Loading...
15 RIVER STREET - ZBA I ivrsal. www.myunivgalop.com phone:l•E56-75el 6 UNV12113 MADE IN USA d i Zoning Board Proiect Status Sheet Address & Applicant: 't— Date Submitted to BOA: V Clerk Stamp: Variances Only - Constructive Approval Date. (100 days from filing) d Abutters List Requested: d Abutters Notice Sent: rf Notice to Abutting // hng Cities & Towns, Councillors: Legal Noticeosted at City ty Hall: (14 days before meeting) d Legal Notice Emailed & Confirmed: Legal Notice Posted on Web: �i Agenda to Applicant: Applicant's email address or fax number to send agenda: Opened at Meeting: (0 -- Continued Meetings: Extension Form(s) Signed & Clerk Stamped? Closed at Meeting: (9 t Decision: Decision Filed: _1 Appeal Period Over: after dcaisim, filed) T'`�`�(21"clap Decision Sent to Applicant: Notice of Decision Sent to abutters, cities and towns, councillors: ZBA ACTION FORM UY Date: 443"utlp Rebecca Curran Chair) � N S ZQ % 6 Mike Du Petitioner: j5W.R,,jeC- y, ,Vee\- To, Watkins Peter Co elas Address: Jinim Tsitsinos J* ------- ca Conditions: Total: ;—n etitioner shall comply with all city and state statutes,ordinances,codes and regulations. All construction shall be done as per the plans and dimensions submitted to and approved by the Building Commissioner. 6.All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. �Petitioner shall obtain a building permit prior to beginning any construction. Exterior finishes of the new construction shall be in harmony with the existing structure. Certificate of Occupancy is to be obtained. A Certificate of Inspection is to be obtained. El Petitioner shall obtain street numbering from the City of Salem Assessor's Office and shall display said number so as to be visible from the street. liPetitioner is to obtain approval from any City Board or Commission having jurisdiction including, but not limited to,the Planning Board. El Unless this Decision expressly provides otherwise,any zoning relief granted does not empower or authorize the Petitioner to demolish or reconstruct the structure(s)located on the subject property to an extent of more than fifty percent(50%)of its floor area or more than fifty percent(501/o)of its replacement cost at the time of destruction. If the structure is demolished by any means to an extent of more than fifty percent(50%)of its replacement cost or more than fifty percent(501/o)of its floor area at the time of destruction,it shall not be reconstructed except in conformity with the provisions of the Ordinance. M r A CITY OF SALEM, MASSACHUSETTS a, q' BOARD OF APPEAL 120 WASHINGTON STREET♦ SALEM,MASSACHUSETTSMI B79UN 29 A 8: 15 KiMBERLEY DRiscoLL TELE:978-745-9595 ♦ FAX:978-740-9846 MAYOR ( !i_[_ June 29, 2016 Decision City of Salem Board of Appeals Petition of LARISSA LUCAS, seeking a Special Permit per Sec. 3.3.3 Nonconforming Structures of the Salem Zoning Ordinance to structurally change the existing nonconforming structure at the property of 15 RIVER STREET (Map 26 Lot 606)(R2 Zoning District) A public hearing on the above Petition was opened on June 15, 2016 pursuant to M.G.L Ch. 40A, 4 11 and closed on that date with the following Salem Board of Appeals members present: Ms. Curran (Chair), Mr. Duffy,Mr. Copelas,Mr. Watkins, and Mr. Tsitsinos. The Petitioner seeks a Special Permit per Sec. 3.3.3 Nonconforming Structures of the Salem Zoning Ordinance to structurally change the existing nonconforming structure. Statements of fact: 1. Larissa Lucas,petitioner,presents the petition. 2. In the petition date-stamped May 23, 2016 the Petitioner requested a Special Permit per Sec. 3.3.3 Nonconforming Structures to allow the petitioner to structurally change the existing non-conforming structure. 3. The petitioner proposes to construct an enclosed four (4) feet by five (5) feet structure in the rear corner to square off the building where there is currently an existing shed of the same dimensions. 4. The expansion will provide for a small kitchen expansion and rear entrance to the house. 