Loading...
64-400 - BLANEY STREET,SALEM HARBOR - CONSERVATION COMMISSION DEP 64 410 - - Plans 20 PVC WATERLINE AND 0�0 � ';� � " �y��-� � ' HANDRAIL W11H 3 - 2 EMPTY ELECTRIC \ TIMBER BALUSTERS O 3x8 WOOD DECKING f ". ~' ' ' �' 'c'�" ,� . O 6x10 STRINGER FASTENED w/6 ' SPIKES � ry EXISTING CONDUITS PLACED IN 2 PER INTX. 10x10 STRINGER \ / � / GALVFASTENED WITH 3/4 � ��\\ WATER EXISTING SWALE AND ��v ` OLTS , SPIGOT COVERED WITH 18" CRUSHED 0 \' / EL. ±14.5 : `^ •, `' ' �.w ;4' �` pin AND BEDDING STONE n 0 V 'a�; � �:. ®° � I, `K �� O ' \ ,� / • ;L.1 + .;:arrunj ; a axtBrit Tcvwnbf O- O O O • � ±250 �2 � WATERLINE o UP FENCE ` ' ER LI r $ITE ( -' o = r 4"0 FIRE 14 + I �' - � !� `a p OFFICE TRAILER - /.. 2"0 F EL V i :/ � _ r �• trhk'I)(^`�3�`r?x. ., �. .y^ yy�y' qqI A'� r 1 ,p74 r� r cTw 50' GANGWAY TWO 30 GANGWAYS MOORING SECTION B — B � 50 GANGWAY _t f,..?. .• PAVED PIPING SECURED DOLPHIN PLATFORM (TYP.) IS �C r—� B ALONG FLOAT SCALE: , =2 LOCUS A 'Q C NCR TE N.T.S. AB TM NT — — _ = - - _ _J + 72" FIRE STAN PI E B A 2 1/2" �/ + + 3"x3"x0.25"0 ALUMINUM SCHD 40 PIPE SURGE TA r K INFILL w IRE FRAME,STYP. -- 60" CLR � MOUNTING C O N C R ET S B / 4" GALVANIZED MOUNTING BLOCK FIRE STANDPIPE DRY FIRE LINE » I I I 1 1/2" 0.D. e . a 2 � FUEL 50 1/4 WALL 36 a_ GRANIT STONE 1 'x10 ' PLATFORM WATER AND FUEL TUBES 36" 42" BOLL" DS °� TRANSFER LINE HOSE REELS ©x5'-06 O.C. 20.. 9" RIBBED 3/8" SS BOLTS DECKING OQ 20 X20 PLATFORM BELOW PLATFORM 24" DIA STEEL (2 EA) a er 4: ® v. _ 24" D PILES HANDRAIL— GUIDEI3 Q O D \ �� 6 TOTAL) 4" CHANNELS 10" 'E' CHANNEL v.o 20 X50 STEEL FLOAT 2"0 WATERLINE 4"q, FIRE 2"4 FUEL v o ' v . \ —III=111— -III=11 I_- \ � SECTION C— C GANGWAY (TYP.j FIRE STANDPIPE DETAIL SCALE: 1 "=2' SCALE: 1 "=1 ' PROPOSED UTILITY LAYOUT SCALE: 1"=20' CONNECT TO NOTES: EXIST STANDPIPE FLEX HOSE (TYP.) 1 . CONCRETE SLAB TO HAVE t 20 PVC 2"0 PVC 2"0 PVC 2"0 PVC „ 11"0 HOSE WATER REMOVABLE J" DRAIN PLUG ... � 25FT. LONG LINE LOCKING CAP 2. CONCRETE TO BE REINFORCED STORZ CONNECTION STANDPIPE D FUEL SHUT WITH 4X4 W4.OxW4.0 WIRE MESH. � OFF VALVE 4"4 SCH40 4"w SCH40 4"� SCH40 4"� SCH40 I 4 � GALV. DRY LINE `' `�' ... � W/ STORZ 55 GAL. CONNECTION DRY LINE 2 WAY GATE 1 "0 PIPE/ SURGE TANK WITH LOCK HOSE I? mH CHAIN GALV. PIPOE .. 2 0 SCH40 v 2"� SCH40 v 2"0 SCH40 �¢— HOSE REEL FUEL �,H o' s� —I s" 6'LINK FENCE SCULLY PIPE LINE 2 DAVID y a• am VENT NO.