Loading...
29 CHESTNUT STREET - ZBA 2 q C hesA-nvt Sr4cee� Zoning Board Prosect States Sheet Address & Applicant: Date Submitted to BOA: � 2 G3 1 &-" Clerk Stamp: t Variances Only - Constructive Approval Date: (100 days from riling) I/ Abutters List Requested: /Abutters Notice Sent: Notice to Abutting Cities & Towns, Councillors: 2/ Legal Notice posted at City Hall: (14 days before meeting) �1 Legal Notice Emailed & Confirmed: Legal Notice Posted on Web: Agenda to Applicant: Applicant's email address or fax number to send agenda: Opened at Meeting: 2 11 -7 It 6 Continued Meetings: Extension Form(s) Signed & Clerk Stamped? Closed at Meeting: 2 -� � � Decision: G-y-a ✓1+,f Decision Filed: .3 2 l� Appeal Period Over: after decision filed) (21"day 0/ Decision Sent to Applicant: � (p v/ Notice of Decision Sent to abutters, cities and towns, councillors: s . ZBA ACTION FORM rBOA1ZDiMEMBERS ;°,MOTIONi SECOND VOTE:` Date: '-I 1 (oRrbecca Curr Mike Duf Petitioner: Tom Watkins Peter Co Blas Address: 201 Cin 5 Y��r S Jimm Tsitsinos Jim Hacker(Alt.) Total: Conditions: 0P titioner shall comply with all city and state statutes, ordinances, codes and regulations. 70,11 construction shall be done as per the plans and dimensions submitted to and approved by the Building ommissioner. 1 requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. ietitioner shall obtain a building permit prior to beginning any construction. iA xterior finishes of the new construction shall be in harmony with the existing structure. Certificate of Occupancy is to be obtained. .Certificate of Inspection is to be obtained. Petitioner shall obtain street numbering from the City of Salem Assessor's Office and shall display said number so as to be visible from the street. Petitioner is to obtain approval from any City Board or Commission having jurisdiction including,but not limited to,the Planning Board. ❑Unless this Decision expressly provides otherwise, any zoning relief granted does not empower or authorize the Petitioner to demolish or reconstruct the structure(s)located on the subject property to an extent of more than fifty percent (50%) of its floor area or more than fifty percent(50%)of its replacement cost at the time of destruction. If the structure is demolished by any means to an extent of more than fifty percent(50%) of its replacement cost or more than fifty percent(50%)of its floor area at the time of destruction, it shall not be reconstructed except in conformity with the provisions of the Ordinance. CTTY OF SALEM, MASSACHUSETTS BOARD OF APPEALS W—W PETITIONFORM CITY OF S4LEM,MASSACHUSETTS BOARD OFAPPEALS `2010 jAIN 2b 'A ICtNA32 1209iINGTON STREET,3RDFLOORS4LEM,MASS4CI1Ug7TS01970TY CLCr ' L- < y;Thorresa.Flare,Director of Inspectional SsIvioes Phone 97&619.5641/ Fac:978-740-9846 R KRvI suZY DRisCOLL Erin S:ha&ry,Staff Flamer `E C E I V E D. MAYOR Phone:978-619-,%M/ Fac 978-740.0904 .. TO THE BOARD OF APPEALS JAN 26 2016 The Undersigned represent that he/she is/are the owners of a certain parcel of land located at: DEPT' OF PLANNING & 'l Address: �ti CIno>fnvF S't , COMMUNITY DEVELOPMENT 1-AnZoning District: n R, -1— An application is being submitted to the Board of Appeal for the following resson(s): This statement must describe what you propose to build,the dimensions,the zone property is in,and the zoning requirements.(Example: I am proposing to construct a 10' x 10' one story addition to my home located at 3 Salern Lane,1 n the R-2 Zoning District. The Zoning Ordinance requires the minimum depth of the rear yard to be 30 feet The current depth of my rear yard is 32 feet"the proposed addition would reduce the depth of the rear yard to 22 feet) b� .lC S' P ' gosed A e For this reason I am requesting: ( )Variance(s)from provisions of Section of the Zoning Ordinance,specifically from What is allowed is (i.e. minimum depth ofrearyard). am proposing is (R?sq.R?stories? %?), and what I (fi?sgft?stories 2AX %?), A Special Permit under Section r of the Zoning Ordinance in