Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Waterways Regulation Program X264832
Chapter 91 Waterways License Application -310 CMR 9.00 Transmural No.
Water-Dependent,Nonwater-Dependent,Amendment
G. Municipal Zoning Certificate
Andrea and Michael Cawlina
Name of Applicant
417 Lafayette Street Salem Harbor Salem
Project street address Waterway Cityrrown
Description of use or change in use:
Install a new pier, ramp and float for private recreational use The project has an order of conditions
To be completed by municipal clerk or appropriate municipal official:
"I hereby certify that the project described above and more fully detailed in the applicant's waterways
license application and plans is not in violation of local zoning ordinances and bylaws."
Printed Name of Municipal Official Date
Signature of Municipal Officia Tdle / - Cityrrown
CH91 App.doc•`Rev.08113 Page 6 of 13
Wetlands & Land Management, Inc. 100 Conifer Hill Drive-#516
Danvers.MA 01923
978-777-0004 Telephone
978-539-0005 FAX
February 17, 2015
Thomas St. Pierre
Inspectional Services Director
Salem City Hall
120 Washington Street
Salem,MA 01970
RE: Chapter 91 License application for 417 Lafayette Street
Installation of a new pier, seasonal gangway, and float
Dear Mr. St.Pierre:
The applicants,Andrea and Michael Cawlina have submitted a Chapter 91 License application to
the DEP Department of Waterways. The Chapter 91 application is for installation of a new pier,
ramp and float for private recreational use.
One behalf of the applicant,we have already filed with the Conservation Commission and
secured an order of conditions which is attached with this application.
The application requires a certification from the Municipal Zoning Official. Please endorse the
appropriate form as indicated by the yellow tag. Would you contact me whether any comments
will be issued and when the endorsed certificate is available.
Sincerely,
Wetlands &Land Management, Inc.
Liar- 9 Mme,
William J. Manuell
For the Applicant
Wetlands & Land Management, Inc. 100 Conifer HinDrive-#516
Danvers-MA 01923
978-777-0004 Telephone
978-539-0005 FAX
Februan- 17, 2015
Ben Lvnch
DEP Waterways Regulation Program
One Winter Street
Boston,MA 02108
RE: Michael&Andrea Cawlina. 417 Lafavette Street. Salem. MA
Application for General. Water Dependant Use-Install new private pier, seasonal
gangway. and float.
Dear Mr. Lynch:
Please accept this application for a general water dependant use license to install a permanent pier
and seasonal ramp and float. The pier ramp and float are over flowed tidelands of the Salem
Harbor in Salem. The purpose of the license application is to provide recreational access to
navigable waters.
The applicant has already secured an order of conditions which is attached with this application.
I will submit by separate cover the Municipal Planning and Zoning certifications to the City of
Gloucester. These will be forwarded to you upon receipt. The appropriate fee has been sent to
the Lock Box. Plans on mylar media will be forwarded as appropriate for approval and
endorsement.
Please contact me for public notice requirements,plans and general communication.
Sincerely,
Wetlands &Land Management, Inc.
William I Manuell
For the Applicant
Transmittal Form and Fee
Enter your transmittal number 10 x264832
o
Transmittal
Your unique Transmittal Number can be accessed online: http://mass.aov/dap/service/onlinettrasmfrm.shtml
Massachusetts Department of Environmental Protection
Transmittal Form for Permit Application and Payment
1. Please type or A. Permit Information
print.A separate
Transmittal Form BRPWW01 General Water Dependant Use License
must be completed 1.permit Code:7 or B character code from permit instructions 2.Name of Permit Category
for each permit private pier, ramp and float for recreationsal acccess to navigable water
application. 3.Type of Project or Activity g
2. Make your
check payable to B. Applicant Information - Firm or Individual
the Commonwealth
of Massachusetts
and mail it with a 1.Name of Firm-Or,if party needing this approval is an individual enter name below:
copy of this form to: Camlina - Michael and Andrea
DEP,P.O.Box
4062,Boston,MA 2.Last Name of Individual 3.First Name of Individual 4.MI
02211. 417 Lafayette Street
S.Street Address
3. Three copies of Salem MA 01970
this form needed. will be 6.Ctiyrrown 7,State 8.Zip Code 9.Telephone# 10.Ext.#
William Manuell- agent bill@wetlandslm.com
Copy 1-the
original must 11.Contact Person 12.e-mail address(optional)
accompany your
permit application. C. Facility, Site or Individual Requiring Approval
Copy 2 must
accompany your Residence
fee payment. 1. Name of Facility, Site Or Individual
Copy 3 should be 417 Lafayette Street
retained for your 2,Street Address
records Salem MA 01970
4. Both fee-paying 3.Cityrrown 4.State 5.Zip Code 6.Telephone# 7.Ext.#
and exempt
applicants must S. DEP Facility Number(if Known) 9.Federal I.D.Number(if Known) 10.BWSC Tracking#(if Known)
mail a copy of this
transmittal form to: D. Application Prepared by (if different from Section B)*
P.O.e x 4062 _Wetlands& Land Management Inc.
Boston,MA 1.Name of Firm Or Individual
02211 100 Conifer Hill Drive#516
2.Address
Note:
Danvers MA 01923 978-777-0004
` 3.City/Town
For BWSC Permits, 4.State -Code 6.Telephone# 7.Ext.#
enter the LSP. William Manuell
8.Contact Person 9. LSP Number(BWSC Permits only)
E. Permit - Project Coordination
1. Is this project subject to MEPA review? ❑ yes Z no
If yes, enter the project's EOEA file number-assigned when an
Environmental Notification Form is submitted to the MEPA unit:
EOEA File Number
F. Amount Due
DEP use Only Special Provisions:
1. ❑Fee Exempt(city,town or municipal housing authority)(state agency if fee is$100 or less).
Permit No: There are no fee exemptions for BWSC permits,regardless of applicant status.
2. ❑ Hardship Request-payment extensions according to 310 CMR 4.04(3)(c).
Rec'd Date: 3. ❑Alternative Schedule Project(according to 310 CMR 4.05 and 4.10).
4. ❑ Homeowner(according to 310 CMR 4.02).
Reviewer., 4771 $215.00 2-17-15
Check Number Dollar Amount - Date
WETLANDS & LAND MANAGEMENT, INC. EXP """ " uHr
100'CONVER HILL DRIVE 8516
e:' .. 5", 72211
'DANVERS,MA 01923 � . , ;,�,. . . - � . . -� . . ...
(978),777-0004
4731
R4Y `UI(l �J✓1��G�' � Lfi✓-L CHECK.
DOLLARS AMouNT
DATE` ' T07HE ORDER OF HRS �OR088 80CSEC MED ED.WRH STATE
U t- f�: - ZIS.OII
. . Klr I IUN-
1110 0 4 4 7 111' 1: 221172LBD: 0035606L9111a :
Chapter 91 License Application
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Waterways Regulation Program x264632
Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No.
