64-627 - 2 ATLANTIC STREET - CONSERVATION COMMISSION `� /d-�(��2- ��-- . G�( -c��-7
..--_
�.
s�-aG
IIII �,
IIIIIIIIIIIIII{IIIIIIIIIIIIIIIIIIIIIIIIIII
S0.ESSEX #286 Bk;35728 Pg;410
03/10/2017 01:12 CONDN Pg 1/1e
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-627
WPA Form 5 — Order of Conditions MassDEPFile#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
City/Town
A. General Information
Please note: Salem
this form has 1. From:
been modified Conservation Commission
with added 2. This issuance is for
space to a.®Order of Conditions b.❑ Amended Order of Conditions
accommodate (check one):.
the Registry
of Deeds 3. To: Applicant:
Requirements
Important: a.First Name b.Last Name
When filling Gregory Investment Group, LLC
out forms on c.Organization
the 301 Edgewater Drive, Suite 100
computer,
use only the d.Mailing Address
tab key to Wakefield MA 01880
move your e.City/Town f.State g.Zip Code
cursor-do
not use the 4. Property Owner(if different from applicant):
return
nkey.
a.First Name b.Last Name
c.Organization
reran
d.Mailing Address
e.City/Town I.State g.Zip Code
5. Project Location:
2 Atlantic St. Salem
a.Street Address b.City/Town
32 189
c.Assessors Map/Plat Number d.Parcel/Lot Number
Latitude and Longitude, if known: d m s it m s
d.Latitude e.Longitude
wpaform5.doc• rev.6/16/2015 Page 1 of 12
I
� t
i Essex Southam-n District
Registry"-f Deeds
45 Congress Street
Suite 4100
Salem, MA '01970
03/10/2017 01:12 PM
Station: ESSX-155
Time:1:12 Type: CONDN Loc: SALEM
Inst 286 BK 35728-470
FEE 55.00
j --� on nn
f
NOI Status Sheet
r)- �a Ff�
Address: DEP #: GL( �
Application Type: A1a1 Date Submitted:
Contact Name: C,� 1�a4 Phone: Q?J f
Proposed activity:
,A pjication Complete
Prrect Fee Received
4-Abutters List Requested --Received
al Ad Sent Legal Ad Confirmed 'Online
ded to Agenda --Agenda to Applicant
Agent Comments to Commission
DEP Comments
Hearing Opened: a,./ID� Continued: � Site Visit: s_
Abutters Notice Confirmed
,--4"e-rmit Sent to Applicant and DEP
Confirmation of Delivery
ration date added to calendar
d to database
pplicant Recorded OoC with Registry
Preconstruction Meeting:
Certificate of Compliance Sent to Applicant and DEP
Confirmation of Delivery
Applicant Recorded CoC with Registry
Notes-
ra
H:\CON COMM\Administrative\project status sheet\NOI status sheet 2012-12-27.doe
COMPSENDER: COMPLETE THIS SECTIONLETE
■ Complete Items 1,2,and 3. X'SIgnature �
■ Print your name and address on the reverse X ��1 - — O Agent
so that we can return the Card to you. ❑Addressee
B. Received by(F
■ Attach this card to the back of the mailpiece, (Printed Name) C. Date of Delivery
or on the front if space permits.
1. Article Addressed to: D. Is delivery address different from item 11 ❑Yes
16c, \ If YES,enter delivery address below: 0 N
�` J�IvJ f`SP I lti
1
II I'll ll III III I II II"IIIIIIII III II I I II III 3. Service Type D Priority xpr E
Mall xpress®
❑Adult Signature D Registered l
D Adult Signature Restricted Delivery D Registered Mail Restricted
grCedified Mall® Delivery
9590 9402 1660 6053 4627 80 D oeroged Mall Reaet W Delivery D Rehm Race ptfor
D Dolled on Delivery Memhmldlse
❑Collect on Delivery Restricted Delivery D Signature Conflmietlon-
2.Article.NumheL(lransfe[fiomservice labe4 ❑Insured Mail D Signature Confirmation
7 12 16 4 0 0 0 2 3 313 3'4 31 ❑meurea Mall Resalcted Delivery Restricted Delivery
ove sso
PS Form 3811,July 2015 PSN 7530-02-000-9053 Domestic Return Receipt
USP'. ,F*# First-Class Mail
y1'{nI�I� Postage&Fees Paid
I II I I,III Il..t„ , .e . _ VIII II II I I Permit No.G-10
9590 9402 1660 6053 4627 80
United States •Sender:Please print your name,address,and ZIP+q®in this box-
Postal Service
Salem Conservation Commission
120 Washington Street, 3rd F]
Salem, MA 01970
T6�C'--- -. -
--- —.•y di;i : i"di: : :,i;i i I •,: , i i si: ;;i i' iii_, ii,:
i.;i, i lli.:. lili s
I
�CONDIT�
v CITY OF SALEM
b,
CONSERVATION COMMISSION
SITE VISIT FORM
PROJECT LOCATION: ^"1� DATE OF SITE VISITt�L�7-- /
L /
PROJECT PROPONENT: DEP FILE NUMBER: /
PROPOSED WORK:
IN ATTENdAI�CE. P6 ?tiuTTt a ' srz
,-nllfii
Commission Members/Agent: Abutters:
Applicant/Property Owner/Representative:
G(}* C
€SITE VISIT PURPO,S ,'
n .. Run
• aa..a''kk':i#"..Nt.. .:.. .. � u'm,Inmfi'Eftt
V�
#10 1-C� � ;:,,tet tmit,El .�.d,.:�:
Photos ❑ Site Map ❑Other:
.�..w
Take into account relevant aspects or features such as: natural or piped drainage or obvious pollution;
topography; existing vegetation; possible alternative sites; signs of wildlife, possible vernal pools, rare species
habitat; landmarks; recent or historical disturbances; proximity to other water bodies or drainage areas;
adjacent land uses.
cn�l �a--1-J ozv�k 1A kt:r'p. -�4
r-........ .,,�.n ""tr'rzw+amRt
RECOMMENUATON$ W " m .kl.k G s ,..n .
1- x
ywrrr L.
l'; CITY OF SALEM
CONSERVATION COMMISSION
February 24, 2017
Greg Hochmuth
Williams & Sparages, LLC
189 North Maine Street, Suite 101
Middleton, MA 01949
Re: Order of Conditions—DEP#64-627-2 Atlantic Street
Dear Mr. Hochmuth:
Enclosed, please find the Order of Conditions for the above referenced project.
Following the 10-business-day appeal period, this document must be recorded at the
South Essex County Registry of Deeds (Shetland Park, 45 Congress Street, Suite 4100
Salem, Massachusetts). Once recorded, please return a copy of Page 12 of the Order,
which will indicate to the Commission that the document has been recorded.
As indicated in the Order, prior to any work commencing:
1. this Order must be recorded,
2. a sign shall be displayed showing DEP File# 64-627 within public view, and
3. contact me at least 48 hours prior to any activity to schedule a pre-construction
meeting to review the Order with your hired contractor.
If you have any further questions, please feel free to contact me 978-619-5685.
Since/rely,
Tom Devine
Conservation Agent
Enclosures
CC: DEP Northeast Regional Office
Gregory Investment Group, LLC
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-627
WPA Form 5 - Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPTransaction#
CiVrown
A. General Information
Please note: Salem
this form has t.From:
been modified Conservation Commission
with added 2.This issuance is for
space to a.®Order of Conditions b.❑Amended Order of Conditions
accommodate (check one):
the Registry
of Deeds 3. To: Applicant:
Requirements
Important: a.First Name b.Last Name
When fining Gregory Investment Group LLC
out fortes on c.Organization
file 301 Edgewater Drive, Suite 100
computer,
use only the d.Mailing Address
tab key to Wakefield MA 01880
move your e.City/Town I.State g.Zip Code
cursor-do
not use the 4, Property Owner(if different from applicant):
return
�key.
a.First Name b.Last Name
c.Organization
loam
d.Mailing Address
e.City/Tom f.State g.Zip Code
s. Project Location:
2 Atlantic St. Salem
a.Street Address b.City/Town
32 189
c.Assessors Map/Plat Number d.Parcel/Lot Number
Latitude and Longitude, If known: d m s d m s
d.Latitude e.Longitude
naform6.doc• rev.6116/2016
Page 1 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-627
WPA Form 5 - Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
City/Town
A. General Information (cont.)
6. Property recorded at the Registry of Deeds for(attach additional information if more than
one parcel):
South Essex
a.County b.Certificate Number(if registered land)
35506 197
c.Book d.Page
7. Dates: 1/26/2017 2/23/2017 2/24/2017
a.Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance
e. Final Approved Plans and Other Documents (attach additional plan or document references
as needed):
See attached
a.Plan Title
b.Prepared By c.Signed and Stamped by
d.Final Revision Date e.Scale
f.Additional Plan or Document Title g.Date
B. Findings
t. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information
provided in this application and presented at the public hearing, this Commission finds that
the areas in which work is proposed is significant to the following interests of the Wetlands
Protection Act(the Act). Check all that apply:
a. ❑ Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of
Pollution
f.
d. El Private Water Supply e. El Fisheries ® Protection of
eHabitat
g. ❑ Groundwater Supply h. ® Storm Damage Prevention i. ❑ Flood Control
2. This Commission hereby finds the project, as proposed, is:(check one of the following boxes)
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance
standards set forth in the wetlands regulations. This Commission orders that all work shall
be performed in accordance with the Notice of Intent referenced above, the following
General Conditions, and any other special conditions attached to this Order. To the extent
that the following conditions modify or differ from the plans, specifications, or other
proposals submitted with the Notice of Intent, these conditions shall control.
.P&o.5.dm- rev.611612015
Page 2 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-627
WPA Form 5 — Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPTransacuon#
City/Town
B. Findings (cont.)
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth
in the wetland regulations. Therefore, work on this project may not go forward unless and
until a new Notice of Intent is submitted which provides measures which are adequate to
protect the interests of the Act, and a final Order of Conditions is issued. A description of
the performance standards which the proposed work cannot meet is attached to this
Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work,
or the effect of the work on the interests identified in the Wetlands Protection Act.
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides sufficient information and includes measures which are
adequate to protect the Act's interests, and a final Order of Conditions is issued. A
description of the specific information which is lacking and why it is necessary is
attached to this Order as per 310 CMR 10.05(6)(c).