order to .bAvi/al dr ck .S f r- '✓ V/e^ C NCI f 'On ( )Appeal of the Decision of the Building Inspector(described below): P,r flc'>rf` r. l S`f��C•��� � ( O)Comprehensive Permit for construction of low or moderate income housing(describeC 'be below): � a d, Current Property Use: -"(4 rir-1 J1re Lot Dimensions Included? )yes ( )No Why? (Example:7lvo Family omC) / \ The Undersigned hereby petitions the Board of Appeals to vary the terms of the Salem Zoning Ordinance and allow P Z the project to be constructed as per the plans submitted,as the enforcement of said Zoning By-Laws would involve practical difficulty or unnecessary hardship to the Undersigned and relief may be granted without substantially � . Q derogating from the intent and purpose of the Zoning Ordinance. o fpm S 2 CITY OF SALEM, MASSACHUSETTS BOARD OF APPEALS PETITION FORM The following written statement has been submitted with this application: O For all Variance requests a written Statement of Hardship demonstrating the following must be attached: a) Special conditions and circumstances that especially affect the land,building,or structure involved, generally not affecting other lands,buildings, and structures in the same district, b) Literal enforcement of the provisions of the Ordinance would involved substantial hardship to the applicant,and c) Desirable relief may be granted without substantial detriment to the public good,and without nullifying or substantially derogating from the intent of the district or the purpose of the ordinance. f For all Special Permit requests a Statement of Grounds must be attached.An application for a special permit for a nonconforming use or structure shall include a statement demonstrating how the proposed change shall not be substantially more detrimental than the existing nonconforming use to the neighborhood in accordance with Section 9.4 Special permits. Such a statement should include reference h the following criteria: a) Social,economic,or community needs served by the proposal; b) Traffic flow and safety,including parking and loading,- c) Adequacy of utilities and other public services; d) impacts on the natural environment,including drainage; e) Neighborhood character, and 1) Potential fiscal impact,including impact on City tax base and employment. ( ) For all Comprehensive Permits for construction of low or moderate income applicants should refer to M.G.L. Ch.40B §20-23. Previous applications to the Board of Appeals involving this property have been submitted with this petition form. The Building Commissioner can provide documentation ofprevious applications to the petitioner or his representative. If dIfferent from petitioner: Petitioner: Property Owner: Address: Address: Telephone: Telephone: Email: Email: Signature: Signature: Date: (Attached consent Date: leper is olso acceptable) Ifdifferent from petitioner: Representative: h.6r- Cp 17 Q-V A TRUE Address:—�? 3 Ch c 1'/ ' ATTEST Telephone: ?o 6 -- yr4 Signature: _ Date: 1-?6 -/ / CITY CLERK DATE DPCD DATE This original application must be filed with the City Clerk �' � -mit �t�•� � r ' r.1 ;�. f� •.4 `SPF_ . ti��. d 6 o- d t p I !!II l at u' � f'e tr. Pf I j f `�'_.�,�•'III��fl I��. ,rr ®+ P mss..'. Ar E,jlll1,� 1 L {1 ! e j p .gm,al.: ROE Jll �r����.��.i,LD Yt^wia`'f�.ti�t g ei�', •'.�An� • �''F,, li �r?l41h k S. ���K {.�}�l h � 'Pt�+69- K`. I.y!I r �l" ,i^��, ! u� 9 �y �IyUl YA ,�, ,;dk •i y' _ r. Y may..�^,yt �... •��' fs yrk � MOW- Fi .rt''�,'"F'z vim.-T-�,-. � ��/,�"` -'-s.,„.l _ - '?' ��•:1�, _ i air .a 4 � � .ti v�� �" •_ 'b+� P y"u' �n. -` s r �, � �_ y41 1 i oag rrmAm �ZN FFFFFF�iC O W N 9 Z 1{ y S05'23'24-E S07'i(—M'E 5 - 36.19' 'y b n 3 ' v 7 I I --------� I I I I I L------- .. -- 17— IN 7 — 1 E u S I j I � rl----- fill vaorwmS°reurou ASB ARCHITECTURE T Q MCGRANE RESIDENCE AIMPe BrHRev,qIA,LffO qP a N .�� W➢6fao01.&F www.asbarcb2xWrc.wm � !! H06MIf 51PFFi�SLLH�IN c V I J b p 6 a � IUp rryW. ,f rf t�'1�'kxl'T rh Ijr t� III�I II 'I I. III _III t' �ItfvP.nu�' 7{� ' l�i� 1 f 'I III li o MI 1 11 r jai oil 'I II IIII 14 Illi Int h I�1� III 1 �I 711 II p r i n 71{7 �Li� wa I O Ili 'I I I, r�� iii 9 I III' I u n�fr ,xf�xuus7RpR� r�� •. ® .,IIII.i III Ir �. I'I Y 17 r�= ',I I m I I II w III 11, I I I I III o' 11 o V I IIII, �I lil I I it I I I III IIII III. IIII 114 I,. III . mom'1 l'I IIII I I 'I li I�—�--� III li 1 L_1_L_1-1 l n� IIT: IIII;I III II I1111I I,: i'�i '111111 II 1 SII IIII I1� I ,III illl 111 . IH JIM �� ll� Ii 1 III11 I�. 1I II iijl �I ;IIII n SII I IIII I Illy W I � ® IIII III II I 1� I Ij ILII IIII ai. D03MR OPTIONS A55 ARCHITECTURE 'n D MCGRANE RESIDENCE AIMEE BEMLEY,AIA,LEED AP VD �� ��r' wew.asbarchltectvre.com R R Md61NIR51A@i�SLLBl,t41 c V vnt.iwti eogn,vM1cnara R 29 Chestnut Street Impact of proposed rear deck: A. Social, economic or community needs served by the proposal: There is no expected impact other than the aesthetic improvement to a historic structure that had some unfortunate modifications made to it in the I950s. The proposed changes will remedy the changes made to the structure so that it feels more true to the Federal style architecture of the building. B. Traffic flow and safety, including parking and loading: The proposed deck will improve safety for inhabitants of the dwelling as there are 2 large sliding doors that currently do not lead to a deck or balcony. Those doors were installed in the 1950s when the structure was renovated. Our understanding is that the deck was ultimately never completed as planned (See photograph of existing doors that was submitted with the application). The exterior of the existing structure has not been modified or altered by the existing homeowner. There is no other expected impact. C. Adequacy of utilities and other public services: There is no expected impact. D. Impacts on the natural environment, including drainage: There is no expected impact, the current location is not wooded and is covered in pavers with sufficient drainage. E. Neighborhood character: While not visible from the street or the neighbors, this will be a much-needed aesthetic update. The proposed deck will be in keeping with the look and feel of the Federal style architecture of the building. As_part of this project the homeowner plans to replace the 1950s era sliding doors that currently do not lead out to a deck or balcony. Full elevations/plans will be submitted to the Historic Commission for approval_ F. Potential fiscal impact, including impact on City tax base and employment: The only impact to the City will be any adjustments made to the taxable valuation of the dwelling as a result of the proposed addition/changes. t;UNUIT,L,,.; CITY OF SALEM, MASSACHUSETTS BOARD OF APPEAL - A p _ 120 WASHINGTON STREET* SALEM,MASSACHUSETTS 019416 MAR -� A S' 53 KiMBERLEY DRrscoLL TELE:978-745-9595 ♦ FAx:978-740-9846 G' rFILP fiTY LE,c `r MAYOR r., S ': Ei�i. :1;SS March 2, 2016 Decision City of Salem Board of Appeals A petition of MAURA MCGRANE seeking a Special Permit from the provisions of Sec. 3.3.5 Nonconforming Single and Two-Family Structures of the.Salem Zoning Ordinance to extend, alter or change the structure to allow the construction of a rear deck at the property of 29 CHESTNUT STREET (Map 25 Lots 240)(R1 Zoning District). A public heating on the above Petition was opened on February 17, 2016 pursuant to M.G.L Ch. 40A, 4 11 and closed on that date with the following Salem Board of Appeals members present: Peter A. Copelas (Vice- Chair), Mike Duffy,Tom Watkins,Jimmy Tsitsinos,Jim Hacker (Alternate). The Petitioner seeking a Special Permit from the provisions of Sec. 3.3.5 Nonconforming Single and Two-Family Structures of the Salem Zoning Ordinance to extend, alter or change the structure to allow the construction of a rear deck. Statements of facts: 1. Peter Cohen of PB + C,presented the petition on behalf of the applicant. 2. In the petition date-stamped January 26, 2016, the Petitioner requested a Special Permit from the provisions of Sec. 3.3.5 Nonconforming Single and Two-Family Structures of the Salem Zoning Ordinance to allow the construction of a rear deck. 3. The current property use is a single-family home located in an R-1 Zoning District. 4. The petitioner is proposing to construct a 14' x 19' rear deck off of the back of the existing non- conforming structure within the side yard setback. 5. The existing structure is 2.7 feet from the side yard lot line. The proposed deck will be 3.1 feet from the side yard lot line,where the dimensional requirement is 10 feet from the side yard setback. 6. The petitioner does not propose to increase the existing nonconforming dimension along the side yard setback with the addition of the rear deck. 7. The requested relief, if granted, would allow the Petitioner to extend, alter or change the structure to allow the construction of a rear deck. 8. At the public hearing one (1) members of the public spoke in favor of, or in opposition to, the petition. The Salem Board of Appeals, after careful consideration of the evidence presented at the public hearing, and after thorough review of the petition, including the application narrative and plans, and the Petitioner's presentation and public testimony, makes the following findings that the proposed project meets the Provisions of the City of Salem Zoning Ordinance: City of Salem Board of Appeals March 2,2016 Project:29 Chestnut Street Page 2 of 2 Findings for Special Permit: The Board finds the proposed modification will not be substantially more detrimental than the existing nonconforming structure to the neighborhood. 1. Social, economic or community needs served by the proposal are that the modifications are in keeping with Federal style architecture of the building. 2. Traffic flow and safety,including parking and loading will not be impacted. 3. Adequacy of utilities and other public services will not be changed. 4. Impacts on the natural environment,including drainage will not be changed. 5. The proposed architectural style of the deck is in keeping with the existing architectural style of the building and surrounding neighborhood. 6. Potential fiscal impact,including impact on the City tax base and employment will be positive. On the basis of the above statements of facts and findings, the Salem Board of Appeals voted five (5) in favor (Peter A. Copelas (Vice-chair), Tom Watkins, Mike Duffy,Jimmy Tsitsinos, and Jim Hacker (alternate) and none (0) opposed, to grant a Special Permit from the provisions of Sec. 3.3.5 Nonconforming Single and Two- Family Structures of the Salem Zoning Ordinance to extend, alter or change the structure to allow the construction of a rear deck, subject to the following terms, conditions and safeguards: Standard Conditions: 1. The Petitioner shall comply with all city and state statutes,ordinances, codes and regulations. 2. All construction shall be done as per the plans and dimensions submitted to and approved by the Building Commissioner 3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 4. Petitioner shall obtain a building pemrit prior to beginning any construction. 5. A Certificate of Occupancy shall be obtained 6. A Certificate of Inspection shall be obtained. 7. Petitioner shall obtain a street numbering from the City of Salem Assessor's Office and shall display said number so as to be visible from the street. 8. Petitioner is to obtain approval from any City Board or Commission having jurisdiction including, but not limited to, the Planning Board. Rebecca Curran, Chair Board of Appeals A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts General Lams Chapter 40A, and shall be filed within 20 days of fik'ng of this decision in the office of the City Clerk. Pursuant to the Massachusetts General Lams Chapter 40A, Section 11, the Variance or Special Permit granted herein shall not take effect until a ropy of the dedrion bearing the cer0ficate of the City Clerk bar been filed with the Essex South Registry ofDeeds. - Pvb �� c cav�me,c�� 2g c�es-t-r,v-� Ste-. �' HISTORIC° Lyman Estate 185 Lyman Street NEW ENGLAND Waltham,MA 02452-564S te]781.891.4882 Definntgtieparr Shapingdiefuture. HistoricNeivEngland.org February 16, 2016 Erin Schaeffer, Staff Planner City of Salem Department of Planning and Community Development 120 Washington Street, Yd floor Salem,MA 01970 Re;29 Chestnut Street, Special Permit petition of Maura McGrane to Zoning Board of Appeals Dear Ms. Schaeffer: Historic New England, an abutter of the above property as the owner of the historic 1821 Philips House, 34 Chestnut Sheet,appreciates the opportunity to comment on the petition of Mauna McGrane for a Special Permit for construction of a rear deck at 29 Chestnut Sheet,the 1822-25 Dodge-Shreve House,to be heard by the Zoning Board of Appeals on February 17. My staff have reviewed the application materials and proposed design by ASB Architecture, which delineate construction at the southeast corner of the house of a 14'x 19' deck at the existing sliding doors on the south wall of 29 Chestnut Street,with the deck to be finished with a classical urn balustrade and lattice below.It is our understanding that this proposal is subject to Special Permit review because the historic siting of 29 Chestnut Street well off of the west side property line puts it out of conformance with current zoning. We also understand that the proposed deck, which will he publicly visible from Warren Street to the south,is subject to further review and approval by the Historical Commission-as the property is located in the McIntire Historic District. The plans you forwarded electronically make clear that while Ms. McGrane's proposed deck may be minimally visible from Chestnut Street, it is set well back on the property,behind a projecting rear ell and its impact,if any, on the Chestnut Street frontage of the properly,would be negligible. In addition,the proposed design appears to be suitably compatible to the architecture of the Dodge-Shreve House. Historic New England therefore has no concerns that this construction will affect the Philips House. Thank you again for the opportunity to comment on this petition. Sincerely yours, (CW�ly Carl R.Nold, President and CEO, Historic New England Cc: Melinda Huff,Museum Operations Manager,Philips House HISTORIC EC E I V E D' Lyman Estate IS Lyman Street NEW ENGLAND FEB 222016 Waltham,MAOZ45=-5645 - tel 781.891.4882 Defining thep,=Shaping thefutum + HistoricNewEngland.org . 6��$.®�PLANNINGff @OMMU'hJllTf`U DEVELOPMENT February 16, 2016 Erin Schaeffer, Staff Planner City of Salem Department of Planning and Community Development 120 Washington Street, 3`d floor Salem, MA 01970 Re: 29 Chestnut Street, Special Permit petition of Maura McGrane to Zoning Board of Appeals. Dear Ms. Schaeffer: - Historic New England, an abutter of the above property as the owner of the historic 1821 Philips House, 34 Chestnut Street, appreciates the opportunity to comment on the petition of Maura McGrane for a Special Permit for construction of a rear deck at 29 Chestnut Street, the 1822-25 Dodge-Shreve House, to be heard by the Zoning Board of Appeals on.February 17. My staff have reviewed the application materials and proposed design by ASB Architecture, which delineate construction at the southeast corner of the house of a 14' x 19' deck at the existing sliding doors on the south wall of 29 Chestnut Street, with the deck to be finished with a classical urn balustrade and lattice below. It is our understanding that this proposal is subject to Special Permit review because the historic siting of 29 Chestnut Street well off of the west side property line puts it out of conformance with current zoning. We also understand that the proposed deck, which will be publicly visible from Warren Street to the south, is subject to further review and approval by the Historical Commission as the property is located in the McIntire Historic District. The plans you forwarded electronically make clear that while Ms. McGrane's proposed deck may be minimally visible from Chestnut Street, it is set well back on the property, behind a projecting rear ell and its impact, if any on the Chestnut Street frontage of the property, would be negligible. In addition, the proposed design appears to be suitably compatible to the architecture of the Dodge-Shreve House. Historic New England therefore has no concerns that this construction will affect the Philips House. Thank you again for the opportunity to comment on this petition. Sincerely yours, Carl R. Nold, President and CEO, Historic New England Cc: Melinda Huff, Museum Operations Manager, Philips House Erin Schaeffer From: vtsdmailer@vt-s.net on behalf ofjlnmetsch@gmail.com Sent: Wednesday, February 17, 2016 3:58 PM To: Erin Schaeffer Subject: [City of Salem MAI ZBA - Kim Youngworth, 14 Winter Street Hello eschaeffer, James Metsch (ilnmetsch(@gmail.com) has sent you a message via your contact form (http://www.salem.com/user/326/contact) at City of Salem MA. If you don't want to receive such e-mails,you can change your settings at http://www.salem.com/user/326/edit. Message: Dear Rebecca Curran,Chair, Members of the Board, City of Salem Jamie Metsch and Kate Leavy here from 18 Oliver St, rear abutting neighbor to applicant.We would like to express our approval of Kim's project and plans to expand the existing footprint and construct a rear addition to her home. We witness the care Kim is taking to restore this older property and appreciate the needs to accommodate modern code and living comforts.The finished result will be a compliment to both the historic and present neighborhood. Respectfully Jamie Metsch& Kate Leavy 18 Oliver St Salem MA 01970 1 �,C0111�IT � CITY OF SALEM MASSACHUSETTS BOARD OF APPEAL �1M1NE 120 WASHINGTON STREET♦ SALEM,MASSACHUSETTS 01970 KIMBERLEY DRISCOLL TELE:978-745-9595 ♦ FAX:978-740-9846 MAYOR MEETING NOTICE You are hereby notified that the Salem Zoning Board of peals will hold its regularly scheduled meeting on Wednesday, February 17,2016 at 6:30 p.m. at City HallAnnex, RM 313, 120 Washington St., Salem,MA Rebecca Curran, Chair MEETING AGENDA I. ROLL CALL � d II. APPROVAL OF MINUTES vT W ➢ August 19, 2015 o ➢ January 20, 2016 D Y III. REGULAR AGENDA °? w J � Project A public hearing for a petition of seeking a Special Permit from the provisions of Sec. 3.3.2 Nonconforming Urex of the Salem Zoning Ordinance to allow the change from one nonconforming use of a candy factory to another nonconforming use of residential dwelling units. Applicant SCHIAVUZZO REALTY LLC Location 93-95 CANAL STREET (Map 33 Lots 164, 165)(B4 Zoning District) Project A continuation of a public hearing for a reapplication seeking Special Permits from Sec. 3.3.3 Nonconforming Structures and 3.3.5 Nonconforming Single and Two- Family Residential Structures and a Variance per Sec. 5.1 Off- Street Parking Requirements of the Salem Zoning Ordinance to allow the conversion of a single-family dwelling unit to a two-family dwelling unit and associated parking. Applicant BLUE WATERS VERO LLC Location 11 HERBERT STREET (Map 35 Lot 320) (R2 Zoning District) Project A public hearing for a petition seeking a Variances requesting relief from Sec. 4.1.1 Table of Dimensional Requirements of the Salem Zoning Ordinance, for relief from rear and side- yard setbacks, minimum lot area per dwelling unit and minirnutm lot area to construct a rear addition. Applicant KIM YOUNGWORTH Location 14 WINTER STREET (Map 35 Lot 88)(R2 Zoning District) Page ] oft City of Satem Board of Appeals Agenda for February 17,2016 Meeting Project A public hearing for a petition of seeking a Special Permit from the provisions of Sec. 3.3.5 Nonconforming Single and Two-Family Structures of the Salem Zoning Ordinance to extend, alter or change the structure to allow the construction of a rear deck. Applicant MAURA MCGRANE Location 29 CHESTNUT STREET (Map 25 Lots 240)(R1 Zoning District) Project A request for a six (6) month extension to exercise the rights granted by the March 4, 2015 Decision that approved Variances from the minimum