5. The property is located in a historic district and the Salem Historical Commission reviewed and approved the proposed work ruling that the construction was in conformance with the historic character of the building and neighborhood. 6. The requested relief, if granted, would allow the Petitioner to structurally change the existing non- conforming structure. 7. At the public heating nine (9) members of the public spoke in favor of, and nonein opposition to, the petition. The Salem Board of Appeals, after careful consideration of the evidence presented at the public hearing, and after thorough review of the petition, including the application narrative and plans, and the Petitioner's presentation and public testimony, makes the following findings that the proposed project meets the provisions of the City of Salem Zoning Ordinance: t \ L a L . City of Salem Board of Appeals June 29,2016 Project: 15 River Street Page 2 of 2 Findings for Special Permit: The Board finds that the structural change is not substantially more detrimental that the existing nonconforming structure to the neighborhood. 1. Social, economic and community needs served by the proposal are not affected. 2. Traffic flow and safety, including parking and loading will not be affected. 3. Adequacy of utilities and other public services will not be affected. 4. Impacts on the natural environment,including drainage will not be affected. 5. Neighborhood character- The proposed addition conforms to the character of the neighborhood and structure. 6. Potential fiscal impact, including the impact on City tax base and employment is positive. On the basis of the above statements of facts and findings, the Salem Board of Appeals voted five (5) in favor (Ms. Curran (Chair), Mr. Duffy, Mr. Copelas, Mr. Watkins, and Mr. Tsitsinos) and none (0) opposed, to grant a Special Permit per Sec. 3.3.2 Nonconforming Uses of the Salem Zoning Ordinance to allow the petitioner to change a use from one non-conforming use to another non-conforming use, subject to the following terms, conditions and safeguards: Standard Conditions: 1. Petitioner shall comply with all city and state statues, ordinances, codes and regulations. 2. All construction shall be done as per the plans and dimensions submitted to and approved by the Building Commissioner. 3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 4. Petitioner shall obtain a building permit prior to beginning any construction. 5. Exterior finished of the new construction shall be in harmony with the existing structure. 6. A Certificate of Inspection is to be obtained. 7. Petitioner is to obtain approval from any City Board or Commission having jurisdiction including, but not limited to the Planning Board. -R1,," LnA,o.,,/C/� Rebecca Curran, Chair Board of Appeals A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this dearion, if any, .shall be made pursuant to Section 17 of the Massacbusetts General laws Chapter 40A, and shall be filed within 20 days of fibng of this deamon in the office of the City Clerk. Pursuant to the Massachusetts General Laws Chapter 40A, Section 11, the Vaaarue or Speaal Permitgranted herein shall not take effect until a ropy of the deasion bearing the certificate of the City Clerk has been filed with the Essex South Regishy of Deeas. $.,c....nwtT,9,t�i . CITY OF SALEM, MASSACHUSETTS BOARD OF APPEAL 120 WASHINGTON STREET SALEM,MASSACHUSETPSMI@79UN 29 A 8: IS KIMBERLEYDRISCOLL TELE:978-745-9595 ♦ FAX:978-740-9846 MAYOR I !11 t- CITY CLE ;l;, 'Ji'ILEN, h ,=, 'S Tune 29, 2016 Decision City of Salem Board of Appeals Petition of LARISSA LUCAS, seeking a Special Permit per Sec. 3.3.3 Nonconforming Structures of the Salem Zoning Ordinance to structurally change the existing nonconforming structure at the property of 15 RIVER STREET (Map 26 Lot 606)(R2 Zoning District) A public hearing on the above Petition was opened on June 15, 2016 pursuant to M.G.L Ch. 40A, 5 11 and closed on that date with the following Salem Board of Appeals members present: Ms. Curran (Chair), Mr. Duffy,Mr. Copelas,Mr. Watkins, and Mr. Tsitsinos. The Petitioner seeks a Special Permit per Sec. 3.3.3 Nonconforming Structures of the Salem Zoning Ordinance to structurally change the existing nonconforming structure. Statements of fact: 1. Larissa Lucas,petitioner,presents the petition. 