441 LAFAYETTE STREET - BUILDING INSPECTION "<441*'?.AFAYETTE'^'STRFF;T` - •-
a
/god: 7, 1A.979
Mechanical Contracting 28r Woodland Ane000
Beverly,MAO1Q15
)v EO 927^2883
/L�N
C\TYAfS `
August 1 , 1988
To Whom it may concern;
Re: Mr. Larry Green
Instarok expansion cement when used as a bolt anchoring
medium shall produce a setting with an average strain
hearing ability for a 1 '/ bolt of 59,000 pounds with a
depth of 12" in 3,000 pound concrete"
Mr. Greens bolts are set a minimum of 16" in granite.
Respectfully,
| |
�
��� ` � �
/ L/ / VL/
'0
t
of
(One 0alent (green 1
;W's li'd
E'I-T Y
OF
op
DECISION
Special Permit c.
Wetlands and Flood Hazard District
Larry Green
441 Lafayette Street
Salem, MA 01970
Re: 441 Lafayette Street
On Thursday, April ZI, 1988, the Planning Board of the City of Salem held a public
hearing regarding the application of Larry Green for a Special Permit under Section P,
Wetlands and Flood Hazard Districts of the Salem Zoning Ordinance, with respect to a
proposal to construct a deck and the placement of an aluminum ramp onto a float at 441
Lafayette Street, which is located in a Flood Hazard District.
At a regularly scheduled meeting of the Planning Board held on May 5, 1988, the
Board voted by a vote of six in favor, one abstention, to approve the application as
complying with the requirements for the issuance of the permit with the following
conditions:
1. Conformance with Plan
Work shall conform to plan entitled, "Plan of Land in Salem, MA, Proposed Deck and
Docking", dated March 12, 1988.
Z. Conservation Commission
Work shall comply with all requirements of the Order of Conditions issued by the
Salem Conservation Commission on April Z8, 1988.
3. Lighting
All future lighting plans for the deck, ramp and float areas shall be reviewed and
approved by the City Planner.
4. Construction Practices
All construction shall be carried out in accordance with the following conditions:
a. No work shall commence before 7:00 am. on weekdays and 8:00 am. on
Saturdays. No work shall continue beyond 5:00 p.m. There shall be no work
conducted on Sundays or holidays.
b. All reasonable action shall be taken to minimize the negative effects of
construction on abutters. Advance notice shall be provided to all abutters in
writing at least 7Z hours prior to commencement of construction.
5. Violations
Any violations of these conditions shall result in revocation of this permit by the
Planning Board.
This Special Permit shall not take effect until a copy of the decision bearing the
certification of the City Clerk that twenty days have elapsed and no appeal has been filed
or that if such appeal has been filed, and it has been dismissed or denied, is recorded in
the Essex County Registry of Deeds and is indexed in the grantor index under the name of
the owner of record or is recorded and noted on the owner's certificate of title. The fee
for recording or registering shall be paid by the owner or applicant.
Walter B. Power III '$•T .
Chairman
M36WP
of c Iem, � ttsstzcl�use# ! 2 s9 Fill
S curb of r� ezLl FILE
' ,.
CITY CLERK,SALEH.fA55. '
DECISION-ON`THE-PETITION} A VARIANCE AT
37441 LAFAYETTE STREET (R-1)
A hearing on this petition was held M;ay l3, 1987 with the following Board
Members present: James Hacker, Chair, «n; Messrs. , Fleming Luzinski, Strout
and Dore. Notice of the hearing was sent to abutters and others and notices of
the hearing were properly published in the Salem Evening News in accordance
with Massachusetts General Laws Chapter 40A.
Petitioner is requesting a Variance from side yard setbacks to allow deck in
this (R-1) zone.
The Variance which has been requested may be granted upon a finding of the
Board that:
a. special conditions and circumstances exist which especially affect
the land,building or structure involved and which are not generally
affecting other lands, buildings and structures in the same district;
b. literal enforcement of the provisions of the Zoning Ordinance would
involve substantial hardship, financial or otherwise, to petitioner;
c. desireable relief may be granted without substantial detriment to the
public good and without nullifying or substantially derogating frau the
intent of the district or the purpose of the Ordinance.
The Board of Appeal, after careful consideration of the evidence presented at the
hearing, and after viewing the plans, makes the following findings of fact:
1. The northwest corner of the existing deck was constructed 8 feet from
the side line, two feet closer than allowed.
