OF THE PETITION OF THE CITY OF SALEM REQUESTING A
VARIANCE FOR THE PROPERTY LOCATED AT 2245-249 DERBY STREET (B-5)
A hearing on this petition was held September 20, 1995 with the following
Board members present: Stephen Touchette, Chairman; Gary Barrett, Albert
Hill, Nina Cohen, ;oseph Ywuc and Arthur LeBrecque. ' otice of the hearing
was sent to abutters and others and notices of the hearing were properly
published in the Salem Evening News in accordance with Massachusetts
General Laws Chapter 40A.
Petitioner, owners of the property request a Variance for lot coverage,
side and rear setbacks to construct a parking garage for the property
located at 245-249 Derby Street (B-5) .
The Variance which has been requested may be granted upon a finding of this
Board that:
1. Special conditions and circumstances exist which especially affect the
land, building or structure involved and which are not generally affecting
other land, buildings, or structures in the same district.
2. Literal enforcement of the provisions of the Zoning Ordinance would
involve substantial hardship, financial or otherwise, to the petitioner.
3. Desirable relief may be granted without substantial detriment to the
public good and without nullifying or substantially derogation from the
intent of the district or the purpose of the Ordinance.
The Board of Appeal, after careful considerations the evidence presented at
the hearing, makes the following findings of fact:
1. City Planner, William Luster presented the petition and described
City's efforts to accommodate concerns expressed by an abutter to
the property.
2. There was no opposition to the petition.
3. Dan Dyer, from the architectural firm of Miller, Dyer & Spears
presented plans for the proposed garage and described the proposed
project, including design changes made to address concerns expressed by
the abutter to the subject property.
4. Donald J. Clarke, 6 Brown Court, an abutter to the property, spoke in
favor of the petition as long as the decision incorporates certain
conditions agreed to by the City in negotiations to address his
concerns about security, snow removal & short term parking.
5. City Planner, William Luster expressed the City's agreement with the
conditions proposed by Mr. Clarke.
6. The proposed garage will provide the area with much needed off-street
parking spaces supporting economic development efforts in the
surrounding area.
7. The requirements of bay construction and the ramping system for the
garage made it impractical to meet lot coverage and set back
requirements.
On the basis of the above findings of fact, and on the evidence presented
at the hearings, the Board of Appeal concludes as follows:
DECISION OF THE PETITION OF THE CITY OF SALEM REQUESTING A
VARIANCE FOR THE PROPERTY LOCATED AT 245-249 DERBY STREET (B-5)
page two
1 . Special conditions exist which especially affect the subject property
and not the district in general.
2. Literal enforcement of the provisions of the Zoning Ordinance would
involve substation hardship to the petitioner.
3 . Desirable relief can be granted without substantial detriment to
public good and without nullifying and substantially derogating from
the intent of the district or purpose of the Ordinance.
Therefore, the Zoning Board of Appeal voted unanimously, '3-0 to grant the
variance requested, subject to the following conditions:
1. Petitioner shall comply with all city and state statures, ordinances,
codes and regulations .
2. Petitioner shall obtain a building permit prior to beginning any
construction.
3. All requirements of the Salem Fire Department relative to smoke and
fire safety shall be strictly adhered to.
4 . A Certificate of Occupancy shall be obtained.
5 A Certificate of Inspection is to be obtained.
6. All construction shall be done as per the plans and dimensions
submitted.
7. Petitioner shall obtain proper street numbering for the City of Salem
Assessor's office and shall display said number so as to be visible
from the street.
8. Petitioner shall close the facade of the parking garage on the west
elevation along the Water's & Brown property.
9. Petitioner shall erect a fence or another suitable barrier at the
northwest corner of the garage's top floor to prevent access to the
roof of 281 Derby Street.
10. Petitioner shall secure the alleyway created as a result of the
construction of the garage with a fence or in a manner acceptable to
the abutter.
11. Petitioner shall institute a short-term parking policy on the first
level of the garage which shall be (1) one hour parking on the first
floor.
12. Petitioner shall encourage all-day or long-term parking to use the
upper floors of the garage.
13. Petitioner shall remove snow from the parking garage in a manner not
to disrupt the abutter.
Variance Granted
September 20, 1995
Gary Barrett, Member ^`�+
Board of Appeal
-o m
w> N
X pa.
Ta
N LIM
DECISION OF THE PETITION OF THE CITY OF SALEM REQUESTING A VARIANCE FOR
i' THE PROPERTY LOCATED AT 245-249 DERBY STREET (3-5)
page three
A COPY OF THIS DECISION HAS BEEN FILED `.«ITH THE PLANNING BOARD AND THE CITY
CLERK
Appeal from this decision, if any, shall be made pursuant to Section 17 of
the Massachusetts General Laws Chapter 10A, and shall be filed within 20
days after the date of filing of this decision in the office of the City
Clerk. Pursuant to Fassachusetts General Laws Chapter 40A, Section 11, the
Variance or Special Permit granted herein shall not take effect until a
copy of the decision bearing the certification of the City Clerk that 20
days have elapsed and no appeal has been filed, or that, if such appeal has
been filed, that it has been dismissed or denied is recorded in the South
Essex Registry of Deeds and indexed under the name of the owner of record
or is recorded and noted on the owner's Certificate of Title.
