Loading...
89 BRIDGE STREET - ZBA `� T3 r'� dge S h est Zoning Board Proiect �tatnc ch Address & Applicant: Date Submitted to BOA: Clerk Stamp: Variances Only - Constructive Approval Date: (100 days from filing) El Abutters List Requested: d Abutters Notice Sent: Z Notice to Abutting Cities & Towns, Councillors: Legal Notice posted osted at City Hall: (14 days before meeting) Legal Notice Emailed & Confirmed: f�/ Legal Notice Posted on Web: a/Agenda to Applicant: Applicant's email address or fax number to send agenda: Opened at Meeting: A Continued Meetings: Extension Form(s) Signed & Clerk Stamped? Closed at Meeting: I ` Decision: G�ar1 t e d Decision Filed: Appeal Period Over: filed)after decisionled) Z.4� (21"clay Ef Decision Sent to Applicant: d Notice of Decision Sent to abutters, cities and towns, councillors: ZBA ACTION FORM 3yi(3Tgnm Date: it Mike Duff Petitioner: Tom Watkins Peter Co elas Address: �� �3r�dc�e S� J, Paul Viccica Alt. Total: —o Conditions: LJ Petitioner shall comply with all city and state statutes, ordinances, codes and regulations. All construction shall be done as per the plans and dimensions submitted to and approved by the Building ommissioner. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. El Petitioner shall obtain a building permit prior to beginning any construction. El Exterior finishes of the new construction shall be in harmony with the existing structure. Certificate of Occupancy is to be obtained. IJA rtificate of Inspection is to be obtained. LJ Petitioner shall obtain street numbering from the City of Salem Assessor's Office and shall display said rn ber so as to be visible from the street. 11J Petitioner is to obtain approval from any City Board or Commission having jurisdiction including,but not limited to,the Planning Board. ❑Unless this Decision expressly provides otherwise, any zoning relief granted does not empower or authorize the Petitioner to demolish or reconstruct the structure(s)located on the subject property to an extent of more than fifty percent(501/o)of its floor area or more than fifty percent(50%)of its replacement cost at the time of destruction. If the structure is demolished by any means to an extent of more than fifty percent(501/o)of its replacement cost or more than fifty percent(50%)of its floor area at the time of destruction,it shall not be reconstructed except in conformity with the provisions of the Ordinance. ❑ r fl CITY OF SALEM, MASSACHUSETTS BOARD OF APPEAW."Ay- ff++!! yyyy 3 120 WASIIINGTON STREET SALEM,MASSACHUSEI7'$ � y � S Mm BERLEY DRIscoLL MELS:978-745-9595♦ FAX:978-740-9846 �q� � JY MAYOR May 3`d, 2017 Decision City of Salem Board of Appeals Petition of JUNIPER 89 BRIDGE ST LLC, requesting a Special Permit per Sec. 3.3.3 Nonconforming Structures and a Variance per Sec. 5.1.8 Table of Required Parking Spaces of the Salem Zoning Ordinance,to allow the petitioner to extend a nonconforming structure and provide four (4) parking spaces (5 required) at 89 BRIDGE STREET (Map 36,Lot 374)(B-1, ECOD Zoning Districts). A public hearing on the above Petition was opened on April 19, 2017 pursuant to M.G.L Ch. 40A, § 11 heard on that date with the following Salem Board of Appeals members present: Mr. Copelas-(Vice-Chau), Mr.Watkins, Mr. Duffy,and Mr.Viccica (alternate). The Petitioner seeks a Special Permit from the provisions of section Sec. 3.3.3 Nonconforming Structures and a Variance per Sec. 5.1.8 Table of Required Parking Spacer of the Salem Zoning Ordinance, to allow the petitioner to extend a nonconforming structure and provide four (4)parking spaces (5 required). Statements of fact: 1. In the petition date-stamped March 29, 2017, the Petitioner requested a Special Permit per section Sec. 3.3.3 Nonconforming Stnrctures and a Variance per Sec. 5.1.8 Table of Required Parking Spaces of the Salem Zoning Ordinance, to allow the petitioner to extend a nonconfomning structure and provide four (4) parking spaces (5 required). 2. Attorney Kristin Kolick-63 Federal Street of Serafini, Darling&Correnti,LLP presented the petition. 3. The property is located within a B-1 and ECOD Zoning Districts. 4. The petitioner proposes to rehabilitate an existing two-family residential building that has been historically used as a three-family building to create a three- unit condominium with four (4) parking spaces. A multi-family residential building is an allowable use by right in the B-1 Zoning District. 5. The petitioner is proposing to construct an addition to the rear of the second and third floor of the existing non-confomvng structure. 