3. ❑ Buffer Zone Impacts: Shortest distance between limit of project
disturbance and the wetland resource area specified in 310 CMR 10.02(1)(a) a.linear feet
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
a. ❑ Bank a.linear feet L.linear feet c.linear feet d.linear feet
s. ❑ Bordering
Vegetated Wetland a.square feet b.square feet c.square feet d.square feet
s. ❑ Land Under
Waterbodies and a.square feet b.square feet c.square feet d.square feet
Waterways
e.c/y dredged f.dy dredged
7. ❑ Bordering Land
Subject to Flooding a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood Storage ecubic feet f.cubic feet g.cubic feet h.cubic feet
e. ❑ Isolated Land
Subject to Flooding a.square feet b.square feet
Cubic Feet Flood Storage C.cubic feet d.cubic feet e.cubic feet f.cubic feet
g. ❑ Riverfront Area
a.total sq.feet b.total sq.feet
Sq ft within 100 ft
c.square feet d.square feet e.square feet f.square feet
Sq ft between 100-
200 ft g.square feet h.square feet i.square feet j.square feet
wpaform5.tl c• rev.6116/2015 Page 3 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands64-627
WPA Form 5 — Order of Conditions MassDEPFile#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
cityrrown
B. Findings (cont.)
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
10. El Designated Port
Areas Indicate size under Land Under the Ocean, below
11. ❑ Land Under the
Ocean a.square feet b.square feet
c.dy dredged d.Gy dredged
12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes
below
13. ❑ Coastal Beachescu yd cu yd
a.square feet bsquare feet c.nourishment d.nourishment
14. ❑ Coastal Dunescu yd cu yd
a.square feet b.square feet c.nourishment d.nourishment
15. ❑ Coastal Banks a.linear feet b.linear feet
16. ❑ Rocky Intertidal
Shores a.square feet b.square feet
17. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet
19. ❑ Land Under Salt
Ponds a.square feet b.square feet
c.dy dredged d.ciy dredged
1s. ❑ Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
20. ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under
the Ocean, and/or inland Land Under Waterbodies and
Waterways, above
a.dy dredged b.o/y dredged
21. ® Land Subject to 4800 4800
Coastal Storm a.square feet b.square feet
Flowage
22. ❑ Riverfront Area
a.total sq.feet b.total sq.feet
Sq ft within 100 It
c.square feet d.square feet e.square feet f.square feet
Sq ft between 100-
200 ft g.square feet h.square feet i.square feet j.square feet
WPWOM5.doc• rev.6/16/2015
Page 4 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-627
WPA Form 5 — Order of Conditions MassDEPFile#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
city/Town
B. Findings (cont.)
•#23.If the 23. ❑ Restoration/Enhancement•:
project is for
the purpose of
restoring or s. uare feet of BVW
enhancing a aq b.square feet of salt marsh
wetland
resource area 24. ❑ Stream Crossing(s):
in addition to
the square
footage that a.number of new stream crossings b.number of replacement stream crossings
has been C. General Conditions Under Massachusetts Wetlands Protection Act
entered in
Section 8.5.c
B.17.c or
The following conditions are only applicable to Approved projects.
Marsh)above, 1. Failure to comply with all conditions stated herein, and with all related statutes and other
please enter
the additional regulatory measures, shall be deemed cause to revoke or modify this Order.
amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying
with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this
Order unless either of the following apply:
a. The work is a maintenance dredging project as provided for in the Act; or
b. The time for completion has been extended to a specified date more than three years,
but less than fiveears from the date of issuance.ce. If this Order is intended to be valid
for more than three years, the extension date and the special circumstances warranting
the extended time period are set forth as a special condition in this Order.
c. If the work is for a Test Project, this Order of Conditions shall be valid for no more than
one year.
5. This Order may be extended by the issuing authority for one or more periods of up to three
years each upon application to the issuing authority at least 30 days prior to the expiration
date of the Order. An Order of Conditions for a Test Project may be extended for one
additional year only upon written application by the applicant, subject to the provisions of 310
CMR 10.05(11)(f).
6. If this Order constitutes an Amended Order of Conditions, this Amended Order of
Conditions does not extend the issuance date of the original Final Order of Conditions and
the Order will expire on unless extended in writing by the Department.
7. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash,
refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath,
paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the
foregoing.
vryarorm&do - rev.6/16/2015
Page 5 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands 64-627
WPA Form 5 — Order of Conditions MassDEPFile#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
City/Town
C. General Conditions Under Massachusetts Wetlands Protection Act
8. This Order is not final until all administrative appeal periods from this Order have elapsed,
or if such an appeal has been taken, until all proceedings before the Department have been
completed.
9. No work shall be undertaken until the Order has become final and then has been recorded
in the Registry of Deeds or the Land Court for the district in which the land is located, within
the chain of title of the affected property. In the case of recorded land, the Final Order shall
also be noted in the Registry's Grantor Index under the name of the owner of the land upon
which the proposed work is to be done. In the case of the registered land, the Final Order
shall also be noted on the Land Court Certificate of Title of the owner of the land upon
which the proposed work is done. The recording information shall be submitted to the
Conservation Commission on the form at the end of this Order,which form must be
stamped by the Registry of Deeds, prior to the commencement of work.
10. A sign shall be displayed at the site not less then two square feet or more than three
square feet in size bearing the words,
"Massachusetts Department of Environmental Protection" [or, "MassDEP"]
"File Number 64-627 "
11. Where the Department of Environmental Protection is requested to issue a Superseding
Order, the Conservation Commission shall be a party to all agency proceedings and
hearings before MassDEP.
12. Upon completion of the work described herein, the applicant shall submit a Request for
Certificate of Compliance(WPA Form 8A)to the Conservation Commission.
13. The work shall conform to the plans and special conditions referenced in this order.
14. Any change to the plans identified in Condition#13 above shall require the applicant to
inquire of the Conservation Commission in writing whether the change is significant enough
to require the filing of a new Notice of Intent.
15. The Agent or members of the Conservation Commission and the Department of
Environmental Protection shall have the right to enter and inspect the area subject to this
Order at reasonable hours to evaluate compliance with the conditions stated in this Order,
and may require the submittal of any data deemed necessary by the Conservation
Commission or Department for that evaluation.
16. This Order of Conditions shall apply to any successor in interest or successor in control of
the property subject to this Order and to any contractor or other person performing work
conditioned by this Order.
v aform5.dm- rev.6/162015
Page 6 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-627
WPA Form 5 - Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Cityrrown
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated
Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be
marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall
be maintained until a Certificate of Compliance has been issued by the Conservation
Commission.
18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have
been fully stabilized with vegetation or other means.At no time shall sediments be
deposited in a wetland or water body. During construction, the applicant or his/her designee
shall inspect the erosion controls on a daily basis and shall remove accumulated sediments
as needed. The applicant shall immediately control any erosion problems that occur at the
site and shall also immediately notify the Conservation Commission, which reserves the
right to require additional erosion and/or damage prevention controls it may deem
necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
19. The work associated with this Order(the"Project')
(1) ❑ is subject to the Massachusetts Stormwater Standards
(2) ® is NOT subject to the Massachusetts Stormwater Standards
If the work is subject to the Stormwater Standards,then the project is subject to the
following conditions:
a) All work, including site preparation, land disturbance, construction and redevelopment,
shall be implemented in accordance with the construction period pollution prevention and
erosion and sedimentation control plan and, if applicable, the Stormwater Pollution
Prevention Plan required by the National Pollution Discharge Elimination System
Construction General Permit as required by Stormwater Condition 8. Construction period
erosion, sedimentation and pollution control measures and best management practices
(BMPs)shall remain in place until the site is fully stabilized.
b) No stormwater runoff may be discharged to the post-construction stormwater BMPs
unless and until a Registered Professional Engineer provides a Certification that:
i. all construction period BMPs have been removed or will be removed by a date certain
specified in the Certification. For any construction period BMPs intended to be converted
to post construction operation for stormwater attenuation, recharge, and/or treatment, the
conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that
the BMP has been properly cleaned or prepared for post construction operation, including
removal of all construction period sediment trapped in inlet and outlet control structures;
ii. as-built final construction BMP plans are included, signed and stamped by a Registered
Professional Engineer, certifying the site is fully stabilized;
N. any illicit discharges to the stormwater management system have been removed, as per
the requirements of Stormwater Standard 10;
wpafo 5.dw• rev.6116/2015 Page 7 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands 64-627
WPA Form 5 — Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
City/Town
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
iv. all post-construction stormwater BMPs are installed in accordance with the plans
(including all planting plans)approved by the issuing authority, and have been inspected to
ensure that they are not damaged and that they are in proper working condition;
v. any vegetation associated with post-construction BMPs is suitably established to
withstand erosion.
c) The landowner is responsible for BMP maintenance until the issuing authority is noted
that another party has legally assumed responsibility for BMP maintenance. Prior to
requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible
party(defined in General Condition 18(e))shall execute and submit to the issuing authority
an Operation and Maintenance Compliance Statement("O&M Statement)for the
Stormwater BMPs identifying the party responsible for implementing the stormwater BMP
Operation and Maintenance Plan ("O&M Plan") and certifying the following:
i.)the O&M Plan is complete and will be implemented upon receipt of the Certificate of
Compliance, and
ii.)the future responsible parties shall be notified in writing of their ongoing legal
responsibility to operate and maintain the stormwater management BMPs and
implement the Stormwater Pollution Prevention Plan.
d) Post-construction pollution prevention and source control shall be implemented in
accordance with the long-term pollution prevention plan section of the approved
Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by
the National Pollution Discharge Elimination System Multi-Sector General Permit.
e) Unless and until another party accepts responsibility, the landowner, or owner of any
drainage easement, assumes responsibility for maintaining each BMP. To overcome this
presumption, the landowner of the property must submit to the issuing authority a legally
binding agreement of record, acceptable to the issuing authority, evidencing that another
entity has accepted responsibility for maintaining the BMP, and that the proposed
responsible party shall be treated as a permittee for purposes of implementing the
requirements of Conditions 18(f)through 18(k)with respect to that BMP. Any failure of the
proposed responsible party to implement the requirements of Conditions 18(f)through
18(k)with respect to that BMP shall be a violation of the Order of Conditions or Certificate
of Compliance. In the case of stormwater BMPs that are serving more than one lot, the
legally binding agreement shall also identify the lots that will be serviced by the stormwater
BMPs. A plan and easement deed that grants the responsible party access to perform the
required operation and maintenance must be submitted along with the legally binding
agreement.
f) The responsible party shall operate and maintain all stormwater BMPs in accordance
with the design plans, the O&M Plan, and the requirements of the Massachusetts
Stormwater Handbook.
.Pa(orm5.dW• rev.6116/2015
Page 8 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-627
WPA Form 5 — Order of Conditions MassDEPFile#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPTmnsaction#
Cit frown
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
g) The responsible party shall:
1. Maintain an operation and maintenance log for the last three(3)consecutive
calendar years of inspections, repairs, maintenance and/or replacement of the
stormwater management system or any part thereof, and disposal (for disposal the
log shall indicate the type of material and the disposal location);
2. Make the maintenance log available to MassDEP and the Conservation
Commission ("Commission") upon request; and
3. Allow members and agents of the MassDEP and the Commission to enter and
inspect the site to evaluate and ensure that the responsible party is in compliance
with the requirements for each BMP established in the O&M Plan approved by the
issuing authority.
h) All sediment or other contaminants removed from stormwater BMPs shall be disposed
of in accordance with all applicable federal, state, and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04
are prohibited.
j) The stormwater management system approved in the Order of Conditions shall not be
changed without the prior written approval of the issuing authority.
k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site
Design Credit(as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1,
Low Impact Development Site Design Credits)shall not be altered without the prior written
approval of the issuing authority.
.
1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld.
Any fencing constructed around stormwater BMPs shall include access gates and shall be
at least six inches above grade to allow for wildlife passage.
Special Conditions(if you need more space for additional conditions, please attach a text
document):
20. For Test Projects subject to 310 CMR 10.05(l 1), the applicant shall also implement the
monitoring plan and the restoration plan submitted with the Notice of Intent. If the
conservation commission or Department determines that the Test Project threatens the
public health, safety or the environment, the applicant shall implement the removal plan
submitted with the Notice of Intent or modify the project as directed by the conservation
commission or the Department.
wpalorm5.doc• rev.6/16/2015 Page 9 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-627
WPA Form 5 — Order of Conditions MassDEPFile#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Cityrrown
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No
2. The Salem hereby finds (check one that applies):
Conservation Commission
a. ❑that the proposed work cannot be conditioned to meet the standards set forth in a
municipal ordinance or bylaw, specifically:
1.Municipal Ordinance or Bylaw 2.Citation
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides measures which are adequate to meet these
standards, and a final Order of Conditions is issued.
b. ® that the following additional conditions are necessary to comply with a municipal
ordinance or bylaw:
Wetlands Protection&Conservation Ordinance c.50
1.Municipal Ordinance or Bylaw 2.Citation
3. The Commission orders that all work shall be performed in accordance with the following
conditions and with the Notice of Intent referenced above. To the extent that the following
conditions modify or differ from the plans, specifications, or other proposals submitted with
the Notice of Intent, the conditions shall control.
