Loading...
000 6 - 0008 CLARK AVENUE - 64-209 CONSERVATION COMMISSION f 1_.. .. r_ \ _ _ __ _ _ __ / t Y r - . i. � _ . �,, ,l/ i,T1 ,�� i "r r ��' r �;' t;, i ,�' � ,T - t �A . eiAr .� •1. 4{' i y A +� x� ~ �• * N r�#��' . . - - . . . . - n3 c n 93 2? iro - PO L A RO70� 6 � � ju �r M. 71 �7 "L)' 1+. Y• iii., J r x ri _41� fi f 1 L rte. w, •`o. CIA,- . r (��ore. Y yL `i2 �f c,leu.K� Au.c_. �: �' _ � ' .. �'• • alt t . q3>^9^7? iFP. PO I_AP.OIO'F Commonweollh Of Niossochusetis Executive Office of Environmenlol Affoirs Department of — ' Environmental Protection 7,4 Mello Boston/h1oriheosl Regional Office ® . Veil linin F, 61'c ld Ai.�/�/ �9g9 Da niel SoGrecnbaum (NN1A,j'/%�/� DATE: 9/8/92 RE: NOTIFICATION OF FILE NUMBER 64-209 WETLANDS/ _Salem This Department is in receipt of the followinga (city/town) accordance with the wetlands Protection Act (M. G . L a Chapter filed31, Section 40) : _ APPLICANT: Nicholas Fiore OWNER OF LAND: ADDRESS : 4 Clark Ave. ADDRESS : Salem, MA 01971 PROJECT LOCATION: 6-8 Clark Ave.Lot 117 118 Although a file c is being issued, the possible follol;ina deficiency (ies) in the filing have been noted : No File = will be 'assigned to this project untill the following missing information is sent to this office to complete the filing in accordance with the Act: ( ) Notice Of- Intent ( ) Locus I,iap ( ) Plans ( ) Title 5-Plan ( ) Appendix A Documentation COMMENTS : - ( ) Application has been forwarded to the Waterways Program to determine if a Chapter Y Licensing 91 License is required . ( ) Applicant is advised to forward a copy of the Notice of Intent to the Army Corps of Engineers for Sec. 404 review (Call 1- 800-362-4367 for further information) . ( ) Project may require a �•,ater Quality Certificate. Applicant is advised to contact the DEP Division of 1• Control ( li'7inter St. Boston, MA, 02108 ; Tel : ( 617 ) 292-5673 ) for forms and further information . ISSUANCE OF A FILE NUMBER INDICATES ONLY COMPLETENESS OF FILING SUBI'iITTED, NOT APPROVAL OF APPLICATION . cc : (X) Conser. atiOn Commission Copies also sent to : ( ) DEP Division of Water Pollution Control ( ) U . S . Army Corps of Engineers , Regulatory Branch ( ) 'City or Town Board of Health ( ) Office Of Coastal Zone Management (X) Representative For the COMMISSS ner Wetlands Section Chief - 10 Commerce way Wob.:rn, Massachusetts 01501 F <il: (617) 935-6393 • Telephone (617) 935-2160 ...�%oN Cp�� �i 2 z Conservatim (ommissim Salem. Massachusetts 01970 !f�SACa��W CITY OF SALEM CONSERVATION COMMISSION NOTICE OF PUBLIC HEARING On Thursday, September 10 , 1992 at 7 : 00 p.m. the Salem Conservation Commission will hold a public hearing for a Notice of Intent under the Wetlands Protection Act, M.G.L. Chapter 131 , Section 40 at the request of Nicholas Fiore, 4 Clark Avenue. The proposed work involves regrading slope and installing an erosion control/revegetation blanket on slope at 6-8 Clark Avenue, Assessor ' s Map 3, Lot 117 and 118. The hearing will be held at One Salem Green, second floor conference room. Betsyy Beetsy Hoornerae Chair September 2, 1992 Mis notioe posted on '"Offioial B lefilII Boai�L+' . dity Hall Ave.,. Salem, Maes. on�Z 1/ at. �� ®3/ in acoordanoe ith A1ap.. {!d, of She Asto of IVA$. t 310 C:tR 70.99 Form 3 oE'F'+"�• commonwealth F R0"°pnO�O'r� 4 ct Massacnuse RS c„y,To..n S a t en Fiore AOO1-CdM Notice of Intent Under the