439 LAFAYETTE STREET - BUILDING INSPECTION za LAFAYETTE.�STREET,
C
111 .
t i211'tll� � �MnSMC�iLtSE#t5 —ic �,
o
J, PlatutiuS *arb
os�
v -o cr
A y.
July 96 , 1981 ti CSD
SPECIAL PERMIT
WETLANDS AND FLOOD HAZARD DISTRICT
Mr. Phillip S. Webster
21 Weston Street
Boston, Massachusetts 02136
On Thursday, June 18, 1981, the Planning Board of the City of Salem held a public
hearing regarding the application of Mr. Phillip S. Webster for a Special Permit
under Section P, Wetlands and Flood Hazard Districts , of the Salem Zoning Ordinance,
with respect to the construction of a new single family dwelling on Lafayette Street,
Salem, Massachusetts .
At a regularly scheduled meeting of the Planning Board on July 16 , 1981, the Board
voted, by a vote of five in favor, none opposed, to approve the application as
complying with the requirements for the issuance of the permit with the following
ccnditions:
1. That all work shall be done in accordance with plan entitled "House for Mr. and
Mrs. Phillip S. 'Webster, Lafayette Street, Salem, Ma. " prepared by John Falat,
Architect, 185 Bass Point Rd. , Nahant, Ma. , dated April 9 , 1981 and revised
April 20 , 1981.
2. This order does not grant any property rights or any exclusive privileges; it does
not authorize any injury to private/public property or any invasion of public/
private rights .
I hereby certify that a copy of this decision has been filed with the City Clerk, and
a copy is on tile with the Planning Board.
This Special Permit shall not take effect until a copy of the decision bearing the
certification of the City Clerk that twenty days have elapsed and no appeal has been
filed or that it such appeal has been tiled, and it has been dismissed or denied, is
recorded in the Essex County Registry of Deeds and is indexed in the grantor index
under the name of the owner of record or is recorded and noted on the owner's
certificate of title . The fee for recording or registering shall be paid by the owner
or applicant.
WALTER B. POWER, III
Chairman, Planning Board
WBP:jar
'.z Conservation Commis�gid f f
V
u Salem, Massachusetts 01970
Ft ,' Telephone 1617) 745-5056
ASS: MAR 30 2 1�3 N '79
RcCEWE'D
CITY OF S,4t.F.H,PASS.
CITY OF SALEM
CONSERVATION COMMISSION
WETLANDS HEARING
A public hearing will be held as required by the Wetlands
Protection Act, G.L. Chapter 131, Section 40, at the request of
Marquis S.S. Magee, 8 Broad Street, Salem, Massachusetts. The
purpose of the hearing is to explore the effects of constructing
a house at 439 Lafayette Street, Salem, Massachusetts. The hearing
will be held on Tuesday, April 10, 1979 at 8:00 P.M. , on the Third
Floor of One Salem Green, Salem, Massachusetts.
BWorortEr/uik) �
Chairman
s .
FORM 4
ORDER OF CONDITIONS
W E T L A N D S P R O T E C T I O N A C T
G.L. C. 131, s. 40
CITY/TOWN Salem, MA. FILE NUMBER 64-76 4
T0: NAME Philip S. Webster ADDRESS 21 Weston Street, Boston, MA: -
CERTIFIED MAIL NUMBER
PROJECT LOCATION:
Address 7,q 7 ',afayette Street, Salem, MA. New single
family dwelling
Recorded at Registry of Book , Page
Certificate (if registered)
REGARDING
Notice of Intent dated
and plans titled and dated
THIS ORDER IS ISSUED ON (date) April 23, 1981
------------------------------------------------------------------
Pursuant to the authority of C.L. c. 131, s. 40, the Salem
Cnssservatioa Sommission has reviewed your Notice of Intent
and plans identified above, and has determined that the area on which
the proposed work is to be done is significant to one or more of the
interests listed in G.L. c. 131, s. 40. The Salem Conservation Commission
hereby orders that the following conditions are necessary to protect
said interests and all work shall be performed in strict accordance
with them and with the Notice of Intent and plans identified above
except where such plans are modified by said conditions.
CONDITIONS
1. Failure to comply with all conditions stated herein, and with
all related statutes and other regulatory measures, shall be
deemed cause to revoke or modify this order.
C
_1_
FORM 4 c
1
ORDER OF CONDITIONS CONTINUED FILE NU:3ER 64-76
2. This order does not grant any property rights or any exclu-
sive privileges; it does not authorize any injury to private
property or invasion of private rights.