The special conditions relating to municipal ordinance or bylaw are as follows(if you need
more space for additional conditions, attach a text document):
Attached conditions are issued under the Wetlands Protection Act and are sufficient for
compliance with the local ordinance
wpaform5.dM- rev.5/16/2015
Page 10 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands 6&1-6a-(
WPA Form 5 — Order of Conditions MassDEP File
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
City/Tow
E. Signatures
Important:When L
This Order is valid for three years, unless otherwise specified as a special
filling p P
I g out fonts condition pursuant to General Conditions#4,from the date of issuance. 1. to of I uance
on the computer, �
use only the tab Please indicate the number of members who will sign this form.
key to move your This Order must be signed by a majority of the Conservation Commission. 2.Number of Signers
cursor-do not
use the return The Order must be mailed by certified mail (return receipt requested)or hand delivered to
key. the applicant.A copy must be mailed, hand delivered or filed electronically a t ame time
�1 with the appropriate MassDEP Regional Office. /
Signat
tarn
❑ b hand delivery on by certified mail,return receipt
requested,on
a ia�il -,
Date Da
F. Appeals
The applicant,the owner, any person aggrieved by this Order, any owner of land abutting
the land subject to this Order, or any ten residents of the city or town in which such land is
located, are hereby notified of their right to request the appropriate MassDEP Regional
Office to issue a Superseding Order of Conditions.The request must be made by certified
mail or hand delivery to the Department,with the appropriate filing fee and a completed
Request for Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)
within ten business days from the date of issuance of this Order.A copy of the request shall
at the same time be sent by certified mail or hand delivery to the Conservation Commission
and to the applicant, if he/she is not the appellant.
Any appellants seeking to appeal the Department's Superseding Order associated with this
appeal will be required to demonstrate prior participation in the review of this project. Previous
participation in the permit proceeding means the submission of written information to the
Conservation Commission prior to the close of the public hearing, requesting a
Superseding Order, or providing written information to the Department prior to issuance of
a Superseding Order.
The request shall state clearly and concisely the objections to the Order which is being
appealed and how the Order does not contribute to the protection of the interests identified
in the Massachusetts Wetlands Protection Act(M.G.L.c. 131, §40), and is inconsistent
with the wetlands regulations (310 CMR 10.00).To the extent that the Order is based on a
municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or
regulations,the Department has no appellate jurisdiction.
"a5sigs.do • rev.02/25/2010
Page ilof
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 64-627
WPA Form 5 — Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Citylrown
G. Recording Information
Prior to commencement of work, this Order of Conditions must be recorded in the Registry of
Deeds or the Land Court for the district in which the land is located, within the chain of title of
the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land subject to the Order. In the
case of registered land, this Order shall also be noted on the Land Court Certificate of Title of
the owner of the land subject to the Order of Conditions. The recording information on this page
shall be submitted to the Conservation Commission listed below.
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation
Commission.
To:
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
Project Location MassDEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
for: Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wpaform&d.- rev.6A6no15 Page 12 of 12
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
Request for Departmental Action Fee
Transmittal Form Provided by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. Request Information
1. Location of Project
a.Street Address b.City/town,Zip
c.Check number d.Fee amount
Important:
When filling 2. Person or party making request(if appropriate, name the citizen group's representative):
out forms on
the computer, Name
use only the
tab key to Mailing Address
move your
cursor-do City/town State Zip Code
not use the
return key. Phone Number Fax Number(if applicable)
_Q 3. Applicant(as shown on Determination of Applicability(Form 2), Order of Resource Area Delineation
(Form 48), Order of Conditions(Form 5), Restoration Order of Conditions (Form 5A), or Notice of
Non-Significance(Form 6)):
Name
Mailing Address
City/Town State Zip Code
Phone Number Fax Number(if applicable)
4. DEP File Number:
B. Instructions
1. When the Departmental action request is for(check one):
❑ Superseding Order of Conditions—Fee: $120.00(single family house projects)or$245(all other
projects)
❑ Superseding Determination of Applicability—Fee: $120
❑ Superseding Order of Resource Area Delineation—Fee: $120
wpafom5.00c• rev.4122/2015 Page 1 of 2
Massachusetts Department of Environmental Protection LF I
Bureau of Resource Protection - Wetlands DEP File Number:
Request for Departmental Action Fee
Transmittal Form Provided by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Instructions (cont.)
Send this form and check or money order, payable to the CommonweaRh of Massachusetts, to:
Department of Environmental Protection
Box 4062
Boston, MA 02211
2. On a separate sheet attached to this form, state clearly and concisely the objections to the
Determination or Order which is being appealed. To the extent that the Determination or Order is
based on a municipal bylaw, and not on the Massachusetts Wetlands Protection Act or regulations,
the Department has no appellate jurisdiction.
3. Send a copy of this form and a copy of the check or money order with the Request for a
Superseding Determination or Order by certified mail or hand delivery to the appropriate DEP
Regional Office(see http://www.mass.gov/eea/aoencies/massdep/about/contacts/).
4. A copy of the request shall at the same time be sent by certified mail or hand delivery to the
Conservation Commission and to the applicant, if he/she is not the appellant.
wpaf0M5.dW• rev.4/22/2015
Page 2 of 2
w!q Attachment to Order of Conditions # 64-627
Page l of 5
SALEM CONSERVATION COMMISSION
DEP FILE #64-627
2 Atlantic Street
City of Salem, Massachusetts
ADDITIONAL FINDINGS
Based on the Estimated Habitats of Rare Wildlife and Certified Vernal Pools Map (2/2/17, online) from Natural
Heritage & Endangered Species Program (NHESP)of the Massachusetts Division of Fisheries and Wildlife, it has
been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contain any
vernal pools.
This Order permits the construction of a multifamily structure and appurtenances per 1/25/2017 Notice of Intent,
approved plans,and the following conditions.
GENERAL CONDITIONS
1. This Order of Conditions must be recorded in its entirety(including all 5 pages of Special Conditions)
at the Essex County Registry of Deeds or the Land Court for the district in which the land is located,
after the expiration of the 10-day appeal period and within 30 days of the issuance. A copy of the
recording information must be submitted to the Salem Conservation Commission before any
work approved in this Order commences.
2. Approval of this application does not constitute compliance with any law or regulation other than
M.G.L Chapter 131, Section 40,Wetlands Regulations 310 CMR 10.00 and the Cit of
gu y Salem Wetlands
Protection Ordinance, Salem Code Chapter 50.
3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No
alteration of wetland resource areas or associated buffer zones, other than that approved in this Order,
shall occur on this property without prior approval from the Commission.
4. Prior to any work commencing on site,a DEP Sign showing DEP File#64-627 must be installed at the
entrance to the site and seen from the public way,but not placed on a living tree.
5. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the
date of the issuance of this Order.
6. With respect to this Order,the Commission designates the Conservation Agent as its agent with powers
to act on its behalf in administering and enforcing this Order.
7. The Commission or its Agent,officers,or employees shall have the right to enter and inspect the property at
any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131,
Section 40,the Wetlands Regulations 310 CMR 10.00,and shall have the right to require any data or
documentation that it deems necessary for that evaluation.
t: Attachment to Order of Conditions # 64-627
Page 2 of 5
8. The term"Applicant'as used in this Order of Conditions shall refer to the owner,any successor in
interest or successor in control of the property referenced in the Notice of intent, supporting documents
and this Order of Conditions. The Commission shall be notified in writing within 30 days of all
transfers of title of any portion of the property that takes place prior to issuance of the Certificate of
Compliance.
9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and
approvals associated with this project. These permits may include but are not necessarily limited to the
following:
(1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816),U.S. Army
Corps of Engineers.
(2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority
of sec.27(5)of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00.
(3) Design Requirements for Construction in Floodplains under the State Building Code(780 CMR
744.).
10. If there are conflicting conditions within this Order,the stricter condition(s) shall rule.
11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and
surface waters during construction or after completion of the project.
12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods
and boundary during construction if necessary.
13. The Commission reserves the right to impose additional conditions on portions of this project or this site
to mitigate any actual or potential impacts resulting from the work herein permitted.
14. The work shall conform to the following attached plans and special conditions:
Final Approved Plans
SITE PLAN IN SALEM, MA; #2 ATLANTIC STREET
(Title)
1/25/2017
(Dated)
Richard L. Williams
(Signed and Stamped by)
City of Salem Conservation Commission
(On file with)
15. Any proposed changes in the approved plan(s)or any deviation in construction from the approved
plan(s)shall require the applicant to file a Notice of Project Change with the Commission. The Notice
shall be accompanied by a written inquiry prior to their implementation in the field, as to whether the
change(s) is substantial enough to require filing a new Notice of Intent or a request to correct or amend
this Order of Conditions. A copy of such request shall at the same time be sent to the Department of
Environmental Protection.
16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has
been issued,the applicant or current landowner shall submit to the Commission a statement signed by the
Attachment to Order of Conditions# 64627
Page 3 of 5
buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of
the Order of Conditions.
17. [Reserved].
PRIOR TO CONSTRUCTION
18. Prior to the commencement of any activity on this site other than activities listed above,there
must be a Pre-Construction Meeting on site between the project supervisor,the contractor responsible
for the work,and the Conservation Agent and/or a member of the Conservation Commission to ensure
that the requirements of the Order of Conditions are understood. The staked erosion control line shall be
adjusted,if necessary,during the pre-construction meeting. Please contact the Conservation Agent at
(978)619-5685 at least forty-eight(48) hours prior to construction to arrange for the Pre-
Construction Meeting.
19. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and
erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The
Commission and/or its Agent shall inspect and approve such installation at the pre-construction
meeting.
20. No clearing of vegetation,including trees,or disturbance of soil shall occur prior to the pre-construction
meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre-
construction meeting if absolutely necessary in order to place erosion control stakes where required.
21. There shall be adequate additional erosion and sediment controls stored onsite for emergency purposes.
EROSION CONTROL
22. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction,
and shall be maintained during construction in any wetland resource area and/or buffer zones. The
erosion control measures shown on the approval plan(s)and provisions in the Order will be the minimum
standards for this project; the Commission or its Agent may require additional measures.
23. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland
resource areas to prevent sediment from entering wetland resource areas.
24. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or
replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed.
25. The area of construction shall remain in a stable condition at the close of each construction day.
26. Any de-watering of trenches or other excavation required during construction shall be conducted so as
to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered
through straw bale sediment traps,silt filter bags or other means approved by the Commission or its
Administrator.
27. Within thirty(30) days of completion of construction on any given portion of the project,all disturbed
areas in the completed portion of the site shall be permanently stabilized with rapidly growing
vegetative cover,using sufficient top soil to assure long-term stabilization of disturbed areas.
28. If soils are to be disturbed for longer than two(2)months, a temporary cover of rye or other grass
should be established to prevent erosion and sedimentation. If the season is not appropriate for plant
Attachment to Order of Conditions #64627
`!
Page 4 of 5
growth, exposed surface shall be stabilized by other appropriate erosion control measures, firady
anchored,to prevent soils from being washed by rain or flooding.
DURING CONSTRUCTION
29. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all
times when work is in progress.
30. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on
the approved plan(s).
31. All waste products,grubbed stumps,slash;construction materials,etc.shall be deposited at least 100 feet
from wetland resource areas and 200 feet from river.
32. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage
system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be
immediately removed.
33. All exposed sub-soils shall be covered by a minimum of three(3)inches of quality screened loam topsoil
prior to seeding and final stabilization.