6. During the public hearing, the Building Inspector gave an opinion that the petitioner did not need to request a Variance for relief from the parking requirements per sec. 5.1.8 Table of Requited Parking Spaces. The structure is an existing two-family structure with a proposal to expand the existing structure and add a thud unit. The Building Inspector stated that the parking requirements of Sec. 5.1.8 applied to the new unit only,which would require a total of 1.5 parking spaces. City of Salem Board of Appeals May 3,2017 Project: 89 Bridge Street Page 2 of 3 7. Based on the Building Inspector's opinion, the petitioner withdrew the request for a Variance for relief from the parking requirements per sec. 5.1.8 Table of Required Parking Spaces because the four (4) proposed parking spaces exceed the requirements of the Zoning Ordinance in this case. 8. The petitioner is requesting a Special Permit per Sec. 3.3.3 Nonconforming Structures, to allow an addition to the rear of the second and thud floors. 9. The proposed addition will not increase or create a new non-conformity. 10. Renovation will be consistent with the newly renovated buildings in the neighborhood.The proposed plan provides parking on a site that currently has no parking, and will benefit the neighborhood by taking can off of the street Utilities and other public services are in place and will be adequate to serve the proposed expansion. The existing building has a similar appearance to the other buildings being renovated on Bridge Street and will maintain many of the existing design elements, which fit with the neighborhood character. The building, as proposed, will be similar in size and scale to the neighboring buildings. The proposed plan will have no substantial impact to the natural environment, including drainage. The proposed plan will have a positive economic impact for the City tax base and employment. 11. The requested relief,if granted,would allow the Petitioner to construct the addition as proposed. 12. At the public hearing, eight (8) members of the public spoke in favor and/or submitted letters in support of the proposal and none (0) spoke in opposition to the proposal. The Salem Board of Appeals, after careful consideration of the evidence presented at the public hearing, and after thorough review of the petition, including the application narrative and plans, and the Petitioner's presentation and public testimony, makes the following findings that the proposed project meets the provisions of the City of Salem Zoning Ordinance: Findings for Special Permit: 1. The proposed —extension of the non-conforming structure would not be substantially more detrimental than the existing non-conforming structure to the neighborhood. 2. The community need for housing is served by the proposal. 3. There are no negative impacts on traffic flow and safety,including parking and loading. 4. The capacity of the utilities is not affected by the project. 5. There are no impacts on the natural environment,including drainage. 6. The proposal improves neighborhood character as it improves the property. 7. The potential fiscal impact,including impact on the City tax base is positive. On the basis of the above statements of facts and findings, the Salem Board of Appeals voted four (4) in favor Mr. Copelas (Vice-Chair),Mr.Watkins,Mr. Duffy,and Mr.Viccica (alternate) and none (0) opposed, to to allow the petitioner to extend a nonconforming structure, subject to the following conditions,terms, and safeguards: City of Salem Board of Appeals May 3,2017 Project: 89 Bridge Street — Page 3 of 3 Standard Conditions: 1. The Petitioner shall comply with all city and state statutes,ordinances,codes and regulations. 2. All construction shall be done as per the plans and dimensions submitted to and approved by the Building Commissioner 3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 4. Petitioner shall obtain a building permit prior to beginning any construction. 5. Exterior finishes of the new construction shall be in harmony with the existing structure. 6. Petitioner shall obtain street numbering from the City of Salem Assessor's Office and shall display said number so as to be visible from the street 7. A Certificate of Occupancy shall be obtained. 8. A Certificate of Inspection shall be obtained. 9. Petitioner is to obtain approval from any City Board or Commission having jurisdiction including,but not limited to,the Planning Board. Special Conditions: 1. The petitioner shall obtain an easement from the owners of 87 Bridge Street to allow access to the rear of 89 Bridge Street from Barton Street and over 87 Bridge Street for the purpose of creating and maintaining parking spaces in the rear of 89 Bridge Street,as per the plans. t Peter Copelas,Vi e-Chair Board of Appeals A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from thin derision, if any,shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A,'and shall be fkd u�itbin 20 days of fk'ng of thu deation in the offire of the City Clerk Pursuant to the Martachwettc General Iowa Chapter 40A, Section 11, the Variance or Special Permit granted berein shall not take effect until a mpy of the dednon