Massachusetts Wetlands Protection Act, G.L. c. 131 , §40 and Application for a Department of the Army Permit Part I: General Information 6-8 Clark Ave 1. Location Street Address LotNurntter Assesors Mao 3 Lot 117 & 118 T Residential Description Regrade slope on site, loam and 2. project: type seed slope , install erosion control/revegation blanket on slope . I i I 3. Registry:County Essex Current Book 10943 _$Page 72 Certificate(It Registered Land) 4. Applicant Nicholas Fiore Tel. 4 Clark Ave Salem, MA — Address 5. Pruery Owner Nicholas Fiore Revocable Trust Agreement Tel. 4 Clark Ave Salem, MA Address S. Representative Landmark Enclineerina and Survevinc Inc Tel. 592-7016 583 Chestnut Street Lynn, MA 01902 ACdress 7. a. Have the Conservation Commission and the Departments Regional office each been sent by Certified mail or hand delivery,2 copies of completed Notice of Intent,with supporting plans and documents? Yes J No ❑ b. Has the fee been submitted? 13 Yes ❑ No c. Total Fling Fee Submitted $55 .00 515 .00 d. Ciryle of iovm Share f Fling Fee $40 .00 Stale Share of Filing Fee (sent to CoFin) ('h of fee in excess of$25, sent to DEP) e. Is a brief statement attached indicating how the applicant calculated the fee? f6 Yes ❑ No Effective 11/10/89 NCP=C OF TN['�`ti' F'_ ?RWS- `?L DEP Ti OF ^z IVZ^�C•V`"i "lT.;L. -L' __ICN DIVISION OF FIG IANCS AND Fn=vn'i5 NC CS CF _=_ (240I) �oor.T_CyT: _cLns G ice: Nine' Nicholas Fiore Name Nicholas Fiore Revocable Trust Agreement 4 Clark Ave Street, 4 Clark Ave C;`J/^-n Salem City/?cm Salem Stat: MA Zia Code Sate MA Zip Code Project Ux,ticn: Sweet/Lot Nu-:her 6-8 Clark Ave City/2b4rn Salem, MA DEP r, Numm (if available) NOI FTT_ 'G F DIS?J1^J F :tta NOI Filisr� Fee: $ 55 .00 Tctal ou Dis ` Fes: $ 15 .00 (as deteati ine3 in Ncce of state -base of Filing Fee: $ Insufficient Fee letter fr= (1/2 of fee in excess of $25.00) ccnse-,aticn c=; inn) City/2tsn Stere of 40 . 00 State Share of Fee: $ F;i i m Fee: $ (1/2 of total disputed fee) City By-law $25 .00 City/Tcwn. Slna^e. of Fee: $ (1/2 of total disa:ted fee) INSP.Rr=' CNS 1. sand t_s Fee 2`'ars:aitta.I fcrn with a check c rcrey oder, payable to the Cac nnwealth of Massachusetts, to the DEP Ioc'c Bax at: Derr-ent of MTdxcnmental Prvtecticn Box 4062 Bcstmi MA 02211 2. Attach a c=v of this form to the Notice of Intent submitted to the local Conservation Commission. 3...Attac-h a ccvv of this form and a civ of the DEP the--Ic to each of the Nctice of Intent forms submitted to the DEP regional office. 11/10/89 FILING FEE CALCULATION WORKSHEET plants, roadways/driveways NOT subject to 310 CMR 10.53(3e) SHALL NOT BE SUBJECT TO ADOIT10NAL FEES CATEGORY 1 $55 Vt3 ACTIVITY No. if said activities are reviewed under a SINGLE NOI S C. Construction Of EACH ROADWAY/DRIVEWAY within the _ A. Existing House/residential lot (addition, deck, — Buffer zone or Coastal Floodrone NOT reviewable gerege,poal, shed,or DRIVEWAY) under 310 CMR 10.53 ('3e) and NOT associated with a SFH B. Site Preparation (removal of vegetation, exca- 55 1 9 — — D. HAZARDOUS WASTE CLEANUP (except as noted in _ vetion grading where home construction isn't category A) proposed under this NOI) TOTAL CATEGORY 3 ACTIVITIES C. Control of nuisance vegetation by removal, herb- _ — — — icides, etc. within a Resource Area PER LOT pursuant to 310 CMR 10.53(4) CATEGORY 4 $725 PER ACTIVITY D. Resource