Loading...
29 CARLTON STREET - ZBA ZI C& I �+ r ,00NDITq.� CITY OF SALEM, MASSACHUSETTS BOARD OF APPEAL 120 WASHINGTON STREET, 3RD FLOOR QSALEM, MASSACHUSETTS 01970 - -- v ° TELEPHONE: 978-745-9595 >MINEoo� FAX 978-740-9846 n _< 0 KIMBERLEY DRISCOLL -< A MAYOR �7 G7 November 30, 2009 " ° Decision t J, City of Salem Zoning Board of Appeals Petition of JOSEPH A. SKOMURSKI, seeking a Variance from minimum rear yard setback to construct a two-level deck at the rear of the existing two-family house, and a Variance from minimum side yard setback to construct a covered side porch, on the property located at 29 CARLTON STREET, Salem, MA(Business Neighborhood Zoning District). Petitioner seeks Variances pursuant to the Salem Zoning Ordinance, §4.0, Dimensional Requirements. Statements of fact: 1. The owner of the properly,Joseph Skomurski, represented himself at the hearing. 2. In a petition dated October 28, 2009, the applicant requested Variances from minimum rear yard setback to construct a two-level deck at the rear of the existing two-family house, and a Variance from minimum side yard setback to construct a covered side porch. 3. A public hearing on the above mentioned Petition was opened on November 18, 2009, pursuant to Mass General Law Ch. 40A, �S 11. The pubic hearing was closed on November 18,2009, with the following Zoning Board of Appeals members present: Richard Dionne (chairing the meeting), Annie Hams,Becky Curran,Beth Debski, and Jimmy Tsitsinos (alternate). 4. There was no public opposition expressed at the meeting. Nat Lord, 27 Carlton St., asked about the plans for drainage, and whether a gutter would be installed. The applicant confirmed that a gutter would be built to handle roof drainage. 5. At its meeting on November 18, 2009, the Board of Appeals voted five (5) in favor and none (0) opposed to grant Variances from the dimensional requirements of §4.0, Dimensional Requirements. The Board of Appeal, after careful consideration of the evidence presented at the public hearing, and after thorough review of the plans and petition submitted, makes the following findings: 2 1. Desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent or purpose of the zoning ordinance. 2. The applicant may vary the terms of the Business Neighborhood Zoning District to construct the proposed additions, which are consistent with the intent and purpose of the City of Salem Zoning Ordinance. 3. In pern fitting such change, the Board of Appeals requires certain appropriate conditions and safeguards as noted below. On the basis of the above findings of fact and all evidence presented at the public hearing including, but not limited to,the Plans, Documents and testimony,the Zoning Board of Appeals concludes: 1. To allow for the construction of the additions as proposed, the requested Variances from dimensional requirements for structures in the Business Neighborhood zone are granted. In consideration of the above, the Salem Board of Appeals voted, five (5) in favor (Harris, Curran,Debski, Tsitsinos and Dionne) and none (0) opposed, to grant petitioner's requests for Variances subject to the following terms, conditions, and safeguards: f 1. Petitioner shall comply with all city and state statutes, ordinances, codes and regulations. 2. All construction shall be done as per the plans and dimensions submitted to and approved by the Building Commissioner. 