Loading...
3 FREEMAN ROAD - ZBA / _ - -- - - � ' i - y �;�o �T CTTY OF SALEM MASSACHUSETTS BOARD OF APPEAL / 120WASHINGTONS7RI'J:f♦ SAI.rAI,MASSAC11L1 rF TS01970 Tiill,r, 978-619-5685 ♦ FAx.978-740-0404 KjNIBL RLLLY DRISCOLL INT AYOR n October 3, 2012 Withdrawal Without Prejudice cnm �.► City of Salem Zoning Board of Appeals m'= N Petition of MARTINE BRACKE and SERGE GREGOIRE requesting a home occupation SpeWl Permit in order to operate a wellness/nutrition/reiki business from the residenoeat 3 oD FREEMAN RD (R-1 Zoning District). A public hearing on the above Petition was opened on July 18, 2012 pursuant to Mass General Law Ch. 40A, § 11. The hearing was continued to September 19, 2012 and closed on that date with the following Zoning Board of Appeals members present: Rebecca Curran (Chair), Michael Duffy,Jimmy Tsitsinos, Annie Harris and Richard Dionne. At the request of the Petitioner, the Board of Appeal voted 4-0 (Curran, Harris, Dionne, and Tsitsinos on favor, none opposed, and Michael Duffy abstaining) to allow the Petitioner to withdraw this petition without prejudice. GRANTED PERMISSION TO WITHDRAW WITHOUT PREJUDICE SEPTEMBER 19, 2012 Rebecca Curran, Chair Salem Zoning Board of Appeals A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A, and shall be filed within 20 days of filing of this decision in the'office of the City Clerk. Pursuant to the Massachusetts General Laws Chapter 40A, Section 11, the Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certificate of the City Clerk has been filed with the Essex South Registry of Deeds. ZBA ACTION FORM p I BOARD MEMBERS s: - MOTION.I SECOND.I,VOTE" l Date: 9� I I 1 f,� I Rebecca Curran(Chair) x I I I I Petitioner: Grf Q 8rF r Richard Dionne Annie Harris V. I Address: I Jamie Metsch I 3 7r22 � Pon�f I Bonnie Belair (Alternate) y IJimmyTsitsinos (Alt.) R-� Qt,(CC,� Total: y Conditions: ❑Petitioner shall comply with all city and state statutes,ordinances,codes and regulations. ❑All construction shall be done as per the plans and dimensions submitted to and approved by the Building Commissioner. ❑All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. ❑Petitioner shall obtain a building permit prior to beginning any construction. ❑Exterior finishes of the new construction shall be in harmony with the existing structure. ❑A Certificate of Occupancy is to be obtained. ❑ A Certificate of Inspection is to be obtained. ❑Petitioner shall obtain street numbering from the City of Salem Assessor's Office and shall display said number so as to be visible from the street. ❑Petitioner is to obtain approval from any City Board or Commission having jurisdiction including, but not limited to,the Planning Board. ❑ Unless this Decision expressly provides otherwise, any zoning relief granted does not empower or authorize the Petitioner to demolish or reconstruct the structure(s) located on the subject property to an extent of more than fifty percent(50%)of its floor area or more than fifty percent(50%)of its replacement cost at the time of destruction. If the structure is demolished by any means to an extent of more than fifty percent(50%) of its replacement cost or more than fifty percent(50%)of its floor area at the time of destruction, it shall not be reconstructed except in conformity with the provisions of the Ordinance.