Area improvement pursuant to 310 CMR _ — A. EACH WETLAND FILLING/CROSSING LIMITED PROJECT _ 10.53 (A) other then 1F, ahove ACCESS ROADWAY/DRIVEWAY under 310 CHR 10.53 (3e) associated with COMMERCIAL, INDUSTRIAL, INSTITU- TIONAL DEVELOPMENT OR RESIDENTIAL SUBDIVISION replacement, UPGRADING CONSTRUCTION. ('see category 2g for SFH driveways*) F. Monitoring Wells/well _— B. Flood Control Structures (construction, REPAIR, — and/or modification) TOTAL CATEGORY 1 ACTIVITIES C. LANDFILLS-public h private — CATEGORY 2 $250 PER ACTIVITY D. SAND h GRAVEL OPERATIONS A. EACH .NEd single family house (SFH) INCLUDING — E. NEW railroad lines or EXTENSIONS of EXISTING _ site preparation, retention/detention basins, lines utilities, SEPTIC SYSTEM, roadway/drivewey other then those pursuant to 310 CMR 10.53(3e) F. Control of NUISANCE VEDETATION under 310CMR _ if reviewed under a SINGLE .NOI 10.53(¢) other then on a SFH lot B. Parking lot/ ANY size _ G. BRIDGES (construction, reconstruction, expansion,_ — maintenance) ASSOCIATED with a SFH lot C. Beach .Nourishment — H. Raising or lowering WATER LEVELS — D. Coastal Activities pursuant to 310 CHR 10.24 — (7a-c) including 7a-Electric Generation Facilities, 1. ALTERATION OF RESOURCE AREA 4 diversion of water 71b-Public Utilities, 7c-Coestel Limited Projects associated with HAZARDOUS WASTE CLEANUP, non- ' including REPAIR/MAINTENANCE of EXISTING piers, mosquito control projects, or for ANY OTHER PURPOSE buildings culverts, etc. NOT EXPRESSLY IDENTIFIED ELSEWHERE IN THIS FEE SCHEDULE E. LIMITED PROJECT ACTIVITIES pursuant to 310 CMR _ J. DREDGING ACTIVITIES not associated with a NEW _ 10.53 (a-d) AND 310 CMR 10.53 (f-1) per footprint dock, pier or other structure described in category 5 F. NEW agricultural/equaculturel projects _ TOTAL CATEGORY 4 ACTIVITIES C. EACH WETLAND DRIVEWAY CROSSING associated with — a SFH pursuant to 310 CMR 10.53(3e) CATEGORY 5 $2 PER LINEAR FOOT; TOTAL FEET NOT TO BE LESS THAN $50 NOR MORE THAN $1000 H. ANY point source discharge — A. Construction, reconstruction, REPAIR, or replace-_ — I. ANY OTHER ACTIVITY not described in categories — ment of DOCKS, PIERS, REVETMENTS, DIKES, or other 1,3,4 A 5 engineering structures on COASTAL or INLAND RESOURCE TOTAL CATEGORY 2 ACTIVITIES AREAS including the placement of RIP-RAP or other materiel on coastal or inland resource areas CATEGORY 3 $525 PER ACTIVITY TOTAL CATEGORY 5 ACTIVITIES _— A. SITE PREPARATION for ANY development other [nen — TOTAL FILING FEE CALCULATED $55 .00 for a SFH INCLUDING removal of vegetation, PERSON CALCULATING FEE SCHEDULE (Print Name) excavation h grading when actual construction is La n f7Tn a rk Fri i riP T ri S S11 rVP i n NOT proposed under this NOI g' B. CONSTRUCTION OF EACH BUILDING within commADDRESS 583 Chestnut Street Lynn, MAercial, _ industrial, institutional, or apartment/condo/ TELEPHONE NUMBER 592-7016 townhouse type of development, ANY PART of which �tfj� is in a BUFFER LONE or RESOURCE AREA. Associated SIGNATURE �,w�� t9 � DATE V z 7 z. activities: site preparation retention/detention Denn l S McMa nus basin construction,septic systems, parking lots, utilities, point source discharges, sewerage treatment • ..e oeO�Exco rox r....crvr OwTEO ,Iry Pn10UNi - - -- - LANDMARK ENGINEERING & SURVEYING, INC. 2173 - — -- 563 CHESTNUT ST. LYNN, MA 01904 PH. 617-5927016 53-251/113 PAYTO THE / / _ — ORDER OF C 111_47(( S &-41,, S. 00 TOTAL OF wvolcE6 —SL�r-F— �U —<�QL------- DOLLARS LE86 ^6016GO11NT ---- -- LANDMARK ENGINEERING 8 SURVEYING, INC. LE66 SHOREBANK ----- TouL o6OucnoN6 ncu THLLlTCUIII'ANY 77. vrvx.un eluol PMOOnT OF CNECx � u'00217311' ':0113025191: 5 3 100 2 6 3 311' DATEOry LINT 2172 -- -- -""- - - LANDMARK ENGINEERING & SURVEYING, INC. ---- -------- ------ --- 563 CHESTNUT ST. LYNN, MA 01904 --- - _-- --- PH. 617-592-7016 57-25i/113 PAY TO THE ( y/ �{-( Q• •_ _ -____—_ --_.... _ Ofl DEO OF_�m�lJ'7Jli��/�"L._QJ�'CFZ.���r411[��'�11.�___� .D �.� - (JV e 7 TOTAL OF wvo¢Ee }�'-�FlT �f' -- ------'--.DOLLARS LE66 %OI6COUNT _ _ ' L.E. __ SHOREBANK LANDMARK ENGINEERING 8 SURVEYING, INC. TOTAL DEDUCTION. Axu7RU5f COMPANY AMOUNT 6'0 0 2 1 7 2114 ':0113025191: 5 3 100 2 6 3 311' 8. Have all obtainable permits.variances and approvals required by local by-law been obtained? Yes A No Obtained: Applied For: Not Applied For: 9. Is any portion of the site subject to a Wetlands Restriction Order pursuant to G.L. c. 131, §40A or G.L. c. 130. §105? Yes G No M 10. List all plans and supporting documents submitted with this Notice of Intent. Identifying Title, Date NumbertLetter A USGS QUADRANGLE B FEMA MAP C 1989 NHP ESTIMATED HABITAT MAP ' D ABUTTERS LIST E ABUTTERS NOTICE F PROJECT PLANS 1 1.Check those resource areas within which work is proposed: (a) LF Buffer Zone (b)Inland: C Bank' Land Subject to Flooding, C: Bordering Vegetated Welland' ❑ Bordering Land Under Water Body 8 Waterway' C Isolated (c)Coastal: Land Under the Ocean' C Designated Port Area Coastal Beach' ❑ Coastal Dune Barrier Beach ❑ Coastal Bank Rocky Intertidal Shore' C Salt Marsh' Land Under Salt PondC Land Containing ShelHish' Fish Run' •Likely to involve U.S. Army Corps of Engineers concurrent jurisdiction.See General Instructions for Completing Notice of Intent. 3-2 12 Is the wetland resource area to be altered by the proposed work located on the most recent Estimated Habitat Map (if any) of rare. "state-listed"vertebrate and invertebrate animal species occurrences provided to the conservation commission by the Natural Heritage and Endangered Species Program? YES [ ] NO [X] Date printed on the Estimated Habitat Map issued NO MAP AVAILABLE [ ] (if any) 1989 If yes, have you completed an Appendix A and a Notice of Intent and filed them, along with supporting documentation with the Natural Heritage and Endangered Species Program by certified mail or hand delivery, so that the Program shall have received Appendix A prior to the filing of this Notice of Intent? YES [ ] NO ( ] 33 Pert II: Site Description Indicate which of the following information has been provided (on a plan,in narrative description or calCula- tions) to clearly, completely and accurately describe existing site conditions. Identifying Number,Letter (of Plan, narrative or calculations) Natural Features: F Soils F Vegetation A, F Topography n a Open water bodies(including ponds and lakes) n/a Flowing water bodies(including streams and rivers) F Public and private surface water and ground water supplies on or within 100 feet of site n/a Maximum annual ground water elevations with dates and location of test F Boundaries of resource areas checked under Part I, item 11 above n/a Other Man-made Features: n/a Structures (such as buildings, piers,towers and headwalls) F Drainage and flood control