Loading...
9 PARALLEL STREET - ZBA 9 PARALLEL STREET CHRISTOPHER KINNON Y1YP.(ll� r UPC 10333 No.153L-3 HASTINGS.CAN 4 p s CITY OF SALEM, MASSACHUSETTS BOARD OF APPEAL (•+i'.: 120 WASHINGTON STREET, 3RD FLOOR ' s SALEM, MA 01970 TEL. (978) 745-9595 FAX (978) 740-9846 "1 r-� STANLEY J. IISOVICZ, Jq, 70 Y 4: C J MAYOR J DECISION OF THE PETITION OF CHRISTOPHER KINNON REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 9 PARALLEL STREET R-2 A hearing on this petition was held June 19, 2002 with the following Board Members Present: Nina Cohen, Joan Boudreau, Nicholas Helides and Joseph Barbeau. Notice of the hearing was sent to abutters and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. The petitioner is requesting a Variance from front & rear setback to construct an addition. Front setback will be 12' rather than 15' and rear setback of 21' instead of the required 30'for the property located at 9 Parallel Street located in an R-2 zone. The Variances, which have been requested, may be granted upon a finding by this Board that: a. Special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other lands, buildings and structure involve. b. Literal enforQement of the provisions of the Zoning Ordinance would involve substantial hardship, financial or otherwise, to the petitioners. c. Desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent of the district of the purpose of the Ordinance. The Board of Appeal, after careful consideration of the evidence presented at the hearing, and after viewing the plans, makes the following findings of fact: 1. Petitioner clesires to construct an addition to a single-family residence located at 9 Parallel Street in Salem. The 15 x 20 foot room would be set back 12 feet from the front proper-ty line, instead of the required 15 feet and the rear setback would be 21 feet insteacy of the required 30 feet. 2. The existing house is nonconforming as to front and rear setbacks, and it abuts on extensive Wetlands, Rosie's Pond, at the rear property line. The proposed addition would exterld no further towards the rear of the property than the existing nonconforming house, and would be setback 5 feet from the front of the house. 3. Petitioner stated that he appeared before the Salem Conservation Commission and presented his plan for the proposed addition. He stated that the members had no opposition 'to the proposed plan. No one appeared to present any opposition to the `f DECISION OF THE PETITION OF CHRISTOPHER KINNON REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 9 PARALLEL STREET R-2 page two proposed plan at the present ZBA meeting either. On the basis of the above findings of fact, and on, the evidence presented at the hearing, the Zoning Board of Appeal concludes as follows 1. Special conditions exist which especially affect the subject property but not the district in general. 2. Literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship to the petitioner. 3. Desirable relief can be granted without substantial detriment to the public good and Without nullifying or substantially derogating from the intent of the district or the purpose of the Ordinance. Therefore,the Zoning Board of Appeal voted 4-0 to grant the Variances requested, subject to the following conditions; 1. Petitioner shall comply with all city and state statutes, ordinances, codes and regulations. 2. All construction shall be done as per the plans and dimensions submitted and approved by the Building Commissioner. 3. All requireMents of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 4. Petitioner shall obtain a building permit prior to beginning any construction. 5. Exterior finishes of the new construction shall be in harmony with the existing structure. VARIANCE GRANTED June 19, 2002 ,r /NinaCohen � CSC Board of Appeal f i A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A, and shall be filed within 20 days after the date of filing of this decision in the office of the City Clerk. Pursuant to Massachusetts General Laws Chapter 40A, Section 11. The Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certificate of the City Clerk that 20 days have elapsed and no appeal has been filed, or that, if such appeal has been filed, that is has been dismissed or denied is recorded in the South Essex Registry of Deeds and indexed under the name of the owner of record or is recorded and noted on the owner's Certificate of Title. Board of Appeal • i . I e T U i —Ell EE E c . 4 16 i I 344 _.... • INTI • LL O� S wa LOCUS MAP ign ®98.9 PARALLEL STREET 1 0.3 99.2 100 100.0 99.5 90' 98.2 99.5 .r 8 w 91)RIVE = WAY zo EXIST DWELLING w #9 ��I� 15 LL 9 3 .7 lo97.1 LOT A 98 — — ` HEDGE 197.9 5• PROP. 0 LOT B 1 z ' Ni DECK 5,032 S.F. m to4 PROPOSED 6' POOL 15.0' ® X9 .4 LIJ 0 x 97.2 x 97.2 U Z HAYBALE LINE .1 LI E/ 2 96. PROPERN 1x95 6— — ,�+6_6� — 96.2 tJ6.1^ WF-3 WF-4 94 856 111 2 W��ND LINE SILT FENCE F�W x 97.8 -�„, .'•1' • , STAKED iy I II•-•,j.J. HAY BALES , .qyL 14H sV' 1f„• PROTECTED RESOURCE AREA 1 TOP OF GROUND 4. GROUND NOTE: ESTABLISH TEMPORARY SURFACE EROSION CONTROL AT f LIMIT OF WORK UNLESS EXTEND 8' OF FABRIC INDICATED OTHERWISE UNDER HAYBALES , 1 CONSTRUCTION SPECIFICATIONS 1. BALES SHALL BE PLACED AT THE LOCATIONS SHOWN AT THE TOE OF A SLOPE ON THE CONTOUR AND IN A ROW WITH ENDS TIGHTLY ABUTTING THE ADJACENT BALES. 2. EACH BALE SHALL BE EMBEDDED IN THE SOIL A MINIMUM OF FOUR (4) INCHES, AND PLACED SO THE BINDINGS ARE HORIZONTAL. ' 3. BALES SHALL BE SECURELY ANCHORED IN PLACE BY TWO WOODEN STAKES DRIVEN i THROUGH THE BALE. THE FIRST STAKE SHALL BE DRIVEN TOWARD THE PREVIOUS LAID BALE AT AN ANGLE TO FORCE THE BALES TOGETHER. 4. INSPECTION SHALL BE FREQUENT AND REPAIR OR REPLACEMENT SHALL BE MADE PROMPTLY AS NEEDED. 5. CONTRACTOR SHALL REMOVE AND DISPOSE OF BARRIER AT COMPLETION OF WORK REFERENCES: AT NO ADDITIONAL COST. D ET A^ I ESSEX COUNTY REGISTRY L BK: 3361 PAGE 324 TYPICAL SILT/FENCE HAYBALE BARRIER TITLE: BK: 10946 PAGE 551 NOT TO SCALE CONSER VA TION PLAN for CHRIS KINNON at I 0;:��� 9 PARALLEL STREET :r BRUCE P. 'F' EATO 121 n ' in SALEM MA GRAPHIC SCALE 20 o 10 sa so ,% Of C .E. C . LAND SURVEYORS INC.) e�,cE (97� 7 WINTER ST. (SUITE 3) PEABODY, MA 01960 531 - 1191 yam T' _�M,... � P. i inch - so rc 90 EaEa SHEET N0: 1 OF 1 DATE : 5-2-02 JOB N0: 1434 NAI �' ""• DRAWN BY: DPB •