2. Building was constructed in accordance with a building permit issued
August 7, 1979; however, plot plan submitted to building department
at that time did not show the deck.
3. Original construction plans submitted to the building department could
not be located.
4. Neighborhood opposition was recorded concerning potential use of the
building as a multifarrsly unit and tideland encroachment.
On the basis of the above findings of fact, and on the evidence presented at the
hearing, the Board of Appeal concludes as follows:
1. Special conditions exist which especially affect the subject but do
not affect the district generally;
2. Literal enforcement of the Ordinance would involve substantial hardship
to the petitioner;
DECISION ON THE PETITION CF PA IE MAGEE FOR A VARIANCE
AT 441 L'. A ETTE STPEET, F:._.-. . .
page two
3. The relief rec.:es;ez can be granted without substantia_ deirament to _.s
public good and +:: _..cut nullifying or substantially derogating from t0
intent of the dis:rfct or the purpose of the Ordinance.
Therefore, the Zoning Roam of Appeal voted unanimously, -CI, tc gr'ant ,t?I6 Va:''_=':C.e
requested, subject to the fclloarfng conditions:
1 . That no changes not PE71ittEd by the current Zoning Ordinance be made
to the existing structure.
^. .. e engineering linen r_E. . on the rip rap bythe surveyors be
removed within thin_.: QN days.
VARIANCE GRANTED
r
0
Peter A. Dore, Associate Member
A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND 'THE CITY CLEKK
;u� r-c USE pl ^,S�A!iT TO SECTIO( 1, it
A• k FOV THS D l C., .. . 20 DAYS Pro:, 1v' _.
CE00L PS CH
C.T. , n _�'S _7. THE \ I _ 77 A
czw 25 A!
Ti 01,
Fa
GERTIFEWE DF T11_i.
OF RECORD OR IS
BOARD. OF APPEAL
x fit# oftt1em, tt $rxcu�E##s
z :
Pnttra of :�ppett1
DECISION ON THE PETITION OF MARQUIS MAGEE FOR A VARIANCE AT
441 LAFAYETTE STREET (R-1)
A hearing on this petition was held May 13, 1987, with the following Board
Members present: James Hacker, Chairman; Messrs. , Fleming Luzinski, Strout
and Dore. Notice of the hearing was sent to abutters and others and notices of
the hearing were properly published in the Salem Evening News in accordance
with Massachusetts General Laws Chapter 40A.
Petitioner is requesting a Variance from side yard setbacks to allow deck in
this (R-1) zone.
The Variance which has been requested may be granted upon a finding of the
Board that:
a. special conditions and circumstances exist which especially affect
the land,building or structure involved and which are not generally
affecting other lands, buildings and structures in the same district;
b. literal enforcement of the provisions of the Zoning Ordinance would
involve substantial hardship, financial or otherwise, to petitioner;
c. desireable relief may be granted wiout substantial detriment to the
public good and without nullifying or substantially derogating from the
intent of the district or the purpose of the Ordinance.
The Board of Appeal, after careful consideration of the evidence presented at the
hearing, and after viewing the plans, makes the following findings of fact:
1. The northwest corner of the existing deck was constructed 8 feet from
the side line, two feet closer than allowed.. r
2. Building was constructed in accordance with a building permit issued
August 7, 1979; however, plot plan submitted to building department
at that time did not show the deck.
3. Original construction plans submitted to the building department could
not be located.
4. Neighborhood opposition was recorded concerning potential use of the
building as a multifamily unit and tideland encroachment.
On the basis of the above findings of fact, and on the evidence presented at the
hearing, the Board of Appeal concludes as follows:
1. Special conditions exist which especially affect the subject but do
not affect the district generally;
2. Literal enforcement of the Ordinance would involve substantial hardship
to the petitioner;
~' DECISION ON THE PETITION OF MARQUIS MAGEE FOR A VARIANCE AT
441 LAFAYETTE STREET (R-1)
Page 2
3. The relief requested can be granted without substantial detriment to the
public goad and without nullifying or substantially derogating from the
intent of the district or the purpose of the Ordinance.
Therefore, the Zoning Board of Appeal voted unanimously, 5-0, to grant the
Variance requested, subject to the following conditions:
1
1. That no changes not permitted by the current zoning ordinance be made
to the existing structure.
2. That a certificate of occupancy be obtained within thirty (30) days.
3. That the engineering lines placed on the rip rap by the surveyors be
removed within thirty (30) days.