facilities at the site and immediately off the site,including culverts and open channels (with inverts), dams and dikes n/a Subsurface sewage disposal systems F Underground utilities F Roadways and parking areas F Property boundaries. easements and rights-of-way n/a Other Part III:Work Description Indicate which of the following information has been provided(on a plan,in narrative description or calcula- tions) to clearly,completely and accurately describe work proposed within each of the resource areas checked in Part I, item 11 above. Identifying Number/Letter (of plan, narrative or calculations) Plainview and Cross Section of: n/a Structures(such as buildings, piers, towers and headwalls) F Drainage and flood control facilities,including culverts and open channels(with inverts), dams and dikes n/a Subsurface sewage disposal systems b underground utilities F Filing, dredging and excavating,indicating volume and composition of material n/a Compensatory storage areas,where required in accordance with Part III,Section 10:57 (4)of the regulations n/a Wildlife habitat restoration or replication arew n/a Other Point Source Discharge n/a Description of characteristics of discharge from point source(both closed and open channel),when point of discharge falls within resource area checked under Part I,item 11 above,as supported by standard engineering calculations,data and plans.including but not limited to the following: 3.4 I. Delineation of the drainage area contributing to the point of discharge; 2. Pre-and post-development peak run-oH from the drainage area,at the point of discharge, for at least the 10-year and 100-year frequency storm; 3. Pre-and post-development rate of infiltration contributing to the resource area checked under Part I,item 11 above: 4. Estimated water quality characteristics of pre- and post-development run-of at the point of discharge. Part IV:Mitigating Measures 1. Clearly, completely and accurately describe,with reference to supporting plans and calculations where necessary: (a) All measures and designs proposed to meet the performance standards set forth under each re- source area specified in Part II or Part III of the regulations;or (b) why the presumptions set forth under each resource area specified in Part II or Part III of the regula- tions do not apply. coastal Resource Area Type: loenofying number or letter S Inland Bordering Vegetated Wetlands of su000n documents No work is proposed within the vegetated F wetlands . A row of haybales will be placed at the toe of slope between the vegetated wetlands and the proposed work to prevent siltation of the wetlands during construction. The haybale barrier will also delineate the limit of work on the site . No materials or equipment will be placed in the vegetated wetlands . All acces to the site will be from Clark Ave. coastal Resource Area Type: idenMy'ng pumper or Otter Wand of support Occumens 3.5 Idenu"g number or letter Coai:L Resource Area Type: of support documents Inland 2. Clearly, completely and accurately describe,with reference to supporting plans and calculations where necessary: (a) all measures and designs to regulate work within the Buffer Zone so as to ensure that said work does not alter an area specified in Part t,Section 10.02(l) (a) of these regulations; or (b) if wor<in the Buffer Zone will alter such an area.all measures and designs