the waters of Collins Cove The proposed use of the structure ( s ) and/or fill is to provide access across a filled land area. The Department will consider all written comments submitted within thirty ( 30 ) days subsequent to the date of publication of this notice in Order to decide whether to grant authorization for the proposed activity pursuant to G . L . Chapter 9I . Written comments on this proposal must be submitted to : Department of Environmental Quality Engineering , Division of Wetlands and Waterways Regulation , Waterways Regulation Section , One Winter Street , Best on , MA 02208 . Further information on this application may be obtained by contacting the Division at 292- 5695 . r THE COMMONWEALTH OF MASSACHUSETTS (Tidal Waters) �f TO THE DEPARTMENT OF ENVIRONMENTAL QUALITY ENGINEERING: The Petition of M..Na ' 1 Apa i i ataa _ Znc municipality L9actwnod in the County of _Plymouth and Commonwealth aforesaid, showeth: That said Petitioner desires to maintain the existing filled area (describe project) including landscaping and a public walkway to enhance public access to the waterfront. in and over the tidewaters of Collins Cove located at Essex Street in the City of Salem (street address) - (city, in the town) county of Egsex and Commonwealth aforesaid; that the tidewater land above low water mark which would be covered or occupied by said structure, is owned by McNeil :& Associates Inc of Westwood, MA and ` uplands shoreword thereof is owned by McNeil & Associates , Inc. of P.O. Box 407 420 Providence Highway Westwood MA 02090 (address) PROJECT INFORMATION 1. The specific use of the proposed structure/841:t is to provide access across a filled-land area to a publicly available walkway extending along the rnllins Cove watPrfz-Qnt ioresentlyowned by McNeil and Associates , Inc. 2. Is the use of the project water dependent? Yes X No Explain: The availability of a perimeter walkway to the public was part of , an aorPnt between the developer and the City of Salem This walkway, in turn allows the public access to the tidal waters adjacent to the property. Thus , maintenance of the filled area including landscaping and public access is related to the presence of the tidal water environment and is in the public ' s interest. 8 � VV �P GO PROJECT 0� LOCUS \Pv E Al \�5 COLUNS VA, COVE O`C �yy 2� LOCUS PLAN 1000 0 1000 2000 FT. ' 1 'PROPOS\�D FOOT BRIDGE / . WATER 1g8%,sa' nai °""R "in ftso s + TOP STONE 1 , v , EXISTING FILLED AREA \\ TO BE-LICENSED ,� I r � � ESSEX - STREET EXTENSION \� o� TAMES cSG� g W. v MALEY -- N 4485 0 _IO 20 40 60 80 PLAN ACCOMPANYING PETITION OF MCNEIL ASSOCIATES PETITION TO MAINTAIN EXISTING FILLED :---AREA.. AND' TO ERECT-FOOT BRIDGE.AT. COLLINS -COVE 1N BEVERLY HARBOR AT:" n SALEM COUNTY OF. ESSEX STATE MA. SHEET IOF 2 FEBRUARY 14 , 1986 0 .. 16,- 0° EL. 17.50 W-0 O EL. 15.50 ` - 2 4000 FOOTING ON M'H.W.=8.8 SUITABLE BASE �� v EXISTING SURFACE DUMPED ROCK - - . ELEVATION-WALKWAY BRIDE NO SCALE 6'-0" 2% 8° HEM.-FIR RAIL 4°x4° HEM-FIR POST 2°x 8HEM.-FIR DECK 4°x 10"HEM.-FIR STRINGER OPEN JOINTED �,tH Oc fyq END VIEW °r JAMES NO SCALE a W. � yi DATUM-CITY OF SALEM BASE -0.0 = M.L.W. °�FFoisTgt+�`fir Ss�ONAL EN4 PLAN ACCOMPANYING PETITION OF MCNEIL ASSOCIATES PETITION TO MAINTAIN EXISTING FILLED ,AREA_: AND TO ERECT FOOT BRIDGE AT - -- .COLLINS-COVE IN BEVERLY`HARBOR AT SALEM COUNTY OF ESSEX STATE MA SHEET 2 OF 2 FEBRUARY 14 , 1986