bearing the certificate of the Gry Clerk has been fkd with the Essex South Hegimy of Deeds. a CITY OF SALEM, MASSACHUSETTS BOARD OF APPEAW"Ay.3 A Mit; 48 Ate/ 120 WASHINGTON STREET♦ SALEM,MASSACHU �1 gY LLERK. KimmRiEYDRiscoLL TELE:978-745-9595♦ FAX:978-740-9M Ml1sg MAYOR May 3`", 2017 Decision City of Salem Board of Appeals r Petition of JUNIPER 89 BRIDGE ST LLC, requesting a Special Permit per Sec. 3.3.3 Nonconforming Structures and a Variance per Sec. 5.1.8 Table of Required Parking Spaces of the Salem Zoning Ordinance, to allow the petitioner to extend a nonconforming structure and provide four (4) parking spaces (5 required) at 89 BRIDGE STREET (Map 36,Lot 374)(B-1, ECOD Zoning Districts). A public hearing on the above Petition was opened on April 19, 2017 pursuant to M.G.L Ch. 40A, § 11 heard on that date with the following Salem Board of Appeals members present: Mr. Copelas (Vice-Chair), Mr. Watkins, Mr. Duffy,and Mr.Viccica (alternate). The Petitioner seeks a Special Permit from the provisions of section Sec. 3.3.3 Nonconforming Structures and a Variance per Sec. 5.1.8 Table of Required Parking Spaces of the Salem Zoning Ordinance, to allow the petitioner to extend a nonconforming structure and provide four (4) parking spaces (5 required). Statements of fact: 1. In the petition date-stamped March 29, 2017, the Petitioner requested a Special Permit per section Sec. 3.3.3 Nonconforming Structures and a Variance per Sec. 5.1.8 Table of Required Parking Spaces of the Salem Zoning Ordinance, to allow the petitioner to extend a nonconforming structure and provide four (4) parking spaces (5 required). 2. Attorney Kristin Kolick-63 Federal Street of Serafini,Darling& Correnti,LLP presented the petition. 3. The property is located within a B-1 and ECOD Zoning Districts. 4. The petitioner proposes to rehabilitate an existing two-family residential building that has been historically used as a three-family building to create a three- unit condominium with four (4) parking spaces. A multi-family residential building is an allowable use by right in the B-1 Zoning District. 5. The petitioner is proposing to construct an addition to the rear of the second and third floor of the existing non-conforming structure. 6. During the public hearing, the Building Inspector gave an opinion that the petitioner did not need to request a Variance for relief from the parking requirements per sec. 5.1.8 Table of Required Parking Spaces. The structure is an existing two-family structure with a proposal to expand the existing structure and add a third unit. The Building Inspector stated that the parking requirements of Sec. ^� 5.1.8 applied to the new unit only,which would require a total of 1.5 parking spaces. City of Salem Board of Appeals May 3,2017 Project: 89 Bridge Street Page 2 of 3 7. Based on the Building Inspector's opinion, the petitioner withdrew the request for a Variance for relief from the parking requirements per sec. 5.1.8 Table of Required Parking Spaces because the four (4) proposed parking spaces exceed the requirements of the Zoning Ordinance in this case. 8. The petitioner is requesting a Special Permit per Sec. 3.3.3 Nonconforming Structures, to allow an addition to the rear of the second and third floors. 9. The proposed addition will not increase or create a new non-conformity. 10. Renovation will be consistent with the newly renovated buildings in the neighborhood.The proposed plan provides parking on a site that currently has no parking, and will benefit the neighborhood by taking cars off of the street. Utilities and other public services are in place and will be adequate to serve the proposed expansion. The existing building has a similar appearance to the other buildings being renovated on Bridge Street and will maintain many of the existing design elements, which fit with the neighborhood character. The building, as proposed, will be similar in size and scale to the neighboring buildings. The proposed plan will have no substantial impact to the natural environment, including drainage. The proposed plan will have a positive economic impact for the City tax base and employment. 11. The requested relief,if granted,would allow the Petitioner to construct the addition as proposed. 12. At the public hearing, eight (8) members of the public spoke in favor and/or submitted letters in 1 support of the proposal and none (0) spoke in opposition to the proposal. The Salem Board of Appeals, after careful consideration of the evidence presented at the public hearing, and after thorough review of the petition, including the application narrative and plans, and the Petitioner's presentation and public testimony, makes the following findings that the proposed project meets the provisions of the City of Salem Zoning Ordinance: Findings for Special Permit: 1. The proposed —extension of the non-conforming structure would not be' substantially more detrimental than the existing non-confonning structure to the neighborhood. 