Loading...
25 WASHINGTON STREET - ZBA i t.. Vo1No1T4 CITY OF SALEM, MASSACHUSETTS �y A�l BOARD OF APPEAL ,0 120 WASHINGTON STREET, 3RD FLOOR SALEM, MASSACH05ETTS 01970 TELEPHONE 978-745-9595 MrveooNe FAX 978-740-9846 KIMBERLEY DRISCOLL - - MAYOR n N September 4, 2008 Decision _ City of Salem Zoning Board of Appeals Petition of GARY & JENNIFER SANTO seeking a variance from minimum rear yard depth and a special permit to alter a non � conforming structure to allow for the construction of a mudroom attaching the existing garage to the main structure and the addition of finished space above the garage at 25 WASHINGTON SQUARE (R-2). A public hearing on the above Petition was opened on August 27, 2008 pursuant to Mass General Law Ch. 40A, §§ 11. The public hearing was closed on August 27, 2008 with the following Zoning Board members present: Robin Stein (Chair), Rebecca Curran, Elizabeth Debski, and Rick Dionne. Petitioner seeks variances pursuant to the following sections of the Salem Zoning Ordinance: Table I: Residential Density Regulations and Sec. 8-4: Nonconforming structure. Statements of fact: 1. Project architect, Walter Jacob, presented the petition on behalf of the Santos. 2. Plans entitled "Santo Residence", prepared by Walter Jacob Architect, LTD accompanied the petition. 3. A plot plan prepared by North Shore Survey Corporation accompanied the petition. 4. The property contains a single family home and an existing garage. 5. The applicants are proposing to connect the existing garage to the main structure. This change would make the garage part of the primary structure; it would no longer be recognized as an accessory structure. The single story structure proposed to connect the two buildings would be within the required rear yard setback of thirty(30) feet. 6. The applicants are proposing to renovate the garage, which they currently describe as having a Mexican motif so that it looks like the primary structure and fits in with the neighborhood. The proposed renovations include increasing the height of the garage (by 10 ft.) with a gable roof. The finished space created • 2 above the garage would be approximately 700 sq. ft.; the space would be accessed by a pull down ladder and would not be entirely useable since it is partially in the eves. Additionally the applicants plan to do shingle siding, a slate roof, and copper downspouts. 7. There was no opposition to the request at the public hearing. The Board of Appeal, after careful consideration of the evidence presented at the public hearing, and after thorough review of the plans and petition submitted, makes the following findings: 1. A literal enforcement of the provisions of the City of Salem Zoning Ordinance would result in substantial hardship financial or otherwise to the petitioner who is seeking to make improvements to their property, which will enhance the neighborhood. 2. The style of the current garage does not fit with the neighborhood; the proposed renovations require minimal dimensional relief and will keep with the character of the neighborhood, therefore desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent or purpose of the ordinance. 3. There are unique conditions affecting the locus and structures, not generally affecting other lots in the in the Zoning District including the existing layout of structures on the site. On the basis of the above findings of fact and all evidence presented at the public hearing including, but not limited to, the Plans, Documents and testimony, the Zoning Board of Appeals concludes: 1. A variance from minimum rear yard depth and a special permit to alter a non conforming structure are granted to allow the proposed connection and renovations. In consideration of the above, the Salem Board of Appeals voted, four (4) in favor (Debski, Curran, Stein, and Dionne) and none (0) opposed, to grant petitioner's request for variances subject to the following terms, conditions, and safeguards: 1. Petitioner shall comply with all City and State statues, ordinances, codes, and regulations. 2. All construction shall be done as per the plans and dimensions submitted to and approved by the Building Commissioner. 3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 4. Petitioner shall obtain a building permit prior to beginning any construction. 3 5. Exterior finishes of new construction shall be in harmony with the existing structure and shall meet the requirements of the Salem Historical Commission. 6. A Certificate of Inspection is to be obtained. 7. Petitioner is to obtain approval from any City Board or Commission having jurisdiction including, but not limited to, the Planning Board. 8. Unless this Decision expressly provides otherwise, any zoning relief granted does not empower or authorize the Petitioner to demolish or reconstruct the structure(s) located on the subject property to an extent of more than fifty percent (50%) of its floor area of more than fifty percent (50%) of its replacement cost at the time of destruction. If the structure is demolished by any means to an extent of more than fifty percent (50%) of its replacement cost or more than fifty percent (50%) of its floor area at the time of destruction, it shall not be reconstructed except in conformity with the provisions of the Ordinance.Robin Stein, Chair Salem Zoning Board of Appeals A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts General Laws .Chapter 40A, and shall be filed within 20 days of filing of this decision in the office of the City Clerk. Pursuant to the Massachusetts General Laws Chapter 40A, Section 11,the Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certificate of the City Clerk has been filed with the Essex South Registry of Deeds.