Loading...
BRIDGE STREET - CONSERVATION COMMISSION (3) S"A SENDER: COMPLETE THIS SECTION COMPLETE THIS SECTION ON DELIVERY ■ Complete items 1,2,and 3.Also complete A Signatur ( � item 4 if Restricted Delivery is desired. y��'1`'1 N Agent ■ Print your name and address on the reverse )(C rS• . Addressee so that we can return the card to you. D. Received by(Printed Name) C. Date of Delivery_j ■ Attach this card to the back of the mailpiece, or on the front if space permits. D. Is delivery address different from item 17 0 Yes 1. M�'�CIe�Addres�sped tiL Ir,}V. ^FApW,•' 0/A /V`"r� r If YES,enter delivery address below: 10No i Wo,& Lo 3. ServicaType litCwUfled Mail ❑ EiQrsss Mail C �-1,\y.`O��•�� IIIlIb�--.,;ti. 1 6���� 0Registered 0 Return Recelpt for Merchandise ❑ Insured Mail 0 C.O.D. 4. Restricted Delivery?(E#ra free) 0 Yes 2. Article Number 1 7012 3050 0001 2959 0833 (transfer from service label) --v-4—- --___ _ _ _ - PS Form 3811, February 2004 Domestic Return Receipt 102595-02-M-1540 I UNITED STATES POSTAL SERVICE First-Class Mail USPS e&Fees Paid Permit No.G-10 • Sender: Please print your name, address, and ZIP+4 in this box • j Salem Conservation Commission J li 120 Washington Street,3rd A 02 Salem,MA 01970 DcpT of p OOMMUMry�Elopt.. RDA Status Sheet Address: J-(o( Date Submitted: Contact Name: l� , U�� Proposed activity: 6a/(- Ca, 4 Phone: Q-,,v c Application Complete r Correct Fee Received o,Legal Ad Sent ❑ Legal Ad Confirmed Online i�-Added to Agenda o Agenda to Applicant b Agent Comments to Commission Hearing Opened: Continued: Site Visit: 64erit Sent to Applicant and DEP 7 Confirmation of Delivery o-*dded to database 9 Notes: HACON COMMWdministrativ6project status sheet\RDA status sheet 2013-10-30.doc F CITY OF SALEM � tee;.: Pk9 CONSERVATION COMMISSION : June 19,2015 Amanda Neville Coneco Engineers& Scientists, Inc. 227 Chelmsford Street, Suite C Chelmsford, MA Re: Determination of Applicability—Bridge Street electric conduit Dear Ms.Neville: Enclosed, please find the Determination of Applicability for the above referenced project. Please note that the Conservation Commission requires the following as a condition of this Determination: 1. Prior to mobilization, applicant shall obtain the Conservation Agent's approval of a detailed materials handling plan. Said plan shall include: (A)A description of the methods for handling material excavated from the site or delivered from offsite (B) A description of erosion and sediment controls and other protective measures to be implemented for any material stockpiled overnight (C) Planned locations of stockpiled materials (D)Evidence of landowner permission for any stockpiling on private property Following the 10-day appeal period and compliance with the above condition, you may proceed with your project. If you have any further questions, please feel free to contact me 978-619-5685. Sincerel 2omDevine Conservation Agent Enclosure CC: DEP Northeast Regional Office Massachusetts Department of Environmental Protection �- Bureau of Resource Protection - Wetlands l WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: When filling out From: forms on the Salem computer, use Conservation Commission only the tab key to move To: Applicant Property Owner(if different from applicant): your cursor- do not use the Massachusetts Electric Compar City of Salem return key. Name Name 170 Medford Street 93 Washington Street Q Mailing Address Mailing Address Maiden – — _ — MA _ 02148_ Salem _ MA 01970 City/Town State Zip Code cityrrown Stale Zip Code 1. Title and Date(or Revised Date if applicable)of Final Plans and Other Documents: Proposed Electrical Conduit Installation Project(Figures 1-5) Undated_ Title Date Title Date Title Date 2. Date Request Filed: 5/28/2015 B. Determination Pursuant to the authority of M.G.L. c. 131, §40, the Conservation Commission considered your Request for Determination of Applicability, with its supporting documentation, and made the following Determination. Project Description (if applicable): Electrical conduit installation per Request for Determination and approved plans Project Location: Bridge Street right of way _ Salem Street Address Cityrrown NA N_A_ Assessors Map/Plat Number Parcel/Lot Number wpaform2.doc•Dcaerminaeon of Applicability•rev.12114 Pelle 1 of 5 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Form 2 — Determination of Applicability Lit Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) The following Determination(s)is/are applicable to the proposed site and/or project relative to the Wetlands Protection Act and regulations: Positive Determination Note: No work within the jurisdiction of the Wetlands Protection Act may proceed until a final Order of Conditions (issued following submittal of a Notice of Intent or Abbreviated Notice of Intent)or Order of Resource Area Delineation(issued following submittal of Simplified Review ANRAD)has been received from the issuing authority(i.e., Conservation Commission or the Department of Environmental Protection). ❑ 1. The area described on the referenced plan(s)is an area subject to protection under the Act. Removing,filling,dredging, or altering of the area requires the filing of a Notice of Intent. ❑ 2a. The boundary delineations of the following resource areas described on the referenced plan(s)are confirmed as accurate. Therefore,the resource area boundaries confirmed in this Determination are binding as to all decisions rendered pursuant to the Wetlands Protection Act and its regulations regarding such boundaries for as long as this Determination is valid. ❑ 2b. The boundaries of resource areas listed below are not confirmed by this Determination, regardless of whether such boundaries are contained on the plans attached to this Determination or to the Request for Determination. ❑ 3. The work described on referenced plan(s)and document(s) is within an area subject to protection under the Act and will remove, fill, dredge, or alter