2. In the petition date-stamped May 23, 2016 the Petitioner requested a Special Permit per Sec. 3.3.3 Nonconforming Structures to allow the petitioner to structurally change the existing non-conforming structure. 3. The petitioner proposes to construct an enclosed four (4) feet by five (5) feet structure in the rear corner to square off the budding where there is currently an existing shed of the same dimensions. 4. The expansion will provide for a small kitchen expansion and rear entrance to the house. 5. The property is located in a historic district and the Salem Historical Commission reviewed and approved the proposed work ruling that the construction was in conformance with the historic character of the building and neighborhood. 6. The requested relief, if granted, would allow the Petitioner to structurally change the existing non- conforming structure. 7. At the public hearing nine (9) members of the public spoke in favor of, and none in opposition to, the petition. The Salem Board of Appeals, after careful consideration of the evidence presented at the public hearing, and after thorough review of the petition, including the application narrative and plans, and the Petitioner's presentation and public testimony, makes the following findings that the proposed project meets the provisions of the City of Salem Zoning Ordinance: `i City of Salem Board of Appeals June 29,2016 Project: 15 River Street Page 2 of 2 Findings for Special Permit: The Board finds that the structural change is not substantially more detrimental that the existing nonconforming structure to the neighborhood. 1. Social, economic and community needs served by the proposal are not affected. 2. Traffic flow and safety, including parking and loading will not be affected. 3. Adequacy of utilities and other public services will not be affected. 4. Impacts on the natural environment,including drainage will not be affected. 5. Neighborhood character- The proposed addition conforms to the character of the neighborhood and structure. 6. Potential fiscal impact, including the impact on City tax base and employment is positive. On the basis of the above statements of facts and findings, the Salem Board of Appeals voted five (5) in favor (Ms. Curran (Chair), Mr. Duffy, Mr. Copelas, Mr. Watkins, and Mt. Tsitsinos) and none (0) opposed, to grant a Special Permit per Sec. 3.3.2 Nonconforming Uses of the Salem Zoning Ordinance to allow the petitioner to change a use from one non-conforming use to another non-conforming use, subject to the following terms, conditions and safeguards: Standard Conditions: 1. Petitioner shall comply with all city and state statues, ordinances, codes and regulations. 2. All construction shall be done as per the plans and dimensions submitted to and approved by the Building Commissionet. 3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 4. Petitioner shall obtain a building permit prior to beginning any construction. 5. Exterior finished of the new construction shall be in harmony with the existing structure. 6. A Certificate of Inspection is to be obtained. 7. Petitioner is to obtain approval from any City Board or Commission having jurisdiction including, but not limited to the Planning Board. Rebecca Curran, Chair Board of Appeals A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts General Lows Chapter 40A, and shall be filed within 20 days of filing of this decision in the office of the City Clerk. Pursuant to the Massachusetts General Laws Chapter 40A, Section 11, the Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certificate of the City Clerk has been filed with the Essex South Registry of Deedr. CITY OF SALEM, MASSACHUSETTS BOARD OF APPEALS co . PETITION FORM CITY OF SALEM,MASSACHUSETTSRECEi r n-- 1 a al`, BOARD OF APPEALS — 120 WASHINGTON STREET,3m FLOOR MAY 2 3 2016 SALEM,MASSACHUSETTS 01970 mDEPT. OF P n \�MSY6 Thomas St.Pierre,Director of Inspectional Services LFl NIFir & COB MUNITY DEVs LOHN.LNT Plnar�'77£z{>i'A,�r4i ' Fuc47R-7•#i)-�i$k) --i � 0 KIMBERLEY DRISCOLL Erin Schaeffer,Staff Planner °- MAYOR Phone:978-619-5685 / Fax:978-740-0404 v —c TO THE BOARD OF APPEALS: The Undersigned represent that he/she islare the owners of a certain parcel of land located at: D Address: ) S RkUE L S 1 SAL-e Nt HA Zoning District: 7 °? An application is being submitted to the Board of Appeal for the following reason(s):This statement UMst describe what you propose to build,the dimensions,the zone property is in,and the zoning requirements.