2. The community need for housing is served by the proposal. 3. There are no negative impacts on traffic flow and safety,including parking and loading. 4. The capacity of the utilities is not affected by the project. 5. There are no impacts on the natural environment,including drainage. 6. The proposal improves neighborhood character as it improves the property. 7. The potential fiscal impact,including impact on the City tax base is positive. On the basis of the above statements of facts and findings, the Salem Board of Appeals voted four (4) in favor Mr. Copelas (Vice-Chair),Mr.Watkins,Mr. Duffy, and Mr.Viccica (alternate) and none (0) opposed, to to allow the petitioner to extend a nonconfornring structure, subject to the following conditions, terms,and / \ safeguards: City of Salem Board of Appeals May 3,2017 Project: 89 Bridge Street Page 3 of 3 Standard Conditions: 1. The Petitioner shall comply with all city and state statutes,ordinances,codes and regulations. 2. All construction shall be done as per the plans and dimensions submitted to and approved by the Building Commissioner 3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 4. Petitioner shall obtain a building permit prior to beginning any construction. 5. Exterior finishes of the new construction shall be in harmony with the existing structure. 6. Petitioner shall obtain street numbering from the City of Salem Assessor's Office and shall display said number so as to be visible from the street. 7. A Certificate of Occupancy shall be obtained. 8. A Certificate of Inspection shall be obtained. 9. Petitioner is to obtain approval from any City Board or Commission having jurisdiction including, but not limited to,the Planning Board. Special Conditions: 1 1. The petitioner shall obtain an easement from the owners of 87 Bridgo Street to allow access to the rear of 89 Bridge Street from Barton Street and over 87 Bridge Street for the purpose of creating and maintaining parking spaces in the rear of 89 Bridge Street, as per the plans. Peter Copelas,Vice-Chi Board of Appeals A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal fmm this decieian, if any, shall be made purmant to Section 17 of the Massachusetts General Laws Chapter 40A, and shall be fkd n*bin 20 days of filing of this decision in the office of the City Clerk. Pursuant to the Massachusetts General Iaws Chapter 40A,Section 11, the Variance or Special Pem'it granted herein shall not take effect until a copy of the decision bearing the certificate of the City Clerk has been fkd with the Essex South Registry of Deeds. MY OF SALEM,MASSACHUSETTS BOARD OF APPEALS PETITION FORM CITY OF SALEM MASSACHUSETTS BOARD OF APPEALS , ter 120 WASHINGTON STREET,3RD FLOOR SALEM,MASSACHUSETTS 01970 to 2 Thomas St.Pierre,Director of Inspectional Services .1 Phone:978-619-5641 /Fax:978-740-984.6 c- � "�`'®'� KIMBERLEY DRisCOLL Erin Schaeffer,Staff Plan - MAYOR Phone:978-619-5685/Fax:978-7740404 AfTI W%- ..°e�] �y �Iw TO THE BOARD OF APPEALS: V The Undersigned represent that he/she is/are the owners of a certain parcel of land ipeatediat' P LAN NI NG & �. g P C0t-1ttJ�UNfIY DEVEL0PN1ENT. Address: 89 Bridge Street Zoning District: B1, ECOR An application is being submitted to the Board of Appeal for the following reason(s): This statement must describe what you propose to build,the dimensions,the zone property is in,and the zoning requirements.(Example: I am proposing to construct a 10'x l0'one story addition to my home located at 3 Salem Lane, in the R-2 Zoning District. The Zoning Ordinance requires the minimum depth ofthe rear yard to be 30feet. The current depth ofmy rear yard is 31 feet;the proposed addition would reduce the depth of the rear yard to 12 feel.) The Petitioner proposes to rehabilitate an existing two-family residential Building to create a three unit condominium with four parking spaces. The Zoning Ordinance requires 1' spaces per dwelling unit with a minimum of 2 spaces meaning that 5 spaces would be required for 3 dwelling units: 4 spaces are proposed. The rehabilitation also includes an addition to the third floor and rear of the existing nonconforming structure. Therefore, a special permit is requested to extend a nonconforming structure. For this reason I am requesting: (4Variance(s)from provisions of Section 5. 1•B of the Zoning Ordinance, specifically from required parking (i.e. minimum depth ofrearyard). What is allowed is 5 spaces (ft?sq ft?stories? %?), and what I am proposing is 4 spaces 0?sq ft?stories?%?). 0O A Special Permit under Section 3.3.3 of the Zoning Ordinance in order to extend a nonconforming structure ( )Appeal of the Decision of the Building Inspector(described below): ( )Comprehensive Permit for construction of low or moderate income housing(describe below): Current Property Use: 2-family home - Are Lot Dimensions Included?X)Yes ( )No Why? (Example:Two Family Home) The Undersigned hereby petitions the Board of Appeals to vary the terms of the Salem Zoning Ordinance and allow the project to be constructed as per the plans submitted,as the enforcement of said Zoning By-Laws would involve practical difficulty or unnecessary hardship to the Undersigned and relief may be granted without substantially derogating from the intent and purpose of the Zoning Ordinance. CITY OF SALEM, MASSACHUSETTS BOARD OF APPEALS PETITION FORM The following written statement has been submitted with this application: ( ) For all Variance requests a written Statement of Hardship demonstrating the following must be attached: a) Special conditions and circumstances that especially affect the land,building,or structure involved, generally not affecting other lands,buildings,and structures in the same district; b) Literal enforcement of the provisions of the Ordinance would involved substantial hardship to the applicant;and c) Desirable relief may be granted without substantial detriment to the public good,and without nullifying or substantially derogating from the intent of the district or the purpose of the ordinance. ( ) For all Special Permit requests a Statement of Grounds must be attached.An application for a special permit for a nonconforming use or structure shall include a statement demonstrating how the proposed change shall not be substantially more detrimental than the existing nonconforming use to the neighborhood in accordance with Section 9.4 Special Permits.Such a statement should include reference to the following criteria: a) Social,economic,or community needs served by the proposal; b) Traffic flow and safety,including parking and loading; c) Adequacy of utilities and other public services; d) Impacts on the natural environment,including drainage; e) Neighborhood character;and f) Potential fiscal impact,including impact on City tax base and employment. O For all Comprehensive Permits for construction of low or moderate income applicants should refer to M.G.L. Ch.40B§20-23. Previous applications to the Board of Appeals involving this property have been submitted with this petition form. The Building Commissioner can provide documentation ofprevious applications to the petitioner or his representative. Juniper 89 Bridge St LLC. ifdiiferentfrompetitioner: Petitioner: c/o Joseph C. Correnti, Esq Property Owner. era ini, Darling & Correnti, LLP Address: 63 Federal Stre Address: Salem, MA 01970 Telephone: Telephone: Email: 'co tenti erf' 'la coin Email: Signature: Signature: (Attached consent letter is also acceptable) Date: rch ` 2017 Date: If different from petitioner: Representative: Address: A TRUE ATTEST Telephone: Signature: Date: CITY CLERK DATE DPCD DATE This original application must befiled with the City Clerk SCHEDULE The Petitioner,Juniper 89 Bridge St LLC, owner of the site at 89 Bridge Street, seeks zoning relief for the rehabilitation of an existing, dilapidated two-family residential building in this B-1 zoning district. The site is located on Bridge Street, between Barton Street and Arbella Street, across from Pearl Street. The abutting Bridge Street properties are newly rehabbed residences. The proposed plan would provide four parking spaces for three units, for which there is currently no parking. The proposed plan also includes an addition to the third floor and the rear of the existing building. The plan, as proposed, requires the following relief: • Special permit to expand an existing nonconforming structure [Section 3.3.3] (addition to second and third stories) • Variance from the parking requirements for dwelling [Section 5.1.81 (five spaces required; four spaces proposed) The Petitioner seeks to preserve and rehabilitate the existing structure, which has historically been used as a three-family. A minor addition to the second and third stories, approximately 352± square feet, is proposed to help create more space in the upper units. The proposed addition will not increase an existing nonconformity, nor will it create a new nonconformity. The proposed addition will provide housing and rehabilitate the existing building to a condition equivalent to the newly renovated neighboring condominiums. While there is pedestrian access off of Bridge Street, vehicular access is proposed in the rear of the building, off of Barton Street by way of an easement to be granted by the abutting property at 87 Bridge Street.The proposed plan provides parking on a site that currently has no parking, which will take cars off the street. Utilities and other public services are in place and will be adequate. The existing building has a similar appearance to other condominium buildings being renovated on Bridge Street and will maintain many of its existing design elements, which fit the character of the neighborhood. The building is also similar in size and scale to the neighboring buildings and will continue to be after the proposed renovations. The proposed plan should have little impact on the natural environment and view, given that the existing building will remain, the current roof ridge height will remain the same, and the number of stories will remain the same. The proposed plan will have a positive economic impact, in that the building will house taxpayers and the renovation will help to increase property values in the Bridge Street Neck neighborhood. Parking is limited by the shape of this "landlocked" site. The site currently has no off-street parking.The site will be accessible to the rear by way of an access easement to be granted by an abutting property, as shown on the plan submitted herewith. Given the constraints of the shape of the lot and the configuration of the building, a total of four parking spaces will fit wholly within the lot lines. This project, when completed, will finish a string of three rehabbed buildings along Bridge Street, creating a new residential enclave of condominiums that are in high demand. Wherefore, the Petitioner respectfully requests that the necessary relief for the project be granted. AREA OF EXI5TING SINGLE STORY 5TRUCTIURE TO DE ADDED ON TO C y� DARKER 5HADED AREAS 7) U REPRE5ENT NEW CON5TRUCTION t:•'` 53 lJ J 6� E p T, Red BaHI Lrchtecture HIGM SIRF£f iPsvncn.MAGissa EXISTING AXONOMETRIC VIEW R .CMM 019 ± V 16 N. Dare Descri fon I 3.24.17 5D-I T PROPOSED MA551NG DIAGRAM Sheet Title: PROJECT PARA M( 5TREET5CAPE VIEW Sheet Number: A-2 April 18, 2017 Rebecca Curran, Chair City of Salem Zoning Board of Appeal 120 Washington Street Salem, Massachusetts 01970 Re: 89 Bridge Street Dear Chairwoman Curran: My name is Gail Acciavatti and I am the owner of the house located at 4 Barton Street, an immediate abutter to 89 Bridge Street. I have reviewed the proposed plans for the rehabilitation of this property and fully support the requested relief, as this investment will help finish this block of Bridge Street and beautify the neighborhood. We are excited that the developer has acquired 89 Bridge Street and will also renovate this property from disrepair to create beautiful condominium units. We/I encourage the Board to grant the relief requested. Sincerely, Name:&6, Address: 4 Barton Street April 18th, 2017 Rebecca Curran, Chair City of Salem Zoning Board of Appeal 120 Washington Street Salem, Massachusetts 01970 Re: 89 Bridge Street Dear Chairwoman Curran: My name is Anja Edohnsdotter and I am the owner of 91 Bridge Street, an immediate abutter to 89 Bridge Street. I have reviewed the proposed plans for the rehabilitation of this property and fully support the requested relief, as this investment will help finish this block of Bridge Street and beautify the neighborhood. The developer has rehabbed my single family home as well as 87 Bridge Street. I am excited that the developer has acquired 89 Bridge Street and will also renovate this property from disrepair to create beautiful condominium units. I encourage the Board to grant the relief requested. Sincerely, Name: 91 Bridge Street April 18th, 2017 Rebecca Curran, Chair City of Salem Zoning Board of Appeal 120 Washington Street Salem, Massachusetts 01970 Re: 89 Bridge Street Dear Chairwoman Curran: Our names are Andrew French and Patrick Connelly and we are the owners of the condominium unit 3 located at 93-95 Bridge Street, an immediate abutter to 89 Bridge Street. We have reviewed the proposed plans for the rehabilitation of this property and fully support the requested relief, as this investment will help finish this block of Bridge Street and beautify the neighborhood. The developer has rehabbed our building as well as 87 Bridge Street. We are excited that the developer has acquired 89 Bridge Street and will also renovate this property from disrepair to create beautiful condominium units. We/I encourage the Board to grant the relief requested. Sincerely, Name: Name: 93-95 Bridge Street April 18th, 2017 Rebecca Curran, Chair City of Salem Zoning Board of Appeal 120 Washington Street Salem, Massachusetts 01970 Re: 89 Bridge Street Dear Chairwoman Curran: Our names are Patrick & Blair McCafferty and we are the owners of the condominium unit 2 located at 93-95 Bridge Street, an immediate abutter to 89 Bridge Street. We have reviewed the proposed plans for the rehabilitation of this property and fully support the requested relief, as this investment will help finish this block of Bridge Street and beautify the neighborhood. The developer has rehabbed our building as well as 87 Bridge Street. We are excited that the developer has acquired 89 Bridge Street and will also renovate this property from disrepair to create beautiful condominium units. Well encourage the Board