proposed to meet the performance standards established for the adjacent resource areaspecified in Partlt or Part III of these regulations. Uprevent l Resource Area Type Bordered By 100-Foot Discretionary Zone: Ideno rng number or letter YBordering Vegetated Wetlands of support documents ork proposed within the buffer zone to the ring vegetated wetlands is comprised of p ng and stabilizing the existing slope on which abuts the vegetated wetlands . The e will be regraded to a maximum slope of where necessary. The slope will be ilized with an erosion control/revegatation ket and four inches of loam. The slope will be seeded with grass seed . A line of ales will be placed at the edge of wetlands revent siltation of the wetlands during construction and to actas a limit of work line . 3.8 Part V:Additional Information for a Department of the Army Permit 1, COE Arpllcatlon No 2. (to be provided by COE) (Name of waterway) 3. Names and addresses of property owners adjoining your property: SEE EXHIBIT D 4. Document other project alternatives(i.e.,other locations and/or construction methods. particularly those that would eliminate the discharge of dredged or fill material into waters or wetlands). 5. 8'•%" x 11" drawings in pianview and cross-section, showing the resource area and the proposed activ- ity within the resource area. Drawings must be to scale and should be clear enough for photocopying. Certification is required from the Division otWater Pollution Control before the Federal permit can be issued.Certification may be obtained by contacting the Division of Water Pollution Control,1 Winter Street, Boston, Massachusetts 02108. Where the activity will take place within the area under the Massachusetts approved Coastal Zone Management Program,the applicant certifies that his proposed activity complies with and will be conducted in a manner that is consistent with the approved program. Information provided will be used in evaluating the application for a permit and is made a matter of public record through issuance of a public notice.Disclosure of this information is voluntary,however,if necessary information is not provided,the application cannot be processed nor can a permit be issued. I hereby certify under the pains and penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents and supportin a and complete, to the best of my knowledge. Signa re of Applicant Da e Landmark En in ring and Surveying, Inc / A�� - 5/Z715Z. Signature of Ap ad nt's Pepresentative Dennis McManus Date 8/27/92 FORM Ettror,.% a CNG rarer 4316 sty n..d by HQU9ACE. 9 May 962'. KID 100 (TEST) ' •T I MAY 82 Ai. darovol eaouu pDtpuoay ualluuua t • ut rt of s Ard Ste •f tlrtspplitstms far • p.m,t to .btsm to otudtisa is UsttN Satn oun.Tr Ofnn a!Ifsaq.sast aad Dod9.9 IOM31 has sppra.rd tbas 4ontiau r"aired by t6•U! Arm, COrps of Eept.tn. OHS N..b.1 0102.0036 ad •aprsuos 41. •f 30 3.111.6., 1963 gpGn Thu awu at .'11 M ••t is 6 polar 17P.- 3-7 COMMONWEALTH OF MASSACHUSETTS LYNN QUADRANGLE DEPARTMENT OF PUBLIC WORKS Exhibit A MASSACHUSETTS 6869111 SW 7.5 MINUTE SERIES (TOPOGRAPHIC) 1340 (SALEM) 1341 55' 343 ,760000 FEET X344 3 /45 v x 70 5z4o*3 104,1\ *� o .,Z 9l %�•�Ir � z li s 1 11 j �v �( (� �� / O • vo ) � � 0 1 '' v l� to � S. � i '// 11 � r �(� '1 :h- 'a�ti4� � � �5R1 - 1 . a ��� • � 1��/\ "\f o��i\/`�\�� 1�=��(:- ')l�^. � Ia��,1£ � ,\ ,5 ..