Loading...
5 LARKIN LANE - BUILDING INSPECTION 5 Larkin Lane _ I J 6�i317 �P Titg Of 19. ttlem, AUSSUc4usetts ! i'o tlublir joropertg i9epartment Nuilbing Department (One t3ulem (green 5�8-715-9595 $xt. 3B� Leo E. Tremblay Director of Public Property Inspector of Building Zoning Enforcement Officer July 31 , 1997 Jerome Chaklos 4=5 Larkin-'Lane Salem, Mass . 01970 RE : Building Permit Dear Mr. Chaklos: You applied for and received a building permit , permit x/499-95 . As of this date we have not received a call for an inspection of work having been completed. If work pertaining to permit #499-95 has been completed, please call for a final inspection. If work is still ongoing please notify us of such, so we can continue to monitor the work. If this office does not hear from you within fifteen ( 15 ) days, your permit will be revoked and work will not be certified per State Building Code . Thank you for your anticipated cooperation in this matter . Sincerely, Leo E . Tremblay . Inspector of Bui dings LET: scm FILE/C. G. COPY CITY OF SALEM BUILDING SALEM, MASSACHUSETTS 01970 PERMIT �s �z DATE :1-7 19 '3C PERMITNO. 497-1 r:?9 r_ APPLICANT 1-iOMF OWNER/SFROM CHAKLE:cn ADDRESS OWNER (NO.) (STREET) (CONTR'S LICENSE) CITY STATE_ZIP CODE TEL NO. •506—7 4 5_..7 73'Ij; PERMITTO ALTFR7)TIDN ( ) STORY l.)I'd C. r=AMIL1' NUMBEROF A. (TYPE OF IMPROVEMENT) NO. DWELLING UNITS (PROPOSED USE) AT(LOCATION) I(IQI QY;` �..I(�f r:I!`•I L�{jai[ ZONING (NO., (STREET) DISTRICT BETWEEN AND (CROSS STREET) (CROSS STREET) LOT - SUBDIVISION MAK-' Zli_ LOT QIP+)3C4BLOCK SIIZE 0100070171SI,;11 F7 BUILDING ISTOBE FT.WIDE BV FT.LONG BV FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS FINISH CFF FIASF_MEIN:'T FOR FAI,ITLY ROOM L-AU NMR'-, . WuRI-(SHGI ' & N H EII'=ARIN 1 WC!. AREA OR@@ PERMIT VOLUME (CUBIC/SQUARE FEET) ESTIMATED COST$ -• 00171 FEE $ 21.1. IL)k1 OWNER CHAKLOS 7FROME T. ADDRESS 5 LARK PI L.AIIN BUILDING DEPT. BY THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET.ALLEY OR SIDEWALK OR ANY PART THEREOF.EITHER TEMPORARILY OR PERMANENTLY.ENCROACHMENTS r ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENTOF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR 1.FOUNDATIONS OR FOOTINGS. ELECTRICAL,PLUMBING AND 2.PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS i 1 1 l 2 r r BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS 1 L OTHER CITY ENGINEER 2 2 WORK SHALL NOT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. qS NOTED ABOVE. OR WRITTEN NOTIFICATION. I DATE OF PEWIT PERMIT No. OWNER LOCATION j 4/15/1955 #95 Theodore Sauvageau 5 Larkin Lane STRUCTURE MATERIAL DIMENSIONS No.OF STORIES 1No.OF FAMILIES I WARD COST 1 1/2 1 1 9000 BUILDER F. Stockton i 4/17/62 1182 Erect two car wood garage - 22x22 $2,000. 9/13/95 11499-95 Finish off basement for family room, laundry, & workshop, install non- bearing wall. (Owner: Jerome & Elizabeth Chaklos) . est 2000. fee 20. M.M.M. ---------- --- -- -2-8-/-9-7 ----- ---- ---------t, --- - ---- -- - - PERMIT #499-95 REVOKED AS OF 7/28/97 by L.E.T. ✓ ` j _ ' < < f ` I I I Otg of t5ttlem, A155tic4usetts S i'o Ilublir trnpertg Department Nuilbing Department (One 6alem (6reen 508-745-9595 Ext. 380 Leo E. Tremblay Director of Public Property Inspector of Building Zoning Enforcement Officer July 31 , 1997 Jerome Chaklos 5 Larkin Lane Salem, Mass . 01970 RE : Building Permit Dear Mr. Chaklos: You applied for and received a building permit, permit #499-95 . As of this date we have not received a call for an inspection of work having been completed. If work pertaining to permit #499-95 has been completed, please call for final inspection. If work is still ongoing please notify us of such, so we can continue to monitor the work. If this office does not hear from you within fifteen ( 15 ) days, your permit will be revoked and work will not be certified per State Building Code . Thank you for your anticipated cooperation in this matter . Sincerely, Leo E . Tremblay Inspector of Bui dings LET: scm