110-112 LEACH STREET - BUILDING INSPECTION IM - iIa Leach
uu
UNC
153L 'bsT
SASTMOS. YM
City of Salem, Mass.
ELECTRICAL DEPARTMENT
44 Lafayette Street
PAUL M. TUTTLE ,CITY ELECTRICIAN
DATE . . . . .�.-./ Z--6-2 . . . . . .
To: INSPECTOR OF BUILDINGS
Salem, Mass.
'c fir. Electrical Contractor
(Signature of Applipnt)
----------------------------------------------------------------------------------------------------------
--
------------- ------------------------
----------------------- --------
has signified their intention of performing the required electrical
work, viz: removing and later replacing all electrical wires, fixtures,
receptacles, etc., on outside of building located at:
... /•)-_1,:t... ...---- -T------------------------"---------------......Street
in conjunction with a wall siding installation to be made by:
='� ' . .......... .....................Siding Contractor
1 z -...------• ------------------------------------------ -------
ISSUED BY
/�fi----- ..............
This is a requirement, preliminary to the issuance of a permit
for the sidewall installation by the inspector of Buildings.
ORIGINAL-SIDEWALL INSTALLER
PINK COPY-BLDG.INSP.
YELLOW COPY-ELEC. FILE