3. This order does not relieve the permittee or any other per-
son of the necessity of complying with all other applicable
federal, state or local statutes; ordinances, by-laws and/
or regulations.
4. The work authorized hereunder shall be completed within one
(1) year from the date of this order unless it is for a
maintenance dredging project subject to Section 5(9). The
order may be extended by the issuing authority for one or
more additional one-year periods upon application to the
said issuing authority at least thirty (30) days prior to
the expiration date of the order or its extension.
5. Any fill used in connection with this project shall be clean
fill, containing no trash, refuse, rubbish or debris, includ-
ing, without limiting the generality of the foregoing, lumber,
bricks, plaster; wire, lath; .paper, cardboard, pipe, tires,
ashes, refrigerators, motor vehicles or parts of any of the
foregoing.
6. No work may be commenced untill all appeal periods have
elapsed from the order of the Conservation Commission or from
a final order by the Department of Environmental Quality
Engineering.
7. No work shall be undertaken until the final order, with
respect to the proposed project, has been recorded in the
Registry of Deeds for the district in which the land is
located within the chain of title of the affected property.
The Document number indicating such recording shall be sub-
mitted on the form at the end of this order to the issuer
of this order prior to commencement of work.
8. A sign shall be displayed at the site not less than two
square feet or more than three square feet bearing the
words, "Massachusetts Department of Environmental Quality
Engineering, Number it.
9. Where the Department of Environmental Quality Engineering
is requested to make a determination and to issue a super-
seding order, the Conservation Commission shall be a party
to all agency proceedings and hearings before the Depart-
ment.
.i •" ORDER OF CONDITIONS CONTINUED FILE NO.- 64-76
C10. Upon completion of the work described herein, the applicant
shall forthwith request, in writing, that a Certificate of
Compliance be issued stating that the work has been satis-
factorily completed. -
11. 'Phe work shall conform to the following described plans and _
additional conditions.
The Commission has determined that the proposed work
is subject to the wetlands Protection Act and is significant v
to storm damage prevention and order the following conditions:
a. Except as modified by this order of conditions, all work
shall be in accordance with the plan titled "House for Mr. & Mrs.
Phillip S. Webster, Lafayette Street, Salem, MA, " prepared by
John Folet, Architect, April 9, 1981,. revised 4/20/81 and revised
again to note the elevation datum as "Mean low water = 0.0011 ;
b. The first floor elevation shall be at elevation 18. 0 feet
or greater;
c. New construction or land alterations shall not block or reduce
the discharge capacity of storm water drains discharging from
Lafayette Street;
d. All pipes and conduits to or from the structure 'shall be
enclosed beneath the lowest..flow slab and siall.be: anchored
and protected from potential action of waves,..
e. The base of all footing shall be at least `'4' feet 'below the
finished grade elevation;
f. The retaining walls shall be constructed in accordance with
the sketch made by John Folet and submitted to the Commission
with gravel backfill, weep holes at 5 ft centers and with the
base of the footings at least 4 feet below the finished grade
elevation. The base shall be at least 10 feet wide;
g. All fill shall be limited to that shown on the reference
plan. There shall be no alteration of land seawood of the mean
high water line.
h. Upon completion of the work all equipment and surplus
materials shall be removed from the site.
i. No on-site work shall be started until such time as all
monies owed to the Commission are paid in full.
-3-
ORDERS OF CONDITIONS -continued
The applicant, any person aggrieved by this order, any owner
of land abutting the land upon which the proposed work is to be
done, or any ten residents of the city or town in which such land
is located, are hereby notified of their right to appeal this order
to the Department of Environmental Quality Engineering provided the
iequest is made in writing and by certified mail to the Department
within ten (10) days from the issuance of this order.
ISSUED BY Salem Conservation Commissi
On thisz�� �lda�y of Q�c� C.� 141, before me personally
appeared .�0, /.c:Xr-dLY� Gi rr o to me
known to be the person described in, and who executed, the foregoing
instt4tugnt and acknowledged that he executed the same as his free act
and deed.,
,0
Commission expireg%%� `G% w�Jnaj`
DETACH ON DOTTED LINE AND SUBMIT TO THE ISSUER OF THIS ORDER PRIOR TO
COMMENCEMENT OF WORK.
TO (Issuing Authority)
PLEASE BE ADVISED THAT THE ORDER OF CONDITIONS FOR THE PROJECT AT
FILE NUMBER , HAS BEEN RECORDED AT THE REGISTRY OF
ON (DATE) _
If recorded land, the instrument number which identifies this trans-
action is _
If registered land, the document number which identifies this trans-
action is
Signed
Applicant
-4-