34. Immediately following drainage structure installation all inlets shall be protected by silt fence,strawbale
barriers and/or silt bags to filter At from stormwater before it enters the drainage system.
35. There shall be no pumping of water from wetland resource areas.
36. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other
components shall be fixed immediately.
37. During construction,all drainage structures shall be inspected regularly and cleaned as necessary.
38. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance
of enforcement actions by the Conservation Commission including,but not limited to,civil administrative
penalties under M.G.L Chapter 21 A,section 16.
AFTER CONSTRUCTION
39. Upon completion of construction and final soil stabilization,the applicant shall submit the following to
the Conservation Commission to request a Certificate of Compliance(COC):
(1) A Completed Request for a Certificate of Compliance form(WPA Form 8A or other form if
required by the Conservation Commission at the time of request).
(2) A letter from a Registered Professional Engineer certifying compliance of the property with this
Order of Conditions.
(3) An"As-Built'plan signed and stamped by a Registered Professional Engineer or Land Surveyor
showing post-construction conditions within all areas under the jurisdiction of the Massachusetts
Wetlands Protection Act. This plan shall include at a minimum:
(a) All wetland resource area boundaries with associated buffer zones and regulatory setback
areas taken from the plan(s)approved in this Order of Conditions;
(b) Locations and elevations of all stormwater management conveyances,structures and best
management designs,including foundation drains,constructed under this Order within any
wetland resource area or buffer zone;
o;
(;, Attachment to Order of Conditions# 64627
Page 5 of 5
(c) Distances from any structures constructed under this Order to wetland resource areas-
"structures"include,but are not limited to,all buildings,septic system components,wells,
utility lines,fences,retaining walls,and roads/driveways;
(d) A line delineating the limit of work-"work"includes any filling,excavating and/or
disturbance of soils or vegetation approved under this Order;
40. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds
and a copy of the recording submitted to the Salem Conservation Commission.
41. If the completed work differs from that in the original plans and conditions,the report must specify how
the work differs; at which time the applicant shall first request a modification to the Order. Only upon
review and approval by the Commission,may the applicant request in writing a Certificate of
Compliance as described above.
42. Erosion control devices shall remain in place and properly functioning until all exposed soils have been
stabilized with final vegetative cover and the Conservation Commission and/or its Agent has authorized
their removal.
CITY OF SALEM
ASSESSOR'S CERTIFICATION OF ABUTTERS AND
PROPERTY OWNERS
BOARD/COMMISSION: Conservation Commission
PROJECT SITE: 2 Atlantic Street 132-0189-0}
DATE: 01/20/2017
DESCRIPTION OF REQUIREMENT: All abutters and any property owner
within 100 feet of the property line of the land where the activity is proposed
including if land is separated by a public or private street or a body of water and
not unreasonably distant from the project site.
This is to certify that the time of the last assessment for taxation made by the City of
Salem, the names and addresses of those listed on the attached sheets are "abutters and
property owners" (as defined by Wed s Protection Act 310 CMR 10.05(4)(a)) to the
parcel(s) of land listed above as the p of ct site.
Assessor's Signatur : Date:
Number of initialed pages attached:
Once Certified,Return to:
Tom Devine, Department of Planning and Community Development
Com'
Parcel ID: 0189-0 Parcel ID:32-0123-0 Parcel ID:32-0124-0
SHUTE P MELA D NGUYEN HUE T MASS COMMONWEALTH OF
4-6 AT NTIC STREET 96 LINDEN ST BOARD OF TRUSTEES OF ST
SAL , MA 01970 SALEM, MA 01970 SALEM,MA 01970
Parcel ID:32-0175-0 Parcel ID:32-0176-0 Parcel ID:32-0177-0
BERNAL DANIEL VALLEE DENNIS M KANTOROSINSKI REALTY
STEUBER TORY 336 ESSEX STREET KANTOROSINSKI
94 LINDEN STREET SALEM, MA 01970 84-86 LINDEN ST
SALEM,MA 01970 SALEM,MA 01970
Parcel ID:32-0 8-801 6ar,o1YA eoSS Parcel ID:32-0176-802 Parcel ID:32-0187-0
MCAULIFFE MARIA BEAREGARD LORRAINE E
80 LINDEN STREET U1 82 LINDEN STREET U82 11 LUSSIER STREET
SALEM, MA 01970 SALEM, MA 01970 A SALEM, MA 01970
PartVI ID:3 -0188-0 -�}/I�v,W Parce 32-0190-0
A G" LAPH�M OY K
C N7RBRK
C LAPHA�1 E ORT
62 L DRIVE 5 L ISSI R STREETTO1983 SALEM, A01970
Megan Tucker Dylan Payne Partners Realty Trust
13 Lussier Street 13 Lussier Street Klantorosinski Development
Salem MA 01970 Salem MA 01970 19 Leavitt Street
Salem, MA 01970
Miroslaw Trust 4-6 Atlantic Realty trust
Gregory Darius 4-6 Atlantic Street
19 Leavitt Street Salem, MA 01970
Salem, MA 01970
"r'1�sessF'ro
File €dit Rec€td �NawgatelF[acgss_'aLkrlrtres';:'€flnts ;..Options,'gM 5tatust=kL. m .
cam . Indem- 09 Parcel ID Card#
Fl
Add Mod 0el------------
Baca 1b,:3i019# 1'.: » : s Lbcat 6,AT PIT CfiREfT` I #� t as1: 246 '
�� : Cungnl Owner, =� G� —' PriorOwner'' -�_ '10/Factors/Taxes.. `
�a
' 1! 46ATLANTICREALTYTRUST � _
�� '-KANTOROSINSKI MIROSLAW TR - '�
Sieat#$ 46 ATLANTIC STREET 5n 6e #fi ype#1 x
x.r 'SGriet#' $aC�'ec#2, yjls#2;
�"`ityrl�t�sn SALEM �Sbd p� fFype#'�;
'; I�rttnr}CeJSFa�e MA' �#S, ,:''01970 _. ._. AccaauntYypa '
{T(3:$. MM/DDn'YYY egal£1'ePez'�� ,531
lit.
w t7tf -417?I 9/30 r2016_... lvtei tnokup Narijpei 36933 :.
-•� "t Sales = -A =Einem bons �' ' ..fir _^ More Owners t"^`Other Parties '.
d'. ,Open 1/18/201.7,';,;1.F 3.11 PM7 _ m.,y ;* r 7956 ` 4uickList
:.
Rale�Edr€`� Perntd�i�Favrgate-#'Peaces UFdtttes TaplS';�Opt,oe�sHelp �StaFus: � �� °w�° ms`s
MUM
arpel!tq 2 8H�16 k,_ , sed i''=tom _1acalirrt�T3�_ a5i::prSTF4�@I=:: 'E, _ 1;,$26D,�_0,0..
Prior Owner " `-iD/FactorstTaxes
1TUCKER MEGHAN
3
#ta 13LU$SIERSTREET S e5 spa 1,
1�Ydvuic�ZStaf MA, rF�a�tal+.' 01970 �At#aur��.yRe;� m
alydLlwa�a, v
r �
� +merdreuprasf1 ,6aFg 31GB1201h c Q +narLap +rxtdurnba 35954 AF .
•``;''MoreOwners :'' s`n''aOtherParties
,E.sDpen /18/2077 , ,=#,3:09PM Fl uickUst
Fda.€Edttftecard tdavtgate RrecessUfditlasTaatsptians Hetpu -Status . .. . .rr-t'�*u.y#. -�:
IndexedBy"- ParcellD Card#
at ItD'zI320i �: - '-Lneahan:r =��LANTfG�i! 'f€SFiLEM € :_`Cdst 8Hia5[�TT '
� .�Pnor Owner %,�` ID/F�c[orsJTaxes
T ' '•.,7m , -�� ` �r � � .... fhaiar'rae' � esfiznTlW
m _
, r GREGORY&KANTOROSINSKI DEV PARTNERS REALTY TRUST I `
„GREGORY DARIUSJKANTOROSINSKI 'MIROSLAW TSS*
kaf#1' 19 LEAVITT STREET #ae #T fyp #1w s=
feetk" � Loce�f yp�#2, e I
Town.SALEM »gf " �ea�i3, i?pe#9,
ffpwtir�tStete MA �oCPa "01970 {
�epa�fat�.B�IL '
��il$ MM/DDrMN L >3ef8tenr� '55061a� :�d pwr�r� 1
ATLvtYeF.Qt1id �. 5 e66Te 1216 '016 9wtler LitBkpP .. G 37266 J
Sales -
Exem ions`` �-�* " .-=i` ?�* More Osuners ==,r:L Other Parties
g; , Open . ',; X1/18/2017, '305 PM t; Ownership Information ,ra.�,,,,,y s,_„ ,7955 [ 4uickList
�1Cl ®8® 2t23h1!!i 101xmo 1111112
L] `
W157 ERIA STREET I
LLS
Q
lu
a
w
N w
LINDEN STREET wad
114
LUSS' STREET
Q
Ul
0�
\�c
a
cc
P r
W PQM u
P
0
CANAL STREET CANAL STREET CANAL STREET
Ell E €
13
d
R
E
�gdl��
1
1 Project No. SALE-0028
1 Applicant:
Gregory Investment Group, LLC
301 Edgewater Drive,Suite 100
1 Wakefield, MA 01880
1
1
1 NOTICE
1
1 OF INTENT
1
2 Atlantic Street
1 Salem, MA 01970
January 25, 2017
1
1 �
& WILLIAMS
SPARAGES
1 189 N.Man Street,Suite 101
Middleton,MA 01949
1 Office Tel: 978-539-8088
Fax:978-539-8200
www.wsengineers.com
1
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands MassDEP File Number
WPA Form 3 - Notice of Intent
Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
Cityrrown
Important:
When filling out A. General Information
' forms on the
computer,use 1. Project Location (Note: electronic filers will click on button to locate project site):
only the tab key
to move your 2 Atlantic Street Salem 01970
tcursor-do not
use the return a.Street Address b.City/Town c.Zip Code
key. 42.50566 N 70.89334 W
Latitude and Longitude: d.Latitude e.Longitude
1 32 189
f.Assessors Map/Plat Number g.Parcel/Lot Number
2. Applicant:
a. First Name b.Last Name
Note: Gregory Investment Group LLC
I Before c.Organization
completing301 Edgewater Drive Suite 100
form consultlt
your local d.Street Address
Conservation Wakefield MA 01880
Commission e.City/Town f.State g.Zip Code
regarding any 781-968-5474 darius.gre or mail.com
municipal bylaw 9 Y@9
or ordinance. h.Phone Number i.Fax Number j. Email Address
3. Property owner(required if different from applicant): ❑ Check if more than one owner
' a. First Name b.Last Name
c.Organization
d.Street Address
e.Cityrrown f.State g.Zip Code
' K.Phone Number i.Fax Number j.Email address
4. Representative (if any):
' Greg Hochmuth
a.First Name b. Last Name
Williams& Sparages LLC
c.Company
189 North Main Street, Suite 101
d.Street Address
Middleton MA 01949
e.Cityrrown f.State g.Zip Code
978-539-8088 978-539-8200 ghochmuth@wsengineers.com
' h.Phone Number i. Fax Number j.Email address
5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form):
$500.00 $237.50 $262.50
' a.Total Fee Paid b.State Fee Paid c.Cityrrown Fee Paid
wpaform3.doc•rev.3/10/2016 Page 1 of 9
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands
MassDEP File Number
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction NumberSalem
Cityrrown
A. General Information (continued)
6. General Project Description:
To construct a single family dwelling within land subject to coastal storm flowage.
I7a. Project Type Checklist: (Limited Project Types see Section A. 7b.)