Water-Dependent,Nonwater-Dependent,Amendment
When ling out A. Application Information (Check one)
tome to the NOTE: For Chapter 91 Simplified License application form and information see the Self Licensing
computer,use P P� PP - 9
only the tab key Package for BRP W W06.
to move your
cursor-do not Name (Complete Application Sections) Check One Fee Application#
use the return
kkey. WATER-DEPENDENT-
General (A-H) ® Residential with<4 units $215.00 BRP W W01 a
❑ Other $330.00 BRP W W01 b
❑ Extended Tenn $3,350.00 BRP WW01c
Forassistance _.._.._..-.._.._ .-.._..-..-.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.
in completing this Amendment(A-H) ❑ Residential with< 4 units $100.00 BRP WW03a
application,please
seethe
'Instructions ❑ Other $125.00 BRP WW03b
NONWATER-DEPENDENT-
Full (A-H) ❑ Residential with <4 units $665.00 BRP WWI 5a
❑ Other $2,005.00 BRP WWI 5b
❑ Extended Term $3,350.00 BRP WW15c
_ ------------------..-..---------.._.._-------.._..-.---......................................
Partial (A-H) ❑ Residential with< 4 units $665.00 BRP WW14a
❑ Other $2,005.00 BRP WW14b
❑ Extended Tenn $3,350.00 BRP WW14c
-------------------------------------------------------------------------_.._.._.-----------------------------------------------
Municipal Harbor Plan (A-H) ❑ Residential with <4 units $665.00 BRP WW16a
❑ Other $2,005.00 BRP WW16b
❑ Extended Term $3,350.00 BRP WW16c
- ---..-..-..-..-..-.----- -..-..-..-..-..-..-..-- -------------------- -----..-..-..-.._----..-..-.._.._.._.._.._.._.._.._.._.
Joint MEPA/EIR(A-H) ❑ Residential with< 4 units $665.00 BRP WW17a
❑ Other $2,005.00 BRP WW17b
❑ Extended Tenn $3,350.00 BRP WW17c
-..-..-.._..-.._.._.._.._.._.._.._.._.._.._.._.._.._.._..-.._.._.._.._.._.._.._..-.._.._.._..-.._..-..-..-.._..-..-.._..-.._.._..-..-.._..-.._.._..-.._.._.._.
Amendment(A-H) ❑ Residential with<4 units $530.00 BRP WW03c
❑ Other $1,000.00 BRP WW03d
❑ Extended Tenn $1,335.00 BRP WW03e
CH91App.doc•Rev.08113 Page 1 of 13
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Waterways Regulation Program X264832
Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No.
Water-Dependent,Nonwater-Dependent,Amendment
B. Applicant Information Proposed Project/Use Information
1. Applicant:
Andrea and Michael Cawlina
Name - E-mail Address
417 Lafayete Street
Mailing Address
Note:Please refer Salem MA 01970
to the"Instructions"
City/Town State Zip Code
177
3
Telephone Number Fax Number
2. Authorized Agent(if any):
William Manuell bill@wetlandslm.com
Name E-mail Address
1 oo Conifer Hill Drive#516
Mailing Address
Danvers MA 01923
City/Town State Zip Code
9787770004 978-539-0005
Telephone Number Fax Number
C. Proposed Project/Use Information
1. Property Information (all information must be provided):
Andrea and Michael Cawlina
Owner Name(If different from applicant) .
Map 32 Lot 385 42.5007 -70.8882
Tax Assessor's Map and Parcel Numbers Latitude Longitude
417 Lafayette Street, Salem MA 01970
Street Address and Cityrrown State Zip Code
2. Registered Land ❑ Yes ® No
3. Name of the water body where the project site is located:
Salem Harbor
4. Description of the water body in which the project site is located (check all that apply):
Type Nature Designation
❑ Nontidal river/stream ® Natural ❑ Area of Critical Environmental Concern
® Flowed tidelands ❑ Enlarged/dammed ❑ Designated Port Area
❑ Filled tidelands ❑ Uncertain ❑ Ocean Sanctuary
❑ Great Pond ❑ Uncertain
❑ Uncertain
CH91App.doc•Rev.08/13 Page of 13
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Waterways Regulation Program X264632
Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No.
Water-Dependent,Nonwater-Dependent,Amendment
C. Proposed Project/Use Information (cont.)
Select use(s)from
Project Type Tawe 5. Proposed Use/Activity description
on pg.tru tions°of the
'Instructions" Install new elevated pier, ramp and float
6. What is the estimated total cost of proposed work(including materials &labor)?
$15,000+/-
7. List the name&complete mailing address of each abutter(attach additional sheets, if necessary).An
abutter is defined as the owner of land that shares a common boundary with the project site, as well
as the owner of land that lies within 50' across a waterbody from the project.
Philip and Carole Moran 415 Lafayette Street, Salem, MA 01970
Name Address
John & Garcia Brennan 419 Layette Street, Salem, MA 01970
Name Address
Name Address
D. Project Plans
1. I have attached plans for my project in accordance with the instructions contained in (check one):
® Appendix A(License plan) ❑ Appendix B (Permit plan)
2. Other State and Local Approvals/Certifications
❑ 401 Water Quality Certificate
Date of Issuance
® Wetlands 64-577
File Number
❑ Jurisdictional Determination JD-
File Number
❑ MEPA
File Number
❑ EOEA Secretary Certificate
Date
❑ 21 E Waste Site Cleanup
RTN Number
CH91App.doc°Rev.08/13 Page 3 of 13
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Waterways Regulation Program x284832
Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No.
Water-Dependent,Nonwater-Dependent,Amendment
E. Certification
All applicants, property owners and authorized agents must sign this page. All future application
correspondence may be signed by the authorized agent alone.
"I hereby make application for a permit or license to authorize the activities I have described herein. Upon
my signature, I agree to allow the duly authorized representatives of the Massachusetts Department of
Environmental Protection and the Massachusetts Coastal Zone Management Program to enter upon the
premises of the project site at reasonable times for the purpose of inspection."
"I hereby certify that the information submitted in this application is true and accurate to the best of my
knowledge."
2-20-15
Applicant's signafu— _ ! Date
Property Owner's signature(if different than applicant) Date
2-20-15
e�
Agent's signat a(if applicable} Date
CH91App.doc•Rev.08/13 Page of 13
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Waterways Regulation Program x264832
Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No.
Water-Dependent,Nonwater-Dependent,Amendment
F. Waterways Dredging Addendum
1. Provide a description of the dredging project Not Applicable — No dredging
❑ Maintenance Dredging (include last dredge date &permit no.) ❑ Improvement Dredging
Purpose of Dredging
2. What is the volume (cubic yards) of material to be dredged?
3. What method will be used to dredge?
❑ Hydraulic ❑ Mechanical ❑ Other
4. Describe disposal method and provide disposal location (include separate disposal site location map)
5. Provide copy of grain size analysis. If grain size is compatible for beach nourishment purposes, the
Department recommends that the dredged material be used as beach nourishment for public
beaches. Note: In the event beach nourishment is proposed for private property, pursuant to 310
CMR 9.40(4)(a)1, public access easements below the existing high water mark shall be secured by
applicant and submitted to the Department.