lot frontage requirements, lot area requirements, and lot coverage maximum requirements to realign lot lines for parcels held in common ownership and to allow an increase in lot coverage maximum for an existing residence. Applicant MARIA and WAYNE MALIONEK Location 23 JACKSON STREET and 17 VALE STREET (Map 25 Lot 661 and Map 25 Lot 660) (R2 Zoning District) Project A continuation of a public hearing for a petition requesting a Special Permit per Sec. 3.3.2 Nonconforming Uses of the Salem Zoning Ordinance to change and existing nonconforming use of a social club to another nonconforming use of eighteen (18) residential units. The petitioner is also requesting Variances for relief from Sec. 4.1.1 Table of Dimensional Requirements for minimum lot area per dwelling unit, minimum lot frontage, minimum lot coverage, front and side yard setbacks, minimum distance between buildings, and number of stories. Applicant MICHAEL MEYER Location 1-3 EAST COLLINS STREET (Map 36 Lot 277)( R1 Zoning District) IV. OLD/NEW BUSINESS 107 FEDERAL STREET -Vote to authorize execution of Agreement for Judgment in the Superior Court action, Arlander v. Sinclair, CA No. 2014-1050B as recommended by City Solicitor's Office. V. ADJOURNMENT This notice posted on "Officir�guU ji jftard" City Hall, Salem, Mass. on 11 ®® at 6'344H in accordance with MGL Chap. 30A, Sections 18-25. Page 2 of 2 WARREN STREET S78' W" ' I 1 I I ls' i I I I I I I I w � � 00 I 1 � I , iU) 0 o GARAGE I I � I PAVED DRIVEWAY I I I I ' I I I I 1 I 1 I I I I I ' I I I L_______—_._J s c cn MAP 25 LOT 240 is M _ MAP 25 LOT 239 21.6' " EXISTING 2ND FL. OSCAR PADJEN RITA PADJEN PROPOSED 1ST FL. 27 CHESTNUT ST. 3 0 0) existing. CO step to lT be removed �' N .— " Z 3 2 c PROPOSED o.�DECK aw aa. 2.7' L p Q N el O a 04 i 04 PORCH 0 MAP 25 LOT 241 3.3' MICHAEL SELBST BRADLEY WILLIAMS 31 CHESTUT ST. THREE STORY DWELLING w #29 0 M io 1N � 4 (n , 57.6" a ai 6 124.40' N82'54'01"E CHESTNUT _ STREET ZONING DISTRICT — 'R1 UFMgSS ZONING BOARD' OF APPEALS PLAN EXISTING PROPOSED °r� 9�y 29 CHESTNUT STREET REQUIRED DWELLING DECK �� GAILL N ° SMITH SALEM LOT AREA 15,000 .27,964 27,964 ° N ND 3w49 PROPERTY OF LOT FRONTAGE 100 124.40' 124.40' F MAURA MCGRANE Q sr€a� FRONT 15 14.9' - aNe SIDE 10 2.7' 3.2' SCALE 1" = 20' APRIL 29, 2016 REAR 30 - - NORTH SHORE SURVEY CORPORATION [LOT 30% 20% 2oz 14 BROWN STREET — SALEM, MA 978-744-4800 � f #4049 ate ) ' s. _ asb architecture r W CZ CE ' p _ Rf PA R/RESiORE PND REPO Ni �c' j U `,L BRCFiOMATCnfpSTIIICJORGJ4L UB V i 1 c HVAC ® � ® W= G 512E MINI-5PLIT 5Y -I FOR _ AC IN MTChEN AND MODHOU5E _ ® ® GLA%fRf NCI DWPS NT HEN =lnnv A 1C ON P.NLING SYSTEM Q 3 W N WOOD r1,1AG1 x N nOR SONTPL WALL BOPRDS - - .Y1 x N Sn PREP i0 BASEMENT PUN TOP PF L. LLJ:n . . ... _.rT 0— ❑� �_ TI FRnns GRnuCMouG TO Q a Q 3 A p SPPCf MW A. T BLOCKIN Ex Sr NG PTSPvanr Proal OL D.Aac- O D. DSTs NEI �saou RuuxG ssm I � fD CEOAZ Pro. _ G - , _____. LouvexeD Paueu.MPNcn ex sT'e . South Elevation SDpDGPANINE STEPS PDRGM1 DN WESNYDf DPM1WSf NGERGnNPPJfLICE E c 20 SCALE:1)4••=r-0• L _ N Z _ - DLmRz WINDOW SCHEDULE MORVDJNLWWDHSTOWCWINDOW w PE npDEL arr.uxrt saE Rouex oPEnlxG Ro xEw xGr. ., PETS y A Dx amzC W-2-a as XsW-2- R'.z- g 9 DX lSLH 3 z'd'x Y9' 199' ONE VNR 6IMERICA WINDGV LEDGEND c DXI z z'<xqs' sa KITTEN Mx aNEuHH.,ETSEC.mH. WW DRnIIic v " O ENI5TING WALL5 TO REMAIN L^yl q DOOR SCHEDULE NEW WALLS MARvlx AuwaoGxsroac DGGu o WALLS TO BE REMOVED PE LMATCSN uxrt 513E RANGING GH OPENING XP0.DrvPRE COMMENTS - -_-_ -_-_ "ALL EXISTING DIMEN51CN5 TO BE FIELD DI UTPRONTDOOR 1 ]'tlxTL'M 1' 0.X MOITIEELOCNSET CIXTEMW VCMR.]'TXICR VERIFIED BY G,C." MARW�NMOOOR 1 q'U'%8'.1 LACT!. SIM TO E%IG DMDED LIGI(IS(SX%IN45DL Di EMEMWJ0. , 3PNTL'NI ' RNR PASSAGE SEi IME0.100.WOOD)MGf LCO0.fi PPNE _ DS NRCHEN)MUD 0.N qn rBp fpENCX 0.'VRS Nf W SNRUCTURPL TIES AT • OOP N RPPPED WI NTI RUSNIC NTRE OPK(iUNG OIL MNISM1)NO LOOK LIRE SOLID BEPM AND FOOTING _ F — VNDER CANIILEVF➢, 11111 E%I111G MUNE E I1 SROOF I TA �GANCI AIGVE CIIP ON WINoowS - IXSIICAR HIP AP 50LID GRANITE TAPING AND srePs rvPs.PPiMeD�no�L PRf PR MfO CED ® RE Nl1JGJ.YlIDON' Proposed Mudhouse Plan CLAPBOAPos M G l 0 OR G NAL 1XI.CIRI — SCALE: I)4-=1'-0" SEE CITAII® _ _ cusTOn snunfR w xG5Era. W < 51AJD CVS3PAC.T - — — — _ RPNCf E%SN NG'AY IDON O BRACKE 'A' ® 4_v — P ®r 5 wURFLKSTO MATOI 0MATOI C0x Si NGQ Lu Lu _ OPTAI \ % 0 EOVS_5i GVFR SPACING � Q _ LS AJDL G — \ N lfw RECESSED PRCEED OPE INIG, yOj w NEW MPRVIN.PLL tL d ry s'.lo; noon DooR GRAIUTE Fourvoavou sroue s'-ly East Elevation West Elevation Q_1 10 SCALE: I/4"=1'-0" - '�U SCALE:Il4"=1'0" n 1 S o a ii "� a- "t im m - m to =_. g G G K CID 1. 1 a e N RN NS foN� - G moY II o o I 0 0o II s'� An O� o0 0 ' IF ��° 00 Hp s o00 0 G B6 seSx N � _I — i-r > ----------- i m N _ 4J I c O ", t I 'ti II 0 £ 8M,I a ° A pc DIN NR . p 11 � o s n hoc Z. " NAM o 000 : 94 ' nn. &n Gmm"9 R PROPOSED RENOVATION FOR: INTERIOR ELEVATIONS ASBARCTECTURE Hn Q MCGRANERESIDENCE SCALE, �-ryMM v DATE:17CHN16HI ,olEe�ro. n PENSIONS: rr AIMEE BENTLEY, AIA, LEE[)AP n ^� PROJECT ADDRESS:. www.a5barchitecture.com ■r 29 CHESTNUT STREET-SALEM,MA R V z rsnmesc�re �misame Eogn meenors (D 1 , asb +, ,.� o , ',' � i - architecture a GARAGE; I, 1 PAVED. w a E I• C_ pe.DRIVEWAY j Q 6. J _ 6 1 Jti ; w3 _ - ___ WARREN STREET .C: -- �. Masao' .. 1 MAP 25 LOT' 240 If cYux 2510T^239, 2T.a' ow i Pn,sn R P..ADJEN f EXISTING 2N-O, PADJEN; PROPOSED 1ST• FL; f HESTNUT' ST., j o 9 MAP-24 LOT 240 ll.l exsting., I R. G step oto /''• tMAP Pb WT:. 0 t)e removed: USLY1 PI➢JN. FlYsn G 1iDR w PMCV2�E➢ 5t R ATA PIAd (n .,. 3]'O65MUi.6i. 3 NEW DECK AND STAIR p '2t8:aoar: .YZ. 2 .n -/ Ir 'PPiPI L F ^ W _ _ •YIP]Si Wit{t' .a. O -4 N M Lo O nm w N - - - mrzec san oxrw. a o PORCH a - w Lu CHESTNUTSTREET' s w . o w m THREE :STORY•DWELLING.' z z � to p I o � s M '00 Proposed Site Plan Proposed Site Plan o U G ' tp N'. ]0 scn�e.re^-ro. 20 scr�m g te 06 BASE PLAN COMPLETED BY NORTH SHORE SURVEY CORP. ON 10 FEB 2016 C-1 WARREN _ STREET S78°50'14"W ` 145.00' I I I I I I I w I I N I I cq o v GARAGE PAVED j DRIVEWAY I I I i I I f I I I I I P I I I I I 7 I I 4 b, MAP 25 LOT 240 0; M rl MAP 25 LOT 239 216` EXISTING 2ND FL. OSCAR PADJEN RITA PADJEN PROPOSED IST FL 27 CHESTNUT ST. 0 of existing �O step to 0 I be removed ,W/ ]9'.-0" N 3.7' ��-PROPOSED. Z a DECK _ a,a no« 2.7' w . II O d' N N 0 h. P] p PORCH MAP 25 LOT 241 13LMICHAEL SELBST BRADLEY WILLIAMS 31 CHESTUT ST. THREE STORY DWELLING w #29 M m PO 6 bo N O 6zd 57.6' m a 124.40' N82'54'01"E CHESTNUT STREET ZONING DISTRICT — Rt `"OFM., ZONING BOARD OF APPEALS PLAN EXISTING PROPOSED ��P SSq� 29 CHESTNUT STREET REQUIRED DWELLING DECK 0' y° SALEM GAIL L. . m' LOT AREA 15,000 27,964 27,964 ° SMITH m LOT FRONTAGE 100 124.40' 124.40' �O NO.35043 PROPERTY OF FRONT 15 14.9' - FGIST0k MAURA MCGRANE bNN. t,Ai4D 5 SIDE 10 2.7' 3.1' II SCALE 1" = 20' FEBRUARY 10, 2016 REAR 30 - - Q U� NORTH SHORE SURVEY CORPORATION LOT COVERAGE 30% 20% 20% 14 BROWN STREET — SALEM, MA 978-744-4800 #4049 WARREN STREET S78°50`14"W 145.00' I I I I I I I I I I W I s 00OR I I GARAGE j PAVED j. DRIVEWAY I I I. I I. I. I I 6 I , I I I I 1 I 1 1 I I 1 I I /____--_--.__J 1 °' MAP 25 LOT 240 Q M MAP 25 LOT 239EXISTING 2ND FL. OSCAR PADJEN zt.e' RITA PADJEN PROPOSED IST FL. 27 CHESTNUT ST. 3 b m existing CD step to t ) 01 I be rernoved d'/ ,. .t9"_a., N 3.1' ^PROPOSED Z DECK ma hoer 2.7' w o � N N O Am M ,n i LO 0 PORCH N' MAP 25 LOT 241 3.3' MICHAEL SELBST BRADLEY WILLIAMS 31 CHESTUT ST. THREE STORY DWELLING w #29 o M N O (n 57.6.. vi v 124.40' N82'54'01"E CHESTNUT STREET ZONING DISTRICT - RtT OFM ZONING BOARD OF APPEALS PLAN EXISTING PROPOSED 2�� gSs9c 29 CHESTNUT STREET REQUIRED DWELLING DECK GAIL lSALEM L. - m. - LOT AREA 15,000 27,964 27,964 ° SMITH NO.35043 " PROPERTY OF LOT FRONTAGE 100 124.40' 124,40' FRONT 15 14.9' _ roGISTS a�° � MAURA MCGRANE h'AL INJD SIDE 10 2.7' 3.1, SCALE 1" = 20' FEBRUARY 10, 2016 REAR 30 - - 61 NORTH SHORE SURVEY CORPORATION LOT COVERAGE 30% 20% 20% 14 BROWN STREET - SALEM, MA 978-744-4800 #4049