Board of Appeal
7 N
- m
^ � N
�^ cn
— -- _ --- ------ - - - - SALEM I
MUNICIPAL PARKING GARAGE
US. R STATE I FEDERAL AID FISCAL SHEET TOTAL ,
DIV. N0.1 1 PROGRAM NO. YEAR N0. SHEETS
MAI 95 1 1 —
THE COMMONWEALTH OF MASSACHUSETTS
MASSACHUSETTS HIGHWAY DEPARTMENT
MUNICIPAL PARKING GARAGE
DERBY STREET / CONGRESS STREET
IN THE CITY OF
SALEM
. I
FEDERAL AID PROJECT NUMBER
I
ARCHITECT MILLER DYER SPEARS INC.
DRAWING LIST I,
2B6 CONGRESS STREET ARCHITECTURAL
BOSTON, MA 02210 M1]A.AR - A I
AT RMA RAY - !F£L i/HL�41 15
,A BOOR Rw -Hcwa
EX2AM1 RY11 EUN.,IICF1
Ay DFVAMAI
GEOTECHNICAL GZA Geoenvironmentol, Inc. :; S°°Y` ECAp1
WALL!XcmYs
320 NEEDHAM STREET STRUCTURAL
NEWTON UPPER FALLS, MA 02154 IS-,
i
ELECTRICAL
I
' xE-H cRpvpSEo uarvt stt["[ '
SITE RIZZO ASSOCIATES, INC.
235 WEST CENTRAL STREET
NATICK MA 01760 I
I
I
STRUCTURAL SOUZA TRUE AND PARTNERS, INC. LOCATION MAP
653 MT. AUBURN STREET 25% SUBMISSION BS9NMENppn FOR APPR vA
WATERTOWN, MA 02172 0AA0= FMXM SWO CHEF ENGWEER DATE
MAY 15 1995
HVAC TMP CONSULTING ENGINEERS INC. aPPROVED
FIRE PROTECTION 52 TEMPLE PLACE COMMISiONER
DATE
BOSTON, MA 02210
PLUMBING
ASSOCIATE '
COMMISIONERS DATE
ELECTRICAL JOHNSON AND STOVER, INC.
1256 PARK STREET DATE
STOUGHTON, MA 02072
DATE
i
DATE
COST ENG. Construction Cost Engineering
of Boston DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION 1
156 TILDEN ROAD
APPROVED:
MARSHFIELD, MA 02.050
MVKVIN AELLIINKTRATnQ I
L 16'-0' I 3D'-0' 30•_0. Q ]0•_0• Q30'-0' ` 24'-0% 7 CAR COUNT
STD cow He Ioiu
16 - 3 79
LEKL 7 7) 27 7 17
_ .••��,r„
LEVEE 3 AS 17 7 6/
lEK 1 t9 17 66
N0716'79'E 105.00 1 �^.•• ^"'I-'
TOTAL 113 m 7 706
A17A6 I -1 �STAY7 NO.7`` ` N SID - STANDARD
PROPERTY UNC - - — COY - COMPACT
I I I I I UPI I NC - HANDICAP
u I I
- — - — - — - t:4J— _ _ - _ —o c-- - _ 4J
I I •� I I i I I •'m. 9
•o I I � � I I 3 STAI.S • 1._6. � V o. m SO TH GOR
A AGE
N10T1J' •E 5000' .
�, �r SALEM, MA
- - r—=- - - - - - - - - - - - - - - - - --- - - - - - - - - -
t I
I Z
i VAN S1AlE
YE TE R ED PA R NI N6 / ' 'r✓.
7 o• Al A7
Al 17 I 1 lEtfl 1 Q
• I. I Q. 11-6• 1 ... r..
i STORAGE
4 SIALLS 0 6'-6• 1 / -
1 - rrOREi t
0
00 0
a FYJ
a.oig - - 0 - - -17
- - 00 0 00 - 00 00
A - ` i: MII1P1t DYER SPP.1R4 INC.