CH91 App.doc-Rev.Da/13 Page 5 of 13
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Waterways Regulation Program MUM
Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No.
Water-Dependent,Nonwater-Dependent,Amendment
H. Municipal Planning Board Notification
Noticeto Andrea and Michael Cawlina -
Applicant: Name of Applicant
Section H should 417 Lafayette Street Salem Harbor Salem
be completed and Project street address Waterway city/rown
submitted along
with the original Description of use or change in use:
application material.
Install a new pier, ramp and float for private recreational use. The project has an order of conditions
To be completed by municipal clerk or appropriate municipal official:
"I hereby certify that the project described above and more fully detailed in the applicant's waterways
license application and plans have been submitted by the applicant to the municipal planning board."
Printed Name of Municipal Official Date
Signature of Municipal Official Title Cityrrown.
Note: Any comments, including but not limited to written comments, by the general public, applicant,
municipality, and/or an interested party submitted after the close of the public comment period
pertaining to this Application shall not be considered, and shall not constitute a basis for standing in
any further appeal pursuant to 310 CMR 9.13(4)and/or 310 CMR 9.17.
CH91 App.doc•Rev.08/13 Page 7 of 13
Correspondence to Municipal Zoning Department
Wetlands & Land Management, Inc. 100 conifer Hill Drive-a516
Danvers.MA 01923 .
978-777-0004 Telephone
9
February 17. 2015 78-539-0005 FAX
Thomas St.Pierre
Inspectional Services Director
Salem City Hall
120 Washington Street
Salem.MA 01970
RE: Chapter 91 License application for 417 Lafavette Street
b3stallation of a new pier. seasonal gangway.and float
Dear Mr. St.Pierre:
The applicants,Andrea and Michael Cawlina have submitted a Chapter 91 License application to
the DEP Department of Waterways. The Chapter 91 application is for installation of a new pier,
ramp and float for private recreational use.
One behalf of the applicant;we have already filed with the Conservation Commission and
secured an order of conditions which is attached with this application.
The application recuires a certification from the Municipal Zoning Official. Please endorse the
appropriate form as indicated by the yellow tag. Would you contact me whether any comments
will be issued and when the endorsed certificate is available.
Sincerely,
Wetlands &Land Management, Inc.
William J. Manuell
For the Applicant
Correspondence to Municipal Planning Department
Wetlands & Land Mannement, Inc. 100 Conifer Hill Drive-0516
Danvers,MA 0192;
978-777-0004 Telephone
978-539-0005 FAX
February 17, 2015
Lynn Goonin Duncan, AICP
Director—Department of Planning and Community Development
Salem City Hall
120 Washington Street
Salem, MA 01970
RE: Chapter 91 License application for 417 Lafayette Street
Installation of a new pier, seasonal gangway, and float
Dear Madame Director:
The applicants, Andrea and Michael Cawlina have submitted a Chapter 91 License
application to the DEP Department of Waterways. The Chapter 91 application is for
installation of a new pier, ramp and float for private recreational use.
One behalf of the applicant, we have already filed with the Conservation Commission
and secured an order of conditions which is attached with this application.
The application requires a.certification from the Municipal Planning Official. Please
endorse the appropriate form as indicated by the yellow tag. Would you contact me
whether any comments will be issued and when the endorsed certificate is available.
Sincerely,
Wetlands& Land Management, Inc-
,
r
�xTilliam I Manueli
For the: Applicant
Order of Conditions
�Iln�I�I�I�I�IIIII0I�III�IN� '.
2014110500242 Bk;33654 Pg;14
1110512014 01:20 Cotmtd Pa 1118
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands 64-577
WPA Form 5 — Order of Conditions MaUDEP File
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 ZEPTransaction#
Salem
cityrrown
A. General information
Please note: Salem
beenrm has t.From. Conservation Commission
been =has
with added 2.This issuance is for
space to a.®Order of Conditions b.❑Amended Order of Conditions
accommodate (check one):
the Registry
of Deeds 3. To: Applicant:
Requirements
Michael J. and Andrea Cawlina
Important: a. First Name to.Last Name
When filling
out forts on a Organization
the 417 Lafayette Street
i computer, -
use only the d.Mailing Address
tab key to Salem MA 01970
move your e. Ctty/Town L StateZI C
cursor-do 9 P ode
not use the 4. Property Owner(if different from applicant):
return key.
r rat a.First Name h.Last Name
I c.Organization
I real
c.Mailing Address
i
e.Citylrown f.State g.Zip Code
5. Project Location:
417 Lafayette Street Salem
a.Street Address b.Cdyrrown
i 32 385
c.Assessors Map/Plat Number d.Parcel/Lot Number
Latitude and Longitude, if known: d m s d m s
d.Latitude e.Longitude
wpefmm5.dac, rev.07/22/2014
` Page i of 12
i
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection=Wetlands 64-577
WPA Form 5 -Order of Conditions M=DEP File
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
Chyfrown
A. General Information (cont.)
s. Property recorded at the Registry of Deeds for(attach additional information if more than
one parcel):
South Essex
a.County b.Certlgcate Number(If registered land)
32737 542
c.Book d.Page
7. Dates: 9/812014 10123/2014 - 10/28/2014
a.Date Notice of Intent Filed b.Date Public Hearing Closed a Date of Issuance
e. Final Approved Pians and Other Documents(attach additional plan or document references
as needed):
See attached
a.Plan Title
b.Prepared By c.Signed and Stamped by
d.Final Revision Date e.Scale
f.Additional Plan or Document Title g.Date
B. Findings
i f. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information
provided in this application and presented at the public hearing,this Commission finds that
the areas in which work is proposed is significant to the following interests of the Wetlands
Protection Act(the Act). Check all that apply:
a. ❑ Public Water Supply b. ® Land Containing Shellfish ` ® Prevention of
Pollution
d. ❑ Private Water Supply e. f. Z Protection of
pp y ® Fisheries Wildlife Habitat
g. ® Groundwater Supply n. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project, as proposed, is:(check one of the following boxes)
i
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance
standards set forth in the wetlands regulations.This Commission orders that all work shall
be performed in accordance with the Notice of Intent referenced above,the following
General Conditions, and any other special conditions attached to this Order.To the extent
that the following conditions modify or differ from the plans, specifications, or other
proposals submitted with the Notice of Intent, these conditions shall control.
I
"fm 5.Onc• rev.07/2212014 Page 2 of 12
i
Massachusetts Department of Environmental Protection Prodded by MassDEP:
Bureau of Resource Protection -Wetlands 64-577
WPA Form 5 — Order of Conditions Mea8°EPFile
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPTransaction9
Salem
CWrown
B. Findings (cont.)
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth
in the wetland regulations.Therefore,work on this project may not go forward unless and
until a new Notice of Intent is submitted which provides measures which are adequate to
protect the interests of the Act,and a final Order of Conditions is issued.A description of
the performance standards which the proposed work cannot meet is attached to this
Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site,the work,
or the effect of the work on the interests identified in the Wetlands Protection Act.