(Example.: 1 am proposing to construct a 10'x 10'one story addition to my home located at 3 Salem Lane, in the R-2 Zoning District.The Zoning Ordinance requires the minimum depth of the rear yard to be 30 feet.The current depth of my rear yard is 32 feet;the proposed addition would reduce the depth of the rear yard to 22 feet.) For this reason I am requesting: ( } Vanance(s)from pray>isions of Section of the Zoning Ordinanez,specifically from (i.e.minimum depth of rear yard). What is allowed is (ft?sq ft?stories? %?),and what I am proposing is (ft?sq ft?stories?%?). (-J'A Special Permit under Section of the Zoning Ordinance in order to m ' ( )Appeal of the Decision of the Building Inspector(described below): ( ) Comprehensive Permit for construction of low or moderate income housing(describe below): Current Property Use: DOf:a ( I b e Are Lot Dimensions Included?(,tYes O No Why? (Example:Two Fami Home) The Undersigned hereby petitions the Board of Appeals to vary the terms of the Salem Zoning Ordinance and allow the project to be constructed as per the plans submitted,as the enforcement of said Zoning By-Laws would involve practical difficulty or unnecessary hardship to the Undersigned and relief may be granted without substantially derogating from the intent and purpose of the Zoning Ordinance. (mac ss�5- Lt-c-as City of Salem Board of Appeals 120 Washington Street Salem, MA 01970 May 20, 2016 Application, for special peImit for a renovation of nonc'onf0 n Lj---g structnre at Description of work: 15 River Street, Salem, MA 01970. Construct enclosed 1 story 4 feet x 5 feet structure in rear corner of building matching the footprint of an existing shed. Construction will match the existing wood of the house and comply with historical style, color. and materials. Purpose: Expand usable space in kitchen with an additional entrance to the house. One of two existing entrances to the house is blocked by the neighbor's driveway.An additional entrance adds safety in case emergency services or evacuation is needed. Statement of Grounds: 1) Social, economic, or community needs: None 2) Uaffic flow and safety: None 3)Adequacy of utilities and other public services: no changes needed 4)Impacts on natural environment, including drainage: None 51Neiehhprhpnd character' project apnroved by Salem Historical Commission with letters of support from direct abutting neighbors and is not visible from street. 6)Potential fiscal impact: May increase the value of the property Applicant: Larissa J. Lucas Property Owner 15 River Street Salem, MA (978) 317-4852 CITY OF SALEM, MASSAOHUSETPS BOARD CF APPEALS PETITION FORM The following written,statement has been submitted-with this application: ( } For all Variance requests a written Statement of Hardship demonstrating the following must be attached: a) Special conditions and circumstances'that especially affect the land,building,or structure involved, generally not affecting other lands,buildings,and structures in the same district; b) Literal enforcement of the provisions of the Ordinance would involved substantial hardship to the applicant;and "c). Desirable-relief may granted.without substantial detriment to the public good,andwithout nullifying or substantially derogating from the intent of the district or the purpose of the ordinance. O For all Special Permit requests a Statement of Grounds must be attached. An application for a special permit for a nonconforming use or structure shall include a statement demonstrating how the proposed change shall not be substantially more detrimental than the existing nonconforming use to the neighborhood in accordance with Section 9ASpecial Permits. Such