Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
64-621 - 40 CIRCLE HILL ROAD - CONSERVATION COMMISSION
J - - � - � __ �. 1� 1 611111111111111111174428 111111111I111,395769 Southern Essex District Registry ` 8117/2016 03:08 PM CONDN Pg: 1120 Massachusetts Department of Environmental Protection Provided by MassDEP: \ Bureau of Resource Protection - Wetlands 64-621 - 1 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem Citylrown A. General Information Q Please note: Salem - this form has 1, From: been modified Conservation Commission with added 2. This issuance is for space to a.®Order of Conditions b. ❑ Amended Order of Conditions accommodate (check one): the Registry of Deeds 3. To: Applicant: Requirements Kenneth Steadman Important: a.First Name b.Last Name When filling Bartlett& Steadman Dev. Corp. . - outformson c.Organization the 67R Village Street computer,t use only the d.Mailing Address - - tabkeyto Marblehead MA 01945 move your e.City/Town f.State g.Zip Code cursor-do not use the 4. Property Owner(if different from applicant): return key. �a/����� -SAME ISI a.First Name b. Last-Name c.Organization - renin d.Mailing Address e.Citylrown f.State g.Zip Code - 5. Project Location: 40 Circle Hill Road Salem a.Street Address - b.City/rown 9 255 c.Assessors Map/Plat Number d. Parcel/Lot Number _ Latitude and Longitude; if known: d m s d m s d.Latitude e.Longitude wpoform6.dw• rev.6/16/2015 - Page 1 of 12 l NOI Status Sheet Address: `{° �:o� � � Ind DEP #: ( 6 Application Type: /Uo` Date Submitted: Contact Name: Phone: r7,:Y ( C 3 4a Proposed activity: 3 , 1,,-,g application Complete orrect Fee Received Abutters List Requested <4keceived .-Legal Ad Sent ,_.,Legal Ad Confirmed— Online Added to Agenda Benda to Applicant Agent Comments to Commission ,DEP Comments Hearing Opened: � Continued: _ Site Visit: Abutters Notice Confirmed --Permit Sent to Applicant and DEP Confirmation of Delivery ,Expiration date added to calendar ,Added to database ,?rp"plicant Recorded OoC with Registry Preconstruction Meeting: Certificate of Compliance Sent to Applicant and DEP Confirmation of Delivery Applicant Recorded CoC with Registry Notes: �C/ ' >� (0 �.rl �✓ M® H:\CON COMMWdnninistrative\project status sheet\NOI status sheet*2012-1'2-27.doe A 5� �_ CITY OF SALEM T7 t �gR gas CONSERVATION COMMISSION July 15, 2016 Ken Steadman 67R Village Street Marblehead, MA 01945 Re: Order of Conditions—DEP #64-621 40 Circle Hill Road, Salem, Massachusetts Dear Mr. Steadman: Enclosed, please find the Order of Conditions for the above referenced project. Following the 10-business-day appeal period, this document must be recorded at the Essex County Registry of Deeds (Shetland Park 45 Congress Street, Suite 4100 Salem, Massachusetts). Once recorded, please return a copy of Page 12 of the Order, which will indicate to the Commission that the document has been recorded. As indicated in the Order, prior to any work commencing: 1. this Order must be recorded, 2. a sign shall be displayed showing DEP File #64-621 within public view, and 3. contact me at least 48 hours prior to any activity to schedule a pre-construction meeting to review the Order with your hired contractor. If you have any further questions, please feel free to contact me 978-619-5685. Sincerely, Tom Devine Conservation Agent Enclosures CC: DEP Northeast Regional Office Massachusetts Department of Environmental Protection Provided by MassDEP: \\\ Bureau of Resource Protection - Wetlands 64-621 / WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem Citylrown A. General Information Please note: Salem this form has 1. From: been modified Conservation Commission with added 2. This issuance is for space to a. ®Order of Conditions b. ❑Amended Order of Conditions accommodate (check one): the Registry of Deeds 3. To: Applicant: Requirements Kenneth Steadman a. First Name b. Last Name Important: When filling Bartlett& Steadman Dev. Corp. out forms on c.Organization the 67R Village Street computer, use only the d. Mailing Address tab key to Marblehead MA 01945 move your e.City/Town f.State g.Zip Code cursor-do not use the 4, Property Owner(if different from applicant): return key. SAME "IAV a. First Name b.Last Name c. Organization noon d.Mailing Address e. City/Town f.State g.Zip Code 5. Project Location: 40 Circle Hill Road Salem a.Street Address b. City/Town 9 255 c.Assessors Map/Plat Number d. Parcel/Lot Number Latitude and Longitude, if known: d m s d m s d. Latitude e. Longitude wpaform5.doc• rev.6/16/2015 Page 1 of 12 Yr Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-621 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town A. General Information (cont.) 6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel): Essex South 39032 a.County b.Certificate Number(if registered land) c. Book d. Page 6/30/2016 7/14/2016 7/15/2016 7. Dates: a. Date Notice of Intent Filed b. Date Public Hearing Closed c.Date of Issuance s. Final Approved Plans and Other Documents (attach additional plan or document references as needed): See attached a.Plan Title b. Prepared By c.Signed and Stamped by d. Final Revision Date e.Scale f.Additional Plan or Document Title g. Date B. Findings t. Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act(the Act). Check all that apply: a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution d. ® Private Water Supply e. ® Fisheries f. ® Protection of Wildlife Habitat g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control 2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes) Approved subject to: a. ® the following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. wpaform5.dcc• rev.6/16/2015 Page 2 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: \ Bureau of Resource Protection - Wetlands 64-621 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town B. Findings (cont.) Denied because: b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect the interests of the Act, and a final Order of Conditions is issued. A description of the performance standards which the proposed work cannot meet is attached to this Order. c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). 3. ® Buffer Zone Impacts: Shortest distance between limit of project 10 +/- disturbance and the wetland resource area specified in 310 CMR 10.02(1)(a) a. linearfeet Inland Resource Area Impacts: Check all that apply below. (For Approvals Only) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 4. ❑ Bank a. linearfeet b. linear feet c.linearfeet d.linear feet 5. ❑ Bordering Vegetated Wetland a.square feet b.square feet c.square feet d.square feet 6. ❑ Land Under a. Waterbodies and square feet b.square feet c.square feet d.square feet Waterways e.cry dredged f.cty dredged 7. ❑ Bordering Land Subject to Flooding a.square feet b.square feet c.square feet d.square feet Cubic Feet Flood Storage e.cubic feet cubic feet g.cubic feet h.cubic feet f. a. ❑ Isolated Land Subject to Flooding a.square feet b.square feet Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet s. ❑ Rivertront Area a.total sq.feet b.total sq.feet Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet Sq ft between 100- 200 ft g,square feet h.square feet i.square feet j.square feet wpaform5.doc• rev.6/16/2015 Page 3 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-621 WPA Form 5 — Order of Conditions MassDEP File# 1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City(rown B. Findings (cont.) Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only) Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement to. ❑ Designated Port Indicate size under Land Under the Ocean, below Areas 1t. ❑ Land Under the Ocean a.square feet b.square feet c.Gy dredged d.c/y dredged 1z. El Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below cu yd cu yd 13. El Coastal Beaches asquare feet b.square feet c.nourishment d. nourishment 14. ❑ Coastal Dunes cu yd cu yd a.square feet b.square feet c. nourishment d.nourishment 15. ❑ Coastal Banks a. linear feet b. linear feet 16. ❑ Rocky Intertidal Shores a.square feet b.square feet 17. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet 1a. ❑ Land Under Salt Ponds a.square feet b.square feet c.dy dredged d.Gy dredged 19. ❑ Land Containing Shellfish a.square feet b.square feet c.square feet d.square feet 20. ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above a.Gy dredged b.Gy dredged 21. ❑ Land Subject to Coastal Storm a.square feet b.square feet Flowage 22. ❑ Riverfront Area a.total sq.feet b.total sq.feet Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet Sq ft between 100- 200 ft g.square feet h.square feet i.square feet j.square feet ,vpaform5.doc• rev.6/16/2015 Page 4 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-621 WPA Form 5 — Order of Conditions MassDEP File# 1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town B. Findings (cont.) #23. If the 23. ❑ Restoration/Enhancement': project is for the purpose of restoring or enhancing a a.square feet of BVW b.square feet of salt marsh wetland resource area 24. ❑ Stream Crossing(s): in addition to the square footage that a.number of new stream crossings b.number of replacement stream crossings has been C. General Conditions Under Massachusetts Wetlands Protection Act entered in Section B.5.c (Bvw)or The following conditions are only applicable to Approved projects. B.17.c(Salt Marsh)above, 1. Failure to comply with all conditions stated herein, and with all related statutes and other please enter regulatory measures, shall be deemed cause to revoke or modify this Order. the additional g y y amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4. The work authorized h II hereunder completed e shall be co p eted within three years from the date of this Order unless either of the following apply: a. The work is a maintenance dredging project as provided for in the Act; or b. The time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. c. If the work is for a Test Project, this Order of Conditions shall be valid for no more than one year. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. An Order of Conditions for a Test Project may be extended for one additional year only upon written application by the applicant, subject to the provisions of 310 CMR 10.05(11)(f). 6. If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not extend the issuance date of the original Final Order of Conditions and the Order will expire on unless extended in writing by the Department. 7. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. w aform5.doc• rev.6/1 612 01 5 Page 5 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-621 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town C. General Conditions Under Massachusetts Wetlands Protection Act 8. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 9. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to the Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 10. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or, "MassDEP] "File Number 64-621 " 11. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before MassDEP. 12. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance(WPA Form 8A) to the Conservation Commission. 13. The work shall conform to the plans and special conditions referenced in this order. 14. Any change to the plans identified in Condition#13 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. v Paform5.Eoc• rev.6/16/2015 Page 6 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands 64-621 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) 17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. 19. The work associated with this Order(the "Project') (1) ❑ is subject to the Massachusetts Stormwater Standards (2) ® is NOT subject to the Massachusetts Stormwater Standards If the work is subject to the Stormwater Standards,then the project is subject to the following conditions: a) All work, including site preparation, land disturbance, construction and redevelopment, shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Construction General Permit as required by Stormwater Condition 8. Construction period erosion, sedimentation and pollution control measures and best management practices (BMPs) shall remain in place until the site is fully stabilized. b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/or treatment, the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures; ii. as-built final construction BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized; iii. any illicit discharges to the stormwater management system have been removed, as per the requirements of Stormwater Standard 10; w afcrm5 doc• rev.6/162015 Page 7 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-621 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) iv. all post-construction stormwater BMPs are installed in accordance with the plans (including all planting plans) approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetation associated with post-construction BMPs is suitably established to withstand erosion. c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible party (defined in General Condition 18(e)) shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement("O&M Statement) for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan ("O&M Plan") and certifying the following: i.) the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance, and ii.) the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. d) Post-construction pollution prevention and source control shall be implemented in accordance with the long-term pollution prevention plan section of the approved Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Multi-Sector General Permit. e) Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement, assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of the property must submit to the issuing authority a legally binding agreement of record, acceptable to the issuing authority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 18(f) through 18(k)with respect to that BMP. Any failure of the proposed responsible party to implement the requirements of Conditions 18(f)through 18(k)with respect to that BMP shall be a violation of the Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans, the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. wpaform5.dac• rev.6/16/2015 Page 8 0!12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-621 / WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) g) The responsible party shall: 1. Maintain an operation and maintenance log for the last three(3) consecutive calendar years of inspections, repairs, maintenance and/or replacement of the stormwater management system or any part thereof, and disposal (for disposal the log shall indicate the type of material and the disposal location); 2. Make the maintenance log available to MassDEP and the Conservation Commission ("Commission") upon request; and 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. j) The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit(as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits) shall not be altered without the prior written approval of the issuing authority. 1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions (if you need more space for additional conditions, please attach a text document): NA 20. For Test Projects subject to 310 CMR 10.05(l 1), the applicant shall also implement the monitoring plan and the restoration plan submitted with the Notice of Intent. If the conservation commission or Department determines that the Test Project threatens the public health, safety or the environment, the applicant shall implement the removal plan submitted with the Notice of Intent or modify the project as directed by the conservation commission or the Department. "aform5.doc• rev.6/162015 Page 9 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-621 WPA Form 5 — Order of Conditions MassDEP File# 1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town D. Findings Under Municipal Wetlands Bylaw or Ordinance 1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No 2. The Salem hereby finds (check one that applies): Conservation Commission a. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw, specifically: 1. Municipal Ordinance or Bylaw 2.Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. b. ® that the following additional conditions are necessary to comply with a municipal ordinance or bylaw: Wetlands Protection &Conservation Ordinance c. 50 1. Municipal Ordinance or Bylaw 2.Citation 3. The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ.from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows (if you need more space for additional conditions, attach a text document): Attached conditions are issued under the Wetlands Protection Act and are sufficient for compliance with the local ordinance wpafcrm5.doc• rev.6/16/2015 Page 10 d 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-621 # WPA Form 5 — Order of Conditions MassDEP File 1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town E. Signatures This Order is valid for three years, unless otherwise specified as a special condition pursuant to General Conditions#4,from the date of issuance. 1. o to of I suance Please indicate the number of members who will sign this form. This Order must be signed by a majority of the Conservation Commission. 2. plumber of Signers The Order must be mailed by certified mail (return receipt requested)or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the approriate Department of Environmental Protection Regional Office, if not filing electronically, and property owner, if different from4applicaSig4��7u�z _ El by hand delivery on n by certified mail, return receipt requested, on Date D F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act(M.G.L. c. 131, §40), and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. w aforra5.doc• rev.61162015 Page 11 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-621 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem Cityrrown G. Recording Information Prior to commencement of work, this Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on this page shall be submitted to the Conservation Commission listed below. Salem Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. To: Salem Conservation Commission Please be advised that the Order of Conditions for the Project at: Project Location MassDEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant wpaform5 Coc- rev.6/16/2015 Page 12 of 12 Ll� Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: Request for Departmental Action Fee Transmittal Form Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. Request Information 1. Location of Project a.Street Address b. Cityrrown,Zip c.Check number d. Fee amount Important: When filling 2 Person or party making request(if appropriate, name the citizen group's representative): out forms on the computer, Name use only the tab key to Mailing Address move your cursor-do City/Town State Zip Code not use the return key. Phone Number Fax Number(if applicable) 3. Applicant(as shown on Determination of Applicability (Form 2), Order of Resource Area Delineation (Form 4B), Order of Conditions (Form 5), Restoration Order of Conditions (Form 5A), or Notice of Non-Significance (Form 6)): a�a Name Mailing Address City/Town State Zip Code Phone Number Fax Number(if applicable) 4. DEP File Number: B. Instructions 1. When the Departmental action request is for(check one): ❑ Superseding Order of Conditions— Fee: $120.00(single family house projects)or$245(all other projects) ❑ Superseding Determination of Applicability—Fee: $120 ❑ Superseding Order of Resource Area Delineation — Fee: $120 wpaform5.doc. rev.41222015 Page 1 of 2 LlMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: Request for Departmental Action Fee Transmittal Form Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Instructions (cont.) Send this form and check or money order, payable to the Commonwealth of Massachusetts, to: Department of Environmental Protection Box 4062 Boston, MA 02211 2. On a separate sheet attached to this form, state clearly and concisely the objections to the Determination or Order which is being appealed. To the extent that the Determination or Order is based on a municipal bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. 3. Send a copy of this form and a copy of the check or money order with the Request for a Superseding Determination or Order by certified mail or hand delivery to the appropriate DEP Regional Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/). 4. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. wpaform5.doc• rev.422/2015 Page 2 of 2 §, Attachment to Order of Conditions # 64-621 `xf Page 1 of 5 SALEM CONSERVATION COMMISSION ATTACHMENT TO ORDER OF CONDITIONS DEP FILE #64-621 40 Circle Hill Road City of Salem, Massachusetts ADDITIONAL FINDINGS Based on the Estimated Habitats of Rare Wildlife and Certified Vernal Pools Map (6/7/2016, online) from Natural Heritage & Endangered Species Program (NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contain any vernal pools. This Order permits the construction of a 3-lot residential subdivision, including roadway, utilities, and other association work,per approved plan and the following conditions. GENERAL CONDITIONS 1. This Order of Conditions must be recorded in its entirety(including all 5 pages of Special Conditions) at the Essex County Registry of Deeds or the Land Court for the district in which the land is located, after the expiration of the 10-day appeal period and within 30 days of the issuance. A copy of the recording information must be submitted to the Salem Conservation Commission before any work approved in this Order commences. 2. Approval of this application does not constitute compliance with any law or regulation other than M.G.L Chapter 131, Section 40, Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands Protection Ordinance, Salem Code Chapter 50. 