Therefore,work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides sufficient information and includes measures which are
adequate to protect the Act's interests, and a final Order of Conditions is issued. A
description of the specific information which is lacking and why it is necessary is
attached to this Order as per 310 CMR 10.05(6)(c).
s. ❑ Buffer Zone Impacts: Shortest distance between limit of project
disturbance and the wetland resource area specified in 310 CMR 10.02(1)(a) a.linear feet
Inland Resource Area impacts: Check all that apply below. (For Approvals Only)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. ❑ Bank a.linear feet b.linear feet c.linear feet d.linear feet
5. ❑ Bordering
Vegetated Wetland a.square feet b.square feet c.square feet d.square feet
s. ❑ Land Under
Waterbodies and a.square feet b.square feet c.squarefeet d.square feet
Waterways
e.Gy dredged f.rJy dredged
7. ❑ Bordering Land
Subject to Flooding a.square feet In.square feet c.square feet d.square feet
Cubic Feet Flood Storage e.cubic feet f.cubic feet g,cubic feet h.cubic feet
P. ❑ Isolated Land
Subject to Flooding a.square feet b.square feet
pubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet
g. ❑ Riverfront Area
a.total sq.feet b.total sq.feet
Sq ft within 100 ft
c.square feet d.square feet e.square feet f.square feet
Sq ft between 100-
200 it g.square feet h.square feet i.square feet j.square feet
wpaform5.tloc• rev.072212014 - Page3 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands 64-577
WPA Form 5 Order of Conditions_ NlessDEPFile#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPTransaclionu
Salem
cityfrown
B. Findings (cont.)
Coastal Resource Area Impacts:Check all that apply below. (For Approvals Only)
Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
10. E) Designated Port
Areas Indicate size under Land Under the Ocean, below
1f. ❑ Land Underthe
Ocean a.square feet b.square feet
c.rJy dredged d.rJy dredged
1z. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes
below
13. ® Coastal Beaches 12 12 Cu yd cu yd
a.square feet b.square feet c.nourishment d.nourishment
14. ❑ Coastal Dunes cu yd cu yd
a.square feet b.square feet c.nourishment d.nourishment
75 75
15. ® coastal Banks a.linear feet b.linear feet
16. ❑ Rocky Intertidal
Shores a.square feet b.square feet
17. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet
18. ❑ Land Under Salt
Ponds a.square feet b.square feet
a cfy dredged d.Uy dredged
19: ❑ Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
20. ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under
the Ocean,and/or inland Land Under Waterbodies and
Waterways, above
i
I
a.cly dredged b.dy dredged
21. ® Land Subject to 1800 1800
Coastal Storm a.square feet b.square feet
Flowage
I
i
wpafarm5.doc- rev.07222014
Page o(12
Massachusetts Department of Environmental Protection Provided by massOER
Bureau of Resource Protection -Wetlands 64-577
WPA Form 5 - Order of Conditions Ma85°EPFile#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 ZEPTransacdon#
Salem
Cityrrown .
B. Findings (cont.)
#22.If the
project is for 22. 5Restoration/Enhancement': -
the purpose of
resto Ing or 325
enhancing a e.square feet of BVW b.square feet of salt marsh
wetland
resource area 23• ❑ Stream Crossing(s):
in addition to
the square
footage that a.number of new stream crossings D.number of replacement stream crossings
has been
entered in C. General Conditions Under Massachusetts Wetlands Protection Act
I
Section B.5.c
(BV
cj(Salt The following conditions are only applicable to Approved projects.
Marsh)above, Failure to comply with all conditions stated herein,-and with all related.statutes and other
please enter UlatO
the additional re 9 ry measures, shall be deemed cause to revoke or modify this Order.
amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying
with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this
Order unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act, or
b. the time for completion has been extended to a specified date more than three years,
but less than five years, from the date of issuance. If this Order is intended to be valid
for more than three years,the extension date and the special circumstances warranting
the extended time period are set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three
years each upon application to the issuing authority at least 30 days prior to the expiration
date of the Order.
B. If this Order constitutes an Amended Order of Conditions, this Amended Order of
Conditions does not extend the issuance date of the original Final Order of Conditions and
it
the Order will expire on 10/28/2017 unless extended in writing by the Department.
7. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash,
refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster,wire, lath,
paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the
foregoing.
8. This Order is not final until all administrative appeal periods from this Order have elapsed,
I or if such an appeal has been taken, until all proceedings before the Department have been
completed.
wp&..S.ao.- rev.WrM014
Page 50112
i
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands 64-577
WPA Form 5 - Order of Conditions MassDEP He#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40, eoEPTransactionn
i Salem
Cltyrrown
C. General Conditions Under Massachusetts Wetlands Protection Act(cont.)
9. No work shall be undertaken until the Order has become final and then has been recorded
in the Registry of Deeds or the Land Court for the district in which the land is located,within
the chain of title of the affected property. In the case of recorded land, the Final Order shall
also be noted in the Registry's Grantor Index under the name of the owner of the land upon
which the proposed work is to be done.In the case of the registered land, the Final Order
shall also be noted on the Land Court Certificate of Title of.the owner of the land upon
which the proposed work is done.The recording information shall be submitted to the
Conservation Commission on the form at the end of this Order, which form must be
stamped by the Registry of Deeds, prior to the commencement of work.
10. A sign shall be displayed at the site not less then two square feet or more than three
square feet in size bearing the words,
"Massachusetts Department of Environmental Protection"[or, "MassDEP"]
"File Number 64-577 "
11. Where the Department of Environmental Protection is requested to issue a Superseding
Order, the Conservation Commission shall be a party to all agency proceedings and
hearings before MassDEP.
12. Upon completion of the work described herein, the applicant shall submit a Request for
Certificate of Compliance(WPA Form BA)to the Conservation Commission.
13. The work shall conform to the plans and special conditions referenced in this order.
14. Any change to the plans identified in Condition#13 above shall require the applicant to
inquire of the Conservation Commission in writing whether the change is significant enough
to require the filing of a new Notice of Intent.
15. The Agent or members of the Conservation Commission and the Department of
I Environmental Protection shall have the right to enter and inspect the area subject to this
Order at reasonable hours to evaluate compliance with the conditions stated in this Order,
and may require the submittal of any data deemed necessary by the Conservation
Commission or Department for that evaluation.
16. This Order of Conditions shall apply to any successor in interest or successor in control of
the property subject to this Order and to any contractor or other person performing work
conditioned by this Order.