1. ® Single Family Home 2. ❑ Residential Subdivision
' 3. ❑ Commercial/Industrial 4. ❑ Dock/Pier
' 5. ❑ Utilities 6. ❑ Coastal engineering Structure
7. ❑ Agriculture (e.g., cranberries, forestry) 8. ❑ Transportation
' 9. ❑ Other
7b. Is any portion of the proposed activity eligible to be treated as a limited project(including Ecological
Restoration Limited Project)subject to 310 CMR 10.24 (coastal)or 310 CMR 10.53 (inland)?
i. ❑ Yes ® No If yes, describe which limited project applies to this project. (See 310 CMR
10.24 and 10.53 for a complete list and description of limited project types)
2. Limited Project Type
If the proposed activity is eligible to be treated as an Ecological Restoration Limited Project(310
CMR10.24(8), 310 CMR 10.53(4)), complete and attach Appendix A: Ecological Restoration Limited
Project Checklist and Signed Certification.
8. Property recorded at the Registry of Deeds for:
Essex
a.County b.Certificate#(if registered land)
35506 197
e Number
' gB. Buffer Zone & Resource Area Impacts (temporary & permanent)
' 1. ❑ Buffer Zone Only—Check if the project is located only in the Buffer Zone of a Bordering
Vegetated Wetland, Inland Bank, or Coastal Resource Area.
2. ❑ Inland Resource Areas(see 310 CMR 10.54-10.58; if not applicable, go to Section B.3,
Coastal Resource Areas).
Check all that apply below. Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
' wpaform3.doc rev.3/10/2016 Page 2 of 9
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands MaaaDEP File Number
WPA Form 3 - Notice of Intent
Document Transaction Number
' L11 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
Cityrrown
B. Buffer Zone & Resource Area Impacts (temporary sr permanent) (conYd)
Resource Area Size of Proposed Alteration Proposed Replacement(if any)
1 For all projects a. ❑ Bank 1.linear feet 2.linear feet
affecting other b. ❑ Bordering Vegetated
Resource Areas, Wetland 1.square feet 2.square feet
please attach a
Inarrative c. ❑ Land Under
explaining how1.square feet 2.square feet
the resource Waterbodies and
area was - Waterways 3.cubic yards dredged
delineated.
Resource Area Size of Proposed Alteration Proposed Replacement(if any)
d. ❑ Bordering Land
Subject to Flooding 1.square feet 2.square feet
3.cubic feet of Flood storage lost 4.cubic feet replaced
e. ❑ Isolated Land
Subject to Flooding 1.square feet
2.cubic feet of flood storage lost 3.cubic feet replaced
f. E Riverfront Area Mosquito Brook
1. Name of Waterway(if available) -specify coastal or inland
' 2. Width of Riverfront Area (check one):
❑ 25 ft. - Designated Densely Developed Areas only
❑ 100 ft. - New agricultural projects only
E 200 ft. -All other projects
3. Total area of Riverfront Area on the site of the proposed project: square feet
4. Proposed alteration of the Riverfront Area:
a.total square feet b.square feet within 100 ft. c.square feet between 100 ft.and 200 ft.
5. Has an alternatives analysis been done and is it attached to this NOI? E Yes❑ No
6.Was the lot where the activity is proposed created prior to August 1, 1996? E Yes❑ No
' 3. E Coastal Resource Areas: (See 310 CMR 10.25-10.35)
Note: for coastal riverfront areas, please complete Section B.2.f. above.
wpaform3.doc•rev.3/10/2016 Page 3 of 9
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands
MassDEP File Number
WPA Form 3 - Notice of Intent
Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
Cityrrown
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont'd)
' Check all that apply below. Attach narrative and supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
Online Users:
Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any)
document
' transaction
number E]a. Designated Port Areas Indicate size under Land Under the Ocean, below
numb
(provided on your
receipt page) b. ❑ Land Under the Ocean
with all 1.square feet
'
supplementary
information you 2.cubic yards dredged
submit to the
Department. c. ❑ Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below
d. ❑ Coastal Beaches 1.square feet 2.cubic yards beach nourishment
e. ❑ Coastal Dunes 1.square feet 2.cubic yards dune nourishment
Size of Proposed Alteration Proposed Replacement(if any)
f. ❑ Coastal Banks 1. linear feet
g. ❑ Rocky Intertidal
' Shores 1.square feet
h. ❑ Salt Marshes 1.square feet 2.sq ft restoration, rehab.,creation
i. ❑ Land Under Salt
Ponds 1.square feet
2.cubic yards dredged
j. ❑ Land Containing
Shellfish 1.square feet
k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
25 +/-
1.
5 +/-1.cubic yards dredged
1. 0 Land Subject to 4,800+/-
Coastal Storm Flowage 1.square feet
4. ❑ Restoration/Enhancement
If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the
square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional
' amount here.
a.square feet of BVW b.square feet of Salt Marsh
' 5. ❑ Project Involves Stream Crossings
a.number of new stream crossings b. number of replacement stream crossings
' wpaform3.doc•rev.3/10/2016 Page 4 of 9
Massachusetts Department of Environmental Protection
Provided by MassDEP:
Bureau of Resource Protection - Wetlands
MassDEP File Number
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction NumberSalem
Cityfrown
C. Other Applicable Standards and Requirements
' ❑ This is a proposal for an Ecological Restoration Limited Project. Skip Section C and
complete Appendix A: Ecological Restoration Notice of Intent— Required Actions (310 CMR
10.11).
Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review
1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on
the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the
Natural Heritage and Endangered Species Program (NHESP)?To view habitat maps, see the
Massachusetts Natural Heritage Atlas or go to
htto://maos.massgis.state.ma.us/PRI EST HAB/viewer.htm.
a. ❑ Yes ® No
If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
MASSGISI/2017 1 Rabbit Hill Road
Ib.Date of map Westborough, MA 01581
' If yes, the project is also subject to Massachusetts Endangered Species Act(MESA) review(321
CMR 10.18). To qualify for a streamlined, 30-day, MESANVetlands Protection Act review, please
complete Section CA.c, and include requested materials with this Notice of Intent(NOI); OR
complete Section C2.f, if applicable. If MESA supplemental information is not included with the NOI,
by completing Section 1 of this form, the NHESP will require a separate MESA filing which may take
' up to 90 days to review(unless noted exceptions in Section 2 apply, see below).
c. Submit Supplemental Information for Endangered Species Review'
1. ❑ Percentage/acreage of property to be altered:
(a)within wetland Resource Area percentage/acreage
1 (b)outside Resource Area percentage/acreage
2. ❑ Assessor's Map or right-of-way plan of site
2. ❑ Project plans for entire project site, including wetland resource areas and areas outside of
wetlands jurisdiction, showing existing and proposed conditions, existing and proposed
tree/vegetation clearing line, and clearly demarcated limits of work"
(a)❑ Project description (including description of impacts outside of wetland resource area&
bufferzone)
(b) ❑ Photographs representative of the site
Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review(see
htto7//www mass.gov/eea/agencies/dfci/dfw/natural-heritage/regulatory-review. Priority Habitat includes habitat for state-listed plants
and strictly upland species not protected by the Wetlands Protection Act.
MESA projects may not be segmented(321 CMR 10.16).The applicant must disclose full development plans even if such plans are
not required as part of the Notice of Intent process.
wpaform3.doc•rev.3/10/2016 Page 5 of 9
Massachusetts Department of Environmental Protection
Provided by MassDEP:
Bureau of Resource Protection -Wetlands
•
WPA Form 3 - Notice of Intent MassDEP File Number
Document Transaction Number
1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/rown
C. Other Applicable Standards and Requirements (cont'd)
1 (c)❑ MESA filing fee (fee information available at
http://www.mass.gov/dfwele/dfw/nhesp/regulatory review/mesalmesa fee schedule.htm).
Make check payable to"Commonwealth of Massachusetts-NHESP" and may to NHESP at
above address
1 Projects altering 10 or more acres of land, also submit.-
(d)
ubmit:(d)❑ Vegetation cover type map of site
' (e)❑ Project plans showing Priority & Estimated Habitat boundaries
I (t) OR Check One of the Following
1. ❑ Project is exempt from MESA review.
Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14,
1 http://www.mass.gov/dfwele/dfw/nhesp/regulatory review/mesa/mesa exemotions.htm;
the NO[ must still be sent to NHESP if the project is within estimated habitat pursuant to
310 CMR 10.37 and 10.59.)
2.❑ Separate MESA review ongoing. a. NHESP Tracking# b.Date submitted to NHESP
' 3. ❑ Separate MESA review completed.
Include copy of NHESP "no Take" determination or valid Conservation & Management
Permit with approved plan.
3. For coastal projects only, is any portion of the proposed project located below the mean high water
line or in a fish run?
a. El Not applicable-project is in inland resource area only b.❑ Yes ® No
1 If yes, include proof of mailing, hand delivery, or electronic delivery of NOI to either:
1 South Shore-Cohasset to Rhode Island border, and North Shore-Hull to New Hampshire border:
the Cape&Islands:
Division of Marine Fisheries- Division of Marine Fisheries-
Southeast Marine Fisheries Station North Shore Office
Attn: Environmental Reviewer Attn: Environmental Reviewer
1213 Purchase Street—3rd Floor 30 Emerson Avenue
New Bedford, MA 02740-6694 Gloucester, MA 01930
1 Email: DMF.EnvReview-South(gastate ma.us Email: DMF.EnvReview-North(a)state.ma.us
Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region,
' please contact MassDEP's Boston Office. For coastal towns in the Southeast Region, please contact
MassDEP's Southeast Regional Office.
wpaform3.doc•rev.3/10/2016 Page 6 of 9
1
Massachusetts Department of Environmental Protection Provided by MassDEP:
' Bureau of Resource Protection - Wetlands
MassDEP File Number
WPA Form 3 - Notice of Intent
Document Transaction Number
I Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City Town
C. Other Applicable Standards and Requirements (cont'd)
' 4. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
Online users: a. ❑ Yes ® No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP
Include your Website for ACEC locations). Note: electronic filers click on Website. ,,
document
transaction b.ACEC
number
1 (provided on your 5. Is any portion of the proposed project within an area designated as an Outstanding Resource Water
receipt page) (ORW)as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00?
with all
supplementary a. ❑ Yes ® No
' information you
submit to the 6. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Department. Restriction Act(M.G.L. c. 131, §40A)or the Coastal Wetlands Restriction Act(M.G.L. c. 130, § 105)?
a. ❑ Yes ® No
7. Is this project subject to provisions of the MassDEP Stormwater Management Standards?
a. ❑ Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management
Standards per 310 CMR 10.05(6)(k)-(q)and check if:
1. ❑ Applying for Low Impact Development(LID) site design credits (as described in
Stormwater Management Handbook Vol. 2, Chapter 3)
2. ❑ A portion of the site constitutes redevelopment
3. ❑ Proprietary BMPs are included in the Stormwater Management System.
b. ® No. Check why the project is exempt:
' 1. ® Single-family house
2. ❑ Emergency road repair
3. ❑ Small Residential Subdivision (less than or equal to 4 single-family houses or less than
or equal to 4 units in multi-family housing project)with no discharge to Critical Areas.
D. Additional Information
❑ This is a proposal for an Ecological Restoration Limited Project. Skip Section D and complete
Appendix A: Ecological Restoration Notice of Intent— Minimum Required Documents (310 CMR
10.12).
Applicants must include the following with this Notice of Intent(NOI). See instructions for details.
Online Users: Attach the document transaction number(provided on your receipt page)for any of
the following information you submit to the Department.
1. ® USGS or other map of the area (along with a narrative description, if necessary) containing
' sufficient information for the Conservation Commission and the Department to locate the site.