�s3D10 6'H CHAIN (EXPLOSION OSQ��ptST ��`� 55 GAL. ' LINK FENCE 55 GAL. PROOF) XS TIMBER PLATFORM TIMBER PLATFORM P1 TOP OF 24"OxO.5" WALL FF 70NA Er�\ 4' SURGE CONCRETE SURGE ABUTMENT &.1O 5 OF DECK EL.14.0 DECK STEEL PIPE GUIDE PILE TANK CONTAINMENT 6" TANK PLATFORM P2 EL. +20.0 50' GANGWAY 50' GANGWAY PLATFORM P4 CURB FUELGLINE PLATFORM P3 II II HrL=i2.� � ,, 2,. GALV. 16"' I ------ t _ _� - FUEL LINE u u TO FERRY �— MI W=0.007 20'x50' STEEL FLOAT CEMALRWHARF �— NEW 20'x50' STEEL FLOAT �I I�I 6" SLAB ' _—� — — — — 6' I ,I D CAST INTO 4• EXISTING MUDLINE PLAN CONCRETE CURB SECTION D — D 0 o a a o o — SECTION A—A n CONCRETE CONTAINMENT SLAB DETAIL SCALE: 1"=20' SCALE: 1"=2' CONSTRUCTION NOTES: 1. INSTALL WATER, DRY FIRE AND FUEL LINES FROM PARKING LOT AREAS TO STATIONS ON FIRST b. THE FUEL LINE SHALL CONSIST OF 2 INCH SCHEDULE 40 GALVANIZED STEEL PIPES EXCEPT FOR FUEL FACILITY SIGNAGE: FLOAT AS INDICATED BY THIS DRAWING AND AS PER THE SPECIFICATIONS. FLEXIBLE HOSE TO BE INSTALLED BETWEEN THE GANGWAYS AND PLATFORMS WITH FLEXIBLE CONNECTION PIPING. BEFORE FUELING: 2. WATER LINE TO BE PROVIDED AS FOLLOWS: c. ALL PIPING, HOSES, FITTINGS, AND VALVES SHALL CONFORM TO THE REQUIREMENTS OF 527 CMR (a) STOP ALL ENGINES AND AUXILIARIES. AS-BUILT 9/12/07 a. INSTALL 2 INCH PVC (SCHEDULE 40 SOLVENT WELDED JOINTS) FROM EXISTING METERED SERVICE 15.05. ALL FITTINGS AND CONNECTIONS SHALL BE UL LISTED WITH SOCKET WELDED (b) SHUT OFF ALL ELECTRICITY, OPEN FLAMES, AND HEAT TO HOSE STATION ON FIRST FLOAT. CONNECTIONS. SOURCES. b. PLACE PIPE IN EXISTING SWALE AND COVER WITH CRUSHED AND BEDDING STONE AS INDICATED. d. EMERGENCY SHUT OFF VALVES SHALL BE PROVIDED AT EACH END OF THE LINE AND AT THE (c) CHECK ALL BILGES FOR FUEL VAPORS. UTILITY INSTALLATIONS c. PROVIDE FLEXIBLE HOSE AT CONNECTIONS BETWEEN GANGWAYS AND FLOATS BOTTOM OF THE GANGWAY AS INDICATED HEREIN. SHUTOFF AND CHECK VALVES SHALL BE (d) EXTINGUISH ALL SMOKING MATERIALS. d. PROVIDE A 2 INCH BALL VALVE TO BE SUPPLIED AT THE ENDS OF THE SERVICE. EQUIPED WITH PRESSURE RELIEVING DEVICES. (c) CLOSE ACCESS FITTINGS AND OPENINGS THAT COULD SALEM FERRY PIER C. PROVIDE 55 GALLON SURGE TANK WITH A FLEXIBLE CONNECTION TO T -FITTING IN THE FUEL ALLOW FUEL VAPORS TO ENTER ENCLOSED SPACES OF SALEM MASSACHUSETTS 3. DRY FIRE LINE TO BE PROVIDED AS FOLLOWS: LINE. PROVIDE TWO WAY VALVE SYSTEM AT T-FITTING. SURGE TANK TO BE PROVIDED WITH THE VESSEL. a. INSTALL 4 INCH SCHEDULE 40 GALVANIZED STEEL PIPE DRY FIRE LINE FROM STANDPIPE