17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated
Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be
marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall
be maintained until a Certificate of Compliance has been issued by the Conservation
Commission.
w afon .dn-I.V.071222014
Page6ot 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of.Resource Protection-Wetlands 64-577
WPA Form 5 Order of Conditions MawDEP File
Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 eDEPTransaction�
Salem
..
city/Town
C. General Conditions Under Massachusetts Wetlands Protection Act(cont.)
18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have
been fully stabilized with vegetation or other means.At no time shall sediments be
deposited in a wetland or water body. During construction,the applicant or his/her designee
shall inspect the erosion controls on a daily basis and shall remove accumulated sediments
as needed.The applicant shall immediately control any erosion problems that occur at the
site and shall also immediately notify the Conservation Commission,which reserves the
right to require additional erosion and/or damage prevention controls it may deem
necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS
19. The work associated with this Order(the"Project")(1)❑ is(2)® is not subject to the
Massachusetts Stormwater Standards. if the work is subject to the Stormwater
Standards,then the project is subject to the following conditions:
a) All work, including site preparation, land disturbance, construction and redevelopment,
shall be implemented in accordance with the construction period pollution prevention and
erosion and sedimentation control plan and, if applicable,the Stormwater Pollution
Prevention Plan required by the National Pollution Discharge Elimination System
Construction General Permit as required by Stormwater Condition 8. Construction period
erosion, sedimentation and pollution control measures and best management practices
(BMPs) shall remain in place until the site is fully stabilized.
b) No stormwater runoff may be discharged to the post-construction stormwater BMPs
unless and until a Registered Professional Engineer,provides a Certification that:
i. all construction period BMPs have been removed or will be removed by a date certain
specified in the Certification. For any construction period BMPs intended to be converted
to post construction operation for stormwater attenuation, recharge, and/or treatment, the
conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that
the BMF has been properly cleaned or prepared for post construction operation, including
removal of all construction period sediment trapped in inlet and outlet control structures;
ii. as-built final construction BMP plans are included, signed and stamped by a Registered
Professional Engineer, certifying the site is fully stabilized;
N. any illicit discharges to the stormwater management system have been removed, as per
the requirements of Stormwater Standard 10;
iv. all post-construction stormwater BMPs are installed in accordance with the plans
(including all planting plans)approved by the issuing authority, and have been inspected to
ensure that they are not damaged and that they are in proper working condition;
v. any vegetation associated with post-construction BMPs is suitably established to
withstand erosion.
Waform5.doc• rev.OMV2014
. Page 7af 12
• I
Massachusetts Department of Environmental Protection Provided by MasaDEP:
Bureau of Resource Protection-Wetlands 64-577
WPA Form 5 - Order of Conditions MasaDEP Fa u
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 ZEPTransacuon#
Salem
cnyrrmn
C. General Conditions Under Massachusetts Wetlands Protection Act(cont.)
I, c) The landowner is responsible for BMP maintenance until the issuing authority is notified
that another party has legally assumed responsibility for BMP maintenance. Prior to
requesting a Certificate of Compliance,or Partial Certificate of Compliance,the responsible
party(defined in General Condition 18(e))shall execute and submit to the issuing authority
an Operation and Maintenance Compliance Statement("O&M Statement)for the
Stormwater BMPs identifying the party responsible for implementing the stormwater BMP
Operation and Maintenance Plan (e0&M Plano)and certifying the following: i.)the O&M
Plan is complete and will be implemented upon receipt of the Certificate of Compliance,
and ii)the future responsible parties shall be notified in writing of their ongoing legal
responsibility to operate and maintain the stormwater management BMPs and implement
i the Stormwater Pollution Prevention Plan.
d) Post-construction pollution prevention and source control shall be implemented in
accordance with the long-term pollution prevention plan section of the approved
Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by
the National Pollution Discharge Elimination System Multi-Sector General Permit
e) Unless and until another party accepts responsibility, the landowner,or owner of any
drainage easement, assumes responsibility for maintaining each BMP. To overcome this
presumption,the landowner of the property must submit to the issuing authority a legally
binding agreement of record, acceptable to the issuing authority, evidencing that another
entity has accepted responsibility for maintaining the BMP, and that the proposed
responsible party shall be treated as a permittee for purposes of implementing the
requirements of Conditions.18(f)through 18(k)with respect to that BMP. Any failure of the
proposed responsible party to implement the requirements of Conditions 18(f)through
18(k)with respect to that BMP shall be a violation of the Order of Conditions or Certificate
of Compliance. In the case of stormwater BMPs that are serving more than one lot, the
legally binding agreement shall also identify the lots that will be serviced by the stormwater
BMPs. A plan and easement deed that grants the responsible party access to perform the
required operation and maintenance must be submitted along with the legally binding
agreement.
f) The responsible party shall operate and maintain all Stormwater BMPs in accordance
with the design plans, the O&M Plan, and the requirements of the Massachusetts
Stormwater Handbook.
wpatorm5.doc• rev.07/2112014 Pape Sof 12
i
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands 54-577
WPA Form 5 Order of Conditions r#assDEPFile#
Massachusetts Wetlands Protection Act M.G.L. c. 131,§40 eDEPTransacGon#
Salem
cayrrom
C. General Conditions Under Massachusetts Wetlands Protection Act(cont.)
g) The responsible party shall:
1. Maintain an operation and maintenance log for the last three(3)consecutive
calendar years of inspections, repairs, maintenance and/or replacement of the
stormwater management,system or any part thereof, and disposal(for disposal the
log shall indicate the type of material and the disposal location);
2. Make the maintenance log available to MassDEP and the Conservation
Commission ("Commission")upon request; and
3. Allow members and agents of the MassDEP and the Commission to enter and
inspect the site to evaluate and ensure that the responsible party is in compliance
with the requirements for each BMP established in the ORM Plan approved by the
issuing authority.
h) All sediment or other contaminants removed from storrnwater BMPs shall be disposed
of in accordance with all applicable federal, state, and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04
are prohibited.
j) The stormwater management system approved in the Order of Conditions shall not be
changed without the prior written approval of the issuing authority.
k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site
Design Credit(as defined in the MassDEP Stormwater Handbook,Volume 3, Chapter 1,
Low Impact Development Site Design Credits)shall not be altered without the prior written
approval of the issuing authority.
1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld.
Any fencing constructed around stormwater BMPs shall include access gates and shall be
at least six inches above grade to allow for wildlife passage.
Special Conditions (if you need more space for additional conditions, please attach a text
document):
i
werf=5.doc- rev.0712MO14
Pelle 9 d 12
Massachusetts Department of Environmental Protection Provided try MaWDEP:
Bureau of Resource Protection -Wetlands 64-5TT
W 'A Form 5 - Order of Conditions MM.DEPRe#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Salem
. City/town
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes . ❑ No
2. The Salem hereby finds(check one that applies):
Conservation Commission -
a. ❑that the proposed work cannot be conditioned to meet the standards set forth in a
municipal ordinance or bylaw,specifically:
1.Municipal Ordinance or Bylaw 2.Citation
Therefore,work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides measures which are adequate to meet these
standards, and a final Order of.Conditions is issued.
b. ®that the following additional conditions are necessary to comply with a municipal
ordinance or bylaw:
Wetlands Protection &Conservation Ordinance ch. 50
1.Municipal Ordinance or Bylaw 2.Citation
3. The Commission orders that all work shall be performed in accordance with the following
conditions and with the Notice of Intent referenced above. To the extent that the following
conditions modify or differ from the plans, specifications, or other proposals submitted with
the Notice of Intent,the conditions shall control.