that area. Therefore, said work requires the filing of a Notice of Intent. ❑ 4. The work described on referenced plan(s) and document(s) is within the Buffer Zone and will alter an Area subject to protection under the Act. Therefore, said work requires the filing of a Notice of Intent or ANRAD Simplified Review(if work is limited to the Buffer Zone). ❑ 5. The area and/or work described on referenced plan(s) and document(s) is subject to review and approval by: Name of Municipality Pursuant to the following municipal wetland ordinance or bylaw: Name Ordinance or Bylaw Citation wpaform2,Coc•Determination of ApplicabVity-my.12/14 page 2 of 5 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) ❑ 6. The following area and/or work, if any, is subject to a municipal ordinance or bylaw but not subject to the Massachusetts Wetlands Protection Act: ❑ 7. If a Notice of Intent is filed for the work in the Riverfront Area described on referenced plan(s) and document(s), which includes all or part of the work described in the Request, the applicant must consider the following alternatives. (Refer to the wetland regulations at 10.58(4)c. for more information about the scope of alternatives requirements): ❑ Alternatives limited to the lot on which the project is located. ❑ Alternatives limited to the lot on which the project is located, the subdivided lots, and any adjacent lots formerly or presently owned by the same owner. ❑ Alternatives limited to the original parcel on which the project is located, the subdivided parcels, any adjacent parcels, and any other land which can reasonably be obtained within the municipality. ❑ Alternatives extend to any sites which can reasonably be obtained within the appropriate region of the state. Negative Determination Note: No further action under the Wetlands Protection Act is required by the applicant. However, if the Department is requested to issue a Superseding Determination of Applicability, work may not proceed on this project unless the Department fails to act on such request within 35 days of the date the request is post-marked for certified mail or hand delivered to the Department. Work may then proceed at the owner's risk only upon notice to the Department and to the Conservation Commission. Requirements for requests for Superseding Determinations are listed at the end of this document. ❑ 1. The area described in the Request is not an area subject to protection under the Act or the Buffer Zone. ® 2. The work described in the Request is within an area subject to protection under the Act, but will not remove, fill, dredge, or alter that area. Therefore, said work does not require the filing of a Notice of Intent. ❑ 3. The work described in the Request is within the Buffer Zone, as defined in the regulations, but will not alter an Area subject to protection under the Act. Therefore, said work does not require the filing of a Notice of Intent, subject to the following conditions (if any). ❑ 4. The work described in the Request is not within an Area subject to protection under the Act (including the Buffer Zone). Therefore, said work does not require the filing of a Notice of Intent, unless and until said work alters an Area subject to protection under the Act. wpalorm2 dw-081erminatim of Appltc slily-rev.12114 Pe9e3of5 Massachusetts Department of Environmental Protection L-17Bureau of Resource Protection -Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) ❑ 5. The area described in the Request is subject to protection under the Act. Since the work described therein meets the requirements for the following exemption, as specified in the Act and the regulations, no Notice of Intent is required: Exempt Activity(site applicable statuatory/regulatory provisions) . The area and/or work described in the Request is not subject to review and approval by: me of Municipality Pursuant to a municipal wetlands ordinance or bylaw. Name Ordinance or Bylaw Citation C. Authorization This Determination is issued to the applicant and delivered as follows: ❑ by hand delivery on by certified mail, return receipt requested on Date D This Determination is valid for three years from the date of issuance (except Determinations for Vegetation Management Plans which are valid for the duration of the Plan). This Determination does not relieve the applicant from complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. ' This Determination must be signed by a majority of the Conservation Coission. A copy must be sent to the appropriate DEP Regional Office(see hftp:i/www.mas vl ea! a ci s/m sd / contacts/) and the property owner(if different from the applicant). Signatures: a .n. C l� Date wpaxormldoc•Delerminagon of ApplicabMlity•rev.12114 Page 4 of 5 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands i` WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Appeals The applicant, owner, any person aggrieved by this Determination, any owner of land abutting the land upon which the proposed work is to be done, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate Department of Environmental Protection Regional Office (see http://www.mass.qov/eea/agencies/massdep/about(contacts/)to issue a Superseding Determination of Applicability. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and Fee Transmittal Form (see Request for Departmental Action Fee Transmittal Form)as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Determination. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant if he/she is not the appellant. The request shall state clearly and concisely the objections to the Determination which is being appealed. To the extent that the Determination is based on a municipal ordinance or bylaw and not on the Massachusetts Wetlands Protection Act or regulations, the Department of Environmental Protection has no appellate jurisdiction. w afwm2.doc•Determination of Appliwdlily•rev.12114 Page 5 of 5 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number: I` Request for Departmental Action Fee _ Transmittal Form Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. Request Information 1. Location of Project a.Street Address b.Cityrrown,Zip c.Check number d. Fee amount Important: When filling 2 Person or party making request(if appropriate, name the citizen group's representative): out forms on _ the computer, Name use only the _ tab key to Mailing Address move your cursor-d0 City/Town ---- State Zip Code not use the return key. Phone Number Fax Number(if applicable) m 3. Applicant(as shown on Determination of Applicability(Form 2), Order of Resource Area Delineation (Form 46), Order of Conditions(Form 5), Restoration Order of Conditions (Form 5A), or Notice of Non-Significance(Form 6)): ria Name Mailing Address CityrFown State Zip Code Phone Number Fax Number(if applicable) 4. DEP File Number: B. Instructions 1. When the Departmental action request is for(check one): ❑ Superseding Order of Conditions— Fee: $120.00(single family house projects)or$245(all other projects) ❑ Superseding Determination of Applicability—Fee: $120 ❑ Superseding Order of Resource Area Delineation — Fee: $120 Send this form and check or money order, payable to the Commonwealth of Massachusetts, to: Department of Environmental Protection Box 4062 Boston, MA 02211 1 x aform2.doc•Request tw Departmental Action Fee Tr n millal Form•rev.1214 Page 1 of 2 f {t{ i Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: 1, Request for Departmental Action Fee ` Transmittal Form Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Instructions (cont.) 2. On a separate sheet attached to this form, state clearly and concisely the objections to the Determination or Order which is being appealed. To the extent that the Determination or Order is based on a municipal bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. 3. Send a copy of this form and a copy of the check or money order with the Request for a Superseding Determination or Order by certified mail or hand delivery to the appropriate DEP Regional Office(see http://www.mass.00v/eea/agencies/massdeo/abouycontacts/). 4. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. wPofom2.d"•Request for DeVetlmentelAWoh Fee Trarumltal Form rev.7211 4 Page 2 of 2 �CONDITg,t4 CITY OF SALEM CONSERVATION COMMISSION ��MmE Salem Conservation Commission 978-619-5685 Will hold a public hearing for a Request for Determination of Applicability for Massachusetts Electric Company (National Grid), 170 Medford St, Malden MA. Purpose of hearing is to discuss proposed installation of an electric conduit under Bridge Street to service the planned development at 401 Bridge St and 44 Boston St (Gateway Center) within an area subject to protection under the Wetlands Protection Act MGL c.131§40 and Salem Wetlands Protection & Conservation Ordinance. Hearing will be held 6/11/15 at 6:30pm in the City Hall Annex, 3`d floor conference room, 120 Washington St. Please print legal ad on: June 4, 2015 Please invoice: Amanda Neville Coneco Engineers & Scientists 227 Chelmsford Street, Suite C Chelmsford, MA 02324 978-656-8684 Ext. 101 City of Salem Department of Platnnin Check/Cash Recei and Community Deve/o P Trackin Pment Please com /eC 9 Form P form and make two copies. Date Received Amount Received Form of Payment Check Client Information ��^^ ❑ Money Order CASH PAYMENTS: client initials Sign Permit APPlication Fee nervation Payment received for what Commission Fee service? ❑ Planning Board Fee/ZBA ❑ SRA/DRS Fee ❑ Old Town Hall Rental Fee Name of staff0 Other: Person receiving PaYment Additional Notes - 11-- II II_I1 11 „ 1i=11 IIT_I1 SII tr_ - f7 7I-_ II t 7-11 =il _II_ =_I1=. -II II�I II 1t- I`II II_ ILII II-II 'I -il_ _II_ _II= .=11_=_il= _ '11==11==1f- _,1--11=^..11==1l=_ II ! 11-- 1'__II fi=_II= - �- =11=11 033 �nlglne_'e=rs ce SICIPtt �CivilEgmeer_n _ITIII- -IISurGeytirgl- = I I-_ I==i I I 11=11 1= 1 colog`tca4 Servtces.t i 1 1=C$ECKDgTE- Veet-gndgewaterl MA 0_2324 I = !_- I I I==I I=_-,nvtronmental _ II- II E _ il. 1_==11_ =11_ _11 11==II= =11_ 11 11- _II- =11_ _11_ 11==11=-i, 1! 'i' II _' PA;Y Ii- 11 -I� u -il- =i1=, =i1 _I! "= =1c_tROCKLANDTE_t=u=s'T_==!I ==11. it _ 1>,1�- -!!- II- =!� 11 11- II- II_5g.yq�Litall_��it =!I_ 1==11==11==i1==1i I__t1_ _Ii_==I1_==11==11_II X111==11_ _11_ _11= -II- -" ==11 II_il_ _ _ -11= =11==11. ==11==II==11-_ _:' -Ij- - -11==,1= -!;==n= =u== OUNTl= =17- '!1=-11==i1: ' -11 11=11 f-1111_1!n I'=i_!! li�l���11==11==11=- �Il- -ti- -11==11= _ _=11==t1=�,1�•-}�)I,of- ��� !1- - -11==!1==ii�'�11 11- - '!t==11= _1l==1I_ _II_ _ 1l- -II_ _ II '!1 s ,ic kre ill III ' It 11 i1= =11 11.11 1 (I " =fl i� Illi=i! -II- _I I!= =11 II.=1 11- -1 ull it _!! 3• 0-1.130414 �78� rn 2 9 5 0 00:6 21 _ AOTRORIZgD SIGNATU {1 �'.II��11=1i= " _ _11=_11_ _ 11_ ==1j==11= =! REQUEST FOR DETERMINATION OF APPLICABILITY Filed Under: THE CITY OF SALEM WETLANDS PROTECTION ORDINANCE (CHAPTER$0), MASSACHUSETTS WETLANDS PROTECTION ACT (MGL CHAPTER 131 SECTION 40,WPA REGULATIONS 310 CMR 10.00) For: PROPOSED ELECTRICAL CONDUIT INSTALLATION PROJECT 401 BRIDGE STREET SALEM,MASSACHUSETTS Property Of.• City of Salem, Massachusetts Submitted To: City of Salem Conservation Commission 93 Washington Street, Salem, Massachusetts 01970 Submitted By: Massachusetts Electric Company (MECO) 170 Medford Street, Malden, Massachusetts 02148 Prepared by: Coneco Engineers & Scientists, Incorporated 227 Chelmsford Street, Suite C, Chelmsford, Massachusetts 01824 (978) 656-8684 May 28, 2015 Coneco Project No. 8217P.0 Bridge Street RDA May 28 2015 Salem,Massachusetts Page i Table of Contents 1.0 Project Narrative..........................................................................................................................1 1.1 Introduction................................................................................................................................. 1 1.2 Existing Site Conditions..............................................................................................................l 1.3 Wetland Resource Areas.............................................................................................................2 2.0 Proposed Work Description.........................................................................................................3 2.1 Introduction.................................................................................................................................3 2.2 Erosion Control...........................................................................................................................3 2.3 General Construction Details......................................................................................................3 3.0 Regulatory Compliance................................................................................................................3 4.0 Summary.......................................................................................................................................4 Appendices Appendix I —WPA Form I Request for Determination of Applicability Appendix 2—Photographic Documentation Figures Figure 1 —Site Locus(USGS)Map Figure 2—Aerial Map Figure 3 —NHESP Map Figure 4—FEMA Map Figure 5 —Resource Area and BMP Map Bridge Street RDA May 28 2015 Salem,Massachusetts Page 1 1.0 PROJECT NARRATIVE 1.1 Introduction This Request for Determination of Applicability(RDA)is being submitted by Coneco Engineers& Scientists, Incorporated(Coneco)on behalf of the Massachusetts Electric Company d/b/a National Grid(MECO) for a proposed underground electrical conduit along Bridge Street in Salem, Massachusetts (refer to Figure 1 - Site Locus Map and Figure 2— Aerial Image). This project is pursuant to the Massachusetts Wetlands Protection Act(WPA; MGL Ch. 131 § 40), and Massachusetts Wetlands Protection Regulations(MWPR; 310 CMR 10.00 et seq.) and the City of Salem Wetlands Protection Ordinance(Chapter 50) and Regulations(Regulations). Refer to WPA Form 1 which is included as Appendix 1. The purpose of the 375± linear foot(If)electrical conduit installation (the"Project Route) is to service a new building being constructed at 401 Bridge Street. Portions of the proposed work will be located within the 100-Foot Buffer Zone to Bank(approximately 180 If)and the 200-foot Riverfront Area(approximately 350 If). The entire Project Route is located within Bordering Land Subject to Flooding (BLSF). In reviewing the proposal with the City of Salem Conservation Agent, it was concluded that this work should be filed as an RDA pursuant to the WPA and the Bylaw. 1.2 Existing Site Conditions The Project Route consists of a 375± if corridor between the roadway right-of-way(ROW)of Bridge Street and the existing property at 401 Bridge Street. Surrounding areas consist of commercial and residential development. A review of the current Mass Geographic Information System(GIS)data layer for the Natural Heritage and Endangered Species Program's(NHESP) Massachusetts Natural Heritage Atlas (I P Edition, October 2008)indicates that the Project Route is not located within Estimated Habitat of Rare Wildlife or Priority Habitat of Rare Species. No certified vernal pools under the jurisdiction of the Wetlands Protection Act Regulations or the Massachusetts Endangered Species Act(321 CMR 10.00 et seq.)occur along the Project Route(See Figure 3 —NHESP Map). According to the November 2014 Federal Emergency Management Agency(FEMA)Flood Insurance Rate Map for Middlesex County, the Project Route is located within a FEMA Special Flood Hazard Area(Zone AE). Zone AE is an area ...subject to inundation by the 1- percent-annual-chance flood event generally determined by approximate methodologies(See Figure 4—FEMA Map). The Project Route is not located within an Area of Critical Environmental Concern(ACEC) or within an Outstanding Resource Water(ORW). Wetland resource areas are described in the following section. Photographs representative of existing conditions in the vicinity of the proposed Project Route are included in Appendix 2. Bridge Street RDA May 28 2015 Salem,Massachusetts Page 2 1.3 Wetland Resource Areas An Environmental Scientist conducted a wetland reconnaissance along the Project Route on April 24, 2015 to identify wetlands,watercourses and other resource areas subject to local, state, and federal jurisdiction. Areas within 200 feet of the Project Route were reviewed. A formal delineation was not completed. The reconnaissance was conducted in accordance with the WPA and Regulations; the Bylaw and Bylaw Regulations; and the Clean Water Act. Methods follow the technical guidance outlined in Delineating Bordering Vegetated Wetlands Under the Massachusetts Wetlands Protection Act:A Handbook(1995); the Corps of Engineers Wetlands Delineation Manual(1987); the Regional Supplement to the Corps of Engineers Wetland Delineation Manual:Northcentral and Northeast Region (Version 2.0, 2012), and others, as applicable. Three jurisdictional resource areas were identified in the vicinity of the Project Route: Bank, BLSF, and Riverfront Area. The resource areas are defined as follows: Bank—310 CMR 10.54 310 CMR 10.54 defines a Bank as the portion of the land surface which normally abuts and confines a water body. It occurs between a water body and a vegetated bordering wetland and adjacent flood plain, or, in the absence of these, it occurs between a water body and an upland. The upper boundary of a Bank is the first observable break in the slope or the mean annual flood level, whichever is lower. The lower boundary of a Bank is the mean annual low flow level. Bordering Land Subject to Flooding—310 CMR 10.57 310 CMR 10.57 defines a Bordering Land Subject to Flooding as an area which floods from a rise in a bordering waterway or water body. Such areas are likely to be significant to flood control and storm damage prevention and provide temporary storage areas for flood water which has overtopped the bank of the main channel of a creek, river, or stream or the basin ofa pond or lake. Riverfront Area—310 CMR 10.58 The Riverfront Area is the area of land between a river's mean annual high-water line measured horizontally outward from the river and a parallel line located 200 feet away. The Mean Annual High Water line of a river is the line that is apparent from visible markings or changes in the character of soils or vegetation due to the prolonged presence of water and that distinguishes between predominantly aquatic and predominantly terrestrial land. Field indicators of bankfull conditions shall be used to determine the mean annual high-water line. Bankfull field indicators include but are not limited to: changes in slope, changes in vegetation, stain lines, top of pointbars, changes in bank materials, or bank undercuts. The approximate locations of resource areas and buffer zones are shown in Figure 5 — Resource Area and BMP Map. These resource areas and buffer zones, while based on GIS data, appear to be generally representative of field conditions. Bridge Street RDA May 28 2015 Salem,Massachusetts Page 3 2.O PROPOSED WORK DESCRIPTION 2.1 Introduction Approximately 375 if of six new 4-inch underground electrical conduits will be installed within the Project Route. The majority of the work area lies within the paved extents of Bridge Street. However, a portion will extend onto the current vacant property at 401 Bridge Street. All work is temporary in nature, and disturbed areas will be returned to their pre- existing condition(to the extent practicable) following completion of work. The Project Route will run along the south side of Bridge Street,adjacent to the 401 Bridge Street property. The Project Route will be located approximately 70 feet south of the North River which runs adjacent to the northern portion of Bridge Street. This section of the North River is bound on the north and south sides by concrete anchored banks which run adjacent to Bridge Street for approximately 700 If. As such, the Project Route will be located within the 100-foot buffer zone to Bank and the 200-foot Riverfront Area(Figure 5 -Resource Area and Best Management Practices(BMP) Map). Construction associated with the project will occur within previously developed/disturbed areas, and will be restored to its previous conditions(to the extent practicable)upon completion of work. BMP placement is depicted in the Figure 5 —Resource Area and BMP Map. 2.2 Erosion Control To guard against potential impacts from the proposed electrical conduit installation,erosion and sedimentation control BMPs consisting of silt sacks will be installed for inlet protection (e.g., catch basins)as necessary. 2.3 General Construction Details The following is a general construction sequence for the proposed electrical conduit installation along the Project Route. The sequence of construction may vary slightly as necessary to assure completion of the overall project. General Construction Sequence: 1. Erosion controls will be installed at the site, as necessary. 2. Pavement will be saw cut to the dimensions of the excavation. This will be approximately three feet in width. 3. Soil will be excavated to a depth of four to five feet and either sidecast (deposited temporarily adjacent to the excavation)onsite or into a dump truck. 4. A gravel bed will be laid within the trench to cradle the conduits. 5. Conduits will be joined and placed in the trench. 6. Concrete will be poured over the top of the newly installed conduits for protection. 7. The trench will be backfilled either with the excavated soil or with clean fill as necessary. No excavated soil will be left on-Site at the conclusion of each work day. 8. The road will be repaved, following existing contours. Disturbed, unpaved areas will be returned to their prior condition to the extent practicable. BridgeStreet M 2 2 1 St ee RDA May 8 0 5 Salem,Massachusetts Page 4 9. Project area cleanup and erosion control removal will include proper disposal of any surplus soil or other materials. 3.0 REGULATORY COMPLIANCE As a result of the proposed work, there will be impacts within the 100-Foot Buffer Zone, 200-Foot Riverfront Area, and BLSF. These impacts are temporary, and the proposed work area will be returned to pre-existing conditions (to the extent practicable)upon completion of the installation. The project is not anticipated to result in impacts to adjacent Resource Areas. Proposed work qualifies as a Limited Project under 310 CMR 10.53(3)(d) of the WPA regulations: The construction, reconstruction, operation and maintenance of underground and overhead utilities, such as...natural gas lines, may he permitted... Additionally,the installation of underground utilities (gas,electric,water)within existing paved or unpaved roadways and driveways is exempt from regulation under MGL 131, § 40, provided said work is conducted soley within the buffer zone and within the roadway or driveway and that all trenches are closed at the completion of each work day(310 CMR 10.02(2)(b)(2)(i). 4.0 SUMMARY A 375± linear foot electrical conduit installation is being proposed along Bridge Street. The purpose of the underground electrical conduit installation is to service a new building being constructed at 401 Bridge Street. A portion of the project lies within the 100-Foot Buffer Zone to Bank,the 200-foot Riverfront Area and BLSF, and temporary impacts are anticipated within these areas. Proposed work qualifies as a Limited Project under 310 CMR 10.53(3)(d)of the Wetlands Protection Act. Given this designation,the fact that work is temporary in nature and limited to previously developed areas, and the proposed employment of erosion and sediment control BMP's to protect adjacent resource areas during construction, Coneco(on behalf of MECO)respectfully requests that the City of Salem Conservation Commission issue a Negative Determination(boxes c and d), allowing the electrical conduit installation to proceed as proposed. fA4 111:1 11 �e �� � dJ'� + tee' •. s 1 � `� r► �i -�j�► I �5% by Kxl�1 �Wnw PNR ,�'„� 44, tow gi ROM ��i�� `r�'�;�A•r�►`��.���� %451 I L�LOCUSoi �F��;�!�+► r s� VZO AJ 14 �l_ :8f1/8, � � ( :'may .- •. i'• may, '� ../i �; � � /Sim���r1ltq��\!r*t►�1►��s IIr �� • h� •tsSITE LOCUS MAP Proposed Electrical Conduit4�t yO Installation Project 401 Bridge Street 1Salem, Massachusetts \ /y T' i 774 1� e ♦ Y � 1 ` !,PREPARED FOR AERIAL IMAGE MASSACHUSETTS ELECTRIC PROPOSED ELECTRICAL CONDUIT �lY� r l•44•� .. • �' •� `�- /+a- ": "`��! .ice *�(_ '-. / X71 •y• O � "� ' +� � ��• •\� i� � l�•f P h, '• � awl ..��4 �. � - ' •�• -• - • • � `e'~,�c�nj�6QG'YGi)C�flN�ycXy N}s ���'uut.Tr?�°Jo`'�- o �p�^�Pc�t COMPANY • PROJECT PREPARED Y 401 BRIDGE STREET •� LE • N • C • "• • Engineers & Scientists • 51 644 t /4 ♦'r � 1� • . t lop Potential Vernal Pools Certified Vernal PoolsI Proposed Electrical Conduit r A 4,NHESP Priority Habitats of Rare Speciesy fes °", 3! 1NHESP Estimated Habitats of Rare Wildlife ��� --i 34 it NHESP MAP PROPOSED •ACONDUIT • INSTALLATION PROJECT 1 401 • 1 II J * a J � y Proposed ElectricalConduit FEMA National Flood HazardLayerFlood Zone Designations 0. Oro- -RPW°�l'u3'LY1a @mgp 1'zif4Ca- n 7 c-• 71 , • • ••• • 'CS9YfD�CoK�1_ 41 � �eLA?1koopC7« Q0�3C_ G�"" n��9 �"f FEMA A■ PROPOSED • • ■ 1INSTALLATION PROJECT 1 • 401 • Note:All catchbasins within the vicinity of the work site ;. shall be fitted with Silt Sacks. .... i10 C. r +*L � Y, •w 'i a P � • 1 t , P H� 4 A yT Proposed Electrical Conduit Bordering Land Subject to Flooding Riverfront Area 100-Foot Buffer Zone North River ero 1 w t e o PREPARED FOR RESOURCE AREA AND BMP MAP MASSACHUSETTS ELECTRIC PROPOSED ELECTRICAL CONDUIT N COMPANY INSTALLATION PROJECT A PREPARED BY 401 BRIDGE STREET {{ SALEM, MASSACHUSETTS IC O N E C O SCALE 1PROJECT NO.1 FIGURE Engineers & Scientists 1 " = 15 0' 821 7P.0 1 5 TRIS DOCUNP.X'r IS IN FEN DED FOR GENERAL PLANNING&IXPORANYIOX PURPOSES ONLY.ALL MEASUREMENTS d LOCAPION 5 ARE APPROXMALE. APPENDIX 1 WPA FoRm 1 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Salem WPA Form 1- Request for Determination of Applicability City/Town Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: When filling out 1. Applicant: forms on the _Massachusetts Electric Company beverly.auxford-paiva(a)nationalgrid,wm computer, use only the tab key Name E-Mail Address to move your 170 Medford Street cursor-do not Mailing Address use the return Malden MA 02148 key. City/Town State Zip Code 508-922-6309 °0 Phone Number fax Number(if applicable) 2. Representative(if any): �e Coneco Engineers&Scientists, Incorporated Firm John Aevazelis jaevazelis(a)-coneco.com Contact Name E-Mail Address 227 Chelmsford Street, Suite C Mailing Address Chelmsford MA 01824 City/Town State Zip Code 508-962-7423 508-697-5996 Phone Number Fax Number(if applicable) B. Determinations 1. I request the Salem make the following determination(s). Check any that apply: Conservation Commission ❑ a.whether the area depicted on plan(s)and/or map(s) referenced below is an area subject to jurisdiction of the Wetlands Protection Act. ❑ b.whether the boundaries of resource area(s)depicted on plan(s)and/or map(s)referenced below are accurately delineated. c.whether h ® the work depicted on plan(s)referenced below is subject to the Wetlands Protection Act. ® d.whether the area and/or work depicted on plan(s) referenced below is subject to the jurisdiction of any municipal wetlands ordinance or bylaw of: Salem Name of Municipality ❑ e.whether the following scope of alternatives is adequate for work in the Riverfront Area as depicted on referenced plan(s). nafoml.doc Page 1 of 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Salem City/Town WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. Project Description 1. a. Project Location (use maps and plans to identify the location of the area subject to this request): Bridge Street Salem Street Address CityTown Roadway Right-of-Way(ROW) Assessors Map/Plat Number Parcel/Lot Number b. Area Description(use additional paper, if necessary): The electrical conduit installation project is located along a portion of Bridge Street.Areas immediately surrounding the project corridor consist of commercial and residential development. c. Plan and/or Map Reference(s): Figures 1 through 5 as noted in the Table of Contents May 19, 2015 Title Date Title Date Title Date 2. a. Work Description (use additional paper and/or provide plan(s)of work, if necessary): The project proposes installation of approximately three hundred seventy-five(375)linear feet of electrical conduit along Bridge Street. See RDA narrative for additional details. v afami.doc Page 2 d4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Salem WPA Form 1- Request for Determination of Applicability City/Town Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. Project Description (cont.) b. Identify provisions of the Wetlands Protection Act or regulations which may exempt the applicant from having to file a Notice of Intent for all or part of the described work(use additional paper, if necessary). Limited Project provisions, 310 CMR 10.53(3)(d): The construction, reconstruction, operation and maintenance of underground and overhead public utilities, such as...underground electrical lines, may be permitted... 3. a. If this application is a Request for Determination of Scope of Alternatives for work in the Riverfront Area, indicate the one classification below that best describes the project. ❑ Single family house on a lot recorded on or before 8/1/96 ❑ Single family house on a lot recorded after 8/1/96 ❑ Expansion of an existing structure on a lot recorded after 8/1/96 ❑ Project, other than a single family house or public project,where the applicant owned the lot before 8/7/96 ❑ New agriculture or aquaculture project ❑ Public project where funds were appropriated prior to 8/7/96 ❑ Project on a lot shown on an approved, definitive subdivision plan where there is a recorded deed restriction limiting total alteration of the Riverfront Area for the entire subdivision ❑ Residential subdivision; institutional, industrial, or commercial project ❑ Municipal project ❑ District, county, state, or federal government project ❑ Project required to evaluate off-site alternatives in more than one municipality in an Environmental Impact Report under MEPA or in an alternatives analysis pursuant to an application for a 404 permit from the U.S. Army Corps of Engineers or 401 Water Quality Certification from the Department of Environmental Protection. b. Provide evidence(e.g., record of date subdivision lot was recorded)supporting the classification above (use additional paper and/or attach appropriate documents, if necessary.) N/A w afo.l.d. Page 3 of 4 Massachusetts Department of Environmental Protection \�^ Bureau of Resource Protection - Wetlands Salem WPA Form 1- Request for Determination of Applicability City/Town Massachusetts Wetlands Protection Act M.G.L. c. 131 40 I ' § D. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Request for Determination of Applicability and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I further certify that the property owner, if different from the applicant, and the appropriate DEP Regional Office were sent a complete copy of this Request(including all appropriate documentation) simultaneously with the submittal of this Request to the Conservation Commission. Failure by the applicant to send copies in a timely manner may result in dismissal of the Request for Determination of Applicability. Name and address of the property owner: City of Salem Name 120 Washington Street Mailing Address Salem City/Town MA 01970 State Zip Code Signatures: I also understand that notification of this Request will be placed in a local newspaper at my expense in accordance with Section 10.05(3)(b)(1)of the Wetlands Protection Act regulations. Signature of Applicant Date Signature of Representative(if any) Date natovoi.doc Page 4 of 4 APPENDIX 2 PHOTOGRAPHIC DOCUMENTATION 7 %•. .�I Imo. - `., 16 Photo 1 Photo 2 View of the approximate Project Route within the View of the approximate Project Route within roadway ROW to Bridge Street,looking southwest. the roadway ROW to Bridge Street,looking south. i il r �. Photo 3 View of the 401 Bridge Street property,looking southeast from Bridge Street. PROPOSED ELECTRICAL CONDUIT i C_o_N_E INSTALLATION PROJECT Engineers & Scientists 401 BRIDGE STREET SALEM,MASSACHUSETTS PHOTOGRAPHER DATE CHECKED FILE NO. AEN 4/24/15 JDA Y:\\8217P.0\PHOTOS\8217P.0-PHOTOS.DOC BEST MANAGEMENT PRACTICES GUIDANCE DOCUMENTS Doc.No. EG-303NE nationalgrid ENVIRONMENTAL GUIDANCE Page 9 of 49 Rev.No.3 Date 8/29/14 SUBJECT Reference Access,Maintenance and Construction EP No.3—Natural Resource Best Management Practices Protection(Chapter 6) Any deviation from the approved Best Management Practices shown in the EFI and/or SWPPP plans shall be communicated immediately to the National Grid Environmental Scientist as it may require additional permitting or could result in a permit violation. 4.1 Sedimentation and Erosion Controls Appropriate sedimentation and erosion control devices shall be installed at work sites, in accordance with permit conditions and/or regulatory approvals, and as needed to prevent adverse impacts to water resources and adjacent properties. The overall purpose of such controls is to prevent and control the movement of disturbed soil and sediment from work sites to adjacent, undisturbed areas, and particularly to water resources, public roads and adjacent properties. All proprietary controls shall be installed per manufacturer's recommendations and specifications. Appropriate sedimentation and erosion control devices include but are not limited to: silt fencing, straw bales, wood chip bags, straw wattles, compost socks, erosion control blankets, mulch, slope interruption practices, flocculent powder/blocks and storm drain/catch basin inlet protection. Such controls shall be installed between the work area and environmentally sensitive areas such as wetlands, streams, drainage courses, roads and adjacent property when work activities shall disturb soils and result in a potential for causing sedimentation and erosion. Staked straw bales often serve as the demarcation of the limits of work and/or sensitive areas to be avoided. Work shall never be conducted outside the limit of erosion controls without prior approval from the National Grid Environmental Scientist. Project plans depict proposed erosion controls, however field conditions may warrant additional practices be implemented (e.g., wet conditions, frozen conditions, poorly drained soils, steep slopes, materials used for work pads, transition areas to swamp mats, number of trips across work areas, etc.). Any deviation from the approved erosion controls shown in the EFI and/or SWPPP plans needs to be communicated immediately to the National Grid Environmental Scientist as it may require additional permitting or result in a permit violation. Appendix 7 provides typical sketches of common sedimentation and erosion controls. If a SWPPP is required for the project, maintenance and inspection of erosion controls shall follow the SWPPP requirements. Sedimentation and erosion controls shall be properly maintained and inspected on a periodic basis, until work sites are properly stabilized and restored. Inspections shall be documented using the Inspection Form "Storm Water, Wetlands & Priority Habitat Environmental Compliance Site Inspection/Monitoring Report" (Appendix 6). Approved for use per EP 10,Document Control PRINTED COPIES ARE NOT DOCUMENT CONTROLLED. FOR LATEST AUTHORIZED VERSION PLEASE REFER TO THE NATIONAL GRID ENVIRONMENTAL INFONET SITE. Doc.No. EG-303NE nationalgrid ENVIRONMENTAL GUIDANCE Page 10 of 49 Rev.No.3 Date 8/29/14 SUBJECT Reference Access,Maintenance and Construction EP No.3—Natural Resource Best Management Practices Protection (Chapter 6) The sequence and timing of the installation of sedimentation and erosion control measures is critical to their success. Sedimentation and erosion controls shall be installed prior to commencing construction activities that may result in any soil disturbance or cause otherwise polluted site runoff. Inspection of these devices may be required by the National Grid Environmental Scientist or by regulators prior to the start of work. The installation of water bars and other erosion control measures shall be installed shortly thereafter. 4.2 Concrete Wash Outs Concrete wash outs shall be used for management of concrete waste. Concrete and concrete washout water shall not be deposited or discharged directly on the ground, in wetlands or waterbodies, or in catch basins or other drainage structures. Where possible, concrete washouts shall be located away from wetlands or other sensitive areas. Consult the National Grid Environmental Scientist on proposed concrete wash out locations prior to their use. Following the completion of concrete pouring operations, the wash outs shall be disposed of off-site with other construction debris. Refer to BMPs in Appendix 7. 4.3 Construction Activities in Standing Water The use of silt curtains or turbidity barriers may be required when working in or adjacent to standing water such as ponds, reservoirs, low flowing rivers/streams, or coastal areas. Silt curtains and turbidity barriers prevent sediment from migrating beyond the immediate work area into the resource areas. Coffer dams constructed using sheet piling or large sandbags (Trade names such as "the Big Bag"or"DamItDams") may be used to temporarily isolate and contain a work area in standing water. When working in standing water, an oil absorbent boom, in addition to a silt curtain or other temporary barrier, shall be placed around the work area for spill prevention. Work in drinking water reservoirs or other waters may require extensive regulatory agency review, even for maintenance work, which could result in additional time required for permitting,review and material procurement prior to the start of work. 4.4 Dewatering Where excavations require the need for dewatering of groundwater or accumulated stormwater, the water shall be treated before discharge. Appropriate controls include dewatering basins, flocculent blocks, filter bags, filter socks, or weir tanks. Schematics of these BMPs are included as in Appendix 7. Water trucks or fractionation tanks may be utilized if watertight containers are desired for controlled on-site discharge or for off-site discharge into an approved dewatering area when site restrictions make it difficult to utilize other dewatering methods on- Approved for use per EP 10,Document Control PRINTED COPIES ARE NOT DOCUMENT CONTROLLED. FOR LATEST AUTHORIZED VERSION PLEASE REFER TO THE NATIONAL GRID ENVIRONMENTAL INFONET SITE. Doc.No. EG-303NE nationalgrid ENVIRONMENTAL GUIDANCE Page:7-44 Rev.No.3 Date 0829/14 SUBJECT' Reference Access,Maintenance and Construction EP No.3-Natural Resource Best Management Practices Protection(Chapter 6) BMP DETAIL SCALE: NONE BURLAP LINING BETWEEN PAVEMENT AND HAYBALES *G�RATE(' CATE HAYBALES SHOWN ATCBASIN TIE HAYBALES TOP & BOTTOM WITH 14 GAUGE WIRE--\,.. FINISH GRADE NOTES: 1. SURROUND STREET DRAINAGE STRUCTURE INLET WITH HAY BALES PRIOR TO CONSTRUCTION AND MAINTAIN UNTIL CONSTRUCTION IS COMPLETED. ACCUMULATED SEDIMENTS SHALL BE REMOVED. 2. HAYBALES PLACED ON PAVEMENT SHALL HAVE BURLAP PLACED BETWEEN PAVEMENT AND HAYBALE BMP PICTURE a 0 v 0 a` `I BMP # 40 m APPROVED COOESMARECE RNOsi DOCUMENT NTRCCON CONTROLLED.SERVICES REtATEST AUTHORIZED CATCH BASIN INLET PROTECTION ii VERSION PLEASE REFER TO THE NATIONAL GRID ENVIRONMENTAL INFONET SITE. Doc.No. EG-303NE nationalgrid ENVIRONMENTAL GUIDANCE Page:745 Rev.No.3 Date 0829/14 SUBJECT Reference Access,Maintenance and Construction EP No.3-Natural Resource Best Management Practices Protection(Chapter 6) BMP DETAIL SCALE: NONE OPTIONAL INSERT 1" REBAR FOR BAG OVERFLOW REMOVAL FROM INLET (REBAR NOT INCLUDED) SILT SACK EXPANSION RESTRAINT DEPTH=D DUMP LOOPS (REBAR j NOT INCLUDED) -� WIDTH=W 7 I LENGTH=L SIZE: L" X W X D" NOTES: PROFILE VIEW 1. PRODUCT TO BE SILT SACK OR APPROVED EQUAL BY NATIONAL GRID ENVIRONMENTAL SCIENTIST. 2. THE USE OF A SILT SACK OPTIONAL OVERFLOW AND OVERALL DIMENSIONS ARE TO BE COORDINATED WITH A NATIONAL GRID ENVIRONMENTAL SCIENTIST. BMP PICTURE x.M t t P 3 a Y U Q F • DETAIL PROVIDED BY ACF ENVIRONMENTAL BMP # 41 N APRVICES NIESARENOT DOCUMENT ROD DCOPWCE PEEV�CONTROLLED.LLLEDE OR LATEST AUTHORIZED SILT SACK VERSION PLEASE REFER TO THE NATIONAL GRID ENVIRONMENTAL INFONET SITE. Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands SA`EP1& WPA Form 1- Request for Determination of Applicabilityclwrown Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Request for Determination of Applicability and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I further certify that the property owner, if different from the applicant, and the appropriate DEP Regional Office were sent a complete copy of this Request(including all appropriate documentation) simultaneously with the submittal of this Request to the Conservation Commission. Failure by the applicant to send copies in a timely manner may result in dismissal of the Request for Determination of Applicability. Name a/ ijnd address of the property owner: S rt 'V Name /do W 0.S6g A,n 711- Mailing Address C) _ '- 6a tLro City/rown - MA (7f970 state Zip Code Signatures: I also understand that notification of this Request will be placed in a local newspaper at my expense in accordance with Section 10.05(3)(b)(1)ol;the Wetlands Protection Act regulations. Signature of App "l�cant Date Oc3 7b 5-- Signature of Representative(if any) Date wpaform7.doc Page 4 W 4