3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 4. Petitioner shall obtain a building permit prior to beginning any construction. 5. Exterior finishes of the new construction shall be in harmony with the existing structure. 6. A Certificate of Occupancy is to be obtained. 7. Petitioner is to obtain approval from any City Board or Commission having jurisdiction including, but not limited to the Planning Board. 8. Petitioner shall install a gutter on the new side entrance to prevent water from shedding onto the neighboring property. ism RichardDionne Salem Zoning Board of Appeals 3 A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision, if any,shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A, and shall be filed within 20 days of filing of this decision in the office of the City Clerk Pursuant to the Massachusetts General Laws Chapter 40A, Section 11,the Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certificate of the City Clerk has been filed with the Essex South Registry of Deeds. Map 41 Lot 63 N/F 92 Derby Street Condominium 92 Derby St. Bk 27183 Pg 119 Concrete Wall 33.70' — Garage Trees he a N 25.77' 0 Evergreen a Tree 3 Map 41 Lot 92 2,265 sq.ft. C V_ 0 l Proposed 5.4 / 11'x6' 1B.79' Deck ir) a, Map 41 Lot 91 Map 41 Lot 62 Nathaniel LordN/F ai Townsend House Condominium 27 Carlton St. #2933 Carlton St. 2/ S Bk 16270 Pg 70 Conc. 1 Sty. Bk 7700 Pg 1 -andinc Dwelling - 1 I GSG 35.25' CS — 0 0 Granite Curb CARLTON STREET REFERENCES: 1) Deed Book 4317 Page 532, 2) Plan in Book 2011 Page 600. PLOT PLAN 3) Plan Book 409 Plan 60. 29 Carlton Street 4) Plan Book 216 Plan 29. Salem, MA ZONING DISTRICT: 131 Prepared By LeBlanc Survey Associates, Inc. 161 Holten Street Danvers, MA 01923 (978) 774-6012 oma' VERNON LeBLANC N October 16, 2009 Scale 1 "=10' N0. 33600 PAF RfISTE HOR. SCALE IN FEET L 0 10 25 50' n R: ',�� 't, t { tl�il�i '+ '1 '� �. ,.:s R PI'!`Sf �i�� l��iff5�✓ kkV yyi �t11tt11t14[13�: 1'1t i i F p • F 4 Walter Jacob Architect, LTD r- 2 Goodwins Court • Marblehead, MA 01945 N 781 .631 .7440 NEW ASPHALT SHINGLES NEW ASPHALT SHINGLES NEW SKYLIGHTS,TWO AT THIS ELEVATION m NEW WINDOW REPLACE EXISTING SIDING AND TRIM THROUGHOUT REPLACE EXISTING SIDING AND TRIM THROUGHOUT REPLACE ALL EXISTING WINDOWS AS SHOWN REPLACE ALL EXISTING m m WINDOWS AS SHOWN NEW OVERHANG @ REBUILT ENTRANCE PORCH NEW OVERHANG @ REBUILT ENTRANCE PORCH --9mm LO PTD WD RAIL AND STEPS AND REBUILT STEPS NEW DECKS AT TWO LEVELS PTD WD RAIL AND STEPS ANDIq EXISTING BRICK REBUILT STEPS O FOUNDATION O - Q 1 South Elevation West Elevation ° 2 SCALER/8" = 1'-0" SCALER/8" = 1'-0" (3) g C: a� m 0 0 n c i C U a U ° N N 0 t 0 U Elevations 10.27.09 Zoning Drawings Walter Jacob Architect, LTD N 2 Goodwins Court • Marblehead, MA 01945 ^' 781 .631 .7440 NEW ASPHALT SHINGLES NEW ASPHALT SHINGLES NEW WINDOW IN MODIFIED NEW SKYLIGHTS AS OPENING - SHOWN,TYPICAL OF 4 TYHIS ELEVATION a NEW WINDOW REPLACE EXISTING SIDING AND TRIM THROUGHOUT REPLACE EXISTING SIDING AND z TRIM THROUGHOUT X w m m REPLACE ALL EXISTING mm `* WINDOWS AS SHOWN o, ImN NEW DOORS,TYPICAL AT FLOOR I AND 2 / + NEW OVERHANG @ REBUILT REPLACE ALL EXISTING ENTRANCE PORCH to 11 CC WINDOWS AS SHOWN, ;,� C 01 TYPICALIM v> 0 NEW DECKS AT TWO LEVELSEHI I ME t Q NEW DECKS AT REAR " 4 m - REBUILT EGRESS STEPS J N East Elevation North Elevation a SCALE: 1/8" = 1 -0' 2 O � SCALE: 1/8 - 1 -0' } U `o a U o Q` a N N c 0 t 0 U r Elevations 10.27.09 Zoning Drawings