a statement should include reference to the following criteria: a) Social,economic,or community needs served by the proposal; b) Traffic flow and safety,including parking and loading; c) Adequacy of utilities and other public services-, d) Impacts on the natural environment,including drainage; e) Neighborhood character,and f) Potential fiscal impact,including impact on City tax base and employment. O For all Comprehensive Permits for construction of low or moderate income applicants should refer to M.G.L. Ch.40B §2423. Previous applications to the Board of Appeals involving this property have been submitted with this petition forte. The Building Commissioner can provide documentation of previous applications to the petitioner or his representative. If differentfrom petitioner: Petitioner. Property owner Address: G2k(�S T Address: Telephone: U '�T`3) -�-- 445-?-- Telephone: Email Lf UlcASP ID c�6MML•Lon Email- Signat Signature: (Attached consent letter is also acceptable) Date: J�ZO 120 I (P Dale: If di erentfrompetitioner: Representative-. A TRUE Address: ATTEST Telephone: Signature: Date: CITY CLERK DATE DPCD DATE 71tis original application"must he filled ivith"the City Clerk. 1 -.. �antni i t'► PROPERTY ADDRESS: 15 RIVER STREET,SALEM,MA 01970 The land in Salem, Essex County, Massachusetts, situated on River Street, and being shown as Lot A on a Plan entitled, "Plan of Land in Salem, Property of Lorraine J. Gadala", dated September 17, 1986, Essex Survey Service, Inc., which Plan is recorded in the Essex South District Registry of Deeds in Plan Book 217, Plan 22 and bounded and described as follows: NORTHERLY: by said River Street, 40.96 feet; EASTERLY: by land now or formerly of Margaret M. Hill, 44.59 feet; SOUTHERLY: by land now or formerly of Lorraine J..Gadala, 13.05 feet; WESTERLY: by Lot B as shown on said plan, 3.17 feet; SOUTHERLY: by said Lot B, 23.15 feet; WESTERLY: by said Lot B, 15.48 feet; SOUTHERLY: by said Lot B, 3.75 feet; and WESTERLY: by said Lot B, 26.82 feet. All of said measurements being more or less. Said Lot A contains 1,664 square feet, more or less, according to said plan and if there are any discrepancies in the foregoing description, the plan shall control. Said premises are conveyed subject to and with the benefit of the following: Right of way as shown on Deed recorded with said Deeds in Book 2904, Page 583. Restriction that no fence shall be erected by the grantor of grantee,their heirs, successors and assigns, on the Easterly boundary which is a distance of twenty-six and 82/100 (26.82) feet as shown on deed recorded with said Deeds in Book 8586, Page 420. Maintenance easement for the benefit of the grantors, their heirs, successors and assigns, for the purpose of maintaining,repairing and improving the Westerly and Southerly portions of the building situated on the Grantors' premises as shown on deed recorded with said Deeds in Book 8586,Page 420. For title see Deed dated August 9, 2008 recorded with Essex South District Registry of Deeds in Book 27984, Page 274. 1 � \ � § w w7k < ; NJ Ira ) ` \ : } \\\ � \ \ »_ & 1 } 4 It \s ~ b � ONTARGET Locating Services n, Water Street www.ontargetservices.com Gardiner,Maine 04345 Utility Serwices tel 800-598-0628 fax 207-588-3302 ,-mail: screening@ontargetservices.com 47 Date/Time: 05/16/2016 06:57:23 LARISSA LUCAS, LUCAS, LARISSA 15 RIVER ST SALEM, MA 01970 Tel: (978)-317-4852 ext. This message is being sent in response to your request for underground Gable location.The following represents a list of responses for the indicated member. These reponses only pertain to the specific member. Ticket#: 20161913618 Place: SALEM, MASSACHUSETTS Address: 15, RIVER ST 1- NATIONAL GRID ELECTRIC - NE NORTH Ticket Screened on 05/13/2016 2- COMCAST CABLE-GREATER BOSTON-NORTH Ticket Screened on 05/13/2016 This ticket is clear of conflict and has been screened by On Target Utility Services If there are questions regarding this transmission or if you arrive at the site and have a question about the markings, please call 1-800-59B-0628, extension 3347, during normal business hours, Monday - Friday between 7:00 and 