�1 Nif '' 7 p ��7�� , �%` o� ei��l� !/,�jo'���.\l�.•�0 /��, \�/ ��{ w �J1i�� -` � 'r'i�� nfr ��> � _ ) /• 1 � Ja4 > e. ,�y I '1 � �' > S SZ'N�-�. n d�i � �� I �.�'�% �^. , rd_�' It-7r'y(/�\/ �1 � }• I��y{d(r c 1 'v) - ' '.© .. .\ > � o ' �"� Il�{pp%t�•Ir-� .�� .$1�0 � � � `e/�g` '� �o SSIN¢�rl`l� C,��I_ 1�6�' � �� - ,) _ l 1 d ��s i1_.1 _�! 1��(r�lc�} 1"�.�ir7�• .�Z - �Ze1a _ of/�+vE (���'11n �/�v�ii• 1 1/. ZPM �44105 62 / 1j•'1.1�/(�lo., -�1 r � p NLS�\'��so /JJJ �,""1 ` \���( ���i�,1 1131{�dr4 i y 540000 h5► r - w ppI 3a� r z � / )�/ � �J� - I � lla � / r ���� •�,���.f'"�'*._ FEET (oo a � . Park \..� - !- \ _ � p � �/�� � ���j'".�� � O ti' � �1 ��� � Y' �•- �/ 36 41 (; � g' • 31 .3�� v /d� / v e/ _ > )}f1) � �/SP ����` 1P ill i • "• 'fit ��a � � ��� � � �� �o l��)�, � moi, � �} ^(� � \,, � � li�-,✓:,sSMtiit,�!< 1 ��� /"1A o� O�° (3.\ ��3 ��S N- si � \����� `�: /� r' � � r - - �� a � rod �� - /7 _ /�251��r�`•} ��f. �h � l�?.2�1\\ ll �. �1���� �'C�� / �/Jr �Q� - No h uoi =4in �. 'S` Wrlls{.�,,, - 3•• u Yu4i\o `II ��Flsheri�/anf\ fiMp. I�ro' Blaney F3•ock Beacchh ��lar� �� �'!/ 13 /p �� y Lillles Pt .e @ O u 1 o / h i 3 pppp •! '. \ 4 0:h4Q z d 6tl °)Rock 4103 r .I •.i:� � � ���,4. .: \ \ a,qs H6afR 111P � i ., �"� /6°. 0 so / LA0 a3e 2 Li coloPt. House \ 'so 7� - b$ \ �1 1a-" it Sb I , 1 / / If •': MATIDNAL FLOOD INSURANCE P[06[AY I` '// Il iiillij FIRM ZONE C / ' //l; III! uli; FL000 INSURANCE RATE MAP CITY OF III'" SALEM, ! IIMASSACHUSETTS IIj41 ESSEX COUNTY LOCUS III' / I IIjIl' PANEL 5 OF 5 � � I � lli�l�' uu.0 iwaaa wer.weu wo•rwiwnm \ '� IIIIIII COMMUMM-PANEL NUMBER 250102 0005 E9 \ �I III III YAP REnsm: EX/H/B/T B ` II � `� � ISI Federal EmetyenyNw{ement A{mq i SALEM ENG*. DIV, T` u reo sr ru / OG V S oev T e r or E rEV O c0 o e 0 ss E seas L L 0 `.. K,u A\; CEOt CAL SURVEY _ C 0:6v ' 1\r� '�v i � I C�!�, 'tea / ♦ 4-.,[ '5-ft ♦�- �� - i � �,c�`\ nib---1,i`, \�n'`� �r `,.`�,�xa y: l•�1 �� �� .� y-����at 1��ti'�'�Yr�^d�``-'r 3.�,T', .__ Yi r.c \��'2•- '�=-- r .u., ���.� � �� �/�lY 1.,. a ._• •'.: F..�., ..mss\Al , Y I 5p FROM: NHP ESTIMATED HABITAT MAP 1989 EDITION EXHIBIT C Exhibit D Abbutter's List Assessor's Map Lot Owner Address 2 7 Nicholas P. Fiore 4 Clark Ave. Salem, MA 01970 3 129 11 if it if " 120 Lena Fiore if " " 116 Paul Claveau 20 Highland Ave. Salem, MA 01970 " 113 Jennifer Borden Trust 3 Clark Ave. Salem, MA 01970 " 114 Raymond G. LeBlanc 5 Clark Ave. Salem, MA 01970 T0: Abutters to 6-8 Clark Ave. (Assessor' s Map 3 Lot 117 & 118) Salem, M.1 From: Landmark Engineering & Surveying, Inc. RE: Wetlands Filing Date: August 27, 1992 This is to inform you that a Notice of Intent has been filed with the Salem Conservation Commission on behalf of our cli- ent, Nicholas Fiore. The Notice requests permission to regrade and stabilize an existing slope within the 100 ' buffer zone of a Bordering Vegetated Wetland at 6-8 Clark Avenue, assessor' s map 3 lot 117 and 118 . Access for the parcel will be from Clark Avenue. The project hearing will be held on September , 1992 at the Salem City Hall. If you have any questions, please feel free to call Dennis McManus at our office or the Salem Conservation Commission. landnot.doo Exhibit E RIP RAP DETA/L RIP RAP DETAIL Sec/ion View Sec/ion View x NTS NTS MAID 3LOT129 12"'RCP DRAIN MAP 2Z OT 7 EDGE OF VEGETA TED / WETLANDS ✓ EX/ST/NG GROUND STONE TO BE JUNDERLA/N BY RCP" M/RAF/ 140N FABRIC /2 r M/RAF/14ON FABRIC 5' (OR EOU/VALENT) 6" GRAVEL Vcb 6"(M/il() STONES6"(MV) STONES u 5. 45348+ S.F. 1041 AC. ASSESSOR'S MAPS LOT 116 MAP3LOTS 1178118 !p"RCP <, MAP 3 LOT 120 PROP. 6' W/FLARED END e �\ z a Rdo RAP .0 1ArE� WETLANDS, _ _ 74 p4 __y� EXJ�S�T TA T/ 113.1 1���/ • - �� _ IIBO —_����, ••..� � � � � � •6 � ��� � ._ AREA OFPROrCSEO WORK SL OPE STAB/L/ZA T/ON DETA/L 12 j N Ts. PROPOSED SL OPE 27' /3O ' ,� ` — — 124 EXIST/NG GROUND EXISTING SL OPE 4"L CAM 8 SEED !30 EDGE OF VEGETATED EROSION CONTROL BLANKET \ (INSTALL AS PER MANUFACTURERS INSTRUCT/ON/ EXIST/Z"RCP WETLANDS I I NV= I4.6B e0. BL ANKET SHAL L BE PHIL L IPS 758 5UaERGRO, l NO TES. HAYBALES `' \ \ 2 /. INFORMA TION /S FROM AN ACTUAL LEGEND 51L TA TION FENCE ~ GROUND INSTRUMENTSURVEY /30.6 EXISTING SPOT ELEVATION i—" k PERFORMED ON ✓UL Y 2B, 1992, 138 EXISTING CONTOUR GRADE e 3231 13o.6 � �' 2. BENCH MARK IS THE RIM OF THE C.B. CATCH BASIN SEWER MANHOL E A T THE EXISTING yL WETLANDS 100 FOO T BUFFER L INE END OF CL ARK A VENUE = 136.91: \ 3z J. COUIVTOUPS ARE ON 2' INTERVAL S. (120) PROPOSED CONTOUR 4. HAY BALES WILL BE MAINTAINED \ DURING ANY CONSTRUCT/ON ACT/V/TY \ \ ON SITE. 132 131.3 136 PROPOSED WORK WITHIN BUFFER ZONE W 136 /. INSTALL LINE OF HAYBALES AT EDGE OF QI BORDERING VEGETATED WETLANDS, 2 W1 THIN THE LIMITS OF THE PROPERTY 4 LINES CUT BACK EXISTING SL OPE-,5 TO 2./ I /00.00 FINE GRAOF AND COMPACT, LOAM AND SEED EXH151 T F A MINIMUM 4" THICK AND INS TA L SROSION HIT SOEWALK CONTROL/VEGETA TION BLANKET. NO TICS OF INTENT PL AIV GRAAITE CMW 3 REMOVE SEDIMENT DEPOSITS AL ONG TOE /N 4= 9%8 7 OFEXISTING SL OPE. CL ARK A VENUE .SALEM, MA 4. INSTALL SIL TA TIO1V FENCE AS PER SL OPE S TAB1L IZA TION DETAIL FOR MAP 3 L OT //3 NICHOL AS F/ORE MAP3L0T114 SCALE /" = 30' AUGUST 27, /992 REVISED SEPT. 22, 1992 ANOMARK ENGINEERING 8 �* 00 r—. ��hmcwE SURVEYING, /NC. o No 33989 X83 CHES TNUT S TREET F awe c+F L YNN, MA OJAI A, MAP3LOT /29 MAP2LOT 7 \ 155-55 i I ' • t Mf+r 3 L "718 //8 45,348+S.F 1041AC. MAP 3LOT/20 a MAP 3LOT116 yL OF SEG Tf1 TE0 we7Z,4Vs — n4 LIMN - .=. SL OPE S TA 3k IZA TION DETA/L \� 1 ,+ AREA OF PROFOSEO WORK N. T.S. \\\ PROPOSED SL OPE 2.T — EX/ST/NG GROUND EX/ST/NG SL OPE 4"LOAM 8 SEED �— � 130 EDGE OF VEGETATED EROS/ON CONTROL BLANKET WETLANDS /INSTALL AS PER MANUFACTURERS INSTRUCTION) ) ��� BLANKET SHALL BE PHILLIPS 758 SUPERGRO. I 3 HAYBALES NO TES.\ 2 /. /NFORMA TION /S FROM AN ACTUAL LEGEND GROUND INSTRUMENT SURVEY /30.6 EXIST/NG SPOT EL EVAT/ON PERFORMED ON JULY 28, /992. /38 EXISTING CONTOUR GRADE 3 C.B. CATCH BASIN �sa6 SEWER MANHOLE/AT THEE ISTNGE — WETLANDS /00 FOO T BUFFER LINE END OF CLARK A VENUE = 13691: 1 4. HA Y 8A ES WILVS L BE MA/ITAINED 1 \ CeDUR/NG ANY CONSTRUCTION ACTIVITY \ ON SITE. I \ PROPOSED WORK WITHIN BUFFER ZONE W � INSTALL LINE OF HAY BALES AT EDGE OF Q BORDERING VEGETATED WETLANDS, �I ileo \ I� 2. WITHIN THE L/M/TS OF THE PROPERTY f LINES CUT BACK EXISTING SL ODES TO 2./ /00.00 FINE GRADE AND COMPACT, L OAM AND SEED EXH/B/T F A MIN/MUM 4" THICK AND INS TALL EROSION g?. 50EWALK o CONTROL/VE-GE TA TION BLANKET. NO TICS OF INTENT PL AN 972 GRANTE CUPS J. REMOVE SEDIMENT DEPOSITS ALONG TOE /N 4.e7 CLARK A VENUE OF EX/ST/NG SL OPE. .SALEM, MA FOR AWP3L0TII4 MAP3L0TA3 NICHOLASFIORE SCALE /- = 30' AUGUST 27, /992 —A 10MA RK ENGINEER/NG 8 01 SURVEYING, INC. `I 'JCM�CiSAN r7 z No 583 CHESTNUT S TREET L YNN, MA