4. That nothing in this decision be interpreted as allowing abuse.
VARIANCE GRANTED
Peter Dore, Associate Member
A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK
APPEAL FROM. THIS DECISION, IF ANY, SHALL K Y.AnE PURRIIANT TO zf^Tli?M 0 OF THE
GET+:RAL IAWS. CHAPI R 805. ANJ SHILL nE N 'D W;IHIN 20 DAYS eFTER THE @ATC 6 iiLi:!^
OF THIS DECISION IN THE OFF!CE OF THE CITY CLERK.
PIPEANT TC i3'S. CE�—R.AL LADS. CHAPTER 303, SECTION 11. THE VARIANCE OR SPECLAL
LPAW.ED HEREIN. SHALL NCT TARE Et--CT UNTIL A COPY OF THEOEC!SIO;', C-=.::!NG -HE LEl -
FICATION OF THE CIT,' CLER:A THAT =O DAYS HAVE ELAPSED AN,; N, UPEAL HAS SEEN FLED,
L.P, THAT. IF S'JCH AN APFEAL HAS 'KEN FILE THAT IT HAS SEEN D[-!ISSED GR DE'IIEC IS
RECORDED IN THE SiiCTH ESSEX K,IISMY Cr DEEDS AND NDEXED e..BE2 'C-!E f.A:dE OF Ir— C...
OF RECORD OR IS RECORDED AND NOTED ON THE OWNER'S CERTIFICATE OF TITLE.
BOARD OF APPEAL
�..<� --
�..>;� .
,.
iu�
PLAN OF LOT
Showing Location of Proposed Structure
T .i 6TIO r( R PERMIT TO BUILD
........ .... ..........CLASS BUILDING
.0 -'ATION
... ... ......... .. ................Ward..... .............
wl
)D DITIONS
�_ ......
...............:I:.......
.._.....................
. .. ................... ... '
I •w it Granted
1
. t :J
i,
/ `��-. _ 197 ....
2 ,J. . .�
I' i
pNi � i7 r; 7
^:TIO:15 41-9i •.iVVt.:1 rn�aa: .: - --- .
i
i•ne applicant, Oilypclsoii oyy, pr ✓f ...__..
jand abutting the land upon which the proposed work is to be done, or
any ten residents of the -city or town in which
sucordend istlocated,
are hereby notified of their right to appeal
Depart-
4,ent of Environmental Quality Engineering provided the request is made in
writing and by certified mail 'to the Department within ten (10) days from the issuante
of this order.
ISSUEDBY Salem Conservation Commission
- y j
ti
April 18, 1979
Date of Issuance ,
On this 'If"241 day of � �-� 19 7J,, before me
.-personally appeared
_ persnto me known to be the
person described in and who executed the foregoing instrument and acknow• .:
ledged that he executed the same as his free act and deed.
Commission expires -
I.
-28-
PAGE L & .LLL Nu. ov-amu
mo work may be commenced until all appeal per.ioas have elapsea trom
the order of the Conservation Commission or xrom a sinal oraer by
the Department of Environmental Quality Engineerina.
7. No work shall be undertaken until- the final Order, with respect to
the proposed project, has been recorded in the Registry of Deeds
for the. district in which the land ie� located within the chain of
title of •the affected property. Copy to be furnished to issuer of .
thisOrdershowing -book and page prior to commencement of work.
8. Upon completion of-the work described -herein,- the applicant shall
.forthwith request, in writing, that a Certificate of Compliance be
issued , stating that the work has .been satisfactorily completed.
•9. A sign shall be displayed at the site not less than two square feet .
or more than three square feet bearing the words, "Massachusetts
Department of Environmental Quality Engineering. Number. 6 O ".
10. Where the Department of Environmental Quality Engineering is
requdsted, to make a determination and to issue a superseding order, .
the Conservation Commission shall be a party to -all agency pro=
ceedings and hearings before the Department.
11. . The work shall conform to the following described plana and
additional conditions.
a. The Salem Conservation Commission has determined that the proposed
work on a coastal bank is significant only to storm damage prevention.
The coastal bank is .forme rock.
i
. Thesite grading and foundation location.shall be in aeoo a ,
with the Site Development Plan of band in Salem, Massachusetts for ^
MarquisMagee et al, prepared by Essex Survey Service, Inc., of Salem,
dated October 18, 1978 and revised March 12, 1979•
C.
prap p ac on the bank. Yegetation :`
on the bank shall not be disturbed except as required for foundation
preparation at the location of the house.
d. The: fall of the bank and the beach shall be kept free of construction
materials at all time.