(Electronic filers may omit this item.)
2. ® Plans identifying the location of proposed activities (including activities proposed to serve as
a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative
to the boundaries of each affected resource area.
' wpaform3.doc•rev.3/10/2016 Page 7 of 9
' Massachusetts Department of Environmental Protection Provided by MassDEP:
1 Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 - Notice of Intent
Document Transaction Number
I Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/raven
D. Additional Information (cont'd)
3. ❑ Identify the method for BVW and other resource area boundary delineations (MassDEP BVW
Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.),
and attach documentation of the methodology.
4. 0 List the titles and dates for all plans and other materials submitted with this NOI.
' Site Plan -2 Atlantic Street
a. Plan Title
Williams& Sparages LLC Richard L. Williams
b. Prepared By c.Signed and Stamped by
1/25/2017 1" =20'
d. Final Revision Date e.Scale
f.Additional Plan or Document Title g. Date
5. ❑ If there is more than one property owner, please attach a list of these property owners not
listed on this form.
' 6. ❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
8. ® Attach NOI Wetland Fee Transmittal Form
9. ❑ Attach Stormwater Report, if needed.
E. Fees
1. ❑ Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district
of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing
authority, or the Massachusetts Bay Transportation Authority.
tApplicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland
Fee Transmittal Form) to confirm fee payment:
5738 1/19/2017
2. Municipal Check Number 3.Check date
5736 1/19/2017
4.State Check Number 5.Check date
Mike Kantorosinski Realty Trust
6.Payor name on check: First Name 7.Payor name on check: Last Name
iwpaform3.doc•rev. 3/10/2016 Page 8 of 9
1
Massachusetts Department of Environmental Protection Pr6wdedbyMassDEP ={1
Bureau of Resource Protection -Wetlands �+
blassDEP File Number `"5,�„
ON
WPA Form 3 - Notice of Intent
I Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
cityrrown
F. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying
plans, documents, and supporting data are true and complete to the best of my knowledge. I understand
that the Conservation Commission will place notification of this Notice in a local newspaper at the
expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to
' the requirements of M.G.L. c. 131, §40. Notice must be made by Certificate of Mailing or in writing by
hand delivery or certified mail (return receipt requested)to all abutters within 100 feet of the property line
Of ro ct jo2ption.
aLo
1. nature Applicant 2.Date
3.S g a u e of roperty Owner(if different) 4.D to q/
I I -L Zo��
5.Signatu of presentative(if any) 66.Dal
For Conservation Commission:
Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents,
' two copies of the NOI Wetland Fee Transmittal Form,and the city/town fee payment,to the
Conservation Commission by certified mail or hand delivery.
For MassDEP:
One copy of the completed Notice of Intent(Form 3), including supporting plans and documents, one
' copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the
MassDEP Regional Office (see Instructions) by certified mail or hand delivery.
Other:
' If the applicant has checked the"yes"box in any part of Section C, Item 3, above, refer to that
section and the Instructions for additional submittal requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a
1 timely manner may result in dismissal of the Notice of Intent.
wpafonn3.doc•rev.3/10/2016 Page 9 of 9
2 Atlantic Street
I ' Salem, Massachusetts
Project Narrative
(January 2017)
The property is a residential lot that is on the corner of Atlantic and Lussier Street near the Salem
State campus and is currently maintained as a lawn area. The lot is approximately 5,250 square feet
' m size and is shown on a plot plan of land,prepared by Bay State Surveying Associates,dated July
27,2009. The entire property falls within Land Subject to Coastal Storm Flowage.
The proposal is to construct a dwelling,driveways,utilities and a roof recharge system.
Jurisdictional Wetland Resource Areas:
Land Subject to Coastal Storm Flowage, (LSCSF
The 100 Year Flood plain is mapped by FEMA as a Zone AE, (elevation 11), and is shown on
community panel 25009C0419G, dated July 16,2014.
Performance Standards:
There are no specific performance standards associated with LSCSF,however;the project has been
designed to incorporate a roof recharge system that should help infiltrate stormwater during smaller
storm events, (see attached roof recharge calculations and operation and maintenance plan),and
care was taken to design a structure that is commensurate with other structures in the area. There
should be no measurable impact to the LSCSF as a result of this project.
Erosion Control Plan
Even though there are no wetlands in the general area the applicant is proposing a 12-inch diameter
mulch sock around portions of the work area to keep sediment from migrating onto the adjacent
' streets and abutting properties.
' 189 NORTH MAIN STREET
WILLIAMS& SPARAGES C(&—
WILLIAMS SUITE 101
CIVIL ENGINEERING& SPARAGES MIDDLETON,MA 01949
LAND SURVEYORS T PHONE: (978)539-8088
FAX: (978)539-8200
S aGo 9e
—/ V Sa'Ifers•=Y C
� Lt Y a./✓/�S9 2 OQ�i
Nagle H,ll Cem � � �•F ,. �: SNOPEAVE `\., �`� ' ` ✓ ���� � yp -.:
PetersPomC
rua
er-
y Q `i� < �'. ®���,-oo, y; t � L�✓r�=FI br � ..
�" 14 F!'�� Nuck Pomt
try,
Y
` f �' '" '• •'� �� t�lotister Rocks
„a
hi
EpSRE �Marys�em°t :..:.
8 NEW \ o .1='
� 94f � Cem 3{;:J q 3` •.
,?REN 5T ^ o � y � °p oE`�° ,.';- /•',,
wAW °
SN� i,
E
,,a t ' yA` EM MARITIM
1 ��! p
° o tNATIO L HISTORIC SITE
.Ri ORD SS' �„�• f � �' �... C".^���
y ~ \
(� N
Z •moi Q `Hl� r 1
aow z � y o ��O J4CKSDN ST 7 y Long`Ryint
nalmer
Cove
•' O.rte 4 °�Po� m � ��OPS S� ` SalCl11 r Y 1
i
Palme•lPoinf
10
ti
i � 50, o Z� / \l� ,�SLlelf :c�y�'r,i � ��•-
' N
UNITED STATES GEOLOGIC SURVEY MAP LOCUS MAP
SALEM,MASS QUAD #2 ATLANTIC STREET
SCALE: 1:25,000(metric contours) SALEM, MA 01970
r �■ r� �r ri �r �r a� ar rr �r �r �r r�/��/����/�J����\�J�r\��\� �■■� r �r r
.'� dr • ' I •a �«f :1`C•W: CV.'
. ,��Ii. _�r .LAUREL STREET. �`AVENUE�m ,.,
Diu, r .... • _.� , '' .' GLENDALE, ..
A'D T'�qe ,s ` -'!'+�•` 1STAEET MAP SCALE 1" 0 500'
. 50 0 500 1000
•n y :`.
MEADOW t a� r L FEET
.$TREETSt' t ' { fpVENUEI ucrcla
..'f4Ni :• � .Y� - OCEAN ,�..
• llD -.� .tis
It. r elm 9' TER
• � N
am
ROK m x _
�! 3T FF,T _ - Jim
ht HERSEYb+"' yt rNl m T,, PANEL 0419G
4-'
i ..•. 4 STNEEff` m 7f r 1 °
. , A FIRM
ST�`q TLgNU � :.1•-•5� , 15e Bed: >• _ �o m }-mil 'pVENUE . q .a
fFT - aJt 4 X11 REST A.EN11E. Z ' + 9
•. V.rrr• m ;�' ?i no FLOOD INSURANCE RATE MAP
ESSEX COUNTY,
® MASSACHUSETTS
t4yp N it ;'.::iZONES%CE 1'tism,11�p " ,Itt N�O R o (ALL JURISDICTIONS)
0� m ru a•'r(EL�141)'a lc s I LEEN°� R
ATLANTIC - .L�j(tytc.4 ,tt .NES� PN PANEL 419 OF 600
° 20~ P R LLEL 'J STREET QPa=J f �, R e. (SEE MAP INDEX FOR FIRM PANEL LAYOUT)
34� J STRE T: 2 y. +•:! p 1 Q�� � 'is 09�F , S4tlIB1N5:
ryp • - �' Q. •• •• ! QQ''. Pfj - - 09G WMMUN iY NUMBER PANE, SUFFIX
LSi ,♦ - O' j , •• pJ� f1'+� E�� D uAnDLEM1rno,lox+l or uron ai• o
sALern.cinor zswoa ai.No
a
T
PARALLE e, t 4,ZP r
` STREET
•r4TREET
>•. :. �' ZONE E '� F k:: .tE� ? .• " ,� � �. ` c•"" -. FAIL OIg
'ts (EL 11) • ,G�,�F,�G r r EQJ� Nodose,User The Map Number shown below
° 0.
• tlJ, '✓ '� ,!� should be used when placing map orders; the
KIMBALL " aG}�j,'Dq �(��� 114 _ Community Number shown above should be
.�y. •'NROAD • ;�• ° used on insurance applications for the subject
,,? i:�r • VO x'8 ,.99gcO�Y community
s t` F� ` N rE gcra.rp MAP NUMBER
r;rr 4 . �C�-A\ % ♦ * x .11 , y A
� 25009C0419G
MAP REVISED
JULY 16,2014
NOy _ r 1 i1A ,�' .yam t\_ � �. m�'K,• m Federal Emergency Menagemeot Agency
ty.� - / •�7A+ !>t O n�6 h 'j- p Thle is an ofic el cow of a potion of me above referenced flood map tt
+tt „4�:. T y j a '• r!t 1 `Y m Use eztractetl ua ng F-MIT On-one. This map does not reflect changes
$LIMNER r • � m-q or amendments vmlcM1 may M1aee been made subsequent to the date on Me
' • title dock. For Me lateat educt information about National Flood Insurance
, ROAD ;,,s .. ROAU"'-a X� q,..:......s�:v,• .$' �. H pr
Progrem eootl maps cheek the FEMA Floptl Map Store at www.mse.fima.gov
Project No. SALE-0028
I �
Proposed Roof Recharge
System Design
#2 Atlantic Street
Salem, Massachusetts
January 25, 2017
1N, C ILauaG s
���ZH of MgSs9c
PETER M. q�
N
g BLAISDELL,JR. m,
o CIVIL m 189 North Main Street,Suite 101
No.41613 Middleton, MA 01949
q GIs EP�o �Q 978-539-8088 Ph
978-539-8200 Fax
/'L www.wsengineers.com
' Roof Recharge Design
#2 Atlantic Street, Salem, MA
' January 25, 2017
January 25, 2017
tPurpose:
' The purpose of this report is to provide a suitable sub-surface roof recharge design for the proposed
dwelling to be constructed at#2 Atlantic Street in Salem,MA.
' Existing Condition Soils Analysis.
In order to model the runoff parameters for both the existing and proposed watershed parameters,
the parent soils on site were mapped using the Web Soil Survey (WSS) made available on the United
States Department of Agriculture (USDA) National Resources Conservation Service (NRCS) website.
The WSS provides vital soil data and information such as Hydrologic Soil Group (HSG) which is
' then input into a mathematical model to generate runoff curve numbers.
The user inputs the soil cover type as well as the hydrologic soil group to generate a weighted curve
' number (CN) and also uses the topography of the land to generate a time of concentration (Tc) from
which the stormwater runoff rate as well as volume may be calculated for a certain watershed for
comparison. A minimum Tc of 1 minutes has been utilized in this analysis.
The NRCS lists the area as Udorthents which has an unspecified Hydrologic Soil Group. Based on
our previous experience with similar projects we have assumed that the soils have an exfiltration
' rate similar to that of a"D"soil.
Using the information found in Table 2-1 Infiltration Rates for Various Soil Textures found in the
' Hydrology Handbook for Conservation Commissioners dated March 2002 by the Department of
Environmental Protection (DEP) we have utilized an exfiltration rate of 0.09 inches per hour for our
mathematical model.
