Loading...
110-112 LEACH STREET - BUILDING INSPECTION IM - iIa Leach uu UNC 153L 'bsT SASTMOS. YM City of Salem, Mass. ELECTRICAL DEPARTMENT 44 Lafayette Street PAUL M. TUTTLE ,CITY ELECTRICIAN DATE . . . . .�.-./ Z--6-2 . . . . . . To: INSPECTOR OF BUILDINGS Salem, Mass. 'c fir. Electrical Contractor (Signature of Applipnt) ---------------------------------------------------------------------------------------------------------- -- ------------- ------------------------ ----------------------- -------- has signified their intention of performing the required electrical work, viz: removing and later replacing all electrical wires, fixtures, receptacles, etc., on outside of building located at: ... /•)-_1,:t... ...---- -T------------------------"---------------......Street in conjunction with a wall siding installation to be made by: ='� ' . .......... .....................Siding Contractor 1 z -...------• ------------------------------------------ ------- ISSUED BY /�fi----- .............. This is a requirement, preliminary to the issuance of a permit for the sidewall installation by the inspector of Buildings. ORIGINAL-SIDEWALL INSTALLER PINK COPY-BLDG.INSP. YELLOW COPY-ELEC. FILE