-27-
ORDER
_ - WG1'LHLVL t'KVYLI�l'1V�V . n�.♦
G.L. C. 131 s. 40
FILE NUMBER: 64-40 PROJECT LOCATION: 441 Lafayette Stre
Salem, Mass.
1 :
TO: Marquis S.S. Magee CERT. MAIL NOL 757143
8 Broad Street
' Salem, Massachusetts
RE NOTICE OF INTENT AND PLANS DATED: DATE OF RECEIPT ON 1 .4�-6-�? .`.
4-2-79 (originally 11-1-78) CONSERVATION COMMISSION:
a DATE OF PUBLIC HEARING: ` = 1
4-10-79
' Salem Conservation : `
Pursuant to the authority of G.L. C. 131 s.. 40, the
Commission i has considered your notice of intent and plane,_,_,.:r.
w; submitted therewith, and has determined that. the area on which the pro-
+ posed work is be done is signifi ant to one or more of the interests
described in the said act. The SSalem Conservation Commission
.: . hereby orders that the .following conditions are necessary and all work
must be"performed•-fn- strict aecordance .with said conditions and with the
- Notice of Intent and Plans, unless modified by said conditions:
Ak
CONDITIONS
1. . Failure' to comply with 611 conditions stated herein, and with all a: 3
related statutes and other regulatory measures, shall be deemed
.� cause to revoke or modify this order. 3} ,
2. This order does not grant any property rights or any exclusive } :
r b. privileges; it does not authorize any injury to private property
j' invasion' of private rights. . 1��{�
3. This order does not relieve the permittee or any other person of the
necessity of complying with all other applicable federal, state or
local statutes, ordinances, bye-laws and/or regulations.
4. The work authorized hereunder shall be completed within one (11 f ar s
from the date of thia.•Order unless otherwise stated below oursuan
14
to Regulation 6.7. The order may be eg'- 14 ,;
tended by the ' issuing authority for one or more additional onetyearn
periods upon application to the said issuing authority at least x142-
thirtydays prior to -the expiration date of the order or its ext St.
• . 5. Any fill used in connection with this project shall be clean fill.
containing no trash, refuse, rubbish or debris, including, withou
limiting the generality of the foregoing, lumber, bricks, plaster _,
wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, "
motor venicles or parts of any of the foregoing. %' „
APPLICATION FOR PERMIT
/�. ��-• !�` /.SC1fJCD pYTpA1SI(1N r1D /`n0.�a(^�,..r�n.� - . .
PERMIT NO.
TO: RE: .
(111'Y OF SALEM ❑ PERMIT FOR SEIVER EXTEI�'*BION
-CI"IY ENGINEER ,_PERMIT FOR R SEWER CONNECTION
SALEM, MASS; -- .
!n �r p
%L ANNIE and ADDRESS.:..�'L2!'��95 ,..:....�.4�.. ............. ...... ....../Jro4 ........[rT.:.........
Individual, Organization, Board, Officer, Making Application
1. NUMBER OF RESIDENCES .1................... NO. OF BEDROOMS ....V..... ........_-_.....................
2. TYPE OF RESIDENCE: ,� SINGLE FAMILY
❑ MULTI FAMILY
S. OTHER NON-RESIDENTIAL TYPE OF ESTABLISHMENT: DESCRIPTION ....................................
.....................:...........................................................:................................................................................... ...............:......
4. ESTIMATED SEWAGE FLOW —GALLONS PER DAY ...........�........O: .... .................... .. ........
5. LENGTH AND LOCATION OF SYSTEM/CONNECTION: Attach drawing of location, show ties to
foundation at house invert, include ties of connection at sewer.
6. IF EXTENSION: NAMA AND ADDRESS OF DESIGN ENGINEER
........................................ Mass. P. E. No. .................-......_
(a) Furnish All Design Calculations and 'Drawings. .
STATE W.P.C.-P-1 0 Approved ' G
❑ Approved ❑ Disa proved
C) Disapproved �...je... e+ z:....�)......
'po-ew /�r37 Cis/ Engineer .
