3 FREEMAN ROAD - ZBA / _ - -- - -
� '
i
- y
�;�o �T CTTY OF SALEM MASSACHUSETTS
BOARD OF APPEAL
/ 120WASHINGTONS7RI'J:f♦ SAI.rAI,MASSAC11L1 rF TS01970
Tiill,r, 978-619-5685 ♦ FAx.978-740-0404
KjNIBL RLLLY DRISCOLL
INT AYOR
n
October 3, 2012
Withdrawal Without Prejudice
cnm �.►
City of Salem Zoning Board of Appeals m'=
N
Petition of MARTINE BRACKE and SERGE GREGOIRE requesting a home occupation SpeWl
Permit in order to operate a wellness/nutrition/reiki business from the residenoeat 3 oD
FREEMAN RD (R-1 Zoning District).
A public hearing on the above Petition was opened on July 18, 2012 pursuant to Mass General
Law Ch. 40A, § 11. The hearing was continued to September 19, 2012 and closed on that date
with the following Zoning Board of Appeals members present: Rebecca Curran (Chair), Michael
Duffy,Jimmy Tsitsinos, Annie Harris and Richard Dionne.
At the request of the Petitioner, the Board of Appeal voted 4-0 (Curran, Harris, Dionne, and
Tsitsinos on favor, none opposed, and Michael Duffy abstaining) to allow the Petitioner to
withdraw this petition without prejudice.
GRANTED PERMISSION TO WITHDRAW WITHOUT PREJUDICE
SEPTEMBER 19, 2012
Rebecca Curran, Chair
Salem Zoning Board of Appeals
A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK
Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts
General Laws Chapter 40A, and shall be filed within 20 days of filing of this decision in the'office
of the City Clerk. Pursuant to the Massachusetts General Laws Chapter 40A, Section 11, the
Variance or Special Permit granted herein shall not take effect until a copy of the decision
bearing the certificate of the City Clerk has been filed with the Essex South Registry of Deeds.
ZBA ACTION FORM
p I BOARD MEMBERS s: - MOTION.I SECOND.I,VOTE" l
Date: 9� I I 1 f,� I Rebecca Curran(Chair) x I
I I I
Petitioner: Grf Q 8rF r Richard Dionne
Annie Harris V. I
Address: I Jamie Metsch I
3 7r22 �
Pon�f I Bonnie Belair (Alternate) y
IJimmyTsitsinos (Alt.)
R-� Qt,(CC,� Total: y
Conditions:
❑Petitioner shall comply with all city and state statutes,ordinances,codes and regulations.
❑All construction shall be done as per the plans and dimensions submitted to and approved by the Building
Commissioner.
❑All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to.
❑Petitioner shall obtain a building permit prior to beginning any construction.
❑Exterior finishes of the new construction shall be in harmony with the existing structure.
❑A Certificate of Occupancy is to be obtained.
❑ A Certificate of Inspection is to be obtained.
❑Petitioner shall obtain street numbering from the City of Salem Assessor's Office and shall display said
number so as to be visible from the street.
❑Petitioner is to obtain approval from any City Board or Commission having jurisdiction including, but not
limited to,the Planning Board.
❑ Unless this Decision expressly provides otherwise, any zoning relief granted does not empower or
authorize the Petitioner to demolish or reconstruct the structure(s) located on the subject property to an
extent of more than fifty percent(50%)of its floor area or more than fifty percent(50%)of its replacement
cost at the time of destruction. If the structure is demolished by any means to an extent of more than fifty
percent(50%) of its replacement cost or more than fifty percent(50%)of its floor area at the time of
destruction, it shall not be reconstructed except in conformity with the provisions of the Ordinance.