CONCRETE PAD FOR SECONDARY CONTAINMENT SYSTEM. LOCATED AT CONCRETE ABUTMENT TO STATION ON FIRST FLOAT. PIPE TO HAVE GALVANIZED f. PROVIDE SIGNAGE AS INDICATED HEREIN. DURING FUELING: MALLABLE TREADED FITTINGS AND STAINLESS STEELBRADED FLEXIBLE CONNECTIONS. g. CONCRETE SLAB AND PIPING TO BE PLACED ON LEVEL, COMPACTED SUBBASE, AUGMENTED WITH (a) MAINTAIN NOZZLE CONTACT WITH FILL PIPE. PROPOSED U T I L I T I E S b. PROVIDE SIAMESE CONNECTIONS AT EACH END TO BE IN ACCORDANCE WITH FIRE DEPARTMENT CRUSHED STONE. (b) WIPE UP SPILLS IMMEDIATELY. REQUIREMENTS. (c) AVOID OVERFLOWING. 5. ALL PIPING TO BE ANCHORED TO STRUCTURES BY GALVANIZED PIPE HANGERS AT STRUCTURES AND (d) FUEL FILLING NOZZLE MUST BE ATTENDED AT ALL 253 LOW STREET 190 OLD DERBY STREET 18 BEACH STREET 4. FUEL LINE AND FACILITIES SHALL BE AS FOLLOWS: WITH WELDED ALUMINUM PIPE HANGERS ALONG GANGWAYS. ANCHORS 6 FEET O.C. MAXIMUM. TIMESV i n e NEWBURYPORT, MA 01950 HINGHAM, MA 02043 MONUMENT BEACH, MA. 02553 . wv fel. (978)465-1428 fel. (781)749-2530 fel. (508)743-0390 a. INSTALLATION OF FUEL DELIVERY SYSTEM TO ACCOMMODATE THE TRANSFER OF DIESEL FUEL ASSOCIATES, INC. fax (978)465-2640 fox (781)749-2751 fax (508)743-0391 FROM A FUEL TRUCK TO THE REEL STATION AT THE FIRST FLOAT. SYSTEM SHALL INCLUDE ALL 6. ALL PIPING LINES SHALL BE TESTED PRIOR TO ACCEPTANCE BY THE CITY. AFTER FUELING: DES. CHK. DR. VAI PIPING, VALVES, CONCRETE PAD, SURGE TANK AND HOSE STATION ON FLOAT AS SPECIFIED i i s2�utmty Layout (a) INSPECT BILGES FOR LEAKAGE AND FUEL ODORS. KWH DBV RMM/RSR FILE N0. HEREIN. 7. ALL WORK TO BE COORDINATED WITH FIRE DEPARTMENT AND CITY OFFICIALS TO ALLOW FOR (b) VENTILATE UNTIL ODORS ARE REMOVED. SCALE APP'D DATE REQUIRED INSPECTIONS. AS SHOWN DBV SEPT. 9007 SHEET 1 of ,p 2,>0 PVC WATERLINE AND / O p � r HANDRAIL WITH A. �� 3x8 WOOD DECKING TIMBER BALUSTERS 1; � r + , � � ,. 3- 2 0 EMPTY ELECTRIC �.r 4'` t rr .� hlJ A■ A 5K .., I O 6x10 STRINGER k' p FASTENED w/6 ' SPIKES fr �(�� sY i"�.�'S x'%�'r °`,• `���Y� �s� / 2 PER INTX. 10x10 STRINGER ,_�,r� ;, ♦ , EXISTING CONDUITS P LACED IN \ : / / GALV. BOLTS 3/4 ;f ; 'fy,�ot, ��' "t t'e t dhd ��\\ WATER EXISTING SWALE AND w ; O �P;yt SPIGOT �� / ! ' / / EL. t 14.5 • + '�"'f°'°II�"`• d.,e nemN COVERED WITH 18 CRUSHED p \� rr ••f •• r..� i. i AND BEDDING STONEVD ' / / e O R' . .. • s} r � ') rn M-.