�yr•�0F«ri�� Location, Ownership, and Detail Must be Correct, Complete and.Legible
Separate Application Required for Every Building
ik ('A9(a ukuak ou rueo wren oris application
a
A AInnlir +i Per i+ + R((iI�J
, . a„er for , ei �t is Build
TO THE BUILDING INSPECTOR:
+
The nnderskmed herebv annlies for a nprmit to build t r:+ 1. . . .. u
M w Location and No.........»`....:....A...... .........$.:.1:::....................Zoning district...........................: v
.................
� i �, , u ' m
_
Name of Owner.......... h� ?:fi.. u.� 5........'l».1:.!. .V.Ar..................................
10
mAddes........ 5t:............... �:1 �
�3 ..........................._........................................._............................
aw
If Owner is corporate body name of responsible officer:......................................................
..........
C
Address...................................� ..f......................._.............. ...................:......................................................-......................... C
Name of Builder.......... k�dress....�!:...Nl.`c�`....�:t...�'..�_.....�✓!.ua,e;e;k W
e Name of ArchitecL......... .....Address.....MAA..Iel Aa_._............... M
Vo
Lot area A.7,..l..�?i:........»..._(sq. ft) %Lot coverage, all buildings........J,?'. E.... ....... ».... ...................— W
om Use group classification (s) (See Code)...Kna......_........................Occupancy(s)..KESW:(*ATIAL........_ S
.c n
+' a Fire resistance rating(s) (See Code Table.25)....... '!.«l._..............................................:..........:.................._.........._. m
a e Fire gradin 9.......:�..f�1Q .. (See Code Table 9-1)................................................._: ........_........._...................._
........y....
e ATo. of stones below grade..... `i..........................................No. of stories above grade...d ............._
.........................
tE No, of feet above grade to high point of roof.........z 0
q ..................................................................................................._
0 c Depth of foundation......�.....1x� y ...�YRt?C Q:...........Type of foundation._:11.4..,%!%......Cesu v.AC�C.....l.A:w:4�. W
i d Foundation bearing (earth, rock, piles, other).......... �.2 >... a.��L....................................._.._.._. ns
.c:3 Building, how framed..........CSlatz.cl.__F 'L c::........................................................................._.....................»......... Z
:E
Z
x
so� Design live loads: floors.....1...........:...
roofs......................._.................................... Z
m Exterior wall materials........hN.... wiS.......» c4........
jK . 1a"Aa2CS.................._..................................
�
o ;
-- .. :.........._.........................................................................................._.--------- ..................._
O
�r Roofingmaterial. -' ..............................roof type......GrAL..
7C
How many means of egress provided........3................_......_.............................+t of fire escapes..._...................�..........
z
00
J $ Stairway enclosure rating............................ _.........................-------_#of elevators.........................................
`! Provisions for handicapped included?.........
Are the following involved? Sprinklers........................................_.......................plumbing.....154._ ........................_.
s=
c Type of
Gas fitting............1
&4 —
.. _....heating Q85.S!RCLS..-:.MM41&ectrical... £»5.........................
tu Type of 5 w,c ala Type of fire Type of
nr .�
K> p
006firealarm....._.>�s"f. ...._.....extinguishers........................:...................fire detection.:.._4 &A%.W'..\............
o, Water meter application No...........!�.YA.2........
eel
.a v Estimated cost of new work.. 8 5 o D O: o U ..
` t ............._.................. _........._......_................_._..
... . .. .......
'm RECEIVED
E d
a
�UL S 1 1 q Signature of Owner....................................................................................
S
-BOARD OF ASSESSORS i Address......................._.._....................................... ......................
............
SALEM: MASS-
.......................................... _......
S e d Authorized R ese tative
7h/ crD
Address........;2... ' Sf t^T » +lfttar_tr4 ss'
Telephone.....
Salem B
Number-
}
/ _ _ _
' Form DECEFile No. 64-40 � .
- (ro be provided by DEQE) .
� �- city/rown
Salem
Commonwealth
_ — Marquis Magee
� . oftAassachuseris Applicant
Certificate of Compliance
Massachusetts Wetlands Profection Act, G.L. c. 131 , §40,
From Salem Conservation Commission Issuing Authority
To Marquis Magee 441 Lafavette-S r Pr= Salem MA
(Name) — (Address).
Date of Issuance Mar
This Certificate is issued for work regulated by an Order of Conditions! issued to Marquis Ma Re e
dated 3/27/87 3ndissued bythe- saasa-= at or
commission
1. $8 Itis hereby certified that the work regulated by the above-referenced Ordet of Conditions has
C` been satisfactorily completed.