Stormwater Modeling Methodology:
The mathematical model used in this analysis was provided using the HydroCAD 10.0 Version
developed by HydroCAD Software Solutions LLC. HydroCAD is a program that is used to model
the hydrology and hydraulics of stormwater runoff and is based largely on programs and
ttechniques developed by the NRCS, specifically TR-20 and TR-55 as well as other hydraulic
calculation methods.
HydroCAD allows the user,for a given rainfall event, to generate runoff hydrographs for single or
multiple watersheds and is used to determine if a given drainage system is adequate under the
desired conditions as well as to predict flooding or other impacts at specified locations such as
erosion.
' As mentioned above, we have held a minimum time of concentration of one (1) minute for the roof
runoff.
2
' Roof Recharge Design
#2 Atlantic Street, Salem, MA
1 January 25, 2017
Proposed Condition Watershed:
The limit of the watershed analysis is the footprint area of the house which equals 1,560 s.f.
' Using the methods described in the stormwater modeling explanation above, a runoff curve number
and time of concentration is input into the model for the one (1) year storm event,Type III, 24-hour
storm events are included in this report.
The results of which are presented in the HydroCAD results printout and the summary table found
below.
The subsurface infiltration structure will be comprised of (8) Cultec 10OHD Heavy Duty Recharger
units connected together with internal manifolds. The structure will sit on a 6" crushed stone bed,
have a 12" crushed stone border and will have a 6" crushed stone cover layer for additional storage
volume.
Conclusion:
As can be seen by examining the following performance table, the proposed stormwater
management system is effective for mitigating the peak flow rates for the proposed roof area up to
and including the one (1) year storm event.
Should the system become surcharged there will be overflow pipes attached to the roof drains to
allow discharge to finish grade and away from the dwelling.
I �
L ,
3
Roof Recharge Design
#2 Atlantic Street, Salem, MA
1 January 25, 2017
t
Proposed Roof Recharge Subsurface Infiltration Structure
(HpdroCAD Pond 2P)
(8) Cultec Recharger 100HD Units (Install inspection ports at the end of each row)
Top of Stone=8.0
Top of Chambers=7.5
1 4" Inv in=7.0 (from Roof Drains)
Bottom of Chambers=6.5
Bottom of 6" Stone bed=6.0
Peak Rate of Runoff Out
(Qout) cfs.
24 hour Type III Peak Rate of
' Storm Event Runoff In *Infiltration 4" Total Peak Water
(YR) (Qin) cfs. (Discarded) Overflow Outflow Level (W.L.) ft.
' 1 0.08 0.0 0.0 0.0 7.70
*Calculated infiltration rate and peak water levels are based upon a rate 0.09 inches per hour for
"D" soils as found in the Hydrology Handbook for Conservation Commissioners, March 2002 Table
i
4
Proposed Roof Recharge System -#2 Atlantic Street
Roof Recharge Type 111 24-hr 1 Yr Rainfall=2.50"
Prepared by Microsoft Printed 1/25/2017
HydroCAD@ 10.00-19 s/n 06611 @ 2016 HydroCAD Software Solutions LLC Page 1
Summary for Subcatchment 1S: Proposed Roof
Runoff = 0.08 cfs @ 12.09 hrs, Volume= 0.007 af, Depth= 2.27"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Type III 24-hr 1 Yr Rainfall=2.50"
Area (sf) CN Description
1,560 98 Paved parking HSG B
1,560 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.0 Direct Entry,
' 1.0 0 Total, Increased to minimum Tc = 6.0 min
Summary for Pond 2P: Cultec 10OHD Units
' Inflow Area = 0.036 ac,100.00% Impervious, Inflow Depth = 2.27" for 1 Yr event
Inflow 0.08 cfs @ 12.09 hrs, Volume= 0.007 of
Outflow = 0.00 cfs @ 6.70 hrs, Volume= 0.002 af, Atten= 99%, Lag= 0.0 min
Discarded = 0.00 cfs @ 6.70 hrs, Volume= 0.002 of
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs / 3
Peak Elev= 7.70' @ 24.05 hrs Surf.Area= 0.006 ac Storage= 0.006 of
Plug-Flow detention time= 727.0 min calculated for 0.002 of(25% of inflow)
Center-of-Mass det. time= 530.1 min ( 1,292.0 - 761.9 )
Volume Invert Avail.Storage Storage Description
#1A 6.00' 0.004 of 8.33'W x 32.501 x 2.04'H Field A
0.013 of Overall - 0.003 of Embedded = 0.010 of x 40.0% Voids
#2A 6.50' 0.003 of Cultec C-100HD x8 Inside#1
Effective Size= 32.1"W x 12.0"H => 1.86 sf x 7.501 = 14.0 cf
Overall Size= 36.0"W x 12.5"H x 8.001 with 0.50' Overlap
Row Length Adjustment= +0.50' x 1.86 sf x 2 rows
0.007 of Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
' #1 Discarded 6.00' 0.090 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.00 cfs @ 6.70 hrs HW=6.02' (Free Discharge)
' t1=Exfiltration (Exfiltration Controls 0.00 cfs)
' Roof Recharge Type 111 24-hr 1 YrRainfall=2.50"
Prepared by Microsoft Printed 1/25/2017
HydroCAD® 10.00-19 s/n 06611 @2016 HydroCAD Software Solutions LLC
iPond 2P: Cultec 10OHD Units
Hyd.gaph
' •mnaw
009 .oieramea
0.0-75Inflow Area=0.036 ac
007
Peak Elev=7.70'
1 0�5
0055 j Storage=0.006 of
U 005 I
°945
0w
ams
0.03
00]5
002
0015
0.01
10005
0 0 1 2 3 4 5 6 m 7 8 9 10 11 12 13 14 15 16 17 18 1920 21 22 23 24 25 6 27 2829 30 31 32 33 30 3 37 38 39 40
rime(hours)
Operation & Maintenance Plan
#2 Atlantic Street
Salem, MA
1
The Operation and Maintenance of the system chambers is as follows:
• The Cultec Chambers inspection ports (located on the inlet row) shall be
inspected a minimum of twice per year, preferably spring and fall, upon
installation.
' If sediment is greater than three inches the chambers shall be cleaned in
accordance to Cultec Operations and Maintenance Guidelines.
' • Inspect gutters for debris and vegetation and any potential blockage. Check for
adequate slope and drainage towards downspouts during cleaning. Gutters in
disrepair shall be repaired or replaced as needed. In addition to scheduled
inspections, inspect after each severe weather events.
I ,
ITHE' SALEM NEWS,
REQUEST FOR LEGAL NOTICE
I understand that by signing this form,I am agreeing to the cost of the legal notice to be published in the
newspaper.
Payment is required at the time of the legal notice being received by the city and before it is published
in the newspaper.
' Please make checks payable to THE SALEM NEWS:
The Salem News
Attn: Legal Notice
32 Dunham Road
Beverly, MA 01915
Prepaid cost required to run: $260
1 ***Important:Average legal notice costs are estimated; customer will either be refunded or billed after
the legal notice is published.
Check# �3 7(attach check)
' If payment is not received,the legal notice will be cancelled.
'
je)
1
CITY OF SALEM
ASSESSOR'S CERTIFICATION OF ABUTTERS AND
PROPERTY OWNERS
BOARD/COMMISSION: Conservation Commission
PROJECT SITE: 2 Atlantic Street 132-0189-01
' DATE: 01/20/2017
DESCRIPTION OF REQUIREMENT: All abutters and any property owner
within 100 feet of the property line of the land where the activity is proposed
including if land is separated by a public or private street or a body of water and
not unreasonably distant from the project site.
' This is to certify that the time of the last assessment for taxation made by the City of
Salem,the names and addresses of those listed on the attached sheets are"abutters and
property owners"(as defined by Weda6ds Protection Act 310 CMR 10.05(4)(a))to the
parcel(s)of land listed above as the ploj of site.
Assessor's Signatu Date:
Number of initialed pages attached:
Once Certified,Return to:
Tom Devine,Department of Planning and Community Development
I
I �
Parcel N: -0189-0 Parcel ID:32-0123-0 Parcel ID:32-0124-0
SHUTE P MELA D NGUYEN HUE T MASS COMMONWEALTH OF
4.6 A NTIC STREET 96 LINDEN ST BOARD OF TRUSTEES OF ST
SAL ,MA 01970 SALEM,MA 01970 SALEM,MA 01970
' Parcel ID:32-0175-0 Parcel ID:32-0176-0 Parcel lD:32-0177-0
BERNAL DANIEL VALLEE DENNIS M KANTOROSINSKI REALTY
STEUBER TORY 336 ESSEX STREET KANTOROSINSKI
94 LINDEN STREET SALEM,MA 01970 84-86 LINDEN ST
SALEM,MA 01970 SALEM,MA 01970
Parcel ID:32 1 6AIP)yn 1QoSS Parcel ID:32-0178.802 Parcel ID:32-0187-0
' CA195119iffillOw MCAULIFFE MARIA BEAREGARD LORRAINE E
80 LINDEN STREET U7 82 LINDEN STREET U82 11 LUSS LER STREET
SALEM,MA 01970 SALEM,MA 01970 SALEM,MA 01970
Pa IID:3 -0188-0 OJA-k— Parce 32-0190-0ALAPH M OYK VI"
C N BRIANC LAPHAA E ORT
62 ROOK DRIVE 5 LUSS R STREET
TO I D,MA 01983 SALEM, A 01970
r
�t
. Megan Tucker Dylan Payne Partners Realty Trust
13 Lussier Street 13 Lussier Street Klantorosinski Development
Salem MA 01970 Salem MA 01970 19 Leavitt Street
Salem,MA 01970
Miroslaw Trust 4-6 Atlantic Realty trust
' Gregory Darius 4-6 Atlantic Street
19 Leavitt Street Salem,MA 01970
Salem, MA 01970
I
I
1
i
�,Assessrro a.�nlaaua- : �+rt Luvme�tpp�xinral: m=n�--��s.ae�
file Edd Record Navigate Process Utilities Tool _Options Hdp Status z:
sa Q Indexed By Parcel_LID Cord ttQF
iAdd Mad Gel Saare Carie!
b„
i RarceIID�320190A Cartkl all Locahm.4-6 ATL4NTICSTREET�SALEk Cast.$246
f4uiWM bwnel Priar OwnsApm
IDffactorslTexes_
-;`
i S T le Na Fejt Name Res. 20m, j
N146 ATLANTIC REALTY TRUST
� >t` KANTOROSINSKI MIROSLAW TR
e
` " SU�e�:b1 4b ATLANTIC STREET Soc Sec 97Tgpe#1�
n Street:tl See Sao#2�`—;Type#2:�""" '
�L i C4ylTown SAL M Soa Z eW W j Type p'i f _ J
= Provax>et5ta&MA Pastel 01970 .. - AccarR Type;
Cuuntty,Code—'"f a Sepmate Eft .. ... -
n
MM/DDM^7Y � . 1 Lepel Relaterae. 3531&371
8wner OccupierE Ova took,' 30'2UtE� �.�„ _ y
Sale Date q Number.
i
Sates E.. .tions Iher Parties ..
� Open � 1/1872017 311 PM 7556 � LheckList
}
{
I
1 k
1
f
1
i
i
i .�
1
eel
.. .
lusesxPro 4 5 4/4564Sal[�n (Cia.t�er,�fu�AplTatcJnfo r < < "-� E' "
FileEditRecordA Navigate process Utilities, Tools_Options Help .Status .. � .Y ��
lrakxed By ParcellD Cardp
r
.odd Mad DM gave Carrel 04 ®II 8
i P.efcell0:02-01.02--;61 -1 _ hCald:9o1'4 Loca4'0F1�3, �U�SSIEFNSTFEET SiLLE"'�'��'MT'�Cost-.b2gP.'[Cm
�Currc—_�-caner — - - P1m Owner _.. "� ID/Fectors�exea
J' "� lNairie wart Neme Res 9'0
TUCKER 9 MEG14AN 1— —
k2 PAYNE -' s DYLAN
;Sire 1, 13 LUSSIER STREET Soq'Sq�117TVGe�dT `� t
' 'SMeetftE� - - SooSao uk1#2.r —Typori2,�'��
_ � r
L�'ilylTown;
SALEM
Bx.Swtta7—T #3 -�
c .
FhoVincelSWi¢MA� P6slaF 67970 _ Acwunt Type .
n
WW
d D 0 B MM/DDKri"/ �__f� Legal Rdarxrca 34801 54 Valid Owner,..
d
R [)WM Occup'ln_ dOeta: 1, Z b Lookup Num6er.
_ . 1 3Ownei5954 i Y
11
Sales Eg= Mme Owners Odw Parties 7
Fdp-en F 1/laU 17i ._aOS PM (--- j 3265FdtWkust
I
File Edit Record Navigate Process Utilities Took Options Help Status `
r
,t Add Mod Del Save Cancel
0 l H38 :•
Parcel tD.32-01840 _ Cann all Locatierc2 ATLANTICSTREET SALEM Caot �1,50p
IC tient wnet �.�^ __p or OwPm 4 fD/Factors/Taxes
'T-16, aaf nie. _ e k F'fd « Res 10-
' pP. GREGORY S KANTOROSINSKI DEV PARTNERS REALTY TRUST T-
GREGORYDARIUS/KANTOROSINSKI a MIRO LAW TRS r�r
a, Sp"eN pl`19 LEAVITT STREET..... SUGSeG 01
Str�.p ,—+--��-, A Say SerJi? Tygepv
x a L�y/T�SALEM Soc 5ec4 e
F'm`we/5te r Podak 01970--- . t Axmst Type'
Col�trgtade, ' sepmate Da.
ff ,LWW MM/DDtyIrW LegalAefG;en4p, r�,.iSi Va9d Ower.Wit'
Otxim Oacupredr�u � Sale De,.12J62016 Owrrer Laaks4 Number: 37266
Mote Owmrs 0d Pones _
F open 1/1B/�Ile aOS PM' f Owtardgi trdarma9an ("`7956 ( QucicL'ut
f
1
r FOREST AVENUE
71
M T AV NUE —i ECD
RFS
1pv
0 12�
rn
O
ds mrn
ly
ATLANTIC STREET
el
z
31 to
r
AFFIDAVIT OF SERVICE
Under the Massachusetts Wetlands Protection Act
(To be submitted to the Massachusetts Department of Environmental Protection
and the Conservation Commission when filing a Notice of Intent)
I, Greg T. Hochmuth, hereby certify under the pains and penalties of
perjury that on Tanuary 26, 2017 I gave notification to abutters in compliance
' with the second paragraph of Massachusetts General Law Chapter 131, Section
40, and the DEP Guide to Abutter Notification dated April 8, 1994, in connection
with the following matter:
' A Notice of Intent was filed under Massachusetts Wetlands Protection Act
' by Gregory Investment Group, LLC with the City of Salem Conservation
Commission on, January 26, 2017 for property located at 2 Atlantic Street.
The form of the notification, and a list of the abutters to whom it was
' given and their addresses, are attached to this Affidavit of Service.
Name v Date
1
i
' Notification to Abutters under the
iMassachusetts Wetlands Protection Act
In accordance with the second paragraph of Massachusetts General Laws Chapter 131,
iSection 40,you are hereby notified of the following.
A. The name of the applicant is Gregory Investment Group,LLC.
B. The applicant has filed a Notice of Intent with the conservation Commission for
the municipality of Salem seeking permission to remove,fill,dredge, or alter an
i Area subject to Protection under the Wetlands Protection Act(General Laws
Chapter 131,Section 40).
' C. The address of the lot where the activity is proposed is 2 Atlantic Street.
D. Copies of the Notice of Intent may be examined at The Salem Conservation
Commission Office,for more information,call: (978) 619-5685.
E. Copies of the Notice of Intent may be obtained for a fee from the applicant's
representative,by calling this telephone number (978) 539-8088 between the
hours of 8:00 and 4:30 on the following days of the week: Monday-Friday.
i F. Information regarding the date, time and place of the public hearing may be
obtained from The Conservation Office.by calling this telephone number 978
619-5685
1
Note: Notice of the Public Hearing,including its date,time and place will be published
iat least five (5) days in advance in the Salem News.
Note: Notice of the Public Hearing,including its date, time and place will be posted in
the City or Town Hall not less than forty eight(48) hours in advance.
Note: You also may contact your local Conservation Commission or the nearest
i Department of Environmental Protection Regional Office for more information about
this application or the Wetlands Protection Act.
i To contact DEP call:
Central Region: 508-767-2884 Northeast Region: 978-694-3200
Southeast Region: 508-946-2718 Western Region:413-784-1100
I
�I 1
i
ZONING COMPARISON TABLE
R2 RESIDENTIAL TWO FAMILY
REQUIRED PROVIDED
ROOF
LEADER MINIMUM LOT AREA 15,000 S.F. 5,250 S.F.
MINIMUM LOT AREA/DWELLING UNIT 7,500 S.F. 2,675 S.F.
°
PIPE MINIMUM LOT FRONTAGE 100 FT 100 FT
SPLASH
BLOCK MINIMUM LOT WIDTH 100 FT 100 FT
SLOPE FINISH GRADE AWAY FROM BUILDING-
30 FRONT YARD 15 FT 15 FT
INLET 12"
PIPE III MINIMUM
SIDE YARD
10 FT 10 FT (MIN)
DRYWELL OR CULTEC UNIT REAR YARD 30 FT
S 3 FT
(SEE DETAIL(S) FOR
BUILDING
�.- I MORE INFORMATION) LOT COVERAGE BY BUILDING 35 % 30
FOUNDATION MINIMUM
ag SETBACK - - - MAXIMUM BUILDING HEIGHT 35 FT 35 FT
MAXIMUM BUILDING HEIGHT (STORIES) 2.5 STORIES 2.5 STORIES
w j l * SEE BOARD OF APPEALS DECISION AT BOOK --- PAGE ---
PROPOSED ROOF LEADER
3 OVERFLOW DETAIL
DETAIL N.T.S.
' 1-2 INCH DIA. WASHED CRUSHED STONE
CULTEC HVLV SFCx2
3 FEED CONNECTOR
I WHERE SPECIFIED
957 COMPACTED FILL
MEGAN TUCKER CULTEC CONTACTOR t ( ) 4 OZ. NON-WOVEN FILTER FABRIC
HEAVY DUTY CHAMBERMBER FINISHED GRADE AROUND STONE. TOP AND SIDES
DYLAN PAYNE L LOAM & SEED MANDATORY.
3 P 13 LUSSIER STREET o" [254 mm] MIN / tea" [102 mm] MI .
ROPOSCD [36s8 mm] MAX.. /
L U 12y MULL STOCKADE FENCE PROPOSED ROOF RECHARGE z.° 6.0" [152 mm] MIN.
H
SOCK (TYp ) (1 YEAR STORM CAPACITY) �(\/ Q O /
3 WW 2.5" [318 mm]
(8) CULTEC 10OHD UNITS
TOP OF CHAMBERS=7.5
Ng BOTTOM OF CHAMBERS=6.5 / j 6.0•' [152 mm] MIN.
(UTILITY POLE \ 52.5 W BOTTOM OF STONE=6.0
40.0" [1016 mm] MIN. CULTEC N0. 20L POLYETHYLENE LINER
`� .3 ' • „ 12.0" [305 mm] MIN. 36.0" [914 mm CENTER TO CENTER TO BE PLACED BENEATH
I HVLV SFCx2 FEED CONNECTOR
GUY WIRE OAK �- WHEN UTILIZING INTERNAL MANIFOLD
N80'42'1 8,,W GENERAL NOTES
15 o CONTACTOR 100HO BY CULTEC, INC. OF BROOKFIELD, CT. WHEN INSTALLED ACCORDING TO CULTEC'S RECOMMENDED
STORAGE PROVIDED = 3.84 CF/FT PER DESIGN UNIT. INSTALLATION INSTRUCTIONS.ALL CONTACTOR 10OHD HEAVY
�J 3 I AK 52.5 REFER TO CULTEC INC.'S CURRENT RECOMMENDED DUTY UNITS ARE MARKED WITH A COLOR STRIPE FORMED INTO
_ O)
M LOT INSTALLATION GUIDELINES. THE PART ALONG THE LENGTH OF THE CHAMBER. ALL
N/1 GOBBLFSTONE x '15• N [3.66UM ALLOWED COVER ON TOP OF UNIT SHALL BE 12.0' CONTACTOR 100 CHAMBERS MUST BE INSTALLED IN
O + ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE AND
5,250 S.F. THE C] FEDERAL REGULATIONS.
RETAINING Q} . O 't THE CHAMBER WILL BE DESIGNED TO WITHSTAND TRAFFIC
Iw NOTE: 100 YEAR FLOODPLAIN ZONE LOADS
3
WALL CD
�a 2s 8.57 1 o AE (ECFV- 1 1 .0), AS SHOWN ON CULTEC CONTACTOR IOOHD HEAVY IDUTY THREE VIEW
�`
' 10it WA�KWq a I FLOOD INSURANCE MAP NUMBER
a 4. 25009CO419G, EFFECTIVE DATE:
PROP, WgTER W 4
07/1E6/2014
ROP. BICE C I
3 WATER MICE w =NOOAK T.O.F. w
,3 o W �c 9.0
ELEV.-13.81 SITE PLAN
II
Jo � � oo• a ��
M o w' o EXISTING o
3
IN ap > 6 ATLANTIC Srw
a ATLANTIC dGRET REALTY
*8 PRO I15.0 PAD TRusr SALEM ,
MA
12MUSED 3.0
LCH 0 0 10' 20' 40'
PLAN SOI4.5'H PICKET
1) BK. 303 PG. 56 SCALE: 1" = 20' DATE: JANUARY 25, 2017
• v FENCE 8.75
O DECK 2) PLAN BY BAY STATE SURVEYING ASSOCIATES INC.
• "PLOT PLAN OF LAND IN SALEM" 7-27-09
J�'S' #2 ATLANTIC STREET
N80" a' �GE OF N80.42 18"W
3 4�21g.,W
y2.5 �Q ?AV`c-MeNT 52.5
S S=3.32BIT, 6 ti
q NV 3.45±/ ,
ERM
SMH=5.74 WILLIAMS
8" CLAY INV.=2.34 � S 5-2.559
GUYISMH-8.48 SMH=12.69
r
8" CLAY INV.=4.33 S _
WIRE( 8" CLAY INV.=5.79 . ss � SPARAGES
A Z� C' M,A
UTILITY POLE W/ AT' /1 n ' O�� RICHARD L, Ox, ENGINEERS I PLANNERS I SURVEYORS
UNDERGROUND {�/�' \II TIC ��� 0 WILLIAMS 189 NORTH MAIN STREET
CIVIL SUITE 101
B No.40190 MIDDLETON, MA 01949
LIC) A -soca
C NE: 978 539
9 e � PHO ( )
C F e �,
V 9 GI
T °� � FAX: (978) 539-8200
R F ,
E s
E r
T , �AL� J wwW.WSENGINEERS.COM
►I25I2o1�-