Loading...
0311 HIGHLAND AVENUE, TOWN FAIR TIRE MILLIKEN ASSOCIATES ARCHITECTURE• PLANNING 44 TOP O HILL ROAD WAPPINGERS FALLS NEW YORK 12590-2234 TEL 845 463 3030 FAX 845 463 321 0 Steve Cummings Building Office - Inspectional Services 98 Washington Street 2nd Floor Salem, MA 01970 RE: Town Fair Tire Center, 311 Highland Avenue, Salem, MA April 8, 2019 Mr. Cummings, Based on observations of the referenced project, we submit the following: The subsurface drainage work has been completed. The Service Area floor drains are installed. The connections have been made to the oil separation tank and sewer system. The rough grading has been done on the site. The bollards at the Service Area overhead doors are in place. The new wall openings at the Service Areas have been created. The piers between the overhead doors been constructed with reinforcing, and the steel lintels are in place as shown on the drawings. The overhead doors have been installed. The upper fascias have been framed and sheathed. The wall openings no longer needed have been framed in and sheathed. The interior C.M.U. wall has been opened up and the new column and steel lintels are in place. The interior partitions at the Service Areas and the Office area have been framed. The electrical work has been roughed in. The gypsum board work is being completed. The old finish flooring has been removed, and the floor trenches have been filled with concrete. The roof drain lines have been moved as necessary and reconnected to the storm drain system. At this stage the construction has progressed in accordance to the drawings. Sincerely, .yS4�nE4 ARC�ij ��• �� G. Rgj�\r t` . r. �v:'r. �2 • of fk Nva'' Andrew Milliken Massachusetts Registered Architect #10899