2. D It is hereby certified that only the following portrons of the work regulated by the above refer-
enced Order of Conditions have been satisfactorily completed:(if the Certificate of Compliance
does not include the entire project. specify what portions are included.)
3. ❑ It is hereby certified that the work regulated by the above-referenced Order of Conditions was
never commenced.The Order of Conditions has lapsed and is therefore no longer valid.No future
work subject to regulation under the Act may be commenced without filing a new Notice of Intent
and receiving a new Order of Conditions.
............................................:.....
...................................................._.
(Leave Space Blank)
8-1
4. I] This certificate shall be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located.The Order was originally recorded on (date)
at the Registry of Book , Page
5. ❑ The following conditions of the Order shall continue: (Set forth any conditions contained in the
Final Order, such as maintenance or monitoring,which are to continue for a longer period.)
Issued by Salem Conservation Commission'
Signature(s)
When issued by the Conservation Commision this Certificate must be signed by a ma;ority of is members.
on this � —day of lfarrh 19 Q� before me
personally appeared r'he above named_person- to me known to be the
person described in and who executed the foregoing instrument and acknowledged that he/she executed
the same as his/her free act and deed. RCSERT G. C::FCUR
N,)i-ry Pyul,C ,
OotaryPub�lio hry Commission Er•pires Lt:y lU', i930/ My commission expires
Detach on dotted line and submit to She - —•
.. - Issuing Authority
ro
Please be advised that the Certificate of Compliance for the project at
File Number 'has been recorded at the Registry of
and has been noted in the chain of title of the affected property on • t B
It recorded land,the instrument number which identifies this transaction is
it registered land,the document number which identifies this transaction is
AppI cant
Signature
8.2
ry
BUILDING DET
ORDER
WE'T`LAND PROTECTION ACT �pft Zp g io Ar1 '19
G.L. C. 131 s. 40 RECEIVED
CITY OF SALEH,MASS.
FILE NUMBER: 64-40 PROJECT LOCATION: 441 Lafayette Street
Salem, Mass .
TO: Marquis S.S . Magee CERT. MAIL NO: 757143
8 Broad Street
Salem, Massachusetts
RE: NOTICE OF INTENT AND PLANS DATED: DATE OF RECEIPT BY
4-2-79 (originally 11-1-78) CONSERVATION COMMISSION: 4-6-79
DATE OF PUBLIC HEARING:
4-1D-79
Pursuant to the authority of G.L. C. 131 s.. 40, the Salem Conservation
Commission has considered your notice of intent and plans
submitted therewith, and has determined t'nat. the area on which the pro-
posed work is `,to be done is significant to one or more- of the interests
described in the said act. The Salem Conservation Commission
hereby orders that the following conditions are necessary and all work
must be performed in strict accordance with said conditions and with the
Notice of Intent and Plans, unless modified by said conditions:
CONDITIONS
1 . Failure to comply with all conditions stated herein, and with all
related statutes and other regulatory measures, shall be deemed
cause to revoke or modify this order.
2 . This order does not grant any property rights or any exclusive
privileges; it does not authorize any ..injury to private property or
invasion' of private rights.
3. This order does not relieve the permittee or any other person of the
necessity of complying with all other applicable federal, state or
local ste.tutes, .ordinances, by-laws and/or regulations.
4. The work authorized hereunder shall be completed within one (1) year
from the date of this order unless otherwise stated below pursuant
to Regulation 6.7. The order may be ex-
tended by the issuing authority for one or more additional one-year
periods upon application to the said issuing authority at least
thirty days prior to the expiration date of the order or its extension.
5 . Any fill used in connection with this project shall be clean fill,
containing no trash, refuse, rubbish or debris, including, without
limiting the generality of the foregoing, lumber, bricks, plaster,
wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators,
motor venicles or parts of any of the foregoing.
I'D"
26 _
1
CONDITIONZ C.)`:^_ _ 4UFD PAGE 2 FILE NO. 64-40
6. No work may be commenced until all appeal periods have elapsed from
the order of the Conservation Commission or from a final order by
the Department of Environmental Quality Engineering..
7. . No work . shall be undertaken untilthe final Order, with respect to
the proposed project, has been recorded in the Registry of Deeds
for the district in which the land is located within the chain of
title of the affected property. Copy to be furnished to issuer of
this Order showing book and page DMor to Commencement of work.