The special conditions relating to municipal ordinance or bylaw are as follows(if you need
more space for additional conditions, attach a text document):
The attached conditions are issued under the Wetlands Protection Act and are sufficient for
compliance with the local ordinance.
i
i
i
I
i
i
I
I
I
wpafo=5.doc• rev.07/222014 Page 10 of 12
i
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection-Wetlands Zf-S?-7
WPA Form 5 - Order of Conditions MasaDEPFile#
Massachusetts Wetlands Protection Act M.G.L. C. 131, §40 eDE rTransadon;
c ty/rown
E. Signatures
rl ng out fo msan This Order is valid for three years,unless otherwise specified as a specialt a
on the computer, condition pursuant to General Conditions#4,from the date of issuance, t.USES of is anog
use only the tab Please indicate the number of members who will sign this form.
key to move your This Order must be signed by a majority of the Conservation Commission. 2.N f Signers
cursor-do not
use the return The Order must be mailed by certified mail(return receipt requested)o han all er
key. the applicant. A copy must be mailed, hand delivered or filed electroni lly s m
with the a propriate MassDEP Re i al Office.
Signa r
F
by hand elivery on ❑ by certified mail, return receipt
z���� /�� requested, on
Dam Date
E. Appeals
The applicant, the owner, any person aggrieved by this Order,any owner of land abutting
the land subject to this Order, or any ten residents of the city or town in which such land is
located, are hereby notified of their right to request the appropriate MassDEP Regional
Office to issue a Superseding Order of Conditions. The request must be made by certified
mail or hand delivery to the Department,with the appropriate filing fee and a completed
Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)
within ten business days from the date of issuance of this Order. A copy of the request shall
at the same time be sent by certified mail or hand delivery to the Conservation Commission
and to the applicant, if he/she is not the appellant.
Any appellants seeking to appeal the Department's Superseding Order associated with this
appeal will be required to demonstrate prior participation in the review of this project. Previous
participation in the permit proceeding means the submission of written information to the
Conservation Commission prior to the close of the public hearing, requesting a
Superseding Order, or providing written information to the Department prior to issuance of
a Superseding Order.
The request shall state clearly and concisely the objections to the Order which is being
appealed and how the Order does not contribute to the protection of the interests identified
in the Massachusetts Wetlands Protection Act(M.G.L. c. 131, §40), and is inconsistent
with the wetlands regulations(310 CMR 10.00).To the extent that the Order is based on a
municipal ordinance or bylaw,and not on the Massachusetts Wetlands Protection Act or
regulations,the Department has no appellate jurisdiction.
W.5sigs.doc r.v.02/2512010 - /
Pageuol r�
I
Attacbment to Order of Conditions#64-577
Pagel of 5
SALEM CONSERVATION COMMISSION
DEP FILE#64-577
417 Lafayette Street
iCity of Salem,Massachusetts
ADDITIONAL FINDINGS
Based on the Estimated Habitats of Rare Wildlife and Certified Vernal Pools Map(9/18/2014,online)from Natural
Heritage&Endangered Species Program(NHESP) of the Massachusetts Division of Fisheries and Wildlife,it
been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contain any
vernal pools.
This Order permits the construction of a new pier, gangway, and float, and repair of an existing wall per 9/8/2014
Notice of Intent and approved plans. Because area labeled Coastal Beach on the 9/8/2014 plan submitted with the
Notice of Intent is likely degraded salt marsh, the applicant will restore 325 feet of salt marsh in this area.
Restoration will be implemented in accordance with Bill Manuell's 10/8/2014 letter.
i
GENERAL CONDITIONS
I. This Order of Conditions must be recorded in its entirety(including all 5 pages of Special Conditions)
at the Essex County Registry of Deeds or the Land Court for the district in which the land is located,
after the expiration of the 10-day appeal period and within 30 days of the issuance. A copy of the
recording information must be submitted to the Salem Conservation Commission before any
work approved in this Order commences.
2. Approval of this application does not constitute compliance with any law or regulation other than
M.G.L Chapter 131, Section 40,Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands
Protection Ordinance,Salem Code Chapter 50.
3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No
alteration of wetland resource areas or associated buffer zones,other than that approved in this Order,
shall occur on this property without prior approval from the Commission.
4. Prior to any work commencing on site, a DEP Sign showing DEP File#64-577 must be installed at the
i
entrance to the site and seen from the public way, but not placed on a living tree.
5. No work approved it this Order may continence until the ten(10)day appeal period has lapsed from the
date of the issuance of this Order.
i
6. With respect to this Order,the Commission designates the Conservation Agent as its agent with powers
to act on its behalf in administering and enforcing this Order.
7. The Commission or its Agent,officers,or employees shall have the right to enter and inspect the property at
any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131,
Section 40,the Wetlands Regulations 310 CMR 10.00,and shall have the right to require any data or
documentation that it deems necessary for that evaluation.
Attachment to Order of Conditions#64-577
Page 2 of 5
8. The term"Applicard"as used in this Order of Conditions shall refer to the owner,any successor in
interest or successor in control of the property referenced in the Notice of intent,supporting documents
and this Order of Conditions. The Commission shall be notified in writing within 30 days of all
transfers of title of any portion of the,pmperty that takes place prior to issuance of the Certificate of
Compliance.
9. It is the responsibility of the applicant to procure all other applicable federal,state and local permits and
approvals associated with this project. These permits may include but are not necessarily limited to the
following:
(1) Section 404 of the Federal Water Pollution Control Act(P.L.92-500, 86 stat. 816),U.S.Army
Corps of Engineers.
(2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority
of sec.27(5)of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00.
(3) Sewer Extension Permit from the DEP Division of Water Pollution Control under G.L.Ch.21A ss7
and 314 CMR 7.00. Any Board of Health permit for septic system design for any portion of the
septic system within 100 feet of wetlands shall be submitted to the Commission prior to
construction initiation.
(4) Design Requirements for Construction in Floodplains under the State Building Code(780 CMR
744.).
10. If there are conflicting conditions within this Order,the stricter condition(s)shall rule.
! 11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and
surface waters during construction or after completion of the project.
12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods
and boundary during construction if necessary.
13. The Commission reserves the right to impose additional conditions on portions of this project or this site
to mitigate any actual or potential impacts resulting from the work herein permitted.
l
14. The work shall conform to the following attached plans and special conditions:
Final Approved Pians
Site PIan tc Accompany a Notice of Intent Application for the construction of a new
Pier/Gangway/Float and the repair/re-pointing of an existing Seawall for an Existing Single-
Family House located at#417 Lafayette Street, Salem,Massachusetts
(Title)
10/5/20I4
(bated)
Scott Ian Patrowicz
(Signed and Stamped by)
City of Salem Conservation Commission
(On file wilt) .