�+t taCi T ,. :• HfVprVf. pwtv • % � Y ± 250 O / 2"0 WATERLINE � , 1 t , SITE t l� f,•f� , UP FENCE / 4"0 FIRE I 2"0 FUEL 1 I / .'' vrtpNo Sr�liJ; I ,r OFFICE TRAILER 777 - • . • ' Mt TWO 30' GANGWAYSel 50 GANGWAY • MOORING SECTION B- B 50 GANGWAY �;. PIPING SECURED DOLPHIN PLATFORM (TY P PAVED / % . SCALE: 1"=2' LOCUS C r-�B ,/ ALONG FLOAT AC NCR T E — - - - i N.T.S. - - - _ — — + AB TM NT „ C 72 -� / `-' + " " 2SCHD 1/240 PIPE FIRE STAN P I E + 3'x3 x0.25 ALUMINWM / + WOVEN WIRE MESH 60" CLR 3x3 x2' INFILL w/FRAME, TYP. 4 GALVANIZED MOUNTING BLOCK FIRE STANDPIPE DRY FIRE LINE SURGE TANKPON �` I , ,/2" Q.D. " CONCR E SLAB 2 FUEL ; I 50 TUBES ALL q. 36 42" WATER AND FUEL ( 36" 0 1 x 10 PLATFORM 3xs'TU d.C. " 9" RIBBED •• op TRANSFER LINE HOSE REELS 20 » 3/8" SS BOLTS DECKING " - 8 p BELOW PLATFORM 24 DIA STEEL (2 EA) : : , •_ - •• 24 00 % 20'X20' PLATFORM ; GUIDE PILES HANDRAIL—..I3" 10" 'E' CHANNEL e• O , , �� 6 TOTAL) 4" CHANNELS v > •; a O l 20'X50' STEEL FLOAT 2"0 VVATERLINE 4% FIRE 2"0 FUEL _1 • ,. ` ,\ \ I I-III_ III-I I I- ,, SECTION C-C • \ GANGWAY TYP. FIRE STANDPIPE DETAIL SCALE: 1 "=2' "_ SCALE: 1"=l' PROPOSED UTILITY LAYOUT i SCALE: 1"=20' 1 CONNECT TO EXIST STANDPIPE FLEX HOSE (TYP.) 1. CONCRETE SLAB TO HAVE * 2"0 PVC 2"0 PVC 2"0 PVC 2"0 PVC „ I 1"o HOSE WATER REMOVABLE J" DRAIN PLUG .� .. .. 25FT. LONG LINE I CKING CAP 2 CONCRETE TO BE REINFORCED STORZ CONNECTIOND FUEL SHUT WITH 4X4 W4.OxW4.0 WIRE MESH. 4"0 SCH40 4"0 SCH40 4"0 SCH40 4"0 SCH40 (STANDPIPE 4 OFF VALVE 55 GAL. GALV. DRY LINE `' `' v W/ STORZ 1"0 PIPE/ CONNECTION DRY LINE 2 WAY GATE SURGE TANK WITH LOCK HOSE — 2"0 SCH40 2"0 SCH40 2"0 SCH40 2"0 SCH40 N 45F' FUEL --16" LINK FE CE GALV. PIPE v—^ HOSE REEL SCULLY PIPE LINE — VENT 6'H CHAIN (EXPLOSION 55 GAL. ' ( LINK FENCE 55 GAL. PROOF) TIMBER PLATFORM &MPLATFORMFDECKPI TOP OF 24"0x0.5" WALL 4' TANKSURGS CONCRETE 6" TANKSURGS ABUTMENT EL.14.5OF EL.14.0 PLATFORM P2 LEE+20.POE GUIDE PILE I I CO BAINMENT -�j 2"0 GALV. 50' GANGWAY 50' GANGWAY !Ili PLATFORM P4 " 11 1I FUEL LINE PLATFORM P3 — 2 GALV. " t HM w 1a:b tly— FUEL LINE 16 i f 4______ u TO FERRY MI W=0-OC7 20'x50' STEEL FLOAT CENTRAL WHARF NEW 20'x50' STEEL FLOAT —� 6" SLOB --� 6' CAST INTO I 4• D CONCRETE CURB /,,-EXISTING MUDLINE PLAN SECTION D — D o a D a o o — 0 u - CONCRETE CONTAINMENT SLAB DETAIL o��`��DAVID SECTION A-A SCALE: 1"=2' VINE ; SCALE: 1"=20' No,29301 CONSTRUCTION NOTES: A9 gFCISJ�r �' S10NPS E'�r 1. INSTALL WATER, DRY FIRE AND FUEL LINES FROM PARKING LOT AREAS TO STATIONS ON FIRST b. THE FUEL LINE SHALL CONSIST OF 2 INCH SCHEDULE 40 GALVANIZED STEEL PIPES EXCEPT FOR FUEL FACILITY SIGNAGE: FLOAT AS INDICATED BY THIS DRAWING AND AS PER THE SPECIFICATIONS. FLEXIBLE HOSE TO BE INSTALLED BETWEEN THE GANGWAYS AND PLATFORMS WITH FLEXIBLE CONNECTION PIPING. BEFORE FUELING: 2. WATER LINE TO BE PROVIDED AS FOLLOWS: c. ALL PIPING, HOSES, FITTINGS, AND VALVES SHALL CONFORM TO THE REQUIREMENTS OF 527 CMR (a) STOP ALL ENGINES AND AUXILIARIES. ! •! / 1 a. INSTALL 2 INCH PVC (SCHEDULE 40 SOLVENT WELDED JOINTS)FROM EXISTING METERED SERVICE 15.05. ALL FITTINGS AND CONNECTIONS SHALL BE UL LISTED WITH SOCKET WELDED (b) SHUT OFF ALL ELECTRICITY, OPEN FLAMES,AND HEAT `_, TO HOSE STATION ON FIRST FLOAT. CONNECTIONS. SOURCES. b. PLACE PIPE IN EXISTING SWALE AND COVER WITH CRUSHED AND BEDDING STONE AS INDICATED. d. EMERGENCY SHUT OFF VALVES SHALL BE PROVIDED AT EACH END OF THE LINE AND AT THE (c) CHECK ALL BILGES FOR FUEL VAPORS. UTILITY INSTALLATIONS c. PROVIDE FLEXIBLE HOSE AT CONNECTIONS BETWEEN GANGWAYS AND FLOATS BOTTOM OF THE GANGWAY AS INDICATED HEREIN. SHUTOFF AND CHECK VALVES SHALL BE (d) EXTINGUISH ALL SMOKING MATERIALS. d. PROVIDE A 2 INCH BALL VALVE TO BE SUPPLIED AT THE ENDS OF THE SERVICE. EQUIPED WITH PRESSURE RELIEVING DEVICES. (e) CLOSE ACCESS FITTINGS AND OPENINGS THAT COULD SALEM FERRY PIER e. PROVIDE 55 GALLON SURGE TANK WITH A FLEXIBLE CONNECTION TO T-FITTING IN THE FUEL ALLOW FUEL VAPORS TO ENTER ENCLOSED SPACES OF SALEM , MASSACHUSETTS 3. DRY FIRE LINE TO BE PROVIDED AS FOLLOWS: LINE. PROVIDE TWO WAY VALVE SYSTEM AT T-FITTING. SURGE TANK TO BE PROVIDED WITH THE VESSEL. a. INSTALL 4 INCH SCHEDULE 40 GALVANIZED STEEL PIPE DRY FIRE LINE FROM STANDPIPE CONCRETE PAD FOR SECONDARY CONTAINMENT SYSTEM. LOCATED AT CONCRETE ABUTMENT TO STATION ON FIRST FLOAT. PIPE TO HAVE GALVANIZED f. PROVIDE SIGNAGE AS INDICATED HEREIN. DURING FUELING: MALLABLE TREADED FITTINGS AND STAINLESS STEEL/BRADED FLEXIBLE CONNECTIONS. g. CONCRETE SLAB AND PIPING TO BE PLACED ON LEVEL, COMPACTED SUBBASE, AUGMENTED WITH (a) MAINTAIN NOZZLE CONTACT WITH FILL PIPE. PROPOSED UTILITIES b. PROVIDE SIAMESE CONNECTIONS AT EACH END TO BE IN ACCORDANCE WITH FIRE DEPARTMENT CRUSHED STONE. (b) WIPE UP SPILLS IMMEDIATELY. Wil; REQUIREMENTS. (c) AVOID OVERFLOWING. 5. ALL PIPING TO BE ANCHORED TO STRUCTURES BY GALVANIZED PIPE HANGERS AT STRUCTURES AND (d) FUEL FILLING NOZZLE MUST BE ATTENDED AT ALL V i n e 253 LOW STREET 190 OLD DERBY STREET 18 BEACH STREET 4. FUEL LINE AND FACILITIES SHALL BE AS FOLLOWS: WITH WELDED ALUMINUM PIPE HANGERS ALONG GANGWAYS. ANCHORS 6 FEET O.C. MAXIMUM. TIMES. NE fel. (9 8)4 MA 28 HI . (781 MA 02013 MONUMENT BEACH, Ma. 02353 fel. (978)465-1428 fel. (781)7d9-2530 fel. (508)7!3-0390 a. INSTALLATION OF FUEL DELIVERY SYSTEM TO ACCOMMODATE THE TRANSFER OF DIESEL FUEL ASSOCIATES,INC, fox (978)465-2640 fox (781)749-2751 fax (508)743-0391 FROM A FUEL TRUCK TO THE REEL STATION AT THE FIRST FLOAT. SYSTEM SHALL INCLUDE ALL 6. ALL PIPING LINES SHALL BE TESTED PRIOR TO ACCEPTANCE BY THE CITY. AFTER FUELING: DES. CHK. DR. VAI 1162\Utmty Layout PIPING, VALVES, CONCRETE PAD, SURGE TANK AND HOSE STATION ON FLOAT AS SPECIFIED (a) INSPECT BILGES FOR LEAKAGE AND FUEL ODORS. KWH DBV RMM/RSR FILE NO. HEREIN. 7. ALL WORK TO BE COORDINATED WITH FIRE DEPARTMENT AND CITY OFFICIALS TO ALLOW FOR (b) VENTILATE UNTIL ODORS ARE REMOVED. SCALE APP'D DATE REQUIRED INSPECTIONS. AS SHOWN DBV MARCH 2007 SHEET 1 of 1 FUEL TRUCK LANDSIDE VALVE GANGWAYS AND PLATFORMS FLOAT ' o\ 0/\o O (z a 4 SURGE VESSEL EXISTING �� TANK TANK WATER SPIGOT o% \-V VALVE DETAILS o/ SCALE: NTS o-� FENCE 20'X20' PLATFORM FIRE STANDPIPE OFFICE TRAILER WATER AND FUEL 50' GANGWAY HOSE REELS 10'x10' PLATFORM TWO 30' GANGWAYS BELOW PLATFORM PAVED + 20'X50' STEEL FLOAT 24" DIA STEEL FIRE TANDPIPE e --------- — _— _ _ __ — — — _—, — ----- -7 =_ + GUIDE PILES (6 TOTAL) FUEL INTAKE & SURGE TANK ON 2"4 FUEL CONCRETE SLAB TRANSFER LINE 50' 4 MOORING oo DOLPHIN 8aFUEL TRUCK Q Q ED CDC Q Q FERRY VESSEL FUEL PROCEDURE PLAN SCALE: I"=30' 0 30 60 SCALE IN FEET FIGURE 1 _ I 2"0 PVC WATERLINE AND / o D IP EMB R B LU 3-2x'0 EMPTY ELECTRIC / ��� � �� US WOOD DECKING MBER BAwsERs O O i / 5x10 STRINGER FASTENED w/6•SPIKES EXISTING CONDUITS PLACED IN �/ /� / /�� �Lw� 3/4•0 z PER Nrtz. ,oeo smINGER WATER EXISTING SWALE AND SPIGOT COVERED WITH 18" CRUSHED �� E t,4.5 AND BEDDING STONED10 % _ 1••• / z9 NM' �• y 1250' /�, �/ 2'•WATERLINE / �Y! �� Sint UP FENCE - .i� i ii P• FlRE {f EL (x libti OFFICE TRALER 7YI0 30' GANGWAYS 50' GANGWAY ' MOORING SECTION B- 50' GANGWAY ;'% PIPING SECURED DOLPHIN PLATFORM P IS PAVED �C ,i ' I �� „ i ALONG FLOAT SCALD r.z LOCUS AtC NCR E _ _ _ N.T.S. AB TM NT _ - _ + X72• { 3'.3•x0.25••ALUMINUM 5CM 40 PIPE FIRE STAN SPI E C ' 401 , " ��� ' A �_z ,�r • WIRE 1 CLR� 4•GALVANIZED MOUNING BLOCK SURGE T K -/ .' INFlu•/rwwE,TMP. FIRE STANDPIPE DR FIRE ONE CONCRET S*B �I / �,II I 50' 11 0D. 36' GRANIT/ STONE 'x10' PLATFORM ' /2"0 FUEL WATER AND FUEL ( ,,;NIDE s5 4z' ap _, j TRANSFER LINE HOSE REELS a 5—o D.C. zD. 9 RIBBED DECKING L' D //� /" / BELOW PLATFORM 24" DIA STEEL (�j SOCIS—, ;1 J14- Sg p �/ 20'X20' PLATFORM V "A � GUIDE PILES RECEIVER r 1C''C CHANNEL O a 00 j%/ / / 6 TOTAL) 4•CHMNELS z. 20'X50' STEEL FLOAT z.WA ERLINE NE • / / 4'• FIRE •... • .. � SECTION C-C,� ���� GANGWAY TYP.) FIRE STANDPIPE DETAIL PROPOSED UTILITY LAYOUT SCALE: 1""20' RWCT ED STANDPIPE fIEX HOSE(IYP.) 1. COMPETE SUB TO HAVE = v 2% aYe '•• "'� v '•• 'w V 2•• �LZI'o OSE WATER REMOVABLE 3• DRAIN PWG OCKING CAP LINE 2. CONCRETE TO BE REINFORCED STM CONNECBDN NEL SHUT WITH 4X4 W4.NW4.0 WIRE MESH. 4•• SCH40 4'0 SCH40 4.0 SGNW J 4.0 S ,IO IWm K2 4 Q �D �VALUE �J GALV.DRY UNE 55 G.L. " caxNEDTIou DRY LINE 2 WAY LATE SURGE TANK •`µ OF ,F.n' WTM LOCK 5'H CHAIN HOSE p 7'•SCHIO 2'•i(V4n 2L SCu40 2'• SCH4D .. R Mm FUEL 'xlDUf ---I B' UNK FENCE SCUu;PIPE Mv—�Su"'FID�w J t� �r~ LINE DAVID q�3' — — — — B. C`� S•H CHAIN (E)FLOSION T,pEp gATF� TyBER gATFT)Ry Yntual J I 55 CAL I UNK FENCE .�. f.Al_ PROOF) FFXX5I501Iuuee Rhi�p OF DE FBI 8 PUIF"ORM OECKPI TOP Ol'VIPE WIDE0.50 PARE U Y TANKE COMAM ENT B• SµRGE NVI"�A' GANCWA EL.,4.3 50'CANGWA FL,4.0 PLATFORM P2 ¢. +20.0 A .SD O I )0 - I CURB y Y• GUNS PLATFORM P3 9oF Gi8TS e' FUEL UNE lE• i —___ NEL LINE u u TO FERRY 1 Al-EN — — — 5 suB \— — —'a'•°°f,— — — — mv" sea* — 255•:'ma^ srm^o`= — — - • 5' ! 4' �D CONCRETE CURB NO '""DUNE PLAN SECTION D—D CONCRETE CONTAINMENT SLAB DETAIL SECTION A-A SCA E: r�2• SCALE: 1•.20' CONSTRUCTION NOTES 1. INSTALL WATER,DRY FBtE AND FUEL LINES FROM PARKING LOT AREAS TO STATIONS ON MUST b. THE FUEL LINE SHALL CONSIST OF 2 INCH SCHEDULE 40 GALVANIZED STEEL PIPES EXCEPT FOR FUEL FACILITY SIGNAGE: FLOAT AS INDICATED BY THIS DRAWING AND AS PER ME SPECIFICATIONS. FLEXIBLEHOSETOBEINSTALLED BETWEENTHEGANGWAYSANDPLATFORMSWTNFLE% U CONNECTION PILING. BEFORE FUELING. 2. WATER LINE TO BE PROVIDED AS FOLLOWS: c ALL PIPING,HOSES,FITTINGS,AND VALVES SHALL CONFORM TO THE REQUIREMENTS OF 527 CMR (a)STOP ALL ENGINES AND AUXILIARIES AS-BUILT 9/12/07 a INSTALL 2INCH EVE(SCHEDULE 40 SOLVENT WELDED JOINTS)MOM EXISTING METERED SERVICE 15.05.ALL FITTINGS AND CONNECTIONS SHALL BE UL LISTED WITH SOCKET WELDED (b)SHUT OFF ALL ELECTTUCEY,OPEN FLAMES,AND HEAT TO HOSE STATION ON FIRST FLOAT. CONNECTIONS. SOURCES. b. PLACE PIPE IN EXISTING SWALE AND COVER WITH CRUSHED AND BEDDING STONE AS INDICATED. d EMERGENCY SHUT OFF VALVES SHALL BE PROVIDED AT EACH END OF THE LINE AND AT THE (c)CHECK ALL BILGES FOR FUEL VAPORS. UTILITY INSTALLATIONS c. PROVIDE FLEXIBLE HOSE AT CONNECTIONS BETWEEN GANGWAYS AND FLOATS BOTTOM OF THE GANGWAY AS INDICATED HEREIN. SHUTOFF AND CHECK VALVES SHALL BE (d)EXTINGUISH ALL SMOKING MATERIALS. d. PROVIDE A 2 INCH BALL VALVE TO BE SUPPLIED AT ME EMS OF ME SERVICE. EQUI'ED WITH PRESSURERELEEATMDEVICES. (e)CLOSE ACCESS FTITINGSAMOPENINGSTHAT COULD SALEM FERRY PIER e. PROVIDE 55 GALLON SURGE TANK WITH AFLEXBLECONNECTION TOT-HUTINGIN THE FUEL ALLOW FUEL VAPORS TO ENTER ENCLOSED SPACES OF SALEM, MASSACHUSETTS 3. DRY FIXE LINE TO BE PROVIDED AS FOLLOWS: LIVE. PROVIDE TWO WAY VALVE SYSTEM AT T-FITTING. SURGE TANK TO BE PROVIDED WITH THE VESSEL. a INSTALL 4 INCH SCHEDULE 40 GALVANIZED STEEL PIPE DRY FIRE LINE FROM STANDPIPE CONCRBTE PAD FOR SECONDARY CONTAINMENT SYSTEM. LOCATED AT CONCRETE ABUTMENT TO STATION ON FIRST FLOAT,FIXE TO HAVE GALVANIZED L PROVIDE SIGNAGE AS INDICATED HEREIN, DURING FUELING: MALLABLE TREADED FITTINGS AND STAINLESS STEELBRADED FLIDBLE CONNECTIONS. & CONCRETE SLAB AND PIPING TO BE PLACED ON LEVEL,COMPACTED SUBBASE,AUGMENTED WITH (a)MAINTAIN NOZZLE CONTACT WITH FILL PIPE. PROPOSED UTILITIES b. PROVIDE SIAMESE CONNECTIONS AT EACH END TO BE IN ACCORDANCE WITH FIXE DEPARTMENT CRUSHED STONE. (b)WEE UP SPILLS NTMEDIATELY. REQUIREMENTSfcI AVOID OVERFLOWING. 5. ALL PIPING TO BE ANCHORED TO STRUCTURES BY GALVANIZED PIPE HANGERS AT STRUCTURES AND (d)FUEL FILLING NOZZLE MUST BE ATTENDED AT ALL vvin� ","'q�q�•W o�eso x�w°iw01Ou°Lu:oxoi5".o.� mx'"(:'":.:�xa„ 4. FUELLINE AND FACILITIES SHALL BE AS FOLLOWS: WITH WELDED ALUMINIUM PIPE HANGERS ALONG GANGWAYS. ANCHORS 6 FEET O.C.MAXIMUMIM . TES. L INSTALLATION OF FUEL DELIVERY SYSTEM TO ACCOMMODATE THE TRANSFER OF DIESEL FUEL _ ASSOCIATES,MC. FROM A FUEL TRUCK TO THE REEL STATION AT ME MST FLOAT. SYSTEM SHALL INCLUDE ALL 6. ALL PIPING LIKES SHALL BE TESTED PRIOR TO ACCEPTANCE BY THE CITY. AFTER FUELING: DES. CNN. DR. VAI „�UIW,bFa• PIPING,VALVES,CONCRETE PAD,SURGE TANK AND HOSE STA TION ON FLOAT AS SPECIFIED (a)INSPECT BILGES FOR LEAKAGE AND FUEL ODORS. KWX DIN RMM/RSR FILE NO. HEREIN, 7. ALL WORK TO BE COORDINATED WITH FIRE DEPARTMENT AND CITY OFFICIALS TO ALLOW FOR (b)VENTILATE UNTIL ODORS ARE REMOVED, SCALE APP'D DATE REQU]BED INSPECTIONS. AS SHOWN DBV I SEPT. 2007 SHEET 1 of 1 it