to grant the relief requested. Sincerely, Name: A[rrrC Name: 93-95 Bridge Street \ l April 18th, 2017 Rebecca Curran, Chair City of Salem Zoning Board of Appeal 120 Washington Street Salem, Massachusetts 01970 Re: 89 Bridge Street Dear Chairwoman Curran: My name is Margo Paranzino and I am the owner of the condominium unit 1 located at 93-95 Bridge Street, an immediate abutter to 89 Bridge Street. I have reviewed the proposed plans for the rehabilitation of this property and fully support the requested relief, as this investment will help finish this block of Bridge Street and beautify the neighborhood. Tie developer has rehabbed our building as well as 87 Bridge Street. We are excited that the developer has acquired 89 Bridge Street and will also renovate this property from disrepair to create beautiful condominium units. I encourage the Board to grant the relief requested. Sincerely, Name: 93-95 Bridge Street April 18th, 2017 Rebecca Curran, Chair City of Salem Zoning Board of Appeal 120 Washington Street Salem, Massachusetts 01970 Re: 89 Bridge Street Dear Chairwoman Curran: My name is Karen Crosbie and I am the owner of the condominium unit 4 located at 93-95 Bridge Street, an immediate abutter to 89 Bridge Street. I have reviewed the proposed plans for the rehabilitation of this property and fully support the requested relief, as this investment will help finish this block of Bridge Street and beautify the neighborhood. The developer has rehabbed our building as well as 87 Bridge Street. We are excited that the developer has acquired 89 Bridge Street and will also renovate this property from disrepair to create beautiful condominium units. I encourage the Board to grant the relief requested. Sincerely, Name: (d e% 93-95 Bridge Street i April 18, 2017 Rebecca Curran, Chair City of Salem Zoning Board of Appeal 120 Washington Street Salem, Massachusetts 01970 Re: 89 Bridge Street Dear Chairwoman Curran: Our names are Matthew DiGiovanni and Elizabeth Field we are the owners of the condominium unit 87 bridge Street Unit 1, an immediate abutter to 89 Bridge Street. I have reviewed the proposed plans for the rehabilitation of this property and fully support the requested relief, as this investment will help finish this block of Bridge Street and beautify the neighborhood. We are excited that the developer has acquired 89 Bridge Street and will also renovate this property from disrepair to create beautiful condominium units. We encourage the Board to grant the relief requested. Sincerely, Name: Wt Name: �^ j Address: 87 bridge Street Unit 1 April 18, 2017 Rebecca Curran, Chair City of Salem Zoning Board of Appeal 120 Washington Street Salem, Massachusetts 01970 Re: 89 Bridge Street Dear Chairwoman Curran: Our names are Ryan Lilly and Holly Lilly we are the owners of the condominium unit 87 bridge Street Unit 3, an immediate abutter to 89 Bridge Street. I have reviewed the proposed plans for the rehabilitation of this property and fully support the requested relief, as this investment will help finish this block of Bridge Street and beautify the neighborhood. We are excited that the developer has acquired 89 Bridge Street and will also renovate this property from disrepair to create beautiful condominium units. We encourage the Board to grant the relief requested. Sincerely, Name: 244 Name: Address: 87 TgStreet Unit 3 CITY OF SALEM, MASSACHUSETTS j� BOARD OF PEAT, . •, 120 WASHINGTON 18EKYtmum KRdaERLEY DRIscoLL F.978-619-5685L98SAL& . MASS MAYOR City of Salem Zoning Board of Appeals Will hold a public hearing for all persons interested in the petition of JUNIPER 89 BRIDGE STREET LLC, requesting a Special Permit per Sec. 3.3.3 Nonconforming Structures and a Variance per Sec. 5.1.8 Table of Required Parking Spaces of the Salem Zoning Ordinance, to allow the petitioner to extend a nonconforming structure and provide four (4) parking spaces at 89 BRIDGE STREET (Map 36, Lot 374)(B-1, ECOD Zoning Districts) The public hearing will be held on WED. April 19, 2017 at 6:30 PM, 3`d Floor, 120 WASHINGTON STREET,Rm 313. Rebecca Curran,Chair Salem News: 4/5/2017 &4/12/2017 Board of Appeals G This notice posted on "Official Bulletin ='s r, City Hall, Salem, Mass. on �p 90 at //:Y�A� in accordant'@' itA AGCY Sections 18-25. hap. 30A, L AREA OF EXISTING SINGLE STORY STRUCTURE TO BE ADDED ON TO DARKER SHADED AREAS , D Q REPRESENT NEW CONSTRUCTION - Q n mei z e t 3 75 O t 'tt'� '. 'ax .akt< .! t'� 4'3 $ �'3 �' •9z ;�j'�� �j"�� +5� ��`�T �--- Af fir iC ! - x.4 •rf. E Rr�1 2� 4 �p �rs � �.. � }r� Yr P�4 ,�� �1 • Y � � " h i i4 r •° R 3 S �.aE � — a •. E�1' '� Yrs YS { r- 5 Red Barn Architecture i!4 HIGH 5TREET J IPSWICH_MAOI 935 r. C, µ 5 �,}.