15. Any proposed changes in the approved plan(s)or any deviation in construction from the approved
pian(s)shall require the applicant to file a Notice of Proiect Change with the Commission. The Notice
shall be accompanied by a written inquiry prior to their implementation in the field,as to whether the
change(s)is substantial enough to require filing a new Notice of Intent or a request to correct or amend
Attachment to Order of Conditions#64-577
Page 3 of 5
this Order of Conditions. A copy of such request shall at the same time be sent to the Department of
Environmental Protection.
16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has
been issued,the applicant or current landowner shall submit to the Commission a statement signed by the
i buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of
the Order of Conditions.
17. Conditions#43 and#44 are perpetual conditions that remain in effect beyond the issuance of a certificate of
compliance.
PRIOR TO CONSTRUCTION
18. Prior to the commencement of any activity on this site other than activities listed above,there
must be a Pre-Construction Meeting on site between the project supervisor,the contractor responsible
for the work,and the Conservation Agent and/or a member of the Conservation Commission to ensure
that the requirements of the Order of Conditions are understood. The staked erosion control he shall be
adjusted,if necessary,during the pre-construction meeting. Please contact the Conservation Agent at
(978)619-5685 at least forty-eight(48)hours prior to construction to arrange for the Pre-
Construction Meeting.
19. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and
erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The
Commission and/or its Agent shall inspect and approve such installation at the pre-construction
meeting.
20. No clearing of vegetation,including trees,or disturbance of soil shall occur prior to the pre-construction
meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre-
construction meeting if absolutely necessary in order to place erosion control stakes where required.
21. There shall be adequate additional erosion and sediment controls stored onsite for emergency purposes.
EROSION CONTROL
22. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction,
and shall be maintained during construction in any wetland resource area and/or buffer zones. The
erosion control measures shown on the approval plan(s)and provisions in the Order will be the minimum
standards for this project;the Commission or its Agent may require additional measures.
All debris;fill and excavated material shall be stockpiled a location far enough away from the wetland
resource areas to prevent sediment from entering wetland resource areas.
24. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or
replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed.
25. The area of construction shall remain in a stable condition at the close of each construction day.
26. Any de-watering of trenches or other excavation required during construction shall be conducted so as
to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered
through straw bale sediment traps, silt filter bags or other means approved by the Commission or its
Administrator.
Attachment to Cadet of Conditions#64-577
i Page 4 of 5
27: Within thirty(30)days of completion of construction on any given portion of the project,all disturbed
areas in the completed portion of the site shall be permanently stabilized with rapidly growing
vegetative cover,using sufficient top soil to assure long-term stabilization of disturbed areas.
28. If soils are to be disturbed for longer than two(2)months,a temporary cover of rye or other grass
should be established to prevent erosion and sedimentation. If the season is not appropriate for plant
growth,exposed surface shall be stabilized by other appropriate erosion control measures,firmly
I anchored,to prevent soils from being washed by rain or flooding.
DURING CONSTRUCTION
29. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all
times when work is in progress.
30. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on
the approved plan(s).
31. All waste products,grubbed stumps,slash;construction materials,etc.shall be deposited at least 100 feet
from wetland resource areas and 200 feet from river.
32. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage
system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be
immediately removed.
33. All exposed sub-soils shall be covered by a minimum of three(3)inches of quality screened loam topsoil
prior to seeding and final stabilization.
34. Immediately following drainage structure installation all inlets shall be protected by silt fence,strawbale
barriers and/or silt bags to filter silt from stormwater before it enters the drainage system.
35. There shall be no pumping of water from wetland resource areas.
I
36. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other
components shall be fixed immediately.
37. During construction,all drainage structures shall be inspected regularly and cleaned as necessary.
38. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance
of enforcement actions by the Conservation Commission including,but not limited to,civil administrative
penalties under M.G.L Chapter 2 iA,section 16.
i
I AF'T'ER CONSTRUCTION
i
3Q. Upon completion of construction, and final soil stabilization,the applicant shall submit the following to
the Conservation Commission to request a Certificate of Compliance(COC):
(1) A Completed Request for a Certificate of Compliance form (WPA Form 8A or other form if
required by the Conservation Commission at the time of request).
(2) A letter from a Registered Professional Engineer certifying compliance of the property with this
Order of Conditions.
(3) An "As-Built"plan signed and stamped by a Registered Professional Engineer or Land Surveyor
showing post-construction conditions within all areas under the jurisdiction of the Massachusetts
Wetlands Protection Act. This plan shall include at aminimum:
Attachment to Order of Conditions#64.577
Page 5 of .5
(a) All wetland resource area boundaries with associated buffer zones and regulatory setback
arras taken from the plan(s)approved in this.Order of Conditions;
(b) Locations and elevations of all stormwater management conveyances,structures and best
management designs,including foundation drains,constructed under this Order within any
wetland resource area or buffer zone;
(c) Distances from any structures constructed under this Order to wetland resource areas-
"structures"include,but are not limited to,all buildings,septic system components,wells,
utility lines,fences,retaining walls,and roads/driveways;
(d) A line delineating the limit of work-',wore'includes any filling,excavating and/or
disturbance of soils or vegetation approved under this Order;
40. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds
and a copy of the recording submitted to the Salem Conservation Commission.
41. If the completed work differs from that in the original plans and conditions,the report must specify how
the work differs;at which time the applicant shall first request a modification to the Order. Only upon
review and approval by the Commission,may the applicant request in writing a Certificate of
Compliance as described above.
I
42. Erosion control devices shall remain in place and properly functioning until all exposed soils have been
stabilized with final vegetative cover and the Conservation Commission and/or its Agent has authorized
their removal.
I
PERPETUAL CONDITIONS
43. Under no circumstances may a float be stored on the beach or salt marsh.
44. Nothing may be stored in the resource area beneath the new pier or gangway.
i
i
i
FOR REGISTRY USE I, HEREBY CERTIFY THAT THIS PLAN WAS -
PREPARED IN ACCORDANCE WITH THE
RULES AND REGULATIONS OF THE REGISTRY
OF DEEDS.
Scott Inn Patrowicz, P.E.
2��P�tH OF M4SS9P
p SCOTT IAN SG _
g PATROWIcz m
. c CML
No.33656
. . 9FGl PCO
IAL
0 - 20 40Forest River
Salem po*
a
1" = 40'. st usul
�ros fi
GRAPHIC SALEM
SCALES (HARBOR {;
#415 LAFAYETTE ST.
PHILIP-D. MORAN Marbl ead
MAP 32, LOT 384
LVIiVS
#417 LAFAYETTE ST. LOCUS PLAN
MICHAEL J. &ANDREA CAWLINA
MAP 32, IAT 385 ._ _ a, 2000'
\ _ j
\ - - .