3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No alteration of wetland resource areas or associated buffer zones, other than that approved in this Order, shall occur on this property without prior approval from the Commission. 4. Prior to any work commencing on site, a DEP Sign showing DEP File#64-621 must be installed at the entrance to the site and seen from the public way, but not placed on a living tree. 5. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the date of the issuance of this Order. 6. With respect to this Order,the Commission designates the Conservation Agent as its agent with powers to act on its behalf in administering and enforcing this Order. 7. The Commission or its Agent, officers,or employees shall have the right to enter and inspect the property at any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131, Section 40,the Wetlands Regulations 310 CMR 10.00, and shall have the right to require any data or documentation that it deems necessary for that evaluation. ?, Attachment to Order of Conditions # 64-621 Page 2 of 5 8. The term"Applicant'as used in this Order of Conditions shall refer to the owner, any successor in interest or successor in control of the property referenced in the Notice of intent, supporting documents and this Order of Conditions. The Commission shall be notified in writing within 30 days of all transfers of title of any portion of the property that takes place prior to issuance of the Certificate of Compliance. 9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and approvals associated with this project. These permits may include but are not necessarily limited to the following: (1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816), U.S. Army Corps of Engineers. (2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00. (3) Design Requirements for Construction in Floodplains under the State Building Code(780 CMR 744.). 10. If there are conflicting conditions within this Order,the stricter condition(s) shall rule. 11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters during construction or after completion of the project. 12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods and boundary during construction if necessary. 13. The Commission reserves the right to impose additional conditions on portions of this project or this site to mitigate any actual or potential impacts resulting from the work herein permitted. 14. The work shall conform to the following attached plans and special conditions: Final Approved Plans DEFINITIVE SUBDIVISION LAYOUT, GRADING & LID STORMWATER MANAGEMENT for a CUL-DE-SAC & THREE RESIDENTIAL LOTS for a site at#40 Circle Hill Road, Salem, Massachusetts (sheets 1 & 2) (Title) 11/18/2009 (Dated) Scott Ian Patrowicz (Signed and Stamped by) City of Salem Conservation Commission (On file with) 15. Any proposed changes in the approved plan(s) or any deviation in construction from the approved plan(s) shall require the applicant to file a Notice of Project Change with the Commission. The Notice shall be accompanied by a written inquiry prior to their implementation in the field, as to whether the change(s) is substantial enough to require filing a new Notice of Intent or a request to correct or amend this Order of Conditions. A copy of such request shall at the same time be sent to the Department of Environmental Protection. Attachment to Order of Conditions # 64-621 e Page 3 of 5 16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has been issued,the applicant or current landowner shall submit to the Commission a statement signed by the buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of the Order of Conditions. 17. [Reserved]. PRIOR TO CONSTRUCTION 18. Prior to the commencement of any activity on this site other than activities listed above,there must be a Pre-Construction Meeting on site between the project supervisor, the contractor responsible for the work, and the Conservation Agent and/or a member of the Conservation Commission to ensure that the requirements of the Order of Conditions are understood. The staked erosion control line shall be adjusted,if necessary, during the pre-construction meeting. Please contact the Conservation Agent at (978) 619-5685 at least forty-eight(48) hours prior to construction to arrange for the Pre- Construction Meeting. 19. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The Commission and/or its Agent shall inspect and approve such installation at the pre-construction meeting. 20. No clearing of vegetation,including trees, or disturbance of soil shall occur prior to the pre-construction meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre- construction meeting if absolutely necessary in order to place erosion control stakes where required. 21. There shall be adequate additional erosion and sediment controls stored onsite for emergency purposes. EROSION CONTROL 22. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction, and shall be maintained during construction in any wetland resource area and/or buffer zones. The erosion control measures shown on the approval plan(s)and provisions in the Order will be the minimum standards for this project;the Commission or its Agent may require additional measures. 23. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland resource areas to prevent sediment from entering wetland resource areas. 24. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 25. The area of construction shall remain in a stable condition at the close of each construction day. 26. Any de-watering of trenches or other excavation required during construction shall be conducted so as to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered through straw bale sediment traps, silt filter bags or other means approved by the Commission or its Administrator. 27. Within thirty(30) days of completion of construction on any given portion of the project, all disturbed areas in the completed portion of the site shall be permanently stabilized with rapidly growing vegetative cover, using sufficient top soil to assure long-term stabilization of disturbed areas. { L.'c. Attachment to Order of Conditions # 64-621 �s Page 4 of 5 28. If soils are to be disturbed for longer than two(2)months, a temporary cover of rye or other grass should be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth, exposed surface shall be stabilized by other appropriate erosion control measures,firmly anchored,to prevent soils from being washed by rain or flooding. DURING CONSTRUCTION 29. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all times when work is in progress. 30. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on the approved plan(s). 31. All waste products,grubbed stumps, slash;construction materials,etc. shall be deposited at least 100 feet from wetland resource areas and 200 feet from river. 32. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be immediately removed. 33. All exposed sub-soils shall be covered by a minimum of three(3)inches of quality screened loam topsoil prior to seeding and final stabilization. 34. 'Immediately following drainage structure installation all inlets shall be protected by silt fence,strawbale barriers and/or silt bags to filter silt from stormwater before it enters the drainage system. 35. There shall be no pumping of water from wetland resource areas. 36. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other components shall be fixed immediately. 37. During construction,all drainage structures shall be inspected regularly and cleaned as necessary. 38. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance of enforcement actions by the Conservation Commission including,but not limited to,civil administrative penalties under M.G.L Chapter 21A, section 16. AFTER CONSTRUCTION 39. Upon completion of construction and final soil stabilization,the applicant shall submit the following to the Conservation Commission to request a Certificate of Compliance(COC): (1) A Completed Request for a Certificate of Compliance form(WPA Form 8A or other form if required by the Conservation Commission at the time of request). (2) A letter from a Registered Professional Engineer certifying compliance of the property with this Order of Conditions. (3) An "As-Built"plan signed and stamped by a Registered Professional Engineer or Land Surveyor showing post-construction conditions within all areas under the jurisdiction of the Massachusetts Wetlands Protection Act. This plan shall include at a minimum: (a) All wetland resource area boundaries with associated buffer zones and regulatory setback areas taken from the plan(s)approved in this Order of Conditions; C, Attachment to Order of Conditions # 64-621 Page 5 of 5 (b) Locations and elevations of all stormwater management conveyances, structures and best management designs, including foundation drains,constructed under this Order within any wetland resource area or buffer zone; (c) Distances from any structures constructed under this Order to wetland resource areas- "structures"include,but are not limited to,all buildings, septic system components,wells, utility lines,fences,retaining walls,and roads/driveways; (d) A line delineating the limit of work-"work"includes any filling,excavating and/or disturbance of soils or vegetation approved under this Order; 40. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds and a copy of the recording submitted to the Salem Conservation Commission. 41. If the completed work differs from that in the original plans and conditions,the report must specify how the work differs; at which time the applicant shall first request a modification to the Order. Only upon review and approval by the Commission,may the applicant request in writing a Certificate of Compliance as described above. 42. Erosion control devices shall remain in place and properly functioning until all exposed soils have been stabilized with final vegetative cover and the Conservation Commission and/or its Agent has authorized their removal. ADDITIONAL CONDITIONS 43. House 43 may be moved toward the cul-de-sac and the retaining wall may be relocated closer toward the wetlands provided that: (A)A minimum 10' no-disturb zone is maintained between the wall and the wetlands boundary. (B) The square footage of the house envelope does not exceed that shown on the approved plan. (C) The wall's stones are sized between 2' and 3' in diameter. (D)3 to 4 wetland markers are installed along the wall. Markers are to be supplied by the Conservation Commission.Locations and number of markers to be approved by the Conservation Agent. PERPETUAL CONDITIONS 44. [Reserved] Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands MassDEP File#: L WPA Form 3 - Notice of Intent eDEP Transaction#:843836 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 ciry/rownsALEM A.General Information 1.Project Location: a.Street Address 40 CIRICLE HILL ROAD b.City[Fown SALEM c.Zip Code 01970 d.Latitude 42.51115N e.Longitude 70.92044W f Map/Plat# 9 g.Parcel/Lot# 255 2.Applicant: _ 1—Individual r Organization a. First Name KENNETH b.Last Name STEADMAN c.Organization BARTLETT AND STEADMAN DEVELOPMENT CORPORATION d.Mailing Address 67R VILLAGE STREET C.Ciry/rown MARBLEHEAD f.State MA g.Zip Code 01945 h.Phone Number 781-631-2427 i. Fax 781-631-9099 'j.Email keno bartlettandsteadman.net 3.Property Owner. I—more than one owner a.First Name KENNETH b.Last Name EADMAN , c.Organization BARTLETT AND STEADMAN DEVELOPMENkORPORATION d.Mailing Address 67R VILLAGE STREET e.City/rown MARBLEHEAD f State MA g.Zip Code 01945 h.Phone Number 781-631-2427 i.Fax 781-631-9099 j.Email kencdbartlettandsteadman.net 4.Representative:. a.First Name SCOTT b.Last Name PATROWICZ, P.E. c.Organization PATROWICZ LAND DEVELOPMENT ENGINEERING d.Mailing Address 14 BROWN STREET e.City/Town SALEM f.State MA g.Zip Code 01970 It.Phone Number 978-836-6400 i.Fax 978-745-4110 j.Email scott.patrowicz@vet*izon.net 5.Total WPA Fee Paid(Automatically inserted from NOl Wetland Fee Transmittal Form): a.Total Fee Paid 1,550.00 b.State Fee Paid 762.50 c.City/Town Fee Paid 787.50 6,Genetal Project Description: LAND SUBDIVISION TO INCLUDE TWO ADDITIONAL LOTS(3 SINGLE-FAMILY HOUSES)AND CUL-DE-SAC PARTIALLY WITHIN A BUFFER ZONE. NO WORK OCCURS WITHIN ANY WETLAND RESOURCE AREAS. 7a.Project Type: I.r Single Family Home 2. F Residential Subdivision 3 r Limited Project Driveway Crossing 4. C CommercialAndustrial 5.F Dock/Pier 6. r Utilities 7.r Coastal Engineering Structure 8. 1—Agriculture(cg.,cranberries,forestry) 9.r Transportation 10. r Other . 7b.ls any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24(coastal)or 310 CMR 10.53(inland)? Page I of 7 * ELECTRONIC COPY LMassachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands MassDEP File#: WPA Form 3 - Notice of IntentcDEP Transaction#:843836 1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Cityrrown:SALEM I. C Yes P No If yes,describe which limited project applies to this project: 2. Limited Project 8.Propetty recorded at the Registry of Deeds for: a.County: b.Certiticate: c.Book: d.Page: NORTHERN ESSEX 39032 B. Buffer Zone & Resource Area Impacts (temporary & permanent) l.Buffer Zone&'Resource Area Impacts(temporary'&permanent): !� This is a Buller Zone only project-Check if the project is located only in the ButTer Zone of a Bordering Vegetated Wetland,Inland Bank,or Coastal Resource Area. 2.Inland Resource Areas:(See 310 CMR 10.54- 10.58,if not applicable,go to Section B.3.Coastal Resource Areas) Resource Area Size of Proposed Alteration Proposed Replacement(if any) a.r Bank 1,linear feet 2.linear feet b.r Bordering Vegetated Wetland ` I.square feet 2.square feet c.r Land under Waterbodies and Waterways , I.Square feet 2.square feet 3.cubic yards dredged d F- Bordering Land Subject to Flooding 1.square feet 2.square feet 3.cubic feet of flood storage lost 4.cubic feet replaced e.r Isolated Land Subject to Flooding ' 1.square feet „., 2.cubic feet of flood storage lost 3.cubic feet replaced I I—RiverGont Area I.Name of Waterway(if any) 2. Width of Riverfront Area(check one) F-25 ft.-Designated Densely Developed Areas only C 100 ft.-New agricultural projects only T 200 ft.- All other projects 3.Total area of Riverfront Area on the site of the proposed project square feet 4. Proposed Alteration of the Riverfront Area: a.total square feet b.square feet within 100 ft. c.square feet between 100 R.and 200 ft. 5.Has an alternatives analysis been done and is it attached to this NOI? f Yes F—No 6.Was the lot where the activity is proposed created prior to August I, 1996? r Yes r-No Page 2 of 7 * ELECTRONIC COPY 1 Massachusetts Department of Environmental Protection Provided by MassDEP: LIP� Bureau of Resource Protection - Wetlands MassDEP File#: WPA Form 3 - Notice of IntentcDEP Transaction#:843836 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 ciryirownsnteM 3.Coastal Resource Areas:(See 310 CMR 10.25- 10.35) Resource Area Size of Proposed Alteration Proposed Replacement(if any) a,r.Designated.Pon Areas Indicate size under Land under the ocean below, b.I Land Under the Ocean 1.square feet 2.cubic yards dredged c.r-Barrier Beaches - Indicate size under Coastal Beaches and/or Coatstal Dunes,below d.r Coastal Beaches 1.square feet 2.cubic yards beach nourishment e.r Coastal Dunes 1.square feet 2.cubic yards dune nourishment f r-Coastal Banks I. linear feet g.r-Rocky intertidal Shores 1.square feet h.F- Salt Marshes I.square feet 2.sq ft restoration,rehab,crea. c r-Land Under Salt Ponds - l.square feet 2.cubic yards dredged j. r Land Containing Shellfish I.square feet k.F-Fish Runs Indicate size under Coastal Banks,Inland Bank,Land Under the Ocean,and/or inland Land.. Under Waterbodies and Waterways;above 1 cubic yards dredged 1.C Land Subject to Coastal Storm Flowage I.square feet 4.Restomti on/Enhancement r Restoration/Replacement If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.2.b or B.3.h above,please entered the additional amount here. a.square feet of BV W b.square feet of Salt Marsh 5.Projects Involves StreamCrossings .. - r Project Involves Streams Crossings If the project involves Stream Crossings,please enter the number of new stream crossings/number of replacement stream crossings. a.number of new stream crossings b.number of replacement stream crossings Page 3 of 7 * ELECTRONIC COPY Massachusetts Department of Environmental Protection Provided by MassDEP: L71— Bureau of Resource Protection- Wetlands MassDEP File#: WPA Form 3 - Notice of Intent eDEP Transaction#:843836 CityrFown:SALEM Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. Other Applicable Standards and Requirements Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review 1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage of Endangered Species program(NHESP)? a• r Yes E No If yes,include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife I Rabbit Hill Road Westborough,MA 01581 b.Date of map:FROM MAP VIEWER If yes,the project is also subject to Massachusetts Endangered Species Act(MESA)review(321 CMR 10.18).... c.Submit Supplemental Information for Endangered Species Review*(Check boxes as they apply) 1.r Percentage/acreage of property to be altered: (a)within Wetland Resource Area - percentage/acreage (b)outside Resource Area percentage/acreage 2.r. Assessor's Map or right-of-way plan of site 3.1— Project plans for entire project site,including wetland resource areas and areas outside of wetland jurisdiction,showing existing and proposed conditions,existing and proposed tree/vegetation clearing line,and clearly demarcated limits of work** a.r Project description(including description of impacts outside of wetland resource area&buffer zone) b.r Photographs representative of the site c.I— MESA riling fee(fee information available at:http://www.inaas.gov/cca/agencies/dfg/d1w/natural-heritaee/re_mlatory- review/mass-endangered-species-act-mesa/nmesa-fee-schedule html) Make check payable to"Natural Heritage&Endangered Species Fund"and mail to NHESP at above address Projects altering 70 or more acres of land, also submit d.r Vegetation cover type map of site e.r Project plans showing Priority&Estimated Habitat boundaries d.OR Check One of the following 1.r- Project is exempt from MESA review.Attach applicant letter indicating which MESA exemption applies.(See 321 CMR 10.14,http://www.mass.gov/eca/agencies/dfg/dfw/laws-regulations/cmr/321-emr-1000-massachusetts-endangered-species- acthtml#10.14;the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.) 2.rSeparate MESA review ongoing. - a.NHESP Tracking Number b.Date submitted to NHESP 3.r Separate MESA review completed. Include copy of NHESP"no Take"determination or valid Conservation&Management Permit with approved plan. * Some projects not in Estimated Habitat may be located in Priority Habitat,and require NHESP review... Page 4 of 7 * ELECTRONIC COPY Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands MassDEP File#: W PA Form 3 - Notice of Intent eDEP Transaction#:843836 L � Massachusetts Wetlands Protection Act M.G.L. a 131, §40 City/Town:SALEM 2. For coastal projects only,is any portion of the proposed project located below the mean high waterline or in a fish run? a.r Not applicable-project is in inland resource area only . b. r_Yes I—No If yes,include proof of mailing or hand delivery of NOI to either: South Shore-Cohasset to Rhode North Shore- Hull to Island,and the Cape&Islands: New Hampshire: Division of Marine Fisheries- Division of Marine Southeast Marine Fisheries Station Fisheries- Atm:Environmental Reviewer North Shore Office 1213 Purchase street-31d floor Atm:Environmental New Bedford,MA 02740-6694 Reviewer 30 Emerson Avenue - Gloucester,MA 01930 If yes,it may require a Chapter 91 license.For coastal towns in the Northeast Region,please contact MassDEP's Boston Office. For coastal towns in the Southeast Region,please contact MassDEP's Southeast Regional office. 3. Is any portion of the proposed project within an Area of Critical Environmental Concern(ACEC)? a.F"_Yes r No If yes,provide name of ACEC(see instructions to WPA Form 3 or DEP Website for ACEC locations). Note:electronic tilers click on Website. b.ACEC Name 4. Is any portion of the proposed project within an area designated as an Outstanding Resource Water(ORW)as designated in the Massachusetts Surface Water Quality Standards,314 CMR 4.00? a. F_Yes rl No 5. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act(M.G.L.c. 131,¢ 40A)or the Coastal Wetlands Restriction Act(M.G.L.c. 130,§ 105)? a. F-Yes I, No 6. Is this project subject to provisions of the MassDEP Stonnwater Management Standards'? a.r Yes,Attach a copy of the Stonnwater Report as required by the Stonnwater Management Standards per 310 CMR 10.05 (6)(k)-(q)and check if: Applying for Low Impact Development(LID)site design credits(as described in Stormwater Management Handbook Vol.2,Chapter 3) 2.1-. A portion of the site constitutes redevelopment 3.F Proprietary BMPs are included in the Stormwater Management System b.r No,Explain why the project is exempt: 1.t— Single Family Home 2.F-- Emergency Road Repair Small Residential Subdivision(less than or equal to 4 single-family houses or less than or equal to 4 units in multi-family 3'1, housing project)with no discharge to Critical Areas, D. Additional Information Applicants must include the following with this Notice of Intent(NO[).See instructions for details. Online Users: Attach the document transaction number(provided on your receipt page)for any of the following information you submit to the Department by regular mail delivery. Page 5 of 7 * ELECTRONIC COPY Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands MassDEP File 4: �._. WPA Form 3 - Notice of Intent eDEP Transaction#:843836 tl Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City/rown:SALEM L I✓ USGS or other snap of the area(along with a narrative description,if necessary)containing sufficient information for the Conservation Commission and the Department to locate the site.(Electronic filers may omit this item.) 2.r Plans identifying the location of proposed activities(including activities proposed to serve as a Bordering Vegetated Wetland [BV W]replication area or other mitigating measure)relative to the boundaries of each affected resource area. 3.R- Identify the method for B V W and other resource area boundary delineations(MassDEP BV W Field Data Form(s). Determination of Applicability,Order of Resource Area Delineation,etc.),and attach documentation of the methodology. 4.r List the titles and dates for all plans and other materials submitted with this NOL. a.Plan Title: b.Plan Prepared By: c.Plan Signed/Stamped By: c.Revised Final Date: C. Scale: SITE PLAN SHOWING PATROWICZ LAND LAND SUBDIVISION DEVELOPMENT SCOTT PATROWICZ November 18,2009 I"=20' (TWO ADDITIONAL LOTS) ENGINEERING 5.r If there is more than one property owner,please attach a list of these property owners not listed on this form. 6.C Attach proof of mailing for Natural Heritage and Endangered Species Program,if needed. 7.F- Attach proof of mailing for Massachusetts Division of Marine Fisheries,if needed. 8.P- Attach NOI Wetland Fee Transmittal Form. 9.F- Attach Stormwater Report,if needed. Page 6 of 7 * ELECTRONIC COPY Massachusetts Department of Environmental Protection Provided by MassDEP: ,.- Bureau of Resource Protection - Wetlands MassDEP File#: WPA Form 3 - Notice of Intent eDEP Transaction#:843836 +'k Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 CirylFoken:SALEM E.Fees I. Fee Exempt:No filing fee shall be assessed for projects of any city,town,county,or district of the Commonwealth,federally recognized Indian vibe housing authority.municipal housing authority,or the Massachusetts Bay Transportation Authority. Applicants must submit the tollowing information(in addition to pages I and 2 of the NO[Welland Fee Transmittal Fenn)to confirm fee payment: 2 Municipal Check Number 3.Vat"date Phn11 cat kf L'G 1tz 4.State Check Number 5.Check date I le-eN r4enn S Y1I�0� 6.Payer name on check:Fina Name 7.Payername nn check:Last Namc F.Signatures and Submittal Requirements I hereby certify under the penalties of perjury That the foregoing Notice of Intent and accompanying plans,documents,and supporting data are true and complete to the best of my knowledge.I understand that the Conservation Commission will place ratification of this Notice in a local newspaper at the expense of the applicant in accordance with The wetlands regulations,310 CMR 10.05(5)(a). further certify under penalties of perjury that all abutters were notified of this application,pursuant to the requirements of M.G.L.c. 131,tl 40.Notice trust be made by Certificate of Mailing or in writing by hand delivery or certified mail(return receipt requested)to all abutters within 100 feet of the property line of the project location. Kenneth Srcadman 6/25/2016 L Signature elApplieu.t 2.Date Kenneth Steadman 6/25/2016 1.Signvuvc of Property Owncr(if diffm'cnp 4.Date Scott I'mrowics6/25/2016 5.Slgnmure of Keprenentarive(ifeny) 6.Dare For Conservation Commission: Two copies of the completed Notice of Intent(Form 3),including supporting plans and documents,two copies of the NO[Wetland Fee'fransntittal Form,and the city/town fee payment,to the Conservation Commission by certified mail or hand delivery. For MassUi One copy of the completed Notice of Intent(Form 3),including supporting plans and documents,one copy of the NOI Wetland Fee Transmittal Form. and a copy of the state fee payment to the MassDEP Regional O(lice(see Instructions)by certified mail or hand delivery. Other: Ifthe applicant has checked the"yes"box in Section C,Items 1-3,above,refer to that section and the Instructions for additional submival requirements. The original and copies must be sent simultaneously.Failure by the applicant to send copies in a timely manner may result in dismissal ofthe Notice of Intent. Page 7 of 7 * ELECTRONIC COPY North Shore'Survey Corporation, Surveyors 00 0 May 4, 2010 RECClVED/Uyp�'tl�'D w 4h OBhiil6m rk 7,.14 Do C'✓,per 40 s �Qr y y R=30.00 \s• as Pa 43.78 \ J P/an No. 856-73 L6 Q fm: L7,C g1'�bryk�k' o� q r 245---- A <� 11 o Lrod n �\ N dh a �\ 0�20 0 W se I it `W�/ - jp0.00 3 Z r� nk` W o b y 2.4,3 y } 49 ' W Irod N 59 06'' 27' w dh. Q Irod S9 61 69 Subdivision of Lobs 56;..57, 58, 59 and 60 Shown on Plon:$56-J1 Filed with Cert bf Title.W. 6103 South Registry District of Essex County Separate certificates of:title.may be issued for land Abutters are shown as shown hereon d4ots;242 243, 244 and 245 on original decree plan. By the Court. Copy of pail al p/on . .I�Cit�C WR,�. . . . . . [AND REGIVR477ON OFFICE Recorder — ,.._e OG vnrn N 67'36'03" E 1 24.74! /--� \% 306 N 26 20,717±SF �30 0 "MCGRATH PARK" PROPOSED PLOT PLAN LOT 2 CITY OF SALEM CIRCLE HILL ROAD, SALEM 1 " = 30' OCTOBER 12, 2016 NORTH SHORE SURVEY CORP. bsi lSENDER: COMPLETE THIS SECTION COMPLETE THIS SECTION ON DELIVERV ■ Complete items 1,2,and 3. 'gn tunt ■ Print your name and address on the reverse `,/ gent so that we can return the card to you. X -C"� Addresses ■ Attach this card to the back of the mailpiece, B. Receiv y(Printed Name) C. Date of Delivery or on the front if space permits. 1. Article Add re�sed tq� D. Is delivery address different from Hem 1? ❑Yes 47 5 8e wlvw� If YES,enter delivery address below: ❑No 61R V;Glt>.P- �a �b(a dl qL(s 3. Service Type ❑Priority Mall Express® El Adult Signature n Registered Mail- II I IIIIII IIII II I II II Ililllillil II II I IIIII III L.Mrtified Mall®Restricted Delivery ❑pegietered Mal Restricted 9590 9402 1660 6053 4637 56 O Certified Mall Restricted Del" o=M=otfor ❑Collect on Delivery ❑Collect on Delivery ResWcted Delivery 13 Signature Confnnationn o_e.Nnl Ne (tiansfar_/mm seNiCe_186eq— ❑Signature Confirmation t 7 212 11640 T 2 0 2 ' ]1313'' 315 2 3.1 o Insured Mai Restricted Delivery Resldoted Delivery $500) PS Form 3811,July 2015 PSN 7530-02-000-9053 Domestic Return Receipt Cla as Mail I I I I III II I A �I� 'I VIIIA FUSPS ios�ge&Fees Paid rst I f#1 I 9590 9402 1660 6053 4637 56 United States •Sender:Please print your name,address,and ZIP+4®in this box- Postal Service jSalem Conservation Commission 120 Washington Street, 3rd Fl Salem, MA 01970 1:G23013 5 10 5 356 , 6 �R CLC y� 1.74 26'00" E 0s. R04 �l I12 � am R�0. 00' 10 L=100. 00' < / #3 17,111fSF BORDERING "MCGRATH PARK" ti VEGETATED WETLANDS CITY OF SALEM 10_FOOT BUFFER TO BORDERING VEGETATED WETLANDS PROPOSED PLOT PLAN LOT 3 CIRCLE HILL ROAD, SALEM 1 " = 30' OCTOBER 12, 2016 NORTH SHORE SURVEY CORP. N 87'36'03" E 24.74' V. 30 6 �"-� N 4�. 5 90✓ <. 20,717±SF #3 / \ % AhyphL \30 \ 0 "MCGRATH PARK" PROPOSED PLOT PLAN LOT 2 CITY OF SALEM CIRCLE HILL ROAD, SALEM 1" = 30' OCTOBER 12, 2016 NORTH SHORE SURVEY CORP. Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands 1 NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Important:When A. Applicant Information filling out forms - on the computer, 1. Location of Project: use only the tab key to move your 40 Circle Hill Road Salem cursor-do not a. Street Address use the return I b.City/Town key. Og b 44 Z$1 a Check number d. Fee amount ree 2. Applicant Mailing Address: Kenneth Steadman 0 a. First Name b. Last Name Bartlett and Steadman Development Corporation c.Organization 67R Village Street d.Mailing Address Marblehead MA 01945 e.CityfTown f. State g.Zip Code 781-631-3_751 781-631-9099 ken@bartlettandsteadman.net h. Phone Number i. Fax Number j. Email Address 3. Property Owner(if different): a. First Name b. Last Name c.Organization d.Mailing Address e. City/Town f. State g.Zip Code If. Phone Number i. Fax Number I. Email Address To calculate B. Fees filing fees, refer to the category fee list and Fee should be calculated using the following process &worksheet. Please see Instructions before examples in the filling out worksheet instructions for filling out WPA Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and buffer zone. Form 3(Notice of Intent). Step 21Number of Activities: Identify the number of each type of activity. � Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions. Step 4/Subtotal Activity Fee: Multiply the number of activities(identified in Step 2)times the fee per category (identified in Step 3)to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in addition to another Resource Area or the Buffer Zone,the fee per activity should be multiplied by 1.5 and then added to the subtotal amount. Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4. Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract$12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50, noifeetf aoc•Welland Fee Transmittal Form•rev.10/17/11 Page 1 of 2 LlMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Fees (continued) Step 11Type of Activity Step 2/Number Step Step 4/Subtotal Activity of Activities 3/Individual Fee Activity Fee 3c 1 $1,050 $1,050 2a 1 $500 $500 Step 5/Total Project Fee: $1,550 Step 6/Fee Payments: Total Project Fee: $1,550 a.Total Fee from Step 5 State share of filing Fee: $762.50 b. 1/2 Total Fee less$12.50 City/Town share of filling Fee: $78750 c. 1/2 Total Fee plus$12.50 C. Submittal Requirements a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to the Commonwealth of Massachusetts. Department of Environmental Protection Box 4062 Boston, MA 02211 b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent; a copy of this form, and the city/town fee payment. To MassDEP Regional Office(see Instructions): Send a copy of the Notice of Intent or Abbreviated Notice of Intent,a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these electronically.) ncifeelfdoc•Welland Fee Transmittal Form•rev.10/17/11 Page 2 of 2 CITY OF SALEM ASSESSOR'S CERTIFICATION OF ABUTTERS AND PROPERTY OWNERS BOARD/COMMISSION: Conservation Commission PROJECT SITE: 40 Circle Hill {09-0255-0} DATE: 06/28/2016 DESCRIPTION OF REQUIREMENT: All abutters and any property owner within 100 feet of the property line of the land where the activity is proposed including if land is separated by a public or private street or a body of water and not unreasonably distant from the project site. This is to certify that the time of the last assessment for taxation made by the City of Salem, the names and addresses of tho listed on the attached sheets are "abutters and property owners" (as defined by Wetl s Protection Act 310 CMR 10.05(4)(a))to the parcel(s) of land listed above as the p of ct site. / Assessor's Signature: Date: 0 1� Number of initialed pages attached: Once Certified,Return to: Tom Devine, Department of Planning and Community Development I Parcel ID:09-0255-0 Parcel ID:09-0038-0 Parcel ID:09-0257-0 BARTLETT&STEADMAN DEV SALEM CITY OF SALEM CITY OF 67 REAR VILLAGE STREET MCGRATH PARK MARBLEHEAD, MA 01945 MA Parcel ID:09-0333-0 Parcel ID:09-0211-0 Parcel ID:09-0230-0 RUGGIERI ALYSSA L SAKOWICH RICHARD F FOURNIER SCOTT F 3 GOOD CIRCLE 41 CIRCLE HILL ROAD 38 CIRCLE HILL ROAD SALEM, MA 01970 SALEM, MA 01970 SALEM, MA 01970 Parcel ID:09-0231-0 Parcel ID:09-0235-0 Parcel ID:09-0236-0 SAKOWICH RICHARD F JR CONTE SHERI KIRBY WILLIAM J SAKOWICH JULIE M 39 SABLE ROAD KIRBYCONSTANCE J 36 CIRCLE HILL RD SALEM, MA 01970 41 SABLE ROAD SALEM, MA 01970 SALEM, MA 01970 Parcel ID:09-0237-0 Parcel ID:09-0242-0 Parcel ID:09-0260-0 LITALIEN JAMES P E BARTLETT&STEADMAN DEV LITALIEN KAREN 39 BUENA VISTA AVE 67REAR VILLAGE STREET 44 SABLE ROAD SALEM, MA 01970 MARBLEHEAD, MA 01945 SALEM, MA 01970 Parcel ID:09-0210-0 DA "115911l 39 CIRCLE HILL RD SALEM, MA 01970 'S 1 J1 , 5JZµr meOLn lU ,'Si r . �FFT.HWI eiey, .e aux, wQ :� P�. T.ewnem) OJW ®USHglft y ^Y � � • � ®' Q JJ O �,..^ �OC • AEWtlnB Twm,ebVs Na L.Mk V. v r3 49 ft =&IDR a =1615ft �1S20ft =2 30ft ft �a"O ft MO ft 0 IQS /.-V x'40 • V O 9° 107 TS.tal..5awm,n MK.rtO ue O poAEltltMMwmalbnalsM ganninvour.we. . ivnn.M lls.we Wl..am..am nd rt.{omldefor M.misurov O � � O ze md..p.,..matmn d Me a.r. 0 510 1020 ft Panted on 06/28/2016 at 09:05 AM R City of Salem Department of Planning & Community Development RECEIVED CHECK RECEIPT AND TRACKING FORM DATE DEPT c, Pl'N"A G & BOARD: CONSERVATION COMMISSION STAFF: TOM CLIENT: PROPERTY ADDRESS: CONTACT NUMBER: PURPOSE FOR APPLICATION: CHECK # Ul AMOUNT RECEIVED: $ t �, ,.>>r �, .'r . =•b " _ 0864 `a r Wab'onal Gmndt ank . 4 dlaate:Ala:. VBARiIE :57 N village 87rEe7 At� 't �EAD 'Marhlehead,`MA 07945 53-430-113 DEVELOPMENT 1 N C 'a E 0 DER OF : ZBZ.� 2 DOLLARS MEMO - avFo s,cruTuse - 115000864i1' 7:0 h 1304 3001: ii'0 1 i8 689 2112 i �ONDI19 CITY OF SALEM CONSERVATION COMMISSION Salem Conservation Commission 978-619-5685 Will hold a public hearing for a Notice of Intent for Kenneth Steadman, 67R Village St, Marblehead MA. Purpose of hearing is to discuss proposed construction of a 3-lot residential subdivision at 40 Circle Hill Rd within an area subject to protection under the Wetlands Protection Act MGL c.131§40 and Salem Wetlands Protection& Conservation Ordinance. Hearing will be held on 7/14/16 at 6:30pm in City Hall Annex, 120 Washington St, 3`d floor conference room. Salem News publication date: 7/7/16 Please invoice: Ken Steadman Bartlett and Steadman Development Corp. 67R Village Street Marblehead, MA 01945 GENERAL NOTES #351. LOglS IS SHOYM art SAIFY ASSESSM'S YAP&LDT 735 ME IIID IS PRESUIHY NDaDm �,�ky 9 .♦: / h ' CIRCLE HILL ROAD / \ \ (SCRUB-GA01rnH)A1H XO BURDN6 n1E IOTN.PNCPFRIY AflFA IS 85.1BHiY. LOCUS qE5 NOT d' EAST WITHIN A FEYF ZME'A'flOwftNN P FIRM Cp1YUNDY PANEL R'Z30G91 OOOPB DATED)XLY J, HOHNM £. l.£RYOND j YAP 9. /WT We /\ 1965,MERUDDRE ME SIN IS OUTSIDE TIE CIT(5 FLOOD HAZARD DIS115CT. \ \ DI FFA S MIS BALDING INSPECTOR,LOg15 MISTS M1MN ME R-, NM MIS AN. FAMILY ZONING g511ECT. Tff ONILH9g1AL REWRFLFNTS PEA TABLE 1 ME SROM!p!Ttl5 PLAN. ONE AND #OO ' ds f• A \P„ g � / / CORPORATION, TOPOGRAPHY N(YAJA ER.20 (PMOR TO AE(91T R RFACIN4 M FASTING ROAD DATIY: A M OF J II cA' �;, { r CIRCLE BILL ROAD 49 DEED RE£9ENCE BOB Laos vRo caAr PINI \ CIRCLE BILL ROAD MTCR'c LesuM, ✓A / / 86561(LOlS 868.57.55 59 AND OD)RE(RSIRAIXMI YAP 9, LOT 209 / \ P Y 90q RDE CERING VEGATE.19032 �4. r / \\ IS BORDERING VEGETATED 12/08. Il OEIEOYWED AND Of1VED BY BY BLL ORIFMANUAL SU (MERINOS AND C • / LAND 200IL LEN»IXI 5/13/06 YER.WU MGS SUNIEIFD BY NgtM SHOTE 9JRlEY CORPORATION B. ORDER 6 CgIgTg15 ISSUED BY MF SNFY CgISRVAMH COYMI59g1 CfP i1lE 0OBF0481 4< I I' � •, , 4/34/0e. l #39 MOR TO FOR ME {� PROPOSED W STORurATER YAI XAGEIIENT SHOMH ONPMIS PI-AN qtt ENGINEER CIkNURRED AM ME %C dd v CIRCLE BILL9AROAD f ND s ' FOS /♦ #3440 P° ,/y I A YAP 9. /or ao � 0 / CIRCLE HILL RO °T w f d g e / G Jost£r.TURec } { ♦�.. J / +d \ V \ YAP 9. LOT 292 w \ /- \ O { + v LEGEND \ / /' \\ Ldl3rl/.0 PRdOPASA'D 4 � '7 d 8 �•4 { /Y 'SII #4/ I� '�� I vvv A1, ' ural ewax / ICH y , #1 \ V � N Y,RCJ q/L'//E LL ROAD DRANA4E YAMI(A£ � AIDDIBIASB ROAD YAP Lor err e DAV/D 19H6A \ � d _ 1 I x x De"N'ppE i2b / YAP 9, /Or 233 V / CIRCLE HILL ROAD � � I � - I / /� I IBM ro u�Rlnm BY ME SIDE V NICNP 9 9 6AAD11/CA ✓A ,xn V / d /O rev s. Lor ODMCCNS MMMmR LOCATION. SNE R M AND MMIf F1EVAlAT NMS OADNED All / \v I e+' 3eR ro u AAIN ro R YAN ow- BUILDUPvv -�HANDICAP RAaY 3 \ / Bw'�rtA o G/`, _ "O .y IDeaAG 1DE18A£AM4Ar r b + / '�' % \\ tR I YAxsnFE-6oq. etodool p SO MAT RwN6F /yam #30 1EYAOY CNTO ° r r .i Q//( � s�O PPAiiwobs ongtotams�m(ANO OURBND) Q / / / CIACLE HILL ROAD d -Y ,p° � d F � i'y I it Iv -eAm i aOAiac�incwN Die(TM w / / / / YAP Y. LOTA290N d I . ')dd tot.otivlwl xm PAIq e, 1°NAA HYDRANCTADE(TBV/110� , { ' I' Die 3 or d d SEMFAA UNE(TBV) Ob 110 al A TmmlE aR A\ Fielim yI d V @ BEbl MANHOLE Sal � A DOES l ww ur 1 { i' r \ d Docs Nm FIDII aTa!* d { Rs+ f I \ no wu U o1rAHEin NIE DIBIASB ROAD y a ,Dz.i[d �lE FMR f .'� mslFHc anon FaE wn1 ALes�/'9. or"sn p ( � qt wTNYIT STREET uWi YAP 9. /UT 23. / ' \ \ / / d'� An '+ d //S Y �w-J � d 1 ♦♦Y O / FRE FW91m FLIXW ElEV AAAA O / ♦♦ FBE iIASHm BA41FlIT pfVAMA�� /1 �i a ... 9REEs/SIlwss � -/ r.40 d { { d / 'f(3 �\M'd \ / d g\� - / 7 d '' { .�yy� ® PANTn'xa PAwaxt AREA o 'd' 1 /meq �+o rdV ♦r-- 8'\T4I F p • DIBII3B PARR 1 rT - yA�-s '',x.." g-atzlln subminA M / \ f.i 9,(.cam' H f a / /' z` DarOPSALAM d _ dr ,.,_FBdoo,,sroT mAOss /�� Arms, LOT PS/ 4 i 3 }�l� LY�.L; $!���_7 y SABLE ROAD / { .{ f .y - _,/y___�_�� d - ♦� , ".,; _ vz JA♦ j''G d'� { ♦ vv OB Ru -._�.- ....... _-__ /ouml va ANsdlit T�moaBoi. /" M Q \ TME 39 SAME MAO NOY/N/£S i/d/ST j. LF slL T „� d d Ili' t ` / FBNCBAt \ fA } � ++lr}+{.� mlmua OF EauA EIEVAna i�SR J { ♦ -{"� 119- / TITENg1 DRA°H ! I R cal (TM uT J (� \ / V , DT , I I ,. cauuax FaRa A.aMm(Dyj it J A g� - A �y 1j.` / tl leEplq/E/llEC1PoC YANME `7 irk { { , �Ma'o,%°.H� ,/_ >;/'; 191571±SF '1 TT �'�.T:'.-.-,-�. : , :IA. U (A SABLE ROAD 1- } ' d ./ / �� 1, OUSE ]LO LTI \\r . o MANE BgAD sEr G</ r i I \ ® / _` d� .:1 r' wcsT I.axoETE PAo7 \ / < / f \ '� \ \ -IE9mwDE FLAT EDDP s s O e \ '/ ' �AS _ ¢1 A�II�ADET 90E.R1, H ON _ Ru.uAY 9. xiR➢r '� NAP 8. LOT 298 /iT \ \ °10, �r }R ♦♦b \ /-- I HMWAT(METrI PRfPSOflVAU( FO°/ (\/ \/' {l / SYr/i/ { ) v.= A Y,� 1 p ♦WOW" 4 r a rts r �� DAs uF Otiv) //)f GUNORAL AAs 3 } F'.,a; GA;YEIER(T°V) (TBV) U) \ a rj O • ,•x.. \ d d / . ,/ r//�P.S� �OOE Orzu _. �,. IIIEIN x AT xAmUNr c ,lr ..o GAS J / _ \ !T ® .d l ¢ //"/ xoTL AL NODE Ruxvr- - '• _ Y" !. \ \• \ / ' = zDAB G aslncr UNE d .f .'A g / ,/�xN/ { CLAIMS WT)fh AT DF` "{ / ♦"y \ l\ \ +fes -+ _ LOars FRaFum uE CJ J/ _ S It F °' d' { r / ./ r TEAR OF EACX Nq,x ♦•e-' wiz \ \ _s�Y s s si .a �H OF MSI / ••I ♦ \ .d' { { / / /7irr (FOR SIg1Y1M1FA i re v'11 60 ♦ _ �, iw \ t / Aa/ s PRmmn 1YIXiAION i- lA9p \\\�y / UNE RArS�Q'P Sf9 / /jI^!/ r/ri 1 ♦ ) SCOTT IAN o aAlgxc sDBAau N J { PATROWICZ N @ d / ,/, / // A ♦♦a -". ` a. 4 r \ \ , } r- _ _r Y ..+ m BEDGE FACE(E)sMG EMVYD) ,M-v ._. M:_i.-Awr.ur_ti 3r_,.GM. O CIVIL -1 (n .a d i / ,� l - I \\ 1 .\ . o,, k \'m �\✓ k' l_ liE=e.;•__•'�% ___.:_ l�No.33656 Z+ (n I `O //i Q), //i 1'"-� ' Al- AY - �` �±�\$o-A \ tom\\� \ -../ •� �+ t } eA-f O Q 1102 0-��' 3�E91c K¢rAlmgsnAm zaxESE xoTE F) N / ! µ{ ,f\�J / U ♦ d 1�2X� /i / / �/ '/ +` s§ / \\ \\ TONT E ,ao-FwT IAIrFm ro ew ,, r / / / r ! o // // z0 a�f SF ♦a ' / I / 1 1`\ ._r..s'-';_�`_�_ � •.>_t- s<r Fw¢ERreDx mxn�faun OF Mu°c) e^ 0 At, II ' r FceRsmrolwMM MDETs�vlm sore a'EMoO • L as" 1 I/ RAID/ t es ..G_-e - " .. gswDE qn I d l �/ { ti 0098 LOCATION •� i I I i I �s-icEr anLSSIn swE ton 51rnuRADEn w,NA,xH x,N D Y. ss �{a../ /I 1 + r.{ : .. ,.` f ZONINGVDISTRICT: Rl z \ F Rn wM I / I / �- "v C7' errxomsTs / i'" J Btumgmr vmu6c ,'{ / \ , I \� ,� `1 ' / l ' (.A7; A c sLsror I $ . IwllY LOT AEA 15000 SF V / I lV V / '� 1 / / :cot!60 t L' N O y+ %s`I 19. '� 1 1 I (l j I .� IRAD } :. . .% s rJ us�Ylu LOT Arw `� - s1wI.1,ER IERYTgI IYL41 O z,`� : •r r /�' 'Y ✓ I 1 I I '_ + 'j_Y_+-� + D dd s�i� '4 S`.oxel Y gEnm) t a' CA1 C] ! '� i/ 1\ { z�r. i / 1 \ a r al. u s Y Hvt m[una liODos K \ .' y ♦• U'a• / I >' 1 / / / RAt i s T r W WY LOT MOM: 100 FEET E \ #44 \ \ ' 3. L ! .. e0. DpwO //`.d /e•n/ „ /'I / Iw,oaDB1\gllip� RAI � Et' ssT,. TAND EIBAC,fM9n 4 s '� 4\' SABLEMAD . /-� 1 1. { A, �;;<� :{r FARAaroAaT DEFINITIVE p V AYBN P mA/./Ex/ a `, a' ,� ,f_�/,I / ,, Q�0.00• /_/ // //Y�(!' - uAauu wr mwrAa: xa O YAP 9. LOT 237 • e' 1 xJ ( A, AP / Mf { // 'rF.Qe. .�/ // I/ / / / p !'\Ala r Y' t T (NL BUIILMC$) / 1 A\ / // / Y i SUBDIVISION N / A, ��/y� '\t ♦. / •410 / I ' /6`� /\\5/�\ r`/%A� .y YNXIY FRpIT Y11R. 15 FEET U \ / __-_ \'�, \ 1 / / /�\//� r ^�' \ 'n < x : MrAAI SDE YAIX. m FFEr ;' r T , t r t LAYOUT, GRADING & WXY REM YARD. Y F£ MA'YM°°°�"'° LID STORMWATER MANAGEMENT d / / ' i.S•r% \ �, -e _':=_ti'l_-r.:=_a_'li'l_E%3:_x:-s_°:r_'r.: ♦ (FEED \ / IE91ov£ / 3'.__l-f-_+___a.._.._t:..'E.i+_ _ for a i 'Y. .'4 i :.Y512\L54.2i Y YApNY 91N'IiM1i: 25 g #3 �, �! / ______==-_-~ =_ _ _ _�) CUL-DE-SAC & S X i _ _ _ _ _ _ _ _ _ _ /s> U' 17A111ty5F �_ / RA90 e ,x° =x- =- r-, = A""Y n�"°°n' °BEETTHREE RESIDENTIAL LOTS YcCRATII PARR ! ,/ / Y - U -. - .rr➢r suet IPPHOIDf1T8 ^I tA99� _ - V azs \ G A SE's�E � AD FEET YAP 9. /m 33 a \ for a site at (� n - HOOHB IOGTION I `�'TR�fD �.. [V' Q: - ax LOB �{� 1T• "s�o>rM� 'A'• Azr«ate #40 Circle Hill Road d /-'_{ '��°'Sj � �R.3Y �^x �Affl _ - Salem, Massachusetts _ _ - ' i 11 r ' /S/ 1H ysd All ` -. g- APPROVAL UNDER SUBDIVISION Date. October 1, 2009 Reused. November IH, 2009 / f t T 1RA3�/ pAzs .\ H Y K CONTROL LAW REQUIRED:Q PEDEROT-m soolR' , - 20' Sheet OT 2 �` r'R SALEM PLANNING BOARD IY 100-FOOT BUFFER TO ; ` I RAza� Inc. t ( ( .. / A RA2/r RA2D F BORDERING VEGETATED WETLANDS \\ i I�'� - RAza razz Land Owner. D o W C Brothers Construction Co., I GRAPHIC SCALE 1 ,��\ r, // "RATH PARK PiLT)Gk )>vu.w. aE ca9>a sf.1..c iY�e.. (.yAD. re m9oz-zzoe E _ 25-FOOT BUFFER TO . { �� V £/rY Al ALLY \ U /.1 RA36 x / MAP - .D! 3R PATROIYICZ F o BORDERING VEGETATED WETLANDS ` `. i �\ LAND DEVELOPMENT ENGINEERING I fi 14 Hrown Street Soren MA 01970 tA31 R - _ / '( - (9]H) 936 _ - ♦ _ 6400 M / f (_ NORTH SHORE SURVEY CORPORATION \1 14 Brown Street Salem MA 01970 `�\I, DAM (Sire J4clarn. NIWrI oS n» ,d W + W.. Alm$COUNTRY j }W A NN 1.1 4.LRAM AND SEmI daei PAVEMENT 1 .E. V •2' /ryj` �y �.(e//�{ T �4+ N NW 'P-J N HW NCJ 123 PROIEC °a 1 YAWG W 1ESIlRFAdNG 1tr �M. O �• V `�'� LVS- �'4 V NrW AS 120 LLpl 66 -1. 6 16- LL2 e•li➢. yf tl eRl'o:.l•L—ISM-INFD. 1Dd 47 -20.00VCROAE BAY(ONKfU-) 101 10X 30Z63SD ]2D SELECT BmFON J O 4 ` O EOS�YAWaLe amUP19 .F 4el �•� �� -y.� O Mo STAINS DYED r CREST ST/A1.86,03 2 _-_- 113 _ CREST ELEV.119A2 113 PM; �� I. j °OKI.a »/•` .A, •dO �" .!. .� �� O�e 0 •� .l.O �O�O O 8)APE�I.DR YN p �/ ,,� IN'1EIE -•. I. �ewM "' .Na � 9� -« Q fl Oma• O 3' �j• � � ZA6 lFFIINI xEaN. M REdlEao 110 _-- _ 110 N FILM IH NOTES: —BE L, µlm./. ��s,/�'4 �I-�� V (�,•/�V O 'a' 7.11 V O•L� ] (� V i V'" 'r 11"' VV' '4• +� .!. •O .F).� AT LL NO 1. A SHNL SNHalT H INBTNL ; PoZd1TIt MO PC T4NAL b M BM STATIDHdt1.58 DENNISmos W N THE TNR PIwPE ED B INVDut-110.38 I03 los SEWER TRENCH DETAIL Or o-0 -; ®r� c5 q � �.� ° .fl®,�•� �Q.4 Q Q� � Q � q����OM -ems• �9. �,. � 100 IN 'M' .A. .d'` CA. ` �'I© �f.l. 4 ^ V .a,• i ME9lO!RAGE °' � V� O •W. � .4 6 .l. Q � pJ• .4 • C7 � .,. �/�/�/ \ '�/ ,�\/��. jam\\\i\/\\� /\\\\ T '-4� �//P'.,,� -'� -'' -'. 4 .4 ... .,• .• ''15�, 9s . b V 3 A 3 pp XARX MAIN O gp d§ MOLE event ME unote-Aw/m MAN) ° off• ;� 1 @ �Olo 90 O O� (0 L _ 00 leO (V n iT.E W p A YIOTE:IF LES MAN III REQUIRED MnIIN 10-FEET C£ 1/1 .. t`n cid =f p 0 1C MH• `MECHAIIPIPE MNA(TW.) N �� •-� �� o' mm yPANM IFR I1XC AIL 9AIE YMET LWbCNaRETE ENCASE YGVI CROSIN6 Z > D 01) {30 1100 i30 2X00 130 WATER Mer EIEV OR BELOW JsEwFx sEXw YUN,w°/aR -ATEN. / 3- W BI➢f SERNCE A(MAN ME A'IDAN,.YANQ CoNec m) W CDMrtLTGN 3•YM.••__ MIam- IF LES SIM S' . t '' (n n e� DTHEN A�`° F Aa YAL ANG o Qom a {x (1) ROAD PROFILE ro osed and existin M YMm QNE BfIDY Y11Fn LM(IATEnAL MD/m MAw> �'• W'" /y 1 _OSFEET REELER^R102 ENCA9. IIIE S' QY ODpI SEE OF EEMFA O/-'� •N V 1� VERTICAL SCALE: 1" - 4• HORIZONTAL SCALE: 1" = 20' ..4 SEWER CROSSING WATER DETAIL a Z� FM91ED GRACE -REA,WTY PRIME AND mql HAMN° MmrM wmDE cIFMA1¢M 2a• ; V \,� �\ '\\\1x IMM LT IED ro Y LETTEIFB'FE'Kn• �� Po w •, �\ Q �` O �16 -4 r V a\ M°MWfULL Bob 01,IXIRtM COVERED �`x ..M J S to RICK MACE MM 3 COUNs S O J. aa2E su MANTA(3 mNIYs MM, .1. b COURYS YA1L) anMMdn OF Ee.xc No.28 D(m.) o 2 f _ _ (]J ams CQ1NiRY f. MAN mCTU OF BTIME KO Na ze J 4•LGM AND SSEp- YIRXIf PAN]IFNi ``:.: MANUFACTURED AN BT ME XLPH THEM M AMD - U ca AeParxv 0+041 P APED NinsUeN ACCQOIJIEE Bnl n1E1R weantaTm. /3 lad GlfaD°� RERimePIGSAIfiIQdIT 1U YtxstAro HttWMT l U -"'/ b - PUMPER ROAD CoNMECTION W (wxlDVK srAxDAL) tp ,,. -.: x-20 LOAnNo a RwD BAY(GRAVEL) _ 111 STRIPS ) +, 1 BsAEI FLANGE I' j • }F;Y016 --(,boo E TO CURpa To sT aEa C-4'A DOMPACTED WSS To PAM- Fb19fD GRAM _ _ _ (4pCO P9 YM.Cppl®VE sMQK1H) (n eAGF1LL BnrAaE ro SURFACE - __ ° ACCaNDOATE SURFACE LEADEN. - = t ( ) o-RIMc RU cFVIEr.MMMT TN. YIEI YI.OI.O �p COMPACTED ww aMFCPMING 1°MlY SPEC C-4t •y V • _ _ " w IMAX-IIS I WTYIE RE9N �a r e•GAZE VN.VE-- Q. w - SEUECT BaMGw •�EDN ° wG MDz° j (. a '» �,. •y yV O ., j CQBACTEn w THRUST BLOIX y a+1 - W S1WEs OMER z• S i. RUBBER BOOT MC0G11FI UNG TToo ASW "GHT SEK ; a wAnF LME E 12•YAL IA5 B•MA1FA YAIY 'X III _ I 1 TALE 2S A YHO ML020 1M1113T BLd% _ 0) Ill]. No SIOXFS OMEN Y eAY"IEE B•W Yw.BEMNG b m.FT. ) f - REAPED CmLFEtE INVERT IO 1 J XOT FEW(se.HOLES � �'K CVS•� I �•L. 0� „A V �• U IN•YME _ e_Ya L4.L� --. I X34mmEtE V .a P y, .4 _� V r l _ FS.IC.SYQADB 0]NG BNErIwW� e•BLAIN.PIPE YEw - eAY FOR sA+Pmr b1XN JOINT PINE , �Sm STME LP PEASTME U w IF W NOTES: -- a51ME asw. b» JII 1 NEW W RATER UM SIAL BE CEMENT Mae WCIB E IRM%PE FAM).BELL MO SPIWT _ ( B MN pFPnl J/4'CAU91fp STORE NAYJFACNBED By WARREN F1PE W LMXMY WRP,OR R.O.RJ]0 W m V.S%pE CMP.M EQUAL- fAiN SiAB� YHD MZM.2 T O/STTC O PIPE sbu CdIFQFI TO ANNA CI30-T. SIE CEMENT Mm1M UNING SHAL CWFOM nl AMWA Yf TO 20•t1P. SUBBAY LDQI$PLAN �� LOCUS�J J uWo GRAPHIC 11� CIM-]1, MINIMUM EMM WNR Fdt ALL RA1FR MES SHAUL BE FlK(0)FFEr. PER Q:°RWMCK ENGINEER BP arecAPMs SAIDA (D$ W NOTES: SCALE 1'- 200' L� SCALE CL 2 MEM MATER SERNCES(FM DOMEBDC USE)RENAL BE COPPER TIMING PER QTY 9'ECIFlGTMS I.HTQiMi NOZIlW BIALL BE YT AT A STANDARD MOUNT ABOVE FINISHED GRANE WMA ❑ MINIMUM EMM COYER FOR A-RATER YRNCEs SWL BE PryE S !FLT. 2.CMSIRUCINRN LF GALES Nq NttIRMR 91AL BE M A4T]WMLE MIM AMRA FMnS () CSm-]I MD AMNA 0502-M RESPEC11NEY roMawC GTEs(CPFM BIGHT) 0- I.UY W INSIDE DIAMETER MFJIHQE PM PIPES 24•be IF}$ _ MNm,"DAIUMV Hll_MAH1s WITH e-MIB BASE ANa S VAUW=%(bol Z a. INST.LLL PROPERLY SIZED CWCIRIE 1XRUIBT BUOCNS AT NL MR°5 MO TEE BRANCHES M REQMIF➢ PoMT)MM TWO 23 HM CMNECBMS M A AS STEAMER CQNECTIQI bARUNI UY BO'w90E DIMEIER,l—aE PW PPES ABATER MM 24 Q To M INSPECTED By THE CITY PRIM TO PWRMG AND MER FOUR(PRIOR M BACNFlWNG). T E D-Sm.'Wltlt He HYORMT MAL BE USED. 2SIE➢$ STEEL REINFORCED PPCEWFn i N. MNK SEEING OF MAZER ONES SHALL BE EASED MMP ENGINEERING CAWURMS AND SHALL BE LP IYPFNW N PER As1M.LE BMM NO. 115 OR EQUAL- 01 BASE,o THE EMQ EASING CDQ6 PRI R PRR SIE M LATER MAN)MD THE PROPOSED HYDRANT INSTALLATION DETAIL ]TABLE AT 2/3 PIPE DIAMETER. 23'1X__ PRE—CAST SEWER MANHOLE DETAIL Q s. PRIM ro OBTAINING A UTNUM PENAL THE CCNTRACTW MO/UR M EM BEEN WNL CMTAET rvo' VAWOMEN YMYT mM5 ME ATT FlNE SAFETY dNSM 1°INSURE THE ADEQUACY CE FIRE SPNSS9M i,D TE PN REQUI -1•,aE BL WIO EYSIIN°PANMFNT EA BUILgH6S .0 SEE ORM NEW. dI S"Un NG PER UTT MLL GW RESPECTN tlTY DEPT.PON YQMIFD Rm11FA4NG MPROVAS MO PERFORM REAMED SERENO PER Cltt 9ECalCRE SUP rvn. ... .�.e�. -Y MM ar CQEC. LAd M 2 m (I.S•GVO9 WATER LINE TRENCH DETAIL (Salem] �°"� DEFINITIVE U m m O 4 aMFR O a O ,�.fl. CQRY W 4•LSM11 NO SID ww 4 APPLYµ ° _ ARmATM SUBDIVISION 3 9•EDAM S BB Y C "G GMO mC6 W.ERIC. Mo. GNANER R"°"; °RB"B LOCUS MAP ROAD PROFILE & O 7.1. . cmx4 6111A,to 1/2•dM.M., J B No sTMEs DYED 3•DIA j TMae MIN ° _ E �0 LY sa x000 Pmr lo'To r O.C.M tv DOIIME O I o °o l STEEL eaTS murzo I o o I f7 - SUITABLE S ° ° `"" "�" l �o ~B�LLn CONSTRUCTION DETAILS a STEEL MAN Pass SET IW MMr DalWRAP AROUND r UMpESIURPLp DISTMCE 0 PENT¢ro (• (SE RAM) L III- SEE MENW O cwPAGT II�I MAL ('� fora [� /� pp BY' -s M m' 00TH!MAOIoIT $ GRAVEL �iE nme PERMANENT PAEIENT PARR WILL Pw.r cpunr wM BLD SPEtlnunans CUL-D-DE-SAC & ? MMMFAa1C K"""°"�Rm PERMANENT PAVEMENT PATCH THREE RESIDENTIAL LOTS U YLL _ L11MQalE � RaacD vANYENr(MJAcuNt To wuroRUL) /.�/</\( 0 C_• .Y 9'' .. BEHINDGRAN .; COMPACTED GRAND D, B �' FIDGEsmNE for a site at B� 40 Circle Hill Road BURPUT akOABRIC Or MINN. (�)-�{} — (6-1CaNSRRWMdNG PmT - - Salem Massachusetts f) Pu��NCE Nor ���TiII IMPLIED iP - - (e-wtl1E5 wMMHI M NL 9CF5) -: (� ° �N� I—I HT{� �3*AAE -III III NOTES: ���% APPROVAL UNDER SUBDIVISION M NOME CONTRACTOR R1 INSTAI IEYPWMT SET HENCE ER°SM CMTN0.(DINT Ci KIM) IMhy. CONTRACTOR SAL COMPLY AM AU.LOCK CPW MO YS e,'EPFlGnONS Dote: October 1. 2009 ReWsed: November 18. 2009 As BONN MOVE Mp HAVE IT MYECIED By ME WlSnvnBW COMIs90N PRIM ro Mr MO REWLAnMs CO TRACM1 SICU-MODFY TI6°FTAL M REQUIRED BY CONTROL LAW REQUIRED: pLDEAOJ_3t scale: I" = z0' $M1eet z or z @ ExuvAnM M EM1N RFMovK M-BIG 1.QdM1E EDGESTCDEs PER MOPW MB.M2 TYPE BE TIE LCCµDPW MO MIND. COlnt/.cTW WAL mrAN sAnsAClmr SALEM PLANNING BOARD W 4•Mx.MICNNEM W MN.MOTX LP GCE INSPECTalo MW LWA now AAB/Oi YH0 DURING AND AFTER f NOTE MIIRA:IM Is RESPMBBLE fm MSUMNG a oSM CONTROL Is PROPERLY z NL SLUPm GRAMME ECQIC SHALL WE LAD AT wSTAUAnM. AL UABUTY PCN MArEW0I 5,INSTAIATM MO aged OEEner. DeInIL9 Brothers Co113tT•I1CtIOn Co., Inc. C MAN AT AL TIME IN ARCBD.W[E MIX TIE OSEIf EP CMQTMs(KTNAs None e SHE SME MME TaWMWi TIE ERPRE Petal MRMYMSXP IS THE RESPd19BRUlY OF TIE CONTRACTOR. PUDE ASSUMES a) AND IN aboo OPERATING CMGnW. FRWM UNDER SLT FENm Is sw" Y PRORetm. No uA9UTY FW THE WAaNRuunp AssoanTFD IRAFIC CONIRQS, G/O PefJlbk DRI1M(W, 81 C011IDe Stn»- iaRGcll, LJDq IG OIW2-2206 LLL SLOPED GRANITE EDGING WOODEN GUAR..) RAIL DETAIL SILT FENCE DETAIL I PATR0IIICZ (SGE) CURBING U N„I m Fug. style LAND DR n Street, ENGINEERING 970 N.:I 14 Brown 978) . 56-64, MA 019)0 U (978) 836-6400 NOR'T'H SHORE SURVEY CORPORATION DAH: 14 13m.,, Street. Salem, MA 01970 (978) 744-4900 `nri CP m i' --N},Wi 300.Nay6Wjs6SD _PF_mJ Fda Nnma-RGimi eHP CROSS ODApTRY H .DUN-DFA:`PAWACWENT W > LONAD ID 125 OR PRWD NO Ci ILAIRACNC91RF NW IRFD. b>> 11 ROAD BASE(CAh1) 4745VG -20.00VC- 307.63SD 1 So ECT BORROW -1.402 120 4- a�µ'EL.•JrrI," 'avr�' .v J•am"'' •4•1'Qn O r�Atr'1' �(�1 .N. •L o.Vp, s V C^ISev '/VVa�.`q^_Rbr`^•l\/a/�'SfZ++ObC1 U((1°G•�rrL�/��/°a' F.L �"YO•yll• • rk tAw �- -SAOX IAB%- ° MID MLD2o I` � NO siDNEs OKA T + 'nm y -L S t6.13 J4• � 'L � Cb '+ O "� �� � v.Q'� , Oµ..4 µ 119 CREST YAV'll9.02 as Lan IIIR La YML -III. Y201.R n µO .L V O.b 0 may, CJ O .YBL•` W.1+ 0 O Ito NIU MREWMFDM NOTECl•SHRO .W-WT SHILL MSTNL AT NL HCOLlITK MA YFATCAL O (1, ® Y �/ µ'-• M _�/ 5� N Bx STATION1a 64 A01 eE1O8 N 11E PPG .rx O.L .y-t �I•• ^ .b �.f. r, \/ .yV) E 5 R11111748 DNVaat-11o38 SELLER TRENCH DETAIL 107 los um m spm. fM9En GRIDS ci V .L p ..a 95J 1 95 /\'` \\//\\\% y�Y/ /'Y//�\ / o b❑ .b ^ ; ; ; .L J ..1. •A' 3 WRIER YNH CTO•WIN. U € M)541M o�L• O .fp \1 O p O OL go � II Ieac 2Wm UNE MrEnu AMM YNx) ° 1 .�j� T 1 •l. E ♦ Q8 ,R"W.• `-MEWANICAL HPE JOINTS(M.) • `� µ OM V/ CJP 1 ' d° ,L O .L •L° 1�A 1:1� oo 'a n� m� +role P am THAN IF, REOGRFD wMW '� M �= -- -- �� .,�TE"AL�uNi°AT SME XWER MEURE RCASE smm v+msm iMt �b' =y V' 1 1 Z 0100 770 1+00 470 2+00 +90 wARR uAY EIEY.aR eELOw _.--.._ L:> \v/[ �� �/' 1 •y �. Q ANU/at SEWERSEWER Mae AND/OR u1FAK V 4 Jx A y J BLCDreG.PeR I� '(OWN WE AeD/CN OM:.SEANCE C Cn ) WF. NECTION ^NOTE IF IFS THAN 5', "'• RRI coMERvIE EHC.E4 rwA1FR YNN CROSSIIC ROAD PROFILE (proposed and existingOb E�ERpXE WLDw4ERCNE(AEA AND/ MAR) (ROwARE fILL 5 am ENCASE SEWER ME 5'FEET ON EIMER 510E or SEMER e ; W •H + 'b µ T- vIIiPCAL SCALE: Y 4' HORIZONTAL SCALE: 1' = 20' SEWER CROSSING WATER DETAIL O ° e � a � 6 �M F .L O e4• 3 ����'mE -- HEAW WTY FRAYS ANp WNA HANNG �K uw1wN RUDE CEARArRCE OF s4• .\> i�\' '\\/�RE eNRON LT 117510 a ILTTEmD-SEMEIt / y ,� O w !•a•, 4�0•yL .4 Q :l cAsnNc ro BE sEr aN AND roTVWm r NW. W 1X NLL BED Cf MORTAR 4w RE-BAR P .y 4 1 i✓ -' IE-9AR i• BRO. e)MORTAR COURSES°r J -1' (Tm) '. 5 OO MD X) (5 colMSEs MY., ,L 1 J_ G S WJRSLS YAG) •� : \ IWf WINWS WATERPROOFING CCWWND(r W.) O q . MCOATSCf gnIHASnO LA0.R, uJ CI055 CCW WY I..� J ULAMA PAW'NFNi L': M PLEACNRFD BY THE NCPPFAS S, µD P ILVY AI10 SEED. 1. IEPUFD w ACCDIelA1Y•£MHN 1HaR O On x4eREWSpPRO % SIRFACNG g11R9.MfMCNO WSIFRICntt15 --REMEORONG Sash.NT rD MIHST.o IfRO'-0 /b PEVJRED. 4ryF' / b 4 - -BLAB BLASE(CRATED FPS AROME RCI � -(YUwaPAL sTWauXI) �� 'u 4�e {.' -L p -'BRFAX.AW"r FIAN4E 1 ) MMH=TO CRM11W ro ASHM 9Sa°-4m _ FN91ED GRACE it SEE MARLS (40W P9 wx.IXIINFFS9N:sIH]MTx) / (n SOMIU:Tom"° SURFACE _ o-RMG RUBBER GA9(ET.MINT(TT.) µ -, µ :_ p ACOAMICATE SUWA E Lael NG e - I 1' �f A C(WFdNWC TO ASTM SPEC C-N J MIO M.M.O SELECT BONBON 4' CLAN F. BUT LE REON ' 0'G,AlE VA1AE- I d d Nweoot..W .t W.WM,R wr LU - uD BOM 3 G -1 IMM IGOGO O • - m:Acl x \NIMIST BLCCN a A d - x0 snlE4 o1ER r If RUBBER SWT ODWORMWG ro ASTM WATER Il1E - tY WM.ITIS e'ENTER MNN 'I III .I TAHI£u - `PEc.c-MJ HmNCNc wATENna1r SFIL I� qq E I $} YID IG020 I - 1SMST pU= ^' �. -SHAPED..EYE WEFT 0) III xD SERFS oWA r �'. e•YN ON BFNON 0 SO,Fr. Be N T anCR MAW NCa b CASs•A•. y .b o 'K O -L (B B•yH �e•IM. ,L-�{y.d - L - ,ene-r'Pawm DGNa 91EEIM0 - 14a, e•OINI.RPE MECM _ BASE FCt OMEE, ]e•WN ANT AMT O As REWxBD W TM W LfDS 4wxA PPE I _ °.L 1 M.YD) III III III III = L- • ° _ a NOTES: as.L s 111 III-III II III ,III II' W ,. NEW e•WATER UNE 91ILL BE CEMENT UWI)OU"LE MON HPE I¢C.BEll AND SPIGOT Ge'YM. tY ! - Iti e'MN DEPTµ 5/4•CN91m STONE YN"IFACTNED By M TO PIE W SOLICIT cor,OR R.D.WC L W. a DOWN CMF. A EQUAL _ - - ___.-. k FA4 STIHIE WD m.N.R LOCUS PIAN FROM LOCUS O PIP(10 71. CRel 10 EARTH,O WRFN. INE CER U S SHM UMM°(5)sha�FEEL TO AMWA 14'1D RV M. PERBASE LOCUS u CIOF71. YMMIW FIRnI WYFR FOR ML WATER uNEs 91µL BE FlYE(5)EEET. NOTES PER LEOTEWWCK ENGINEER SPEaRCAMNIs SALEM GIS W GRAPHIC 1.HYDRANT SCALE: 1'- 300' L��J SCALE a 2 NFW WATER SEANCES(FCR DCMESTC USE)SHI11 ME COPPER lI9HG PER Ctt 4£aFIG110NS 2 CCHSIRUCDW M5 C�1E5 EIAI HYDRANTS$NAIL BE IN WACCGDMM M1N�AWW"A°E XOIES: Q MWIWIY EARTH 1:OVEA ECR ALL WATER sERNMS 91µL BE HTE(s)fFEE CSW-n AND AMA Cbl-e4 RESPECnhLT.bNelW_•GATES(a91 REIT).•D- I5NGS.9NRMW HTMINTS MIR W MIB BASE ANO S eA W WEMXGS(CRCI I.UY 4f INSIDE DIAMETER MNWCE iqf PIPES N•W LESS, Z ]. INSTAL PRM'FALY 93ED WHLREIE MILLET BLCa(5 AT NL BENDS AND oOURUBRANCHES A5 BEWARED SOLE)MM lY0 25 HOSE CONNECTORS CIA 4.5"SIENIER CdXECTICI'µMIF'• USE OD'WINDS MNWCIF FOR PIPES GREATER MAN 24' N BE IN9•ECIEO RY ME ptt PRICE N PW WMG AMD AFRI XUR(PRIOR ro BAfXFIIIING). MEL 5W.'WICR nr WINIANT SOUL BE USED. 251FP5; 51FII RERRFMMEO W'•OL111FR PMnRCP11FNE PER ASTM.L:BMd NO. ` FlXAL SMG GE N"NEA CIEs 91µL SE BASES GX"'`NGNEDNN°`W.a'LAnGNs AND PRNL M HYDRANT INSTALLATION DETAIL L115 OR E0.1 (O eAsED all THE UOSMG COEBUOMS(ROW A PRESSUK a SIZE OF WATER WAR)AND THE PROPOSED 15'W DEMANDS J.TABLE AT 2/3 PPE CNE7ER Q ' "5D"TO RGAHJr'MMSM"DIMIUsIPERMIT.Tx`EWACY OF AND LER'ENG FOR HE PRPO"T"Gr Nut iu .•� PRE-CAST SEWER MANHOLE DETAIL ' " PLNLUT EDMS ^NIC°^B p' _ THE Ctt FlRE SAfHET DIORAC TO WALL OO PiATE Y°F FIRE SUPPREW FCi nE all K D 1•Iwl MT RWC CEA dlRGel6s. ME SHE CGITRACICR SXNL COLRpNA1F RLL Gpl RESPEETYE tltt T.ECR REWIRfD RESUIFAQIG APPROVNS AND PERFORM REgXRED TESMS PER ptt SPECIFICATIONS rv11 WATER LINE TRENCH DETAIL (Salem) pWW=E " IT DMC IAIO IN R CCP ,.STAGH) RmHGRo DEFINITIVE EMrnD- 6 1 4•IONI WO SFFO CiAMl Y O AGR �� TANS SUBDIVISION U COREL \ iY/ /� Tm LAE le-wAREL AR�ASE TIM d o _p d SEM sAWm EOMs MD.a PGMER HOST.�ACTED eN LOCUS MAP ROAD PROFILE & 3 WHO M,.DSD,rPE N �° O ermu�^� 5" NO naNEs oNR a'aA TR leo N SEL OEWL B.WMr �, - I° s1FDOTH,.°BOLTS ¢ V.i3'PRESEURF-� ° ° III O 1SgIN ° �_ f ,3•SB MACRPOST IMro4'O.C. R �• 3111M— Tg o G G `"" N MENS .ERM G G ° �AB� CONSTRUCTION DETAILS a MIN ATTAMOIf PIEEEL RfTIAR P0515 5!T,a MART b CJ ENE'S / o ° rp O -_ C��� 111 EISMME v O° v.._ BAGXFlLL POST TWICE (k-HAM) ,6 "-,III- SEE TIER. for a U \ GRAWL� A III MTNL H'ADEj% sPDG emP DPM 4R"MEEIT p V eGBO NOM PERMANENT PAWMENT PATEN SOUL MY CCWFLT MIH MND SPECIFICATER& CUL-DE-SAC & FORMS AREA0"""" CEMENT MICERNME WiTE 0 RNISHE°PAKMENT(AIWAMTTOWAMAW PERMANENT PAVEMENT PATCH THREE RESIDENTIAL LOTS ° . L BM`µ O ;° .Tein�arE > _ for a site at CLYPACTm CPT£L BUR RISOrM ,,g � Ii1 ' '" #40 Circle Hill Road PUT_ o e i1 CR R EAWRWRONGPDS \ _ Salem Massachusetts �• W GROUND.W MM (EWCN6 WWYW pl NL 3Ea) _ S U) SM OFOF oEKE - CGp III {IL—�T�BTIa{ ee`�Ma�1—III NOTES: I %Y APPROVAL UNDER SUBDIVISION oGte: oGtn6er t, zoos R,weee: Nn.eme,r 1e, zao9 NOTE: OONTRACIat ro INSTAL TEMPgiMY SILT FENCE 009M Ca1TRa(UM1T OF TRX) ImlES CPRRUcnM 91Ill cPIPLr wnl Au LxA WW LAID YxD 9`EaHCAnMs C As Slaw=AND xA,E 1T MSEEc1ED BY THE WrI9RVATxW cwW59al HwR ro Mr MD Rcwunws.cOxm"cT9R SHru 4WPr rws MEAL M xolram By CONTROL LAW REQUIRED: EMCAvafm OR EARTH REMOM°µ-ATG L GRAMIRTM1mGESIMES NEW MWw MQ,"2 ME SB THE LOCK MW AND MID. OWURACMI WALL OBTAIN SATISFACTORY SALEM PLANNING BOARD PLDEp07-]1 Scale: I" = zo' sheet z or z N NESS,Ir ON.WITH M FACE 1xSPECTONS FROM LIX.'A WIN MD/OR AHD P.PMG AND MUi NOTE CWIRNtRle IS REWd9BLE FCR..EROACN 0ONTROL Is eso"EM T 2 AL SLOPED ofel BEGINS SHeU BE LAD AT INVALATNL EN W. NJAMUTY FOR YAINS,INSTNLATIXI AND C YNNTAMD L LY AT NE M ACO_EDANM MM.aroUWn i CF CCMS(NMSING EILAxDs felOO THE SE E THROUGHOUT THE ENnHD RE 1CT w.MRLIANSWP IS 1K RES9 PONWUtt M THE CONTRACTOR. HR ASAWES wn Land Oer. Defulis Brothers Construction Co., Inc. MD IN GMO OPERATING O)NDn(N. EROSION UNDER SILT FENCE IS STRICTLY PROHIBITED. NO UAMUTY FIX n1E CVARpRNLAND ASSOUEED 1RAi1C CWTRCS. 0/0 PaUtak tbBAW. 31 C°1DOe Street TmSeOe, L. YA 01802-2205 SILT FENCE DETAIL SLOPED GRANITE EDGING WOODEN GUARD RAIL DETAIL PATROWICZ 0 (SGE) CURBING LAND DEVELOPMENT ENGINEERING noL Io oma HOI uooi. nm is xm. 14 Bron Street, Salem, MA 01970 U (WS) 936-6400 NORTH SHORE SURVEY CORPORATION 14 Brown Street, Salem, MA 01970 DATE: (979) 744-4800 w�a q ' GENERAL NOTES LOCUS IS AIOYN W SALEM ASSESSORS YAP&LOT 255.11E LAME)5 PRESETIILY NOCOED ♦ ✓. / #35 (SFIIIB-fROWIII)"NO BUILDINGS THE EDTA P Ell AREA 5 65.6 W. OCCUR DOES NOT CIRCLE HILL ROAD % EXIST MTiLWORN MN A fFLA ZONE"A" N PNI ER MEN COMMUNITY PEL k3WB1 BOOM DAM.IULT 3. ROBERT F$ YAP a LLE Poe B / /\ 1945.TIE1EFCItE lHE SITE IS OUTSIDE THE ONS FLUOD HU IARO DISTRICT. r 2. PER SALEM BUILDINGNSPECICR,LOCOSEN515 WITHIN THE R-1 RESIOETInK OIEi.WILY ZONINGyo \\ Ir / / / `\ DISTINCT. 1HE D=ENSICMK REWIIIFLFNIS PEA TA9E 1 ME SIIGM!OI lM5 PUN. w (1/y 3. PRNERTY ONE.WD ICPOAAFM'PER AMAL 001-THE-GROUND 41RKY BY NOITA SNORE SURVEY 00 C i, 3/ WRPoRATAIN,KAGIBER,2007(PNOt m RECENT RESURFACING OF E%RTNG ROAD). DATUM, NGMD OF J '} '' } r / CIRCLE ffiLL ROAD / 2 le, 0¢W0cE Tal Lames E,wo COURT ww CIRCLE HILL ROAD MAl'!I I'll 111. 41Y\ .A.. '^4 YAP B£L8T Y08JR 4 4 ;� F W °sy Ig5e,l(Cols pe.SIT.sy ss AMID eo)REMsmATxM f/ BCCY(133.rFRnTTCATT-38032 C' ♦ \�Kb \ s. BORDERING \. � � "R • �y / BOG VEGETATED DETTIODNED NU EE BY SILL (MYNALS M,0 ANe MANAGEMENT)ON 5/12/08, EAUAND LSURVEYED BY MONTH ADFE SURVEY COPPORAnON \ / A� / • may\ y -ne ry / / 6. ORDER OF CONDITIONS ISSUED BY THE SALEM CONSERON VATICOMMISSION DEP FILE/084-0484 4I21IDB. L ` All, - #:39 / 1 059 m APPLTTNG FCR THE NOME OF DMIINTENT PERMIT,THE tltt ENGINEER CONWRRED WITH 11K PRDP03D En SIOBMYMTEx IWIMDIQNT sIIOYN W THIS ft.W. SP1 lave/L�N d s r CIRCLE Ifla� A�� t j / '\ / �Q4 SIO\ All, "` EDWARD tuaP 9, Lor 2ro / j / 40' / CIRCLE HILL ROAD �G Jos/£v reYee R. Lor Ece zas j ♦. i"°� v A / Ir /i / LEGEND 'yl \ � J1 y •^"s j Y 1 4/ � 1� I A\V ��y 1 G1Ef1 BASIN r #1 `euE.'s;.rI CIRCLE IIILLYROAD�A\\ , TNMN,M�YAMIDIc �Q RICHARD r SAAR ICH 1 1 U I • DIBIASE ROAD \ / 136 i y . YAP 9. or PEI p \/ RAV J SN£A /` I O YAP 9, /OT Saa \\ y y ) \ } MNM RIPE 12"p / CIRCLE /TILL ROAD } / / TBV m BE TamTED Br THE SITE RL MAP s 1AADIxN. Jx `0' \ / / d \d CWTHACICR ANO1 m MAP a. Lor zar / I ..f.} \ / 1 SUIS 1�+STT SXeAA. ♦ / y d l t r /At \ } rex m ff xdmm TN TO REMAM YYn m sau a' \ xNNNCAP RAMP (YAx.AaE B 4NAB y � �AD�MLeMr. /6. y , '�A / \ � mNsmmlcr wM AJa SEEM \ / / RA ( ,Iro A.A.- /} a 6TfNNITE BOND I.BE ISO TART MWT CONCRETE CURBING O y N / 1 AP amtc iANriaas LTMaxc Z / °!p r .y ^ v I Yw/ BCCnac ONE(Me) Q \ / SGE Th CUTICLE HILL ROAD i -♦' i / N°' } d \ iL ,r^= MATER DATE(ABV)— Td� J / a e eouRHlsR d ya d` T A Y^ YALE DAT(Y —II 0- / / / j YAP e, ITT Pao c ° • - 1 - ADoel B°FNRM INm PNM ,^w �' HYDRANT F / y SIP' Ibs.n MDT d o - SEM N TINE IT" / 011l A NamK A f� =0 ap \ Well06 #Q / / wMuif110Y mi T j �a«I Tae�\ .rd,!d oVEm4Ax woe ' DIBIASE ROAD / / IIOfS ECT nOw all pe 4 rs. D WALL. f1°TT/ :' i "0. EmstreMixaurn s�iNEEPOrouwr WW ALBERT J DUCARB / AP } j } i y / d).A �4 � del�1 } N' ,ET£ RYAIm ETAR BEv,Snw YAP 9, /OP P31 _ D \ �r ' d 'd 111E aaacsm BASBEENL BEVATTOI�- /� d d d !/ 7\ 8o- 3 ,�sglxues r (�1�AQ"•yjo 0) } 3 / j\ /=/'E,/d �/ d �. { j t � PAINTED"NO PJF6xG"ATEA O 3 Ae d i >/ g• jd ,d } d /i,Pr`5' vy d r , SPOT a+Anm Pm ACTUA / : / ` _ Ilt. 'II�EN i ` • DIBIASE PARE DM�,1IE-ENDIAND SIM.,• M \ / ♦ \ Al, I ,d d ♦// /€ i N d s / / __ r \ \� .,r slrr Oe.sALeY i _ es• {3* i 4' s T PRDPOAn mor uAADEs \\�� RNA _. ,n' I ♦ \ L 'Ef-"_l[` scmT�OmaxIPTTu°aEoRrwAul'wsNTmESOJRTwSIK£F.C(TreRIC'/�1 YAiYAP 9, LOT 257 C�o \\rNAI SABLE ROAD j - A 8es RY LSr dQ � 1 LF SILT PENCE 6 Eaurz Pr-ew-euu a. YAP LaT zae .112 xA2 0.-LT pA YYer ET M_ ♦. 11, + r0ISEOox { / 18 \ yyW TSI ~# �� 5 � yU a I.e 4 / { /♦ 3 =°' _ I x 1 1PPBOIaIATB \1 tr B M m DIn M(oN mNaem BAD) ROID '•. ° I A _ _ ,i' / , - j / \ . eooss 1.ocsnoN ` -\` „AM mnDAte"Bill / C.� a"a°s'TE sS1P5iEvs U dap YAP a. fur zM•iP• j } /.:T /Ase _ _ BOND. mNrFsn SnruA O 6//C 4� 'Al ♦ 6• ` / `� f�/ I./ - '.\ �_- I NmRAN¢IEVp d YB MAIU M .y j� �• l J �� // / / P r. GAS UMEPROPANE(TBV)TAN( 'iYF FQ�/ l u� �•• ♦ .i 'dI yy� �aY/i/ y \ �Ir �/ I Ons z� - w GAS vuY(Txv) U) M,'•9 O I•• } l / i /��.r J /e" �8 1'' \ M.wuMOYwL / - _ )J •• ` I / 4. / —NOON ONu �/-. •j T E ( 1 'AT NNYDRNN , / ,,..0 GAS METER(T" J / ••,�•• } ♦ d / , ��-'-'= Reel \/ P _ jN OF M zanlNc DIrnen ulE y��y / MwTe Abe rta AT YALE i Y d v l V / \. ,q \ ••i (� }Well } j '♦i .S/>♦/ i� D iectmtE /"f ar' _ ..r�. A °z A w� i % ✓ �F.P SS,y� �s Pxrowv ur. •,I•• ♦ A } d d .`z �NUAN of EARNA NAME i �� i�'( ISP v Aa.AAV �_ ♦ gArpg Ol _ O� SCOTT IAN 1G rarnxs mamtt uc ,,.�..�.. i �/ i eo ,uwa.u.,r IIS �A �G.0 ;� PATROWICZ rrT _ / .•• /// . YITIWTNM. / _ __ \\\ y \" (/D —__ ___ BUILDING SETBAOI UK N / ,f i �. IT. rk\ �,1 S� p CIVIL -+ ( ♦ 10 ,� // /L ./+�- t / '� .T~jiu le\ \� 'l .PABIl ` '' _ v ,9 No.33656 ImuE rA� ExISTMG Iacocca) /j� } \I 1 xv Y �gd _ Q'�O,c SIC/ST E `cQ Pmz6—�-� BORDERING WGETAIED METILANDS wrDITwBmcAC NOTE EN) 0AD �/ / a-�s l \\ �\ / k .: FS/ONALEN�' �' •- AID %12 m ♦ ns s I \ \ �,. 1Do-Emr euETm m BLw W 1 All, i /i / War / SAT R1NCE EROSION CONTRO NMB OE MmN) O \ /.y� eW I II + 1 Tji, :x x _ Efel.(raDEEP Deal B1ac Anel jfF11 .v y"1�� I�iOrvvvfASF d ;p�� 'NPN" \ 6 I I /(./:/-. .I .. . . .. rw s1aNMATEN rTlwTrox WIW al fell her WrIBETAN CREATEEARTNER Beer ♦ s/ i '� ` V i I �../ 1 /I i 1, i ,I eua ZONING DISTRICT: RI Z \ Amro,PLANTED wN / / V, 'a d N APPHOm1ATS 1 .! I .d ( ( / / I- Q � � } /j /' eouse LocsnoN \ I 1 J / l BORDERING / / Y xORv n S"S, s: VEGETATED INMIM wT,uEw T4000 m Oy \ ` \ \ \ �_�_ fi__.' _ +.f I\ y/,?/./,. j{A�y,`„`/ASI( �`�).h\°MEOC a Amroz) to Q •'� /�� . \I511B �• _ " 17 ':t' ) aAll�d WETLANDS MINIMUM LOT NEAm s1°wvTR RETENTION BASIN OfNV 7II °MzuNo. 15.00c)mm C11I )5- 11 / / gmz2f YEwX1Y LOT YOIN: 1.T¢T #�� YARD SETE0l d� �r' a d -� 3 c ..,CI -t I^ r/ y edel i //� /If ro NSNNaM gnrs N+' ocAwnm AT maxr \ / ! j \ \ j .�• a0�_ Tj �7ay PARMOU.m FRONTAGE) SABLE ROAD { �, / �� { -I , . , YA>NWM LOTCCNE� JM DEFINITIVE 0 JAMES P LITAL/£N - \ J t\ ` `ee { / I xf j ^ /// �..,�/ //Yd d (NL ouUml U \ YAP s, Lor za'r / j ` /JY \ j t /� '' �// I, "�/ \ ^! �� \AEJ - N, rrARD: 1s ETn SUBDIVISION TTNA SIDE rrm: 10FEET d $� t ,�{ N�S� °x Y _ NMANNRERYRa: D E LAYOUT, GRADING & { ` ' \/ 3� _v� � IB YAuuY BEDGT: FEET (FEET) LID STORMWATER MANAGEMENT ! MOG M1 for a AA (STORIES CUL—DE—SAC & THIS PLAN HAS BEEN yECRArH PARE — 17,i11t}SF / , , \ z G YIIDAIM ET]!(£NpO1T: a ETFT 0 REDUCED FROM THE ORIGINAL araAeY ` APPIOUl T3 � M AB/ ��' Al � m I THREE RESIDENTIAL LOTS YAP.9, LOT ae /'. r NOBNA lbacAnON : P 1 for a site at 1 H=SCALE OF THIS PLAN IS: { „ t Ns�o; 1 ty d , y -.0 {r , ,A _ UO #40 Circle Hill Road u s I " �'x �.Ex Y i Salem, Massachusetts In { aaew APPROVAL UNDER SUBDIVISION Date: October t zoos Reaseo'. rvoVemse, Ie, zaw C G e• / ♦ a = _i a i 3_ < s4. s a <. M-1 R� *_ ' ' -i � CONTROL LAW REQUIRED: :� P(DEP07-31 Scale- T" - 20' Sheet 1 of 2 ED ,I Y_ § Q 100—FOOT BUFFER T0�\� 1\ �.{ _ r M qAIRY ,,� SALEM PLANNING BOARD BORDERING VEGETATED IIETLANAS t\ t _ 1 �'i i .f=ar+ '_ � wza \ Land Owner. Dis, W C Brothers Construction 2-U Inc. ED c/o F'etricY Da1W1e, m CoWm 9TAeet Terzece. Lym, IEA °1902-2205 GRAPHIC SCALE 25-FOOT BUFFER TO' t j '•� A-� _ PATROWICZ BORDERING VEGETATED WETLANDS ` ` IraPae�sr'aF s • J ./�. Ys sc a_�_-i-J:_s r s m LAND DSV61APY6[iiT BNCINEBRiNG 0 _aC i_ 14 Brawn Street Salem, MA 01970 / :�_:-`-:-v y._ - (sTa) ats sau m.e z0 n - NORTH SHORE roM, S SURVEY CORPORATION N 3 i ♦ 3-�}`[y�r�.• 3 ,'_T }� M-+ 14 Brown Sheet, Salem, MN 019)0 / « _ «'> Ime (978) Tao-aeon