� (978)595-6764 EXISTING AXONOMETRIC VIEWh Y C J S r;c;sr No. Date Description � p I 1324.U I sa I W I 2 � - ��RK r Firh d PROPOSED MA551NG DIAGRAM *r t Sheet Title: PROJECT PARAMETERS 5TREET5CAPE VIEW Sheet Number: HEIGHT OF BUILDING TO REMAIN k +� UNCHANGED. ALL NEW CONSTRUCTION E TO LINE UP WITH EXISTING RIDGE LINE 4 � NEW SHED DORMER E Q� O 75 N 6� 6 CD cn -_ - CD U m THIRD FLOOR EL. + 19'-4" Red Barn Architecture (TOP OF FINISH FLOOR) - _- — = ea HIGH5TReEr - - -- - -_ — _ IPSWICH.MA 0193b (975)595-6764 + SECOND FLOOR EL. +9'- 10" (TOP OF FINISH FLOOR) ----- ------ - -___ LLLJ FIRST FLOOR EL. +O'-O" --------- - ------------------------- (TOP OF FINISH FLOOR) No.1 Date I Description PER 1 3.24.17 1 5D-I Sheet Title: PROPOSED FRONT ELEVATION PROP05ED FRONT ELEVATION A-6 SCALE: I/8" = I '-O" Sheet Number. - - A-6 4 D U HEIGHT OF BUILDING TO REMAIN E iz�) E UNCHANGED. ALL NEW CONSTRUCTION Q� O TO LINE UP WITH EXISTING RIDGE LINE 75 E O I L Co U ® ® ® �_ DASHED LINE REPRESENTS FACE OF EXISTING CONSTRUCTION THIRD FLOOR EL. + 19'-4" Red Barn Architecture (TOP OF FINISH FLOOR) - CH,dIGAO19 IPSWIVOCH,MAOI 938 (975)595-6]64 SECOND FLOOR EL. +9'- 10" (TOP OF FINISH FLOOR) PROJECTION OF NEW CANTILEVER FIR5T FLOOR EL. +O'-O" Q (TOP OF FINISH FLOOR) No.1 Date I Description I 1124,171 5D-I I Sheet Title: PROPOSED SIDE ELEVATION 0 PROPOSED SIDE ELEVATION Sheet Number: A SCALE: 1/8" = 1 '-O" a�. A-7 4- N E a� -rte HEIGHT OF BUILDING TO REMAIN UNCHANGED. ALL NEW CONSTRUCTION E i� E TO LINE UP WITH EXISTING RIDGE LINE O -6 p) 73 - - _ — O .. _ DASHED LINE REPRESENTS FACE OF ® ( _ EXISTING CONSTRUCTION I I THIRD FLOOR EL. + 19'-4" -- - - -. __ .__- -----__ ------.—_ -------- - -_- --- Barr Architecture (TOP OF FINISH FLOOR) Red e4 rnGMSTREEr —� IPSMCH,MA 01936 ® (975)595-6764 SECOND FLOOR EL. +91- ) O" (TOP OF FINISH FLOOR) PROJECTION OF NEW CANTILEVER - NO ADDITION AT FIRST FLOOR (FACE OF _-- EXISTING BUILDING STAYS SAME) PIR5T FLOOR EL. +O'-O" ------ -- - -- --------------(TOP Of OF FIN15H FLOOR) No. Date I Description 3.24.17 1 5D-I I I i Sheet Title: PPOP05ED PEAR ELEVATION Q PROPOSED REAR ELEVATION A-8 Sheet Number: SCALE: 1/8" = 1 '-O" A-8 Q� � < 77) f T0 m ® - ® _ THIRD FLOOR EL + 1 9'-4" — — --- ---- --- - Red Barn Architecture _ ea yicn srREer (TOP OF FINISH FLOOR) Fs cn,MAoisss ® - ® (978)595-6764 SECOND FLOOR EL +9'- loll (TOP OF FINISH FLOOR) NUB FIR5T FLOOR EL. +O'-O" (TOP OF FINISH FLOOR) , No.'s Date 1 Description '3.24.171 5D-I i Sheet Title: PPOP05ED FRONT ELEVATION PROPOSED SIDE ELEVATION A-9 Sheet Number: SCALE: I/8" = I '-O" a� A-9 BRIDGE STREET o 4032' 37.35' - 50.00' - m el I I 14 7 k93-95 m q89 #87 I m m D F ti li I I � m 113 6I o i i z I io ini � / ACCESS EASEMENT -a #9l F9 1121 111 8 S 4I 3 2 1 10 9 I I I 150,001 1 _ 1 58.90' I HEREBY CERTIFY THAT THE PROPERTY LINES SHOWN ARE THE LINES DIVIDING EXISTING OWNERSHIPS AND THE LINES OF STREETS AND WAYS SHOWN ARE THOSE OF PUBLIC OR PRIVATE STREETS AND WAYS ALREADY ESTABLISHED AND NO NEW LINES FOR THE DIVISION OF EXISTING OWNERSHIPS OR FOR NEW WAYS ARE SHOWN. - I HEREBY CERTIFY THAT THIS PLAN HAS BEEN PREPARED IN CONFORMITY REVISED SITE PLAN WITH THE RULES AND REGULATIONS OF THE REGISTERS OF DEEDS OF THE FOR 87 BRIDGE STREET CONDOMINIUM, COMMONWEALTH OF MASSACHUSETTS. 93-95 BRIDGE STREET CONDOMINIUM AND SITE PLAN FOR 89 BRIDGE STREET CONDOMINIUM RESERVED FOR REGISTRY USE ONLY IN �� SALEM, MA ' PREPARED BY: P.S.F. AND ASSOCIATES 0WttS 4 HIGHLAND AVENUE WAKEFIELD, MA 01880 (781) 883-5473 0' 10' 20' 30' 40' PAUL J. FINOCCHIO P.L.S. No.36115 DATE REV. 3/23/17 SCALE: 1"=20' DATE: JANUARY 18, 2017 FILE No. 6909BA FIELD PLOT DESIGN DRAFT CALC. CHECK t BRIDGE STREET o 40.32' 3].35' O 4I #93-95 J #89 #0] w J 1--1 T D ry I 16RLJ 1 Z71 3 I a I Z ry o f N ACCESS EASEMENT -► I �J #91 FTI 12 11110 9 8 5 4 3 z 1 58.90' -- - 3149'- I 149'-I HEREBY CERTIFY THAT THE PROPERTY LINES SHOWN ARE THE LINES DIVIDING EXISTING OWNERSHIPS AND THE LINES OF STREETS AND WAYS SHOWN ARE THOSE OF PUBLIC OR PRIVATE STREETS AND WAYS ALREADY ESTABLISHED AND NO NEW LINES FOR THE DIVISION OF EXISTING OWNERSHIPS OR FOR NEW WAYS ARE SHOWN. I HEREBY CERTIFY THAT THIS PLAN HAS BEEN PREPARED IN CONFORMITY REVISED SITE PLAN WITH THE RULES AND REGULATIONS OF THE REGISTERS OF DEEDS OF THE FOR 87 BRIDGE STREET CONDOMINIUM, COMMONWEALTH OF MASSACHUSETTS. 93-95 BRIDGE STREET CONDOMINIUM AND SITE PLAN FOR 89 BRIDGE STREET CONDOMINIUM RESERVED FOR REGISTRY USE ONLY IN x� Pa SALEM, MA paomm PREPARED BY: P.J.F. AND ASSOCIATES roans 4 HIGHLAND AVENUE WAKEFIELD, MA 01880 (781) 883-5473 0' 10' 20' 30' 40' < PAUL J. FINOCCHIO P.L.S. No.36115 DATE REV. 3/23/17 SCALE: I"=20' DATE: JANUARY 18, 2017 FILE No. 6909BI FIELD PLOT DESIGN DRAPI' CALC: CHECK BRIDGE STREET � a � 37.35' 1 W co / #89 i I � I 4 I I r w iv I o 'I o I I1 2 3 PARKING SPACES 9'X19' NOTE : PLOT PLAN OF LAND IN a t'°` F SALEM , MA 1 PREPARED BY: PJF & ASSOCIATES 4 HIGHLAND AVE WAKEFIELD, MA PAUL J. FINOCCHIO—P.L.S. (781 )883-5473 SCALE: 1" = 20' DEED REF,: DATE: 2/15/2017 PAUL J, FINOCCHID P,L,S, No,36115 DATE FILE No 16909C