_
4419A LAFAYETTE ST SITE PLAN . _ -
JOHN W. DRENNAN - DAVM: MLW=0.0
MAP 32, LOT 386
—
�. ;94,
COASTAL BANK
(top of ex.seawall) - - -PIER-._._._ ___ _- j
w/STEPS
3-
13'MEAN __-pn---
HIGH WATER exhtr�." ROSS BEAM FOR
(approximate line) ,n --_--- D en wau GANGWAY
Wt more' —••1„� sandy beach _-- HOISTING
grasses _
aWa. aea-� erc � MECHANISM
el
-""-----edge of mud
FLOAT_IS CONNECTED TO FOUR
�6 PILES, SO THA1 1T DOES-NOT
,- MOVE MUGH--HORIZONTALLY,
PROPOSED FLOAT (3'TOTAL. HEIGHT: _LADDER---BUT DOES SLIDE UP & bOWN1
2'HIGH PLASTIC FLOATATION DRUMS & (Wth-the-tides) - ---
---
THIGH DECKING) A
-- --- -- -- ----- �
Tidal mud flats
MEAN LOW WATER .A'
(approxi to line)
N i
SALEM HARBOR
Date: 2/24/15
Sheet 1 of 2
PLANS ACCOMPANYING, PETITION OF
Michael J. & Andrea Cawlina
for the construction of a pier, gangway &
a float (secured to four piles)
located at:
417 Lafayette Street, Salem, Massachusetts
(adjacent to Salem Harbor)
zw
4e
FOR REGISTRY USE I, HEREBY CERTIFY THAT THIS PLAN WAS
PREPARED IN ACCORDANCE WITH THE
RULES-,-SAND REGULATIONS OF THE REGISTRY
DEEDS.
Scott an Patrowicz, P.E.
OF
444sS9c
o$ SCOTT IAN yc
PATROVACZ m
c CML.. -
u 9 No.33656
... . . AL
NOTES:
1. MHW IS LOCATED WITHIN THE SALT MARSH
(as shown on the Site Plan), ELEVATION 8.8
(DATUM: MLW=0.0).
IER_(PT_wood, frame,w/trex decking) 4-PILES ..
REQUIRED (2 up-gradient of the ex.seawall
find-2-in-the sandy oodsf6f tiedch) " o
GANGWAY HOIST (lifting_mechanism3
' mounted on cross beam) � '" �
FlNAL-DESIGN`(to-be-deterrnined_by____._.__
macine..contractor)
_._. F_
..-61+ -L -'
a
i
- FINAL HEIGHTOF PILESPickett
fence (to be-deteFmined by _ mz
EXISTING GRADE 40tLF ALUM.GANGWAY
-
marine-contractor)
— g
- _
(to remain) w
.W Wev:13 75 .._. _
T1r -_ba * TOP OF FLOAT - - 14
III-T1 IIh I'111- -- - -- dudn hi h tide
__ _ ...
11 l 11 i l l 11 l ll 1 1 11 1 1 III ep's»° �.i _ _ f elevation 2 0 ) 13
y TOP OF FLOAT
^ - 12
COASTAL BANK �..
� � ��(during low-tide) "-'- 11
(top of ex.seawall) _i_ r. F- _. -elevation:-10.4-- to
- MEAN HIGH--WATER— s
�o
g.
_� aorto
---INSTALL-STOPS-(so-that 7
EXISTING SEAWALL TO BE eF of Float
REPAIRED ANDRE=POINTED _____the bottom-of the--float
flOat ..._
" �� Shope at elevation:7.4
(approximately 75±LF) coastal l -`during-low--tide,-which-1s- ' - 5
-Beach Salt Marsh \ __. _.more._than.-30-inches.._._ ,- q
(grasses) above the tidal flats .
�7nud
9 0.0 I .
A
zs HORIZONTAL GRAPHIC SCALE j
VERTICAL o o s l0 20 40
GRAPHIC SCALE
1 = 2.5' 0 1" = 10'
1.25
I
2.5 PROFILE VIEW A-A'
DATUM: MLW=0.0
I
Date: 2/24/15
I
Sheet 2 of 2
PLANS ACCOMPANYING PETITION OF
Michael J. & Andrea Cawlina
for the construction of a pier, gangway &
a float (secured to four piles)
located at:
417 Lafayette Street, Salem, Massachusetts
(adjacent to Salem Harbor)
J � CITY u: '.ti' O'FF'ICE
l C aurb of Appvd SALEM. MASS.
MARCH 19, 1980
DECISION ON THE PETITION OF L. KENT SMITH, M.D. REQUESTING A VARIANCE FOR
417 LAFAYETTE STREET
A hearing on this Petition was held on March 19, 1980 with the following
Board Members present: James H. Boulger, Jr. , Chairman, Messrs. Hopper,
LaBrecque, Feeherry and Hacker. Notices of the hearing were sent to abutters
and others and a notice of the hearing was published in the Salem Evening
News on March 5, 1980 and March 12, 1980, in accordance with Massachusetts
General Laws Chapter 40A,
The Petitioner has requested a variance for the property at 417 Lafayette
Street to reduce the minimum lot area below the minimum requirements for an
R-1 district. The property is in an R-1 district where the minimum lot area
is now 15,000 square feet.
The Board of Appeals, after consideration of the evidence presented at
the public hearing and after viewing the property,makes the following findings
of fact:
1. The Petitioner wishes to sell approximately 1,875 square feet of his
property to the owner of adjacent property in order to enlarge the
rear yard of the adjacent property.
2. The proposed sale will reduce the size of the Petitioner' s property
to below the minimum lot size in an R-1 district.
On the basis of the above findings of fact, and the evidence presented at
the public hearing, the Board of Appeals concludes as follows: .
(1) The proposed sale of 1,875 square feet of the Petitioner's property
involves land which, because of its topography, should be properly
added to the property of the adjacent owner in order to be fully
utilized,
(2) The conditions described above especially affect the land in question
but do not generally affect the zoning district in which the land is
located.
(3) The conditions described above affect the land in question, but not
the zoning district generally.
(4) The desired variance may be granted without substantial detriment
to the public good.
Therefore, the Board of Zoning Appeals unanimously voted in favor of granting
the requested relief. The Board grants a variance to the Petitioner on the
following terms. and conditions: '
1. The Petitioner is granted a variance from minimum lot size in a R-1
district.
2. No structures can be constructed on the 1,875 square feet of land sold
to the adjacent owner.
Anthony M./ eeherry
� P;r, T s.: rl n ,,�:- Acting Secretary
PU?S:.Si 9 . 6� . .,!" L ' _.'. E? . ` ., ^1 -. . ._ p? .;:•° 0? S?ELS 1. ::ilT
GA I^ A C'-
U -ir C!;;O .`i.',O r •i:RT• -
FICAT:CiI V .ti_ .,c i'! UER;( !Pr `AFo F _ ,. r3E ...=_:�i li 'S 9Es i F.:
OR 7II47. G S ".':i .. ?'rE`-.I_ V,IS CE F': F::Ef)i:iAT T. :Il y: .._Yil D!S;I:SSED OR C0NED 1$
RECORDED IN THE SCU7ti ESSE. RcS!Si.',Y OF i.E O At:D :i..iE:(=D UiiDE? THE b:.A%IE OF TBE C'iliiER .
OF RECORD OR IS RECORDED A:iD NOTED ON 6 OWP:L J CcRiI;KATE Ur' TITLE. -
BOARD OF APPFAC -
A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK