Loading...
40 LAWRENCE STREET - BUILDING INSPECTION 40 Pendaf® ' OEM& 74520 400/* P4 CITY OF SALEM, MASSACHUSETTS _ BUILDING DEPARTMENT 120 WASHINGTON STREET,3"FLOOR nma TEL. (978) 745-9595 FAX(978) 740-9846 HIMBERLEY DRISCOLL MAYOR THOMAS ST.PIERRE DIRECTOR OF PUBLIC PROPERTY/BUILDING COMMISSIONER August 24,2010 Mark Gauthier 40 Lawrence Street Salem Ma.01970 Re: Retaining Wall Dear Owner, This Department has received and investigated a complaint regarding the retaining wall on the right side of your property. This complaint dates back to the construction of the second story on your home. At that time we were assured that the retaining wall would be repaired towards the end of the building project. The Mass. State Building Code 780 C.M.R section 5103 requires the owner of a property to maintain all parts and systems in a safe,operable, and sanitary condition. You are directed to begin repairs to the retaining wall within 30 days of receipt of this notice. Failure to repair the wall will result in further enforcement actions. If you feel you are aggrieved by this order, your appeal is to the Board of Buildings, Regulations and Standards in Boston. If you have any questions, please contact me directly. Thomas St.Pierre �,/ Director of Inspectional Services/Building Commissioner cc. Jason Silva, John Pellitier Mark H. Gauthier 40 Lawrence Street Salem MA. 01970 (978) 257-1713 October 29, 2009 City of Salem Building Department Dear Sir or Madam: This letter is to inform you that The Home Doctor(Owner Adam Post) has been removed from the construction project on 40 Lawrence Street for failure to manage and complete the project in a reasonable and timely manner. I Mark Gauthier (Home Owner) will be resuming responsibility for the completion of this project. Sincerely � JJ � 107167 Mark H. Gauthier Home Owner—40 Lawrence Street, Salem MA. 01970 (978) 257-1713