RETAIL 1 ® /.. `, �.:-::...!at:.:!_..u>•
DUD
��ann
" 0 I 10 AILS • 9'-6•
"'C' -I .> .`'H •`:� rr av-w aaao
'-F. :' ru av•w oma
IWATER p®
f I O I -IT
I I •r } .i:' •( MY+as 9507
®
I, I 10 I c EL 16'-6• P E T E R E D P A R N I N CRET
�• ' 1 r •I• ..''x o.nr ar
1 AMNE R DO NOT ENTER _ ` '"� I I '� �+� 15 WAY 1995
I r I-T00-I sl(71ALE '- _ A ! I 11350' / AT I u 75% SIE rSsICN
Ai IAJ _ r� i I `````^^^�^�� 1 '•� i, ', Rodaiona
J.
— STAIR N01 •`•, I I 11 rALLS � O a'-6•
- 1
------------_ 00 o
_ _ _' —
-Y:?
'-'r"i`:•:
p o.ip TU c
SIOVO' 1 1.79' F"R
PLAN
CD 3- s/a 3- s 3 ' 3-u 5/8-
X-11 5/e 3_11 s 71A 7p•_0 3
/ 3/E• T-/ 3/6' - 3/er-. 3/6' r-. 3 71-A 3/9' /a•
11'-11 1/8' 26-03
Y.O. YA.Y.O. Y.O. YO. Y.OY.O.
-
1'-11 5/9' 7 ]*-IT 5/8' 1'-11 5/a• 1'-I1 5/a --
FLOOR PLAN - LEVEL 1
AI pa.9p NrMr
CONOR E S S 5 TREE T Al
AI Al
v, Ile . I' ` NORTH
P
30'_ 3°'-0, Y 3°' Y2<-0'
II i I I I I
' I
' I I
II I I o
I illi Lili°I � '
a AS OPEN
0 - - - - ._.LI- -- - - - - - - - - - -- - —= _____- _ - -- - - - -14 - I- -
t I - _ OPEN ; SOUTH HARBOR
o.
3 COMPACT SPACES Y- 'W16'-0'
GARAGE
II
I '
i SALEM, MA
_RAMP ON ID LEVEL it
i
I I I RAMP UP -
I2
Ai A7 /
RAMP UP FROM LIVE 1 I �`
o r �
of Y I i — OPEN
J COMPACT SPACES T T 16'-0'
` EL 24'-6' �•
LFVE125
`J I ?AUJ" DYER SMAM INC.
2
AlAS I 'i 1I N TOM-Me
i� 11 ACES 0 6' 2' O Iu M•by 009
e I0. 1
N
I 6 I
I I I RAMP UP I \ A.M r. 9507
- 113'5V
15 MAY 1995
li' I 25%SUSVWON
2 SP 0 6'-6' At A7
slon
I I I Re� a
Fl,
L O➢. OiOm'
I I I IIIIUPI I I `\`
' I I IIIII I .9I 15 OMPACT SP S Y-6� X 16'-O" I I
I I
— ,1111 I I t
I 111111°N
mo:rq nur 1
o ( �
nMR PIAN
LEVEL 2 LEVEL 25
m
r-;; s/s' s-u 5/2m r s'-;1 s/'cJ'-n s/e' r s'-u 5/e' �3'-11 s/=.
N
P
12'_0 3/6' I 10'-0 3/a' 0'-0 3/r 10'-0 3/3/4' ,= r 10 0 3/: fJ_ 10'-0 3/a• r 10'-0 3/: - -,°'-0 3/4 70-0 o`
�- TET M.o. 1 i M.°. M.O. T i
M.O. U.O.
.l�l�" U.O. U.O.
5/6.
FLOOR PLAN - LEVEL 2 / LEVEL 2.5 A, AS 6a. q W er
q ♦ 2NORTH [lf1L/
Y 1b._0. Q i JD 0 30 D 21-0
� I
I '1
i
1 1 1
J I IIII VIII I \\
11 I I 1 I I I L�1.«jl up
SOUTH HARBOR
ACLS 0 B 2-I GARAGE
1
SALEM, MA
I�
O — - - _ — -
I 1
I I RAMP UP I I RAMP DN
ACES 0 B•"2- \\
lE�E1 3 1
J -- I - - — — - — — MII1Flt DYER SPFaRS INC I
raw-sst we° 1
e 11 ACES 0 5'-2' e \ ru m�ase°°ss I
m
I I I RAMP UP 9507
I 1 oaa es '
15 MAY 1995 '
Ai 1 A7 7$SUDMISSION
2 SP O -6 �
Ai A7 I 1 Revisions
W .b Cvb
1 I
1 1 1 I IIIUPI
I I I ycj i 15 1 OWPACT SP kCES T-I- % 76'- "
/\ I Ilil
l i l - - FLOOR PLAN
N LEVEL 3 / LEVEL 35
a
0
m
N
P
1
N I
I
FLOOR PLAN - LEVEL 3 / LEVEL 3.5 Al'AS Dc.n9 AmD>
'AA., A3 I
J NORTH
Ile . 1
yl _ 30'-0- I 3o-aso'-o' I Jo-o1i-o'
I I I I I I I I
I I 1 1
I II I II
3 I OPEN
Al AS /
I I I I I I II 111111 1 \\
I _ _ I_ 11111111 I 1
�1 —
I
SOUTH HARBOR
o I I I n A¢s o 6. GARAGE
` \ I
11 a SALEM, MA I
� -
Ea
RAMP ON
2 2
A7 Al A7
11 ;PACESSOW 9'0 5'
I
F4 I IE�IE 1 1 /
l LEVFl 4.5 �-
�'- - - —
Ii NEU" DYIR SPEAM ING ,
2 `, Issl�y�n ov�io
Al A5 �1(I• 11 AmSA b 6'1' 1 V� Tod M.=5 ce6o
'<
1 1 RAMP ON 1
1 1 on}n t 9507
u '
15 MAY 1995
1 I I I I
SWSSiON
I T 2 5P S 0 6-6' Al l Al 25S SU
u Reisbns
I I I I I I I 3 SPACES 0 -6' I 15 MPACi SP CES T-6i X
ONI I 1 1
1
_ _ _ — _ — — _ — _ _- 0—
E3 -
FLOOR raw
I i I
LEVEL 4 LEVEL 43
O
m I
N
1 1
N
1
•� I
9rc.vq Num6tt
FLOOR PLAN - LEVEL 4 / LEVEL 4.5 At A5
I
AI A{ A4 NORTH '
� 1� � 1' I
i
I
Q
O
i
1 I 1
1 ASAgI I ,_ —,- SOUTH HARBOR
GARAGE
LEVEL 4^ _ _ _____ _ __
________________�_________------_ � - - SALEM MA
------ - - -----o
0 0
IEYkl
ELEv. '4J 6'4J 6 I =______ ________ _
i- - _
RETAIL LEVEL iIl
Eta 14'-6-
NORTH
4'-6NORTH ELEVATION
A5 A5 MIER DYER SPEARS INC !
tee wpw mr .
i �, J T 1 15 f \ 6 J 7 r.l m-sae saso
J 2
4
5 A9 I I AS A9 I I AS A9
I
i.0. PC ELEV. 53'-Er 9507
ELLV. 49' ___ __ _
-5 i LEVEL 4
0xELEV. 44'-6
15 MAY 1995
I -
lEL?:13.5
25%SUOU SS.ON
-
ELEV. 39'-6
x I t I LEVEL J
_____ _ _____ _s=== __ 2—x,=6 Revisions
b M. evC�
LEVEL 2.5^ _ ______________ --------------
__ I —
[LEV. 29'-6 J I I - 1 2 _
b # --{----------- 7 _ a
1 I I I I II
w
CONGRESS 5T. E?1iRf IfVFl9 �� —__. -_ —_jp _ _ _____ I ' ' IPA P=4 II__ Elfli LEVE —
c ELEV. 16-6 ---- - ----- i - -----------r___________________i=______ ---- 4 �A1.EVATIONS
o
m �
EAST ELEVATION
A5 AS
1/8' 1'
W
J
W
9rc.�9 nSv
�a I
x
N
r
N
N
i'
c
4 ,
t
- • Y "1� v
Al,
t'
- .� a .: ♦-
T.O. PC ELEV. 53'-6 SOUTH HARBOR .. .
EVEL 5 GARAGE
�EtEV. 49'-6-. • •L • � 'n�c -
I I I I I I I -
ItVEL 4 _
SALEM MA ,'
LEVEL 3.5
I 1 ___ =-=F GELD. 39-T
ORICK BRICK .
ELEV. J4'-6�
LEVEL
w
CONGRESS 5T. ENTRY LEVEL
RETNL LEVEL„ __________
ELEV 14 6 I ==c=a=--==—=--=n
WEST ELEVATION
MR.LPR'DYER SPEARS INC'•,
see Omo.e faviiet
mto
Y Y Y Y TO an.we aseo
F.en-ax odu
I T.O. PC ELEV. 5)'-6
or 9507...
4.5 daM ax•. -
_ 49'-6 .
15 MAY 1995 ' •�
0 LEVEL
1.5 25%SUBNISSIQN.
ELEV. 6 ReAslons , ° Pw r
BRICK. � �. xo mt: omraue,
I - LEVEL 2.5 .
------- - __________ -__- -__- _-_-_ _ _- _-_-
F EL 16'-6' . .
w CONGRESS Sr. ENTRY LEVEL . ✓
I _ uu Drawing Title:
c r7_______________________________________7________________________--_____-_______7 ELEV.
a
m P.LEVA1'IONS
SOUTH ELEVATION r.• '
A6 A6 1�8. 1. Y�;rc'r
W
' Drawing Number r tia
A6 >-
I
I I I 1
I II
LEVEL 1.5
_ r -- - SOUTH HARBOR
M. µ'=6� - - - - - _ - � �_=