4:30 We would appreciate your help in speeding up the notification process. Please contact On Target with a current email address or fax number. Thank you. SCO T M. Salem Historical Commission 120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction ❑x Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 15 River Street Name of Record Owner: Larissa Lucas Description of Work Proposed: Construct enclosed addition on corner of building matching footprint of existing shed per drawings prepared by R-T Framke Construction dated 311511 i with an alternative to put in clapboards instead of a second cornerboard at juncture with main house. Addition to be painted to match existing house. Dated: March 17 2016 SALEM HI CAL C MMIS ON By: The homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work. w��:�� � � �+ � + _ t { `i ��^- - � _ x"9�4 1 / 4 �. ` 5 ". .�.�,,, r �_ , /.� �I P � Y iT AeI � . �� �! � �Y � f (sy/ r' �+� ��� Yy. 1` �a�f/i� � ;R ��� Ali , I � C ,. ' ; s.� ..,, ,,, � w;r .,r _�-- r �I Ff T 5 N� F b fit. i3 s. ..�.�.- _ �, `�t 7 _... f � ,� �, -�-� !. -- --- - �' _,- y `�f`» � .� i � 1��,`���.�i l 1 � t,� ` `1 � ,, � V � - � � � � ��_��� 1 - '� '�,� +1 v, � Y t �iw \`�� pp �J�.g.R'^1a i ��,�e�.� / aLL: � , � /����� q�� �c�. ��, � r x I l I til- rl zx4 i I .I LI hLL T I IIi` �i I nn PI R� RON I, dile `-�I , Rcdyr�{q 6 f � r I ya.,rnove III III�;a l l ; Oldoui ;Je•xoif9 ./ _--- +, i I, i I ,� � Plains Pre pare:.. 6cS f07- LJ 5' I T Commonwealth of Massachusetts Citv of Salem 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5841. Return card to Building Division for Certificate of Occupancy - EE PAID: No. , B-16.427 PERMIT TO BUILD FEE ID: $35.00 DATE ISSUED: 5/6/2016 This certifies that LUCAS, LARISSA J has permission to erect, alter, or demolish a_t)uilding _ 15 RIVER.ST<REET , Map/Lot: 260606-0 as follows: Other Building Permit -RENOVATIONS TO HOME OTHER THAN THE BUMP OUT (SHA - Certificate of Appropriateness on file) r � Contractor Name: ROLF Y FRANKE DBA: Contractor License No: 46354 " t w ,r 5/6/2016 Building Official Date This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request .N, All work authorized by this permit shall conform to thea - approved eppllcaGon and the approved construction documents for which this permit has been.granted. , All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. - t This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public Inspection for the entire duration of the work until the completion of the same. - .. r The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. f r H I C#: 124673 'Personscontracting with unregistered contractors do not have access to the guaragty fund'(as set forth in MGL c.142A). . .. Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. .a ' a Commonwealth of Massachusetts i City of Salem 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 \t Return card to Building Division for Certificate of Occupancy Permit No. 8.16.427 PERMIT TO BUILD FEE PAID: $35.00 DATE ISSUED: 5/6/2016 This certifies that LUCAS, LARISSA J has permission to erect, alter, or demolish a building 15.RIV,.ER,ST.REET Map/Lot: 260606-0 as follows: Other Building Permit BUILD SMAL&STRUCTURE,1BOW+WINDOW (SHA Certificate of Appropriateness on file) Z " i - i Contractor Name: ROLF Y FRANKE P DBA: h} t YY Contractor License No: 48354 ft §:i` 5/6/2016 Bwldmg;Offlclal" �' µ Date k This permit shall be deemed abandoned and invalid unless the'work authoriied '" y permit is wmmenced wMm soCmonths after issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request. ;; „ �'';-a 'A All work authorized by this permit shall conform to thea roved application and thea ' 3 - PP PP pproved construction tlocumants for" permit has been granted. .. 1 1. ^i4y' A�H�k "t 5'�. r, All construction,alterations and changes of use of any.buil structures shall be in compliance with the locafzoning by Iswsand codes. This permit shall be displayed in a location clearly visible froth ecceSsstreet or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issued until all applicable.signatures by the Building and Fire Officials are,provided ori tbis permit. y k H IC#: 124673 "Personscontracting with"unregistered contractors do not haps access'to the guaranty fund'(as set forth in MGL c.142A). Restrictions: '� .Y '•,.' x � NMS c _�.,. Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. Erin Schaeffer From: Alexa Ogno <adogno@alum.mit.edu> S 2\V e(; Sent: Saturday,June 11, 2016 1:56 PM, To: Erin Schaeffer Subject: 15 River Street Dear Ms. Schaeffer, I am writing to support the application of 15 River Street to renovate a current shed and make it part of the main house. Historically, houses have grown organically, following the needs of growing families and evolving technology. Kitchens are especially prone to such changes.As cooking moved from smoky open fires to controlled stoves, so outdoor cooking lean-to's were enclosed and made part of the house.Allowing this shed to become part of the house proper will follow in the footsteps of the evolution of most of Salem's old homes. Such incremental growth of homes also allows families to stay where they have roots and community they are invested in. Permitting this change will allow a family that is strongly attached to the city to continue to meet its needs and remain in Salem. We have lost enough such families. Thank you for your service to the city, Alexa Ogno 180A Federal Street ADOgno@alum.MIT.edu 1 i Erin Schaeffer From: Daniel Madigan <dmadigan77@gmail.com> Sent: Friday, June 10, 2016 3:19 PM To: Erin Schaeffer Subject: 4'x5' Addition to rear of 15 River Street This letter is in support of my neighbors, Larissa Lucas and David Hallowes, who hope to construct an extension onto the rear portion of their residence on 15 River Street. While building in a historic residential neighborhood requires care, and at times, restrictive guidelines, I hope that responsible and considerate home owners such as David and Larissa are granted a fair hearing for a sensible architectural plan to enhance their existing kitchen space. Larissa and David have shown admirable concern for the greater good in their neighborhood. Within the past year, Larissa offered a principled compromise concerning the appropriate preservation of cobblestones at the end of our street. Rather than follow voices of polarity- to either thoughtlessly maintain the whole area's Tarmac by Lockman Square- or to expend more municipal funds to expose a cobbled surface on this sloped area that may be dangerous for traffic at River, Bridge and Lynn Street, Larissa was one of the few who sought middle ground. As citizens, we have a responsibility following the spirit of the "Americans with Disabilities Act" to consider people less fortunate than ourselves. Some people may fmd the steep gradient abutting the streets dangerous for walking, especially in New England winters, more so as the area's sidewalks were unfinished. However, the original cobblestones are an historic feature of the area, and maintaining their appearance is appropriate. Now, we have professionally finished crosswalks of Belgian blocks across the River and Lynn Street intersection, and a portion by Bridge Street that serves as an attractive but useful visual cue for safer driving to and from Bridge Street. This is due in no small part to Larissa and David's positive contribution. Mention of this is not irrelevant. Indeed, I think it shows how historic preservation, necessary progress, and respect for others can be achieved and maintained at once, with thoughtful planning. This is needed on both sides and both ends of River Street, as well as elsewhere in our city. David and Larissa also improved the street side of their driveway, by repairing the brick pavement during an adjacent improvement. I am sure they will submit an architectural plan deserving serious consideration for approval, and I hope that you will assist in this process, similarly to how you have done for other improvements in the MacIntire district. Sincerely, Dan Madigan. 14 River Street, Salem, Ma. Dmadigan77@gmail.com dmadigan77@gmail.com t i J Erin Schaeffer From: vtsdmailer@vt-s.net on behalf of ianjcox@gmail.com Sent: Monday,June 13, 2016 10:58 PM To: Erin Schaeffer Subject: [City of Salem MA] Support for ZBA petition on June 15, Larissa Lucas Hello eschaeffer, Ian Cox(ianjcox@gmail.com) has sent you a message via your contact form (http://www.salem.cpm/user/326/contact) at City of Salem MA. If you don't want to receive such e-mails,you can change your settings at http://www.salem.com/user/326/edit. Message: Dear Ms. Schaeffer, I am Larissa Lucas' neighbor on River Street. Please accept this letter in support of the ZBA petition on June 15, 2016 by Larissa Lucas of 15 River Street for a special permit to allow improvement to a non-conforming structure. Sincerely, Ian and Caroline Cox' 2 River Street Salem, MA 01970 1 Erin Schaeffer From: Kerry Rourke <truculentloo@gmail.com> Sent: Monday,June 13, 2016 8:31 PM To: Erin Schaeffer Subject: Support for Zoning Appeal:June 15th Meeting To the Members of the Board of Appeals, Please accept my in absentia support of the petition for appeal submitted by Larissa Lucas of 15 River Street. I am not a direct abutter, but as the homeowner at 6 Andover Street, I can see the exact area in question from all of my rear windows and my yard. The proposed extension of the Lucas home's footprint into the area currently used as a garbage shed makes both functional and aesthetic sense to me. I have been in the Lucas home while it was occupied by the former owners and recall how unwieldy the kitchen layout had to be in order to work within the confines of the awkward exterior footprint. I can imagine that making the kitchen square will substantially improve the lives of the Lucas family members and any future owners of the home. This appeal to improve the functionality of one of our neighborhood antiques reminds me of the successful appeal made a few years ago by Peter and Jan Eschauzier; they, in fact, altered the external footprint of their home in order to add a much-desired bathroom. It seems there is a solid precedent in,our neighborhood to help current homeowners, within reason, live more comfortably in 21st-century style. Fortunately, the proposed alteration to the Lucas property would not substantially change the way the current home looks. The garbage shed appears to fully occupy the corner, and any more solid, permanent structure replacing it could only be an aesthetic improvement. Please accept this letter of support as you consider the Lucas appeal. I have no vested interest in the outcome of this appeal, but I do recognize that there appears to be precedent for such a functional change and that the homeowner's proposals seem to be in keeping with the visual appeal of the home and the neighborhood. Best regards, IGerry Rourke 6 Andover Street Salem, MA 01970 truculentloo.v ail.com i l L Erin Schaeffer From: Cindy Johnson <cynthia.m.johnson@gmail.com> Sent: Thursday,June 09, 2016 9:17 AM To: Erin Schaeffer Cc: Larissa Lucas Subject: Support for special permit for 15 River Street Dear Ms. Schaeffer, My husband and I are the owners of 13 River Street. As direct abutters, we are writing to convey our support for a special permit approval to change an existing nonconforming structure at 15 River Street. The item is on the ZBA agenda for the 6/15 meeting. The owner of 15 River Street, Larissa Lucas, would like to convert an existing garbage shed into an enclosed first floor addition to her kitchen. The enclosure is on the same footprint. I believe the project would make her kitchen much more functional for her family. Furthermore,there is plenty of precedent as it is not unlike renovations that have been approved for other homes on this street and in the neighborhood. In addition, my dining room window and kitchen window both have direct views of the existing garbage shed. I believe this view would be much improved with the conversion of the garbage shed into part of her existing kitchen. We fully support Ms. Lucas'petition for a special permit. We encourage zoning board members to approve it. Please contact us if you have any questions. Sincerely, Rick & Cindy Johnson 13 River Street Salem MA 01970 508-527-1219 Cynthia Johnson 508/527-1219 (mobile) www.festivus5k.com www.linkedin.com/l)ub/3/127/2bO t .