8. Upon completion of the work described herein, - the applicant shall
forthwith request, in writing, that a Certificate of Compliance be
issued stating that the work has been satisfactorily completed.
9.. A sign shall be displayed at the site not less than two square feet
or more than three square feet bearing the words, "Massachusetts
Department of Environmental Quality Engineering. Number 64-40 " .
10. Where the Department of Environmental Quality Engineering is
requested, to make a determination and to issue a superseding order,
the Conservation Commission shall be a party to all agency pro-
ceedings and hearings before the Department.
11. The work shall conform to the following described plans and
additional conditions.
a. The Salem Conservation Commission has determined that the proposed
work on a coastal bank is significant only to storm damage prevention.
The coastal bank is formed by outcropping rock.
b. The site grading and foundation location shall be in accordance
with the Site Development Plan of Land in Salem, Massachusetts for
Marquis Magee et al, prepared by Essex Survey Service, Inc. , of Salem,
dated October 18, 1978 and revised March 12, 1979.
c. There shall be no fill or riprap placed on the bank. Vegetation
on the bank shall not be disturbed except as required for foundation
preparation at the location of the house-
d. The fall of the bank and the beach shall be kept free of construction
materials at all time.
-27-
'COYMMONS CCNT"NTJFO PAGE 3 FILE NO. 64-40
The applicant, any person aggrieved by this order, any owner of
land abutting the land upon which the proposed work is to be done, or
any ten residents of the-city or town in which such land is located,
are hereby notified of their right to appeal this order to the Depart-
ment of Environmental Quality Engineering provided the request is made in
writing and by certified mail 'to the Oeoartment within ten (10) days from the issuance
of this order.
y ISSUED By Salem Conservation Commission
i
April 18, 1979
Date of Issuance
1 .
On this day of e 19 7/`, before me
personally appeared - t
_ 1 to me known to be the
person described in and who executed the foregoing instrument and acknow-
ledged that he executed the same as his free act and deed.
My Commission expires _ 3o
-28- .
1
;
1
i
E70 I
VD)
:v v c
i
��; � �\ \�'' •,. _ T •`mfr i
J\
I `•` O \` � •.rte\ \� \\� 1' � �` � y, � � .i�_ 1tU _ ,. � ,
1 3
Imo• ` r cC 1 , ,I �`}G \\`\\\, \` ' •`\\
1
1
i
per
t9 _ \
i � g - -•-.•. ate; �.��.r�'3 `. � _
SA+ 7
�yoM o7r1�O
t T %ttv ofIeiit,
y I3 n
< IP m
1th is 13rqpertu 33eta #ulellt
- `4 Wein✓ SY Department
�Inlln ii. �3uCncrs
011V c alem 05rern
74i-0213
August 7, 1979
Salem Conservation Commission
Bradford C. Northrup, Chairman
RE: 441 Lafayette St.
Foundation Permit
Gentlemen:
I wish to advise we have issued a foundation permit at the
above referenced address. The construction documents furnished in
conjunction with the application, including a "Site Development"
plan prepared by Essex Survey (dated March 12, 1979) raise some
doubts in my mind as not being in conformance with your Orders of
Conditions.
The site plan calls for a "Finish First Floor El. 30.00"
which I am informed is in reality an upper basement level at
elevation 28.31 . There is also a lower basement level at elevation
25.8' on the rear of the house.
The grades shown with solid lines and circled numbers are
meant to be existing grades and not finished final grades as is the
usual practice. Since the entrance foyer will be at elevation 37.00'
six to seven feet of fill will be required at the front of the house to
bring the grade to + 35.001 . Just how this will be placed in relation
to the "bank" referred to in paragraph ll.c of your Conditions is
unclear.
I bring this to your attention to avoid any possible questions
or misunderstandings at a later date, and to give you an opportunity
to review the situation before we issue a superstructure permit.
The plans for the permit are on file in our office should you
wish to avail yourself of them.
Respectfully,
Daniel F. Mansur,
Asst.Building Inspector
DFM:tc
cc: R. Swenson, Asst. City Engineer
��•w*9 EUI(_DINC DEPT
Ctv lif $alenl ilassachusetts
101ututiiV Puarl Nov 1 16 3Q All '78
(Onr 0a1Pra (green RECEIVED
CITY OF SALEM,PMA$$,
November 7, 1978
MEMO
TO: Sohn Powers
Building Inspector
FROM: Michael Moniz
Planning Board Aide
RE: Property of Marquis Magee
441 Lafayette St.
Plans dated Oct. 18, 1978
Essex Survey Co.
The Flood Hazard Districts affected by coastal flooding (zones A3, V3) are
based on elevation 15.36 feet Mean Low Water (11.0 Mean Sea Level) . Boundary
lines trace this elevation contour. Where it can be properly shown that
land is above this elevation, that land shall not be considered as being
included in the District.
Any proposed use to be located within the limits of these Districts as
determined by the Inspector of Buildings under Section IX of this Ordinance
shall be governed by all regulations of this Section as well as all other
applicable provisions of this Ordinance.
The proposed building at 441 Lafayette St. will be located above the
15.36' mlw elevation. The first floor elevation will be at 30' mlw.
Site Plan attached.
\OV
i
7.
Conservation Commission
Salem, Massachusetts 01970
Telephone 1617) 745-5056
t55,� _
November 7, 1978
Mr. Patrick Burke
221 Essex St.
Salem, MA 01970
Dear Mr. Burke:
As we discussed on Sunday, November 5th, you client should file drawings
of the proposed structure, certified by a registered civil engineer, in order
to complete the information necessary for the Notice of Intent.
Please advise whether you would like to withdraw the Notice of Intent
submitted November 2, 1978, in order to give Mr. Magee time to comply.
Thank you for your cooperation in this matter.
Sincerely,
BradforGd, Northrup •�
Chairman
BCN/sm
Otu of `alrtu, C � tssctcl,usc##s
s � +aepnrfnwnt of j3ublir Perks
ANTHONY V. FLETCHER. R,P.E.
CITY ENGINEER
Match 8; 1976
Mit. John Powend
Bu.itd.ing Inspector
One Satem Green
Satem, Mass . _
Dear ht. Powers :
I wish to .in6otm you that we have approved dewet connection
permits Sort .the 6ottow.ing:
a) Lot Z-2 (No. .1 Lautent Road) to MegatopoC.ia Reatty Trtust
Son a Sout unit apartment bu.ied.ing .
b) Lott 48 (neat No . 441 Labayette Stteet) to Etnedt R.
Betteau bot a three bedroom 4ingte bam.i2y dwetting .
e) Lot 4A (neat No. 441 La6ayette Street) to Etnedt, R.
Betteau Sot a three bedroom 4.ing2e 6am.ity dwetting.
d) Lot 1 (neat No 435 La6ayette Stteet ) to Etnedt R.
Betteau Sot a .three bedroom s.ingte 6am.i2y dwetting .
e) Lot B (No. 5 Crowd.is Stteet) to Ernest R. Betteau bot
a three bedroom s.ingte Sam.ity dwetting .
16 you requite any 6utthet .in6onmat.ion tegatd.ing the above ,
pteade contact me.
i
- Vetty truCy-,�yours ,
A. V. Ftetehet, P. E.
City Engineer
AVF/cc
r,
9
9
SCO II
y 'ICClktl of ' alc?lI, C ''I55adliI5£ff5 _
a ;
leparfucenf of jiublic porl's
�'ci mso`r"
ANTHONY V. FLETCHER. R.P.E.
CITY ENGINEER
Manch 8, 1976
Eft. John Poweta
Bu.itd.ing Inspector
One Satem Gteen
Satem, Maaa .
Deal Mt. Powers :
I w.Cah to .insotm you that we have approved sewer connection
petm.ita son the sottow.ing:
a) Lot Z-2 (No . 1 Lautent Road) to Megatopotiz Reatty Ttu.at
soa a hour unit apartment bu.itd.ing . .
b ) Lot 4B (neat No . 441 La6ayette Street) to Etnest R .
Betteau 6or a three bedroom Aingte sam.ity dwett.Lng .
c) Lot 4A (neat No. 441 La6ayette Stteet) to Etnest. R.
Betteau bot a three bedroom a.ingte 6am.ity dwett.ing .
d) Lot 1 (neat No . 435 La6ayette Street ) to Etnest R.
Betteau -6or a three bedroom si.ngte sam,ity dwett.ing .
e) Lot B (No. 5 Cnowd.is Stteet) to Etnest R. Betteau bot
a three bedroom aingte sam.ity dwetting.
16 you requite any 6utther .in6otmat.ion tegatd.ing the above,
ptease contact me.
Vety tauty youta ,
qqz /py
r//i -L-�
A . V. Ftetehet, P. E.
City Engineet